| S.No |
Project Name |
Tender No |
Tender Date |
Tender Start Date |
Tender End Date |
Document |
| 1 |
Consultancy Services for Preparation of DPR for construction of 4-lane Southern Bypass of Jalgaon City in the State of Maharashtra |
2025_NHAI_258085_1 |
09/12/2025 |
05/12/2025
|
05/01/2026
Time
11:0Hrs
|
|
| 2 |
Preparation of detailed project report (DPR) from Km 7.00 to Km 39.00 through consultancy services on road Nilapani-Muling La (total length 32.00 Km) from foot track to NHSL specifications using latest survey technology i.e. LiDAR technology for comprehensive planning of formation, permanent and surfacing works including LA/FC works along with safety measures under 36 BRTF Project Shivalik in Uttarakhand State |
Chardham/Shivalik/08/2025-26 |
02/12/2025 |
02/12/2025
|
16/12/2025
Time
17:0Hrs
|
|
| 3 |
Consultancy services for preparation of DPR for Rehabilitation and Upgradation of existing road between km 29.300 to km 86.120 Jhala to Heena from existing/single lane to double lane with paved shoulder specification on Gangotri-Uttarkashi-Dharasu (NH-34) in the State of Uttarakhand. |
2025_MoRTH_887804_1 |
04/12/2025 |
02/12/2025
|
16/01/2026
Time
11:0Hrs
|
|
| 4 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Construction of 4 Lane Elevated Corridor from Natesan Nagar ROB (km 38.220 of NH-45A) to Ariyankuppam Bridge (km 40.780 of NH-45A) and Widening of existing Road to 4 Lane road from Ariyankuppam Bridge (km 40.780 of NH-45A) to Mullodai State Border (km 54.180 of NH-45A) (total length 16km) in UT of Puducherry. |
ROChennai12014NH45AAP0125PU |
04/12/2025 |
25/11/2025
|
30/12/2025
Time
15:0Hrs
|
|
| 5 |
Consultancy Services for preparation of Detailed Project Report Comprising Topographical Survey, Soil Investigation, Hydrological Study, Preparation of detailed design and drawing of Construction of ROB Maharashtra Border (Sahjani -Aurad) to Halbarga Cross NH-752K Road at Km. 35.40 near Shivaji Chowk (LC 67/T, km 129/10) in Bhalki Town of Bhalki Taluka Bidar District |
ENHD/KLB/DPR/TENDER/2025-26/1298 |
25/11/2025 |
25/11/2025
|
05/01/2026
Time
15:0Hrs
|
|
| 6 |
Consultancy Services for Preparation of DPR for 6-lane Road from Harsaru bypass of Gurugram Pataudi road at Wazirpur (NH352W) to Jhajjar (NH-352) including construction of Farrukhnagar Bypass (Approx. Length 33 KM) |
2025-NHAI-256175-1 |
20/11/2025 |
20/11/2025
|
01/01/2026
Time
11:0Hrs
|
|
| 7 |
Consultancy Services for Preparation of Feasibility Report for Circumferential Ranchi Bypass starting from Urkid (NH-20) - Brombey (NH-75) - Kurgi (NH-43) - Phudi (NH-75Ext.) - Harbul (NH-33) and terminated at Urkid (NH20) with spurs road |
NHAI/RO/RNC/JH/2025-26/17 |
09/12/2025 |
18/11/2025
|
02/01/2026
Time
11:0Hrs
|
|
| 8 |
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Up-gradation of NH-149 from Km 0.000 to 68.280 (Pallahara to Pitiri section) from 2 lane PS to 4 Lane configuration in the state of Odisha |
2025-NHAI-255507-1 |
19/11/2025 |
14/11/2025
|
30/12/2025
Time
11:0Hrs
|
|
| 9 |
Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Bhimtal to Almora via Khutani, Ramgarh, Kwarab, Peora and Vishvanath in the State of Uttarakhand-2nd call |
2025_NHIDC_884673_1 |
21/11/2025 |
07/11/2025
|
15/12/2025
Time
15:0Hrs
|
|
| 10 |
Consultancy Services of Preparation of DPR for Inter connected link road between Paderu (on NH-516E) and Pinagadi (on NH-16) via Madugula Ghat Road in the State of Andhra Pradesh |
APDIV-2025 /05 Andhra Pradesh Division |
11/11/2025 |
06/11/2025
|
04/12/2025
Time
11:0Hrs
|
|
| 11 |
Project Management Consultancy services for upgradation from 2 Lane with PS to 4 Lane configuration of NH15 from Ch 381000 at Gogamukh to Ch 438000 at Kulajan Tiniali in the State of Assam |
NHIDCL/Assam/PMC/GKT/2025 |
19/11/2025 |
06/11/2025
|
08/12/2025
Time
15:0Hrs
|
|
| 12 |
Consultancy services for carrying out feasibility study and preparation of Detailed Project Report and Pre-construction activities for alternate highway of existing highway (NH-110) from Siliguri to Darjeeling in the state of West Bengal |
NHIDCL/HQ/DPR/NH110/Sili-Darj |
06/11/2025 |
06/11/2025
|
29/12/2025
Time
15:0Hrs
|
|
| 13 |
Consultancy Services for Preparation of Detailed Project Report of 5.0 km with approaches (Standalone Bridge Project) of Parshuram Ghat section (Realignment ) on Panvel-Mahad-Panji Road NH-66 (4L-6L-PS) in the State of Maharashtra |
No.NHD/PEN/AB/TC/2788/2025-26 |
26/11/2025 |
04/11/2025
|
31/12/2025
Time
17:30Hrs
|
|
| 14 |
Consultancy Services for preparation of Detailed Project Report for 3 Nos of Construction of Vehicular Underpasses (VUPs) at Ch Km 4.500 & Km 37.500 (Govindpur–Chas Section) of NH-18 (old NH-32) and at Ch. Km 19.700 (Jaina more location) of NH-320 (Old NH-23) in the State of Jharkhand (3rd Call). |
NHAI/RO/RNC/JH/2025-26/10 |
07/11/2025 |
03/11/2025
|
02/12/2025
Time
11:0Hrs
|
|
| 15 |
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Construction of 4-Lane with Paved Shoulder from Phulbari to Shillong in the State of Meghalaya |
2025-NHIDC-883828-1 |
03/11/2025 |
03/11/2025
|
15/12/2025
Time
15:0Hrs
|
|
| 16 |
Consultancy Services for preparation of DPR for New Alignment Proposed for improving 6 lane Port connectivity of Port to NH-06 by Underground/Underwater Tunnel (twin tube tunnels of tentative length 9 Km), elevated corridor of tentative length 4 km and connecting roads (tentative length 3 km) /RoB from NS Dock Area of Kolkata Dock System to Salap, Howrah connectivity to NH-06 in the State of West Bengal |
WBDIV-22/2/2025-WB Division /E-298067 |
25/11/2025 |
03/11/2025
|
15/12/2025
Time
15:0Hrs
|
|
| 17 |
Consultancy Services for preparation of detailed Project Report for Indore-Udaipur green field corridor in the state of Madhya Pradesh & Rajashtan. |
2025-NHAI-253370-1 |
04/11/2025 |
24/10/2025
|
09/12/2025
Time
11:0Hrs
|
|
| 18 |
Consultancy Services for preparation of Detailed Project Report for Indore – Udaipur green field corridor in the state of Madhya Pradesh & Rajasthan |
2025_NHAI_253370_1 |
24/11/2025 |
24/10/2025
|
22/12/2025
Time
11:0Hrs
|
|
| 19 |
Consultancy Services for DPR Preparation for 2 Lane Paved Shoulder / 4 lane road including junction improvements and bypasses between Baranikkavu (km 0/000) to Mundakkayam (Km 116/800) of entire NH 183 A in the state of Kerala |
RW/TRI/OE/NH-183A/241/2025-26 |
22/10/2025 |
23/10/2025
|
05/12/2025
Time
17:0Hrs
|
|
| 20 |
Consultancy Services for preparation of DPR for 1. 4 Lane with PS from km 37.40 to km 66.7 of NH-848 and 2. 4 lane from km 0.00 to km 4.200 , km 7.200 to km 10.00 of NH-848A 3. 4 Lane with PS from km 24.200 to km 28.600 of NH 848B in Valsad District |
NIT.NO. RW/DPR/NH-848 |
15/10/2025 |
15/10/2025
|
28/11/2025
Time
17:0Hrs
|
|
| 21 |
Consultancy Services for preparation of DPR for Upgradation of existing 2-lane to 4 lane of Netrang – Dediapada - Sagbara - GJ/ MH Border section of NH-753B in Gujarat (Pkg-I) |
NHAI/2025/Guj./ NH-753B-NH-113/DPR/e-293264 (Pkg-I) |
22/10/2025 |
06/10/2025
|
08/12/2025
Time
11:0Hrs
|
|
| 22 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Access Controlled Corridor from Addanki (Muppavaram, End Point of BKV) to End of Vijayawada Western Bypass of NH-16 (approximate length 99.33Km) in the State of Andhra Pradesh. |
2025_NHAI_251358_1 |
31/10/2025 |
06/10/2025
|
18/11/2025
Time
11:0Hrs
|
|
| 23 |
Consultancy Services for preparation of DPR for Upgradation of existing 2-lane to 4 lane of Padhi-Dahod section of NH-113 in Gujarat and Rajasthan (Pkg-2) |
NHAI/2025/Guj./ NH-753B-NH-113/DPR/e-293264 (Pkg-2) |
21/11/2025 |
06/10/2025
|
08/12/2025
Time
11:0Hrs
|
|
| 24 |
Consultancy Services for Preparation of Detailed Project Report (DPR) of 4-laning of Jabalpur-Mandla-Chilpi section of NH-30 in the State of Madhya Pradesh |
251081 |
15/10/2025 |
03/10/2025
|
03/11/2025
Time
11:0Hrs
|
|
| 25 |
Consultancy services for preparation of DPR for 4 laning of Telangana Tentative Length (in Km) Period of Assignment 122.000 Khammam Sathupally to Ashwaraopet Section upto AP Border of NH 365BB in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/16 Dt 01.10.2025 |
14/10/2025 |
01/10/2025
|
11/11/2025
Time
15:0Hrs
|
|
| 26 |
Consultancy services for preparation of DPR for 4 laning from km 615.0 to 668.600 of Kalyan to Nirmal Section of NH 61 in the state of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/13 Dt 30.09.2025 |
14/10/2025 |
30/09/2025
|
10/11/2025
Time
15:0Hrs
|
|
| 27 |
Consultancy services for preparation of DPR for 4 L of Nakrekal to Mallampally of NH 365 including Construction of flyover at Km 25.60 to 27.20 of Nakrekal Thanamcherla section of NH 365 and Construction of Narsampet Bypass in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/14 Dt 30.09.2025 |
14/10/2025 |
30/09/2025
|
10/11/2025
Time
15:0Hrs
|
|
| 28 |
Consultancy services for preparation of DPR for 4 laning of Suryapet to Jangaon section of NH 365B in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/15 Dt 30.09.2025 |
14/10/2025 |
30/09/2025
|
10/11/2025
Time
15:0Hrs
|
|
| 29 |
Consultancy services for preparation of feasibility study and Detailed Project Report (DPR) for Four Lanning of NH - 41 from Km. 122.000 to 221.800 (Desalpar-Mandvi-Naliya Road) in the state of Gujarat |
NIT.NO. RW/DPR/NH-41 |
30/09/2025 |
30/09/2025
|
10/11/2025
Time
15:0Hrs
|
|
| 30 |
Consultancy Services for preparation of Detailed Project Report Comprising Topographical Survey Soil Investigation Hydrological Study Preparation of detailed design and drawing of Construction of ROB Maharashtra Border Sahjani Aurad to Halbarga Cross NH 752K Road at Km. 35.40 near Shivaji Chowk LC 67 T km 129 10 in Bhalki Town of Bhalki Taluka Bidar District in the state of Karnataka |
ENHD KLB DPR 2025 26 986 |
01/10/2025 |
30/09/2025
|
14/11/2025
Time
15:0Hrs
|
|
| 31 |
Consultancy services for preparation of feasibility study and Detailed Project Report (DPR) for Four Lanning of NH - 341 Bhuj - Khavda - Dharamshala Road (Including Bhuj Bypass starting from Sekhpir Chokdi to Palara) in the state of Gujarat |
NIT.NO. RW/DPR/NH-341 |
29/09/2025 |
29/09/2025
|
01/11/2025
Time
18:0Hrs
|
|
| 32 |
Consultancy Services for preparation of Detailed Project Report for 3 Nos of Construction of Vehicular Underpasses (VUPs) at ChKm 4.500 &Km 37.500 (Govindpur–Chas Section) of NH-18 (old NH-32) and at Ch. Km 19.700 (Jaina more location) of NH-320 (Old NH23)in the State of Jharkhand (2nd Call) |
NHAI/RO/RNC/JH/2025-26/10 |
30/09/2025 |
29/09/2025
|
29/10/2025
Time
11:0Hrs
|
|
| 33 |
Consultancy Services for Preparation of DPR for Construction of descoped portion of NH 16 and rehabilitation of existing RoB on NH 19 from km 652.700 to km 653.010 and Construction of a Low Height Subway at LHS at Ranichak RoB of NH 116 under WB |
RO-KOL/DPR/VUP NH-16/Kolkata |
09/10/2025 |
29/09/2025
|
17/11/2025
Time
11:0Hrs
|
|
| 34 |
Consultancy Services for Preparation of DPR for (a) Development of new greenfield High speed corridor from Nanded to Degloor along with spur connecting to Jalna -Nanded Expressway, (b) Elevated viaduct/flyover in Ausa Town, and (c) Flyover/Trumpet Interchange at Waranga Phata T-Junction, in the State of Maharashtra |
2025-NHAI-250758-1 |
23/10/2025 |
29/09/2025
|
29/10/2025
Time
11:0Hrs
|
|
| 35 |
Consultancy Services for Preparation of DPR of 285.81 km of National Highways to 2-4 LPS configuration under Mumbai Circle (NH) PWD Maharashtra. |
RO/MUM/TENDER/DPR/2025-26/14 |
28/09/2025 |
26/09/2025
|
27/10/2025
Time
17:0Hrs
|
|
| 36 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for elevated corridor for connectivity from AIIMS to Mahipalpur Bypass project with further extension to Gurgaon- Faridabad Road. |
2025-NHAI-250310-1 |
25/09/2025 |
24/09/2025
|
15/10/2025
Time
11:0Hrs
|
|
| 37 |
Consultancy Services for Preparation of DPR for development of Eastern Extension of Urban Extension Road-II (UER-II). |
2025-NHAI-250307-1 |
25/09/2025 |
24/09/2025
|
15/10/2025
Time
11:0Hrs
|
|
| 38 |
2nd call for Consultancy services for preparation of DPR for Construction of road from Wan (Km 60.00) to Tapovan (Km 99.20) in Greenfield to NHSL Specification using LIDAR Technology based survey in the State of Uttarakhand (Approximate length 39.20 kms) |
RE-NIT-07-2025-26 |
26/09/2025 |
24/09/2025
|
31/10/2025
Time
18:0Hrs
|
|
| 39 |
Consultancy Services for Preparation of DPR for extension of UER-II till Delhi Saharanpur Highway |
2025-NHAI-249937-1 |
22/09/2025 |
22/09/2025
|
13/10/2025
Time
11:0Hrs
|
|
| 40 |
Consultancy Services for preparation of DPR for 4 Lane to 6 Lane of Moradabad-Bareilly section of NH-09 (old NH-24) in the State of Uttar Pradesh |
2025_NHAI_249982_1 |
23/09/2025 |
22/09/2025
|
30/10/2025
Time
11:0Hrs
|
|
| 41 |
Consultancy Services for preparation of DPR for Six laning of BhilaiBhandara section of NH-53 at Raipur- Nagpur Corridor in the state of Chhattisgarh & Maharashtra |
2025_NHAI_249411_1 |
07/10/2025 |
18/09/2025
|
06/11/2025
Time
11:0Hrs
|
|
| 42 |
Preparation of Detailed Project Report for upgradation of Raipur Bilaspur section to Six Eight Lane Access Control Road Project and feasibility studies of greenfield alignment from Aurang to Darri Bilaspur in the state of Chhattisgarh. |
NHAI/11012/CG/DPR/Raipur-Bilaspur Upgradation/2025 |
22/10/2025 |
18/09/2025
|
13/11/2025
Time
11:0Hrs
|
|
| 43 |
Consultancy Services for Preparation of DPR for Roing town Bypass total length of10km in the State of Arunachal Pradesh |
RW/Ar.P/DPR/25-26/01 |
18/09/2025 |
17/09/2025
|
01/10/2025
Time
11:0Hrs
|
|
| 44 |
Consultancy Services for Preparation of DPR for Connectivity of Gadchiroli(MH) with Raipur - Vishakhapatnam Corridor in the State of Chhattisgarh |
2025_NHAI_248984_1 |
17/09/2025 |
16/09/2025
|
15/10/2025
Time
11:0Hrs
|
|
| 45 |
Preparation of DPR, Pre-Construction Activity and Project Supervision of Widening of existing single lane to two lane with PS from Km 39.00 to Km 283.00 on NH 202 (old 155) in the state of Nagaland on EPC Mode (Tentative Length 244.00 Km) |
RW/GHT/NG/PMC/NH202/202526/430 |
16/09/2025 |
15/09/2025
|
10/11/2025
Time
15:0Hrs
|
|
| 46 |
DPR Consultant for preparation of a comprehensive upgradation plan covering service roads junction improvements grade separators rigid pavement and blackspot rectification measures for New Mangalore Port Road Connectivity for the stretch from Surathkal to Nanthoor on NH 66 and BC Road to Nathoor on NH 73 |
NIT No.18/NHAI/RO-BNG/DPR/Tender/2025-26 dated 12.09.2025 |
19/09/2025 |
12/09/2025
|
14/09/2026
Time
11:0Hrs
|
|
| 47 |
Consultancy Services for preparation of DPR and Feasibility report for construction of 4 lane tunnel and viaduct (km 205.26 to km 207.25 tentative length of tunnel 1.67 km and viaduct 320m) on NH-33 (Old NH 80) and 4 lane spur connection from IWAI Sahibganj port to NH-33 (Old NH 80) (tentative length 2.8 km including 1 ROB) in the State of Jharkhand |
2025-NHAI-248399-1 |
12/09/2025 |
11/09/2025
|
01/12/2025
Time
11:0Hrs
|
|
| 48 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Four Laning of Project from Existing Two Lane with Paved Shoulders of Krishnagiri - Tindivanam section of NH-77 (Old NH-66) from Km 0.000 to Km 182.182 (Length 182.182 Km) in the State of Tamil Nadu 5th Call |
NHAI/ ROC/ DPR-NH-77/ 24-25/ 205 |
17/09/2025 |
11/09/2025
|
06/10/2025
Time
17:0Hrs
|
|
| 49 |
Consultancy services for preparation of DPR for the works of (i) Construction of 4L Fatehnagar- Dariba- Railmagra- Khandel section of NH-162A (Length-tentatively 36km) (ii) Construction of 4L Jhalarapatan to Chavli Border section of NH-552G (Length-tentatively 32km) (iii) Rehabilitation-Reconstruction of existing Mahi bridge at Ch.226.045 on NH-927A (Length – tentatively 504m) in the State of Rajasthan. |
NIT/927/09/Jai/Raj/ |
17/09/2025 |
11/09/2025
|
29/10/2025
Time
11:0Hrs
|
|
| 50 |
Consultancy Services to carry out detailed technical assessment of the corridor to identify issues impacting the efficiency of the corridor and its design solutions for Panipat-Jalandhar section of NH-44 from Km 96 000 to Km 387 100 in the states of Haryana and Punjab |
2025-NHAI-248138-1 |
30/09/2025 |
10/09/2025
|
16/10/2025
Time
11:0Hrs
|
|
| 51 |
Consultancy Services for preparation of DPR for I.Widening 2LPS of balance reaches Km 184.840 to Km 190.00 and Km 194.840 to 198.800, II.Construction of additional vent to existing Major Bridge at Km 210.0 to 2 of Nizamabad-Jagdalpur NH 63 |
RW/HYD/Misc-28/NIT/DPR 2025-26/02-2nd call Dt 09.09.2025 |
30/09/2025 |
09/09/2025
|
09/10/2025
Time
15:0Hrs
|
|
| 52 |
Consultancy Services for preparation of DPR for Strengthening of existing road and Construction of Bridges on Hyderabad-Bhupalapatnam Section of NH 163 in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/08-2nd Call Dt 09.09.2025 |
01/10/2025 |
09/09/2025
|
09/10/2025
Time
15:0Hrs
|
|
| 53 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Basti Ring Road (Phase-II) in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/Basti Ring Road (Phase-II)/2025-26 Date.08.09.2025 |
09/09/2025 |
08/09/2025
|
03/11/2025
Time
16:0Hrs
|
|
| 54 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Construction of Gola Ring Road in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/NH-730/2025-26 Date- 08.09.2025 |
11/09/2025 |
08/09/2025
|
19/12/2025
Time
11:0Hrs
|
|
| 55 |
Consultancy Services for Preparation of Detailed Project Report for Construction of additional 2 lane ROB of Chouri Chura and Deoria ROB of NH-727A in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/NH-727A/2025-26 Date- 04.09.2025 |
10/09/2025 |
04/09/2025
|
04/11/2025
Time
11:0Hrs
|
|
| 56 |
Consultancy Services for Preparation of Detailed Project Report for Up gradation to 4 lane 2L PS of Parour to Chauntra from Km 100 840 to Km 140 625 and Chauntra to Padhar from Km 140 625 to Km 180 00 of Pathankot Mandi section of NH 154 in the state of Himachal Pradesh through BOT Hybrid Annuity EPC mode |
2025_NHAI_247647_1 |
15/09/2025 |
04/09/2025
|
07/10/2025
Time
11:0Hrs
|
|
| 57 |
Consultancy Services for preparation of Detailed Project Report for (A) Development of High-Speed Access Controlled National Highway Corridor from Haridwar to Haldwani in the State of Uttar Pradesh and Uttarakhand (B) Construction of 4-lane Lalkuan Bypass, Haldwani Bypass and Kathgodam Bypass on NH-109 (Old NH 87) in the state of Uttarakhand and (C) Construction of Saharanpur Ring Road in the state of Uttar Pradesh |
UK DIV-20016/40/2025-O/o GM (Tech) |
25/09/2025 |
04/09/2025
|
13/10/2025
Time
11:0Hrs
|
|
| 58 |
Consultancy Services for pre. of (DPR) for Widening 4LPS from Bahraich head Qtr. at Km.263.000 to Sanai Chauraha at km433.000,Maharajganj to kaptanganj Km.505.000 to Km.537.000 and Kaptanganj to Padrauna Km.537.00to 564.00ofNH730 in the State ofUP. |
CE-RO/LKO/DPR/NH-730/2025-26 Date-03.09.2025 |
10/09/2025 |
03/09/2025
|
19/12/2025
Time
11:0Hrs
|
|
| 59 |
Consultancy Services for feasibility study and preparation of DPR for improvement and up-gradation of NH.334DD starting from the junction with NH330 (Hamidpur, dist. Aligarh) and end point is NH334C (Bulandshahar) in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/334DD/2025-26 Date-03.09.2025 |
10/09/2025 |
03/09/2025
|
19/12/2025
Time
11:0Hrs
|
|
| 60 |
Consultancy Services for Preparation of DPR for construction of 2L Bridges at Km92.911, Km99.206, Km100.600,Km121.800,Km126.901, Km144.135,Km150.794, Km171.056, Km178.612,Km192.354,Km194.118, Km201.176,Km216.801 and Km226.195 of NH730 intheStateofUP |
E-RO/LKO/DPR/NH-730/2025-26 Date- 03.09.2025 |
09/09/2025 |
03/09/2025
|
04/11/2025
Time
11:0Hrs
|
|
| 61 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Reconstruction of HL Bridges on various NHs in the State of Jharkhand |
RO/Ranchi/DPR/NH/2025-26 |
02/09/2025 |
02/09/2025
|
03/11/2025
Time
15:0Hrs
|
|
| 62 |
Consultancy Services for DPR Preparation for 2 Lane Paved Shoulder / 4 lane road including junction improvements and bypasses between km 62/100 (Anjilimoodu - Near Chenganur Town) to Kumily Km 215/450 of NH 183 in the state of Kerala |
RW/TRI/OE/NH-183/239/2025-26 |
02/09/2025 |
02/09/2025
|
31/10/2025
Time
15:0Hrs
|
|
| 63 |
Consultancy Services for DPR Preparation for 2 Lane Paved Shoulder / 4 lane road including junction improvements and bypasses between Kozhikode (km 5/0) to Muthanga (Km 117/6) of NH 766 along with alternate 4L bypass option of thamaraserry Ghat portion in the state of kerala |
RW/TRI/OE/NH-766/240/2025-26 |
02/09/2025 |
02/09/2025
|
31/10/2025
Time
15:0Hrs
|
|
| 64 |
CS of Preparation of DPR for development of 4L greenfield highway from Kuppam Hosur Bengaluru (STRR) a spur road from NH140 to Kanipakam Town and Highway connecting South side of Kakinada Port to NH216 in Andhra Pradesh |
2025_NHAI_247061_1 |
03/09/2025 |
01/09/2025
|
01/10/2025
Time
11:0Hrs
|
|
| 65 |
CS for preparation of DPR for dev. of Eastern side Ring Road/bypass around Bulandshahar development of Bypass on NorthernSide of Aligarh and elevated corridor/high. Lalkuwan (23.600) to Dadari bypass (33.650) along Ghaziabad Aligarh NH34/NH334C in UP |
2025_NHAI_247102_1 |
04/09/2025 |
01/09/2025
|
22/09/2025
Time
11:0Hrs
|
|
| 66 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Rehabilitation and up gradation to 4L PS of NH-220 in the State of Jharkhand. |
RO/Ranchi/DPR/NH-220/2025-26 |
29/08/2025 |
29/08/2025
|
03/11/2025
Time
15:0Hrs
|
|
| 67 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Rehabilitation of Bridges on various NHs in the State of Jharkhand. |
RO/Ranchi/DPR/NH/Rehab/2025-26 |
29/08/2025 |
29/08/2025
|
03/11/2025
Time
15:0Hrs
|
|
| 68 |
Preparation of Detailed Project Report for addressing the site requirement for capacity augmentation at various locations on the corridor Agra-Etawah-Chakeri-Varanasi section of NH-2 in the State of Uttar Pradesh |
2025_NHAI_246921_1 |
13/09/2025 |
29/08/2025
|
29/09/2025
Time
11:0Hrs
|
|
| 69 |
Consultancy services for preparation of DPR and Land acquisition of Vasmat City Bypass on NH-61 and Gangakhed City Bypass on NH-361 F in the state of Maharashtra on EPC Mode. |
RO/MUM/TENDER/DPR/2025-26/13 |
14/09/2025 |
29/08/2025
|
14/10/2025
Time
17:0Hrs
|
|
| 70 |
Consultancy Services for preparation of Detailed Project Report for Bhopal-Jabalpur green field corridor in the state of Madhya Pradesh |
2025_NHAI_246932_1 |
17/09/2025 |
29/08/2025
|
30/09/2025
Time
11:0Hrs
|
|
| 71 |
Consultancy services for Preparation of DPR for 4 laning of Malegaon Manmad Kopargaon in the State of Maharashtra |
2025_NHAI_246763_1 |
28/08/2025 |
28/08/2025
|
29/09/2025
Time
11:0Hrs
|
|
| 72 |
Consultancy Services for Four Lanning from 1. km 265.200 to km 287.905 in Dahod District and 2. from KM 356.905 to km 414.646 (Ferkuva to Bodeli section) of NH-56 in Chhotaudepur District and 3. km 0/00 to km 48.575 of NH 756 in the state of Gujarat. |
NIT.NO. RW/DPR/NH-756 |
27/08/2025 |
27/08/2025
|
30/09/2025
Time
15:0Hrs
|
|
| 73 |
Consultancy services for preparation of DPR of NH-848K for Upgradation to Four to Six lane with paved shoulder from 2LPS,4LPS between Km. 0.00 to 160.00(Anand-Nadiad-mahudha-Kathlal-Kapadvanj-Bayad-Dhansura-Modasa Section) in the State of Gujarat |
RW/DPR/NH-848K |
27/08/2025 |
27/08/2025
|
30/09/2025
Time
15:0Hrs
|
|
| 74 |
Consultancy Services for preparation of DPR for the development of High-Speed access-controlled Corridor from Ayodhya to Varanasi in the state of Uttar Pradesh. |
UP/HQ/ Ayodhya-Varanasi /DPR/2025 |
28/08/2025 |
27/08/2025
|
14/10/2025
Time
11:0Hrs
|
|
| 75 |
Consultancy Services for preparation of Detailed Project Report for Widening and up-gradation to 4-lane of the (i) Saoner-Chhindwara Section of NH-547 (about 75.46 Km), (ii) Chhindwara-Seoni section of NH- 347 (about 63 Km) and (iii) up gradation MDR to 2-lane PS which would be spur to NH-547 from Bajaj Tiraha on Saoner-Chhindwada section of NH-547 to Rajna Tiraha on Nagpur–Betul Section of NH-47 including access to the spiritual Shri Hanuman Mandir complex (20.2 Km) (Hanuman Lok) at Jam Sawliin |
DPR-12/13/2025-PIU Chhindwara |
23/09/2025 |
26/08/2025
|
09/10/2025
Time
11:0Hrs
|
|
| 76 |
Consultancy Services for Pre-Construction Activities and Preparation of Detailed Project Report for development of 2 Lane Alternate Route to Bypass Dabarkot Landslide Zone (from Km 75.950 to Km 80.750) on NH-134 in the State of Uttarakhand |
2025_MoRTH_874404_1 |
25/08/2025 |
25/08/2025
|
06/10/2025
Time
15:0Hrs
|
|
| 77 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Widening and Strengthening to 2LPS of NH-133A and NH-333A in the State of Jharkhand. |
RO/Ranchi/DPR/NH-133A and 333A/25-26 |
25/08/2025 |
25/08/2025
|
03/11/2025
Time
15:0Hrs
|
|
| 78 |
Consultancy Services for Preparation of DPR for Roing town Bypass total length of 10km in the State of Arunachal Pradesh |
RW/Ar.P/DPR/25-26/01 |
22/08/2025 |
22/08/2025
|
12/09/2025
Time
11:0Hrs
|
|
| 79 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR CONSTRUCTION OF WAN-TAPOVAN ROAD BETWEEN KM 60.00 TO KM 99.20 TO NHSL SPECIFICATION USING LIDAR TECHNOLOGY BASED SURVEY IN THE STATE OF UTTARAKHAND (APPROXIMATE LENGTH 39.20 KMS) |
NIT-07-2025-26 |
05/08/2025 |
22/08/2025
|
13/09/2025
Time
18:0Hrs
|
|
| 80 |
Consultancy services for preparation of DPR for “Rehabilitation & Upgradation of Existing road between km 29.300 to km 55.550 (Jhala to Sukhi Bend) from existing/single lane to double lane with paved shoulder specification on Gangotri-Uttarkashi-Dharasu road (NH-34) on EPC mode in the State of Uttarakhand( length 26.25 km) |
Chardham/Shivalik06/2025-26 |
19/08/2025 |
19/08/2025
|
30/08/2025
Time
12:0Hrs
|
|
| 81 |
Consultancy services for preparation of DPR for four laning, reconstruction of existing culvert to 4 lane Minor bridge and construction of ROB on NH 63 |
RW/HYD/Misc-28/NIT/DPR 2025-26/10 Dt 19.08.2025 |
21/08/2025 |
19/08/2025
|
23/09/2025
Time
15:0Hrs
|
|
| 82 |
Consultancy Services for Preparation of DPR for development of 4-lane Kadapa-Kurnool section of NH-40 as an access controlled highway along with spur to Orvakal Industrial area (length-193 kms) in the state of Andhra Pradesh. |
2025_NHAI_245652_1 |
09/09/2025 |
19/08/2025
|
07/10/2025
Time
11:0Hrs
|
|
| 83 |
Consultancy Services for Balance work in preparation of DPR for Coastal Road from Nagapattinam to Tuticorin Section via Ramanathapuram (Green field) from Km 314.400 to Km 626.755 of NH-32 in the State of Tamil Nadu |
NHAI/17011/02/41/2025/RO Madurai |
20/08/2025 |
16/08/2025
|
09/10/2025
Time
11:0Hrs
|
|
| 84 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway Bhavnagar Bharuch in the state of Gujarat |
Pkg-4-RW/NH-37011/46/2025-BPSP |
19/08/2025 |
13/08/2025
|
15/09/2025
Time
17:0Hrs
|
|
| 85 |
Consultancy services for preparation of DPR to mitigate the bottlenecks from Punjab/UT border near Zirakpur flyover to Poultry Farm chowk including de-congestion of old Airport chowk, Halo Majra T-Point and Poultry Farm chowk on NH-05 (3Km, 6Lane) |
RW/CH/W(27)UT/CHD/2025/4.8.25 |
13/08/2025 |
13/08/2025
|
27/08/2025
Time
15:0Hrs
|
|
| 86 |
CONS SERS FOR CARRYING OUT FEASIBILITY STUDY A PREP OF DPR FOR CONS IMPVT OF EX CL 9 TO NHSL SPES OF RD BARIPATTAN-JHALAS F KM 97.00 TO KM 231.00 (P-V) (ACT L 120.30 KMS F KM 97.00 TO KM 217.300) INCLD MIN BR, LA, FC A SHIFTG UTILIT IN 31 TF U PRO SPK IN J K UT |
2025_BRO_725658_1 |
17/08/2025 |
12/08/2025
|
13/10/2025
Time
11:0Hrs
|
|
| 87 |
Consultancy Services for preparation of CS for preparation of DPR for 3 Nos of Construction of VUPs at Ch Km 4.500 and Km 37.500 Govindpur Chas Section of NH18 old NH-32 and at Ch. Km 19.700 Jaina more location of NH320 Old NH 23 |
NHAI/RO/RNC/JH/2025-26/10 |
03/09/2025 |
12/08/2025
|
25/09/2025
Time
11:0Hrs
|
|
| 88 |
Consultancy services for preparation of DPR for widening and strengthening upto 7m or 10m or 4 lane from km 18.10 to km 127.740 Except km 71.2 to 77.6 and 97.6 to km 104.92 and 108.2 to km 117.16 of NH 64 |
NIT.NO. RW/DPR/NH-64/2 |
11/08/2025 |
11/08/2025
|
15/09/2025
Time
15:0Hrs
|
|
| 89 |
Consultancy services for preparation of DPR for 4L of Warangal to Khammam section of NH 563 including Warangal bypass connecting NH 563 and NH 163 in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/09 Dt 08.08.2025 |
21/08/2025 |
08/08/2025
|
22/09/2025
Time
15:0Hrs
|
|
| 90 |
Consultancy services for preparation of DPR of NH 64 for Upgradation to two lane or four lane with paved shoulder from SL or 2L or 2L and PS between Km. 127.740 to 386.020 Mahisagar River Missing Link Dandi Section in the State of Gujarat |
NIT.NO. RW/DPR/NH-64 |
08/08/2025 |
08/08/2025
|
15/09/2025
Time
15:0Hrs
|
|
| 91 |
Consultancy Services for preparation of DPR/Feasibility Report of projects in the State of Kerala |
2025-NHAI-244643-1 |
23/09/2025 |
08/08/2025
|
01/10/2025
Time
15:0Hrs
|
|
| 92 |
Consultancy Services of Preparation of DPR for Construction of Ring Road to Dhule City connecting NH-53 to NH-52 in the State of Maharashtra. |
2025-NHAI-244148-1 |
06/08/2025 |
06/08/2025
|
24/09/2025
Time
11:0Hrs
|
|
| 93 |
Project Management Consultancy Services for Construction of 2- Lane bypass of Karnaprayag (length of bypass 4km with tunnels of length 2.89 km), Panduwakhal (length of bypass 10km with tunnels of length 1.795 km) & Kainchidham (length of bypass 1.9km with tunnels of length 0.325 km) on NH 109 (old 87 ext) and Bageshwar Hills in market area (length of bypass 2.38km with tunnels of length 1.1km) on NH-309A (Total Length of bypasses - 18.284km including tunnels of total length 6.11km with ap |
2025_MoRTH_871944_1 |
06/08/2025 |
06/08/2025
|
13/10/2025
Time
17:0Hrs
|
|
| 94 |
Consultancy Services for DPR Preparation of Rehabilitation and Upgradation to 4-lane configuration from Una to Birhu and Lathiani to Bhota of NH-503A and Construction of Missing Link of NH-03 from Km 250/592 to Mandi Bypass in Himachal Pradesh. |
2025-MoRTH-871990-1 |
06/08/2025 |
05/08/2025
|
13/11/2025
Time
15:0Hrs
|
|
| 95 |
Consultancy Services for preparation of DPR for development-upgradation of existing 4 lane to 6 lane of (i) Lucknow Sitapur section of New NH-30 and (ii) Orai-Barah Section of NH-27 in the State of Uttar Pradesh |
2025_NHAI_244035_1 |
18/08/2025 |
05/08/2025
|
09/09/2025
Time
11:0Hrs
|
|
| 96 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Widening from Km. 40.00 to 123.300 of NH-330D in the State of Uttar Pradesh |
CE-RO/LKO/DPR/NH-330D/2025-26 Date. 04.08.2025 |
05/08/2025 |
04/08/2025
|
25/09/2025
Time
11:0Hrs
|
|
| 97 |
Consultancy Services for Preparation of Detailed Project Report for Widening of existing single intermediate lane to 2lane with paved shoulders and Alignment ReAlignment from Km. 70.00 to 189.00 Shankarpur to Salondhar on NH-309 Old No. 121 in the State of Uttarakhand. |
2025_MoRTH_870782_1 |
28/07/2025 |
29/07/2025
|
16/09/2025
Time
15:0Hrs
|
|
| 98 |
Consultancy services for preparation of DPRs for construction of LRV cavern tunnels (16 Nos) of 60 mtr long each at various locations under Project Himank in Union Territory of Ladakh |
2025_BRO_695969_2 |
27/07/2025 |
27/07/2025
|
16/08/2025
Time
18:0Hrs
|
|
| 99 |
Preparation of Detailed Project Report for Construction of 4 lane road from Aska to Berhampur on NH-59 in Odisha State |
08-ROBBSR-2025-26-DPR |
30/07/2025 |
26/07/2025
|
24/09/2025
Time
15:0Hrs
|
|
| 100 |
Consultancy Services for Preparation of DPR for connectivity of Raiganj (West Bengal) at NH-12 to Barsoi (Bihar) |
RO-KOL/DPR/Raiganj-Barsoi/Malda |
01/08/2025 |
25/07/2025
|
18/09/2025
Time
11:0Hrs
|
|
| 101 |
Consultancy Services for preparation of Detailed Project Report of Construction of Bikaner to Kotputli expressway in the state of Rajasthan |
2025_NHAI_242067_1 Tech_Raj_ DPR_BK |
14/10/2025 |
21/07/2025
|
28/10/2025
Time
11:0Hrs
|
|
| 102 |
Consultancy Services for Preparation of Detailed Project Report for Four Laning of Dindigul – Nattham section from Km 0.000 to Km 38.000 (Tentative Design Length 38.000 Km) of NH-383 in the State of Tamil Nadu |
NHAI/17011/02/40/2025/RO Madurai |
19/07/2025 |
19/07/2025
|
02/09/2025
Time
11:0Hrs
|
|
| 103 |
Consultancy Services for Preparation of DPR for development of Eastern Extension of Urban Extension Road-II (UER-II) |
2025-NHAI-241733-1 |
18/07/2025 |
18/07/2025
|
07/08/2025
Time
11:0Hrs
|
|
| 104 |
Consultancy Services for Preparation of DPR for Bijapur Gulbarga Humnabad section TN Karnataka Border to Bangalore section Nelamangala Tumkur section Goa / Karnataka Border to Kundapur Strecth and Bijapur-Hungund section in the state of Karnataka |
NIT No.14/NHAI/RO-BNG/DPR/Tender/2025-26 dated 17.07.2025 |
23/07/2025 |
18/07/2025
|
17/09/2025
Time
15:0Hrs
|
|
| 105 |
Consultancy Services for Preparation of DPR for widening to Four lane with Paved Shoulder from Two lane with Paved Shoulder from Km.74.135 (near Honaganahalli) to Km.261.483 (near Hubballi) of NH-52 in the State of Karnataka. |
2025_MoRTH_869379_1 |
25/07/2025 |
17/07/2025
|
16/10/2025
Time
15:0Hrs
|
|
| 106 |
Consultancy Services for Preparation of Detailed Project Report of 98.10 km of National Highways under Latur Division (NH) PWD Maharashtra. |
RO/MUM/TENDER/DPR/2025-26/10 |
25/08/2025 |
16/07/2025
|
08/09/2025
Time
17:0Hrs
|
|
| 107 |
Consultancy Services for Preparation of Detailed Project Report of 37 km of National Highways under Nanded Division (NH) PWD Maharashtra. |
RO/MUM/TENDER/DPR/2025-26/11 |
25/08/2025 |
16/07/2025
|
08/09/2025
Time
17:0Hrs
|
|
| 108 |
Preparation of Detailed Project Report of 35 km of National Highways under Chh. Sambhajinagar Division (NH) PWD Maharashtra. |
RO/MUM/TENDER/DPR/2025-26/08 |
24/08/2025 |
16/07/2025
|
08/09/2025
Time
17:0Hrs
|
|
| 109 |
Consultancy Services for Preparation of Detailed Project Report of 37 km of National Highways under Jalna Division (NH) PWD Maharashtra. |
RO/MUM/TENDER/DPR/2025-26/09 |
24/08/2025 |
16/07/2025
|
08/09/2025
Time
17:0Hrs
|
|
| 110 |
Consultancy Services for Preparation of Detailed Project Report of Kusumba-Dondaicha -Shahada section of NH-160H and MP Border-Palpadiya-Raver section of NH 347C. |
RO/MUM/TENDER/DPR/2025-26/12 |
07/09/2025 |
16/07/2025
|
26/09/2025
Time
17:0Hrs
|
|
| 111 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Capacity augmentation form 2L PS to 4 Lane/6 Lane of Banda Karwi Jasra section form Ch. 37.000 to Ch. 201.555 of NH35 (Old NH76) in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/NH-35(Old NH-76)/2025-26 Date- 15.07.2025 |
30/07/2025 |
15/07/2025
|
17/12/2025
Time
11:0Hrs
|
|
| 112 |
Consultancy Services for Preparation of DPR for Extension of UER II till Delhi Saharanpur Highway |
2025-NHAI-241342-1 |
15/07/2025 |
15/07/2025
|
06/08/2025
Time
11:0Hrs
|
|
| 113 |
Consultancy services for preparation of DPR for the works of (i) 4L Spur to Khatu from Shahpura (NH-48) in the state of Rajasthan (tentatively 60km) (ii) Bypass-realignment of Alwar, Viratnagar, Naugaon etc. and rectification of accident spots-blackspots on Hanuman circle to Bagad tiraya section of NH-248A (tentatively 25km) (iii) Realignment of Atru town and widening of remaining 2L sections to 2L PS of Baran –Aklera section of NH-752 (Length -35km tentatively) (iv) Repair and rehabilitation of |
RW/JAI/RJ/RO/AP/2025-26/143/03 |
17/07/2025 |
15/07/2025
|
16/08/2025
Time
15:0Hrs
|
|
| 114 |
Consultancy Services for preparation of DPR for Strengthening of existing road and Construction of Bridges on Hyderabad-Bhupalapatnam Section of NH 163 in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/08 Dt 14.07.2025 |
25/07/2025 |
14/07/2025
|
21/08/2025
Time
15:0Hrs
|
|
| 115 |
Consultancy Services for Preparation of Detailed Project Report for Construction of additional 2 lane ROB of Chouri Chura and Deoria ROB of NH-727A in the State of Uttar Pradesh |
CE-RO/LKO/DPR/NH-727A/2025-26 Date- 14.07.2025 |
01/08/2025 |
14/07/2025
|
28/08/2025
Time
11:0Hrs
|
|
| 116 |
Consultancy Services for Preparation of Feasibility report and Detailed Project Report for construction of Greenfield 4 lane of Shimla (Near Tara Devi) to Shalaghat (Near village Kolaka) section of NH-205 (Old NH-88) from Km 0.000 to Km 28.800) (tentative length 28.80 km) Package-I and Shimla Bypass connectivity from km 138.00 of Shimla bypass (near village Chadau) to Shimla (Near Tara Devi) section (tentative length 7.00 km) in the State of Himachal Pradesh |
2025_NHAI_241085_1 |
23/08/2025 |
12/07/2025
|
15/09/2025
Time
15:0Hrs
|
|
| 117 |
Consultancy Services for Preparation of DPR for widening to Four lane with paved Shoulder from Two lane with paved Shoulder from Km. 0.00 to Km. 118.470 (Kalaburagi-Wadi-Yadgiri-Kadechur Section) of NH-150 in the State of Karnataka |
2025_MoRTH_868687_1 |
16/07/2025 |
12/07/2025
|
16/10/2025
Time
15:0Hrs
|
|
| 118 |
onsultancy Services for Preparation of Detailed Project Report for construction of 02 Lane Bridges at Km 92.911, Km 99.206, Km 100.600, Km 121.800, Km 126.901, Km 144.135 and Km 150.794 of NH-730 in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/NH-730/2025-26 Date- 11.07.2025 |
05/08/2025 |
11/07/2025
|
25/08/2025
Time
11:0Hrs
|
|
| 119 |
Consultancy Services for Preparation of Detailed Project Report for construction of 02 Lane Bridges at Km 171.056, Km 178.612, Km 192.354, Km 194.118, Km 201.176, Km 216.801 and Km 226.195 of NH730 in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/NH-730/2025-2026 Date.11.07.2025 |
05/08/2025 |
11/07/2025
|
25/08/2025
Time
11:0Hrs
|
|
| 120 |
Consultancy Services for Preparation of Detailed Project Report of 152 km of National Highways under Nagpur Division (NH) PWD Maharashtra. |
RO/MUM/TENDER/DPR/2025-26/07 |
17/08/2025 |
11/07/2025
|
26/08/2025
Time
17:0Hrs
|
|
| 121 |
Consultancy Services for Preparation of Detailed Project Report of 129 km of National Highways under Akola Division (NH) PWD Maharashtra. |
RO/MUM/TENDER/DPR/2025-26/05 |
16/08/2025 |
11/07/2025
|
26/08/2025
Time
17:0Hrs
|
|
| 122 |
onsultancy Services for Preparation of Detailed Project Report of 423 km of National Highways under Gadchiroli Division (NH) PWD Maharashtra. |
RO/MUM/TENDER/DPR/2025-26/06 |
16/08/2025 |
11/07/2025
|
26/08/2025
Time
17:0Hrs
|
|
| 123 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Widening to 2 Lane PS from Haraiya- Bhabhnana-Swaminarayan- Manakpur to Gonda Section of NH-727G in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/727G/2025-26 Date- 11.07.2025 |
30/07/2025 |
11/07/2025
|
25/08/2025
Time
11:0Hrs
|
|
| 124 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Gola Ring Road in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/NH-730/2025-26 dated 10.07.2025 |
01/08/2025 |
10/07/2025
|
25/08/2025
Time
11:0Hrs
|
|
| 125 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Basti Ring Road (Phase_II) in the State of Uttar Pradesh. |
CE-RO/LKO/DPR/Basti Ring Road (Phase-II)/2025-26 Date- 10.07.2025 |
29/07/2025 |
10/07/2025
|
25/08/2025
Time
11:0Hrs
|
|
| 126 |
Consultancy Services for preparation of Detailed Project Report for Indore-Khalghat-MP/MH Border section of NH-52 in the state of Madhya Pradesh under Capacity Augmentation |
MPDIV-21016/75/ 2024-RO Bhopal (MP West) |
06/08/2025 |
09/07/2025
|
13/08/2025
Time
11:0Hrs
|
|
| 127 |
Consultancy Services for preparation of Detailed Project Report for the work Widening and strengthening of Existing 2L to 2LPS from Km 40/00 to 68/600 Km Podamari to Mohana of NH-326 and from km 0/00 to km 102/900 Mohana to Paralakhemundi of NH 326A |
07-ROBBSR-2025-26-DPR |
17/07/2025 |
09/07/2025
|
24/09/2025
Time
15:0Hrs
|
|
| 128 |
Consultancy Services for preparation of Detailed Project Report for the work Construction 4L from 0/00 to 239/900 Km Balangir to Nayagarh of NH-57. |
06-ROBBSR-2025-26-DPR |
17/07/2025 |
09/07/2025
|
24/09/2025
Time
15:0Hrs
|
|
| 129 |
Construction of 4 lane road from Godibandha Chakk 307.934Km to Jharabareni 284.000Km NH-53 including Kaniha Bypass. |
05-ROBBSR-2025-26-DPR |
17/07/2025 |
09/07/2025
|
24/09/2025
Time
15:0Hrs
|
|
| 130 |
Widening of 2L to 2LPS from 351/480 to 367/480 and 376/480 to 434/767 Km. of NH 26. |
2025_MoRTH_868072_1 |
17/07/2025 |
09/07/2025
|
24/09/2025
Time
15:0Hrs
|
|
| 131 |
Widening to 4L road of Barpalli- Balangir -Kesinga Bhawanipatna -Junagarh on NH 26 from 21/000 to 202/000 km excluding Bhawanipatna bypass. |
03-ROBBSR-2025-26-DPR |
17/07/2025 |
09/07/2025
|
24/09/2025
Time
15:0Hrs
|
|
| 132 |
Consultancy Services for Preparation of DPR for widening and up-gradation of Raebareli-Banda stretch of NH-232 (old) in the state of Uttar Pradesh (2nd call) |
UP/HQ/ Raebareli-Banda /DPR/2025 |
18/07/2025 |
09/07/2025
|
05/08/2025
Time
11:0Hrs
|
|
| 133 |
Consultancy Services for DPR to mitigate the bottlenecks from Punjab/UT border near Zirakpur flyover to Poultry Farm chowk including de-congestion of old Airport chowk, Halo Majra T-Point and Poultry Farm chowk on NH-05 (3Km, 6Lane) |
RW/CH/W(27)UT/CHD/2025/26.6.25 |
08/07/2025 |
08/07/2025
|
17/07/2025
Time
15:0Hrs
|
|
| 134 |
Consultancy services for preparation of DPR for 4 L of Rudrampur to Bhadrachalam Section from Km 71.0 to 171.6 of Vijayawada to Jagadalpur Section of NH 30 and Construction of Kothagudem Bypass connecting NH 930P and NH 30 in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/05 Dt 03.07.2025 |
25/07/2025 |
04/07/2025
|
21/08/2025
Time
15:0Hrs
|
|
| 135 |
Consultancy services for preparation of DPR for 4L from Km 15.525 to 234.4 of Jacherla to Kalwakurthy to Mallepally to Haliya to Alinagar to Miryalaguda to Kodad Section of NH 167 in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR 2025-26/06 Dt 03.07.2025 |
25/07/2025 |
04/07/2025
|
20/08/2025
Time
15:0Hrs
|
|
| 136 |
Consultancy Services for preparation of DPR for the work Construction of 4 lane Bypass to Mahabubnagar Town from Km 275.350 of NH 167 to Km 13.285 of NH 167N in the State of Telangana |
RW/HYD/Misc-28/NIT/DPR/2025-26/03 Dt 03.07.2025 |
23/07/2025 |
04/07/2025
|
21/08/2025
Time
15:0Hrs
|
|
| 137 |
Consultancy services for rectification measures on Mahadevpur to Bhupalapally Section 2LPS of NH 353C from Km 25.0 to 59.2 Design Ch. Km.25.467 to 59.200 and DPR for Parkal Bypass, Bhupalapally Bypass on Sironcha Atmakur Section of NH 353C |
RW/HYD/Misc-28/NIT/DPR/2025-26/04 Dt 03.07.2025 |
23/07/2025 |
04/07/2025
|
21/08/2025
Time
15:0Hrs
|
|
| 138 |
Consultancy Services for preparation of DPR for I. Widening to 2L PS of balance reaches Km 184.840 to Km 190.00 and Km 194.840 to 198.800, II. Construction of additional vent to existing Major Bridge at Km 210.0 to 2 of Nizamabad to Jagdalpur NH 63 |
RW/HYD/Misc-28/NIT/DPR 2025-26/02 Dt 03.07.2025 |
21/07/2025 |
04/07/2025
|
21/08/2025
Time
15:0Hrs
|
|
| 139 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Construction of 4 Lane Elevated Corridor from Natesan Nagar ROB (km 38.220 of NH-45A) to Ariyankuppam Bridge (km 40.780 of NH-45A) and Widening of existing Road to 4 Lane road from Ariyankuppam Bridge (km 40.780 of NH-45A) to Mullodai State Border (km 54.180 of NH-45A) (total length 16km) in UT of Puducherry |
ROChennai12014NH45AAP0125PU |
03/07/2025 |
02/07/2025
|
26/11/2025
Time
15:0Hrs
|
|
| 140 |
CS for Preparation of DPR for i Construction of 6 lane Prayagraj Southern Bypass Phase2 L 34.4 Km section from Km 0.000 to 34.400 in Uttar Pradesh ii Construction of new Bridge at Yamuna River parallel to Naini Cable Stayed Bridge in UttarPradesh |
2025_NHAI_239883_1 |
16/07/2025 |
01/07/2025
|
31/07/2025
Time
11:0Hrs
|
|
| 141 |
Consultancy Services for preparation of DPR for Widening to 4 Lane Divided Carriageway of Chhapra Gopalganj section of NH-85 in the state of Bihar |
2025-NHAI-239254-1 |
02/07/2025 |
24/06/2025
|
08/08/2025
Time
11:0Hrs
|
|
| 142 |
Consultancy Services for Feasibility study and DPR preparation for Construction of 4 lane road from Kadapa to Rangampeta cross via Rayachoti pileru of NH 40 from Km 199.0 to Km 337.800 excluding Guvvalacheruvu Ghat Tunnel in the state of AP |
RO/VJA/DPR F R/NH-40/2024-25 |
27/06/2025 |
21/06/2025
|
05/08/2025
Time
16:0Hrs
|
|
| 143 |
Consultancy Services for Feasibility study and DPR preparation for a.Upgradation to 4 lane of NH 42 Old NH 219 from Km 58 600 to 140 680 Palamaneru to Krishnagiri Border section and b.Formation of Bypass to Madanapalli town on NH42 in the state of AP |
RO/VJA/DPR F R/NH-42/2024-25 |
27/06/2025 |
21/06/2025
|
05/08/2025
Time
15:0Hrs
|
|
| 144 |
Consultancy Services for Preparation of DPR for Connectivity of Gadchiroli(MH) with Raipur- Vishakhapatnam Corridor in the State of Chhattisgarh |
2025-NHAI-238800-1 |
24/06/2025 |
19/06/2025
|
12/08/2025
Time
11:0Hrs
|
|
| 145 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Four Laning of Project from Existing Two Lane with Paved Shoulders of Krishnagiri - Tindivanam section of NH-77 (Old NH-66) from Km 0.000 to Km 182.182 (Length 182.182 Km) in the State of Tamil Nadu – 3rd Call |
NHAI/ ROC/ DPR-NH-77/ 2024-25/ 205 |
04/07/2025 |
19/06/2025
|
09/07/2025
Time
17:0Hrs
|
|
| 146 |
Consultancy Services for Preparation of Detailed Project Report for Development of 6–lane National Highway from Barbil to Chandikhole (Length - 215Km) in the state of Odisha. |
2025-NHAI-238628-1 |
19/06/2025 |
17/06/2025
|
07/08/2025
Time
11:0Hrs
|
|
| 147 |
Consultancy Services for Preparation of Detailed Project Report for Development of Greenfield Northern Hamirpur Bypass of 2LPS Kohli to Chilbahal section Length 24 Km in Shimla Mataur Section of NH 103 03 in the state of Himachal Pradesh Upgradation Development widening of 2LPS to 4LPS from End of hamirpur bypass Chilbahal to Bhangbar Section New NH 03 and NH 303 (Length 37 Km) in the State of Himachal Pradesh Package IV |
2025 NHAI 238303 1 |
14/07/2025 |
13/06/2025
|
03/09/2025
Time
11:0Hrs
|
|
| 148 |
Consultancy services for preparation of DPR to mitigate the bottlenecks from Punjab/UT border near Zirakpur flyover to Poultry Farm chowk including de-congestion of old Airport chowk, Halo Majra T-Point and Poultry Farm chowk on NH-05 (Approx. Length - 3 Km) in the UT of Chandigarh. |
RW/CH/W(27)UT/CHD/2025 |
11/06/2025 |
11/06/2025
|
23/06/2025
Time
15:0Hrs
|
|
| 149 |
Consultancy Services for Preparation of Detailed Project Report for Widening work from Km. 142 to 156 including construction of bridge at Km. 131 and Km. 148 (Umarda Canal Bridges and Ishan river bridge ) of NH-234 (Old NH-91A) in the State of U.P. |
CE-RO/LKO/DPR/NH-234 (Old NH-91A)/2025-26 Date.10.07.2025 |
29/07/2025 |
11/06/2025
|
25/08/2025
Time
11:0Hrs
|
|
| 150 |
Consultancy Services for preparation of DPR for Widening to 4 Lane Divided Carriageway of Chhapra Rewaghat Muzaffarpur section of NH-722 in the state of Bihar |
2025-NHAI-237922-1 |
12/06/2025 |
10/06/2025
|
24/07/2025
Time
11:0Hrs
|
|
| 151 |
Consultancy Services for Preparation of DPR for Construction of Moregram Kishanganj High Speed Corridor in the State of West Bengal |
NHAI/West Bengal/DPR/Moregram - Kishanganj/2025/E-280947 |
16/06/2025 |
10/06/2025
|
10/07/2025
Time
15:0Hrs
|
|
| 152 |
RFP for Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect to (a) Up gradation of existing 2L plus PS of Agartala-Udaipur section to 4L Plus PS from Km 6.800 to Km 55.00 of NH-08 and (b) Development/ upgradation of Udaipur (NH-08) to Amarpur in the State of Tripura on EPC basis |
NHIDCL/TRIPURA/DPR/4L/A-U/2025 |
10/06/2025 |
10/06/2025
|
24/07/2025
Time
15:0Hrs
|
|
| 153 |
Consultancy Services for Preparation of DPR for Widening to 4Lane from Km 35.00 to Km 66.275 from Nalagarh to Swarghat of NH 105 and Spur in the State of HP. |
RO/HP/Works (340)/2024-25 (Comp. No. 246879) |
16/06/2025 |
06/06/2025
|
22/07/2025
Time
15:0Hrs
|
|
| 154 |
Consultancy Services for Preparation of DPR for Upgradation of 4-lane Tada-Nellore Section of NH-16 (Km. 54.383 to Km. 165.183/Km.1383.713) and 4-lane Nellore Bypass (Km. 1366.547 to Km.1383.713) (Total length - 127.966 Km) to 6-Lane configuration in the state of Andhra Pradesh. |
2025_NHAI_237720_1 |
24/06/2025 |
06/06/2025
|
22/07/2025
Time
11:30Hrs
|
|
| 155 |
Consultancy Services for Pre-Construction Activities and Preparation of Detailed Project Report for development of 2 Lane Alternate Route to Bypass Dabarkot Landslide Zone (from Km 75.950 to Km 80.750) on NH-134 in the State of Uttarakhand |
2025_MoRTH_863159_1 |
05/06/2025 |
06/06/2025
|
21/07/2025
Time
15:0Hrs
|
|
| 156 |
Consultancy Services for preparation of feasibility strudy and detailed project report for construction of 4lane with paved shoulder from Phulbari to Shillong in the state of Meghalaya |
2025-NHIDC-863424-1 |
10/06/2025 |
05/06/2025
|
07/08/2025
Time
15:0Hrs
|
|
| 157 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane Access Controlled High Speed Corridor starting from Siliguri to Guwahati and connecting Jorabat in the States of West Bengal and Assam |
NHIDCL/DPR/Siliguri-Guwahati/25-26 |
05/06/2025 |
05/06/2025
|
07/08/2025
Time
15:0Hrs
|
|
| 158 |
Consultancy Services for Preparation of Detailed Project Report for Development of 4lane National Highway 128B from Ballia junction on NH31 near Teekha to mau Length 56Km section in Uttar Pradesh |
2025_NHAI_237295_1 |
15/07/2025 |
03/06/2025
|
05/08/2025
Time
11:0Hrs
|
|
| 159 |
Consultancy Services for Preparation of Detailed Project Report (DPR) of 4-laning of Jabalpur-Mandla-Chilpi section of NH-30 in the State of Madhya Pradesh |
2025_NHAI_237427_1 |
11/06/2025 |
03/06/2025
|
09/07/2025
Time
11:0Hrs
|
|
| 160 |
Consultancy services for Preparation of Detailed survey investigation & preparation of DPR including L.A. & other clearance for construction of ROB at Km 17.00 (Goagachi) on NH 131A in the State of Bihar |
NIT No.06/DPR/NH/PURNEA/2025-26 |
10/06/2025 |
31/05/2025
|
30/06/2025
Time
16:0Hrs
|
|
| 161 |
Consultancy services for preparation of DPR and Land acquisition of Gangakhed City Bypass 4Lane PS Configuration Road on NH361F connecting to NH361F km at 17.650 to km 33.400 and NH 752K in Gangakhed Taluka District Parbhani in the state of Maharashtra |
No./NHDN/TEN/DPR/Nan/1526/2025 |
18/06/2025 |
30/05/2025
|
16/07/2025
Time
17:0Hrs
|
|
| 162 |
Consultancy services for preparation of DPR and Land Acquisition of Vasmat City Bypass road on NH61 connecting to NH61 km 60.00 to km 75.400 in Vasmat Taluka District Hingoli in the state of Maharashtra on EPC Mode. Tentative Length 17.50 km |
NHDN/TEN/DPR/Nan/1526/2025 |
18/06/2025 |
30/05/2025
|
16/07/2025
Time
17:0Hrs
|
|
| 163 |
Consultancy Services for DPR preparation of 4 lane road including Junction improvement and Bypasses between Km 62/100 to 106/700 of NH 183 in the State of Kerala. |
17/SE/NH/CC/KOCHI/2024-25 Consultancy Anjilimoodu |
06/06/2025 |
28/05/2025
|
12/06/2025
Time
17:0Hrs
|
|
| 164 |
DPR Preparation for 4 lane road including junction improvements and bypasses between Km 137_000-160_000 of NH 183 in the state of kerala |
16/SE/NH/CC/KOCHI/2024-25 |
06/06/2025 |
28/05/2025
|
12/06/2025
Time
17:0Hrs
|
|
| 165 |
Consultancy Services for the Preparation of Detailed Project Report DPR for the four lane Bypass of NH stretch from km 44 600 to km 56 600 Thamarassery Ghat of NH 766 in the State of Kerala |
RW/TRI/OE/NH-766/138/2017-18 |
28/05/2025 |
28/05/2025
|
14/07/2025
Time
11:0Hrs
|
|
| 166 |
Consultancy Services for preparation of DPR for development of 4/6 lane Greenfield access-controlled Highway from Bareilly-Haldwani in the State of Uttar Pradesh and Uttarakhand |
2025_NHAI_236592_1 |
27/05/2025 |
27/05/2025
|
25/06/2025
Time
11:0Hrs
|
|
| 167 |
Consultancy Services for Detailed Project Report (DPR) for construction of 4/6-lane Ring Road / Bypass (180 Km) to decongest NH-66 in the State of Goa. |
RO/MUM/AP/Goa/2025-26/NH-66/DPR |
30/05/2025 |
26/05/2025
|
15/01/2026
Time
17:0Hrs
|
|
| 168 |
Consultancy services for Preparation of DPR for long term mitigation measures for 17 nos of Blackspot locations on NH-27 (old NH-31D) in the state of West Bengal |
RO-KOL/DPR/Blackspots/NH-27/Jalpaiguri/2025 |
25/05/2025 |
23/05/2025
|
10/07/2025
Time
11:0Hrs
|
|
| 169 |
Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction of greenfield alignment wideningof existing carriageway to 2 lane with paved shoulder configuration along with mitigation |
NHIDCL/HQ/Uttarakhand/DPR/ Bhimtal to Almora /2025 |
07/06/2025 |
21/05/2025
|
14/07/2025
Time
15:0Hrs
|
|
| 170 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 4-Lane with Paved Shoulder, High Speed Corridor from Guwahati (near Jorabat) to Barapani ( near Mawlyngkhung) in the State of Meghalaya |
NHIDCL/Meghalaya/ Jorabat- Barapani/2025 |
16/06/2025 |
20/05/2025
|
30/07/2025
Time
15:0Hrs
|
|
| 171 |
Consultancy Services for preparation of Detailed Project Report for Capacity Augmentation (2 to4 Laning) of Manoharpur Dausa section of NH-148 (length 62.3 km) & Lalsot Kothun section of NH-23 (length 50.5 km) the State of Rajasthan |
RAJDIV 20013/77/2024 Rajasthan Division/ E 265732/02 Pkg-1 |
24/06/2025 |
19/05/2025
|
10/07/2025
Time
11:0Hrs
|
|
| 172 |
Consultancy Services for preparation of Detailed Project Report for Capacity Augmentation (2 to4 Laning) of Salasar Nagaur section of NH-58 (length 119.6 km) the State of Rajasthan |
RAJDIV 20013/77/2024 Rajasthan Division/ E 265732/02 (PKG-II) |
24/06/2025 |
19/05/2025
|
10/07/2025
Time
11:0Hrs
|
|
| 173 |
Consultancy Services for Preparation of DPR for Construction of Grade Separators at Sarona Chowk (ch. 279.750), Udyog Bhawan (269.000), Telibandha Chowk (Ch. 268.000) on Raipur City Portion of NH-53 at Raipur-Aurang section and Atal Path Expressway |
NHAI/11012/CG/DPR/Grade Separators/2025/2nd Call |
03/07/2025 |
16/05/2025
|
15/07/2025
Time
11:0Hrs
|
|
| 174 |
Consultancy Services for Preparation of DPR for improvement of Ashram to Badarpur Road (NH-2). |
2025-NHAI-235634-1 |
22/05/2025 |
16/05/2025
|
17/06/2025
Time
11:0Hrs
|
|
| 175 |
Consultancy Services for Preparation of DPR for improvement of Haryana- Delhi Border to Punjabi Bagh Road (NH-09). |
2025-NHAI-235638-1 |
26/05/2025 |
16/05/2025
|
17/06/2025
Time
11:0Hrs
|
|
| 176 |
Consultancy Services for Preparation of DPR for Improvement of Mehrauli to Delhi Haryana Border (NH 148A) |
2025-NHAI-235628-1 |
29/05/2025 |
16/05/2025
|
16/06/2025
Time
11:0Hrs
|
|
| 177 |
Consultancy Services for Preparation of Feasibility Report cum Detail Engineering report for construction offour lane road Km. 275-000 to 313-000 of NH 927A starting from near Mohan Colony Chauhara, Banswara toDanpur upto Rajasthan-MP Border |
RO/JAI/DPR/01/2025-26/495 |
30/05/2025 |
15/05/2025
|
30/06/2025
Time
15:0Hrs
|
|
| 178 |
Consultancy Services for preparation of Detailed Project Report for Indore-Khalghat-MP/MH Border-Dhule-Pimpalgaon section of NH- 52 in the state of Madhy Pradesh and Maharashtra under Capacity Augmentation |
2025_NHAI_235029_1 |
19/05/2025 |
09/05/2025
|
30/06/2025
Time
11:0Hrs
|
|
| 179 |
DPR for Kaithlighat to Shakral Shimla Bypass from km 143750 to km 144600 and DeScoped section of from km 127420 to km 128830and development of junction at km 128830 and Additional 2 lane Tunnelat Kandaghat in the state of Himachal Pradesh |
2025_NHAI_234208_1 |
17/05/2025 |
01/05/2025
|
22/05/2025
Time
11:0Hrs
|
|
| 180 |
Consultancy Services for Preparation of DPR for widening and up-gradation of Jaunpur-Khujjhi & Chandwak-Saidpur stretch of NH-731 in the state of Uttar Pradesh (2nd call) |
UP/HQ/ Jaunpur-Saidpur/ DPR/2025 |
21/05/2025 |
30/04/2025
|
12/06/2025
Time
11:0Hrs
|
|
| 181 |
CS for Preparation of DPR for Tech assessment and Improvement measures on existing 6 lane Udaipur Ratanpur Shamlaji section Km 287.400 to Km 401.200 of NH8 and and Preparation of DPR for Con of new Udaipur Bypass in Rajasthan and Gujarat |
NHAI/Tech/ Raj/DPR/UDA-BP |
16/05/2025 |
29/04/2025
|
24/06/2025
Time
11:0Hrs
|
|
| 182 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for elevated corridor for connectivity from AIIMS to Mahipalpur Bypass project with further extension to Gurgaon- Faridabad Road. |
2025-NHAI-233909-1 |
28/05/2025 |
28/04/2025
|
26/06/2025
Time
11:0Hrs
|
|
| 183 |
DPR and Preconstruction activities for Rehabilitation and Upgradation of Forest stretches in Sarsam to Kothari Ch. Km 33.000 to Km 90.000 and Kothari to Dhanoda Ch. Km 90.000 to Km 147.650) of NH 161A to 2LPS configuration in the state of Maharashtra |
NHDN/TENDER/DPR/NANDED/ 1190 /2025 |
28/05/2025 |
28/04/2025
|
13/06/2025
Time
17:0Hrs
|
|
| 184 |
Consultancy Services for preparation of DPR for Upgradation of NH-27 (Jhansi-Orai) from 4 Lane to 6 Lane Divided Carriageway in the state of Uttar Pradesh |
2025_NHAI_233673_1 |
26/05/2025 |
25/04/2025
|
03/06/2025
Time
11:0Hrs
|
|
| 185 |
Consultancy Services for Preparation of Detailed Project Report and Feasibility study for Construction of 4 lane in Section Kohmara to Ghoti Km 0.000 to Km 28.000 forest section in Kohmara- Goregaon- Gondia- Tirora- Masnar Road NH 753 (Length - 28.00 Km) in Gondia District in the state of Maharashtra. |
04/EENH/NGP/2025-26/ |
09/05/2025 |
25/04/2025
|
18/06/2025
Time
17:0Hrs
|
|
| 186 |
Consultancy Services for preparation of DPR for Upgradation of NH27 (Jhansi-Orai) from 4 Lane to 6 Lane Divided Carriageway in the state of Uttar Pradesh |
2025_NHAI_233673_1 |
29/04/2025 |
24/04/2025
|
27/05/2025
Time
11:0Hrs
|
|
| 187 |
Consultancy Services for preparation of DPR for Construction of Spur from Amas- Darbhanga Corridor of NH-119D to Bodhgaya, Rajgir, Vaishali & Darbhanga in the state of Bihar (2nd Call) |
2025-NHAI-233444-1 |
24/04/2025 |
23/04/2025
|
26/05/2025
Time
15:0Hrs
|
|
| 188 |
Consultancy Services for preparation of DPR for Construction of Buxar – Bhagalpur High-speed Corridor/ Expressway in the state of Bihar |
2025-NHAI-233360-1 |
29/04/2025 |
22/04/2025
|
16/06/2025
Time
11:0Hrs
|
|
| 189 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) AND PROVIDING PRE-CONSTRUCTION ACTIVITIES FOR ERECTION OF FENCE AND CONSTRUCTION OF TRACK ALONG THE FENCE OF INDO - MYANMAR BORDER (IMB) BETWEEN BP-168 TO BP-175 (LENGTH - 74.70 KM) INCLUDING CONSTRUCTION OF APPROACH ROADS IN THE STATE OF ARUNACHAL PRADESH UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/04/2025-26 |
20/04/2025 |
21/04/2025
|
31/05/2025
Time
12:0Hrs
|
|
| 190 |
Consultancy Services for preparation of Detailed Project Report for upgradation of 4-lane stretches of Barwa–Adda–Panagarh section of NH-19 into 6-lane standard in the State of Jharkhand and West Bengal |
NHAI/Tech/WB/Kolkata/NH-19/DPR |
23/04/2025 |
21/04/2025
|
08/07/2025
Time
11:0Hrs
|
|
| 191 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) AND PROVIDING PRE-CONSTRUCTION ACTIVITIES FOR ERECTION OF FENCE AND CONSTRUCTION OF TRACK ALONG THE FENCE OF INDO-MYANMAR BORDER (IMB) BETWEEN BP-179 TO BP-186 (LENGTH- 110.00 KM) INCLUDING CONSTRUCTION OF APPROACH ROADS IN THE STATE OF ARUNACHAL PRADESH UNDER 103 RCC/752 BRTF/PROJECT UDAYAK |
CE (P) Udayak/DPR Consultancy/01/2025-26 |
18/04/2025 |
19/04/2025
|
30/05/2025
Time
12:0Hrs
|
|
| 192 |
Consultancy Services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane with Paved Shoulder ,Animal Underpasses 6 Nos and ROB 01No. on Nilajphata - Pauni- Adyal- Bhandara road on NH247 as a Wildlife Mitigation Plan in KM 109.790 to Km 163.050 in State of Maharashtra. |
23/EENH/NGP/2024-25/3rd call/ 2043 |
24/04/2025 |
18/04/2025
|
02/05/2025
Time
17:0Hrs
|
|
| 193 |
Consultancy Services for Preparation of Detailed Project Report and Pre-Construction activities for Construction of Seven Tunnels of 60m length each at three different locations, in the Union Territory of Ladakh |
CE(P)/VJK/EPC/03/2025-26 |
12/04/2025 |
12/04/2025
|
26/05/2025
Time
12:0Hrs
|
|
| 194 |
Consultancy services for preparation of DPR and land acquisition of Bhokar City Bypass road on NH61 connecting to NH161A km 0.00 to km 5.00 in Bhokar Taluka District Nanded in the state of Maharashtra on EPC Mode Length 5.00 km |
No.NHDN/TEN/DPR/Nan/968/2025 |
18/05/2025 |
12/04/2025
|
06/06/2025
Time
17:30Hrs
|
|
| 195 |
Consultancy Services for Preparation of DPR and Land Acquisition of Degloor City Bypass Road on NH 63 Connecting to NH 361 Km 00.00 to km 12/.000 in Taluka Degloor Dist. Nanded in the State of Maharashtra on EPC Mode. Length 12.00 km |
No.NHDN/TEN/DPR/Nan/968/2025. |
18/05/2025 |
12/04/2025
|
06/06/2025
Time
17:30Hrs
|
|
| 196 |
Consultancy services for preparation of DPR and land acquisition of Kinwat City Bypass road on NH 161A km 0.00 km 07.00 in Taluka Kinwat District Nanded in the state of Maharashtra on EPC Mode Length 7.00 km |
No.NHDN/TEN/DPR/Nan/968/2025.. |
18/05/2025 |
12/04/2025
|
06/06/2025
Time
17:30Hrs
|
|
| 197 |
Consultancy Services for Preparation of DPR and Land Acquisition of Mukhed City Bypass and Sugaon Village Bypass Road on NH161A Taluka Mukhed Dist. Nanded in the State of Maharashtra on EPC Mode. Length 10.00 km |
No NHDN/TEN/DPR/Nan/968/2025 |
18/05/2025 |
12/04/2025
|
06/06/2025
Time
17:30Hrs
|
|
| 198 |
Consultancy services for preparation of DPR and land acquisition of Tamsa City Bypass Road on NH 752I km 0.00 to km 3.00 in Taluka Hadgaon District Nanded in the state of Maharashtra on EPC mode Length 3.00 km |
No.NHDN./TEN/DPR/Nan/968/2025 |
21/05/2025 |
12/04/2025
|
06/06/2025
Time
17:30Hrs
|
|
| 199 |
Consultancy Services for Preparation of Detailed Project Report for (i) Construction of 6–lane Prayagraj Southern Bypass Phase2 (Length 34.4 Km) section from Km 0.000 to Km 34.400 in the state of Uttar Pradesh (ii) Construction of new Bridge at Yamuna River parallel to Naini Cable Stayed Bridge in the state of Uttar Pradesh |
2025_NHAI_232596_1 |
25/04/2025 |
11/04/2025
|
15/05/2025
Time
11:0Hrs
|
|
| 200 |
Consultancy Services for Preparation of DPR for Four Laning of Thamaraipatti to T.Pudupatti section (Madurai Ring Road Phase-II) from Km 29.960 to Km 83.170 (Length 53.210 Km) of NH-744A in the State of Tamil Nadu |
NHAI/17011/02/36/2025/RO Madurai |
15/04/2025 |
11/04/2025
|
26/05/2025
Time
11:0Hrs
|
|
| 201 |
CS for prep of DPR for develop. of Eastern side RR bypass around Bulandshahar city develop of Bypass of Aligarh Dist.EC highway frm Lalkuwan Km.23.600 to start of Dadari bypass Km.33.650 along Ghb Aligarh sec in Uttar Pradesh |
2025_NHAI_232516_1 |
16/04/2025 |
09/04/2025
|
18/06/2025
Time
11:0Hrs
|
|
| 202 |
Consultancy Services for Feasibility study and preparation of Detailed Project Report (DPR) and providing Pre Construction-activities for construction of two-lane Highway Tunnel (Lapri tunnel) (approximate length 2.63 Km) on Budhal-Mahore-Gul road between km 86.900 to km 106.180 (Design chainage km 88.410 to km 91.040 of proposed road) including approach road (approximate length 1.00 Km) in 31 BRTF area under project Sampark in UT of J&K (3rd call) |
2025_BRO_704074_1 |
15/04/2025 |
09/04/2025
|
04/06/2025
Time
17:0Hrs
|
|
| 203 |
PREPARATION OF DPR INCLUDING LAND ACQUISITION AND FOREST CLEARANCE FOR CONSTRUCTION OF ROAD TUNGRI-SAMCHUNG-TSELA-MAGO FROM NEW TO NHSL SPECIFICATIONS (INDICATIVE LENGTH – 60 KMS) UNDER PROJECT VARTAK IN ARUNACHAL PRADESH |
CE (P) VTK/NIT/06/2024-25 |
09/04/2025 |
09/04/2025
|
09/06/2025
Time
11:0Hrs
|
|
| 204 |
Consultancy Services for Preparation of Detailed Project Report for (A) Development of High-Speed Access Controlled National Highway Corridor from Haridwar to Haldwani in the State of Uttar Pradesh and Uttarakhand AND (B) Construction of 4-lane Lalkuan Bypass, Haldwani Bypass and Kathgodam Bypass on NH-109 (Old NH 87) in the state of Uttarakhand. |
2025-NHAI-232348-1 |
23/04/2025 |
08/04/2025
|
08/05/2025
Time
11:0Hrs
|
|
| 205 |
Consultancy Services for Preparation of Detailed Project Report for (A) Development of High-Speed Access Controlled National Highway Corridor from Haridwar to Haldwani in the State of Uttar Pradesh and Uttarakhand AND (B) Construction of 4-lane Lalkuan Bypass, Haldwani Bypass and Kathgodam Bypass on NH-109 (Old NH 87) in the state of Uttarakhand. |
2025-NHAI-232348-1 |
15/05/2025 |
08/04/2025
|
22/05/2025
Time
11:0Hrs
|
|
| 206 |
DPR Preparation for Major bridge on NH 160H at km 111/300 near Takarkheda village on Tapi river in State of Maharashtra |
2025-MoRTH-855943-1 |
02/05/2025 |
07/04/2025
|
05/06/2025
Time
17:30Hrs
|
|
| 207 |
Consultancy Services for preparation of DPR for development of 4/6 lane Greenfield access-controlled Highway from Etawah-Farrukhabad-Bareilly in the state of Uttar Pradesh (2nd Call) |
UP/HQ/ Etawah Farrukhabad Bareilly /HSC/DPR/ 2025 |
04/04/2025 |
04/04/2025
|
04/06/2025
Time
11:0Hrs
|
|
| 208 |
Consultancy services for preparation of DPR and Pre-const. activities in respect ofconstruction of existing carriageway into 2l withPS from Pakyong toBarapathing via Gangchung , Tokchi and Machong in the State ofSikkim (2nd call) |
NHIDCL/Sikkim/DPR/Pakyong/25 |
02/04/2025 |
02/04/2025
|
08/05/2025
Time
15:0Hrs
|
|
| 209 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRE-CoNSTRUCTION ACTIVITIES FOR CONSTRUCTION OF ROAD NURBO SUMDO-KIATO TO NHDL SPECIFICATIONS FOR 75.00 KM LENGTH FROM KM 0.00 TO KM 75.00 including TWO DIMENSIONAL 5.0 KM TUNNEL INCLUDING DETAIL FEASIBILITY STUDY FOR TUNNEL AT TAKLING-LA PASS UNDER 108 RCC/759 BRTF/ PROJECT DEEPAK IN THE STATE OF HIMACHAL PRADESH |
CE (P) DPK-19/2024-25 |
28/03/2025 |
28/03/2025
|
21/05/2025
Time
16:0Hrs
|
|
| 210 |
DPR for Construction of Trimbakeshwar Bypass Road network to Four lane with paved shoulder along Ghoti Trimbakeshwar Jawhar Road |
2025-MoRTH-854917-1 |
12/05/2025 |
28/03/2025
|
09/06/2025
Time
17:30Hrs
|
|
| 211 |
Consultancy Services of Preparation of DPR for development of 4-lane greenfield highway from Kuppam-Hosur-Bengaluru (STRR) in the State of Andhra Pradesh. |
APDIV-2022/02/2025-Andhra Pradesh Division |
21/05/2025 |
28/03/2025
|
03/06/2025
Time
11:0Hrs
|
|
| 212 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Four Laning of Project from Existing Two Lane with Paved Shoulders of Krishnagiri - Tindivanam section of NH-77 (Old NH-66) from Km 0.000 to Km 182.182 (Length 182.182 Km) in the State of Tamil Nadu – 2nd Call |
NHAI/ RO-CHENNAI/ DPR-NH-77/ 2024-25/ 205 |
11/04/2025 |
27/03/2025
|
17/04/2025
Time
11:0Hrs
|
|
| 213 |
Project Management Consultancy Services for Widening to 2-lane with paved shoulder along with specialized slope protection works in vulnerable landslide/ sinking zones from Km 0.000 to 52.100 of NH-10 Sevoke-Rangpo section” in the State of West Bengal |
NHIDCL/HQ/NH-10/PMC/2025 |
26/03/2025 |
26/03/2025
|
15/04/2025
Time
15:0Hrs
|
|
| 214 |
Consultancy Services DPR of Strengthening and Improvement from Km 231.0 - 231.420, Km 232.580 -236.0, Km 248.0 to 265.400, Km 290.500 to 294.600 on Hyderabad-Bhupalapatnam Section of NH-163 in the Telangana 2nd Call |
SE R and B NH WGL 30 2024 25 Dt. 24.03.2025 |
26/03/2025 |
25/03/2025
|
16/04/2025
Time
15:0Hrs
|
|
| 215 |
Consultancy Services for preparation of Detailed Project Report for Construction of Rairakhol Town Bypass on NH-153B and NH-55 in the State of Odisha under Annual Plan 2024-25. |
03-ROBBSR-2024-25/DPR-3rd call |
26/03/2025 |
24/03/2025
|
09/05/2025
Time
15:0Hrs
|
|
| 216 |
Project Management Consultancy Services For Design and supervision of construction of 2 lane road starting from Dhalwala km 228.800 start of tunnel to km 235.800 of NH 7 (length-7.0 kms) with five tunnels of Length 750m,100M,100M,200M AND 300m. |
2025_MoRTH_853903_1 |
21/03/2025 |
24/03/2025
|
05/05/2025
Time
17:0Hrs
|
|
| 217 |
Consultancy Services for preparation of Detailed Project Report for 4-laning of Gumla to Kolebira section of NH-23 (New NH 143) in the State of Jharkhand |
NHAI/RO/RNC/JH/2024-25/16 |
02/05/2025 |
24/03/2025
|
12/05/2025
Time
11:30Hrs
|
|
| 218 |
Consultancy Services for preparation of Detailed Project Report for Indore-Khalghat-MP/MH Border-Dhule-Pimpalgaon section of NH- 52 in the state of Madhy Pradesh and Maharashtra under Capacity Augmentation |
NHAI/RO-MP/DPR/IND/IDP/2025 |
21/04/2025 |
21/03/2025
|
08/05/2025
Time
11:0Hrs
|
|
| 219 |
Consultancy Services for Preparation of DPR of Farakka Raiganj Section of NH- 12 (old NH-34) for long term mitigation measures of black spots proposed to be rectified on standalone basis for Blackspot IDs WB-04-52-BS (from Ch. 380.75 to Ch. 381.25) & WB-03-73-BS (from Ch. 304.90 to Ch. 305.40) and the work of Construction of Service road at Sujapur area (from Ch. 312.50 to Ch. 315.50) |
RO-KOL/DPR/BlackSpot/NH-12/Malda |
07/04/2025 |
20/03/2025
|
08/05/2025
Time
11:0Hrs
|
|
| 220 |
Consultancy Services for preparation of Detailed Project Report for widening and strengthening from Km 327.700 to Km 413.700 and Km 429.700 to Km 513.700 on NH-326 in the State of Odisha under Annual Plan 2024-25 |
09-ROBBSR-2024-25 |
21/03/2025 |
20/03/2025
|
15/05/2025
Time
15:0Hrs
|
|
| 221 |
Consultancy Services for DPR Preparation for reconstruction of Minor bridge at Km 92 and Km 96 of NH-522(including complete Land acquisition , Forest clearance and utility shifting if any) in the state of Jharkhand under EPC mode |
NH/HAZARIBAGH/2024-25/09 |
27/03/2025 |
20/03/2025
|
11/04/2025
Time
15:0Hrs
|
|
| 222 |
Consultancy Services for DPR preparation of 4 lane road including junction improvement and bypasses between Km 62_100 to 106_700 of NH 183 in the State of Kerala |
2025_MoRTH_853742_1 |
27/03/2025 |
19/03/2025
|
22/04/2025
Time
17:0Hrs
|
|
| 223 |
Consultancy Services for the preparation of DPR for widening and up-gradation of Ambedkar Nagar to Raebareli section of NH-128 from Chainage Km 0.00 to Km 148.980 & Ayodhya – Prayagraj Section from Ch. Km 82.000 to Km 95.100 of NH-330 in the state of Uttar Pradesh. |
UP/HQ/Raebareli Tanda/DPR/2025 |
19/03/2025 |
19/03/2025
|
13/05/2025
Time
11:0Hrs
|
|
| 224 |
Consultancy Services for DPR Preparation for 4 lane road including junction improvements and bypasses between km 137/000 to 160/000 of NH183 in the state of Kerala |
2025_MoRTH_853790_1 |
25/03/2025 |
19/03/2025
|
22/04/2025
Time
17:0Hrs
|
|
| 225 |
Consultancy Services for Feasibility Study & Detailed Engineering for Construction of 4-Lane Una Bye Pass starting from Ghaluwal Km 13/500 of NH-503A, NH- 503Ext., Una-Dhamandri Road, Dangoli (MDR-84), PGI Satellite Centre (NH-503A) and terminating near Rakkar Km 37/00 (NH-503Extn.) in the State of Himachal Pradesh. |
RO/HP/Works (337)/2024-25 (243632) |
24/03/2025 |
12/03/2025
|
14/05/2025
Time
15:0Hrs
|
|
| 226 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR UPGRADATION OF 2 LANE WITH PAVED SHOULDER TO 4 LANE WITH PAVED SHOULDER FROM AKALTARA TO RENGALPALI/ODISHA BORDER FROM KM 151.450 TO KM 276.786 INCLUDING BILASPUR BYPASS TOTAL LENGTH OF 155.336 KM ON NH 49 IN THE STATE OF CHHATTISGARH |
RW/RO/CG/DPR/NH49 |
12/03/2025 |
12/03/2025
|
06/05/2025
Time
11:0Hrs
|
|
| 227 |
Consultancy Services for Prepartion of Detailed Project Report and Feasibillity study for the Rail Over Bridge at Khaparkheda railway Crossing of Package IV (Phase-I – Dahegaon to Kamptee Section) on NH247 at Ch. 4.880 over Khaparkheda-Pipla Halt Broadgauge Line in the State of Maharashtra. |
38/EENH/NGP/2024-25/1213 |
17/03/2025 |
10/03/2025
|
26/03/2025
Time
17:0Hrs
|
|
| 228 |
Consultancy Services for Preparation of Detailed Project Report for Upgradation to 4 lane 2L PS of Parour to Chauntra from Km 100 840 to Km 140 625 and Chauntra to Padhar from Km 140 625 to Km 180 00 of Pathankot Mandi section of NH 154 in the state of Himachal Pradesh through BOT Hybrid Annuity EPC mode. |
2025 NHAI 229449 1 |
29/03/2025 |
10/03/2025
|
23/04/2025
Time
11:0Hrs
|
|
| 229 |
Consultancy Services for Feasibility study and preparation of DPR for 2L plus PS for NH-516E road from Km 8.830 to 10.400, Km 12.800 to 14.400 and Km 23.200 to 43.700 of Rajamahendravaram to Rampachodavaram Section and for NH-26 road from Km 473.287 to 486.831 of Raipur to Visakhapatnam Section in the State of Andhra Pradesh. |
SENHVJA/26/2024-25 Dated.07.03.2025 |
17/05/2025 |
10/03/2025
|
27/05/2025
Time
17:0Hrs
|
|
| 230 |
Consultancy Services for Feasibility Study/Preparation of DPR for Bypass to Kavali and Kaligiri towns on NH 167BG in the state of Andhra Pradesh |
SENHVJA/25/2024-25 Dated 04.03.2025 |
03/05/2025 |
07/03/2025
|
19/05/2025
Time
17:0Hrs
|
|
| 231 |
Consultancy Services for preparation of DPR for the work (i)“Widening to 4-Laning of the stretch from Km 247/000 to 248/300 including construction of High Level Bridges at Km 215/700, Km 216/780, Km 223/014, Km 223/300, Km 225/130, Km 234/600, Km 263/470, Km 296/700, Km 302/250 and Km 302/395 on Hyderabad-Bhupalapatnam Section of NH-163 (ii) Construction of Flyover at Km 25/600 to 27/200 of Nakrekal-Thanamcharla Section of NH-365 in the State of Telangana 3rd Call |
SE R and B NH WGL 29 2024-25, Dt. 15.02.2025 |
07/03/2025 |
07/03/2025
|
10/03/2025
Time
15:0Hrs
|
|
| 232 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge along with its approaches connecting NH-10 with NH-510 near Singtam,development of its junction and identification and realignment from Km 0.000 to Km 3.074 (Singtam-Tarku) on NH-510 into 2 lane with paved shoulder configuration along with permanent mitigation measures for landslide/sinking/slip zones on existing section 2nd call |
NHIDCL/Sikkim/DPR/NH-510/Singtam-Tarku/25/2nd Call |
06/03/2025 |
06/03/2025
|
15/04/2025
Time
15:0Hrs
|
|
| 233 |
Consultancy Services for Preparation of DPR for development of Eastern Extension of Urban Extension Road-II (UER-II). |
2025-NHAI-228896-1 |
19/03/2025 |
05/03/2025
|
23/04/2025
Time
11:0Hrs
|
|
| 234 |
CONSULTANCY SERVICES TO CARRYOUT GEOTECHNICAL SURVEY AND INVESSTIGATION, FEASIBILITY STUDY INCLUDING ENVIRONMENTAL/SOCIAL IMPACTS AND PREPARATION OF DETAILED PROJECT REPORT, POST DESIGN DRAWINGS OF HILL PROTECTION FOR WIDENING OF EXISTING TRACK FROM SAN UNDER DEPOSIT WORKS (FUNDED BY SHRIMATA VAISHNO DEVI SHRINE BOARD (SMVDSB)) UNDER 69 RCC/35 BRTF PROJECT SAMPARK IN JK (UT) (DEPOSIT WORK) |
2025_BRO_700075_1 |
06/03/2025 |
04/03/2025
|
22/04/2025
Time
11:0Hrs
|
|
| 235 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road NH -353D in Km 109.650 and 111.175 In State Of Maharashtra On EPC Mode. |
36/EENH/NGP/2024-25/1049 |
24/04/2025 |
28/02/2025
|
30/04/2025
Time
17:0Hrs
|
|
| 236 |
Consultancy Services for Detailed Project Report(DPR) for.. A) Proposed Udgir Bypass on NH-63 (Length 11.05km) B) Proposed ROB at Aashtamode (LC No.05 C) on NH-63. C) Proposed ROB at Pangaon (LC No.T-107) on NH-361H D) Proposed ROB at Wadval Nagnath (LC No.97) on NH-752K E) Proposed ROB at Parali (LC No.T-24) & Reconstruction of Structures of Parali-Dharmapuri section of NH-361H. in the State of Maharashtra. |
EENHD/Latur/Tender-1/DPR/4172025_MoRTH_850999_1 |
06/03/2025 |
27/02/2025
|
21/04/2025
Time
17:0Hrs
|
|
| 237 |
Consultancy Services of Preparation of DPR for Inter connected link road between Paderu (on NH-516E) and Pinagadi (on NH-16) via Madugula Ghat Road in the State of Andhra Pradesh |
2025_NHAI_227961_1 |
29/03/2025 |
25/02/2025
|
17/04/2025
Time
11:0Hrs
|
|
| 238 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRE CONSTRUCTION-ACTIVITIES FOR CONSTRUCTION OF ROAD NURBO-SUMDO-KIATO INCLUDING TAKLING-LA TUNNEL (5.0 KM LENGTH TENTATIVE) TO NHSL SPECIFICATIONS FROM KM 30.00 TO KM 75.00 (NET LENGTH 45.00 KM INCLUDING TWO DIMENSIONAL 5.0 KM TUNNEL) UNDER PROJECT DEEPAK IN THE STATE OF HIMACHAL PRADESH |
CE (P) DPK-17/2024-25 |
25/02/2025 |
24/02/2025
|
16/04/2025
Time
16:0Hrs
|
|
| 239 |
Consultancy Services for DPR Preparation for 4 lane road including junction improvements and bypasses between km 137/000 to 160/000 of NH183 in the state of Kerala. |
2025-MoRTH-847969-1 |
03/03/2025 |
24/02/2025
|
20/03/2025
Time
17:0Hrs
|
|
| 240 |
Consultancy Services for the Preparation of Detailed Project Report (DPR) for the Improvement of Existing Highway, Junctions and Bypasses between km. 62_100 (Anjilimoodu-Near Chenganur Town) to km. 106_700 (Aida Junction-Kottayam) of NH-183, Kerala |
2025_MoRTH_847730_1 |
04/03/2025 |
24/02/2025
|
20/03/2025
Time
17:0Hrs
|
|
| 241 |
Consultancy Services for Preparation of Detailed Project Report for Widening of existing single intermediate lane to 2 lane with paved shoulders and Alignment Re Alignmentfrom Km 189.00 to 263.115 Salondhar to Buwakhal on NH 309 Old No 121. |
2025_MoRTH_850254_1 |
20/02/2025 |
24/02/2025
|
07/04/2025
Time
17:0Hrs
|
|
| 242 |
Consultancy Services for Preparation of DPR for widening and up-gradation of Jaunpur-Khujjhi and Chandwak-Saidpur stretch of NH-731 in the state of Uttar Pradesh |
UP/HQ/Jaunpur-Saidpur/DPR/2025 |
20/02/2025 |
20/02/2025
|
25/03/2025
Time
11:0Hrs
|
|
| 243 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION IMPROVEMENT OF ROAD BARIPATTAN JHALLAS FROM KM 103.700 TO 210.00 IN 31 BRTF AREA UNDER PROJECT SAMPARK IN J K |
2025_BRO_698713_1 |
23/02/2025 |
20/02/2025
|
11/04/2025
Time
11:0Hrs
|
|
| 244 |
DPR for Kaithlighat to Shakral Shimla Bypass from Km 143750 to Km 144600 and DeScoped section of from Km 127420 to Km 128830 and development of Junction at Km. 128830 and Additional 2 Lane Tunnel at Kandaghat in the State of Himachal Pradesh |
2025_NHAI_227175_1 |
19/02/2025 |
19/02/2025
|
11/03/2025
Time
15:0Hrs
|
|
| 245 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway of Bhavnagar Bharuch in the state of Gujarat |
2025_MoRTH_849923_1 |
19/02/2025 |
19/02/2025
|
17/06/2025
Time
17:0Hrs
|
|
| 246 |
Consultancy services for preparation of DPR & Feasibility report for Development of NH-162E, Pali-Nadol-Desuri-Charbhuja Junction section (Km 29/00 to Km 94/00 of old SH-67 and Km 278/00 to Km 281/500 & Km 290/00 to Km 296/00 of old SH-16) with Construction of Elevated road/ Tunnel road in Wildlife / Forest section, as per requirement (Km 281/500 to Km 290/00 of old SH-16). (Tentative Length=83.00 Km) |
2025_MoRTH_849130_1 |
17/02/2025 |
17/02/2025
|
19/03/2025
Time
11:0Hrs
|
|
| 247 |
Consultancy Services for preparation of DPR for the work of Widening to 4L/6L and Strengthening from Km 165/000 to 171/600 of Vijayawada-Jagadalpur Section of NH-30 in the State of Telangana (2nd Call) |
SE RB NH WGL 28 2024 25 Dt 15 02 2025 |
07/03/2025 |
15/02/2025
|
12/03/2025
Time
15:0Hrs
|
|
| 248 |
Consultancy Services for preparation of Detailed Project Report for Bhopal-Jabalpur green field corridor ( Part of Vision 2047) in the state of Madhya Pradesh |
2025_NHAI_226866_1 |
19/02/2025 |
14/02/2025
|
21/04/2025
Time
11:0Hrs
|
|
| 249 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT FOR GEOLOGICAL INVESTIGATION OF SLOPE STABILISATION/SLOPE MITIGATION BETWEEN KM 1.900 TO KM 8.780, KM 27.00 TO KM 27.150 AND KM 35.500 TO KM 35.650 ON SANKLANG TOONG ROAD UNDER AOR OF 107 RCC/758 BRTF/ PROJECT SWASTIK IN SIKKIM STATE Job No 314/204 |
CE(P)Swtk/37/2024-25 |
11/02/2025 |
12/02/2025
|
10/03/2025
Time
12:0Hrs
|
|
| 250 |
Consultancy Services for Preparation of DPR for Extension of UER-II till Delhi Saharanpur Highway |
2025-NHAI-226526-1 |
13/02/2025 |
12/02/2025
|
07/04/2025
Time
11:0Hrs
|
|
| 251 |
Consultancy Services for Preparation of Detailed Project Report for Development of 6–lane National Highway of Chitrakoot-Prayagraj-Varanasi (Length - 249Km) section in the state of Uttar Pradesh |
2025_NHAI_226535_1 |
03/04/2025 |
12/02/2025
|
23/04/2025
Time
11:0Hrs
|
|
| 252 |
PREPARATION OF DPR FOR HILL SLOPE PROTECTION ON 07 ZIGS ON NGG- LGG ROAD FROM KM 40.00 TO KM 44.00 IN AOR OF 125 RCC/ 763 BRTF/ VARTAK IN ARUNACHAL PRADESH |
CE (P) VTK/NIT/04/2024-25 |
11/02/2025 |
11/02/2025
|
12/04/2025
Time
11:0Hrs
|
|
| 253 |
CONSULTANCY SERVICE FOR ENGAGEMENT OF CONSULTANT FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION OF ROAD NEW TO NHSL ON CHARANG-KHIMOKUL FROM KM 0.00 TO KM 30.000 (NET LENGTH 30.000 KM), RISHI-DOGRI-GANTHAM-BALAM FROM KM 0.00 TO KM 64.000 (NET LENGTH 64.000 KM), KOTA-DOGRI-SHIMDONG FROM KM 0.00 TO KM 23.000 (NET LENGTH 23.000 KM) AND NITHAL-TACH-NAKDUM FROM KM 0.00 TO KM 9.000 (NET LENGTH 9.000 KM) UNDER 68 RCC / 759 BRTF UNDER PROJECT DEEPAK IN HIMACHAL PRADESH |
Tender No.CE (P)DPK-10/2024-25 |
22/01/2025 |
11/02/2025
|
27/02/2025
Time
16:0Hrs
|
|
| 254 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR FOR ERECTION OF FENCE AND CONSTRUCTION OF TRACK ALONG THE FENCE OF INDO-MYANMAR BORDER (IMB) BETWEEN BP-175 TO BP-179 IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/42/2024-25 |
15/02/2025 |
08/02/2025
|
20/03/2025
Time
12:0Hrs
|
|
| 255 |
Consultancy Services for DPR preparation of NH-320D from Km 0.00 to Km 86.00 in the State of Jharkhand |
2025-MoRTH-847693-1 |
11/03/2025 |
07/02/2025
|
29/04/2025
Time
15:0Hrs
|
|
| 256 |
PMC services for widening to 2 lane with PS of NH-10 Sevoke-Rangpo section in West Bengal |
NHIDCL/HQ/NH-10/PMC/2024 |
29/01/2025 |
07/02/2025
|
25/03/2025
Time
15:0Hrs
|
|
| 257 |
Chief Engineer (NH), Maharashtra has been assigned the work of „‘Consultancy services for Preparation of Detailed Project Report for A) Chandurbazar Bypass on NH 353J ( Length = 6.00Km) , B) Morshi Byapss on NH 353 K( Length = 9.00Km) , C) Warud Bypass on NH 353 K ( Length = 12.00 km. D) Digras Bypass on NH 161A ( Length = 5.00 km )Total length 32 km length in the state of Maharashtra.” |
36/EENH/AMT/2024-25 |
11/03/2025 |
06/02/2025
|
02/04/2025
Time
17:30Hrs
|
|
| 258 |
Consultancy services for preparation of DPRs for construction of LRV cavern tunnels (16 Nos) of 60 mtr long each at various locations under Project Himank in Union Territory of Ladakh |
2025_BRO_695969_1 |
16/02/2025 |
03/02/2025
|
29/03/2025
Time
18:0Hrs
|
|
| 259 |
Consultancy Services for Preparation of Detailed Project Report for construction of bridges on River Ganga (at km 803.050) & River Sone (at km 935.500) on Varanasi-Aurangabad Section of NH-2 in the state of Bihar |
2025-NHAI-225569-1 |
13/02/2025 |
03/02/2025
|
15/04/2025
Time
15:0Hrs
|
|
| 260 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND PROVIDING PRE-CONSTRUCTION SERVICES IN RESPECT TO CONSTRUCTION OF EXISTING / GREENFIELD ALINGMENT FOR MANUL-SANKLANG (PHASE-I) AND SANKLANG-NING LA -MENSHITHANG (PHASE-II) TO NHSL SPECIFICATIONS UNDER PROJECT SWASTIK IN SIKKIM STATE |
CE (P) SWTK/03/2024-25/EPC |
03/02/2025 |
03/02/2025
|
20/03/2025
Time
17:0Hrs
|
|
| 261 |
Consultancy services for the preparation of Detailed Project Report DPR for Land Acquisition and forest proposal for upgradation to two lane paved shoulders Four lane configuration Tembhurni Pandharpur Mangalwedha Umadi to Vijapura Border Road NH 56 |
NHD/TC/162/2025 |
08/02/2025 |
03/02/2025
|
03/04/2025
Time
17:30Hrs
|
|
| 262 |
Consultancy Services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane with Paved Shoulder ,Animal Underpasses (6 Nos) and ROB (01No.) on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitigation Plan in KM 109/790 to Km 163/050 in State of Maharashtra. |
23/EENH/NGP/2024-25 / 2nd call/561 |
10/02/2025 |
01/02/2025
|
25/02/2025
Time
17:0Hrs
|
|
| 263 |
Consultancy Services for preparation of DPR for widening and upgradation of Raebareli Banda stretch of NH232 (old) in the state of Uttar Pradesh |
UP/HQ/Raebareli Banda/DPR/2025 |
13/02/2025 |
31/01/2025
|
25/03/2025
Time
11:0Hrs
|
|
| 264 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD MOREHTHINGPAI- NEW SAMATHAL (M-T-N-S) FROM KM 60.00 TO KM 85.00 (NEW SAMATHAL) (APPROX) TO NHSL SPECIFICATION UNDER 25 BRTF/PROJECT SEWAK IN MANIPUR STATE |
CE (P)/SWK/DPR CONSULTANCY/03/2024-25 (Fourth Call) |
27/01/2025 |
30/01/2025
|
01/03/2025
Time
11:0Hrs
|
|
| 265 |
Consultancy Services for Preparation of Detailed Project report for 4 Lane with paved shoulder from km. 0.00 (Chhapwa) to km. 25.00 (Bettiah) of NH 727 for the year 2024_25 in the State of Bihar. |
09/NH/MOT/DPR/2024-25 |
30/01/2025 |
29/01/2025
|
24/03/2025
Time
15:0Hrs
|
|
| 266 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of NH-81, NH-181, NH-381, NH-948 & NH-85 in the State of Tamil Nadu. |
ROChennaiMoRTH12014NHDPR16AP22 |
27/01/2025 |
27/01/2025
|
11/03/2025
Time
11:30Hrs
|
|
| 267 |
Consultancy Services for Preparation of Detailed Project Report for construction of 02 Lane Bridges at Km 92.911 Km 99.206 Km 100.600 Km 121.800 Km 126.901 Km 144.135 and Km 150.794 of NH 730 in the State of Uttar Pradesh. |
324/1-Tender Cashier(LMP)-NHC dated 24.01.2025 |
22/02/2025 |
25/01/2025
|
24/02/2025
Time
11:0Hrs
|
|
| 268 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND PROVIDING PRE-CONSTRUCTION SERVICES IN RESPECT TO UPGRADATION AND CONSTRUCTION OF EXISTING/GREENFIELD ALIGNMENT FOR NAMCHI-RAVANGLA-KARSANG-NUNG-SANKLANG (Phase-I) and NUNG-BE-TOLUNG GOMPA-JAKTHANG-ZEEMA (Phase-II) TO NHDL SPECIFICATIONS WITH PAVED SHOULDERS UNDER PROJECT SWASTIK IN SIKKIM STATE |
CE(Project)SWTK/02/2024-25/EPC |
22/01/2025 |
22/01/2025
|
10/03/2025
Time
17:0Hrs
|
|
| 269 |
Consultancy Services for Preparation of DPR for Development of Chandigarh Haridwar Greenfield Access Controlled National Highway and Connectivity from Sonipat to Delhi Dehradun Expressway in the State of Haryana Uttar Pradesh and Uttarakhand |
2025-NHAI-224585-1 |
17/02/2025 |
22/01/2025
|
28/02/2025
Time
11:0Hrs
|
|
| 270 |
Consultancy Services for Preparation of DPR for 4 Lane from Km 0 to Km 15.300 from Punjab Border to Jhalera of NH 503A in the State of Himachal Pradesh. |
RO/HP/Works (344)/2024-25 (248017) |
23/01/2025 |
22/01/2025
|
11/03/2025
Time
15:0Hrs
|
|
| 271 |
Consultancy, Services for preparation of Detailed Project Report for Construction of Rairakhol Town Bypass on NH-153B and NH-55 in the State of Odisha under Annual Plan 2024-25 |
03-ROBBSR-2024-25/DPR -2nd call |
23/01/2025 |
21/01/2025
|
06/03/2025
Time
15:0Hrs
|
|
| 272 |
Consultancy Services for Preparation of DPR for 4 Lane from Km 39 to 91 from Ranital to Mubarikpur on NH 503 with 2 lane and paved shoulders spur to Mata Chintpurni in the State of Himachal Pradesh. |
RO/HP/Works (341)/2024-25 |
22/01/2025 |
21/01/2025
|
10/03/2025
Time
15:0Hrs
|
|
| 273 |
Consultancy services for preparation of DPR for study of landslide area on various locations between Chainage km 172.900 to km 182.000 along NH-39 (New NH-29)in the state of Nagaland |
CE/NH/CONSULTANT/LS/NH-39/2023-24 |
20/01/2025 |
21/01/2025
|
04/02/2025
Time
13:0Hrs
|
|
| 274 |
Consultancy services for preparation of feasibility study/ DPR for Widening of Two lane with paved shoulders from Km (Design chainage) Km 70.90 to Km 84.10 and Km 92.50 to Km 111.50 Churikatte to anandapura section of NH-69 in the state of Karnataka. |
EE/NHDSMG/NH69/NIT3/DPR/24-25 |
20/01/2025 |
21/01/2025
|
29/01/2025
Time
16:0Hrs
|
|
| 275 |
Consultancy Services for Preparation of DPR for Strengthening/Rehabilitation of NH-2E (Belghoria Expressway) from Km.0.000 to Km.7.363 (excluding Km.2.900 to Km.4.250 BHS) under North 24 Parganas District, West Bengal |
RO-KOL/Bel-Exp/DPR/2024/2nd Call |
21/01/2025 |
20/01/2025
|
04/02/2025
Time
11:0Hrs
|
|
| 276 |
Consultancy Services for Preparation of Detailed Project Report and Pre-Construction of Seven Tunnels of 60m length each at three different locations, in the Union Territory of Ladakh |
CE(P)/VJK/EPC/01/2024-25 |
04/02/2025 |
20/01/2025
|
15/03/2025
Time
12:0Hrs
|
|
| 277 |
PMC for preparation of Detailed Project Report, Pre construction activity and supervision for the work of Widening/Upgradation to 4LPS from Barabanki to Lakhimpur of NH727H (except from Dewa to Fatehpur km 19 000 to km 39 000) in the state of UP |
CE-RO/LKO/PMC/727H/2024-25 Dated.17.01.2025 |
20/01/2025 |
17/01/2025
|
05/05/2025
Time
11:0Hrs
|
|
| 278 |
Consultancy Services for preparation of DPR for the works 1. Widening to 2L PS of balance reaches from Km 184.840 to Km 190.00 and Km 194.840 to 198.800 of NH-63 on Nizamabad-Jagdalpur road on EPC mode and 2. Construction of additional vent to existing Major Bridge at Km 210.0-2 of Nizamabad-Jagdalpur section of NH-63 in the State of Telangana |
SE R and B NH NZB 26 2024 25 Dt 17 01 2025 4th call |
22/01/2025 |
17/01/2025
|
31/01/2025
Time
15:0Hrs
|
|
| 279 |
Consultancy Services for Preparation of Detailed Project report for VTR Bypass 2 lane with paved shoulders configuration along with a bridge over Gandak River from Bagaha to Near UP Border of NH 727. |
08/NH/MOT/DPR/2024-25 |
17/01/2025 |
17/01/2025
|
05/02/2025
Time
15:0Hrs
|
|
| 280 |
Consultancy services for Preparation of Detailed survey investigation & preparation of DPR including L.A. & other clearance for construction of ROB at Km 17.00 (Goagachi) on NH 131A in the State of Bihar. |
10/DPR/NH/PURNEA/2024-25 |
17/01/2025 |
16/01/2025
|
06/02/2025
Time
16:0Hrs
|
|
| 281 |
Consultancy Services for Preparation of Detailed Project Report (DPR)-2nd call for (1) Four Laning of Project from Existing Two lane with Paved Shoulder of Bijapur Gulbarga Humnabad section of NH 50 in the State of Karnataka (Length – 220.0 Km) (2) Four/six Laning of Project from Tamilnadu/Karnataka Border to Bangalore section of NH948 in the state of Karnataka (Length – 187.0 Km) |
NIT No.33/NHAI/RO-BNG/DPR/Tender/2024-25 dated 15.01.2025 |
16/01/2025 |
15/01/2025
|
06/03/2025
Time
11:0Hrs
|
|
| 282 |
DPR and Preconstruction activites for Rehabilitation and Upgradation of Forest stretches in Sarsam to Kothari Km 33.000 to Km 90.000 and Kothari to Dhanoda Km 90.000 to Km 147.650 of NH 161A to 2LPS configuration in Maharashtra (length 14.525 Km) |
NHDN/TENDER/DPR/NAN/125/2025 |
19/01/2025 |
14/01/2025
|
05/02/2025
Time
17:0Hrs
|
|
| 283 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of NH-136, NH-179A & NH-532 in the State of Tamil Nadu. |
ROChenMRTH12014NH136DPR10AP24 |
16/01/2025 |
10/01/2025
|
26/02/2025
Time
11:30Hrs
|
|
| 284 |
Preparation of Detailed Project Report, Pre construction activity and supervision for the work of Elevated flyover in Dhanbad Town from km-53(Dhansar) on (NH-218) to Govindpur on NH-19 (Old NH-2) in the state of Jharkhand |
NH/Dhanbad/13/2024-2025 |
04/02/2025 |
10/01/2025
|
25/02/2025
Time
15:0Hrs
|
|
| 285 |
DPR preparation for Land Acquisition and Construction of Sakri bypass on NH 752G in the state of Maharashtra |
04/ EEIH / Dhule I 30 /2025 |
14/02/2025 |
10/01/2025
|
04/03/2025
Time
17:30Hrs
|
|
| 286 |
Consultancy Services for DPR Preparation for Ambad Bypass with 4L PS configuration of Jalna Ambad Wadigodri road NH753H in the state of Maharashtra |
EENH/Jalna/Tender/NIT No 10/2063 |
15/01/2025 |
09/01/2025
|
13/02/2025
Time
17:30Hrs
|
|
| 287 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of Kalwari Bypass- 2 lane with Paved Shoulder for Kalwari town on NH-227A (Ram Janki Marg) KM-36 in the State of Uttar Pradesh. |
110 /705C(1)-NH Circle/2024-25 Date. 08.01.2025 |
15/01/2025 |
09/01/2025
|
18/02/2025
Time
15:0Hrs
|
|
| 288 |
Project Management Consultancy Services For Design and supervision of construction of 2 lane road starting from Dhalwala km 228.800 start of tunnel to km 235.800 of NH 7 (length-7.0 kms) with five tunnels of Length 750m, 100M,100M,200M AND 300m. |
2025_MoRTH_843284_1 |
08/01/2025 |
09/01/2025
|
28/02/2025
Time
17:0Hrs
|
|
| 289 |
Consultancy Services for preparation of Detailed Project Report for Development of Southern portion of Hyderabad Regional Ring Road Express Way in the State of Telangana |
SE RandB NH HYD 14 2024 25 dt. 08.01.2025 |
09/01/2025 |
09/01/2025
|
10/02/2025
Time
15:0Hrs
|
|
| 290 |
CS for DPR for preparation and upgradation of part of NH17 and NH317 to 4 Lanning configuration from Ellenbari to Salsalabari via Bagrakote Odlabari Chalsa Telipara Birpara Hasimara in Jalpaiguri Alipurduar Coochbihar district in the state of WB |
MORTH/RO-KOL/NIT/DPR/24-25/01 |
08/01/2025 |
08/01/2025
|
21/02/2025
Time
18:0Hrs
|
|
| 291 |
Consultancy Services for preparation of DPR for development of 4/6 lane Greenfield access-controlled Highway from Aligarh-Moradabad-Bijnor in the state of Uttar Pradesh(2nd Call) |
UP/HQ/Aligarh-Mor-Bijnor/HSC/DPR/2025 |
09/01/2025 |
08/01/2025
|
18/02/2025
Time
11:0Hrs
|
|
| 292 |
Consultancy Services for Preparation of DPR and providing pre-Construction services in respect to Up gradation of existing 2L to 4L Plus PS of Agartala-Udaipur section of NH-08 in the state of Tripura on EPC basis |
2025-NHIDC-843264-1 |
08/01/2025 |
07/01/2025
|
20/02/2025
Time
15:0Hrs
|
|
| 293 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT FOR GEOLOGICAL INVESTIGATION OF SLOPE STABILISATION/SLOPE MITIGATION BETWEEN KM 1.900 TO KM 8.780, KM 27.00 TO KM 27.150 AND KM 35.500 TO KM 35.650 ON SANKLANG TOONG ROAD UNDER AOR OF 107 RCC/758 BRTF/ PROJECT SWASTIK IN SIKKIM STATE Job No 314/204 |
CE (P) SWTK/31/2024-25 |
19/12/2024 |
07/01/2025
|
01/02/2025
Time
12:0Hrs
|
|
| 294 |
Consultancy Services for Construction of a viaduct at Gulabghati and Construction of an Underpass at Ranibagh on NH 87(New No NH109) |
64/12M-NH/2025 dt 07.01.2025 |
07/01/2025 |
07/01/2025
|
14/02/2025
Time
15:0Hrs
|
|
| 295 |
PMC services for upgradation from 2 Lane with PS to 4 Lane configuration of NH-129 (Old NH-39) from Ch 0.000 at Numaligarh Tiniali to Ch 106.780 at Assam-Nagaland Border at Khatkhati, Karbi Anglong district of Assam and Dimapur of Nagaland |
RW/GHT/PMC/DPR/Tender/AS/794 |
06/01/2025 |
06/01/2025
|
06/02/2025
Time
15:0Hrs
|
|
| 296 |
Consultancy Services for Preparation of DPR and Land Acquisition of Degloor City Bypass Road on NH 63 Connecting to NH 361 Km 00/00 to km 12/000 in Taluka Degloor Dist. Nanded in the State of Maharashtra on EPC Mode. Length 12.00 km |
15/NHDN/TEN/DPR/Nanded/20/2025 |
15/01/2025 |
06/01/2025
|
31/01/2025
Time
17:30Hrs
|
|
| 297 |
Consultancy Services for Preparation of DPR and Land Acquisition of Mukhed City Bypass and Sugaon Village Bypass Road on NH161A Taluka Mukhed Dist. Nanded in the State of Maharashtra on EPC Mode (Length 10.00 km) |
15/NHDN/TEN/DPR/Nanded/20/2025. |
15/01/2025 |
06/01/2025
|
31/01/2025
Time
17:30Hrs
|
|
| 298 |
Consultancy services for preparation of DPR and land acquisition of Tamsa City Bypass Road on NH 752I km 0/00 to km 3/00 in Taluka Hadgaon District Nanded in the state of Maharashtra on EPC mode (length 3.00 km) |
NHD/Nanded/TC/ 20 /2024-25 |
18/01/2025 |
06/01/2025
|
31/01/2025
Time
17:30Hrs
|
|
| 299 |
Consultancy services for preparation of DPR and land acquisition of Bhokar City Bypass road on NH-61 connecting to NH-161A km 0/00 to km 5/00 in Bhokar Taluka District Nanded in the state of Maharashtra on EPC Mode (length 5.00 km) |
NHD/Nanded/TC/ 20 /2024-25. |
18/01/2025 |
06/01/2025
|
31/01/2025
Time
17:30Hrs
|
|
| 300 |
Consultancy services for preparation of DPR and land acquisition of Kinwat City Bypass road on NH 161A km 0/00 km 07/00 in Taluka Kinwat District Nanded in the state of Maharashtra on EPC Mode(length 7.00 km) |
NHD/Nanded/TC/ 20 /2024-25.. |
18/01/2025 |
06/01/2025
|
31/01/2025
Time
17:30Hrs
|
|
| 301 |
Consultancy Services for preparation of Detailed Project Report for Widening to 4L from km 235.00 to km 300.300 of Nayagarh Khordha on NH 57 in the State of Odisha |
08-ROBBSR-2024-25 |
13/01/2025 |
03/01/2025
|
04/02/2025
Time
15:0Hrs
|
|
| 302 |
Consultancy Services for preparation of feasibility study and detailed project report including land aquisition and other statutory clearances for construction of ROB and its approaches at km 8 on NH527A in the state of Bihar for the year 2024-25 |
11/NH/JAINAGAR/DPR/2024-25 |
11/01/2025 |
02/01/2025
|
17/02/2025
Time
15:0Hrs
|
|
| 303 |
Consultancy Services for preparation of DPR for development of 4/6 lane Greenfield access-controlled Highway from Etawah-Farrukhabad-Bareilly in the state of Uttar Pradesh |
UP/HQ/ Etawah Farrukhabad Bareilly/HSC/DPR/2024 |
09/01/2025 |
28/12/2024
|
18/02/2025
Time
11:0Hrs
|
|
| 304 |
Consultancy Services for preparation of DPR for Capacity Augmentation of existing 4 lane Meerut to Muzaffarnagar section of NH-58 (new NH-334) to 6 lane in the state of Uttar Pradesh |
2024-NHAI-221242-1 |
09/01/2025 |
24/12/2024
|
08/02/2025
Time
11:0Hrs
|
|
| 305 |
Detailed Project Report (DPR) for 2-4-laning from Km 0.00 to Km 27.00 i.e. Karnataka border to Sanquelim section (27 Km) of NH-748AA in the State of Goa |
RO/MUM/Annual Plan/Goa/2024-25/02. |
04/01/2025 |
24/12/2024
|
20/05/2025
Time
17:0Hrs
|
|
| 306 |
Consultancy Services for DPR preparation for Construction of Kainchi Dham Bypass on NH 87 E (New No NH109) |
4620/12M-NH/2024 dt 23.12.2024 |
23/12/2024 |
23/12/2024
|
10/02/2025
Time
15:0Hrs
|
|
| 307 |
Consultancy services for preparation of DPR and Pre-construction activities in respect of construction/ widening of existing carriageway into 2L with PS configuration along with mitigation measures of vulnerable sinking / sliding zones of section from Pakyong to Barapathing via Gangchung , Tokchi and Machong in the State of Sikkim |
NHIDCL/HQ/Sikkim/DPR/Pajkyong-Barapathing/2024 |
20/12/2024 |
20/12/2024
|
20/02/2025
Time
15:0Hrs
|
|
| 308 |
Consultancy Services for Preparation of DPR for Strengthening/Rehabilitation of NH-2E (Belghoria Expressway) from Km.0.000 to Km.7.363 (excluding Km.2.900 to Km.4.250 BHS) under North 24 Parganas District, West Bengal |
RO-Kolkata/Bel-Exp/DPR/2024 |
20/12/2024 |
20/12/2024
|
13/01/2025
Time
11:0Hrs
|
|
| 309 |
Consultancy Services for DPR Preparation for Mahuda More (NH-18) to Lututanr (NH-218) Bypass including Land Acquisition, Forest Clearance, R AND R, Utility Shifting in the state of Jharkhand under EPC mode. |
2024-MoRTH-839397-1 |
13/01/2025 |
20/12/2024
|
04/02/2025
Time
15:0Hrs
|
|
| 310 |
Consultancy Servicesfor DPR Preparation for Lututanr (NH-218) to Nirsa (NH-19) Bypass including Land Acquisition, Forest Clearance, R and R, Utility Shifting in the state of Jharkhand under EPC mode |
2024-MoRTH-839385-1 |
15/01/2025 |
20/12/2024
|
04/02/2025
Time
15:0Hrs
|
|
| 311 |
Consultancy Services for Feasibility study and preparation of Detailed Project Report (DPR) and providing Pre Construction-activities for construction of two-lane Highway Tunnel (Lapri tunnel) (approximate length 2.63 Km) on Budhal-Mahore-Gul road between km 86.900 to km 106.180 (Design chainage km 88.410 to km 91.040 of proposed road) including approach road (approximate length 1.00 Km) in 31 BRTF area under project Sampark in UT of J&K (2nd call) |
2024_BRO_687366_1 |
07/12/2024 |
19/12/2024
|
10/02/2025
Time
11:0Hrs
|
|
| 312 |
Consultancy Services for Preparation of DPR for Widening to 4 Lane from Km 35.00 to Km 66.275 from Nalagarh to Swarghat of NH 105 and Spur in the State of Himachal Pradesh. |
RO/HP/Works (340)/2024-25 |
19/12/2024 |
18/12/2024
|
30/01/2025
Time
15:0Hrs
|
|
| 313 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report including land acquisition and other statutory clearances for Construction of ROB and its approaches at km 54 sahid chowk Jainagar on NH 527B in the state of Bihar |
10/NH/JAINAGAR/DPR/2024-25 |
17/12/2024 |
17/12/2024
|
23/01/2025
Time
15:0Hrs
|
|
| 314 |
Consultancy Services for DPR of 1. Widening to 2L PS of balance reaches from Km 184.840 to190.00,194.840 to198.800 of NH-63 2. Construction of additional vent to existing Major Bridge at Km 210.0-2 of NH-63 in Telangana 3rd CALL |
SE R and B NH NZB 25 2024 25 Dt 13 12 2024 |
17/12/2024 |
13/12/2024
|
20/12/2024
Time
16:0Hrs
|
|
| 315 |
Consultancy Services for Preparation of DPR for Upgradation to 4 lane 2LPS of Parour to Chauntra from Km 100 840 to Km 140 625 and Chauntra to Padhar from Km 140 625 to Km 180 00 of Pathankot Mandi section of NH 154 in the state of Himachal Pradesh |
2024 NHAI 219253 1 |
13/01/2025 |
12/12/2024
|
21/01/2025
Time
11:0Hrs
|
|
| 316 |
Consultancy Services for Preparation of DPR for Extension of NE-5 till NH-344M in Delhi and Haryana |
DLDIV 20011/42/2024 NHAI RO Delhi /E 267034 |
13/12/2024 |
11/12/2024
|
05/03/2025
Time
15:0Hrs
|
|
| 317 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) AND PROVIDING PRE-CONSTRUCTION ACTIVITIES FOR ERECTION OF FENCE AND CONSTRUCTION OF TRACK ALONG THE FENCE OF INDO – MYANMAR BORDER (IMB) BETWEEN BP-168 TO BP-175 (LENGTH – 83.00 KM) INCLUDING CONSTRUCTION OF APPROACH ROADS IN THE STATE OF ARUNACHAL PRADESH UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/29/2024-25 |
11/12/2024 |
06/12/2024
|
17/01/2025
Time
12:0Hrs
|
|
| 318 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report including land acquisition and other statutory clearances for Two Lane ROB at Km 97.00 (Rampur) at 59 SPL Railway km 295/2_3 of NH 727 in State of Bihar. |
05/NH/Motihari/DPR/2024-25 |
06/12/2024 |
06/12/2024
|
20/12/2024
Time
15:0Hrs
|
|
| 319 |
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Flyover at Km 27.00 (at the crossing of NH-27) on NH-131(106) in the State of Bihar |
06/DPR/NH-MADHEPURA/2024-25 |
11/12/2024 |
05/12/2024
|
04/02/2025
Time
16:0Hrs
|
|
| 320 |
2nd call Consultancy Service for preparation of feasibility study and Detailed Project Report for Construction of Railway Over Bridge at Km 2 135 and at Km 6 035 on NH 753 H Jalna city Bypass in four lane configuration in the State of Maharashtra |
EENH/Jalna/Tender/NIT No-7/1869 |
12/12/2024 |
05/12/2024
|
06/01/2025
Time
17:30Hrs
|
|
| 321 |
Consultancy Services for Preparation of feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulder on NH-169A from Km. 30.75 to Km. 51.60 (Agumbe Ghat) in the State of Karnataka. |
RW/BNG/NH- 169A/Km.33-41/23/2022(3rd Call) |
04/12/2024 |
04/12/2024
|
07/01/2025
Time
15:0Hrs
|
|
| 322 |
Preparation of DPR and Land Acquisition of Satana Bypass of Road network for Upgradation to Four Lane with paved shoulder on Sakri Satana Deola Chandavad Manmad Yeola Kopargaon Shirdi Road NH752G in Km. 00.00 to 15.000 in Tal. Satana Dist. Nashik |
2024-MoRTH-837874-1 |
01/01/2025 |
04/12/2024
|
25/02/2025
Time
17:30Hrs
|
|
| 323 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF NEW ROAD MANUL-MENSHITHANG TO NHSL SPECIFICATIONS BETWEEN KM 0.00 TO KM 52.00 THROUGH GREEN FIELD ALIGNMENT IN THE AOR OF 107 RCC UNDER 758 BRTF PROJECT SWASTIK IN THE STATE OF SIKKIM JOB NO 314/211 |
CE(P) SWTK/28/2024-25 |
07/01/2025 |
30/11/2024
|
15/02/2025
Time
12:0Hrs
|
|
| 324 |
DPR Preparation for Construction of a viaduct at Gulabghati and Construction of an Underpass at Ranibagh on NH 87(New No NH109) |
4322/12-NH/2024 dt 29.11.2024 |
30/11/2024 |
30/11/2024
|
23/12/2024
Time
15:0Hrs
|
|
| 325 |
Consultancy Services for preparation of Detailed Project Report for Bhopal-Indore green field corridor (Part of Vision 2047) in the state of MP |
2024_NHAI_216849_1 |
12/12/2024 |
28/11/2024
|
14/01/2025
Time
11:0Hrs
|
|
| 326 |
Consulatncy Services for DPR 1. Widening to 2L PS of balance reaches from km 184.840 to 190.00, 194.840 to 198.800 of NH-63 2. Construction of additional vent to existing Major Bridge at Km 210.0-2 of NH 63 in Telangana |
SE R and B NH NZB 23 2024 25, Dt.23.11.2024 2nd Call |
27/11/2024 |
27/11/2024
|
09/12/2024
Time
15:0Hrs
|
|
| 327 |
Preparation of DPR for Construction of Spur from Amas- Darbhanga/ Nearby suitable NH Corridor of NH-119D to Bodhgaya, Rajgir, Vaishali & Darbhanga in the state of Bihar |
2024-NHAI-216532-1 |
26/12/2024 |
26/11/2024
|
10/01/2025
Time
15:0Hrs
|
|
| 328 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge along with its approaches connecting NH-10 with NH-510 near Singtam,development of its junction and identification and realignment from Km 0.000 to Km 3.074 (Singtam-Tarku) on NH-510 into 2 lane with paved shoulder configuration along with permanent mitigation measures for landslide/sinking/slip zones on existing section |
NHIDCL/Sikkim/DPR/NH-510/Singtam-Tarku/2024-25 |
07/11/2024 |
25/11/2024
|
13/02/2025
Time
15:0Hrs
|
|
| 329 |
Consultancy Services for preparation of Detailed Project Report for Widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (Sitarganj) to km 52.200 (Tanakpur) of NH-125 (New NH -09) in the State of Uttarakhand |
2024-NHAI-215897-1 |
09/12/2024 |
22/11/2024
|
06/01/2025
Time
11:0Hrs
|
|
| 330 |
CS for DPR for 4 Laning from Km 247.0 to 248.3 including construction of HLBs at Km 215.700,216.780,223.014,223.300,225.130,234.600,263.470,296.700,302.250 and 302.395 on NH163,Flyover at Km 25.6 to 27.2 of NH 365 in State of Telangana 2nd Call |
SE R and B NH WGL 26 2024-25, Dt. 21.11.2024 |
24/11/2024 |
21/11/2024
|
28/11/2024
Time
15:0Hrs
|
|
| 331 |
Consultancy Services for preparation of DPR for the work 4 Laning of the missing links in the reaches from Km162.0-165.4, Km 194.4-202.2, Km 202.850-205.350, Km 207.600-209.400, Km 211.0-212.800 of Hyderabad Bhupalapatnam Section of NH-163 in the State of Telangana 2nd Call |
SE R and B NH WGL 25 2024-25, Dt. 20.11.2024 |
27/11/2024 |
20/11/2024
|
02/12/2024
Time
15:0Hrs
|
|
| 332 |
Preparation of DPR of upgradation/new construction of Pehowa-Kurukshetra- Yamunanagar Highway including Kurukshetra Bypass starting from NH-152 (at Pehowa), connecting MDR-119 and NH-44 (in Kurukshetra) and terminating at NH-344 (in Yamunanagar) in the State of Haryana (2ndcall) |
2024-NHAI-215398-1 |
21/11/2024 |
20/11/2024
|
23/12/2024
Time
11:0Hrs
|
|
| 333 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of Kalwari Bypass- 2 lane with Paved Shoulder for Kalwari town on NH-227A (Ram Janki Marg) KM-36 in the State of Uttar Pradesh. |
3883 /705C(1)-NH Circle/2024-25 Dated 16_11_2023 3rd call |
19/11/2024 |
19/11/2024
|
18/12/2024
Time
11:0Hrs
|
|
| 334 |
Consultancy Services for Feasibility Study and Detailed Project Report for Construction of a Minor Bridge at Ch. 1.020 Km of NH 219 (Mohania_ Bhabhua_ Chand_ Dharauli (UP Border)) |
05-NH/AUR/DPR/2024-25 |
19/11/2024 |
18/11/2024
|
02/01/2025
Time
17:0Hrs
|
|
| 335 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ONEPC MODE FOR CONSTRUCTION OF ROAD MOREH THINGPAI- NEW SAMATHAL (M-T-N-S) FROM KM 60.00 TO KM 85.00 (NEW SAMATHAL) (APPROX) TO NHSL SPECIFICATION UNDER 25BRTF/PROJECT SEWAK IN MANIPUR STATE |
CE (P)/SWK/DPR CONSULTANCY/03/2024-25 (Third Call) |
07/11/2024 |
18/11/2024
|
18/12/2024
Time
11:0Hrs
|
|
| 336 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD GELEMO-PUKAR LA (NEW ALIGNMENT) FROM KM 0.00 TO KM 25.00 (NET LENGTH 25.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SP THE AOR OF 128 RCC UNDER 23 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-04/2024-25 |
16/11/2024 |
18/11/2024
|
20/12/2024
Time
4:0Hrs
|
|
| 337 |
Consultancy Services for preparation of Detailed Project Report of Capacity augmentation (from 2 to 4 lane) of (i) Manoharpur Dausa section & Lalsot Kothun section of NH-148/23, and (ii) Salasar Nagaur section of NH-58 in the state of Rajasthan (Package-I) |
RAJDIV-20013/77/2024-Rajasthan Division/E-265732 |
20/12/2024 |
18/11/2024
|
30/01/2025
Time
11:0Hrs
|
|
| 338 |
Consultancy Services for preparation of Detailed Project Report of Capacity augmentation (from 2 to 4 lane) of (i) Manoharpur Dausa section & Lalsot Kothun section of NH-148/23, and (ii) Salasar Nagaur section of NH-58 in the state of Rajasthan (Package-II) |
RAJDIV-20013/77/2024-Rajasthan Division/E-265732/Pkg-II |
20/12/2024 |
18/11/2024
|
30/01/2025
Time
11:0Hrs
|
|
| 339 |
Consultancy Services for preparation of Detailed Project Report of (i) Capacity augmentation of Jaipur reengus (NH-52) with Construction of Khatushyam ring road, and (ii) Upgradation from 2 to 4 lane of Jodhpur Pachpadra (NH-112) in the state of Rajasthan (Package-I) |
NHAI/Tech/Raj/DPR/P/01 (Pkg-I) |
23/12/2024 |
18/11/2024
|
14/01/2025
Time
11:0Hrs
|
|
| 340 |
Consultancy Services for preparation of Detailed Project Report of (i) Capacity augmentation of Jaipur reengus (NH-52) with Construction of Khatushyam ring road, and (ii) Upgradation from 2 to 4 lane of Jodhpur Pachpadra (NH-112) in the state of Rajasthan (Package-II) |
NHAI/Tech/Raj/DPR/P/01 (Pkg-II) |
23/12/2024 |
18/11/2024
|
14/01/2025
Time
11:0Hrs
|
|
| 341 |
Consultancy services for Preparation of Detailed survey investigation & preparation of DPR including L.A. & other clearance for construction of ROB at Km 17.00 (Goagachi) on NH 131A in the State of Bihar |
08/DPR/NH/PURNEA/2024-25 |
01/12/2024 |
14/11/2024
|
30/12/2024
Time
16:0Hrs
|
|
| 342 |
Consultancy Services for preparation of Detailed Project Report for upgradation of existing road to 2 lane with PS for the newly declared NH 702D starting from junction with NH 715 at Jorhat to Assam-Nagaland Border Out Post at Mariani (Length 26 km) |
RW/GHT/PMC/DPR/Tender/AS/656 |
14/11/2024 |
14/11/2024
|
24/12/2024
Time
15:0Hrs
|
|
| 343 |
Consultancy Services for Feasibility study and preparation of DPR on NH-329A from Diphu to Assam Nagaland Border near Dimapur via Dhansiri (Length 38km) under Bakulia NH Division in the state of Assam. |
RW/GHT/PMC/DPR/Tender/AS/652 |
13/11/2024 |
13/11/2024
|
24/12/2024
Time
15:0Hrs
|
|
| 344 |
Project Management Consultancy services for upgradation from 2 Lane with PS to 4 Lane configuration of NH-15 from Ch 381.000 at Gogamukh to Ch 438.000 at Kulajan Tiniali under Dibrugarh NH Division. |
RW/GHT/PMC/DPR/Tender/AS/645 |
12/11/2024 |
12/11/2024
|
28/12/2024
Time
15:0Hrs
|
|
| 345 |
Project Management Consultancy services for upgradation from 2 Lane with PS to 4 Lane configuration of NH-15 from Ch 264.000 at Gohpur to Ch 381.000 at Gogamukh under PWD, Nagaon NH Division |
RW/GHT/PMC/DPR/Tender/AS/642 |
11/11/2024 |
11/11/2024
|
28/12/2024
Time
15:0Hrs
|
|
| 346 |
PMC Services for Preparation of Detailed Project Report, Pre-Construction Activity and Project Supervision of upgradation of existing intermediate lane to 2-lane with paved shoulder of NH 329A from Km 38.00 to Km 83.00 in the State of Nagaland |
RW/GHT/NG/PMC/2024-25/630 |
11/11/2024 |
08/11/2024
|
23/12/2024
Time
11:0Hrs
|
|
| 347 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu (Package-V) |
ROChennaiMoRTH12014NHDPR20AP22 |
08/11/2024 |
08/11/2024
|
17/01/2025
Time
11:30Hrs
|
|
| 348 |
Consultancy Services for Feasibility Study and Preparation of DPR for 4L/6L of Kathipudi to Machilipatnam stretch of NH216 from Km 0/000 to Km 229/000 in the state of Andhra Pradesh |
SENHVJA/05/2024-25 Dated 07.11.2024 |
20/12/2024 |
08/11/2024
|
30/01/2025
Time
17:0Hrs
|
|
| 349 |
Consultancy Services for Preparation of DPR for Construction of Minor Bridge along with approaches at Km 141/380 of NH 216 across Gudavalli drain at Gudavalli in the state of Andhra Pradesh |
SENHVJA/04/2024-25 Dated 04.11.2024 |
02/12/2024 |
06/11/2024
|
09/12/2024
Time
17:0Hrs
|
|
| 350 |
Consultancy Services for preparation of DPR for (i) Construction of Bypass (4L PS) to Huzurnagar Town on Miryalaguda-Kodad Section of NH-167 (ii) Construction of Bypass (4L PS) to Khammam Town by joining missing link between NH-365A (Khammam-Kuravi Section) and NH-163G (Nagpur Vijayawada Section) in the State of Telangana2nd call |
SE R B /NH/WGL/23/2024-25, Dt 05.11.2024 |
16/11/2024 |
05/11/2024
|
21/11/2024
Time
15:0Hrs
|
|
| 351 |
CS for DPR for i. Widening to 4-Laning from Km 247.000 to 248.300, construction of HLBs at Km 215.700,216.780,223.014,223.300,225.130,234.600,263.470,296.700,302.250 and Km 302.395 on NH-163. ii Flyover at Km 25.600 to 27.200 of NH-365 in Telangana |
SE R and B NH WGL 24 2024-25, Dt. 05.11.2024 |
17/11/2024 |
05/11/2024
|
21/11/2024
Time
15:0Hrs
|
|
| 352 |
Consultancy Services for Preparation of Detailed Project Report for Development of Greenfield Northern Hamirpur Bypass of 2L PS (Kohli to Chilbahal section, Length 24 Km) in Shimla Mataur Section of NH 103 03 in the state of Himachal Pradesh and Upgradation Development widening of 2L PS to 4L PS from End of hamirpur bypass (Chilbahal to Bhangbar Section (New NH 03 and NH 303) (Length 37 Km) in the State of Himachal Pradesh (Package IV) |
2024 NHAI 213539 1 |
26/11/2024 |
05/11/2024
|
20/02/2025
Time
11:0Hrs
|
|
| 353 |
Consultancy Services for Preparation of DPR for Four Laning of 1.Thuvakudi to Panjapur section in Old NH-67, 2. Trichy - Karur section of Old NH-67 and 3. Elevated Corridor in Trichy to Madurai section of NH-38 in the State of Tamil Nadu (2nd Call) |
NHAI/17011/02/29/2024 |
27/11/2024 |
05/11/2024
|
16/12/2024
Time
11:0Hrs
|
|
| 354 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR “REHABILITATION & UPGRADATION OF EXISTING ROAD BETWEEN KM 29.300 TO KM 86.120 (JHALA TO HEENA) FROM EXISTING/SINGLE LANE TO DOUBLE LANE WITH PAVED SHOULDER SPECIFICATION ON GANGOTRI-UTTARKASHI-DHARASU ROAD (NH-34) ON EPC MODE IN THE STATE OF UTTARAKHAND( LENGTH 56.82 KM). |
85070/Con/G-D/Pkg-II and III/Fri/EPC Cell dated 04 Oct 2024 |
24/10/2024 |
02/11/2024
|
16/11/2024
Time
15:0Hrs
|
|
| 355 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision of upgrading the existing 2-lane to 4-lane of NH-154 (New NH-06) |
RW/GHT/PMC/DPR/Tender/AS/610 |
05/11/2024 |
01/11/2024
|
17/12/2024
Time
15:0Hrs
|
|
| 356 |
Consultancy Services for completion of preconstruction activities Land Acquisition, forest clearances and Utility shifting for the work Widening to 4 Lane PS from Km 67.200 to Km 108.542 of SironchaAtmakur Section of NH 353C in Telangana |
SE R and B NH WGL 22 2024-25, Dt.30.10.2024 |
06/11/2024 |
31/10/2024
|
07/11/2024
Time
15:0Hrs
|
|
| 357 |
DPR for various section in ShimlaBypass and 1400 m DeScoped section near Kaithlighat and development of Jn and 2Lane Tunnel at Kandaghat in HP on NH 5 |
2024_NHAI_212991_1 |
26/11/2024 |
30/10/2024
|
18/12/2024
Time
11:0Hrs
|
|
| 358 |
Consultancy Services for preparation of DPR for the work 1. Balance works of four laning from Km 6.700 to 7.930, Km 10.090 to 10.670, Km 11.070 to 11.110, Km 14.500 to 15.100, Km 16.030 to 16.120 RHS, Km 16.750 to 17.055 LHS, Km 16.760 to 17.100 RHS, Km 19.700 to 21.500 of Nizamabad-Jagadalpur section of NH63 and 2. Reconstruction of Existing culvert to 4 lane Minor bridge at Km 14.400 of Bodhan-Nizamabad Section of NH63 in the State of Telangana. |
SE R and B NH NZB 21 2024 25 3rd call, Dt. 28.10.2024 |
29/10/2024 |
29/10/2024
|
05/11/2024
Time
15:0Hrs
|
|
| 359 |
PMC services for FS, preparation of DPR, providing pre-construction services and Construction supervision of construction for 2 lane with PS of NH 701A for Shopian Kellar Pakherpora Yousmarg Doodthpathri Magam in the UT of JK |
RO/JK/PMC/NH-701A/58/2024 |
01/11/2024 |
28/10/2024
|
02/01/2025
Time
15:0Hrs
|
|
| 360 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu (Package-IV) |
ROChennaiMRTH12014NHDPR16AP22 |
24/10/2024 |
22/10/2024
|
29/11/2024
Time
11:30Hrs
|
|
| 361 |
Consultancy Services for preparation of DPR for development of 4/6 lane Greenfield access-controlled Highway from Aligarh-Moradabad-Bijnor in the state of Uttar Pradesh |
UP/HQ/ Aligarh-Mor-Bijnor /HSC/ DPR/2024 |
22/10/2024 |
21/10/2024
|
27/11/2024
Time
11:0Hrs
|
|
| 362 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report including land acquisition and other statutory clearances for Two Lane ROB at Km 97.00 (Rampur) at 59 SPL Railway km 295/2_3 of NH 727 in State of Bihar. |
02/NH/Motihari/DPR/2024-25 |
30/10/2024 |
21/10/2024
|
18/11/2024
Time
15:0Hrs
|
|
| 363 |
Consultancy Services for Preparation of Detailed Project Report for construction of 02 Lane Bridges at Km 171.056 Km 178.612 Km 192.354 Km 194.118 Km 201.176 Km 216.801 and Km 226.195 of NH 730 in the State of Uttar Pradesh. |
2793/1-Tender Cashier (LMP)-NHC/24-25 dated 23.08.2024 2nd call |
18/11/2024 |
19/10/2024
|
25/11/2024
Time
11:0Hrs
|
|
| 364 |
Consultancy Services for Preparation of Detailed Project Report for construction of 02 Lane Bridges at Km 92.911 Km 99.206 Km 100.600 Km 121.800 Km 126.901 Km 144.135 and Km 150.794 of NH 730 in the State of Uttar Pradesh. |
2792/1-Tender Cashier (LMP)-NHC/24-25 dated 23.08.2024 2nd call |
14/11/2024 |
19/10/2024
|
25/11/2024
Time
11:0Hrs
|
|
| 365 |
Consultancy Services for Preparation of Detailed Project Report for Upgradation of stretch from LGBI airport (Km 134) to Jalukbari section (km 146) of NH-17 (New)/ NH-37(old) in the state of Assam |
NEDIV-20011/7/2024-NHAI-ROGuwahati/E-259943 |
18/11/2024 |
18/10/2024
|
17/12/2024
Time
15:0Hrs
|
|
| 366 |
Consultancy Services for DPR Preparation for realignment upgradation to 2-lane with paved shoulder /four lanning of NH-23 (New NH-143) from Km 88.00 to Km 211.200 in the State of Jharkhand including Land Acquisition, Forest Clearance and Utility Shi |
NH/Gumla/01/2024-25 |
18/10/2024 |
18/10/2024
|
18/11/2024
Time
15:0Hrs
|
|
| 367 |
Consultancy Services for DPR Preparation for realignment and upgradation to 2-lane with paved shoulder/four lanning of NH-143A from km 44.00 to 70.200 in the State of Jharkhand on EPC mode including Land Clearance, Forest Diversion and Utility Shifting etc |
NH/GUMLA/02/2024-25 |
17/10/2024 |
17/10/2024
|
18/11/2024
Time
15:0Hrs
|
|
| 368 |
Consultancy Services for preparation of DPR for the work 1. Balance works of four laning from Km 6.700 to 7.930, Km 10.090 to 10.670, Km 11.070 to 11.110, Km 14.500 to 15.100, Km 16.030 to 16.120 RHS, Km 16.750 to 17.055 LHS, Km 16.760 to 17.100 RHS, Km 19.700 to 21.500 of Nizamabad-Jagadalpur section of NH63 and 2. Reconstruction of Existing culvert to 4 lane Minor bridge at Km 14.400 of Bodhan-Nizamabad Section of NH63 in the State of Telangana. |
SE R and B NH NZB 18 2024-25, Dt. 15.10.2024 |
16/10/2024 |
15/10/2024
|
25/10/2024
Time
15:0Hrs
|
|
| 369 |
Survey investigation and preparation of DPR through consultancy for constr impvmt of extng rd KNC fm Cl 9 to NHDL specification fm km 0 to km 31 pt 430 inclding aprch rd to khab of 3 km length km 0 reckoned from km 433 pt 265 NH 05 of HT rd under project Dpk in HP |
Tender No CE Project Deepak 02 of 2024-25 |
21/09/2024 |
15/10/2024
|
25/11/2024
Time
16:30Hrs
|
|
| 370 |
Consultancy Services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane with Paved Shoulder ,Animal Underpasses (6 Nos) and ROB (01No.) on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitigation Plan in KM 109.790 to Km 163.050 in State of Maharashtra. |
23/EENH/NGP/2024-25 |
03/12/2024 |
11/10/2024
|
16/12/2024
Time
17:0Hrs
|
|
| 371 |
Consultancy Services for Prepartion of Detailed Project Report and Feasibillity study for Up-gradation of Four Lane with Paved Shoulder of NH 347 A from Wardha-Pulgaon-Arvi-Ashti-Haturana-Multai for the Section from Wardha to Salod (Design Chainage Km 0.000 to Km 4.000) and Pulgaon City Section (Design Chainage Km 24.800 to Km 26.800) In the state of Maharashtra. |
22/EENH/NGP/2024-25 |
20/12/2024 |
11/10/2024
|
25/04/2025
Time
17:0Hrs
|
|
| 372 |
Consultancy services for Preparation of DPR & Preconstruction Activity and Forest Diversion for Rehabilitation and Upgradation of existing highway to Two lane Paved Shoulder configuration of Wardha Arvi NH 647 in forest section km 24/060 to 26/010, km 31/118 to 32/310, km 44/630 to km 47/530 in the State of Maharashtra. |
20/EENH/NGP/2024-25 |
23/12/2024 |
11/10/2024
|
25/04/2025
Time
17:0Hrs
|
|
| 373 |
Cost estimate of Preconstruction Activities for Upgradation of Pulgaon to Arvi Section of NH 347A from Km 26/500 to Km 59/900 [Design Chainage Km 0/000 to Km 33/400] (Excluding Samrudhhi Expressway Length from Km 30/000 to 33/000 - 3.00 Km) to Two Laning with Paved Shoulder in the state of Maharashtra |
21/EENH/NGP/2024-25 |
23/12/2024 |
11/10/2024
|
25/04/2025
Time
17:0Hrs
|
|
| 374 |
Consultancy services for preparation of Detailed Project report for the work Construction of 4L from km 182.300 to km 202.200 Bhawanipatna to Junagarh of NH 26 in the State of Odisha. |
07-ROBBSR-2024-25/DPR |
18/10/2024 |
09/10/2024
|
16/12/2024
Time
12:0Hrs
|
|
| 375 |
Consultancy services for preparation of Detailed Project report for the work Construction of 4L from km 145.00 to km 171.800 kesinga to Bhawanipatna. |
06-ROBBSR-2024-25/DPR |
18/10/2024 |
09/10/2024
|
16/12/2024
Time
12:0Hrs
|
|
| 376 |
Consultancy Services for preparation of Detailed Engineering report for Widening from two lane paved shoulder to four lane paved shoulder from Km 0.00 (State boarder of Rajasthan and Gujrat) to 76.400 (Junction of NH-62 in Sirohi) Via Mandar Reodar and Anadara in the state of Rajasthan(Tentative length 76.400 KM) |
NIT NO 02/2024-25 SE NH JODHPUR |
23/10/2024 |
08/10/2024
|
25/11/2024
Time
11:0Hrs
|
|
| 377 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR GRADE SEPRATED STRUCTURE WITH SLIP ROAD AT KM 0/00 (SHAHPURA JUNCTION) AND KM 86 (KATI GHATI ALWAR) OF SHAHPURA-ALWAR RAMGARH-NUH ROAD NH-248A |
NIT 02/2024-2025 EE PWD NH Dn-I, Jaipur |
10/10/2024 |
08/10/2024
|
08/11/2024
Time
17:0Hrs
|
|
| 378 |
DPR Preparation for reconstruction of H.L. Bridge in Falgu river at km 24 of NH-22 (including complete Land acquisition, Forest clearance and utility shifting if any) in the state of Jharkhand under EPC mode. |
NH/HAZARIBAGH/2024-25/02 |
07/10/2024 |
07/10/2024
|
20/11/2024
Time
15:0Hrs
|
|
| 379 |
Consultancy Services for preparation of DPR for development of High-Speed access-controlled Corridor from Panipat-Gorakhpur ( Phase-2) in the state of Uttar Pradesh |
UP/HQ/Panipat Gorakhpur (Phase II)/HSC/DPR/2024 |
07/10/2024 |
07/10/2024
|
27/11/2024
Time
11:0Hrs
|
|
| 380 |
Consultancy Services for preparation of DPR for development of High-Speed access-controlled Corridor from Panipat-Gorakhpur (Phase-1) in the state of Uttar Pradesh |
UP/HQ/Panipat Gorakhpur(Phase-I)/ HSC/DPR/2024 |
04/10/2024 |
04/10/2024
|
27/11/2024
Time
11:0Hrs
|
|
| 381 |
Consultancy Services for preparation of Detailed Project Report for the work Widening and strengthening to 2LPS from Km 0.000 to Km 41.400 on NH 153B |
02-ROBBSR-2024-25/DPR |
10/10/2024 |
04/10/2024
|
16/12/2024
Time
12:0Hrs
|
|
| 382 |
Consultancy Services for preparation of Detailed Project Report for the work Widening and strengthening to 2LPS from 327.700 to Km 413.700 Kota to Malkangiri |
2024_MoRTH_829285_1 |
10/10/2024 |
04/10/2024
|
16/12/2024
Time
12:0Hrs
|
|
| 383 |
Consultancy Services for preparation of Detailed Project Report for the work Construction of Rairakhol town Bypass on NH 153B NH 55 |
03-ROBBSR-2024-25/DPR |
10/10/2024 |
04/10/2024
|
16/12/2024
Time
12:0Hrs
|
|
| 384 |
Consultancy Services for Feasibility Study & Detailed Engineering for Construction of 4-Lane Una Bye Pass starting from Ghaluwal Km 13/500 of NH-503A, NH- 503Ext., Una-Dhamandri Road, Dangoli (MDR-84), PGI Satellite Centre (NH-503A) and terminating near Rakkar Km 37/00 (NH-503Extn.) in the State of Himachal Pradesh. |
RO/HP/Works (337)/2024-25 |
14/10/2024 |
04/10/2024
|
18/11/2024
Time
15:0Hrs
|
|
| 385 |
Consultancy service for preparation pf DPR for the work Widening and strengthening to 4L from Km 5.000 to Km 14.690 on NH 20 Champua to Rimuli |
01 ROBBSR 2024-25/DPR |
09/10/2024 |
04/10/2024
|
16/12/2024
Time
12:0Hrs
|
|
| 386 |
Consultancy Services for preparation of Detailed Project Report for the work Widening and strengthening to 2LPS from Km 429.700 to Km 513.700 MV 18 to Motu |
05-ROBBSR-2024-25/DPR |
17/10/2024 |
04/10/2024
|
16/12/2024
Time
12:0Hrs
|
|
| 387 |
Consultancy Services for completion of preconstruction activities Land Acquisition, forest clearances and Utility shifting for the work Widening to 4 Lane PS from Km 67.200 to Km 108.542 of Sironcha Atmakur Section of NH 353C in Telangana 2nd Call |
SE R and B NH WGL 15 2024 25, Dt. 03.10.2024 |
08/10/2024 |
03/10/2024
|
10/10/2024
Time
15:0Hrs
|
|
| 388 |
PREPARATION OF DPR FOR HILL SLOPE PROTECTION ON 07 ZIGS ON NGG- LGG ROAD FROM KM 40.00 TO KM 44.00 IN AOR OF 125 RCC/ 763 BRTF/ VARTAK IN ARUNACHAL PRADESH |
CE (P) VTK/NIT/04/2024-25 |
01/10/2024 |
01/10/2024
|
14/12/2024
Time
11:0Hrs
|
|
| 389 |
Consultancy Services for preparation of feasibility study and Detailed Project Report for Construction of Railway Over Bridge ROB 32 000 Rotegaon on NH 752 H of Yevola Vaijapur Shivoor road in four lane configuration in the state of Maharashtra |
2024-MoRTH-828593-1 |
18/10/2024 |
01/10/2024
|
07/01/2025
Time
17:30Hrs
|
|
| 390 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of Kalwari Bypass- 2 lane with Paved Shoulder for Kalwari town on NH-227A (Ram Janki Marg) KM-36 in the State of Uttar Pradesh. |
3292/705C(1)-NH Circle/2024-25 Date- 27.09.2024 |
04/10/2024 |
28/09/2024
|
28/10/2024
Time
11:0Hrs
|
|
| 391 |
Consultancy Services for preparation of Detailed Project Report for Widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (Sitarganj) to km 52.200 (Tanakpur) of NH-125 (New NH -09) in the State of Uttarakhand |
2024-NHAI-209539-1 |
08/10/2024 |
26/09/2024
|
28/10/2024
Time
11:0Hrs
|
|
| 392 |
Consultancy Services for preparation of DPR and Feasibility report for construction of tunnel and viaduct on NH- 80 Pkg- II under NH (O) in the State of Jharkhand (2nd Call) |
NHAI/RO/RNC//JH/2024-25/01 |
21/11/2024 |
26/09/2024
|
04/12/2024
Time
11:0Hrs
|
|
| 393 |
Consultancy Services for preparation of DPR for Construction of Grade Separators at Sarona Chowk Ch. 279750 Udyog Bhawan Ch 269 000 and Telibandha Chowk Ch 268 000 on Raipur City portion of NH 53 at Raipur Aurang section in the state of Chhattisgarh |
NHAI/11012/CG/DPR/Grade Seprators/2024 |
29/03/2025 |
26/09/2024
|
08/04/2025
Time
11:0Hrs
|
|
| 394 |
Consultancy Services for preparation of Detailed Project Report for upgradation of NH 111 New NH-130 from Km 82 50 to Km 215 800 Katghora Shivnagar Ambikapur section for four lanes within available ROW in the state of Chhattisgarh |
NHAI/CG/Katghora-Ambikapur/DPR/E-259182 |
25/03/2025 |
26/09/2024
|
08/04/2025
Time
11:0Hrs
|
|
| 395 |
Consultancy Services for preparation of DPR for the work 1. Balance works of four laning from Km 6.700 to 7.930, Km 10.090 to 10.670, Km 11.070 to 11.140, Km 14.500 to 15.100, Km 16.030 to 16.120 RHS, Km 16.750 to 17.055 LHS, Km 16.760 to 17.100 RHS, Km 19.700 to 21.500 of Nizamabad-Jagadalpur section of NH63 and 2. Reconstruction of Existing culvert to 4 lane Minor bridge at Km 14.400 of Bodhan-Nizamabad Section of NH63 in the State of Telangana. |
SE R and B NH NZB 15 2024-25, Dt. 20.09.2024 |
28/09/2024 |
25/09/2024
|
09/10/2024
Time
15:0Hrs
|
|
| 396 |
Consultancy Services for preparation of DPR for 4 Laning from km 0.00 to 10.32 and km 78.20 to 133.20 of NH-136 (Thanjavur- Perambalur-Attur Road) including Construction of two ROBs at km 0.60 (LC-300A) and km 133.20 (LC-131) of NH-136 in Tamil Nadu. |
ROChenMRTH12014NH136DPR10AP24 |
01/10/2024 |
25/09/2024
|
04/11/2024
Time
11:30Hrs
|
|
| 397 |
Consultancy Services for Preparation of DPR for development of Hyderabad-Bengaluru high speed corridor under Master Plan of National Highways with vision 2047 in the State of Andhra-Pradesh, Karnataka & Telangana |
2024_NHAI_209251_1 |
26/11/2024 |
24/09/2024
|
12/12/2024
Time
15:0Hrs
|
|
| 398 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu (Package-I) |
ROChennaiMRTH12014DPR026AP22 |
04/10/2024 |
24/09/2024
|
06/11/2024
Time
11:30Hrs
|
|
| 399 |
Consultancy Services for preparation of DPR for 4 Laning from km 0.00 to km 20.00 of NH-179A (Salem Tirupathur Vaniyambadi road) including Construction of ROB at Km 0.20 of NH-179A in lieu of LC No.169 in the State of Tamil Nadu. |
ROChenMRTH12014179ADPR08AP24 |
27/09/2024 |
23/09/2024
|
06/11/2024
Time
11:30Hrs
|
|
| 400 |
Consultancy Service for preparation of feasibility study and Detailed Project Report for Construction of Railway Over Bridge at Km 2 135 and at Km 6 035 on NH 753 H Jalna city Bypass in four lane configuration in the State of Maharashtra. |
EENH/Jalna/Tender/NIT No-6/1472 |
05/10/2024 |
19/09/2024
|
24/10/2024
Time
17:30Hrs
|
|
| 401 |
Consultancy Service for preparation of feasibility study and Detailed Project Report for Construction of Railway Over Bridge at Km 20 670 in Selu town (L.C.No.99) on Deogaon Phata-Selu-Pathari Road NH 548 B in four lane configuration in the State of |
EENH/Jalna/Tender/NIT No-5/1471 |
06/10/2024 |
19/09/2024
|
24/10/2024
Time
17:30Hrs
|
|
| 402 |
Consultancy Services for Preparation of Detailed Project Report for Development of 6–lane National Highway from Barbil to Chandikhole Length - 215Km in the state of Odisha |
2024-NHAI-208582-1 |
29/10/2024 |
18/09/2024
|
06/02/2025
Time
11:0Hrs
|
|
| 403 |
Consultancy Services for Feasibility study and DPR preparation for Construction of 4 lane road from Kadapa to Rangampeta cross via Rayachoti, pileru of NH40, from Km 199.0 to Km 337.800 excluding Guvvalacheruvu Ghat Tunnel and its approaches in the state of Andhra Pradesh along with 2 and 4 lane bypass to Kadapa town by connecting NH40 and NH716 in the state of Andhra Pradesh |
NIT.No.09/EPC/SE,NH,ATP/Dy.SE/TO/AEE 1/2024-25, Dt.10.09.2024 |
16/10/2024 |
17/09/2024
|
11/11/2024
Time
15:0Hrs
|
|
| 404 |
Consultancy Services for Feasibility study and DPR preparation for a.Upgradation to 4-lane of NH-42(Old NH-219) from Km 58.600 to 140.680 (Palamaneru to Krishnagiri Border section)” and b.“Formation of Bypass to Madanapalli town on NH-42” in the state of Andhra Pradesh |
NIT.No.08,SE,NH,ATP,2024-25 Dt.10.09.2024 |
14/10/2024 |
17/09/2024
|
11/11/2024
Time
15:0Hrs
|
|
| 405 |
Consultancy Services for Feasibility study and DPR preparation for a.Upgradation to 4-lane of NH-42(Old NH-219) from Km 58.600 to 140.680 (Palamaneru to Krishnagiri Border section)” and b.“Formation of Bypass to Madanapalli town on NH-42” in the state of Andhra Pradesh |
NIT.No.08 SE,NH,ATP 2024-25 Dated.10.09.2024 |
08/11/2024 |
17/09/2024
|
18/11/2024
Time
15:0Hrs
|
|
| 406 |
Consultancy Services for Feasibility study and DPR preparation for Construction of 4 lane road from Kadapa to Rangampeta cross via Rayachoti, pileru of NH40, from Km 199.0 to Km 337.800 excluding Guvvalacheruvu Ghat Tunnel and its approaches in the state of Andhra Pradesh along with 2 and 4 lane bypass to Kadapa town by connecting NH40 and NH716 in the state of Andhra Pradesh |
NIT.No.09 SE,NH,ATP 2024-25 Dated.10.09.2024 |
08/11/2024 |
17/09/2024
|
18/11/2024
Time
15:0Hrs
|
|
| 407 |
Consultancy Services for Preparation of Detailed Project Report for Widening of existing 4 lane to 6 Lane with 2 Lane Service roads on each side from km 0.00 Bhubaneswar to km 67.00Km Puri of NH-316 in the State of Odisha |
2024-NHAI-208248-1 |
29/10/2024 |
13/09/2024
|
06/02/2025
Time
11:0Hrs
|
|
| 408 |
Consultancy Services of Preparation of DPR for development of 4-lane greenfield highway from Kuppam- Hosur-Bengaluru (STRR) in the State of Andhra Pradesh. |
2024_NHAI_208047_1 |
25/11/2024 |
12/09/2024
|
12/12/2024
Time
11:0Hrs
|
|
| 409 |
Consultancy Services for feasibility study and Detailed Project Report for Construction of a Minor Bridge at Ch. 1.020 Km of NH-219 (Mohania-Bhabhua-Chand-Dharauli(UP Border)) |
03-NH/AUR/DPR/2024-25 |
26/09/2024 |
12/09/2024
|
04/11/2024
Time
17:0Hrs
|
|
| 410 |
CS for DPR (i) Bypass of town Kot Ise Khan (NH-703B) Km.8.500-12.00 (ii) Bypass of town Bhikwind (NH-703B) Km.72.800-76.300 (iii) Bypass of town Bagha Purana on NH-254 Km.19.05-Km.26.15 (iv) Bypass of town Jalalabad (NH-754) Km.72.00 to SH-20 Punjab. |
RW/CH/W(104)/PB/2024-25 |
12/09/2024 |
12/09/2024
|
04/10/2024
Time
17:0Hrs
|
|
| 411 |
Consultancy Services for Preparation of DPR and providing pre-Construction services in respect to Up gradation of existing 2L to 4L Plus PS of Agartala-Udaipur section of NH-08 in the state of Tripura on EPC basis |
2024-NHIDC-825569-1 |
24/09/2024 |
11/09/2024
|
08/11/2024
Time
15:0Hrs
|
|
| 412 |
PREPARATION OF DPR INCL LAND ACQUISITION AND FOREST CLERANCE FOR CONSTRUCTION OF ALTERNATE ALIGNMENT OF ROAD ORANG-KALAKTHANG-SHERGAON- RUPA- TENGA BETWEEN KM 51.300 AND KM 88.300 TO NHDL SPECIFICATIONS IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH |
CE (P) VTK/NIT/03/2024-25 |
07/09/2024 |
07/09/2024
|
22/10/2024
Time
11:0Hrs
|
|
| 413 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD MOREHTHINGPAI- NEW SAMATHAL (M-T-N-S) FROM KM 60.00 TO KM 85.00 (NEW SAMATHAL) (APPROX) TO NHSL SPECIFICATION UNDER 25 BRTF/PROJECT SEWAK IN MANIPUR STATE |
CE (P)/SWK/DPR CONSULTANCY/03/2024-25 (SECOND CALL) |
02/09/2024 |
07/09/2024
|
07/10/2024
Time
11:0Hrs
|
|
| 414 |
Consultancy Services for completion of preconstruction activities Land Acquisition, forest clearances and Utility shifting for the work Widening to 4 Lane PS from Km 67.200 to Km 108.542 of Sironcha Atmakur Section of NH 353C in Telangana |
SE R and B NH WGL 14 2024 25, Dt. 03.09.2024 |
13/09/2024 |
04/09/2024
|
18/09/2024
Time
15:0Hrs
|
|
| 415 |
1)Akola Bypass to 4L with paved shoulder on NH161A starts at Dongargaon fata end at Ridhora Village on NH53 in Akola District in the State of Maharashtra (Total Length35.00KM). 2)Forest Diversion to 2LPS from Km 123.100 to 126.160 on Anjangaon Betul |
2024-MoRTH-824289-1 |
09/09/2024 |
03/09/2024
|
03/10/2024
Time
17:50Hrs
|
|
| 416 |
Consultancy Services for DPR for Widening to 4 Laning of the stretch from Km 247/000 to 248/300 including HLBs at Km 215/700,216/780,223/014, 223/300, 225/130,234/600,263/470, 296/700,302/250 and 302/395 on NH-163 in Telangana |
SE R and B NH WGL 09 2024 25, Dt. 21.08.2024 |
02/09/2024 |
02/09/2024
|
18/09/2024
Time
15:0Hrs
|
|
| 417 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Pipra Bazar Bypass at Km 44 on NH 106 (New NH-131) in the State of Bihar. |
04/DPR/NH-MADHEPURA/2024-25 |
07/09/2024 |
30/08/2024
|
13/12/2024
Time
16:0Hrs
|
|
| 418 |
Consultancy Services for preparation of DPR for the works 1. Widening to 2L PS of balance reaches from Km 184.840 to Km 190.00 and Km 194.840 to 198.800 of NH-63 on Nizamabad-Jagdalpur road on EPC mode and 2. Construction of additional vent to existing Major Bridge at Km 210.0-2 of Nizamabad-Jagdalpur section of NH-63 in the State of Telangana |
SE R and B NH NZB 13 2024 25, Dt. 24.08.2024 |
14/09/2024 |
29/08/2024
|
20/09/2024
Time
15:0Hrs
|
|
| 419 |
Preparation of Feasibility study and Detailed Project Report including land acquisition and other statutory clearances for two Lan ROB at Km 97.00 Rampur at 59 SPL Railway km 295 2 3 of NH 727 in State of Bihar. |
01/NH/Motihari/DPR/2024-25 |
02/09/2024 |
28/08/2024
|
01/10/2024
Time
15:0Hrs
|
|
| 420 |
Consultancy services for the preparation of DPR for 6 laning of Mumbai-Pune NH-48 from Shilphata Km 131-200 To Nigadi KM 20-400 Including improvement of black spots, road safety improvement and financial analysis. |
RO/MUM/DPR/01/2024-25 |
23/09/2024 |
28/08/2024
|
15/10/2024
Time
17:0Hrs
|
|
| 421 |
Consultancy Services for preparation of DPR for the work Strengthening and Improvement from Km 231.0 to 231.420,232.580 to 236/0,248/0 to 265/400, 290/500 to 294/600 on Hyderabad- Bhupalapatnam Section of NH-163 in the State of Telangana |
SE R and B NH WGL 12 2024 25, Dt. 21.08.2024 |
03/09/2024 |
28/08/2024
|
18/09/2024
Time
15:0Hrs
|
|
| 422 |
Consultancy Services for Preparation of Detailed Project Report for construction of 02 Lane Bridges at Km 171.056, Km 178.612, Km 192.354, Km 194.118, Km 201.176, Km 216.801 and Km 226.195 of NH 730 in the State of Uttar Pradesh. |
2793/1-Tender Cashier (LMP)-NHC/24-25 dated 23.08.2024 |
30/08/2024 |
26/08/2024
|
07/10/2024
Time
11:0Hrs
|
|
| 423 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Bhavnagar-Bharuch section of Jamnagar - Bhavnagar Bharuch Corridor passing through the State of Gujarat-Pkg-4 |
2024_MoRTH_813624_1 |
23/08/2024 |
26/08/2024
|
04/11/2024
Time
15:0Hrs
|
|
| 424 |
Consultancy Services for Preparation of Detailed Project Report for construction of 02 Lane Bridges at Km 92.911, Km 99.206, Km 100.600, Km 121.800, Km 126.901, Km 144.135 and Km 150.794 of NH 730 in the State of Uttar Pradesh. |
2792/1-Tender Cashier (LMP)-NHC/24-25 dated 23.08.2024 |
29/08/2024 |
24/08/2024
|
07/10/2024
Time
11:0Hrs
|
|
| 425 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND FEASIBILITY REPORT OF BYPASSES AT SAWAIMADHOPUR WITH TUNNEL/ELEVATED AS REQUIRED AND CHHAN, ALLAHAPUR, BEHRAMDA KHURD, 17 MILE ETC. (TENTATIVE LENGTH = 18 KM.) ON NH 552 EXTN. IN STATE OF RAJASTHAN |
NIT 01/2024-2025 EE PWD NH Dn-I, Jaipur |
02/09/2024 |
24/08/2024
|
30/09/2024
Time
16:0Hrs
|
|
| 426 |
Consultancy Services for preparation of DPR for the work Widening to 4L 6L and Strengthening from Km 165.000 to 171.600 of Vijayawada-Jagadalpur Section of NH-30 in the State of Telangana |
SE R and B NH WGL 10 2024 25, Dt. 21.08.2024 |
03/09/2024 |
22/08/2024
|
19/09/2024
Time
15:0Hrs
|
|
| 427 |
Consultancy Services for preparation of DPR for Construction of Flyover at Km 25.600 to 27.200 of Nakrekal-Thanamcharla Section of NH-365 in the State of Telangana |
SE R and B NH WGL 11 2024 25, Dt. 21.08.2024 |
05/09/2024 |
22/08/2024
|
23/09/2024
Time
15:0Hrs
|
|
| 428 |
Consultancy Services for preparation of DPR for i.Construction of Bypass 4L PS to Huzurnagar Town on NH-167 ii.Construction of Bypass 4L PS to Khammam Town by joining missing link between NH-365A and NH-163G in the State of Telangana |
SE R and B NH WGL 07 2024 25, Dt. 21.08.2024 |
24/08/2024 |
22/08/2024
|
19/09/2024
Time
15:0Hrs
|
|
| 429 |
Consultancy Services for preparation of DPR for Construction of Bypass 4L PS to Kothagudem Town on Vijayawada Jagadalpur Section of NH-30 in the State of Telangana |
SE R and B NH WGL 08 2024 25, Dt. 21.08.2024 |
24/08/2024 |
22/08/2024
|
19/09/2024
Time
15:0Hrs
|
|
| 430 |
Consultancy Services for preparation of DPR for the work 4-Laning of the missing links in the reaches from Km 162.0-165.4, 194.4-202.2, 202.850-205.350, 207.600-209.400, 211.0-212.800 of Hyderabad-Bhupalapatnam Section of NH-163 in Telangana State |
SE R and B NH WGL 06 2024 25, Dt. 21.08.2024 |
23/08/2024 |
22/08/2024
|
19/09/2024
Time
15:0Hrs
|
|
| 431 |
Consultancy Services for Preparation of feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulder on NH 169A from Km. 30.75 to Km. 51.60 Agumbe Ghat in the State of Karnataka |
RW/BNG/NH-169A/Km.33-41/23/2022DPR |
21/08/2024 |
21/08/2024
|
10/09/2024
Time
15:0Hrs
|
|
| 432 |
Consultancy Services for Remaining work DPR Preparation including LA and Other clearances and Construction Supervision of NH 322(Musrigharari to Bela Nawada) in the state of Bihar. |
05/NH/Samastipur/EPC/2024-25 |
30/08/2024 |
20/08/2024
|
04/10/2024
Time
15:0Hrs
|
|
| 433 |
PREPARATION OF DETAILED PROJECT REPORT FOR UP-GRADATION OF KATGHORA TO AMBIKAPUR SECTION ON NH-130 TO FOUR LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF CHHATTISGARH |
RO/2024/11 |
21/08/2024 |
20/08/2024
|
16/12/2024
Time
11:0Hrs
|
|
| 434 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report including land acquisition and other statutory clearances for Construction of ROB and its approaches at km 8 on NH 527A in the state of Bihar |
05/NH/JAINAGAR/DPR/2024-25 |
21/08/2024 |
13/08/2024
|
04/10/2024
Time
15:0Hrs
|
|
| 435 |
Consultancy Services for Preparation of Detailed Project Report for (i) Widening of NH-03 from Km.49.200 to Km.58.85 (ii) Construction of Pathankot Bypass (4-Lane) starting from NH-154 at km.5.500 and terminating at NH-44 in the State of Punjab. |
RW/CH/PB/DPR/2024/2 |
12/08/2024 |
12/08/2024
|
17/09/2024
Time
15:0Hrs
|
|
| 436 |
Consultancy Services for Preparation of DPR for 4 lane of Ujjain Jhalawar MP Rajasthan Border from km 0.00 to km 133.575 of NH552G in the state of MP |
2024_NHAI_204252_1 |
24/09/2024 |
08/08/2024
|
29/10/2024
Time
17:0Hrs
|
|
| 437 |
Consultancy Services for DPR preparation for construction of RUB at Chainage 297/680 adjoining to the existing RUB on Kota Darah Jhalawar Section on NH 52 |
02_2024_25 |
07/08/2024 |
07/08/2024
|
21/08/2024
Time
11:0Hrs
|
|
| 438 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of 2 lane with Paved Shoulder at Kalwari bypass on NH-227A (Ram Janki Marg) KM-36 in the State of Uttar Pradesh. |
2555/705C(1)-NH Circle/2024-25 Date-06.08.2024 |
09/08/2024 |
07/08/2024
|
09/09/2024
Time
11:0Hrs
|
|
| 439 |
Consultancy services for preparation of DPR of widening to 2lane with PS of Bareilly Bhutah Bisalpur of NH 730B and ch. 15.500 to 17.000 Maigalganj Mohamadi Section of NH 730A in the State of Uttar Pradesh. |
2572/1-Tender Cashier (Bly)-NHC/24-25 dt. 05.08.2024 |
08/08/2024 |
06/08/2024
|
17/09/2024
Time
17:0Hrs
|
|
| 440 |
Consultancy Services for Feasibility study and preparation of Detailed Project Report (DPR) and providing Pre Construction-activities for construction of two-lane Highway Tunnel (Lapri tunnel) (approximate length 2.63 Km) on Budhal-Mahore-Gul road between km 86.900 to km 106.180 (Design chainage km 88.410 to km 91.040 of proposed road) including approach road (approximate length 1.00 Km) in 31 BRTF area under project Sampark in UT of J&K |
2024_BRO_666028_1 |
18/07/2024 |
06/08/2024
|
05/10/2024
Time
11:0Hrs
|
|
| 441 |
Consultancy Services for for Preparation of Detailed Project Report for Up gradation to 4 lane 2L PS of Parour to Chauntra from Km 100 840 to Km 140 625 and Chauntra to Padhar from Km 140 625 to Km 180 00 of Pathankot Mandi section of NH 154 in the state of Himachal Pradesh through BOT Hybrid Annuity EPC mode |
2024 NHAI 203957 1 |
28/08/2024 |
06/08/2024
|
08/10/2024
Time
11:0Hrs
|
|
| 442 |
Consultancy Services for Preparation of DPR for development of Nagpur-Hyderabad high speed corridor under Master Plan of National Highways with vision 2047 in the State of Maharashtra and Telangana |
TGDIV-20011/15/2024-Telangana Division |
05/10/2024 |
02/08/2024
|
05/11/2024
Time
11:30Hrs
|
|
| 443 |
Consultancy services for the preparation of DPR for LA and forest proposal for upgradation to 2LPS- 4 lane configuration Mokhada- Jawhar- Vikramgad- Manor-Palghar road NH 160A in Palghar District in the state of Maharashtra |
NHD/Tender/1326 |
20/08/2024 |
31/07/2024
|
25/09/2024
Time
17:30Hrs
|
|
| 444 |
Consultancy Services for preparation of (DPR) for construction of new Bypasses (Etawah Bypass, Baralokpur Bypass, Kusmara Bypass, Farrukhabad Bypass,Bewar Bypass) on various selected stretches of National Highways in the State of Uttar Pradesh. |
CE-RO/LKO/DPR-Farrukhabad/ Bypass/2024-25 Dated- 31.07.2024 |
01/08/2024 |
31/07/2024
|
16/09/2024
Time
11:0Hrs
|
|
| 445 |
Consultancy Services for preparation of Detailed Project Report for the upgradation of Newly Declared N.H. 131 B starting from its junction with NH-31 near Naugachhia and terminating at its junction with NH-33 near Bhagalpur (Both side approaches of Vikramshilla Setu) from 2-lane to 4-lane in the state of Bihar. |
NIT NO. 06/NH Bhagalpur/2024-25 |
29/07/2024 |
29/07/2024
|
24/09/2024
Time
17:0Hrs
|
|
| 446 |
Consultancy Services for preparation of Feasibility study and Detailed Project report for Bikaner bypass to complete ring road in the State of Rajasthan |
NIT No. 03/2024-25 SE NH BIKANER |
09/08/2024 |
29/07/2024
|
25/09/2024
Time
17:0Hrs
|
|
| 447 |
Consultancy Services for preparation of Feasibility study and Detailed Project report for missing link from Titanwar on NH-311 to Laxmangarh on NH-52 (Part of Laxmangarh-Narnol Corridor vision 2047) in the State of Rajasthan |
NIT No. 02/2024-25 SE NH BIKANER |
10/08/2024 |
29/07/2024
|
25/09/2024
Time
17:0Hrs
|
|
| 448 |
Detailed Project Report (DPR) for 2-4-laning from Km 0.00 to Km 27.00 i.e. Karnataka border to Sanquelim section (27 Km) of NH-748AA in the State of Goa |
RO/MUM/Annual Plan/Goa/2024-25/02 |
04/08/2024 |
29/07/2024
|
16/09/2024
Time
17:0Hrs
|
|
| 449 |
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Flyover at Km 27.00 (at the crossing of NH-27) on NH-131(106) in the State of Bihar |
03/DPR/NH-MADHEPURA/2024-25 |
05/08/2024 |
26/07/2024
|
17/09/2024
Time
16:0Hrs
|
|
| 450 |
Consultancy Services for Preparation of Detail engineering Report for Widening from Two lane with paved shoulder from Km 161/00 to Km 269/260 Nagaur-Bikaner section on NH-62 (Tentative length 108.260) in the State of Rajasthan |
NIT No. 01/2024-25 SE NH BIKANER |
10/08/2024 |
26/07/2024
|
17/09/2024
Time
17:0Hrs
|
|
| 451 |
NHAI has been assigned the work of Consultancy Services for Widening and improvement of existing 2 lane to 4 lane configuration from Maranahally km.236/000 to Addahole Km.261.810 of NH75 Shiradi Ghat 2nd Call |
NIT No.13/NHAI/RO-BNG/DPR Consultancy Services/Tender/2024-25 dated 23/07/2024 |
25/07/2024 |
23/07/2024
|
06/08/2024
Time
15:0Hrs
|
|
| 452 |
Consultancy Services for Preparation of DPR for Four Laning of stretches, 1.Thuvakudi to Panjapur section in Old NH-67, 2. Trichy - Karur section, Ring Road to Trichy Town of Old NH67 and 3. Elevated Corridor in Trichy to Madurai section of NH38 in the State of Tamil Nadu |
NHAI 17011 02 29 2024 RO Madurai |
22/10/2024 |
23/07/2024
|
30/10/2024
Time
11:0Hrs
|
|
| 453 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD MOREHTHINGPAI- NEW SAMATHAL (M-T-N-S) FROM KM 60.00 TO KM 85.00 (NEW SAMATHAL) (APPROX) TO NHSL SPECIFICATION UNDER 82 RCC/25 BRTF/PROJECT SEWAK IN MANIPUR STATE |
CE (P)/SWK/DPR CONSULTANCY/03/2024-25 |
15/07/2024 |
22/07/2024
|
20/08/2024
Time
11:0Hrs
|
|
| 454 |
Consultancy Services for Preparation of DPR for development of Nagpur-Hyderabad high speed corridor under Master Plan of National Highways with vision 2047 in the State of Maharashtra and Telangana |
TGDIV-20011/15/2024-Telangana Division |
02/08/2024 |
16/07/2024
|
21/10/2024
Time
11:0Hrs
|
|
| 455 |
Consultancy Services for preparation of Detailed Project Report for four to six laning of Hyderabad-Vijayawada Section from Km.40.000 to Km.266.000 (226.00 Kms) of NH-9 (New NH-65) in the States of Telangana & Andhra Pradesh |
TGDIV-20011/14/2024-Telangana Division/E-254042 |
02/08/2024 |
16/07/2024
|
03/10/2024
Time
11:0Hrs
|
|
| 456 |
Consultancy Services for preparation of Detailed Project Report for four to six laning of Hyderabad-Vijayawada Section from Km.40.000 to Km.266.000 (226.00 Kms) of NH-9 (New NH-65) in the States of Telangana & Andhra Pradesh |
TGDIV-20011/14/2024-Telangana Division |
07/10/2024 |
16/07/2024
|
05/11/2024
Time
11:30Hrs
|
|
| 457 |
Consultancy Services for Preparation of DPR for Four Laning of existing 2 lane stretches, 1. Dindigul Theni to Kumili section, 2. Trichy to Karaikudi section NH336, NH36 and NH536 and 3. Nagapattinam - Thanjavur Section of NH83 in the State of Tamil Nadu |
NHAI 17011 02 28 2024 RO Madurai |
19/10/2024 |
12/07/2024
|
30/10/2024
Time
11:0Hrs
|
|
| 458 |
Consultancy Services for Preparation of DPR for Four Laning of existing 2 lane stretches, 1. Dindigul Theni to Kumili section, 2. Trichy to Karaikudi section NH336, NH36 and NH536 and 3. Nagapattinam - Thanjavur Section of NH83, Bypass to Tiruvarur Town in the State of Tamil Nadu |
NHAI/17011/02/28/2024/RO Madurai |
24/07/2024 |
12/07/2024
|
03/10/2024
Time
11:0Hrs
|
|
| 459 |
Consultancy Services for preparation of Detailed Project Report for Spur to Agra District via Bharatpur from Delhi Mumbai Expressway (near Barodameo Alwar District) in the State of Rajasthan |
NHAI/Tech/Raj/ DPR/254405 |
19/09/2024 |
11/07/2024
|
24/09/2024
Time
15:0Hrs
|
|
| 460 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for (1).Construction of 4L ROB at Km 33.100 and Km 35.660 (2) 4L Major Bridge at Km 32.000 (3). Upgradation to 4 Lane from Km 45.400 to Km 46.200 on NH-330B in the State of UP. |
CE-RO/LKO/DPR/NH-330B/2024-25 Date.10.07.2024 |
12/07/2024 |
10/07/2024
|
30/04/2025
Time
11:0Hrs
|
|
| 461 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Madhya Pradesh (Package-02) Tentative Length 60KM |
2024-MoRTH-815667-1 |
16/07/2024 |
09/07/2024
|
23/08/2024
Time
17:0Hrs
|
|
| 462 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Madhya Pradesh (Package-01) Total length 58 km |
2024-MoRTH-815652-1 |
16/07/2024 |
09/07/2024
|
23/08/2024
Time
17:0Hrs
|
|
| 463 |
CS for DPR (i) Bypass of town KotIseKhan (NH-703B) Km.8.500-12.00 (ii) Bypass of town Bhikwind (NH-703B) Km.72.800-76.300 (iii) Bypass of town Bagha Purana on NH-254 Km.19.05-Km.26.15 (iv) Bypass of town Jalalabad (NH-754) Km.72.00 to SH-20 in Punjab |
RW/CH/PB/DPR/2024/II |
08/07/2024 |
08/07/2024
|
25/07/2024
Time
15:0Hrs
|
|
| 464 |
Consultancy Services for Preparation of DPR for construction of 02 Lane Bridges (adjacent to existing structure) at Km146.400 (Sharda Canal),Km 162.905 (Sharda River),Km 189.225 (Ghaghra River)and Km 212.724(Saryu River)of NH-730 in the State of UP. |
CE-RO/LKO/DPR/NH-730/2024-25 dt.08.07.2024 |
09/07/2024 |
08/07/2024
|
29/08/2024
Time
11:0Hrs
|
|
| 465 |
Consultancy Services for preparation of Detailed Project Report for Realignment of 4 laning of Urga-Pathalgaon section of NH 130A under Bharatmala Pariyojana between design km.114.410 to km.121.450 total length of 7.45 km in the State of Chhattisgarh |
NHAI/RO-RAIPUR/RE-ALIGNMENT URGA-PATH/DPR/2024 |
06/07/2024 |
06/07/2024
|
15/07/2024
Time
15:0Hrs
|
|
| 466 |
Consultancy Services as DPR for the projects in the state of Karnataka. (i) Four laning of Bijapur-Gulbarga-Humnabad section of NH-50. (ii) 4/6-lane of BRT Tiger Reserve Boundary to Bangalore section of NH-948 |
NIT No.08/NHAI/RO-BNG/DPR/Tender/2024-25 dated 05.07.2024 |
15/07/2024 |
05/07/2024
|
26/07/2024
Time
15:0Hrs
|
|
| 467 |
Consultancy Services for Preparation of Detailed Project Report for (i) Widening of NH-03 from Km.49.200 to Km.58.85 (ii) Construction of Pathankot Bypass (4-Lane) starting from NH-154 at km.5.500 and terminating at NH-44 in the State of Punjab |
RW/CH/PB/DPR/2024 |
04/07/2024 |
04/07/2024
|
22/07/2024
Time
15:0Hrs
|
|
| 468 |
Consultancy Services for Four Lanning from (1) 265/200 to 287/905 in Dahod District and (2) from KM 356/905 to 421/400 (Ferkuva to Bodeli section) of NH-56 in Chhotaudepur District in the state of Gujarat. |
NIT.NO. RW/DPR/NH-56 |
04/07/2024 |
04/07/2024
|
05/08/2024
Time
16:0Hrs
|
|
| 469 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD SIYUM-MENCHUKA (NEW ALIGNMENT) FROM KM 0.00 TO KM 80.00 (NET LENGTH 80.00 KMS) GREEN FIELD ALIGNMENT TO NHDL SPECIFICATIONS IN THE AOR OF 77 RCC UNDER 23 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-01/2024-25 |
04/07/2024 |
04/07/2024
|
06/09/2024
Time
12:0Hrs
|
|
| 470 |
CONSUTANCY SERVICES FOR FEASIBILITY STUDY,PREPARATION OF DETAILED PROJECT REPORT(DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF GELLING BISHING ROAD GREEN FIELD ALIGNMENT (INDICATIVE LENGTH 25.0 KM) FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK |
CE(P) BMK/EPC-10/2023-24 |
12/07/2024 |
01/07/2024
|
22/07/2024
Time
11:0Hrs
|
|
| 471 |
Consultants for preparation of Detailed Project Report of Consultancy Services for Widening and improvement of existing 2 lane to 4 lane configuration from Maranahally (km.236/000) to Addahole (Km.261.810) of NH-75 (Shiradi Ghat) |
NIT No.07/NHAI/RO-BNG/DPR Consultancy Services/Tender/2024-25 dated 01/07/2024 |
12/07/2024 |
01/07/2024
|
22/07/2024
Time
11:0Hrs
|
|
| 472 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for capacity augmentation from 2L PLUS PS to 4 lane/ 6lane of Kabrai Banda section of NH 35 (Old NH76) in the State of Uttar Pradesh. |
1666/102C Dated 27.06.2024 |
01/07/2024 |
28/06/2024
|
12/08/2024
Time
11:0Hrs
|
|
| 473 |
Consultancy Services for Preparation of DPR for Technical assessment and Improvement measures on existing six lane Udaipur - Ratanpur - Shamlaji section from Km 287.400 to Km 401.200 (Design Ch. 333.585 to Ch. 446.515) of NH-8 in the State of Rajasthan and Gujarat |
NHAI/NHDP-V/2015/KUA/CU-pkg-V (E-148279) |
19/07/2024 |
27/06/2024
|
05/11/2024
Time
11:0Hrs
|
|
| 474 |
DPR Preparation for widening of Ajanta Ghat to 4 lane with paved shoulder of NH 753 F Configuration in the state of Maharashtra (2nd Call) |
EENH./Jalna/Tender/NIT No-03/408 |
30/07/2024 |
27/06/2024
|
23/08/2024
Time
17:30Hrs
|
|
| 475 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Kharagpur-Chandikhol-Cuttack-Khorda-Tangi section of Kharagpur- Cuttack-Visakhapatnam Corridor passing through the |
2024_MoRTH_813594_1 |
21/08/2024 |
26/06/2024
|
04/11/2024
Time
15:0Hrs
|
|
| 476 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Tangi-Brahampur-Visakhapatnam section of Kharagpur-Cuttack- Visakhapatnam Corridor |
2024_MoRTH_813608_1 |
22/08/2024 |
26/06/2024
|
04/11/2024
Time
15:0Hrs
|
|
| 477 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Jamnagar-Bhavnagar section of Jamnagar - Bhavnagar Bharuch Corridor passing through the State of Gujarat. |
2024_MoRTH_813617_1 |
22/08/2024 |
26/06/2024
|
04/11/2024
Time
15:0Hrs
|
|
| 478 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Gwalior-Jhansi-UP Border section of Agra - Morena - Gwalior - Jhansi - Sagar - Lakhnadon Corridor passing through |
2024_MoRTH_813628_1 |
22/08/2024 |
26/06/2024
|
04/11/2024
Time
15:0Hrs
|
|
| 479 |
pkg 6 Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between UP Border- Sagar Lakhnadon section of Agra - Morena - Gwalior - Jhansi - Sagar - Lakhnadon Corridor passing |
2024_MoRTH_813630_1 |
23/08/2024 |
26/06/2024
|
04/11/2024
Time
15:0Hrs
|
|
| 480 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Mangaluru-Bengaluru passing through the State of Karnataka.-Pkg-7 |
2024_MoRTH_813633_1 |
23/08/2024 |
26/06/2024
|
04/11/2024
Time
15:0Hrs
|
|
| 481 |
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Gangtok - Siliguri passing through the State of Sikkim and West Bengal.-Pkg-8 |
024_MoRTH_813638_1 |
23/08/2024 |
26/06/2024
|
04/11/2024
Time
15:0Hrs
|
|
| 482 |
Preparation of DPR for Rehabilitation /Up gradation of Talegaon Warud Gonapur Section to 2Lane plus Paved shoulder standards from Design km Ch 14/300 to 19/800, 24/150 to 24/800,31/00 to 47/00, 48/010 to 60/703 (Total length of the project 35.25 km) section of NH 347A on EPC Mode in the state of Maharashtra. |
789596_3 |
21/06/2024 |
14/06/2024
|
13/07/2024
Time
17:30Hrs
|
|
| 483 |
Consultancy services for preparation of DPR forstudy of landslide areaon various locations between Chainage km 172.900 to km 182.000 along NH-39 (New NH-29) in the state of Nagaland |
CE/NH/CONSULTANCY/LS/NH-39/2023-24 |
14/06/2024 |
14/06/2024
|
21/06/2024
Time
13:0Hrs
|
|
| 484 |
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for 2 Laning from Mishraulia to Bhengari (UP_Bihar Border) of newly declared NH 727B for Year 2024_25 in the State of Bihar. |
03-NH/CHAPRA/DPR/2024-25 |
14/06/2024 |
13/06/2024
|
30/07/2024
Time
17:0Hrs
|
|
| 485 |
2nd Call Consultancy Services for project Management including preparation of Detailed Project Report of Selected stretches corridors of Road Networks in the State of Maharashtra for new alignment for Sawangi MitmitaTisgaon Jn From Sawangi Ch 140 180 |
2024-MoRTH-801170-2 |
17/06/2024 |
13/06/2024
|
12/07/2024
Time
17:30Hrs
|
|
| 486 |
DPR preparation suggesting for uninterrupted flow of traffic providing additional Lanes/ bridges/ underpass/ tunnel as per requirement and improvement of black spots between chainage 296/000 to 299/000 on Kota Darah Jhalawar Section of NH 52 |
NIT_01_2024-25 |
16/06/2024 |
12/06/2024
|
22/07/2024
Time
11:0Hrs
|
|
| 487 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Four Lane ROBs at Km 43.961 and 48.596 from Gaya to Biharsharif Section of NH 120 (Old NH 82) in State of Bihar. |
1-NH/BIHARSHARIF-2/DPR/2024-25 |
11/06/2024 |
11/06/2024
|
05/08/2024
Time
15:0Hrs
|
|
| 488 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation Upgradation and Widening of existing Highway to for 4 lane with paved shoulder from Narsi Phata to Junction with NH 161 of Hingoli City road Section of NH 461B including 4L Major Bridge Across Kayadhu River (Total Length 7.30 Km) in Hingoli district in the State of Maharashtra |
2024-MoRTH-795566-2 |
11/06/2024 |
11/06/2024
|
19/07/2024
Time
17:30Hrs
|
|
| 489 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation and Widening of existing Highway to 2Lane with Paved Shoulder of Mahan Akola from Km.107/500 to Km.136/809 (Length 29.309 Km) of NH 161A in Akola district in the State of Maharashtra. |
01/EENH/AKL/2024-25 |
10/06/2024 |
10/06/2024
|
11/07/2024
Time
17:30Hrs
|
|
| 490 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Pipra Bazar Bypass at Km 44 on NH-106 (New NH-131) in the State of Bihar |
02/NH-MADHEPURA/2024-25 |
05/08/2024 |
07/06/2024
|
22/08/2024
Time
16:0Hrs
|
|
| 491 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Singheshwar Bypass on NH-131(106) in the State of Bihar |
01/NH-MADHEPURA/2024-25 |
03/08/2024 |
07/06/2024
|
22/08/2024
Time
16:0Hrs
|
|
| 492 |
Consultancy Services for preparation of Detailed Project Report for Widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (Sitarganj) to km 52.200 (Tanakpur) of NH-125 (New NH -09) in the State of Uttarakhand |
2024-NHAI-197587-1 |
12/07/2024 |
06/06/2024
|
29/07/2024
Time
11:0Hrs
|
|
| 493 |
Consultancy Services for Preparation of Detailed Project Report for Four / Six laning of Dindigul-Theni-Kumili Section of NH-183 in the State of Tamil Nadu |
NHAI/17011/02/27/2024/RO Madurai |
03/06/2024 |
31/05/2024
|
15/07/2024
Time
11:0Hrs
|
|
| 494 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DPR AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF BISHING TINALI (INDICATIVE LENGTH 55 PT 400 KM GREEN FIELD ALIGNMENT FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATION UNDER PROJECT BRAHMANK |
CE (P) BMK/02/2024-25 |
21/05/2024 |
04/05/2024
|
29/06/2024
Time
11:0Hrs
|
|
| 495 |
Consultancy Services for preparation of Detailed Engineering report for Widening from two lane paved shoulder to four lane paved shoulder from Km 0.00 (State boarder of Rajasthan and Gujrat) to 76.400 (Junction of NH-62 in Sirohi) Via Mandar Reodar and Anadara in the state of Rajasthan(Tentative length 76.400 KM) |
NIT NO 01/2024-25 |
23/04/2024 |
18/04/2024
|
20/06/2024
Time
11:0Hrs
|
|
| 496 |
Consultancy Services for Preparation of Detailed Project Report for 4 Lane Bypasses to Villages (i) Lahli (ii) Singhani (iii) Kharak (iv) Bamla on NH-709E in Bhiwani Distt and Bypass to Tohana Town on NH-148B in Fatehabad District in the Haryana |
RW/CH/HR/DPR/2023-24/02 |
16/04/2024 |
16/04/2024
|
23/05/2024
Time
15:0Hrs
|
|
| 497 |
RFP for Consultancy Services for Preparation of Detailed Project Report for Slope Protection and Slope Stabilization works including Rockfall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima road under SARDP-NE in the State of Nagaland |
2024_NHIDC_803294_1 |
26/04/2024 |
08/04/2024
|
23/05/2024
Time
15:0Hrs
|
|
| 498 |
Consultancy services for preparation of feasibility study and Detailed Engineering report for Ahore Bypass on NH-325 |
NIT.NO.03/2023-2024 |
05/04/2024 |
03/04/2024
|
21/05/2024
Time
17:0Hrs
|
|
| 499 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD NAMPONG-VIJAYNAGAR FROM KM 30.00 TO KM 100.00(NET LENGTH OF ROAD 70.00 KM) TO NHDL SPECIFICATIONS UNDER 103 RCC/752 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/33/2023-24 |
23/03/2024 |
20/03/2024
|
02/05/2024
Time
12:0Hrs
|
|
| 500 |
CONSUTANCY SERVICES FOR FEASIBILITY STUDY,PREPARATION OF DETAILED PROJECT REPORT(DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF GELLING BISHING ROAD GREEN FIELD ALIGNMENT (INDICATIVE LENGTH 25.0 KM) FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK |
CE(P) BMK/EPC-11/2023-24 |
18/03/2024 |
18/03/2024
|
07/05/2024
Time
11:0Hrs
|
|
| 501 |
Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches/corridors of Road Networks in the State of Maharashtra for Upgradation Four lane and above configuration Detail Project Report for Two lane with paved shoulder in Km. 0 /00 to Km 80/00 of Chattrapati Sambhajinagar (A.S.Club) – Vaijapur – Kopargaon Road NH – 752I |
2024-MoRTH-801027-1 |
09/05/2024 |
16/03/2024
|
17/05/2024
Time
17:30Hrs
|
|
| 502 |
1 (Ministry of Road Transport & Highways) Government of India Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches/corridors of Road Networks in the State of Maharashtra for New Alignment for Sawangi -Mitmita-Tisgaon Jn. from Sawangi Ch.-140/180 km to Tisagaon Junction Ch-152/180 km of NH-753F |
2024-MoRTH-801170-1 |
09/05/2024 |
16/03/2024
|
17/05/2024
Time
17:30Hrs
|
|
| 503 |
Consultancy Services for preparation of Detailed Project Report for (i) connectivity of Nagari to Medikheda fatak and (ii) Khatushyam ring road and Pathway along NH-52 (Jaipur to Sikar) for pedestrian pilgrim in the State of Rajasthan (Package-I) |
NHAI/Tech/Raj /DPR/ 214128 |
16/05/2024 |
15/03/2024
|
06/08/2024
Time
11:0Hrs
|
|
| 504 |
Consultancy Services for preparation of Detailed Project Report for (i) connectivity of Nagari to Medikheda fatak and (ii) Khatushyam ring road and Pathway along NH-52 (Jaipur to Sikar) for pedestrian pilgrim in the State of Rajasthan (Package-2) (2024_NHAI_191579_1) |
NHAI/Tech/Raj /DPR/ 214128 |
16/05/2024 |
15/03/2024
|
06/08/2024
Time
11:0Hrs
|
|
| 505 |
Consultancy Services for preparation of Detailed Project Report for Construction of elevated structure/bypass in Kherwara town in Udaipur district and Interchange at km 72.135 of NH-754A on Kalusar-Eta Road in Sriganganagar district in the State of Rajasthan - Package-1 |
NHAI/Rajasthan/DPR/Structures/2024 |
24/04/2024 |
15/03/2024
|
06/05/2024
Time
11:0Hrs
|
|
| 506 |
Consultancy Services for preparation of Detailed Project Report for Construction of elevated structure/bypass in Kherwara town in Udaipur district and Interchange at km 72.135 of NH-754A on Kalusar-Eta Road in Sriganganagar district in the State of Rajasthan (Package-2) |
NHAI/Rajasthan/DPR/Structures/2024 (Package-2) |
24/04/2024 |
15/03/2024
|
06/05/2024
Time
11:0Hrs
|
|
| 507 |
DPR preparation suggesting for uninterrupted flow of traffic providing additional Lanes/ bridges/ underpass/ tunnel as per requirement and improvement of black spots between chainage 296/000 to 299/000 on Kota Darah Jhalawar Section of NH 52 |
NIT09/2023-24 |
16/03/2024 |
15/03/2024
|
24/04/2024
Time
11:0Hrs
|
|
| 508 |
Preparation of Detailed Project Report for up-gradation of Four laning of EXISTING CH. 0.00 FROM RAIPUR TO CH. 186.800 SARANGARH of NH-130B to Two lane with paved shoulder/Four lane with paved shoulder configuration in the state of Chhattisgarh |
RO/2024/01 |
22/03/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 509 |
Preparation of Detailed Project Report for up-gradation Two laning with Paved shoulder of Paund at Ch.40.380 to Madangmuda (including Abhanpur bypass and Rajim bypass) at Ch.168.800 on NH-130C in the state of Chhattisgarh |
NIT No. /RO/2024/09/ |
05/04/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 510 |
Preparation of Detailed Project Report for up-gradation Four laning of Keshloor-Sukma-Konta in the state of Chhattisgarh |
NIT No. /RO/2024/07/ |
05/04/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 511 |
Preparation of Detailed Project Report for up-gradation of Four laning of existing alignment /realignment from chainage 81.500 to 301.240 of NH-43 New NH-30 Dhamtari Jagdalpur section in the state of Chhattisgarh |
RO/2024/02 |
28/03/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 512 |
Preparation of Detailed Project Report for up-gradation of Four laning of Kawardha bypass on NH-30 (Old NH-12A in the state of Chhattisgarh |
RO/2024/03 |
28/03/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 513 |
Preparation of Detailed Project Report for up-gradation of Four laning of NH-353 from Ch0.00 to Ch.65.900 Including Mahasamund Bypass and Bagbahara bypass in the state of Chhattisgarh |
RO/2024/04 |
28/03/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 514 |
Preparation of Detailed Project Report for up-gradation of Four laning) work of MP /CG border to Ambikapur section in the state of Chhattisgarh |
RO/2024/05 |
28/03/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 515 |
Preparation of Detailed Project Report for up-gradation of Four laning of Raigarh bypass in the state of Chhattisgarh |
RO/2024/06 |
28/03/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 516 |
Preparation of Detailed Project Report for up-gradation Four laning of Jagdalpur-Geedam in the state of Chhattisgarh |
RO/2024/08 |
28/03/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 517 |
Preparation of Detailed Project Report for up-gradation Two laning with Paved shoulder of Jashpurnagar to Dumari road NH-143B in the state of Chhattisgarh |
RO/2024/10 |
28/03/2024 |
15/03/2024
|
18/06/2024
Time
17:0Hrs
|
|
| 518 |
Consultancy Services for preparation of Detailed Project Report for Khatushyam ring road and Pathway along NH-52 (Jaipur to Sikar) for pedestrian pilgrim in the State of Rajasthan |
NHAI/Tech/Raj /DPR/ 214128 |
30/07/2024 |
15/03/2024
|
24/09/2024
Time
11:0Hrs
|
|
| 519 |
Consultancy Services for preparation of Detailed Engineering report for Widening from two lane paved shoulder to four lane paved shoulder from Km 0.00 (State boarder of Rajasthan & Gujrat) to 76.400 (Junction of NH-62 in Sirohi) Via Mandar, Reodar and Anadara in the state of Rajasthan Tentative length 76.400 KM) |
NIT No.04/2023-24 |
04/04/2024 |
14/03/2024
|
12/04/2024
Time
11:0Hrs
|
|
| 520 |
Consultancy Services for Preparation of Detailed Project Report for Widening of existing single intermediate lane to 2 lane with paved shoulders and Alignment ReAlignmentfrom Km 189.00 to 263.115 Salondhar to Buwakhal on NH 309 Old No 121. |
2024_MoRTH_800184_1 |
13/03/2024 |
14/03/2024
|
17/05/2024
Time
15:0Hrs
|
|
| 521 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR GRADE SEPRATED STRUCTURE WITH SLIP ROAD AT KM 0/00 (SHAHPURA JUNCTION) AND KM 86 (KATI GHATI ALWAR) OF SHAHPURA-ALWAR RAMGARH-NUH ROAD NH-248A |
2024_MoRTH_800739_1 NIT 19/2023-24 EE PWD NH Dn-I, Jaipur |
30/04/2024 |
14/03/2024
|
14/06/2024
Time
18:0Hrs
|
|
| 522 |
Monetization of public funded operational National Highways stretches Selection and Empanelment of Technical Due Diligence Consultants for effective implementation of Asset Monetization program under TOT n InvIT |
2024-NHAI-191184-1 |
07/05/2024 |
13/03/2024
|
11/06/2024
Time
11:0Hrs
|
|
| 523 |
Monetization of public funded operational National Highways stretches Selection and Empanelment of Traffic Due Diligence Consultants for effective implementation of Asset Monetization program under TOT AND InvIT |
2024-NHAI-191216-1 |
07/05/2024 |
13/03/2024
|
11/06/2024
Time
11:0Hrs
|
|
| 524 |
Detailed Project Report Preparation for Land Acquisitoion and Construction of 4L Dondaicha to Shahada Road section of NH 160H (27.500 km) in the State of Maharashtra. |
2024-MoRTH-799346-1 |
23/04/2024 |
13/03/2024
|
13/05/2024
Time
17:30Hrs
|
|
| 525 |
Preparation of Detailed Project Report of Consultancy Services for Preparation of Detailed Project Report for Development scheme for Longleng- Longching- Mon- Tizit section (Km 33.248 to Km 177.000) of National Highway 702 in the State of Nagaland |
2024_NHIDC_800109_1 |
20/03/2024 |
12/03/2024
|
24/04/2024
Time
15:0Hrs
|
|
| 526 |
Consultancy Services for preparation of DPR including detailed Geology & Geomorphology study, Geotechnical Investigations, Satellite Imagery and INSAR deformation study, Topographical survey, 3D mapping and preparation of DPR for providing Cost Effective and Suitable remedial measures for prevention of landslides/rockfall /river cut/ mass movement/bank erosion etc. at identified locations / sections between KIRATPUR TO PANDOH on Kiratpur-Manali Section of NH-21 in the State of Himachal Pradesh |
2024_NHAI_190773_1 |
15/03/2024 |
11/03/2024
|
09/04/2024
Time
11:0Hrs
|
|
| 527 |
Consultancy services for preparation of DPR for study of landslide area on various locations between Chainage km 172.900 to km 182.000 along NH-39 (New NH-29) in the state of Nagaland |
CE/NH/CONSULTANCY/LANDSLIDE/NH-39/2023-24 |
12/03/2024 |
08/03/2024
|
19/04/2024
Time
13:0Hrs
|
|
| 528 |
Consultancy Services for DPR Preparation for widening of Ajanta Ghat to 4 LPS of NH-753F configuration in the state of Maharashtra. |
EENH/Jalna/Tender/NIT No-03/408 |
08/04/2024 |
08/03/2024
|
19/04/2024
Time
17:30Hrs
|
|
| 529 |
Consultancy services for preparation of DPR for study of landslide area on various locations between Chainage km 172.900 to km 182.000 along NH-39 (New NH-29) in the state of Nagaland |
CE/NH/CON/LANDSLIDE/NH-39/2023-24 |
10/05/2024 |
08/03/2024
|
07/06/2024
Time
13:0Hrs
|
|
| 530 |
Detailed Project Report Preparation for Land Acquisitoion and Construction of Kolde Visarwadi Road section of NH 752G 50.20km in the State of Maharashtra. |
2024-MoRTH-799358-1 |
29/04/2024 |
07/03/2024
|
13/05/2024
Time
17:30Hrs
|
|
| 531 |
Consultancy services for preparation of Feasibility Study and DPR for construction of Mokokchung Bypass in the state of Nagaland. |
CE/NH/CONSULTANCY/MKGBYPASS/2023-24 |
09/05/2024 |
07/03/2024
|
07/06/2024
Time
13:0Hrs
|
|
| 532 |
Detailed Project Report preparation for Land Acquisition and Construction of Kusumba Dondaicha Road section of NH 160H (55.00 Km) in the state of Maharashtra. |
2024-MoRTH-799336-1 |
23/04/2024 |
07/03/2024
|
13/05/2024
Time
17:30Hrs
|
|
| 533 |
Project Management Consultancy Services for Widening to 2-lane with paved shoulder from Km 0.000 to 52.100 of NH-10 Sevoke-Rangpo section in the State of West Bengal |
MORTH/ROKOL/NIT/PMC/2023-24/01 |
08/03/2024 |
07/03/2024
|
01/07/2024
Time
15:0Hrs
|
|
| 534 |
Consultancy Services for preparation of Feasibility Study and DPR for construction of Mokokchung Bypass in the state of Nagaland |
CE/NH/CONSULATNCY/MKGBYPASS/2023-24 |
09/02/2024 |
07/03/2024
|
18/04/2024
Time
13:0Hrs
|
|
| 535 |
Consulatancy services for preparation of Feasibility Study and DPR for widening and construction of 2 lane and paved shoulders NH 329A in the state of Nagaland |
CE/NH/CONSULTANCY/NH329A/2023-24 |
11/02/2024 |
06/03/2024
|
16/04/2024
Time
13:0Hrs
|
|
| 536 |
Consultancy Services for preparation of DPR for Repair /Rehabilitation of existing pavement and Bridges/CD Works on Road Stretch between Chainage 289/500 to 299/000 on Kota Darah Section on NH 52 incl construction of additional bridge and RUB. |
NIT 08/2023-24 |
12/03/2024 |
05/03/2024
|
26/03/2024
Time
11:0Hrs
|
|
| 537 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation and Upgradation of 2 4 lane paved shoulder of Buldhana- Khamgaon road Section of NH753E including flyover in Botha forest. (Length 47.5 Km) in Buldhana district in the State of Maharashtra. |
2024_MoRTH_797407_1 |
28/02/2024 |
26/02/2024
|
26/03/2024
Time
17:30Hrs
|
|
| 538 |
PROJECT MANAGEMENT CONSULTANCY SERVICES FOR DESIGN and SUPERVISION OF CONSTRUCTION OF ROAD STARTING FROM DHALWALA START OF TUNNEL TO KM 235.615 OF NH 58 LENGTH-7.0 Km WITH FIVE TUNNELS OF LENGTH 750m, 100M,100M,200M AND 300m. |
2024_MoRTH_795222_1 |
15/02/2024 |
19/02/2024
|
31/05/2024
Time
17:0Hrs
|
|
| 539 |
Consultancy Services for Preparation of detailed project report for construction of 4 lane railway over bridge at ch. 3.800 on NH-11 (21) (Agra-JaipurBikaner) (Prithvinath gate, railway crossing no.-6A) in District Agra in the State of Uttar Pradesh |
10184M/13M-NHCK/24 Dated 15.02.2024 |
22/02/2024 |
17/02/2024
|
27/02/2024
Time
11:0Hrs
|
|
| 540 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of Animal Underpasses 6 Nos on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitigation Plan in KM 109.790 to Km 163.050 in State of Maharashtra. |
40/EENH/NGP/2023-24/2nd call /792 |
22/02/2024 |
16/02/2024
|
28/02/2024
Time
17:0Hrs
|
|
| 541 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation Upgradation and Widening of existing Highway to for 4 lane with paved shoulder from Narsi Phata to Junction with NH 161 of Hingoli City road Section of NH 461B including 4L Major Bridge Across Kayadhu River (Total Length 7.30 Km) in Hingoli district in the State of Maharashtra |
2024_MoRTH_795566_1 |
21/02/2024 |
15/02/2024
|
15/03/2024
Time
17:30Hrs
|
|
| 542 |
Consultancy Services for four Lanning of NH 123(507) from Herbertpur to Kalsi (Ch. 0.00 to 16.00). |
2024_MoRTH_794590_1 |
10/02/2024 |
12/02/2024
|
05/04/2024
Time
15:0Hrs
|
|
| 543 |
Consultancy services for preparation of Detailed Project Report (DPR)based feasibility report for construction of Flyover at Km 99.400 of NH 730 (Major Junction with state highway-93)in the State of Uttar Pradesh. |
475/1Tender Cashier_LMP/23-24 dated 07.02.2024 |
13/02/2024 |
08/02/2024
|
21/02/2024
Time
17:0Hrs
|
|
| 544 |
Consultancy Services for Project Management including preparation of Detailed Project Report in realignment portion to Jalgoan Pachora Bhadgaon Chalisgaon NH 753J for bypass in jalgaon district |
2024-MoRTH-794045-1 |
07/03/2024 |
06/02/2024
|
15/04/2024
Time
17:30Hrs
|
|
| 545 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-HUSH-DILLE GG (NEW ALIGNMENT) FROM KM 0.00 TO KM 58.00 (NET LENGTH 58.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (4th CALL) |
ANK/NIT-05/2023-24 4th Call |
03/02/2024 |
03/02/2024
|
01/03/2024
Time
12:0Hrs
|
|
| 546 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD TAWANG- WOMINGLA- KUMROTSAR FROM KM 0.000 TO KM 33.39 CL-5 TO NHSL AND FROM KM 33.39 TO KM 40.00 NEW TRACK TO NHSL SPECIFICATIONS UNDER GS LTRoWP 2023-24 UNDER 125 RCC/763 BRTF (P) VARTAK IN TAWANG DISTRICT OF ARUNACHAL PRADESH |
CE (P)/VTK/NIB/26/2023-24 |
01/02/2024 |
01/02/2024
|
23/03/2024
Time
11:0Hrs
|
|
| 547 |
CS for DPR for Bypasses of Villages (i) Lahli (ii) Singhani (iii) Kharak (iv) Bamla on NH709E in Bhiwani Distt and Bypass of Tohana Town on NH148B in Fatehabad Distt in State of Haryana |
RW/CH/HR/DPR/2023-24 |
31/01/2024 |
31/01/2024
|
01/03/2024
Time
15:0Hrs
|
|
| 548 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Singheshwar Bypass on NH-131(106) in the State of Bihar |
12/NH-MADHEPURA/2023-24 |
13/02/2024 |
31/01/2024
|
16/03/2024
Time
16:0Hrs
|
|
| 549 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD NEW MELLING- DAMTENG FROM KM 0.000 TO KM 22.000 TO NHSL SPECIFICATIONS IN SECTOR OF 120 RCC/ 763 BRTF/ PROJECT VARTAK |
CE (P)/VTK/NIB/05/2023-24 |
31/01/2024 |
30/01/2024
|
21/03/2024
Time
11:0Hrs
|
|
| 550 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Slope protection works including Rock-fall protection and Landslide mitigation measures from km 123.840 to km 166.700 of NH-29 Dimapur –Kohima 4 laning project under SARDP-NE Project in the State of Nagaland- 2nd Call |
2024_NHIDC_792819_1 |
31/01/2024 |
30/01/2024
|
23/02/2024
Time
15:0Hrs
|
|
| 551 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR GRADE SEPRATED STRUCTURE WITH SLIP ROAD AT KM 0/00 (SHAHPURA JUNCTION) AND KM 86 (KATI GHATI ALWAR) OF SHAHPURAALWAR RAMGARH-NUH ROAD NH-248A |
2024_MoRTH_792143_1 |
31/01/2024 |
25/01/2024
|
08/02/2024
Time
17:0Hrs
|
|
| 552 |
Consultancy Services for preparation of DPR for Repair /Rehabilitation of existing pavement and Bridges/CD Works on Road Stretch between Chainage 289/500 to 299/000 on Kota Darah Section on NH 52 incl construction of additional bridge and RUB. |
NIT-06/2023-24 |
11/02/2024 |
23/01/2024
|
28/02/2024
Time
11:0Hrs
|
|
| 553 |
Consultancy Services for Preparation of Detailed Project Report for Widening of existing single intermediate lane to 2 lane with paved shoulders and Alignment ReAlignmentfrom Km 189.00 to 263.115 Salondhar to Buwakhal on NH 309 Old No 121 in the State of Uttarakhand. |
2024_MoRTH_791129_1 |
18/01/2024 |
19/01/2024
|
04/03/2024
Time
15:0Hrs
|
|
| 554 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of ROB at L/C No. 1/Class A Safiyasarai Ch-71.970 of NH-80, L/C No. 5/SPL/T Shivnarayanpur Ch-171.300 of NH-80 and ROB at L/C No. 2/C-T(SPL) Mirzachowk Ch-188.200 of NH-80 in the state of Bihar. |
Re NIT. 25/NH-Bhagalpur/2023-24 |
18/01/2024 |
18/01/2024
|
14/03/2024
Time
11:0Hrs
|
|
| 555 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD NACHO-BANGTE-NEYING (NEW ALIGNMENT) FROM KM 0.00 TO KM 57.00 (NET LENGTH 57.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 77 RCC UNDER 23 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (2nd Call) |
ANK/NIT-22/2023-24 (2nd Call) |
18/01/2024 |
18/01/2024
|
09/02/2024
Time
12:0Hrs
|
|
| 556 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD SARLI-PHULLE-WASI-DHARMU-SANGIA (NEW ALIGNMENT) FROM KM 13.500 TO KM 40.00 (NET LENGTH 26.50 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (2nd Call) |
ANK/NIT-23/2023-24 (2nd Call) |
18/01/2024 |
18/01/2024
|
09/02/2024
Time
12:0Hrs
|
|
| 557 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD SARLI-SEMAI-BAKAR-KAWACHI (NEW ALIGNMENT) FROM KM 54.873 TO KM 90.00 (NET LENGTH 35.127 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 119 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (2ND Call) |
ANK/NIT-24/2023-24 (2nd Call) |
18/01/2024 |
18/01/2024
|
09/02/2024
Time
12:0Hrs
|
|
| 558 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-KARU-SERING-BAGAN (NEW ALIGNMENT) FROM KM 0.000 TO KM 68.00 (NET LENGTH 68.000 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (2nd CALL) |
ANK/NIT-25/2023-24(2nd Call) |
18/01/2024 |
18/01/2024
|
09/02/2024
Time
12:0Hrs
|
|
| 559 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of Animal Underpasses 6 Nos on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitigation Plan in KM 109.790 to Km 163.050 in State of Maharashtra. |
40/EENH/NGP/2023-24/ |
07/02/2024 |
17/01/2024
|
12/02/2024
Time
17:0Hrs
|
|
| 560 |
CS FOR PREPARATION OF DPR FOR CONSTRUCTION OF AVALANCHE GALLERY/CONTROL OF ZOZILA TUNNEL TO KARGIL AND IMPROVEMENT OF ROAD GEOMETRICS INCLUDING CONSTRUCTION OF BRIDGES VIADUCTS ETC IN BETWEEN KM 118 TO KM 268 OF ZOZILA KARGIL LEH ROAD NH 1 UNDER BRO |
RW/SR/W(18)/Ladakh/2022/Part1 |
16/01/2024 |
12/01/2024
|
27/03/2024
Time
15:0Hrs
|
|
| 561 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT FROM KM 30.00 TO 69.00, FROM KM 69.00 TO 87.00, OF SRINAGAR-SONMARG-ZOJILA ROAD(NH-01) AND FROM KM 0.00 TO 13.00 ,CHAMKOT-TITHWAL ROAD (NH-701). |
RO/JK/DPR/SRI/GUMRI/28/2024 |
19/01/2024 |
12/01/2024
|
28/03/2024
Time
15:0Hrs
|
|
| 562 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR GRADE SEPRATED STRUCTURE WITH SLIP ROAD AT KM 0/00 (SHAHPURA JUNCTION) AND KM 86 (KATI GHATI ALWAR) OF SHAHPURA-ALWAR RAMGARH-NUH ROAD NH-248A |
NIT 12/2023-24 EE PWD NH Dn-I, Jaipur |
09/01/2024 |
09/01/2024
|
22/01/2024
Time
18:0Hrs
|
|
| 563 |
Preparation of DPR for Rehabilitation Up gradation of Talegaon Warud Gonapur Section to 2Lane plus Paved shoulder standards from Design km Ch 14.300 to 19.800, 24.150 to 24.800,31.00 to 47.00, 4.010 to 60.703 Total length of the project 35.25 km section of NH 347A on EPC Mode in the state of Maharashtra. |
NITNo21EENHAMT202324 |
12/01/2024 |
09/01/2024
|
07/02/2024
Time
17:30Hrs
|
|
| 564 |
Consultancy services for Preparation of Detailed Project Report for A) Chandurbazar Bypass on NH 353J ( Length 6.00Km) , B) Morshi Byapss on NH 353 K( Length 9.00Km) , C) Udkhed realignment on NH 353J ( length 4 km. D) Warud Bypass on NH 353 K ( Length 12.00 km. E) Digras Bypass on NH 161A ( Length 5.00 km ) F) Missing link of NH 353J connecting NH 548C in Paratwada with 4LPS ( length 7.00 km ) G) Forest stretch of NH 353J Morshi Chandurbazar Achalpur (length 3.5 km ) Total length 46.5 km |
NIT19/EENH/AMT/2023-24 |
12/01/2024 |
05/01/2024
|
07/02/2024
Time
17:30Hrs
|
|
| 565 |
Consultancy services for preparation of Detailed Project Report (DPR)based feasibility report for construction of Flyover at Km 99.400 of NH 730 (Major Junction with state highway-93)in the State of Uttar Pradesh. |
33/1Tender Cashier (LMP)/23-24 dt 03.01.2024 |
11/01/2024 |
05/01/2024
|
01/02/2024
Time
11:0Hrs
|
|
| 566 |
Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148.589 (Existing Km 235.070) (Vailoo) to Design Km 176.532 (Existing Km (263.070) Donipawa of 8.643 Km Length on Khellani-Khanabal Section of NH-244 in the UT of Jammu and Kashmir |
NHIDCL/J&K/DPR/Khellani-Khanabal/PKg-VI |
08/01/2024 |
05/01/2024
|
05/03/2024
Time
11:0Hrs
|
|
| 567 |
Consultancy Services for preparation of Detailed Project Report (DPR) based feasibility report for 4 laning of NH-334DD (Hamidpur-jewar-Jhajhar-kakod-Bulandshahr Road) & for connectivity of NH-334DD effected due to construction of Jewar Airport on existing alignment at Km.11.200 to Km.13.600 of the NH-334DD (Hamidpur-jewar-Jhajhar-kakod-Bulandshahr Road) in the state of Uttar Pradesh. |
47/354Com-NHC/24 Dt. 03.01.2024 |
05/01/2024 |
05/01/2024
|
01/02/2024
Time
11:0Hrs
|
|
| 568 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Four Lane ROB at Km 48.596 from Gaya to Biharsharif Section of NH 120 (Old NH 82) in State of Bihar. |
4-NH/BIHARSHARIF2/DPR/2023-24 |
05/01/2024 |
05/01/2024
|
22/02/2024
Time
15:0Hrs
|
|
| 569 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Monigong-Dile Duting and Henkar- Tabeyongkong and Bruni-Balchida road approved under ICBR(PH-III) project in the State of Arunachal Pradesh(Total length 60 Km)( Package-II)-(2nd Call) |
NHIDCL/Ar. Pr./DPR/ICBR-III/ M-D,H-T,B-B/(P(2)/233 |
08/01/2024 |
04/01/2024
|
21/02/2024
Time
15:0Hrs
|
|
| 570 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-HUSH-DILLE GG (NEW ALIGNMENT) FROM KM 0.00 TO KM 58.00 (NET LENGTH 58.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (3rd CALL) |
ANK/NIT-05/2023-24 3rd Call |
30/12/2023 |
30/12/2023
|
27/01/2024
Time
12:0Hrs
|
|
| 571 |
Consultancy Services for preparation of Detailed Project Report (DPR) for widening to four lane from Km.4.00 to Km.17.756 of NH11(21) (Agra-Jaipur- Bikaner) in the State of Uttar Pradesh. |
11686M/13M-NHCK/23 dated 22.12.2023 |
13/01/2024 |
29/12/2023
|
07/02/2024
Time
11:0Hrs
|
|
| 572 |
Consultancy Services for Preparation of detailed project report for construction of 4 lane railway over bridge at ch. 3.800 on NH-11 (21) (Agra-Jaipur- Bikaner) (Prithvinath gate, railway crossing no.-6A) in District Agra in the State of Uttar Pradesh |
11686M/13M-NHCK/23 dt 22.12.2023 |
13/01/2024 |
29/12/2023
|
07/02/2024
Time
11:0Hrs
|
|
| 573 |
Preparation of Detailed Project report for 4 laning from km. 25.00 (Bettiah) to km. 94.00 (Mangalpur) with Flyover at Station Chowk Bettiah in km. 25.600 of NH 727 for the year 2023_24 in the State of Bihar.) |
NH/MOT/DPR/01/2023-24 |
27/12/2023 |
28/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
| 574 |
Consultancy services for preparation of feasibility study and Detailed Engineering report for Ahore Bypass on NH-325 |
NIT No.01/2023-24 |
08/02/2024 |
27/12/2023
|
19/02/2024
Time
17:0Hrs
|
|
| 575 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities and Land Acquisition for Construction of 4-lane from Chainage 15.000 to Chainage 61.500 on NH-334A in the State of Uttarakhand. |
2023_MoRTH_786948_1 |
26/12/2023 |
26/12/2023
|
05/02/2024
Time
15:0Hrs
|
|
| 576 |
Consultancy Services for Preparation of Detailed Project Report including LA andother clearances for Construction of Singheshwar Bypass on NH-131(106) in theState of Bihar |
10/NH-MADHEPURA/2023-24 |
29/12/2023 |
15/12/2023
|
29/01/2024
Time
16:0Hrs
|
|
| 577 |
Preparation of DPR for Rehabilitation/Up gradation of Jalna Sindkhrd Raja Mehakar Malegaon Karanja Deogaon Pulgaon section to 2 lane Paved shoulder standard from Design Km Ch.100/00 to 186/00 (Total length of the project 91.80 km) section of NH 753C on EPC mode in the state of Maharashtra. |
14/EENH/AMT/2023-24 |
20/12/2023 |
14/12/2023
|
04/01/2024
Time
17:30Hrs
|
|
| 578 |
Preparation of DPR for Rehabilitation/Up gradation of Jalna Sindkhrd Raja Mehakar Malegaon Karanja Deogaon Pulgaon section to 2 lane Paved shoulder standard from Design Km Ch.00/00 to 100/00 (Total length of the project 107.150 km) section of NH 753C on EPC mode in the state of Maharashtra. |
13/EENH/AMT/2023-24 |
20/12/2023 |
14/12/2023
|
04/01/2024
Time
17:30Hrs
|
|
| 579 |
Consultancy Services for four Lanning of NH 123(507) from Herbertpur to Kalsi (Ch. 0.00 to 16.00). |
2023_MoRTH_784961_1 |
21/12/2023 |
14/12/2023
|
29/01/2024
Time
15:0Hrs
|
|
| 580 |
Preparation of DPR for Rehabilitation Up gradation of Jalna Sindkhed Raja Mehakar malegaon Karanja Deogaon Pulgaon road section to 2Lane Paved shoulder standards from Design km Ch. 186.00 to 287.350 (Total length of the project 101.350 km) section o |
15/EENH/AMT/2023-24 |
15/12/2023 |
14/12/2023
|
04/01/2024
Time
17:30Hrs
|
|
| 581 |
Consultancy Services for preparation of DPR for upgradation of single lane to 2-lane and tunneling of existing alignment- realignment from Chainage 68.600 to 75.00 of NH-107 Sitapur- Sonprayag Gaurikund Section in the State of Uttarakhand. |
2023_MoRTH_784810_1 |
19/12/2023 |
13/12/2023
|
01/02/2024
Time
15:0Hrs
|
|
| 582 |
Consultancy Services for preparation of DPR for widening to 2 Lane configuration of NH-309B (Almora-Panar) including connectivity to proposed Almora Bypass on NH-87Ext. in the State of Uttarakhand. |
2023_MoRTH_784251_1 |
18/12/2023 |
12/12/2023
|
01/02/2024
Time
15:0Hrs
|
|
| 583 |
Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches corridors of Road Networks in the State of Maharashtra for Upgradation to Two lanes with paved shoulders Four lane configuration of Ma |
2023-MoRTH-784713-1 |
16/12/2023 |
11/12/2023
|
05/01/2024
Time
17:30Hrs
|
|
| 584 |
Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches corridors of Road Networks in the State of Maharashtra for Upgradation Four lane and above configuration of The Highway starting from |
2023-MoRTH-784715-1 |
16/12/2023 |
11/12/2023
|
05/01/2024
Time
17:30Hrs
|
|
| 585 |
Consultancy Services for Preparation of Detailed Project Report DPR for Widening to 4L from km 235.00 to km 300.300 of Nayagarh- Khordha on NH-57 in the State of Odisha. Bid reference no 01-ROBBSR-2023-24-DPR |
01-ROBBSR-2023-24-DPR |
30/11/2023 |
11/12/2023
|
16/01/2024
Time
12:0Hrs
|
|
| 586 |
Consultancy Services for preparation of Feasibility Study and Detailed Engineering Report for Construction of Two lane with paved shoulder for Rajgarh Bypass connecting NH-52 to NH-709 Extn in the State of Rajasthan |
NIT No. 01/2023-24 EE PWD NH CHURU |
08/12/2023 |
08/12/2023
|
03/01/2024
Time
17:0Hrs
|
|
| 587 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Slope protection works including Rock-fall protection and Landslide mitigation measures from km 123.840 to km 166.700 of NH-29 Dimapur –Kohima 4 laning project under SARDP-NE Project in the State of Nagaland |
2023_NHIDC_783993_1 |
06/12/2023 |
06/12/2023
|
13/01/2024
Time
15:0Hrs
|
|
| 588 |
Carrying out Survey, geotechnical investigation and preparation of gads, boq, Detailed designing, working drawings, detailed estimates INCLUDING required modifications during consultancy Service for project Management Phase including preparation of Detailed Project Report of Development of Faridabad Noida (FNG) 6-Lane corridor alignment &Including major bridge over River Yamuna connecting sector -168 & 167-A, Noida with Sector-89 via Lalpur village in district Faridabad |
2023 HRY 333913 1 |
06/12/2023 |
06/12/2023
|
04/01/2024
Time
17:0Hrs
|
|
| 589 |
Appointment of PMC for preparation of Detailed Project Report of 4L PS Padruna Bypass, completion of Pre construction activity and Project supervision as Independent Engineer of 4L PS/2L PS work of NH727 from 0.000 to 46.500 in the state of Uttar Pradesh |
CE-RO/LKO/PMC/NH-727/2023-24 dt. 06.12.2023 |
08/12/2023 |
06/12/2023
|
30/01/2024
Time
15:0Hrs
|
|
| 590 |
Appointment of PMC for preparation of Detailed Project Report of Padruna Bypass, completion of Pre construction activity and Project supervision as Independent Engineer of 4L PS/2L PS work of NH727 from 0.000 to 46.500 in the state of Uttar Pradesh |
CE-RO/LKO/PMC/NH727/202324 dt. 06.12.2023 |
29/01/2024 |
06/12/2023
|
13/02/2024
Time
15:0Hrs
|
|
| 591 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway - 2 at Dhubri to NH - 127B in the State of Assam(4th Call) |
NHIDCL/2022-23/AS/Dhubri/DPR /NW-2/NH-127B/C4 |
14/12/2023 |
05/12/2023
|
26/12/2023
Time
15:0Hrs
|
|
| 592 |
RETENDER FOR SURVEY, INVESTIGATION AND PREPARATION OF DPR THROUGH CONSULTANCY FOR CONSTRUCTION / IMPROVEMENT OF EXISTING ROAD KHAB- NAMGIA-CHUPPAN- SHIPKILA FROM CL-9 TO NHDL SPECIFICATION FROM KM 0.00 TO KM 31.430 ( INCLUDING APPROACH ROAD TO KHAB OF LENGTH 3.000 KM) KM 0.000 RECKONED FROM KM 433.265 NH-05 OF HINDUSTAN-TIBBET ROAD UNDER 68 RCC / 759 BRTF UNDER PROJECT DEEPAK IN HIMACHAL PRADESH |
CE(P) DPK/07/2023-24 |
20/12/2023 |
05/12/2023
|
22/01/2024
Time
16:0Hrs
|
|
| 593 |
IMPROVEMENT OF ROAD GEOMETRICS INCLUDING CONSTRUCTION OF BRIDGES VIADUCTS ETC IN BETWEEN KM 268 TO KM 391 OF ZOZILA KARGIL LEH ROAD NH 1 UNDER PROJECT VIJAYAK IN UT OF LADAKH |
O/CH/SR/W(18)/Ladakh/2022 |
02/12/2023 |
30/11/2023
|
01/01/2024
Time
12:0Hrs
|
|
| 594 |
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for Construction of W and S to 2 Lane with paved shoulder from Km 41 to Km 92 of NH 2C (New NH-119) in the State of Bihar. |
06-NH/GAYA/DPR/2023-24 |
04/12/2023 |
30/11/2023
|
24/01/2024
Time
17:0Hrs
|
|
| 595 |
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for 4 Laning of Arwal to Biharsharif from km 0.00 to km 89.00 of NH 110(New NH 33) in the State of Bihar. |
07-NH/GAYA/DPR/2023-24 |
04/12/2023 |
30/11/2023
|
24/01/2024
Time
17:0Hrs
|
|
| 596 |
Consultancy Services for Feasibility study and Preparation of Detailed Project Report including LA and Other Clearance for 4- Laning of Kujapi (Gaya) to Panchanpur (Gaya) from Km 103.865 to Km 118 of NH-120 and Dobhi to Gosaidih from Km 0.00 to Km 13.00 of NH-99(New NH-22) in the State of Bihar. |
07-NH/GAYA/DPR/2023-2024 |
05/12/2023 |
30/11/2023
|
24/01/2024
Time
17:0Hrs
|
|
| 597 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to 2 Lane with Paved Shoulder of Shegaon - Sangrampur from Km. 55/000 to Km. 88/000 (Length=33 Km) of NH 161G in Buldhana district in the State of Maharashtra. |
2023_MoRTH_782729_1 |
08/12/2023 |
28/11/2023
|
26/12/2023
Time
17:30Hrs
|
|
| 598 |
Consultancy services for Preparation of Detailed Project Report for Rehabilitation & Up gradation of Sangrampur MP Border section of NH-161G to Two lane configuration in Buldhana district in the State of Maharashtra (Length30.00 Km). |
2023_MoRTH_782732_1 |
08/12/2023 |
28/11/2023
|
26/12/2023
Time
17:30Hrs
|
|
| 599 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of4-Lane ROB to “Rampur-Alamatti-Kudalasangam LC No.54 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC54/TENDER/2023-24/1309 |
28/11/2023 |
28/11/2023
|
12/12/2023
Time
17:30Hrs
|
|
| 600 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of 2-Lane ROB to “Banashankri- Lakmapur -Km 9.50 (Near Lakmapur Village) LC No.28 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC-28/TENDER/2023-24/1308 |
28/11/2023 |
28/11/2023
|
12/12/2023
Time
17:30Hrs
|
|
| 601 |
Consultancy Services for Project Management including preparation of Detailed Project Report of Selected stretches corridors of Road Networks in the State of Maharashtra for Upgradation to Two lanes with paved shoulders Four lane configuration of Mal |
2023-MoRTH-782648-1 |
02/12/2023 |
25/11/2023
|
09/12/2023
Time
17:55Hrs
|
|
| 602 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for upgradation of NH69 to Four Lane from Chikkaballapur to Mulbagal ie From Km 401 300 to 483 591 including realignment for Chikkaballapurtown |
RW/BNG/NH-69/Consulatncy /Km.401-483/78/2023 |
23/11/2023 |
23/11/2023
|
11/01/2024
Time
15:0Hrs
|
|
| 603 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Basam-Thathi-Amaha and Bruni-Lama Camp-Kangri Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 86 Km) ( Package-V) |
NHIDCL/ICBR-III/DPR/B-T-A B-LC-K/P-V/ |
24/11/2023 |
23/11/2023
|
04/01/2024
Time
15:0Hrs
|
|
| 604 |
Consultancy services for feasibility study DPR survey and preparation of land plan for Widening to two lane with paved shoulder from Km 86.2 (Charmadi Ghat) to Km 99.2 (Kottighere) & Km 113.71 (Mudigere Hand Post) to Km 194.555 (Banavara) of NH-73 in the State of Karnataka |
RW/BNG/NH 234/Km 86-99/72/2022 |
17/11/2023 |
17/11/2023
|
13/12/2023
Time
15:0Hrs
|
|
| 605 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of Animal Underpasses 6 Nos on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitigation Plan in KM 109.790 to Km 163.050 in State of Maharashtra. |
24/EENH/NGP/2023-24/2nd call/ 5021 |
24/11/2023 |
16/11/2023
|
30/11/2023
Time
17:0Hrs
|
|
| 606 |
Project Management Consultancy Services for Construction of Bageshwar bypass including 2- Lane Tunnel with approaches across the Bageshwar Hills in market area (Existing Km Stone 130 to Existing km Stone 136 of NH-309A) (Total length of bypass 2.2 km including 1.05 Km tunnel) in the State of Uttarakhand. |
2023-MoRTH-780418-1 |
10/11/2023 |
14/11/2023
|
02/01/2024
Time
15:0Hrs
|
|
| 607 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-HUSH-DILLE GG (NEW ALIGNMENT) FROM KM 0.00 TO KM 58.00 (NET LENGTH 58.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH (2nd Call) |
ANK/NIT-05/2023-24 2nd Call |
13/11/2023 |
14/11/2023
|
26/12/2023
Time
12:0Hrs
|
|
| 608 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD NACHO-BANGTE-NEYING (NEW ALIGNMENT) FROM KM 0.00 TO KM 57.00 (NET LENGTH 57.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 77 RCC UNDER 23 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-22/2023-24 |
13/11/2023 |
14/11/2023
|
05/01/2024
Time
12:0Hrs
|
|
| 609 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD PHULLE-WASI-DHARMU-SANGIA (NEW ALIGNMENT) FROM KM 13.500 TO KM 40.00 (NET LENGTH 26.50 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-23/2023-24 |
13/11/2023 |
14/11/2023
|
05/01/2024
Time
12:0Hrs
|
|
| 610 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD SEMAI-BASKAR-KAWACHI (NEW ALIGNMENT) FROM KM 54.873 TO KM 90.00 (NET LENGTH 35.127 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 119 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-24/2023-24 |
13/11/2023 |
14/11/2023
|
05/01/2024
Time
12:0Hrs
|
|
| 611 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-KARU-SERING-BAGAN (NEW ALIGNMENT) FROM KM 0.000 TO KM 68.00 (NET LENGTH 68.000 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-25/2023-24 |
13/11/2023 |
14/11/2023
|
05/01/2024
Time
12:0Hrs
|
|
| 612 |
PREPARATION OF RECCE SURVEY DETAILED PROJECT REPORT (DPR) THROUGH CONSULTANCY FOR CONSTRUCTION OF ROAD TAWANG- WOMINGLA- KUMROTSAR (APPX NET LENGTH 40 KMS) FROM KM 0.00 TO KM 33.390 CL-5 TO NHSL AND FROM KM 33.390 TO KM 40.00 NEW TRACK TO NHSL SPECIFICATIONS UNDER GS LTRoWP 2023-24 UNDER 125 RCC/ 763 BRTF (P) VARTAK IN TAWANG DISTRICT OF ARUNACHAL PRADESH. |
CE(P)/VTK/NIT/26/2023-24 |
10/11/2023 |
11/11/2023
|
27/11/2023
Time
12:0Hrs
|
|
| 613 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to four lane from Km 0.00 to Km 71.6 of NH275 Mani Mysore Bangalore section in the State of Karnataka |
RW/BNG/NH-275/Km.0-71.6 /42/2023 |
10/11/2023 |
10/11/2023
|
13/12/2023
Time
15:0Hrs
|
|
| 614 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD NEW MELLING- DAMTENG FROM KM 0.000 TO KM 22.000 TO NHSL SPECIFICATIONS IN SECTOR OF 120 RCC /763 BRTF /PROJECT VARTAK |
CE(P)/VTK/NIT/05/2023-24 |
10/11/2023 |
10/11/2023
|
26/12/2023
Time
13:0Hrs
|
|
| 615 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Four Lane ROB at Km 48.596 from Gaya to Biharsharif Section of NH 120 (Old NH 82) in State of Bihar. |
02-NH/BIHARSHARIF/DPR/2023-24 |
08/11/2023 |
08/11/2023
|
15/12/2023
Time
11:0Hrs
|
|
| 616 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Construction of new 2Lane/4Lane Major bridges at km 3,500 on Kali River, km 39.840 on Ganga River, km 53.250 on Ram Ganga River and 03 Minor Bridges at km 31.425, km 31.710, km 44.665 and 01 ROB at km 36.645 of NH730C in the state of Uttar Pradesh. |
CE-RO/LKO/DPR/2023-24 Dt. 07.11.2023 |
15/11/2023 |
07/11/2023
|
03/01/2024
Time
15:0Hrs
|
|
| 617 |
Consultancy services for preparation of DPR for 4 no of Projects in the state of Odisha |
NHAI/13012/139/RO/OD/2851/2023 |
01/12/2023 |
07/11/2023
|
11/12/2023
Time
11:0Hrs
|
|
| 618 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities and Land Acquisition for Construction of 4-lane from Chainage 15.000 to Chainage 61.500 on NH-334A in the State of Uttarakhand. |
2023_MoRTH_778731_1 |
07/11/2023 |
01/11/2023
|
15/12/2023
Time
11:0Hrs
|
|
| 619 |
Consultancy services for Preparation of Detailed Project Report for Rehabilitation and Up gradation 4L Standard Of Patur Balapur Shegaon NH 161G (Design Km 0.000 to Km 33.200 and Design Km 36.600 to Km54.800) (Total length 51.400 KM) in the state of Maharashtra on EPC Mode- |
2023_MoRTH_778513_1 |
07/11/2023 |
30/10/2023
|
28/11/2023
Time
17:30Hrs
|
|
| 620 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Singheshwar Bypass on NH-131(106) in the State of Bihar |
06/NH-MADHEPURA/2023-24 |
01/11/2023 |
27/10/2023
|
11/12/2023
Time
16:0Hrs
|
|
| 621 |
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Bridges over Kataiya Hydel tail race & canal on NH-131(106) in the State of Bihar |
06/NH-MADHEPURA/2023-24 (2) |
04/11/2023 |
27/10/2023
|
11/12/2023
Time
16:0Hrs
|
|
| 622 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of 2-Lane ROB to “Banashankri- Lakmapur -Km 9.50 (Near Lakmapur Village) LC No.28 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC28/TENDER/2023-24/1115 |
27/10/2023 |
27/10/2023
|
16/11/2023
Time
17:30Hrs
|
|
| 623 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of4-Lane ROB to “Rampur-Alamatti-Kudalasangam LC No.54 including approaches in the state of Karnataka |
ENHD/VJP/DPR/LC54/TENDER/2023-24/1116 |
30/10/2023 |
27/10/2023
|
16/11/2023
Time
17:30Hrs
|
|
| 624 |
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Bridges over Kataiya Hydeltail race & canal on NH-131(106) in the State of Bihar |
06/NH-MADHEPURA/2023-24 (2) |
30/11/2023 |
27/10/2023
|
11/12/2023
Time
16:0Hrs
|
|
| 625 |
RETENDER FOR ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR FOR CONSTRUCTION OF ROAD GUMPA SIMBI H/SPRING JACHEP FROM KM 0.00 TO 69.00 TO NHSL SPECIFICATIONS UNDER 116 RCC/48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/14/2023-24 |
26/10/2023 |
26/10/2023
|
28/11/2023
Time
12:0Hrs
|
|
| 626 |
Consultancy Services for preparation of Detailed Project Report for Construction of 2-lane Tunnel between Sonprayag (NH-107) & Kalimath (SH-96) including approach road up to Chunni Bend on NH- 107A (Total length23 km including 7 km of Tunnel) in the State of Uttarakhand. |
2023_MoRTH_777808_1 |
06/11/2023 |
25/10/2023
|
07/12/2023
Time
15:0Hrs
|
|
| 627 |
Consultancy services for Preparation of Fesibility study & Preparation of Detailed Project Report including LA & Other clearances for construction of DPR work for Byepass/ Realignment of Spur to Balia of NH-120 in the State of Bihar. |
05-NH/GAYA/DPR/2023-24 |
26/10/2023 |
20/10/2023
|
19/12/2023
Time
17:0Hrs
|
|
| 628 |
SURVEY, INVESTIGATION AND PREPARATION OF DPR THROUGH CONSULTANCY FOR CONSTRUCTION / IMPROVEMENT OF EXISTING ROAD KHAB- NAMGIA-CHUPPAN- SHIPKILA FROM CL-9 TO NHDL SPECIFICATION FROM KM 0.00 TO KM 31.430 ( INCLUDING APPROACH ROAD TO KHAB OF LENGTH 3.000 KM) KM 0.000 RECKONED FROM KM 433.265 NH-05 OF HINDUSTAN-TIBBET ROAD UNDER 68 RCC / 759 BRTF UNDER PROJECT DEEPAK IN HIMACHAL PRADESH |
CE (P) DPK-07/2023-24 |
26/10/2023 |
20/10/2023
|
23/11/2023
Time
16:0Hrs
|
|
| 629 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD HAYULIANG-CHAGLOHAGAM FROM KM 0.00 TO 57.75 (NET LENGTH 57.75 KM) TO NHSL SPECIFICATIONS UNDER 116 RCC/48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/16/2023-24 |
18/10/2023 |
19/10/2023
|
29/11/2023
Time
12:0Hrs
|
|
| 630 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of Animal Underpasses (6 Nos) on Nilajphata - Pauni- Adyal- Bhandara road on NH-247 as a Wildlife Mitigation Plan in KM 109.790 to Km 163.050 in State of Maharashtra. |
24/EENH/NGP/2023-24 |
09/11/2023 |
18/10/2023
|
13/11/2023
Time
17:0Hrs
|
|
| 631 |
Consultancy Services for Preparation of Detailed Project Report for Single Lane NH specifications of Chanhgchenmo to Tsogtsalu Road including Tunnel in the Union Territory of Ladakh |
NHIDCL/Ladakh/DPR/Chanhgchenmo-Tsogtsalu/2023-24 |
12/10/2023 |
11/10/2023
|
18/12/2023
Time
11:0Hrs
|
|
| 632 |
Consultancy Services for Preparation of Feasibility Report cum Detail Engineering report for NH 927A starting from Swaroopganj -Kotra- Kherwara From Km. 0/0 to 148/100, Dungarpur bypass km. 166/320 to 175/480 Talwara Bypass 248/780 to 251/660 and Banswara bypass 257/730 to 274/200 |
06/2023-24 |
13/10/2023 |
11/10/2023
|
21/12/2023
Time
11:0Hrs
|
|
| 633 |
Consultancy Services for Preparation of Detailed Project Report for 4/6 lanes /4/6 lane with Paved Shoulder configuration for the stretch of Gwalior-Bhind upto MP/UP Border (NH-92), Total length 108 Km in the State of Madhya Pradesh |
775356 |
15/10/2023 |
09/10/2023
|
20/11/2023
Time
17:30Hrs
|
|
| 634 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD ALO – TAPOLA FROM KM 0.00 TO KM 23.00 (NET LENGTH 23.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) Udayak/DPR Consultancy/05/2023-24 |
08/10/2023 |
07/10/2023
|
17/11/2023
Time
12:0Hrs
|
|
| 635 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB to level crossing No.800A Kolar- Malur- Hosur Road at Km 313.200 on SH-17 |
LC800ANIT10 |
05/10/2023 |
05/10/2023
|
19/10/2023
Time
16:0Hrs
|
|
| 636 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB to level crossing No.39 in Chikkaballapura town limit Bagepalli Bangalore Road (Old NH-07) at Km 510.50 (near old RTO office) |
EE/NHD/BNG/AE-1/LC39/NIT10/2023-24 |
05/10/2023 |
05/10/2023
|
19/10/2023
Time
16:0Hrs
|
|
| 637 |
Consultancy Services for four lanning of NH-123(507) from Herbertpur to Kalsi Ch. 0.00 to 16.00. |
2023_MoRTH_774629_1 |
02/11/2023 |
05/10/2023
|
20/11/2023
Time
11:0Hrs
|
|
| 638 |
consultancy services for Preparation of DPR including detailed Geological, Geotechnical and Topographical Surveys Investigations and Design of Cost Effective and Suitable remedial measures for prevention of landslides rockfall in identified locations approx. 27 Nos from KIRATPUR TO PANDOH on Kiratpur Manali Section of NH-21 in the State of Himachal Pradesh |
2023_NHAI_169598_1 |
11/10/2023 |
04/10/2023
|
21/12/2023
Time
11:0Hrs
|
|
| 639 |
Consultancy Services for Preparation of DPR including detailed Geological, Geotechnical and Topographical Surveys/Investigations and Design of Cost Effective and Suitable remedial measures for prevention of landslides/rockfall in identified locations (approx. 18 Nos) from PANDOH TO MANALI on Kiratpur-Manali Section of NH-21 in the State of Himachal Pradesh. |
2023_NHAI_169582_1 |
11/10/2023 |
04/10/2023
|
30/11/2023
Time
11:0Hrs
|
|
| 640 |
Consultancy Services for preparation of DPR for upgradation of single lane to 2 lane and tunneling of existing alignment realignment from Chainage 68.600 to 75.00 of NH 107 Sitapur Sonprayag Gaurikund Section in the State of Uttarakhan |
2023_MoRTH_773809_1 |
26/10/2023 |
28/09/2023
|
20/11/2023
Time
15:0Hrs
|
|
| 641 |
Project Management Consultancy Services for Construction of 2 Lane bypass at the Lohaghat Hills in market area Start of bypass Km 136.325 of NH09 End of bypass km 142 of |
2023-MoRTH-773398-1 |
31/10/2023 |
27/09/2023
|
17/11/2023
Time
15:0Hrs
|
|
| 642 |
CS for preparation and approval of Detailed Design and Drawing of Various Standard Spans of ROB with Standard Deck Config of 2Lane one way and 3Lane one way including Proof checking from IITs/NITs and Approval from (RDSO Lucknow) |
NHAI/HQ/ROB/RFP/2023 |
29/09/2023 |
27/09/2023
|
23/11/2023
Time
11:0Hrs
|
|
| 643 |
Consultancy Services for Preparation of Feasibility study/DPR for Construction of flyover in Hubli City from Kittur Channamma Circle to Bidnal Cross of old NH-4 (Extended Bangalore Arm) in the State of Karnataka-2nd Call |
EENH/HBL/1198/Bangalore arm |
26/09/2023 |
25/09/2023
|
09/10/2023
Time
17:0Hrs
|
|
| 644 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD GUMPA-SIMBI-H/SPRING-JACHEP FROM KM 0.00 TO 69.00 (NET LENGTH 69.00 KM) TO NHSL SPECIFICATIONS UNDER 116 RCC/48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P) Udayak/DPR Consultancy/14/2023-24 (2023_BRO_620172_1) |
23/09/2023 |
25/09/2023
|
16/10/2023
Time
12:0Hrs
|
|
| 645 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB/RUB to Kallipalya-Prabhuvanahalli road at Km.1.00 of Tumkur Taluk, Tumkur District, LC No. 48 |
ENHDT/AE/DPR/LC48/23-24/475 |
19/09/2023 |
24/09/2023
|
16/10/2023
Time
16:0Hrs
|
|
| 646 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD MALINYE-BALUA-KAPUDA (NET LENGTH 78.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) Udayak/DPR Consultancy/01/2023-24 (2023_BRO_619693_1) |
24/09/2023 |
21/09/2023
|
02/11/2023
Time
12:0Hrs
|
|
| 647 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of 2-Lane ROB to “Banashankri- Lakmapur -Km 9.50 (Near Lakmapur Village) LC No.28 including approaches in the state of Karnataka |
ENHD/VJP/DPR/TENDER/2023-24/903 |
25/09/2023 |
20/09/2023
|
16/10/2023
Time
17:30Hrs
|
|
| 648 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of4-Lane ROB to “Rampur-Alamatti-Kudalasangam LC No.54 including approaches in the state of Karnataka |
ENHD/VJP/DPR/TENDER/2023-24/904 |
25/09/2023 |
20/09/2023
|
16/10/2023
Time
17:30Hrs
|
|
| 649 |
Consultancy for Feasibility study and DPR of 4 Laning from Km 0 Paswan Chowk to Km 58.450 Mushrigharari except Km 11.00 to Km 13.05 4Lane ROB Portion and Km30 to Km35 Proposed 2 Lane with PS Jandaha Bazar Bypass of existing section of NH322 in Bihar. |
03-NH/Gulzarbagh/DPR/2023-24 |
26/09/2023 |
20/09/2023
|
21/11/2023
Time
17:0Hrs
|
|
| 650 |
CONSUTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT(DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF ALONG-YINGKIONG ROAD BETWEEN KM 40.00 TO KM 65.00 (INDICATIVE LENGTH 25.00 KM) FOR CONSTRUCTION AND UPGRADATION FROM CL-09 TO NHDL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK |
CE(P)BMK/06/2023-24 |
15/09/2023 |
16/09/2023
|
08/12/2023
Time
11:0Hrs
|
|
| 651 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB to Nagendra Colony to Bommanakatte Road at Shivamogga Corporation Limit ,Shivamogga District, LC No. 50 (Sl No12) |
EE/NHD/SMG/AE1/NIT1/LC50/1029 |
16/09/2023 |
16/09/2023
|
26/10/2023
Time
16:0Hrs
|
|
| 652 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB to SH-26 Halageri-Halkal Road Near Arasalu at Hosanagara Taluk,Shivamogga District, LC No. 92 (Sl No20) |
EE/NHD/SMG/AE1/NIT2/LC92/1030 |
16/09/2023 |
16/09/2023
|
26/10/2023
Time
16:0Hrs
|
|
| 653 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of 4-laning in Km 0 to 141 (Bariarpur to Bishunpur) of NH-333 with land acquisition in the State of Bihar |
NIT NO. 06/NH-LAKHISARAI/2023-24 |
15/09/2023 |
15/09/2023
|
09/11/2023
Time
17:0Hrs
|
|
| 654 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF TUTING-MUIRBE-BANE ROAD (INDICATIVE LENGTH 72.0 KM) GREEN FIELD ALIGNMENT FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK IN ARUNACHAL PRADESH. |
CE(P)BMK/05/2023-24 |
14/09/2023 |
14/09/2023
|
13/11/2023
Time
11:30Hrs
|
|
| 655 |
Consultancy Services for Preparation of Feasibility-DPR for Construction of ROB-RUB to Maidala-Aregujjanahalli road at Km.3.00 of Tumkur Taluk, Tumkur District, LC No. 35 |
ENHDT/AE/DPR/LCs/2023-24/475 |
15/09/2023 |
14/09/2023
|
16/10/2023
Time
16:0Hrs
|
|
| 656 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD TAPA-HUSH-DILLE GG (NEW ALIGNMENT) FROM KM 0.00 TO KM 58.00 (NET LENGTH 58.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 BRTF PROJECT ARUNANK IN THE STATE OF ARUNACHAL PRADESH |
ANK/NIT-05/2023-24 |
11/09/2023 |
11/09/2023
|
03/11/2023
Time
12:0Hrs
|
|
| 657 |
PREPARATION OF (DPR) THROUGH CONSULTANCY FOR CONSTRUCTION OF ROAD TAWANG WOMINGLA KUMROTSAR FROM KM 0.00 TO KM 33.390 CL 5 TO NHSL AND FROM KM 33.390 TO KM 40.00 NEW TRACK TO NHSL UNDER 763 BRTF (P) VARTAK IN TAWANG DISTRICT OF ARUNACHAL PRADESH |
CE(P)/VTK/26/2023-24 |
11/09/2023 |
11/09/2023
|
25/10/2023
Time
12:0Hrs
|
|
| 658 |
PREPARATION OF (DPR) THROUGH CONSULTANCY FOR CONSTRUCTION OF ROAD TAWANG WOMINGLA KUMROTSAR FROM KM 0.00 TO KM 33.390 CL 5 TO NHSL AND FROM KM 33.390 TO KM 40.00 NEW TRACK TO NHSL UNDER 763 BRTF (P) VARTAK IN TAWANG DISTRICT OF ARUNACHAL PRADESH |
CE(P)/VTK/26/2023-24 |
05/12/2023 |
11/09/2023
|
27/12/2023
Time
12:0Hrs
|
|
| 659 |
Consultancy Services for Preparation of DPR’s for various work on NH -89, NH – 62 & NH – 65 Construction of LHS at level crossing (LC No. 64) (Manasar Phatak) at Km 172.990 on NH-65 Construction of LHS at level crossing (LC No. C-61) (Bikaner Phatak) km 165.550 on NH-89 Construction of LHS at level crossing (LC No. C-06) at Deshnok km 248.820 on NH-62 Construction of Low height subway/RUB Near Proposed ROB at Railway Km. 503/0-1 (LC No-85) on NH-89 |
07/2023-24 |
12/09/2023 |
08/09/2023
|
18/09/2023
Time
13:0Hrs
|
|
| 660 |
As Per RFP |
Re NIT. 13/NH-Bhagalpur/2023-24 |
08/09/2023 |
08/09/2023
|
18/10/2023
Time
17:0Hrs
|
|
| 661 |
Consultancy Service for Preparation of Feasibility Study and Detailed Project Report for development of existing road to 4-Lane with paved shoulder of Barapani - Shillong Road (NH-06) from Km 61.800 to Km 78.000 alongwith bridge at Umiam Dam in Meghalaya for execution on EPC Mode |
NHIDCL/Meghalaya/DPR/ Shillong-Barapani(4L)/2023 |
05/09/2023 |
04/09/2023
|
06/10/2023
Time
15:0Hrs
|
|
| 662 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Lazu- Wakka -Khanu & Konsa – Longding Road (Approx. 120 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/LWKKL/2022-23/RO-Ita / |
04/09/2023 |
04/09/2023
|
11/10/2023
Time
11:0Hrs
|
|
| 663 |
Consultancy Services for Preparation of Detailed Project Report for Four / Six laning of Dindigul-Theni-Kumili Section of NH-183 in the State of Tamil Nadu |
NHAI/17011/02/20/2023/RO Madurai |
04/10/2023 |
04/09/2023
|
26/10/2023
Time
10:0Hrs
|
|
| 664 |
Consultancy Services for preparation of (DPR) for Construction of new 2 Lane/4- Lane Major bridges atkm3.500 on Kali River,km39.840 on Ganga River and 03 Minor Bridges at km31.425,km31.710, km44.665 and 01 ROB at km36.645 of NH730C in the state of UP |
CE-RO/LKO/DPR/2023-24 Dated.01.09.2023 |
22/09/2023 |
04/09/2023
|
16/10/2023
Time
11:0Hrs
|
|
| 665 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Madhya Pradesh. (Package-01) |
CE-RO/BPL/DPR-1/2023-24 |
08/09/2023 |
30/08/2023
|
08/11/2023
Time
17:30Hrs
|
|
| 666 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Madhya Pradesh. (Package-02) |
CE-RO/BPL/DPR-2/2023-24 |
08/09/2023 |
30/08/2023
|
08/11/2023
Time
17:30Hrs
|
|
| 667 |
Consultancy Services for preparation of Detailed Project Report for Construction of 2-lane Tunnel between Sonprayag NH-107 and Kalimath (SH-96) including approach road up to Chunni Bend on NH-107A Total length23 km including 7 km of Tunnel in the State of Uttarakhand. |
2023_MoRTH_769168_1 |
30/08/2023 |
30/08/2023
|
13/10/2023
Time
15:0Hrs
|
|
| 668 |
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Bridges over Kataiya Hydel tail race & canal on NH-131(106) in the State of Bihar |
NIT No. 01/NH-MADHEPURA/2023-24 (2) |
09/09/2023 |
28/08/2023
|
19/10/2023
Time
17:0Hrs
|
|
| 669 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Singheshwar Bypass on NH-131(106) in the State of Bihar |
NIT no. 01/NH-MADHEPURA/2023-24 |
05/09/2023 |
28/08/2023
|
19/10/2023
Time
17:0Hrs
|
|
| 670 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB at Karwar-Kaiga Ilkal Road km 247/000 ( Gadag town ) Gadag Tq Gadag Dist-2nd call |
999/3 Dt.22.08.2023 |
28/08/2023 |
28/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 671 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.45 to 2 lane on Halligudi-Timmapur MDR Road at Mundargi taluk Gadag District-2nd call |
999/8 Dt.22.08.2023 |
28/08/2023 |
28/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 672 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.43 to 2 lane on Timmapur-Harlapur MDR at Gadag taluk Gadag district-2nd call |
999/9 Dt.22.08.2023 |
28/08/2023 |
28/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 673 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Tungri-Mathow-Dubbin-Dishing-Debrik Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 84.00 Km) ( Package-I |
NHIDCL/Ar.Pr./DPR/ICBR- III/T-D/P-I/2022-23 |
29/08/2023 |
25/08/2023
|
11/10/2023
Time
15:0Hrs
|
|
| 674 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Monigong-Dile Duting & Henkar- Tabeyongkong Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 38.00 Km) ( Package-II) |
NHIDCL/Ar.Pr./DPR/ICBR- III/M-T/Pkg-II/2023 |
29/08/2023 |
25/08/2023
|
11/10/2023
Time
15:0Hrs
|
|
| 675 |
Consultancy Services for preparation of Detail Engineering Report for i) Two lane to Four lane for Suratgarh Sriganganagar section of NH 62 from Km 175.0 to Km 250.9 ii) Flyover at Manaksar Circle on NH 62, Suratgarh iii) Intersection design and safety audit of IGNP Bridge service lane at Km 157.067 of Bikaner-Suratgarh section on NH 62 in the State of Rajasthan |
NIT NO. 06/2023-24 EE PWD NH BIKANER |
25/08/2023 |
25/08/2023
|
11/10/2023
Time
17:0Hrs
|
|
| 676 |
Consultancy Services for preparation of Detail Engineering Report for Ghaggar Bridge at Km 176.100 on NH 62 in the state of Rajasthan |
NIT NO. 07/2023-24 EE PWD NH BIKANER |
26/08/2023 |
25/08/2023
|
05/09/2023
Time
17:0Hrs
|
|
| 677 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Tuting-(Kunging) Kahebingo-Taphuk, Jorging –DBGG-2590 & DBGG-Nape,Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 114.00Km) ( Package-III) |
NHIDCL/Ar.Pr./DPR/ICBR-III/T- 2590-D-N/Pkg-III/20 |
31/08/2023 |
25/08/2023
|
11/10/2023
Time
15:0Hrs
|
|
| 678 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Bruni-Balchida Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length 22.00Km) ( Package- IV) |
NHIDCL/Ar.Pr./DPR/ ICBR- III/B-B/Pkg-IV/2023 |
31/08/2023 |
25/08/2023
|
11/10/2023
Time
15:0Hrs
|
|
| 679 |
Construction of 4/6-lane Ring Road / Bypass (300Km) to decongest NH-66 in the State of Goa. |
RO/MUM/AP/Goa/2023-24/5/NH-66/DPR |
12/09/2023 |
24/08/2023
|
15/01/2024
Time
11:0Hrs
|
|
| 680 |
Consultancy Services for Preparation of Feasibility study /DPR for Construction of ROB to two lane on Kalmala-Shiggaon SH-23 road at km.169.00 of Koppal Taluk, Koppal District for LC No. 68-2nd call |
999/6 Dt.22.08.2023 |
24/08/2023 |
22/08/2023
|
11/09/2023
Time
16:0Hrs
|
|
| 681 |
“Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB’s/RUB’s to “Annigeri- Hallikeri-Ibrahimpur MDR from Km 0.00 to Km 15.20 at 2lane chainage k.m. 1.20 (near Annigeri Railway Gate) at LC 19 in Annigeri taluk.”2nd call |
EENH/HBL/999/4/Annigeri |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 682 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.15 to 2 lane on Sindhanur-Hemmadaga SH-30 at Km.131.00 in Near Mallapur Village Ron taluk Gadag district,2nd call |
999/1 Dt.22.08.2023 |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 683 |
“Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB’s/RUB’s to “Motebennur- Khurdh Kodihalli MDR Road 4lane on Km 1.00 at LC 229 in Byadagi taluk Haveri District”2nd Call |
EENH/HBL/999/7/Motebennur |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 684 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.24 to 2 lane on Hole alur Somankatti Melamath Asuti road at Km.0.00 in Near Hole Alur Ron taluk Gadag District-2nd call |
999/2 Dt.22.08.2023 |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 685 |
“Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB/ROB’s to “Widening of existing RUB 4lane on Khanapur Talaguppa SH-93 at Km 37.65 in Alnavar taluka Dharwad District .” 2ndCall |
EENH/HBL/999/5/khanapur |
28/08/2023 |
22/08/2023
|
11/09/2023
Time
17:0Hrs
|
|
| 686 |
Consultancy Services for Preparation of Feasibility - DPR for Construction of ROB-RUB to Mandya- Hadagali Road SH-47 at km. 259.850 of Holalkere Taluk Chitradurga District, LC No. 174 |
ENHDCTA/AE/ROBLC174/2023-24/364 |
21/08/2023 |
21/08/2023
|
08/09/2023
Time
15:0Hrs
|
|
| 687 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR CONSTRUCTION OF ROAD KALARUS- SONA PINDI GALI FROM CL-5 TO NHSL (PS) FROM KM 0.00 TO KM 34.68 (NET LENGTH 34.68 KM UNDER 109 RCC/ 32 BRTF (P) BEACON IN J&K (UT). |
CE (P) BCN/EPC/Consultancy/09/2023-24 |
21/08/2023 |
21/08/2023
|
11/09/2023
Time
12:0Hrs
|
|
| 688 |
Consultancy services for Preparation of DPR for construction/improvement of road Baghbella-Toli-Nagina from CL-5 to NHSL (PS) from km 0.00 to km 20.460 (Net length 20.460 kms) under AOR of 109 RCC/32 BRTF/ (P) Beacon in Jammu & Kashmir (UT). |
CE (P) BCN/Consultancy/10/2023-24 |
21/08/2023 |
21/08/2023
|
11/09/2023
Time
12:0Hrs
|
|
| 689 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF THE FOLLOWING ROADS IN THE AOR OF 116 RCC/48 BRTF UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE PART-I HAYULIANG-GLOTHANG LA DU DAKHRU-KUNDAO ROAD FROM KM 0.00 TO KM 107.00 (NET LENGTH 107.00 KMS) TO NHSL SPECIFICATIONS & PART-II KIBITHU-KUNDAO ROAD FROM KM 0.00 TO KM 52.00 (NET LENGTH 52.00 KMS) TO NHSL SPECIFICATIONS |
CE (P) Udayak/DPR Consultancy/10/2023-24 |
07/08/2023 |
20/08/2023
|
27/10/2023
Time
12:0Hrs
|
|
| 690 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB/RUB to Kumuta-Kadamadagi Road at Haliyar km. 261.60 of Chitradurga Taluk, Chitradurga District, LC No. 15 |
ENHDCTA/AE2/ROBLC15/2023-24/363 |
19/08/2023 |
19/08/2023
|
07/09/2023
Time
16:0Hrs
|
|
| 691 |
Consultancy Services for preparation of Detail Engineering Report for Ghaggar Bridge at Km 176.100 on NH 62 in the state of Rajasthan |
NIT NO. 04/2023-24 EE PWD NH BIKANER |
17/08/2023 |
17/08/2023
|
23/08/2023
Time
17:0Hrs
|
|
| 692 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD MOREH-THINGPAI-NEW SAMATHAL (M-T-N-S) FROM KM 45.00 TO KM 85.00 (NEW SAMATHAL) (APPROX) TO NHSL SPECIFICATION UNDER 25 BRTF/PROJECT SEWAK IN MANIPUR STATE (SECOND CALL) |
CE (P)/SWK/DPR CONSULTANCY/03/2023-24 (Second Call) |
08/08/2023 |
14/08/2023
|
29/09/2023
Time
11:0Hrs
|
|
| 693 |
(i) Consultancy services for preparation of DPR for widening to four lane from Km 69/750 to Km 75/750 of NH-552 Extn. and plantation, street lighting and road safety works from Km 0/00 to Km 28/00 on NH-248 & (ii) Consultancy services for preparation of DPR for grade separated structure with slip road at Achrol from km 11/00 to km 12/00 of NH-248 |
2023-MoRTH-765233-1 |
05/08/2023 |
04/08/2023
|
04/09/2023
Time
18:0Hrs
|
|
| 694 |
Consultancy Services for Preparation of DPR’s for various work on NH -89, NH – 62 & NH – 65 Construction of LHS at level crossing (LC No. 64) (Manasar Phatak) at Km 172.990 on NH-65 Construction of LHS at level crossing (LC No. C-61) (Bikaner Phatak) km 165.550 on NH-89 Construction of LHS at level crossing (LC No. C-06) at Deshnok km 248.820 on NH-62 Construction of Low height subway/RUB Near Proposed ROB at Railway Km. 503/0-1 (LC No-85) on NH-89 |
03/2023-24 |
14/08/2023 |
02/08/2023
|
23/08/2023
Time
12:0Hrs
|
|
| 695 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD NEW MELLING DAMTENG FROM KM 0.000 TO KM 22.000 TO NHSL SPECIFICATIONS IN SECTOR OF 120 RCC/763 BRTF/PROJECT VARTAK |
CE (P) VTK/EPC/NIB-05 OF 2023 - 24 |
24/08/2023 |
28/07/2023
|
11/09/2023
Time
18:0Hrs
|
|
| 696 |
Consultancy Services for Preparation of Feasibility study/DPR for Construction of flyover in Hubli City from Kittur Channamma Circle to Bidnal Cross of old NH-4 (Extended Bangalore Arm) in the State of Karnataka |
EENH/HBL/779/Extended bangalore Arm |
26/07/2023 |
25/07/2023
|
16/08/2023
Time
16:0Hrs
|
|
| 697 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.24 to 2 lane on Hole alur Somankatti Melamath Asuti road at Km.0.00 in Near Hole Alur Ron taluk Gadag Disttrict |
EENH/HBL/753/Holealur |
26/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 698 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.45 to 2 lane on Halligudi-Timmapur MDR Road at Mundargi taluk Gadag District |
EENH/HBL/753/8 |
27/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 699 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.43 to 2 lane on Timmapur-Harlapur MDR at Gadag taluk Gadag district |
EENH/HBL/753/9 |
27/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 700 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROB’s/RUB’s to Motebennur- Khurdh Kodihalli MDR Road 4lane on Km 1.00 at LC 229 in Ranebennur taluk Haveri District |
EENH/HBL/753/7/Motebennur |
27/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 701 |
Consultancy Services for preparation of Detailed Project Report and for Pre-Construction activities towards Construction of 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH-715) in the State of Assam. |
NHIDCL/ASSAM/ 2023-24/G-NG/Tunnel/DPR/ |
29/07/2023 |
24/07/2023
|
14/08/2023
Time
15:0Hrs
|
|
| 702 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB/ROB’s to “Widening of existing RUB 4lane on Khanapur Talaguppa SH-93 at Km 37.65 in Alnavar taluka Dharwad District |
EENH/HBL/753/5/Khanapur Talaguppa |
29/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 703 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of RUB at Karwar-Kaiga Ilkal Road km 247.000 ( Gadag town ) |
EENH/HBL/753/3/karwar Kaiga Ilkal |
31/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 704 |
Consultancy Services for Feasibility Study, Preparation of DPR and providing pre-construction services for Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) of NH-1 in the under UT of Jammu and Kashmir -2nd Call. |
NHIDCL/JK/NH-1/Zojila 2nd Tube Tunnel/DPR /2023 |
22/07/2023 |
24/07/2023
|
16/08/2023
Time
15:0Hrs
|
|
| 705 |
Consultancy Services for Preparation of Feasibility study /DPR for Construction of ROB/RUB to two lane on Kalmala-Shiggaon SH-23 road at km.169.00 of Koppal Taluk, Koppal District for LC No. 68. |
753 Dt.20.07.2023 |
24/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 706 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs/RUBs to Annigeri- Hallikeri-Ibrahimpur MDR from Km 0.00 to Km 15.20 at 2lane chainage k.m. 1.20 (near Annigeri Railway Gate) at LC 19 in Annigeri taluk |
EENH/HBL/753/4/Annigeri |
24/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 707 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of ROBs to level crossing No.15 to 2 lane on Sindhanur-Hemmadaga SH-30 at Km.131.00 in Near Mallapur Village Ron taluk Gadag district . |
EENH/HBL/753/1Mallapur |
24/07/2023 |
24/07/2023
|
16/08/2023
Time
17:0Hrs
|
|
| 708 |
Consultancy Services for Preparation of Feasibility studies, General Arrangement Drawing ( G.A.D.) and Detailed Geotechnical Investigation by taking trial Bores for Chandrapur City Bypass and Construction of Road Over Bridge ( R.O.B. ) over Gondia Ch |
03/EENH/GAD/2023-24 |
19/07/2023 |
19/07/2023
|
04/08/2023
Time
17:0Hrs
|
|
| 709 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Construction of Major Bridge with Approaches (Alongwith Land Acquisition) Total Length 3.90 Km across Wainganga River near Hardoli village |
NIT02/EENH/GAD/2023-24 |
17/07/2023 |
17/07/2023
|
04/08/2023
Time
18:0Hrs
|
|
| 710 |
Consultancy Services for Preparation of DPR for various work on NH 89 NH 62 and NH 65. Construction of LHS at level crossing LC No 64 Manasar Phatak at Km 172.990 on NH 65 in Nagaur City in the state of Rajasthan. 2 Construction of LHS at level cros |
02/2023-24 |
19/07/2023 |
10/07/2023
|
31/07/2023
Time
12:0Hrs
|
|
| 711 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway - 2 at Dhubri to NH - 127B in the State of Assam. (3rd Call) |
NHIDCL/2022-23/AS/Dhubri /DPR/NW-2/NH-127B/C3 |
07/08/2023 |
07/07/2023
|
21/08/2023
Time
15:0Hrs
|
|
| 712 |
Consultancy Service for Preparation of Feasibility Study and Detailed Project Report for development of existing road to 4-Lane with paved shoulder of Barapani - Shillong Road (NH-06) from Km 61.800 to Km 78.000 alongwith bridge at Umiam Dam in Meghalaya for execution on EPC Mode |
2023-NHIDC-760150-1 |
11/07/2023 |
03/07/2023
|
10/08/2023
Time
15:0Hrs
|
|
| 713 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD MALINYE-BALUA-KAPUDA (NET LENGTH 78.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
2023_BRO_606254_1 |
09/07/2023 |
01/07/2023
|
12/08/2023
Time
12:0Hrs
|
|
| 714 |
Consultancy Services for preparation of DPR for Construction of Spur to Bodhgaya and Rajgir from Amas- Darbhanga Corridor of NH-119D in the state of Bihar |
NHAI/BIHAR/DPR/BODHGAYA-RAJGIRSPUR/2023 |
01/08/2023 |
28/06/2023
|
11/08/2023
Time
11:0Hrs
|
|
| 715 |
Consultancy Services for preparation of DPR for Construction of Spur to Bodhgaya and Rajgir from Amas- Darbhanga Corridor of NH-119D in the state of Bihar. |
NHAI/Bihar/DPR/BodhgayaRajgirSpur/2023 |
02/08/2023 |
28/06/2023
|
11/08/2023
Time
15:0Hrs
|
|
| 716 |
Consultancy Services for Preparation of DPR for various work on NH 89 (new NH 58) section of NH 89.(junction of SH 63 and kuchera Bypass) of NH 89 |
01 / 2023-24 |
04/07/2023 |
27/06/2023
|
31/07/2023
Time
11:0Hrs
|
|
| 717 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Provisioning of 4 lane Bridge over river Kushiyara (approx. Length 300 m) and its approaches between Karimganj, Assam (India) and ZakiganjUpazila (Sylhet district, Bangladesh) (approximate length of 900 m) -3rd Call |
NHIDCL/HQ/DPR/KarimganjZakiganj/2022 |
27/06/2023 |
27/06/2023
|
25/07/2023
Time
15:0Hrs
|
|
| 718 |
“Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Rehabilitation and Resettlement of sinking zones and sliding zones between Km 368.000 To Km 468.000 (NH-07) and construction of tunnel at Pagal Nallah location (near Km 454.300 to Km 454.870 of NH07) in the state of Uttarakhand” |
2023_NHIDC_759355_1 |
03/08/2023 |
26/06/2023
|
10/10/2023
Time
15:0Hrs
|
|
| 719 |
Consultancy Services for preparation of Detailed Project Report and for Pre- Construction activities towards Construction of 4-lane Tunnel Connectivity across River Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH- 715) in the State of Assam. |
NHIDCL/ASSAM/2023-24/G-NG/Tunnel/DPR |
22/06/2023 |
23/06/2023
|
10/07/2023
Time
16:0Hrs
|
|
| 720 |
Consultancy services for Authoritys Engineer for Supervision of Work of widening to four lane rigid pavement configuration from Km 90.00toKm 100.8 on NH96(Km 42.0 to Km 53.0 as per new NH-330), design length 11.3 Km under EPC mode in the state of U.P |
1649/167 Yata(1)-NH Circle/2023-24 dt.19.06.2023 |
21/06/2023 |
19/06/2023
|
03/08/2023
Time
15:0Hrs
|
|
| 721 |
Consultancy Services for Feasibility Study, Preparation of DPR and providing pre-construction services for Construction of Twin Tube Uni-directional Tunnel under Ganesh top hill on Khanabal-Baltal section of NH-501 in Jammu and Kashmir |
NHIDCL/JK/NH-501/ Sheshnag Tunnel/DPR /2022-23 |
25/05/2023 |
19/06/2023
|
14/08/2023
Time
15:0Hrs
|
|
| 722 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF ROAD MOREH-THINGPAI-NEW SAMATHAL (M-T-N-S) BETWEEN KM 45.00 TO KM 85.00 (NEW SAMATHAL) TO NHSL SPECIFICATION UNDER 25 BRTF/PROJECT SEWAK IN MANIPUR STATE |
CE (P)/SWK/DPR CONSULTANCY/03/2023-24 |
08/06/2023 |
15/06/2023
|
15/07/2023
Time
12:0Hrs
|
|
| 723 |
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK |
RW/CH/W(37)/JK/2023 |
14/06/2023 |
14/06/2023
|
17/10/2023
Time
15:0Hrs
|
|
| 724 |
CONSUTANCY SERVICES FOR FEASIBILITY STUDY,PREPARATION OF DETAILED PROJECT REPORT(DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF YINGKIONG-JIDU-BISHING ROAD GREEN FIELD ALIGNMENT (INDICATIVE LENGTH 160.0 KM) FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATION UNDER 1448 BCC/761 BRTF IN AOR OF (P) BRAHMANK |
CE(P) BMK/EPC-02/2023-24 |
19/06/2023 |
14/06/2023
|
11/08/2023
Time
11:0Hrs
|
|
| 725 |
RETENDER FOR CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PRJECT REPORT AND PROVIDING PRE-CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF HIGHWAY TUNNEL BETWEEN KM 10.250 TO KM 10.650 ON MAR UNDER 108 RCC / 759 BRTF / PROJECT DEEPAK IN THE STATE OF Himachal Pradesh |
CE (P) DPK/03/2023-24 |
13/06/2023 |
13/06/2023
|
31/08/2023
Time
17:0Hrs
|
|
| 726 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD ALO – TAPOLA FROM KM 0.00 TO KM 23.00 (NET LENGTH 23.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) Udayak/DPR Consultancy/05/2023-24 |
14/06/2023 |
12/06/2023
|
24/07/2023
Time
12:0Hrs
|
|
| 727 |
Consultancy Services for Preparation of Feasibility Report cum Detail Engineering report for NH 927A starting from Swaroopganj -Kotra- Kherwara From Km. 0/0 to 148/100, Dungarpur bypass km. 166/320 to 175/480 Talwara Bypass 248/780 to 251/660 and Banswara bypass 257/730 to 274/200 in the State of Rajasthan |
NIT 01/2022-23 SE PWD |
20/06/2023 |
05/06/2023
|
16/08/2023
Time
11:0Hrs
|
|
| 728 |
Consultancy Services for Preparation of DPR for suggesting suitable engg. measures/solution in the rock sliding reach of Km.12.85 to Km14.10 and Km 26.00 to Km 28.25 for Upgradation to 2L PS configuration from Kundal to Jhadol sec. NH-58E on EPC mode |
02/2023-24 SE PWD NH Circle |
28/06/2023 |
05/06/2023
|
16/08/2023
Time
11:0Hrs
|
|
| 729 |
Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Lumla to Neliya (border) (Length - 100 Km) in the State of Arunachal Pradesh. |
NHIDCL/Arunachal/DPR/ Inter-corridor/L-N/2023 |
14/06/2023 |
01/06/2023
|
11/07/2023
Time
15:0Hrs
|
|
| 730 |
Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Jang to Lumla (Length - 60 Km) in the State of Arunachal Pradesh. |
NHIDCL/Arunachal/DPR/ Inter-corridor/2023 |
13/06/2023 |
01/06/2023
|
11/07/2023
Time
15:0Hrs
|
|
| 731 |
Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Kamenbari to Tenga (Length - 60 Km) in the State of Arunachal Pradesh on fixed cost cum quality basis. |
NHIDCL/Arrunachal/DPR/Inter-corridor/2023 |
08/06/2023 |
01/06/2023
|
11/07/2023
Time
15:0Hrs
|
|
| 732 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu (Package-III) |
ROChennaiMoRTH12014DPR12AP2023 |
31/05/2023 |
30/05/2023
|
20/07/2023
Time
11:30Hrs
|
|
| 733 |
Consultancy Services for preparation of Detailed Project Report for upgradation of existing single road to 2-lane configuration from Churachandpur to Tipaimukh section of NH-02 in the State of Manipur |
NHIDCL/Manipur/DPR/NH-02/Ccpur to Tipaimukh/2023 |
29/05/2023 |
29/05/2023
|
12/07/2023
Time
15:0Hrs
|
|
| 734 |
Consultancy Services for preparation of DPR for widening to 2 Lane configuration of Chamoli Kund Section km 0 to km 84 of National Highway 107A in the State of Uttarakhand |
2023_MoRTH_755196_1 |
29/05/2023 |
27/05/2023
|
10/07/2023
Time
15:0Hrs
|
|
| 735 |
Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at (i) Near GMVN Guest House, Nala Guptkashi (NH-109) (ii) Near Sersi (NH-109), Ukhimath (iii) Gangnani Hot Water Spring (NH-34), Uttarkashi and (iv) Gangotri Dham (NH-34), Uttarkashi in the State of Uttarakhand. |
NHIDCL/TCP/DPR/UK/2023 |
24/05/2023 |
25/05/2023
|
17/07/2023
Time
15:0Hrs
|
|
| 736 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening of existing 2 lane to 2 lane with paved shoulders from Km. 64.00 to Km.90.00 of NH-52 (Old NH-63) (Yellapura to Sangatigikoppa) on Ankola-Gooty section in the State of Karnataka |
RW/BNG/NH-52(old NH-63)/Km.64-90/149/2023 |
22/05/2023 |
22/05/2023
|
30/06/2023
Time
16:0Hrs
|
|
| 737 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for Construction of new bypass at yellapur town on NH-52 (old NH-63) Ankola-Gooty section in the State of Karnataka |
RW/BNG/NH-52//Km.64-73/151/2023 |
22/05/2023 |
22/05/2023
|
30/06/2023
Time
16:0Hrs
|
|
| 738 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-1) (2nd Call) |
2023-NHAI-154594-1 |
22/05/2023 |
18/05/2023
|
20/06/2023
Time
11:0Hrs
|
|
| 739 |
Consultancy services for preparation of DPR for various stretches in the state of Gujarat |
NHAI/HQ/GJ/DPR/2023-24/Lot-1/efile 204274 |
21/05/2023 |
18/05/2023
|
03/07/2023
Time
11:0Hrs
|
|
| 740 |
Consultancy service for preparation of Detailed Project Report (DPR) for 4 Lanning of NH-17 (new) and NH-317 (new) from km 710.00 (Telipara) to km 718.00 (Birpara) of old NH-31 and km 157.835 (Birpara) to km 225.428 (near Salsalabari) of old NH-31C (total length 75.593 km) in the district of Jalpaiguri and Alipurduar, West Bengal. |
WBPW_Rd/EE/NHD-IX/eRFP-3/23-24 |
24/05/2023 |
18/05/2023
|
03/08/2023
Time
17:0Hrs
|
|
| 741 |
Consultancy service for preparation of Detailed Project Report (DPR) for Widening/Upgradation to 2L-PS of NH-717 (new) from km 634.00 (Chalsa) to km 674.175 (Maynaguri) of old NH-31 (total length 40.175 km) in the district of Jalpaiguri, West Bengal. |
WBPW_Rd/EE/NHD-IX/eRFP-2/23-24 |
24/05/2023 |
18/05/2023
|
03/08/2023
Time
17:0Hrs
|
|
| 742 |
Consultancy Service for preparation of Detailed Project Report (DPR) for 4-Lanning of NH-17 (New) from Km 604.00 (Near Ellenbari) to Km 634.00 (Chalsa) of Old NH-31 and Km 105.00 (Chalsa) to Km 145.632 (Telipara) of Old NH-31C (Total Length-70.632 Km) in the District of Jalpaiguri, West Bengal. |
WBPW_Rd/EE/NHD-IX/eRFP-1/23-24 |
23/05/2023 |
18/05/2023
|
03/08/2023
Time
17:0Hrs
|
|
| 743 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPOR (DPR) AND PROVIDING PRECONSTRUCTION SERVICES IN RESPECT OF MIGGING-JORGING ROAD (INDICATIVE LENGTH 112.00 KM) GREEN FIELD ALIGNMENT FOR CONSTRUCTION AND UPGRADATION TO NHSL SPECIFICATIONS UNDER 105 RCC/761 BRTF IN AOR OF (P) BRAHMANK IN ARUNACHAL PRADESH |
CE(P)BMK-EPC-01/2023-24 |
22/05/2023 |
15/05/2023
|
15/07/2023
Time
11:0Hrs
|
|
| 744 |
Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram |
NHIDCL/Mizoram/DPR/Lunglei-bypass/2022-23 |
17/05/2023 |
15/05/2023
|
28/06/2023
Time
11:0Hrs
|
|
| 745 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF ROAD MALINYE-BALUA-KAPUDA (NET LENGTH 78.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) Udayak/DPR Consultancy/01/2023-24 (2023_BRO_594330_1) |
10/05/2023 |
13/05/2023
|
24/06/2023
Time
12:0Hrs
|
|
| 746 |
PMC for FS prep of DPR providing pre construction activities nd Construction supervision for Construction of Highway Tunnel of 5.5 Km inclg approaches across Pir Panjal Range betwn Km 75.00 nd Km 80.50 on Poonch Uri Road in JK |
RW/CH/W(38)/JK/2023 |
09/05/2023 |
09/05/2023
|
03/06/2023
Time
17:0Hrs
|
|
| 747 |
Consultancy Services for Preparation of Feasibility study and Preparation of DPR including LA and Other Clearance for Construction of W S to 2Lane with paved shoulder from Km 41 to Km 92 of NH119 Old NH2C in the State of Bihar |
04-NH/GAYA/DPR/2023-24 |
22/05/2023 |
08/05/2023
|
21/07/2023
Time
17:0Hrs
|
|
| 748 |
Consultancy services for preparation of Detailed Project Report for the work of Rehabilitation and Upgrading 2 lane with Paved Shoulders Configuration and Strengthening of Purulia-Dhanbad Road Section up to Bengal-Jharkhand Border (Km. 0.0 to 10.00) of NH-218 in the State of West Bengal. |
EE/NHD-IV/NIT/DPR/2023-24/01 |
12/05/2023 |
08/05/2023
|
25/07/2023
Time
18:0Hrs
|
|
| 749 |
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK |
RW/CH/W(37)/JK/2023 |
08/05/2023 |
08/05/2023
|
03/06/2023
Time
17:0Hrs
|
|
| 750 |
Consultancy service for preparation of Detailed Project Report (DPR) for 4 Lanning of NH 31C (New NH 327) from Km. 0.00 (West Bengal/Bihar Border) to Km. 32.00 (Bagdogra) in the district of Darjeeling, West Bengal. |
MORTH/RO-KOL/NIT/DPR/23-24/08 |
04/05/2023 |
04/05/2023
|
26/06/2023
Time
15:0Hrs
|
|
| 751 |
Pre. of DPR incl. LAand Other Clearances for Cons. ofroad from 2Lane to 4Lane ofa.Arwal to Biharsharif from Km 0 to Km 89 of New NH33b.Kujapi Gaya to Panchanpur from Km 103 to 118 of NH120 c.Dhobhi to Gosaindih from Km 0 to 13 of NH22 in Bihar |
03-NH/GAYA/DPR/2023-24 |
22/05/2023 |
04/05/2023
|
18/07/2023
Time
17:0Hrs
|
|
| 752 |
Preparation of DPR a.Const. of ROB in km55 of NH33 at Rly underpass Bridge No 69 Near Arwal More at Jehanabad b.Const. of ROB in km 200.650 of NH120 at Rly LC No 46B T Near Bikramganj c.Const of ROB in km 243.900 of NH120 at Rly Dumrown Near Dumrown |
02-NH/GAYA/DPR/2023-24 |
16/05/2023 |
03/05/2023
|
16/06/2023
Time
17:0Hrs
|
|
| 753 |
Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services from –(i) Silchar ISBT (Start point of Silchar Bypass) to junction of NH-37 & NH-6 at Dhaleshwari, (ii) End of proposed Badarpur bypass to Churaibari (Assam-Tripura Border) (iii) Spur from NH -8 near Karimganj to Sutarkandi. |
NHIDCL/Assam/DPR/ Silchar/Churaibari/2023 |
30/05/2023 |
01/05/2023
|
14/06/2023
Time
15:0Hrs
|
|
| 754 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for port connectivity between (i) National Waterway – 2 at Dhubri to NH - 127B,(ii) National Waterway-16 at Badarpur to NH-37 & (iii) National Waterway-16 at Karimganj to NH-37 in the State of Assam. |
NHIDCL/2022-23/AS/Dhubri/ DPR/NW-2/NH-127B |
14/06/2023 |
01/05/2023
|
14/06/2023
Time
15:0Hrs
|
|
| 755 |
Consultancy Services for DPR for Construction of 6 lanes elevated corridor and deve. of road, Prabhat Chouraha to Ratnagiri Tiraha, ITI Tirah to Chetak Bridge, Gautam nagar to Veersawarker setu, CSIR AMPRI to Misrod section of NH-46 L-18.20 Km in MP |
751151 |
29/04/2023 |
29/04/2023
|
01/06/2023
Time
17:30Hrs
|
|
| 756 |
CONSULTANCY SERVICES FORPREPARATION OF DPR FOR CONSTRUCTION OF ROAD FROM ASHA CHEEMA GURDALIGALI APHARWAT SARSON ANITA TRISTAR FROM KM 0.00 TO KM 61.25 TO NHSL WITH PAVED SHOULDER SPECIFICATIONS UNDER 99 RCC / 760 BRTF PROJECT BEACON IN J&K (UT) |
CE (P) BCN/Consultancy/06/2023-24 |
27/04/2023 |
27/04/2023
|
05/06/2023
Time
12:0Hrs
|
|
| 757 |
Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect to following (i) Up-gradation to 2/4/6 lane from km 343 (Kumarghat) to km 397 (Ambassa) and from km 422 (Mugiakami) to km 456.5 (Champaknagar), (Total Length 88.5 km) on Churaibari to Agartala road section on NH-08 in the State of Tripura on EPC basis. (ii) 2/4 lane of Eastern Agartala Bypass ( Lembucherra-Khayerpur) (Approximate Length 10 Km) in the State of Tripura on EPC basis |
NHIDCL/Tripura/NH-08/DPR/C-A /2023 |
28/04/2023 |
21/04/2023
|
12/06/2023
Time
15:0Hrs
|
|
| 758 |
CS for preparation and approval of Detailed Design and Drawing of Various Standard Spans of ROB with Standard Deck Config of 2Lane one way and 3Lane one way including Proof checking from IITs/NITs and Approval from (RDSO Lucknow) |
NHAI/HQ/ROB/ RUB/RFP/2023 |
19/05/2023 |
17/04/2023
|
08/06/2023
Time
11:0Hrs
|
|
| 759 |
Consultancy Services for preparation of Detailed Project Report for construction of 2 lane 4 lane ROB in lieu of Level Crossing no.KK 26 Railway Ch. Km 109 20 21 at Existing Ch Km 37.003 of NH 516E in the State of Andhra Pradesh |
SE-RO/VJY/DPR/ROB/PIU-ARAKU |
18/04/2023 |
12/04/2023
|
05/06/2023
Time
17:0Hrs
|
|
| 760 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation Upgradation an Widening of existing Highway to 2Lane 4 Lane with Paved Shoulder from Km. 55.800 to Km. 113.650 (Length 57.8 |
NIT01/NHDGAD/2023-24 |
12/05/2023 |
11/04/2023
|
22/05/2023
Time
17:0Hrs
|
|
| 761 |
“Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from (a) Rongli, Sikkim to Jhalong, West Bengal (Missing link-Greenfield) (b) Rangpo (Km 52.300 of NH-10) to Rorathang (Km 8.023 of NH-717A) in the State of Sikkim and (c) Treatment/ Restoration of newly developed sinking zone between Km 0.00 (Rhenock) to Km 26.706 (Ro |
2023_NHIDC_748653_1 |
20/04/2023 |
10/04/2023
|
08/06/2023
Time
15:0Hrs
|
|
| 762 |
“Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Lavamore (Km 61.10) to Start of Pedong Bypass (Km 79.700) and from Reshi (Km 96.254) to Rhenock (Km 101.554) along NH-717A & from Rhenock (Km 0.00) to Rongli Bazaar (Km 15.300) along NH-717B in the States of Sikkim and West Bengal |
2023_NHIDC_748458_1 |
18/04/2023 |
06/04/2023
|
05/06/2023
Time
15:0Hrs
|
|
| 763 |
PMC for preparation of Detailed Project Report, Pre construction activity and supervision for the work of Upgradation from Km. 220.048 to km 305.820 of NH-35 old ch.km 400.858 to km 486.775 of NH-76E to 4L PS. Standard. |
CE-RO/LKO/PMC/NH-35(76E) /2022-23 dt. 27.03.2023 |
29/03/2023 |
27/03/2023
|
23/05/2023
Time
17:0Hrs
|
|
| 764 |
PMC for FS prep of DPR providing pre construction activities nd Construction supervision for Construction of Highway Tunnel of 5.5 Km inclg approaches across Pir Panjal Range betwn Km 75.00 nd Km 80.50 on Poonch Uri Road in JK |
RW/CH/W(38)/JK/2023 |
25/03/2023 |
25/03/2023
|
17/04/2023
Time
15:0Hrs
|
|
| 765 |
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK |
RW/CH/W(37)/JK/2023 |
25/03/2023 |
25/03/2023
|
17/04/2023
Time
15:0Hrs
|
|
| 766 |
Preparation of Detailed Project Report for construction of bridge including approaches across Giri River on Paonta Sahib Gumma Fediz section of National Highway NH 707 old no. NH 72 B from km 14.200 to km 18.000 in the State of HP Distt. Sirmaur |
MoRTH PIU-P.S./DPR/KD-MB/22-23/2074 |
06/04/2023 |
24/03/2023
|
15/05/2023
Time
11:0Hrs
|
|
| 767 |
Consultancy services for Feasibility study and Preparation of detailed project report including LA and other clearances for construction of Jehanabad Bypass connecting NH33 and NH 83 in the State of Bihar |
2023_MoRTH_747610_1 |
17/04/2023 |
24/03/2023
|
08/05/2023
Time
17:0Hrs
|
|
| 768 |
Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram |
NHIDCL/Mizoram/DPR/Lunglei bypass/2022-23 |
22/03/2023 |
20/03/2023
|
08/05/2023
Time
11:0Hrs
|
|
| 769 |
Consultancy Services for preparation of Detail Engineering report for ROB proper Construction of Bow String type girders in railway portion from ROB chainage 1 696 to chainage 1 871 Total length 175 m at km 30 on NH l62E Pali Nadol Section Crossing the Falna Marwar Railway Section at LC No C 67 near Somesar in the state of Rajasthan |
02/2022-23/EENHPALI |
23/03/2023 |
13/03/2023
|
30/03/2023
Time
18:0Hrs
|
|
| 770 |
Consultancy Services for preparation of Detailed Project Report (DPR) for various safety measures, towards Zero Fatality Corridor, on Chilakaluripeta to Nellore section of NH-16 from Km.1182.802 to Km.1366.547 in the state of Andhra Pradesh. |
2023-NHAI-148301-1 |
19/04/2023 |
08/03/2023
|
17/07/2023
Time
15:0Hrs
|
|
| 771 |
PMC work of (A) RAJIM BYPASS FROM CH. 11.840 TO CH. 21.180 OF NH-130C (B) PAUND TO DHAVALPUR FROM CH. 40.400 TO CH. 99.800 OF NH-130C (C) DHAVALPUR TO MADANGMUDA FROM CH. 99.800 TO CH. 168.800 OF NH-130C (D) 4-LANE ROB CONSTRUCTION IN KM. 6.850 NEAR VILLAGE MANIKCHAURI OF NH-130C (E) 4-LANE ROB CONSTRUCTION IN KM. 16.200 NEAR NAVAPARA (RAJIM) OF NH-130C in the state of Chhattisgarh. |
01, 02, 03 & 04/ RO/CG/NH/2022-23/East-II/PMC/2 |
06/03/2023 |
07/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 772 |
Consultancy Services for Preparation of DPR including detailed Geological, Geotechnical and Topographical Surveys/Investigations and Design of Cost Effective and Suitable remedial measures for prevention of landslides/rockfall in identified locations (approx. 45 Nos) on Kiratpur-Manali Section of NH-21 in the State of Himachal Pradesh |
2023 NHAI 148103 1 |
10/03/2023 |
06/03/2023
|
18/04/2023
Time
11:0Hrs
|
|
| 773 |
AS Per NIT/RFP |
RE-NIT NO. 08/NH-BHAGALPUR/2022-23 DT. 06.03.2023 |
06/03/2023 |
06/03/2023
|
19/04/2023
Time
11:0Hrs
|
|
| 774 |
Consultancy Services for preparation of Detailed Project Report for construction of Kawardha Bypass of National Highways-12A with Two/Four lane with paved shoulder configuration in the state of Chhattisgarh |
01/ RO/CG/NH/2022-23/East-II/DPR |
03/03/2023 |
03/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 775 |
PREPARATION OF DETAILED PROJECT REPORT, PRE CONSTRUCTION ACTIVITY AND PROJECT SUPERVISION FOR THE WORK OF RECONSTRUCTION/UP-GRADATION OF SELECTED STRETCHES/CORRIDORS OF NATIONAL HIGHWAYS TO TWO/FOUR LANE WITH PAVED SHOULDER CONFIGURATION Pkg-1 |
01, 02, 03 & 04/ RO/CG/NH/2022-23/East-II/PMC |
06/03/2023 |
03/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 776 |
PMC work of GHODARI (NADI MOD)- MAHASAMUND-BAGBAHARA-TEMRI-ODISHA BORDER FROM EXISTING CH. 0.000 TO CH. 65.900 Km. of NH-353. (A) TELANGANA BORDER -BHOPALPATNAM- JAGDALPUR ROAD FROM KM. 287.000 TO KM. 504.000 ON NH-63 (B) JAGDALPUR-DHANPUNJI ROAD FROM KM. 299.00 TO 317.800 ON NH-63 (C) DANTEWADA BYPASS ON NH-163A in the state of Chhattisgarh. |
01, 02, 03 & 04/ RO/CG/NH/2022-23/East-II/PMC/4 |
06/03/2023 |
03/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 777 |
PMC work of GHODARI (NADI MOD)- MAHASAMUND-BAGBAHARA-TEMRI-ODISHA BORDER FROM EXISTING CH. 0.000 TO CH. 65.900 Km. of NH-353 in the state of Chhattisgarh. |
01, 02, 03 & 04/ RO/CG/NH/2022-23/East-II/PMC/3 |
07/03/2023 |
03/03/2023
|
13/06/2023
Time
13:0Hrs
|
|
| 778 |
CS for DPR for CONSTN OF AVALANCHE GALLERY CONTROL STRUCTS TO ACHIEVE ALL WEATHER CONNECTIVITY BETWN EASTERN PORTAL OF ZOZILA TUNNEL TO KARGIL ND IMP OF ROAD GEOMETRICS INCLG CONSTN OF BRIDGES VIADS ETC KM108 TO KM268 OF ZOZILA KARGIL LEH ROAD NH1 |
RW/SR/WORKS(18)/LADAKH/2022 |
02/03/2023 |
02/03/2023
|
17/03/2023
Time
15:0Hrs
|
|
| 779 |
IMPROVEMENT OF ROAD GEOMETRICS INCLUDING CONSTRUCTION OF BRIDGES VIADUCTS ETC IN BETWEEN KM 268 TO KM 391 OF ZOZILA KARGIL LEH ROAD NH 1 UNDER PROJECT VIJAYAK IN UT OF LADAKH |
RW/SR/Works(18)/Ladakh/2022/PI |
02/03/2023 |
02/03/2023
|
17/03/2023
Time
15:0Hrs
|
|
| 780 |
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK |
RW CH/W(37)/JK/2023 |
01/03/2023 |
01/03/2023
|
24/03/2023
Time
17:0Hrs
|
|
| 781 |
PMC for FS prep of DPR providing pre construction activities nd Construction supervision for Construction of Highway Tunnel of 5.5 Km inclg approaches across Pir Panjal Range betwn Km 75.00 nd Km 80.50 on Poonch Uri Road in JK |
RW/CH/W(38)/JK/2023 |
01/03/2023 |
01/03/2023
|
24/03/2023
Time
17:0Hrs
|
|
| 782 |
Consultancy Services for preparation of Detailed Project Report (DPR) for stretches (i) Kamenbari to Tenga (ii) Jang to Lumla and (iii) Lumla to Neliya (border) in the State of Arunachal Pradesh. |
NHIDCL/Arunachal/DPR/Inter-corridor/2023 |
15/03/2023 |
27/02/2023
|
10/04/2023
Time
15:0Hrs
|
|
| 783 |
Consultancy Services for Preparation of Detailed Project Report for rehabilitation and upgradation of NH-52 stretch in Autram Ghat Section (from Km.375 to Km.390) part of Aurangabad–Dhule section of NH-52 in the State of Maharashtra-3rd call |
NHAI/RO-NAG/TENDERS/2022-23/38 |
22/02/2023 |
22/02/2023
|
23/03/2023
Time
11:0Hrs
|
|
| 784 |
Project management consultancy services for 4/6 laning of Mumbai-Pune NH-48 from Shilphata (Km. 131/200 To Nigadi (KM 20/400) INCLUDING IMPROVEMENT OF BLACK SPOTS, ROAD SAFETY IMPROVEMENT AND FINANCIAL ANALYSIS. |
No. RO/MUM/PMC-1/2022-23 |
30/03/2023 |
22/02/2023
|
08/05/2023
Time
17:0Hrs
|
|
| 785 |
Consultancy Services for Feasibility Study and Preparation of DPR for Widening and Strengthening to 2-Lane with Paved Shoulder in Km 0 to 115 (Bariyarpur to Vamdah) of NH-333 with land acquisition in the State of Bihar. |
RE-NIT NO. 10/NH-LAKHISARAI/2022-23 |
16/02/2023 |
16/02/2023
|
01/04/2023
Time
17:0Hrs
|
|
| 786 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Itakhola (on NH-15) - Seijosa - Pakke Kessang (on NH-13) Road (Approx. 80 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/ISPK/2022-23/RO-Ita |
13/02/2023 |
13/02/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 787 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Seppa - Chayangtajo Road (Approx. 81 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/SCT/2022-23/RO/Ita/ |
13/02/2023 |
13/02/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 788 |
Project Management Consultancy Services for Construction of Construction of Twin Tube Uni-directional Tunnel (10.8 km) under Ganesh top hill including approaches from D.ch. 60.400 ( Chandanwadi) to D.Ch. 82.700 ( Near Sangam Top ) on Khanabal-Baltal section of NH-501 in the under UT of Jammu & Kashmir on EPC mode. |
NHIDCL/J&K/NH-501/Sheshnag Tunnel/PMC /2022-23 |
25/01/2023 |
13/02/2023
|
11/04/2023
Time
15:0Hrs
|
|
| 789 |
Feasibility study Land Acquisition and preparation of DPR for i Construction of Bypass in south east Direction of Darbhanga. ii Baheri Spur of NH 527E iii km 104 Bhitha More to KM 217 Naraharia of NH104 |
06/NH/Jainagar/2022-23 |
03/03/2023 |
10/02/2023
|
13/04/2023
Time
15:0Hrs
|
|
| 790 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches from Km 62/00 to Km 92/320 and Km 115/320 to Km 160/320 of NH-58 (Vadali to Palanpur) including Vadgam Bypass, Vadali Bypass and Chansol Bypass in the State of Gujarat. |
2023_MoRTH_739346_1 |
08/02/2023 |
09/02/2023
|
02/05/2023
Time
17:0Hrs
|
|
| 791 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches from Km 221/800 to Km 290/200 of NH- 41 (Naliya Jn to Narayan Sarovar)the State of Gujarat. |
2023_MoRTH_739504_1 |
09/02/2023 |
09/02/2023
|
02/05/2023
Time
17:0Hrs
|
|
| 792 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches Km 61/658 to Km 105/00 of NH- 953 (Ahwa to Maharastra Border hilly section) in the State of Gujarat. |
2023_MoRTH_739512_1 |
09/02/2023 |
09/02/2023
|
02/05/2023
Time
17:0Hrs
|
|
| 793 |
PMC services for Widening to 4 lane of NH 105 from Km 35 00 to 66 275 of Nalagarh to Swarghat road in the State of Himachal Pradesh |
RO/HP/Works (292)/2022-23/1012 |
09/02/2023 |
08/02/2023
|
17/04/2023
Time
15:0Hrs
|
|
| 794 |
PMC for Widening to 4 lane of NH 503 Extn from Km 0 to 28 900 Amb to Una and Widening to 4lane of NH 70 New 03 Jallandhar Hoshiarpur Gagret Amb Nadaun Hamirpur TauniDevi Sarkaghat Mandi road from Km. 58 400 to 114 PB HP border to Nadaun in the HP |
RO/HP/Works (293)/2022-23/1016 |
10/02/2023 |
08/02/2023
|
25/03/2023
Time
15:0Hrs
|
|
| 795 |
Project Management Consultancy Services for construction of Highway 2 lane Tunnel including approaches across the Nahan Town on Nahan Sarahan Kumarhatti Road NH 907A from Km 0 00 to Km 5 00 in the State of Himachal Pradesh |
RO/HP/Works (266)/2022-23/997 |
09/02/2023 |
06/02/2023
|
25/03/2023
Time
15:0Hrs
|
|
| 796 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Lazu- Wakka -Khanu & Konsa – Longding Road (Approx. 120 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/LWKKL/2022-23/RO-Ita / |
27/01/2023 |
27/01/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 797 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Provisioning of 4 lane Bridge over river Kushiyara (approx. Length 300 m) and its approaches between Karimganj, Assam (India) and Zakiganj Upazila (Sylhet district, Bangladesh) (approximate length of 900 m).-2nd Call |
NHIDCL/HQ/DPR/Karimganj-Zakiganj/2022 |
06/02/2023 |
24/01/2023
|
09/03/2023
Time
15:0Hrs
|
|
| 798 |
Consultancy Services for Preparation of Detailed Project Report for 2 lanes/2 lane with paved shoulder configuration of stretch of NH-552 Extn, NH-347C, NH-135BD, and NH-135BB Total length162 Km in the state of Madhya Pradesh |
RO/Bhopal/NH/DPR/01/2022-23 |
28/01/2023 |
21/01/2023
|
07/03/2023
Time
17:30Hrs
|
|
| 799 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of 2nd Tube Uni-directional Zojila Tunnel (13.14 km) from D.ch. 16.80 to D.Ch. 30.50 of NH-1 in the under UT of Jammu & Kashmir |
NHIDCL/J&K/NH-1/Zojila 2nd Tube Tunnel/DPR /2023 |
16/01/2023 |
21/01/2023
|
01/05/2023
Time
15:0Hrs
|
|
| 800 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Kanubari – Hukanjuri – Deomali – Margherita Road (Approx. 110 km) in the State of Arunachal Pradesh / Assam. |
RW/Ar.P/DPR/KHDM/2022-23/RO-Ita |
20/01/2023 |
20/01/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 801 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “2-lane with Paved Shoulder of NH-configuration for Baramulla-Gulmarg Road (approx length 42 Km)” in the UT of Jammu & Kashmir. |
NHIDCL/JK/DPR /Baramulla Gulmarg (2L)/2022-23 |
23/12/2022 |
18/01/2023
|
09/02/2023
Time
15:0Hrs
|
|
| 802 |
PMC Service for Construction of Highway 2- Lane Tunnel including approaches across the Bageshwar Hills in market area km 130 to km 136 of Rameshwar-Almora of NH-309A in the State of Uttarakhand |
RO/UK/BAGHESWAR TUNNEL/01 |
16/01/2023 |
16/01/2023
|
02/03/2023
Time
11:0Hrs
|
|
| 803 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre- Construction activitiesfor connecting National Waterway - 2 at Dhubri to NH - 127B in the State of Assam. (2nd Call) |
NHIDCL/2022-23/AS /Dhubri/DPR/NW2-NH127B/C2 |
10/12/2022 |
16/01/2023
|
23/01/2023
Time
15:0Hrs
|
|
| 804 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for 2-laning of Changlang -Khimiyang -Lazu Road (Approx. 100 km) in the State of Arunachal Pradesh |
2023_MoRTH_734234_1 |
11/01/2023 |
11/01/2023
|
16/03/2023
Time
11:0Hrs
|
|
| 805 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to four lane from 100.00 to 106.00 & Km.112.800 to Km. 127.160 of NH-63 Ankola-Gooty section in the State of Karnataka |
RW/BNG/NH-63/Km 100-106/146/2022 |
10/01/2023 |
10/01/2023
|
20/02/2023
Time
16:0Hrs
|
|
| 806 |
CS for DPR for CONSTN OF AVALANCHE GALLERY CONTROL STRUCTS TO ACHIEVE ALL WEATHER CONNECTIVITY BETWN EASTERN PORTAL OF ZOZILA TUNNEL TO KARGIL ND IMP OF ROAD GEOMETRICS INCLG CONSTN OF BRIDGES VIADS ETC KM108 TO KM268 OF ZOZILA KARGIL LEH ROAD NH1 |
2023_MoRTH_733085_1 |
10/01/2023 |
10/01/2023
|
23/02/2023
Time
11:0Hrs
|
|
| 807 |
IMPROVEMENT OF ROAD GEOMETRICS INCLUDING CONSTRUCTION OF BRIDGES VIADUCTS ETC IN BETWEEN KM 268 TO KM 391 OF ZOZILA KARGIL LEH ROAD NH 1 UNDER PROJECT VIJAYAK IN UT OF LADAKH |
RW/SR/Works(18)/Ladakh/2022/PI |
10/01/2023 |
10/01/2023
|
23/02/2023
Time
17:0Hrs
|
|
| 808 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for Construction of New 4lane Bypass to Hubballi-Dharwad cities connecting NH-218(Near Kusugal) and NH-48(Near Narendra) in the State of Karnataka |
RW/BNG/NH-218/NEW BYPASS/108/2022 |
09/01/2023 |
09/01/2023
|
20/02/2023
Time
16:0Hrs
|
|
| 809 |
Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh. |
Ar.P/RSA/Pasighat Bypasss/2022-23/RO-Ita |
09/01/2023 |
06/01/2023
|
02/02/2023
Time
11:0Hrs
|
|
| 810 |
PMC for preparation of Detailed Project Report, Pre construction activity and supervision for the work of Elevated corridor from Ramadevi to Gol Chauraha on NH-91 in the state of U.P. |
CE-RO/LKO/PMC/Lot-VII/2022-23 Dated.04.01.2023 |
06/02/2023 |
04/01/2023
|
24/02/2023
Time
11:0Hrs
|
|
| 811 |
PMC services for construction of Double Lane Highway Tunnel across Fotula top on Zojila-Kargil-Leh road under Project Vijayak in UT of Ladakh |
2022_MoRTH_725875_1 |
02/01/2023 |
02/01/2023
|
02/02/2023
Time
15:0Hrs
|
|
| 812 |
PMC services for construction of 2.50 km long road Tunnel across Namik La Pass on road Zojila-Kargil- Leh under Project Vijayak in UT of Ladakh |
2022_MoRTH_726039_1 |
02/01/2023 |
02/01/2023
|
02/02/2023
Time
15:0Hrs
|
|
| 813 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation Upgradation of existing road to 2 lane 4lane with paved shoulders configuration of Mohol Kurul Kamati Kanbas Achegaon Walsang Dhotri Musti Tandulwadi NH 465 Km 0.00 to 107.600 Length 107.600 km Approx District Solapur in the State of Maharashtra |
2022_MoRTH_731500_1 |
02/01/2023 |
27/12/2022
|
10/02/2023
Time
17:0Hrs
|
|
| 814 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation / Upgradation of existing road to 2lane/4lane with paved shoulders configuration of Murum-Alur-Waghdari-Akkalkot-Nagansur-Tolnur-Maharashtra State Border NH 548B Km 263 00 (Dalimb Junction) to 344 562 (Maharashtra State Border) (Length = 81.562 km Approx)- District Solapur in the State of Maharashtra. |
2022_MoRTH_731561_1 |
02/01/2023 |
27/12/2022
|
10/02/2023
Time
17:0Hrs
|
|
| 815 |
Consultancy services of Feasibility Report cum DPR for Widening of the existing 2-lane road to 4-lane from Willingdon Island-Kundanoor or alternatively to Aroor-other suitable location on NH-66 to provide connectivity to Cochin Port Trust in Kerala |
NHAI/PC/ Willingdon-Kundanoor/2022 |
26/12/2022 |
21/12/2022
|
24/01/2023
Time
11:0Hrs
|
|
| 816 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2Lane / 4 Lane with Paved Shoulder of NH 160 near Sinnar connecting Shirdi, Ahmadnagar, Kolgaon, Daund, Phaltan, Dahiwadi, Vita, Tasgaon, Miraj in the state of Maharashtra. (Section Sangli District Border - Vita to Tasgaon Km 227/480 to 273/780) Total Length 46.30 Km ) |
5/EENHPUNE2434/2022dt5/12/2022 |
20/12/2022 |
19/12/2022
|
16/05/2023
Time
17:5Hrs
|
|
| 817 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2Lane / 4 Lane with Paved Shoulder of NH 160 near Sinnar connecting Shirdi, Ahmadnagar, Kolgaon, Daund, Phaltan, Dahiwadi, Vita, Tasgaon, Miraj in the state of Maharashtra. Section Tasgaon -Miraj Karnataka State Border ( including Tasgaon bypass) Km 273/780 to 321/780 ( Total Length 48.00 Km) |
5/EENH/Pune 2434/2022dt 5/12/2022 |
20/12/2022 |
19/12/2022
|
16/05/2023
Time
17:5Hrs
|
|
| 818 |
Consultancy service for preparation of Detailed Project Report for construction of 4 lane elevated corridor of NH-31 (New NH-10) from km 581.00 to km.595.00 including ROB on Sevoke at 592.400 km in the district of Darjeeling West Bengal. |
MORTH/RO-KOL/NIT/DPR/22-23/03 |
19/12/2022 |
16/12/2022
|
09/02/2023
Time
11:0Hrs
|
|
| 819 |
Consultancy Services for DPR Preparation for realignment and upgradation to2-lane with paved shoulder/four lanning of NH133A from Km 5.40 (excluding Barharwa Bypass) to Km 24.90 (excluding Pakur Bypass) in the State of Jharkhand on EPC mode including Land Acquisition,Forest Clearance and Utility Shifting etc. |
2022_MoRTH_729153_1 |
17/12/2022 |
15/12/2022
|
29/12/2022
Time
16:30Hrs
|
|
| 820 |
PMC Services for Up-gradation to 2 lane with paved shoulders configuration of NH310A starting from its junction with NH 310 near Tashi View Point connecting Penengla, Kabi, Phensong, Phodong, Namok, Rangrang and terminating at Mangan |
RW/GHT/PMC/DPR/Tender/SK/1067 |
16/12/2022 |
15/12/2022
|
14/01/2023
Time
15:0Hrs
|
|
| 821 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2Lane / 4 Lane with Paved Shoulder of NH 160 near Sinnar connecting Shirdi, Ahmadnagar, Kolgaon, Daund, Phaltan, Dahiwadi, Vita, Tasgaon, Miraj in the state of Maharashtra. ( Section Dahiwadi to Sangli District Border Km 180/080 to 227/480 Total Lensth 47.40 km. |
2022-MoRTH-728614-1 |
16/12/2022 |
12/12/2022
|
16/05/2023
Time
17:5Hrs
|
|
| 822 |
Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Upgradation & Widening of existing Highway to Rigid Pavement 2Lane / 4 Lane with Paved Shoulder of NH 160 near Sinnar connecting Shirdi, Ahmadnagar, Kolgaon, Daund, Phaltan, Dahiwadi, Vita, Tasgaon, Miraj in the state of Maharashtra connecting chikhodi and Terminating at its junction with NH-48 in the state of Karnataka.( Section Phaltan to Dahiwadi Km 138/050 to 180/080 ) |
NIT No.05/EENH/PUNE/2434/2022 dt.05/12/2022 |
17/12/2022 |
12/12/2022
|
16/05/2023
Time
17:5Hrs
|
|
| 823 |
Project Management Consultancy Services for Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel (2.5 km) including approaches (2.1 km) from km 10.600 to km 15.200 (Package-2) on Sairang - Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode |
NHIDCL/Mizoram/NH-6/Aizawl Bypass/PMC/Package-2 |
09/12/2022 |
12/12/2022
|
23/01/2023
Time
11:0Hrs
|
|
| 824 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND PROVIDING PRE CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF HIGHWAY TUNNEL BETWEEN KM 10pt250 TO KM 10pt650 ON MAR UNDER 108 RCC 759 BRTF PROJECT DEEPAK IN THE STATE OF HP ON EPC MODE |
CE (P) DPK/16/2022-23 |
05/01/2023 |
12/12/2022
|
28/02/2023
Time
17:0Hrs
|
|
| 825 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of ROB at L/C No. 1/Class A Safiyasarai Ch-71.970 of NH-80, L/C No. 5/SPL/T Shivnarayanpur Ch-171.300 of NH-80 and ROB at L/C No. 2/C-T(SPL) Mirzachowk Ch-188.200 of NH-80 in the state of Bihar. |
RE NIT No. 05/NH-Bhagalpur/2022-23 Dt. 09.12.2022 |
10/12/2022 |
10/12/2022
|
24/01/2023
Time
17:0Hrs
|
|
| 826 |
Consultancy Services for preparation of Detailed Project Report for rehabilitation or reconstruction of existing retained bridges in Ranchi-Rargaon-Mahulia section from Km. 114.000 to Km. 277.500 of NH-33 in the state of Jharkhand |
NHAI/RO/RNC/JH/2022-23/20 |
04/01/2023 |
08/12/2022
|
23/01/2023
Time
11:0Hrs
|
|
| 827 |
Consultancy Services for Preparation of Feasibility Study, Detailed Project Report Survey,Preparation of Land plan for Widening to Four lane on NH-169 from Km.25.15 to 60.00 (excluding from Km. 53.775 to 55.060) on (Shimoga Mangalore Section) in the state of Karnataka |
RW/BNG/NH-169/Km.30-60/107/2022/DPR |
02/12/2022 |
02/12/2022
|
05/01/2023
Time
16:0Hrs
|
|
| 828 |
Consultancy Services for Preparation of feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulder on NH-169A from Km. 30.75 to Km. 51.60 (Agumbe Ghat) in the State of Karnataka |
RW/BNG/NH-169A/Km.33-41/23/2022/DPR |
02/12/2022 |
02/12/2022
|
05/01/2023
Time
16:0Hrs
|
|
| 829 |
Consultancy Services for feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Sagara-Havinahalli -Holebaglu -Kalasvalli -Sighandoor - Markutka (junction with NH-766c) in the state of Karnataka |
RW/BNG/NH-766C/SAGAR-MARAKUTTAKA/08/2019-DPR(1) |
01/12/2022 |
01/12/2022
|
02/01/2023
Time
15:0Hrs
|
|
| 830 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulder from Km. 124.00 to153.00 of NH-169 (Tanikonda to SK Boarder) in the state of Karnataka |
RW/BNG/NH-169/Km.124-153/109/2022/DPR |
01/12/2022 |
01/12/2022
|
05/01/2023
Time
16:0Hrs
|
|
| 831 |
Survey Investigation Land Acquisition feasibility study and preparation of DPR on NH. 227 Old NH. 104 for Construction of H.L. R.C.C bridge with approaches over Kamla River at chainage 159 280 in the state of Bihar for the year 2022-23 |
04/NH/JAINAGAR/2022-23 |
12/12/2022 |
01/12/2022
|
17/01/2023
Time
11:0Hrs
|
|
| 832 |
PMC services for construction of Double Lane Highway Tunnel across Fotula top on Zojila-Kargil-Leh road under Project Vijayak in UT of Ladakh |
RW/SR/Works(16)/Ladakh/01/2022 |
29/11/2022 |
29/11/2022
|
09/01/2023
Time
15:0Hrs
|
|
| 833 |
PMC services for construction of 2.50 km long road Tunnel across Namik La Pass on road Zojila-Kargil- Leh under Project Vijayak in UT of Ladakh |
RW/SR/Works(15)/Ladakh/2022 |
29/11/2022 |
29/11/2022
|
11/01/2023
Time
15:0Hrs
|
|
| 834 |
Consultancy Services for DPR Preparation for Widening and strengthening to 4 lane along with geometric improvement including Replacement of Culverts and Bridges from km 0.00 to km 41.00 of NH-220 in the State of Jharkhand including complete Land Acquisition, Forest Clearance and Utility Shifting etc |
2022_MoRTH_726284_1 |
29/11/2022 |
29/11/2022
|
03/01/2023
Time
14:30Hrs
|
|
| 835 |
Consultancy Services for Preparation of Detailed Project Report for rehabilitation and upgradation of NH-52 stretch in Autram Ghat Section (from Km.375 to Km.390) part of Aurangabad – Dhule section of NH-52 in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2022-23/23 |
26/11/2022 |
26/11/2022
|
14/12/2022
Time
11:0Hrs
|
|
| 836 |
Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of Upgradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (Meghalaya) through Bangladesh. |
NHIDCL/HQ/DPR/Hilli-Mahendraganj/2022 |
23/11/2022 |
23/11/2022
|
16/01/2023
Time
15:0Hrs
|
|
| 837 |
Consultancy service for feasibility study & DPR preparation of Rangia Bypass of NH-127 D including ROB (L=8.00 Km) under Annual Plan 2022-23 in the State of Assam. |
RW/GHT/AS/PMC/TENDER/2022-23/957 |
24/11/2022 |
22/11/2022
|
05/01/2023
Time
15:0Hrs
|
|
| 838 |
Consultancy Services for Preparation of Feasibility DPR for Widening to Two lane with paved shoulders from km 41.90 to 84.30, 88.20 to 105.25, 148.23 to 161.55, 166.35 to 174.13, 176.12 to 186.55 and 191.90 to 192.90 on NH 766C of Byndoor –Ranebennur section in State of Karnataka |
RW/BNG/NH-766C/SAGAR-MARAKUTTAKA/08/2019-DPR |
22/11/2022 |
22/11/2022
|
02/01/2023
Time
15:0Hrs
|
|
| 839 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre- Construction activities for connecting National Waterway – 2 at Dhubri to NH - 127B in the State of Assam |
NHIDCL/2022-23/AS/ Dhubri/DPR/NW2-NH127B |
09/11/2022 |
16/11/2022
|
23/11/2022
Time
15:0Hrs
|
|
| 840 |
CS FOR DPR FS DETAILED SURVEY/INVESTGN ALIGNMT OPTION PREPRN OF GAD ENGNG REPT FOR CONSTN OF PROPOSED FOB ND APPROACS ALONG WID SER ROAD ND PREPN OF LA PAPERS FS US DETAILS ON BATHINDA DABWALI ROAD KM297.115 NH54 IN PB |
RW/CH/W(40)/PB/2022/1 |
15/11/2022 |
15/11/2022
|
16/12/2022
Time
11:0Hrs
|
|
| 841 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF FOLLOWING ROADS UNDER PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH (RECALL) PARTI MIPI-ANDRATHANG FROM KM 20.00 TO KM 50.00 (NET LENGTH 30.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF Part-II CHANGLOHGAM-KEPAPU FROM KM 16.50 TO KM 22.875 (LENGTH 6.375 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR O |
CE (P) Udayak/DPR consultancy/12/2022-23 |
15/11/2022 |
15/11/2022
|
12/12/2022
Time
12:0Hrs
|
|
| 842 |
CS FOR FS DETAILED SURVEY/INVESTIGATION PREPARATION OF GAD DETAILED PR FOR CONSTRUCTION OF 4 LANE ROB IN LIEU OF RC NO A 8 A at KM 3.600 on NH 154 (PATHANKOT KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB |
RW/CH/W(41)/PB/2022/1 |
15/11/2022 |
15/11/2022
|
16/12/2022
Time
11:0Hrs
|
|
| 843 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane CC Road with paved shoulder on Dahegaon- Kuhi Umred section of NH-247 from Km 17/870 to 32/000 & 51/420 to 72/000 (Including Feasibility Study of Bypass to Railway crossing at 17/870 in Kamptee village) in State of Maharashtra. |
13/EENH/NGP/2022-23/5036 |
20/12/2022 |
10/11/2022
|
02/01/2023
Time
17:0Hrs
|
|
| 844 |
PMC for preparation of Detailed Project Report, Pre construction activity and supervision for the work of Widening/Upgradation to 2L P.S. from Km. 58.600 to 105.177 ( Dramandganj to UP/MP Border) of NH-135C in the state of U.P. |
CE-RO/LKO/PMC/135C/2021-22 Dated.09.11.2022 |
29/11/2022 |
09/11/2022
|
29/12/2022
Time
17:0Hrs
|
|
| 845 |
preparation of detailed project report and pre construction activities for construction of Railway Over Bridge on NH 11 (21) (Prithvinath gate railway crossing no 6A) in district Agra in the state of Uttar Pradesh |
11202M/13M-NHCK/22 dated 01.11.2022 |
07/11/2022 |
03/11/2022
|
14/12/2022
Time
15:0Hrs
|
|
| 846 |
Consultancy Services for Preparation of Detailed Project Report and preconstruction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection works, treatment of vulnerable sliding/sinking zones, Improvement of safety and sustainability of NH network by incorporating Bypasses, Viaducts, Bridges, Tunnels, etc along NH-10 from Km 52.00 (Rangpo) to Km 80.00 (Ranipool) in the State of Sikkim |
2022_NHIDC_720398_1 |
02/11/2022 |
28/10/2022
|
22/12/2022
Time
15:0Hrs
|
|
| 847 |
Consultancy Services for Preparation of Detailed Project Report for Provisioning of 4 lane Bridge over river Kushiyara (approx. Length 300 m) and its approaches between Karimganj, Assam (India) and Zakiganj Upazila (Sylhet district, Bangladesh) (approximate length of 900 m). |
NHIDCL/HQ/DPR/Karimganj-Zakiganj/2022 |
18/10/2022 |
28/10/2022
|
09/12/2022
Time
15:0Hrs
|
|
| 848 |
Consultancy Services for preparation of DPR for Restoration / Upgradation of Road Manali_Leh from NHDL to two Lane Paved Shoulder specifications km 303.00 (Existing Chainage) to km 326.00 |
RW/SR/Works(17)/Ladakh/2022 |
27/10/2022 |
27/10/2022
|
12/12/2022
Time
11:0Hrs
|
|
| 849 |
Preparation of Detailed Project Report and services for Pre-Construction activities in respect of Providing four nos. of bypasses with 2 lane with paved shoulder standard bypassing the stretches at (i) Km 4.00 to 4.5 at jamjuri (ii) Km 12.00 to 12.50 at Kakraban (iii) Km 20.00 to 22.00 at Melaghar (iv) Km 28.500 to 29.500 at Sonamura on NH-08 in State of Tripura (approximate length of 11.0 Km). |
NHIDCL/Tripura/NH-08/Udaipur-Sonamura/2022 |
25/10/2022 |
27/10/2022
|
19/01/2023
Time
15:0Hrs
|
|
| 850 |
Consultancy Services for preparation of Detailed Project Report for up-gradation of ( i ) Banda- Insuli- Sawantwadi- Buradi Devasu Titha (25.00 Km) in Sindhudurg District in state of Maharashtra (ii) NH 166A to two lane paved shoulder in Vadkhal |
2022_MoRTH_717360_1 |
26/10/2022 |
26/10/2022
|
21/11/2022
Time
15:0Hrs
|
|
| 851 |
Project management Consultancy services for feasibility study and preparation of DPR, Supervision during construction and maintenance of NH-627(Pkj-I). |
No.RW/GHT/PMC/DPR/Tender/AS/837 |
21/10/2022 |
21/10/2022
|
12/12/2022
Time
15:0Hrs
|
|
| 852 |
Project management Consultancy services for feasibility study and preparation of DPR, Supervision during construction and maintenance of NH-627(Pkj-II). |
RW/GHT/PMC/DPR/Tender/AS/847 |
21/10/2022 |
21/10/2022
|
12/12/2022
Time
15:0Hrs
|
|
| 853 |
PMC services for upgradation of Zojila Kargil Leh section of NH 01 from km391.000(Nimmu) to km430.000 (Leh) from existing NHDL to NH four lane specifications in the UT of Ladakh (39 km approx.) |
RW/SR/Works(13)/Ladakh/2022 |
20/10/2022 |
20/10/2022
|
22/12/2022
Time
11:0Hrs
|
|
| 854 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (Meghalaya) through Bangladesh (approximate length of 80.00 Km). |
NHIDCL/HQ/DPR/Hilli-Mahendraganj/2022 |
30/09/2022 |
20/10/2022
|
05/11/2022
Time
15:0Hrs
|
|
| 855 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-I) |
NHAI/PC/DPR/Port Connectivity MasterPlan/ 2022/(Package-I) |
17/10/2022 |
17/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 856 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-2) |
NHAI/PC/DPR/Port Connectivity MasterPlan/ 2022/(Package-2) |
17/10/2022 |
17/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 857 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-3) |
NHAI/PC/DPR/Port Connectivity MasterPlan/ 2022/(Package-3) |
17/10/2022 |
17/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 858 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan (Package-4) |
NHAI/PC/DPR/Port Connectivity MasterPlan/ 2022/(Package-4) |
17/10/2022 |
17/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 859 |
Consultancy Services for preparation of DPR of Mahuda More (NH-18) to Lututanr (NH-218) Bypass including Land Acquisition, Forest Clearance, R and R and Utility etc. all complete work as per latest guidelines of MoRTH, GOI, New Delhi. |
NH/Dhanbad/11/2022-23 (2nd Call) |
12/10/2022 |
17/10/2022
|
17/11/2022
Time
17:0Hrs
|
|
| 860 |
Consultancy Services for preparation of DPR of Lututanr (NH-218) to Nirsa (NH-19) Bypass including Land Acquisition, Forest Clearance, R and R and Utility etc. all complete work as per latest guidelines of MoRTH, GOI, New Delhi. |
NH/Dhanbad/12/2022-23(2nd Call) |
12/10/2022 |
17/10/2022
|
17/11/2022
Time
17:0Hrs
|
|
| 861 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches on National Highways in the State of Gujarat on Fixed Cost Basis Km 61/658 to Km 105/00 of NH-953 (Ahwa to Maharastra Border) existing IL/2L/2L plus PS/4L |
2022_MoRTH_718002_1 |
14/10/2022 |
14/10/2022
|
16/12/2022
Time
18:0Hrs
|
|
| 862 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches on National Highways in the State of Gujarat on Fixed Cost Basis Km 62/00 to Km 92/320 and Km 115/320 to Km 160/320 of NH-58 (Vadali to Palanpur) including Vadgam Bypass, Vadali Bypass and Chansol Bypass existing 2L/2L plus PS |
2022_MoRTH_717992_1 |
14/10/2022 |
14/10/2022
|
16/12/2022
Time
18:0Hrs
|
|
| 863 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches on National Highways in the State of Gujarat on Fixed Cost Basis Km 221/800 to Km 290/200 of NH-41 (Naliya Jn to Narayan Sarovar) Existing 1L/2L/2L pluc PS |
2022_MoRTH_717972_1 |
14/10/2022 |
14/10/2022
|
16/12/2022
Time
18:0Hrs
|
|
| 864 |
Consultancy Services for preparation of Feasibility/DPR for Construction of 6 lane elevated corridor and its approaches from km 629.860 to km. 634.000 in Ranasthalam town portion, Construction of Grade separated structures at various junctions of NH16 passing through Visakhapatnam City limits from Km 682.980 to Km 741.246 and Construction of 6 lane flyover from Mahanadu Junction in Vijayawada City to Nidamanuru Railway Bridge on NH-16 in the state of Andhra Pradesh |
2022-NHAI-131099-1 |
14/10/2022 |
14/10/2022
|
04/11/2022
Time
15:0Hrs
|
|
| 865 |
Consultancy services for Detailed Project Report preparation for Rehabilitation and Upgradation to 2-lane from km 28.00 o Km 70.00 (Ramnagar to Shankarpur) of NH-121 (New NH-309) with paved shoulder in the State of Uttarakhand. |
2022_MoRTH_716949_1 |
10/10/2022 |
11/10/2022
|
08/12/2022
Time
15:0Hrs
|
|
| 866 |
CS for work of DPR(i)4 Lan of NH919(71B)frm Km26.460 to Km47.100 nd Km54.000 to Km78.900 Palwal (ii)Rehab/Redesg of extng 4Lan rd frm Km17.700 to Km26.460 nd Km49.750 to Km54.000(iii)4 Lan Palwal-Jewar-Alig. rd(NH-334D)Frm RD 0 to 15.66 Km |
RW/CH/HR/W(20)/2022 |
11/10/2022 |
11/10/2022
|
24/11/2022
Time
16:0Hrs
|
|
| 867 |
Consultancy Services for Preparation of DPR including detailed Geological, Geotechnical and Topographical Surveys/Investigations and Design of Cost Effective and Suitable remedial measures for prevention of landslides/rockfall in identified locations (approx. 44 Nos) on Kiratpur-Manali Section of NH-21 in the State of Himachal Pradesh |
131422 |
17/11/2022 |
10/10/2022
|
06/12/2022
Time
11:0Hrs
|
|
| 868 |
Project Management Consultancy services for Widening to 4-lane of NH-07 from Km 46/00 to 96/00 of Kala Amb Paonta Sahib Dehradun road in the State of Himachal Pradesh. |
RO/HP/Works(265)/2022-23/616 |
07/10/2022 |
07/10/2022
|
03/01/2023
Time
15:0Hrs
|
|
| 869 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) INCLUDING LAND ACQUISITION AND FOREST CLEARANCE OF ROAD DIRANG-MANDALA BETWEEN KM 0.000 AND KM 28.000 FROM CL-9 TO NHDL SPECIFICATIONS (NET LENGTH 28 KM) UNDER PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH |
CE (P) VTK/NIT-13/2022-23 |
04/10/2022 |
01/10/2022
|
01/11/2022
Time
12:0Hrs
|
|
| 870 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) ON EXISTING ROAD INCLUDING CONSULTANCY SERVICE FOR CONSTRUCTION OF SHAKTI-KUMROTSAR ROAD FROM KM 0.000 (SHAKTI) TO KM 36.000 (KUMROTSAR) (APPROX NET LENGTH 36.000 KMS) TO NHSL SPECIFICATIONS IN ARUNACHAL PRADESH STATE |
CE (P) VTK/NIT-15/2022-23 |
04/10/2022 |
01/10/2022
|
03/11/2022
Time
12:0Hrs
|
|
| 871 |
PREPARATION OF RECEE SURVEY AND TRACE CUT (RSTC) AND DETAILED PROJECT REPORT (DPR) THROUGH CONSULTANCY FOR CONSTRUCTION OF ROAD KLEMTA-PT 4634 FROM KM 0.00 TO KM 6.00 (APPX NET LENGTH 6.00 KM) TO NHDL SPECIFICATIONS (NEW ROAD) IN TAWANG DISTRICT OF ARUNACHAL PRADESH |
CE (P) VTK/NIT-16/2022-23 |
30/09/2022 |
30/09/2022
|
31/10/2022
Time
12:0Hrs
|
|
| 872 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of ROB at L/C No. 1/Class A Safiyasarai Ch-71.970 of NH-80, L/C No. 5/SPL/T Shivnarayanpur Ch-171.300 of NH-80 and ROB at L/C No. 2/C-T(SPL) Mirzachowk Ch-188.200 of NH-80 in the state of Bihar. |
04/NH-BHAGALPUR/2022-23 |
30/09/2022 |
29/09/2022
|
28/11/2022
Time
17:0Hrs
|
|
| 873 |
CS FOR THE CONSTRUCTION OF NEW CIRCULAR BYPASS FOR(i)BHIWANI HANSI ROAD(NH148B) TO BHIWANI LOHARU ROAD(NH709Extn) VIA BHIWANI TOSHAM ROAD-PARTII(ii)VILLAGE DHIGAWA(iii)VILLAGE-LOHANI-JUI(iv)LOHARU-PILANI ROAD NH709(EXTN) TO LOHARU-SURAJGARH ROAD |
RW/CH/HR/W(388)/2021 |
26/09/2022 |
26/09/2022
|
11/11/2022
Time
11:0Hrs
|
|
| 874 |
Consultancy Services for Feasibility Study and Preparation of DPR for 4-laning of Nangal-Anandpur Sahib-Kiratpur Sahib of NH-503 Extn. (32.83 Km) in the State of Punjab |
RW/CH/W(42)/PB/2022 |
26/09/2022 |
26/09/2022
|
07/11/2022
Time
16:0Hrs
|
|
| 875 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR CARRYING OUT FEASIBILITY STUDY DETAILED SURVEY/ INVESTIGATION ALIGNMENT OPTION PREPARATION OF GENERAL ARANGEMENT DRAWING ENGINEERING REPORT FOR CONSTRUCTION OF PROPOSED FLYOVER BRIDGE AND ITS APPROACHES ALONG WITH SERVICE ROAD AND PREPARATION OF LAND ACQUISITION PAPERS FOR ACQUISITION OF LAND, FOREST CLEARANCE AND UTILITY SHIFTING DETAILS COMPLETE IN ALL RESPECTS ON BATHINDA-DABWALI ROAD AT KM 297.115 ON NH-54 IN DISTT. BATHINDA IN THE STATE OF PUNJAB. |
RW/CH/W(40)/PB/2022 |
22/09/2022 |
23/09/2022
|
28/10/2022
Time
16:0Hrs
|
|
| 876 |
PMC Service for Construction of Highway 2- Lane Tunnel including approaches across the Bageshwar Hills in market area km 130 to km 136 of Rameshwar-Almora of NH-309A in the State of Uttarakhand |
RO/UK/ BAGHESWAR TUNNEL/01 |
23/09/2022 |
23/09/2022
|
16/11/2022
Time
15:0Hrs
|
|
| 877 |
Consultancy Services for preparation of Feasibility cum DPR for development of various Port Connectivity stretches under Port Connectivity Master Plan |
2022_NHAI_129508_1 |
23/09/2022 |
23/09/2022
|
27/10/2022
Time
11:0Hrs
|
|
| 878 |
Package I - Rev (1) DPR for Construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, Improvements of junctions, and Construction of Additional Two-lane Flyover works in the NH-532 (2) DPR for Construction of additional two lane flyovers at Kurinjipadi (km 22/6) and Virudhachalam (Km 51/2) in NH-532 (3) DPR for Construction of Vadalur bypass at Km 28/4 of NH-532 (4) DPR for formation of Bypass to Chengalpet Town on the Eastern Side of NH32 (Old NH45) to join ECR (NH-332A) |
TN.No.12/2022-23/HDO/NH/Dt.22.09.2022 |
27/09/2022 |
22/09/2022
|
08/11/2022
Time
15:0Hrs
|
|
| 879 |
CS FOR FEASIBILITY STUDY DETAILED SURVEY-INVESTIGATION PREPARATION OF GAD DPR FOR CONSTRUCTION OF 4-LANE ROB IN LIEU OF RAILWAY CROSSING NO A-8-A at KM 3-600 on NH-154 (PATHANKOT-KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB |
RW/CH/W(41)/PB/2022 |
22/09/2022 |
22/09/2022
|
28/10/2022
Time
16:0Hrs
|
|
| 880 |
Consultancy Services for Detail Project Report (DPR) for the project of Construction of Chibramau bypass on NH91 of Aligarh to Kanpur section under Bharatmala pariyojna |
2022_NHAI_129837_1 |
10/10/2022 |
22/09/2022
|
07/11/2022
Time
11:0Hrs
|
|
| 881 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF FOLLOWING ROADS UNDER PROJECT UDAYAK IN THE STATE OF ARUNACHAL PRADESH (RECALL) PART-I MIPI-ANDRATHANG FROM KM 20.00 TO KM 50.00 (NET LENGTH 30.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF Part-II CHANGLOHGAM-KEPPAPU FROM KM 16.50 TO KM 22.875 (LENGTH 6.375 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 1 |
CE(P)Udayak/DPR consutancy/04/2022-23 |
21/09/2022 |
21/09/2022
|
08/10/2022
Time
15:0Hrs
|
|
| 882 |
PMC SERVICES FOR Construction of Leh Bypass to 4 Lane Specifications Including LA Utility Shifting(i) Starting Near Phyang Village near HPCL plant and join Leh-Manali Highway(NH-3) near Upshi ii) Bypass road of Leh from NH-01 Saboo-NH-3 |
RW/SR/Works(12)/Ladakh/2022 |
15/09/2022 |
15/09/2022
|
28/11/2022
Time
17:0Hrs
|
|
| 883 |
Preparation of Detailed Project Report DPR for Construction of Bridge with approaches at 1. km 126.744 TEL River on NH 26 and 2. km 92.200 Mahendratanaya River on NH 326A in the State of Odisha |
03-ROBBSR-2022-23/DPR |
15/09/2022 |
15/09/2022
|
14/11/2022
Time
15:0Hrs
|
|
| 884 |
preparation of detailed project report and pre construction activities for construction of Railway Over Bridge on NH 11 (21) (Prithvinath gate, railway crossing no 6A) in district Agra in the state of Uttar Pradesh. |
1808M/13M-NHCK/22 dated 14.09.2022 |
23/09/2022 |
15/09/2022
|
14/10/2022
Time
15:0Hrs
|
|
| 885 |
Consultancy Services for Preparation of DPR for Construction of 2-Lane with paved shoulders bypass (with provision of Tunnels) at Lohaghat (Start of bypass Km 136.325 (Devradi Bend) of NH 9 End of bypass km 142 (Raikot Maher) of NH 9) |
2022_MoRTH_711739_1 |
14/09/2022 |
14/09/2022
|
20/10/2022
Time
16:0Hrs
|
|
| 886 |
CS FOR FEASIBILITY STUDY DETAILED SURVEY-INVESTIGATION PREPARATION OF GAD DPR FOR CONSTRUCTION OF 4-LANE ROB IN LIEU OF RAILWAY CROSSING NO A-8-A at KM 3-600 on NH-154 (PATHANKOT-KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB |
2022_MoRTH_712074_1 |
14/09/2022 |
14/09/2022
|
28/10/2022
Time
16:0Hrs
|
|
| 887 |
PMC for GI with widening to 2 lane with PS from end of proposed Barpeta Bypass to Amingaon passing through important locations of Amingaon, Dodora, Singimari, Hajo, Mukalmua, Rampur, Doulashal, Barpeta, Howly etc.(excluding Barpeta Bypass) on NH-427. |
RW/GHT/PMC/DPR/Tender/AS/661 |
15/09/2022 |
13/09/2022
|
13/10/2022
Time
15:0Hrs
|
|
| 888 |
Consultancy Services for preparation of Detailed Project Report for 4 laning of Gumla to Kolebira section of NH 23 New NH 143 in the State of Jharkhand |
NHAI/RO/RNC/JH/2022-23/8 |
10/09/2022 |
12/09/2022
|
19/10/2022
Time
11:0Hrs
|
|
| 889 |
PMC for 4 lane NH 15 from Baihata Chariali to Start Mangaldoi Bypass connecting NH-15 to NH-27 ( old NH-31 ) (Missing Link) with Junction design and 4 lane of NH-15 from Mangaldoi (excluding Mangaldoi bypass) to Mission Chariali of NH-15 |
RW/GHT/PMC/DPR/Tender/AS/646 |
12/09/2022 |
09/09/2022
|
10/10/2022
Time
15:0Hrs
|
|
| 890 |
PMC services for 4-laning of NH-17(NEW)/31(OLD) from km 816th (Baxirhat (Assam West Bengal Border)) to km 900 (Bilasipara (excluding Gauripur Bypass)) |
RW/GHT/PMC/DPR/Tender/AS/647 |
14/09/2022 |
09/09/2022
|
17/10/2022
Time
15:0Hrs
|
|
| 891 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Taksing-Ghora Camp-Lung OP Road Approved under ICBR (PH-II) Project in the State of Arunachal Pradesh |
2022_NHIDC_708907_1 |
14/09/2022 |
09/09/2022
|
16/09/2022
Time
11:0Hrs
|
|
| 892 |
Project Management Consultancy Services for construction of Highway 2 lane Tunnel including approaches across the Nahan Town on Nahan Sarahan Kumarhatti Road NH 907A from Km 0 00 to Km 5 00 in the State of Himachal Pradesh |
RO/HP/Works(266)/2022-23/526 |
09/09/2022 |
09/09/2022
|
10/11/2022
Time
15:0Hrs
|
|
| 893 |
Consultancy Services for Preparation of Detailed Project Report for rehabilitation and upgradation of NH-52 stretch in Autram Ghat Section (from Km.375 to Km.390) part of Aurangabad – Dhule section of NH-52 in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2022-23/17 |
09/09/2022 |
09/09/2022
|
22/09/2022
Time
11:0Hrs
|
|
| 894 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches on National Highways in the State of Gujarat on Fixed Cost Basis |
2022_MoRTH_710412_1 |
08/09/2022 |
08/09/2022
|
31/10/2022
Time
15:0Hrs
|
|
| 895 |
Consultancy services of Feasibility Report cum DPR for Widening of the existing 2-lane road to 4-lane from Willingdon Island-Kundanoor or alternatively to Aroor-other suitable location on NH-66 to provide connectivity to Cochin Port Trust in Kerala |
NHAI/TECH/PC/ Willingdon-Kundanoor/2022 |
08/09/2022 |
05/09/2022
|
10/11/2022
Time
12:0Hrs
|
|
| 896 |
Consultancy Services for Preparation of DPR for suggesting suitable engg. measures/solution in the rock sliding reach of Km.12.85 to Km14.10and Km 26.00 to Km 28.25 for Upgradation to 2L PS configuration from Kundal to Jhadol sec. NH-58E on EPC mode |
02/2022-23 PWD NH Circle Udaipur |
01/11/2022 |
01/09/2022
|
17/11/2022
Time
11:0Hrs
|
|
| 897 |
PMC Services for Up-gradation to 2 lane with paved shoulders configuration of NH310A starting from its junction with NH 310 near Tashi View Point connecting Penengla, Kabi, Phensong, Phodong, Namok, Rangrang and terminating at Mangan |
RW/GHT/PMC/DPR/Tender/SK/612 |
01/09/2022 |
31/08/2022
|
01/10/2022
Time
15:0Hrs
|
|
| 898 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF FOLOWING ROADS (A) MIPI-ANDRATHANG FROM KM 20.00 TO KM 50.00 (30.0 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER 62 RCC UNDER 752 BRTF AND (B) CHANGLOHGAM-KEPPAPU ROAD FROM KM 16.50 TO KM 22.875 (6.375 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER 116 RCC AOR OF 48 BRTF. (NET LENGTH 36.375 KMS), UNDER THE PROJECT UDAYAK IN THE STATE OF AR.P |
CE(P)Udayak/DPR Consultancy/01/2022-23 |
29/08/2022 |
30/08/2022
|
13/09/2022
Time
15:0Hrs
|
|
| 899 |
Consultancy Services for Preparation of Detailed Project Report for construction of 4 Lane Bypass starting from its junction with Gondia – Tirora Road NH 753 and terminating at its junction with Balaghat - Gondia Road NH 543in Gondia District in the state of Maharashtra |
08/EENH/NGP/2022-23/4302 |
21/09/2022 |
28/08/2022
|
04/10/2022
Time
17:0Hrs
|
|
| 900 |
Consultancy services for Preparation of Feasibility study, detailed project report, Survey and preparation of land plan for widening to Four lane on NH 169 from km 3.00 to 30.00 on Shivamogga - Mangalore Section in the State of Karnataka under Annual Plan 2022-23 |
EE/NH/SMG/AE1/NH169/NIB6/2022-23/1082 |
25/08/2022 |
26/08/2022
|
30/09/2022
Time
16:0Hrs
|
|
| 901 |
Consultancy Services for, Feasibility study, detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Sagara – Havinahalli – Holebaglu – Kalasvalli – Sighandoor – Markutka (junction with NH-766C) in the State of Karnataka |
EE/NHD/SMG /AE-1/NH-766C/Consultancy/NIB04/2ndcall/2022-23/1069 |
23/08/2022 |
23/08/2022
|
23/09/2022
Time
16:0Hrs
|
|
| 902 |
Consultancy Services for Preparation of detailed project report of NH-2B for 4-laning from 00.00 km at Bardhaman to Bolpur and minimum 2-lane with paved shoulder configuration from Bolpur to 105.00 km at Mallarpur to merge with NH-60 in the District of Bardhaman and Birbhum, West Bengal. |
e-NIQ No 01 of 2022-23 |
05/09/2022 |
23/08/2022
|
16/11/2022
Time
11:0Hrs
|
|
| 903 |
preparation of detailed project report and pre construction activities for construction of Railway Over Bridge on NH 11 (21) (Prithvinath gate, railway crossing no 6A) in district Agra in the state of Uttar Pradesh. |
1620M/13M-NHCK/22 dated 18.08.2022 |
26/08/2022 |
20/08/2022
|
06/09/2022
Time
15:0Hrs
|
|
| 904 |
Project Management Consultancy Services for Feasibility study and detailed Engineering for Widening to 2-lane with paved shoulder and geometric improvements of NH-907A from Km 5/00 to Km 78/00 (Nahan to Kumarhatti Stretch) in the State of Himachal Pradesh |
RO/HP/WORKS(280)/2022-23-443 |
18/08/2022 |
18/08/2022
|
06/10/2022
Time
15:0Hrs
|
|
| 905 |
Project Management Consultancy services for Construction of Additional Major Bridge and its approaches across river Teesta (at Sevoke) starting around km 591.60 of NH‐31(New NH-17) in the District of Darjeeling, West Bengal. |
MORT&H/RO-KOL/NIT/PMC/2022-23/02 |
07/09/2022 |
18/08/2022
|
22/12/2022
Time
11:0Hrs
|
|
| 906 |
Detailed Engineering report for Consultancy Services for preparation of Detail Engineering report for Widening from two lane to four lane with paved shoulder from Km 180 500 End of Nagaur Bypass to 267 500 Netra Village on NH 62 |
01/2022-23-SE-NH-BK-NIT |
01/09/2022 |
17/08/2022
|
29/09/2022
Time
12:0Hrs
|
|
| 907 |
Consultancy services of Feasibility Report cum Detailed Project Report for 4 Laning of Sitarganj-Tanakpur (Km 0 to Km 52.2) section of NH-125 in the state of Uttarakhand |
2021-NHAI-125837-1 |
18/08/2022 |
17/08/2022
|
16/09/2022
Time
11:30Hrs
|
|
| 908 |
Consultancy Services for Preparation of Feasibility/ DPR for widening to two lane with paved shoulder from Km 5.00 to 48.20 (Hulsur to Halbarga Section) of NH-752K in the state of Karnataka. |
ENHD/KLB/DPR/TENDER/22-23/578 |
16/08/2022 |
16/08/2022
|
22/09/2022
Time
17:0Hrs
|
|
| 909 |
Consultancy Services for Preparation of Detailed Project Report for construction of 4 Lane Bypass starting from its junction with Gondia – Tirora Road NH 753 and terminating at its junction with Balaghat - Gondia Road NH 543in Gondia District in the state of Maharashtra. |
08/EENH/NGP/2022-23/3873 |
29/08/2022 |
12/08/2022
|
09/09/2022
Time
17:0Hrs
|
|
| 910 |
Consultancy Services for DPR Preparation for 4 / 6 Laning with 7.0m service road on either side of Ranchi circumferential road starting from Urkid (NH-20) - Brombey (NH-75) - Kurgi (NH-43) - Phudi (NH-75Ext.) - Harbul (NH-33) and terminated at Urkid (NH-20) with spurs road (Total Length- 195 Km) in the State of Jharkhand on EPC mode including Land Acquisition, Forest Clearance and Utility Shifting etc |
2022_MoRTH_705593_1 |
29/08/2022 |
12/08/2022
|
28/09/2022
Time
17:0Hrs
|
|
| 911 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Construction of Railway Over Bridge on NH 753 at Km. 46.300 in Gondia City (L.C. No. GJ1A-SPL/3E on Balaghat to Gondia line section between Nagra to Gondia) on Kohmara - Gondia - Tirora - Tumsar - Ramtek Road NH 753 in Gondia District in the state of Maharashtra. |
07/EENH/NGP/2022-23/3872 |
21/09/2022 |
12/08/2022
|
30/09/2022
Time
17:0Hrs
|
|
| 912 |
Detailed Engineering report for Consultancy Services for preparation of Detail Engineering report for construction Of Nagaur Bypass (Balance length) from existing Km 161/000 (Amarpura at old NH-65) to Km 173/100 (Gogelao on NH-62) |
04/2022-23 |
16/08/2022 |
10/08/2022
|
29/09/2022
Time
12:0Hrs
|
|
| 913 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of Elevated corridor Anishabad (Patna) - Phulwari - AIIMS (7.00 Km) on Anishabad - Aurangabad - Hariharganj Road, NH-98 (New NH-139) in the state of Bihar. |
NH-12030/4/2022-RO Patna |
06/08/2022 |
06/08/2022
|
15/09/2022
Time
11:0Hrs
|
|
| 914 |
Consultancy Services for Feasibility Study and Preparation of DPR for Widening and Strengthening to 2-Lane with Paved Shoulder in Km 0 to 115 (Bariyarpur to Vamdah) of NH-333 in the State of Bihar. |
02 /NH-LAKHISARAI /2022-23 |
04/08/2022 |
05/08/2022
|
10/10/2022
Time
17:0Hrs
|
|
| 915 |
Consultancy Services for Preparation of Feasibility study and DPR for Construction of 4laning of Masrakh to Chakia Km 86 to Km 143 of NH227A and Chakia to Bhitha more Km 0 to 104 of old NH104 New NH227 section of RamJanki Marg in the State of Bihar. |
NH-12014/64/2022-RO Patna |
14/09/2022 |
02/08/2022
|
02/12/2022
Time
11:0Hrs
|
|
| 916 |
Consultancy Services for Preparation of Detail Engineering report for Widening and strengthening to 2 lanes with paved Shoulders of Pratapgarh - Padi Section (Km. 80.00 to Km. 180.00) of NH-113 |
01/2022-23 |
06/08/2022 |
01/08/2022
|
06/09/2022
Time
11:0Hrs
|
|
| 917 |
Consultancy Services for Preparation of Feasibility/DPR for Widening or Reconstruction of major bridge across Bennihalla at Km 160.900 on Bijapur –Hubli section of NH-218 in the State of Karnataka |
EENH/HBL/883 |
01/08/2022 |
30/07/2022
|
11/01/2023
Time
17:0Hrs
|
|
| 918 |
Consultancy Services for Preparation of Feasibility/DPR for Construction of New Bypass to Hubballi-Dharwad cities connecting NH-218(Near Kusugal) and NH-48(Near Narendra) in the State of Karnataka |
EENH/HBL/882 |
30/07/2022 |
30/07/2022
|
26/09/2022
Time
17:0Hrs
|
|
| 919 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND PROVIDING PRE-CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF HIGHWAY TUNNEL BETWEEN KM 10.250 TO KM 10.650 ON MALLING ALTERNATE ROUTE (MAR) UNDER 108 RCC/759 BRTF/PROJECT DEEPAK IN THE STATE OF HIMACHAL PRADESH |
CE (P) DPK/10 of 2022-23 |
29/07/2022 |
29/07/2022
|
20/10/2022
Time
12:0Hrs
|
|
| 920 |
Consultancy Services Preparation of Detail Engineering Report for Widening to lane of Mahwa to Mandawar section of NH_921 and ROB LC No.-95 on Alwar Nuh section of NH-248A |
2022_MoRTH_700859_1 |
27/07/2022 |
27/07/2022
|
16/08/2022
Time
18:0Hrs
|
|
| 921 |
Consultancy Services for Preparation of Feasibility/DPR for Widening to Two lane with paved shoulders from km 41.90 to 84.30, 88.20 to 105.25, 148.23 to 161.55, 166.35 to 174.13, 176.12 to 186.55 and 191.90 to 192.90 on NH 766C of Byndoor –Ranebennur section in State of Karnataka |
EE/NHD/SMG/AE1/NH-766C/NIB30/2ndcall/839.. |
22/08/2022 |
26/07/2022
|
23/08/2022
Time
16:0Hrs
|
|
| 922 |
Consultancy Services for Preparation of Feasibility/DPR for Widening to Two lane with paved shoulders from km 41.90 to 84.30, 88.20 to 105.25, 148.23 to 161.55, 166.35 to 174.13, 176.12 to 186.55 and 191.90 to 192.90 on NH 766C of Byndoor –Ranebennur section in State of Karnataka |
EE/NHD/SMG/AE1/NH-766C/NIB30/2ndcall/839 |
26/07/2022 |
26/07/2022
|
17/08/2022
Time
16:0Hrs
|
|
| 923 |
Project Management Consultancy Services for feasibility study and detailed engineering for rehabilitation and up gradation of NH 154A from km 84 00 to km 93 00 and km 130 00 to km 172 00 in the State of Himachal Pradesh |
RO/HP/Works (277)/2022-23/327 |
22/07/2022 |
22/07/2022
|
06/09/2022
Time
15:0Hrs
|
|
| 924 |
Consultancy Services for Preparation of Detailed Project Report for Widening to 4 lane existing ROB Including Detailed Estimate and Design etc on Barshi Yedashi Latur Udgir Degloor road NH 63 at Ch 83 600 Near Harangul Railway Station 2nd Call |
2022_MoRTH_702036_1 |
21/07/2022 |
20/07/2022
|
03/08/2022
Time
17:0Hrs
|
|
| 925 |
Consultancy Services for Preparation of DPC for Widening to 4 lane existing ROB including Detailed Estimate Design etc on Parali Pimpala Dahiguda Section NH 548B at Km 96 900 Shyama Prasad Mukharji ROB 2nd Call |
2022_MoRTH_701885_1 |
21/07/2022 |
20/07/2022
|
03/08/2022
Time
17:0Hrs
|
|
| 926 |
Consultancy Services for Detailed Project Report Preparation for Construction of Four lane Udgir city Eastern Bypass road on NH 50 in the State of Maharashtra Tentative Length 4 00 Km |
2022_MoRTH_702052_1 |
21/07/2022 |
20/07/2022
|
08/08/2022
Time
15:0Hrs
|
|
| 927 |
Consultancy services for Feasibility study and Preparation of detailed project report including LA and other clearances for construction of Jehanabad Bypass connecting NH33 and NH83 in the State of Bihar |
03-NH/GAYA/DPR/2022-23 |
29/09/2022 |
20/07/2022
|
06/10/2022
Time
15:0Hrs
|
|
| 928 |
Project Management Consultancy Services for Construction of 2 Lane Highway Tunnel including Approaches to Bypass Pauri Town on Kotdwar _Satpuli _Pauri_Srinager Road of NH_534 old NH 119 in the State of Uttarakhand |
RO/UK/PAURI TUNNEL/01 |
18/07/2022 |
19/07/2022
|
08/09/2022
Time
15:0Hrs
|
|
| 929 |
Consultancy Services for Preparation of Detailed Project Report for 4/6 lanes 4/6 lane with Paved Shoulder configuration for the stretch of Gwalior-Bhind upto MP/UP Border (NH-92) Total length 108 Km in the State of Madhya Pradesh |
2021-MoRTH-649159-2 |
01/08/2022 |
16/07/2022
|
12/09/2022
Time
17:30Hrs
|
|
| 930 |
Consultancy Services for Detailed Project Report Preparation of Detailed Design and Land Acquisition of Ashtamode ROB (Tentative Length 1.0 Km) on NH 63 In the state of Maharashtra 3 calll |
2022_MoRTH_701099_1 |
20/07/2022 |
15/07/2022
|
03/08/2022
Time
17:0Hrs
|
|
| 931 |
Consultancy services for preparation of Feasibility Report cum DPR for Upgradation to six laning of (i) Hoskote-Mulbagal section from Existing Chainage Km 237.700 to Existing Chainage Km 302.000 and Mulbagal-KNT/AP Border section from Existing Chainage Km 216.912 to Km 239.100 (ii) Existing 6 lane Hoskote-Mulbagal section for accessing any additional structure/any other facilities from Existing Chainage Km 302.000 to Existing Chainage Km 318.000 Km of NH-75 in the state of Karnataka |
NHAI/KNT/Hoskote-Mulbagal-KNT/AP Border/2022/137035 |
21/07/2022 |
13/07/2022
|
12/08/2022
Time
11:0Hrs
|
|
| 932 |
Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh. |
Ar.P/RSA/Pasighat Bypasss/2022-23/RO-Ita |
18/07/2022 |
12/07/2022
|
26/08/2022
Time
11:0Hrs
|
|
| 933 |
Consultancy services for preparation of detailed project report for development of NH-114A from Km 138 to Km 290.7 excluding Deoghar bypass and Giridih bypass in the State of Jharkhand |
RW/Ranchi/AP-04/2022-23 |
26/07/2022 |
09/07/2022
|
08/08/2022
Time
17:0Hrs
|
|
| 934 |
Consultancy services for Feasibility study and detailed project report of 2-laning/4-laning from Naubatpur to Hariharganj of existing [Anisabad (Patna)-Arwal-Aurangabad-Hariharganj ] Section of NH-139 in Bihar. |
05-NH/AUR/DPR/2022-23 |
15/07/2022 |
06/07/2022
|
05/09/2022
Time
17:0Hrs
|
|
| 935 |
Consultancy Services for preparation of DPR for Capacity Augmentation of Existing 6-lane Highway of Jaipur-Kishangarh section from Ch. 273.500 to Ch. 363.885 of NH-8 (New NH-48) in the State of Rajasthan |
2022_NHAI_121253_1 |
23/07/2022 |
04/07/2022
|
03/08/2022
Time
11:0Hrs
|
|
| 936 |
Consultancy services for preparation of detailed project report for development of NH-133 from Km 94.00 to Km 131.00 in Dumka and Deoghar district in the State of Jharkhand |
RW/Ranchi/AP/06/2022-23 |
26/07/2022 |
30/06/2022
|
16/08/2022
Time
15:0Hrs
|
|
| 937 |
PACKAGE-I (1) DPR for Construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, Improvements of junctions, and Construction of Additional Two-lane Flyover works in the NH-532 (2) DPR for Construction of additional two lane flyovers at Kurinjipadi (km 22/6) and Virudhachalam (Km 51/2) in NH-532 (3) DPR for Construction of Vadalur bypass at Km 28/4 of NH-532 |
TN.No.07/2022-23/HDO/NH/Date.28.06.2022 |
30/06/2022 |
28/06/2022
|
17/08/2022
Time
15:0Hrs
|
|
| 938 |
Consultancy Services for preparation of DPR for 4-laning from existing stretch of 2 lane with paved shoulder of approx. length of 85.800 kms on NH-765 from Hyderabad (Tukkuguda) to Dindi (from Ch.23.000 km at Ch. 108.800 km) in the state of Telangana |
2022_NHAI_119644_1 |
28/06/2022 |
20/06/2022
|
11/08/2022
Time
11:0Hrs
|
|
| 939 |
1. Widening to 2 lane with paved shoulder from Km 99/0 - km 119/0 of NH 49 Extn (New NH 85) on EPC Mode, 2. Construction of Grade Separator in km 67/10 of NH 49 Extn. (New NH 85) on EPC Mode |
TN.No.06/DO/NH/2022/Dt. 17.06.2022 |
17/06/2022 |
17/06/2022
|
18/08/2022
Time
15:0Hrs
|
|
| 940 |
Consultancy Services for Preparation of Feasibility/DPR for Out1er Ring Road to Gadag-Betageri Twin City in Gadag Taluka Gadag District SH-45( Arabhavi-Chellikere Road) intersection @ Km132.45 to, SH-06 ( Karwar-Ilkal Road Km 225.00 ),Intersection and to NH-63 Km 195.470.( @ VUP )Intersection |
EENHDHubli/2022-23/498 |
16/06/2022 |
16/06/2022
|
14/07/2022
Time
15:0Hrs
|
|
| 941 |
Consultancy Services for Detailed Project Report Preparation for Ashtamode ROB (Tentative Length 1.0 km) On NH 63 in the state of Maharashtra(2nd Call) |
2022_MoRTH_695521_1 |
21/06/2022 |
16/06/2022
|
29/06/2022
Time
17:0Hrs
|
|
| 942 |
Consultancy Services for DPR preparation for 4-laning from Km.519.150 to Km.545.176 section of NH-53 passing through Badrama Wildlife Sanctuary Portion in the State of Odisha. |
2022-NHAI-119201-1 |
28/06/2022 |
16/06/2022
|
01/08/2022
Time
11:0Hrs
|
|
| 943 |
Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at the following locations in the State of Uttarakhand. (i) Nainital-Bhavali Road Cantonment Board Land, Nainital (ii) Nainital-Haldwani Road near Rajkiya Vaidhshala, first Bend, Nainital |
2022_NHIDC_694480_1 |
15/06/2022 |
15/06/2022
|
05/08/2022
Time
12:0Hrs
|
|
| 944 |
Consultancy Services for preparation of DPR for development of improvement from Km.0.000 to km 67.400 of Bhubaneswar-Puri Section of NH-316 (Old NH-203) in the State of Odisha |
NHAI/11011/37/RO/OD/2022 |
29/06/2022 |
14/06/2022
|
01/08/2022
Time
11:0Hrs
|
|
| 945 |
Consultancy Services for Detailed Project Report Preparation for Widening of existing ROB to four lane on Barshi - Yedashi - Latur - Udgir - Degloor Road NH 63 at Ch.83/600 (Near Harangul Railway Station) |
NIT No.05/EENHD/Latur/971/2022 |
17/06/2022 |
09/06/2022
|
29/06/2022
Time
17:0Hrs
|
|
| 946 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Up-gradation & Widening of road to two lane with paved shoulders from Udaipur to Srimantapur (Indo- Bangladesh Border) via Sonamura (approximate length of 35.000 Km) on existing SH-06 in the State of Tripura for providing better road connectivity to Comilla in Bangladesh. |
NHIDCL/Tripura/ DPR/Udp--Snmr/2022 |
06/06/2022 |
08/06/2022
|
15/06/2022
Time
15:0Hrs
|
|
| 947 |
Consultancy services for feasibility study and detailed Engineering for Construction of 4 lane flyover on NH 503 extn. between km. 31.00 to 35.00 or by pass to Una town in the state of Himachal Pradesh |
RO/HP/Works(236)/2022-23/201 |
08/06/2022 |
08/06/2022
|
25/07/2022
Time
17:0Hrs
|
|
| 948 |
Consultancy Services for Feasibility/Detail Project Report of elevated road from Thanagazi to Natni ka bara (via Bharatri Tiraha, Kushalgarh Tiraha) section of NH 248A (old SH 29A) |
2022_MoRTH_692274_1 |
08/06/2022 |
08/06/2022
|
07/07/2022
Time
18:0Hrs
|
|
| 949 |
PMC Services for preparation of DPR, pre-construction activity and construction supervision of 2-Laning with paved shoulder from Mokokchung to Zunheboto, Chozuba to Phek and from Losami Junction to Meluri on NH-702A in the State of Nagaland |
RW/GHT/NG/PMC/702A/2022-23/260 |
08/06/2022 |
08/06/2022
|
04/08/2022
Time
15:0Hrs
|
|
| 950 |
PMC Services for preparation of detailed project report, pre-construction activity and construction supervision of 2-Laning with paved shoulder from Mokokchung to Watiyim (Length-70.00 Km) on NH- 702D in the State of Nagaland |
RW/GHT/NG/PMC/702D/2022-23/261 |
09/06/2022 |
08/06/2022
|
04/08/2022
Time
15:0Hrs
|
|
| 951 |
PROJECT MANAGEMENT CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT, PRE-CONSTRUCTION ACTIVITY AND CONSTRUCTION SUPERVISION OF 2-LANING WITH PAVED SHOULDER ON NH-306A IN MIZORAM |
RW/GHT/MZ/PMC/306A/2022-23 |
08/06/2022 |
03/06/2022
|
25/07/2022
Time
15:0Hrs
|
|
| 952 |
PMC Services for Up-gradation to 2 lane with paved shoulders configuration of NH310A starting from its junction with NH 310 near Tashi View Point connecting Penengla, Kabi, Phensong, Phodong, Namok, Rangrang and terminating at Mangan |
No RW/GHT/PMC/DPR/Tender/SK |
31/05/2022 |
30/05/2022
|
14/07/2022
Time
14:0Hrs
|
|
| 953 |
Consultancy Services for preparation of Detailed Project Report for Tunnel Car Parking at Kempty fall (Mussoorie) in the State of Uttarakhand (3rd call). |
2022_NHIDC_691828_1 |
31/05/2022 |
30/05/2022
|
06/06/2022
Time
11:0Hrs
|
|
| 954 |
Consultancy Services for Development of NH-114A from Km 138 to Km 290.7 excluding Deoghar Bypass in the State of Jharkhand |
RW/Ranchi/AP-04/2022-23 |
01/06/2022 |
27/05/2022
|
11/07/2022
Time
17:0Hrs
|
|
| 955 |
Consultancy services for preparation of detailed project report for development of NH-114A from Km 12.325 to Km 62.00 in Deoghar district in the State of Jharkhand. |
RW/Ranchi/AP-03/2022-23 |
01/06/2022 |
25/05/2022
|
21/07/2022
Time
15:0Hrs
|
|
| 956 |
Preparation of Feasibility study and Detailed Project report for construction of 4-laning of Chakia to Bhitha More section of Ram Janki Marg with land acquisition in Bihar |
01/NH-SITAMARHI/2022-23 |
31/05/2022 |
25/05/2022
|
19/07/2022
Time
17:0Hrs
|
|
| 957 |
Consultancy Services for preparation of DPR for development of Greenfield Access Controlled Highway from Patna to Purnia in the State of Bihar under Bharatmala Pariyojana Phase-II |
2022_NHAI_116959_1 |
30/05/2022 |
25/05/2022
|
02/08/2022
Time
11:0Hrs
|
|
| 958 |
PREP OF RSTC (RECCE SURVEY AND TRACE CUT) AND DPR FOR CONST OF ROAD LOWER GOMPA-SHYARO-JANGDA-BROKSAR FROM KM 0.00 TO KM 18.270 (EXISTING NET LENGTH-18.270 KM) TO NHSL SPECIFICATIONS UNDER 763 BRTF PROJECT VARTAK IN ARUNACHAL PRADESH STATE |
CE (P) VTK/01/2022-23 |
24/05/2022 |
24/05/2022
|
29/06/2022
Time
12:0Hrs
|
|
| 959 |
Consultancy Services for Detailed Project Report Preparation for Ashtamode ROB (Tentative Length 1.0 km) On NH 63 in the state of Maharashtra |
2022_MoRTH_690165_1 |
24/05/2022 |
23/05/2022
|
14/06/2022
Time
17:0Hrs
|
|
| 960 |
Consultancy services for preparation of Detailed Project Report (DPR) for the development of Nasrullaganj to Badi stretch (Length 94 Km) in the state of Madhya Pradesh |
2022_NHAI_116549_1 |
16/06/2022 |
20/05/2022
|
27/06/2022
Time
11:30Hrs
|
|
| 961 |
Consultancy Services for Preparation of Feasibility/DPR for the work of Widening to four lane from 100.00 to 106.00 and Km.112.800 to Km.128.850 of NH-63 Ankola-Gooty section in the State of Karnataka |
EENHDHubli/2022-23/270 |
16/05/2022 |
16/05/2022
|
25/06/2022
Time
17:0Hrs
|
|
| 962 |
PMC for preparation of Detailed Project Report, Pre construction activity and Construction supervision for the work of Widening / Upgradation to 4L from Km. 472.00 to 505.00 of NH-730 i/c Maharajganj bypass in the state of U.P. |
CE-RO/LKO/PMC/Lot-V/2021-22 Dated.13.05.2022 |
01/06/2022 |
13/05/2022
|
25/07/2022
Time
15:0Hrs
|
|
| 963 |
PMC for preparation of Detailed Project Report, Pre construction activity and Construction supervision for the work of Widening / Upgradation to 4L from Km. 564.00 to 603.00 of NH-730 in the state of U.P. |
CE-RO/LKO/PMC/Lot-VI/2021-22 Dated.13.05.2022 |
01/06/2022 |
13/05/2022
|
25/07/2022
Time
15:0Hrs
|
|
| 964 |
Consultancy Services for Detailed Project Report Preparation for Construction of four lane Udgir city Northern Bypass road on NH 63 in the state of Maharashtra. (Tentative Length 8.20 km). |
2022_MoRTH_688769_1 |
13/05/2022 |
12/05/2022
|
23/05/2022
Time
17:0Hrs
|
|
| 965 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Sagara-Havinahalli -Holebaglu - Kalasvalli -Sighandoor - Markutka (junction with NH-766C) in the State of Karnataka. |
EE/NHD/SMG/AE1/NH766C/consultancy/NIB04/2022-23/246 |
10/05/2022 |
10/05/2022
|
09/06/2022
Time
16:0Hrs
|
|
| 966 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of New NHs the highway starting from its junction with NH-37 near Pailapool connecting Jaipur, Harinagar, Kumarcherra, Zinam, Hagrum and terminating at its junction with NH-137(Mahur-Tamenglomg Road) in the state of Assam |
NHIDCL/Assam/DPR/ Pailapool/2021/202941 |
25/04/2022 |
09/05/2022
|
26/05/2022
Time
15:0Hrs
|
|
| 967 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Two lane Highway Handenbroke-Zingpal Between Coordinates 34042-52.97-N, 76040-15.53-E (5 Km from Handenbroke End) and 34044-27.49-N, 76045-42.16-E (Km 4.013 from Zingpal end) in the Union Territory of Ladakh |
CE(P) Vijayak/02/2022-23 |
02/05/2022 |
05/05/2022
|
04/07/2022
Time
12:0Hrs
|
|
| 968 |
Consultancy Services for preparation of DPR for Construction of Elevated corridor / at grade Improvements to 2-lane / 4-lane from km 128.6 to km 191.100 of Hyderabad - Srisailam Section of NH-765 in the state of Telangana under Annual Plan 2022-23 on EPC mode |
SE RandB NH HYD 01 2022-23 dt. 16.04.2022 |
30/05/2022 |
05/05/2022
|
20/06/2022
Time
15:0Hrs
|
|
| 969 |
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Supaul Bypass on NH-327(E)in the State of Bihar |
NIT No.01/NH-MADHEPURA/2022-23 |
06/07/2022 |
05/05/2022
|
25/08/2022
Time
17:0Hrs
|
|
| 970 |
Consultancy Services for preparation of DPR for 4 laning from Ghaziabad /Hapur to Kanpur/Unnao Greenfield alignment via Farrukhabad (tentative length 380 Km) |
NHAI/11013/DPR/G-A Green Field/IV/2022/146850 |
06/05/2022 |
02/05/2022
|
07/06/2022
Time
11:0Hrs
|
|
| 971 |
PREP OF RSTC (RECCE SURVEY AND TRACE CUT) AND DPR FOR CONST OF ROAD LOWER GOMPA-SHYARO-JANGDA-BROKSAR FROM KM 0.00 TO KM 18.270 (EXISTING NET LENGTH-18.270 KM) TO NHSL SPECIFICATIONS UNDER 763 BRTF PROJECT VARTAK IN ARUNACHAL PRADESH STATE |
CE (P) VTK/01/2022-23 |
30/04/2022 |
30/04/2022
|
21/05/2022
Time
12:0Hrs
|
|
| 972 |
Preparation of Detailed Project Report for Construction of Bypass to Harur Town from Km.49/500 – 55/0 of NH 179A |
TN.No.01/2022-23/ DO/ Date. 29.04.2022 |
28/05/2022 |
29/04/2022
|
22/06/2022
Time
15:0Hrs
|
|
| 973 |
Preparation of Detailed Project Report for Construction of Bypass to Varatanapalli Town from km.7/0-9/0 of 2019 (New NH 42) |
TN.No.01/2022-23/ DO/ Date. 29.04.2022 (Sl No.2) |
28/05/2022 |
29/04/2022
|
22/06/2022
Time
15:0Hrs
|
|
| 974 |
Preparation of Detailed Project Report of Development of Kathua-Bhasoli-Bani-Bhaderwah-Doda state road to connect NH-44 with NH-244 (250 Km) to four lane NH standards under Bharatmala Phase IIA, Development of Bhaderwah-Chamba state road as extension to NH-154A to connect with NH-244 (130 Km) to four lane NH standards, and Development of Tawi Bridge(4th)- Satwari-Jammu Airport- Miran Sahib-R.S- Pura- Suchetgarh (old Jammu- Sialkot) Road (30 Km) to four/six lane NH standards |
2022_NHAI_114318_1 |
04/05/2022 |
28/04/2022
|
12/07/2022
Time
11:0Hrs
|
|
| 975 |
Consultancy services for preparation of Detailed Project Report (DPR) for Construction of 04 lane Elevated Corridor/ Double Decker flyover in the District of Prayagraj. |
CE-RO/LKO/DPR/PIU-PRG Dated.25.04.2022 |
27/04/2022 |
25/04/2022
|
15/06/2022
Time
11:0Hrs
|
|
| 976 |
DPR for construction of Lohaghat and Pithoragarh bypass of NH-9 |
2022_MoRTH_685204_1 |
29/04/2022 |
23/04/2022
|
24/05/2022
Time
16:0Hrs
|
|
| 977 |
Consultancy Services for preparation of Detailed Project Report (DPR) for 4 lane Ring Road around Mathura Vridavan of NH-19 |
CE-RO/LKO/DPR/2022-23 Dated.23.04.2022 |
26/04/2022 |
23/04/2022
|
07/06/2022
Time
11:0Hrs
|
|
| 978 |
Consultancy Services for Preparation of Detailed Project Report and providing services for Pre-Construction activities in respect of Up-gradation & Widening of road to two lane with paved shoulders from Udaipur to Srimantapur (Indo- Bangladesh Border) via Sonamura (approximate length of 35.000 Km) on existing SH-06 in the State of Tripura for providing better road connectivity to Comilla in Bangladesh. |
NHIDCL/Tripura/DPR/Udp-Snmr/2022 |
18/04/2022 |
22/04/2022
|
13/05/2022
Time
15:0Hrs
|
|
| 979 |
Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at Kampty fall (Mussoorie) in the State of Uttarakhand |
2022_NHIDC_684993_1 |
27/04/2022 |
21/04/2022
|
11/05/2022
Time
15:0Hrs
|
|
| 980 |
PROJECT MANGEMENT CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT PROVIDING PRE-CONSTRUCTION ACTIVITIES AND CONSTRUCTION SUPERVISION FOR CONSTRUCTION OF HIGHWAY TUNNEL INCLUDING APPROACHES TO BYPASS CHIYALIK ZIGS BETWEEN KM 19.17 AND 37.60 ON NH-09 |
Bharatmala/21-22/Chiyalik Bypass |
13/04/2022 |
13/04/2022
|
14/06/2022
Time
16:0Hrs
|
|
| 981 |
Consultancy Services for preparation of DPR for construction of 4-lane greenfield Bypasses in Mohanlalganj & Bacchhrawa for NH -30,Gosaiganj , Haiderganj & Gangaganj for NH 731,Lalganj, Mohanganj & Raniganj for NH 31 and Jayas for NH 128 in the state of UP |
2022_NHAI_112785_1 |
12/04/2022 |
12/04/2022
|
27/06/2022
Time
13:0Hrs
|
|
| 982 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Two lane Highway Tunnel including approaches across Hamboting La, in the Union Territory of Ladakh |
CE(P) Vijayak/01/2022-23 |
09/04/2022 |
11/04/2022
|
25/06/2022
Time
12:0Hrs
|
|
| 983 |
PROJECT MANAGEMENT CONSULTANCY SERVICES FOR UP-GRADATION TO 2 LANE WITH PAVED SHOULDERS CONFIGURATION OF NH310A STARTING FROM ITS JUNCTION WITH NH 310 NEAR TASHI VIEW POINT CONNECTING PENENGLA, KABI, PHENSONG, PHODONG, NAMOK, RANGRANG AND TERMINATING AT MANGAN IN THE STATE OF SIKKIM FOR A LENGTH OF 58.0 KM APPROX. |
01/CE(NH)/RBD/2022-23 |
11/04/2022 |
11/04/2022
|
08/06/2022
Time
11:0Hrs
|
|
| 984 |
Consultancy services for preparation of Detailed Project report (DPR) for Construction of flyover at km 163.5-165.3 (Thangachimadam Detailed Project Report) of NH 49 and Providing wayside amenities (Rest area) including development of Arichalmunai of NH 49 (Package - IX). |
TN.NO.1/HDO/NH/2022-23/08.04.2022 |
08/04/2022 |
08/04/2022
|
22/06/2022
Time
15:0Hrs
|
|
| 985 |
Consultancy Services for Preparation of Feasibility/ DPR for widening to two lane with paved shoulder from Km 0.00 to Km 49.09 (Miriyan near Telangana Border to Bapur at Junction of NH-65 via Chincholi Section) of NH-167N in the state of Karnataka |
ENHD/KLB/DPR/TENDER/22-23/23. |
06/04/2022 |
06/04/2022
|
20/04/2022
Time
17:30Hrs
|
|
| 986 |
Consultancy services for Feasibility study and detailed project report of separate twolane road on bank of Varun-Sone canal from Naubatpur to Daudnagar and 4-laning of Daudnagar- Aurangabad-Hariharganj section for Patna-Aurangabad-Hariharganj Section of NH-139 in Bihar. |
05-NH/AUR/DPR/2021-22 |
13/05/2022 |
06/04/2022
|
22/06/2022
Time
17:0Hrs
|
|
| 987 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 4 Lane elevated Road from Km 162 to Km 164 Vidhansabha chowk to Mohkampur flyover and Improvement of Jogiwala Junction in Km 164 on NH 72 New NH 07 in the State of UK |
2022_MoRTH_682013_1 |
04/04/2022 |
04/04/2022
|
18/05/2022
Time
15:0Hrs
|
|
| 988 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package VI) |
TN.No.01/DO/NH/2022/Dt. 01.04.2022 |
03/04/2022 |
01/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 989 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package VII) |
TN.No.02/DO/NH/2022/Dt. 01.04.2022 |
03/04/2022 |
01/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 990 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package VIII) |
TN.No.03/DO/NH/2022/Dt. 01.04.2022 |
03/04/2022 |
01/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 991 |
Consultancy services for preparation of Detailed Project report (DPR) for Construction of Western Bypass to Madurai town from Kappalur to Vadipatti on EPC Mode in the State of Tamil Nadu. |
TN.No.04/DO/NH/2022/Dt. 01.04.2022 |
03/04/2022 |
01/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 992 |
PACKAGE-II (1. Preparation of DPR for Study of Landslide Mitigation in GHAT Section from Km 0/00 – 2/4 of NH-234, 2. DPR for 4 laning of NH – 234 from Km 0/0 to Km 202/60 (excluding Vellore, Gudiyatham Bypass, Vettavalam & Kaniyambadi Bypass and Km 0/0 – 2/4 GHAT Section)) |
TN.No.34/2021-22/HDO/NH/Dt.30.03.2022 |
01/04/2022 |
31/03/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 993 |
PACKAGE-I (1) DPR for Construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, Improvements of junctions, and Construction of Additional Two-lane Flyover works in the NH-532 (2) DPR for Construction of additional two lane flyovers at Kurinjipadi (km 22/6) and Virudhachalam (Km 51/2) in NH-532 (3) DPR for Construction of Vadalur bypass at Km 28/4 of NH-532 |
TN.No.33/2021-22/HDO/NH/Dt.30.03.2022 |
01/04/2022 |
31/03/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 994 |
Consultants for the Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package V) |
TN.No.22/DO/NH/2021/Dt. 30.03.2022 |
31/03/2022 |
30/03/2022
|
08/06/2022
Time
15:0Hrs
|
|
| 995 |
PMC for Construction of Additional Major Bridge and its approaches across river Teesta at Sevoke starting around km 591.60 of NH-31 New NH10 in the District of Darjeeling West Bengal. |
e-NIQ No.-03 of 2021-22 of SENHPDC |
01/04/2022 |
29/03/2022
|
17/06/2022
Time
14:0Hrs
|
|
| 996 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package III) |
TN.No.30/HDO/NH/2021-22/Dt.29.03.2022 |
18/04/2022 |
29/03/2022
|
09/06/2022
Time
15:0Hrs
|
|
| 997 |
Consultancy services for preparation of Detailed Project report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Tamil Nadu ( Package IV) |
TN.No.31/HDO/NH/2021-22/Dt.29.03.2022 |
23/04/2022 |
29/03/2022
|
09/06/2022
Time
15:0Hrs
|
|
| 998 |
Consultancy Services for preparation of DPR for development of Tunnel from Dehradun/Rishikesh to Tehri in the State of Uttarakhand |
2022_NHAI_111287_1 |
06/04/2022 |
26/03/2022
|
27/04/2022
Time
11:0Hrs
|
|
| 999 |
Consultancy Services for Preparation of Feasibility/DPR for Widening to Two lane with paved shoulders from km 41.90 to 84.30, 88.20 to 105.25, 148.23 to 161.55, 166.35 to 174.13, 176.12 to 186.55 and 191.90 to 192.90 on NH 766C of Byndoor –Ranebennur section in State of Karnataka. |
EE/NHD/SMG/AE1/NH-766C/NIB30/2534 |
24/03/2022 |
24/03/2022
|
25/04/2022
Time
16:0Hrs
|
|
| 1000 |
PROJECT MANAGEMENT CONSULTANCY SERVICES FOR Construction of Elevated Road in Jodhpur city portion from Krishi Mandi circle (Mandore) to Akhaliya Chouraha |
2022-NHAI-110851-1 |
20/04/2022 |
23/03/2022
|
28/04/2022
Time
11:0Hrs
|
|
| 1001 |
Preparation of Detailed Project Report for Construction of Bypass to Harur Town from Km.49/500 – 55/0 of NH 179A |
TN.No.14/2021-22/ DO/ Date. 18.03.2022 |
05/04/2022 |
18/03/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 1002 |
Preparation of Detailed Project Report for Construction of Bypass to Varatanapalli Town from km.7/0-9/0 of 219 (New NH 42) |
TN.No.14/2021-22/ DO/ Date. 18.03.2022(2) |
05/04/2022 |
18/03/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 1003 |
Consultancy Services for Preparation of DPR for Construction of 2 Lane with paved shoulders bypass with provision of Tunnels at Lohaghat Start of bypass Km 136 325 Devradi Bend of NH 9 End of bypass km 142 Raikot Mahe of NH 9 and at Pithoragarh Start of bypass Km 197 Ancholi of NH 9 End of bypass km 206 750 Satsilling of NH 9 on NH-09 in the State of Uttarakhand |
CHARDHAM/NH-125/2021-22/Bypass |
17/03/2022 |
17/03/2022
|
06/04/2022
Time
16:0Hrs
|
|
| 1004 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22 |
EE/NHD/SMG /AE1/NH206/Consultancy/NIB11/3rd call/2470 |
16/03/2022 |
16/03/2022
|
31/03/2022
Time
16:0Hrs
|
|
| 1005 |
Consultancy Services for preparation of DPR cum feasibility report for 4-laning green field highway from Meerut-Haryana border in the state of Uttar Pradesh. |
2022_NHAI_110188_1 |
21/03/2022 |
16/03/2022
|
19/04/2022
Time
11:0Hrs
|
|
| 1006 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR)FOR FOUR LANNING OF ROAD FROM TITRAM MOR KATTHAL TO DEOBAN KANCHT (SH-11) (KM.189.300 TO 193.300), DEOBAN KANCHI TO KTTHANA (SH-11A) (KM.0.000 To 18.680), KTTHANA-NAGURAN ROAD (SH-11A) (KM. 18.680 TO 30.000), JIND-JHANSI ROAD (SH-12) (KM. 85.600 TO 95.030) & KM. 95.030 1O 124.268 IN KAITHAL, JIND & HISAR DISTT (Under HAM Scheme. |
Jind/HSRDC/Prep. of DPR of Titiram Mor to Hansi |
27/03/2022 |
16/03/2022
|
05/04/2022
Time
15:0Hrs
|
|
| 1007 |
Consultancy Services for preparation of DPR from existing 2 lane to 4-lane from Km.0.000 to Km-68.000 (old chainage Km.197.300 to Km.265.300) of Kanaktora - Jharsuguda Section of NH-49 in the State of Odisha |
2022-NHAI-110222-1 |
28/03/2022 |
16/03/2022
|
11/05/2022
Time
11:0Hrs
|
|
| 1008 |
PMC for preparation of DPR, Pre construction activity and Project supervision for the work of Widening to 2 lane with pave shoulder of Shahjahanpur Bisalpur (Length 45.00 km) and Pilibhit to Khatima (Length 28km) of NH-731K in the State of U.P. |
CE-RO/LKO/PMC/Lot-IV/ 2021-22/PKG-I Dated 15.03.22 |
25/03/2022 |
15/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 1009 |
PMC for preparation of DPR, Pre construction activity and Project supervision for the work of 4 lane construction of Major of 1.20 Km length along with its approaches on NH 135A and construction of ROB at Km 406 on NH 730 in the State of U.P. |
CE-RO/LKO/PMC/Lot-IV/ 2021-22/PKG-II dt 15.03.2022 |
25/03/2022 |
15/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 1010 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of Elevated corridor from Ramadevi to GolChauraha on NH-91A in the State of U.P. |
CE-RO/LKO/PMC/Lot-I V/2021-22/PKG-III dt15.03.2022 |
25/03/2022 |
15/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 1011 |
Project Management Consultancy Services for construction of Highway 2- lane Tunnel including approaches across the Jalori Pass on Sainj 0/00-Luhri- Aut 97/00 Road NH-305 from Km. 46/080 to Km. 57/00 in the State of Himachal Pradesh. |
RO/HP/Works(227)/2020-21 |
17/03/2022 |
14/03/2022
|
28/04/2022
Time
11:0Hrs
|
|
| 1012 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR /Lot-II /Package-I) |
CE-RO/LKO/DPR/Lot-II/2021-22 Dated .11.03.2022 |
21/03/2022 |
12/03/2022
|
29/04/2022
Time
11:0Hrs
|
|
| 1013 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR/ Lot-II/Package-II) |
CE-RO/LKO/DPR/Lot-II/2021-22 Dated 11.03.2022 |
21/03/2022 |
12/03/2022
|
29/04/2022
Time
11:0Hrs
|
|
| 1014 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR/ Lot-II/Package-III) |
CE-RO/LKO/DPR/Lot-II/2021-22 Dated ..11.03.2022 |
21/03/2022 |
12/03/2022
|
29/04/2022
Time
11:0Hrs
|
|
| 1015 |
Consultancy services for Preparation of Feasibility/DPR for widening to Four lane on NH 169 from km 30.00 to 60.00 on Shimoga – Mangalore Section in the State of Karnataka under Annual Plan 2021-22 |
EENHD/AE1/NH169/NIB28/2436 |
09/03/2022 |
09/03/2022
|
19/03/2022
Time
16:0Hrs
|
|
| 1016 |
Consultancy services for Preparation of Detailed Project Report for Widening to 2/4 laning of Road branching from km 54/2 of NH 209, Palani to Kodaikkanal and the road to join at km 40/8 of NH 45E (1. km 1/4 - km 13/2, Thekkampatty to Palani Adivaram (ODR) (branching from NH 209) - 11.80km 2. km 0/0 - km 38/0 Palani to Kodai Ghat road (MDR) - 38.00km 3. Km 0/0 - km 41/2 Kodai Ghat road 41.20km (SH) (Joining at 45E) on EPC Mode in the state of Tamil Nadu. |
TN.No.20/DO/NH/2021/Dt. 09.03.2022 |
10/03/2022 |
09/03/2022
|
26/04/2022
Time
15:0Hrs
|
|
| 1017 |
Preparation of Feasibility study and Detailed Project Report for Construction of 4-laning of Chakia to Bhitha more section of Ram Janki Marg |
03/NH-SITAMARHI/2021-22 |
02/04/2022 |
09/03/2022
|
02/05/2022
Time
17:0Hrs
|
|
| 1018 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of Widening to 2 lane Paved shoulder of Pratapgarh-Amethi -Gauriganj-Musafirkhana of NH-931 in the state of U.P. |
CE-RO/LKO/PMC/ Lot-III/2021-22/PKG-III |
10/03/2022 |
08/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 1019 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of Widening to 2 lane Paved Shoulder of Jagdishpur-Jais-Salon of NH-931A in the state of U.P. |
CE-RO/LKO/PMC/ Lot-III/2021-22/PKG-IV |
10/03/2022 |
08/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 1020 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of widening to 4 lane of Ayodhya-Pratapgarh section of NH-96 (New NH-330) in the state of U.P. |
CE-RO/LKO/PMC/ Lot-III/2021-22/PKG-I |
09/03/2022 |
08/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 1021 |
PMC for preparation of Detailed Project Report, Pre construction activity and Project supervision for the work of widening to 4 lane of Rewa-Renukoot -Garwa-Daltonganj-Ranchi of NH-75E (For UP Portion) in the state of U.P. |
CE-RO/LKO/PMC/ Lot-III/2021-22/PKG-II |
09/03/2022 |
08/03/2022
|
25/05/2022
Time
15:0Hrs
|
|
| 1022 |
Consultancy Services for Balance works of Land acquisition Plan Forest clearance Proposals and other pre construction activities in respect DPR for Sainj Luhari Jalori Banjar Aut Road excluding Jalori Pass Tunnel of NH 305 from Km. 0 to Km. 97 |
PW-CE-NH-CTR-Ten Notice/Consultancy/22-5342-49 |
04/03/2022 |
03/03/2022
|
11/04/2022
Time
17:0Hrs
|
|
| 1023 |
Consultancy Services for preparation of DPR for 4laning of Masrakh Rajapatti Fazillahpur Kesariya Chakia Sitamarhi Bhitha More (150 km) sec of Ram Janki Marg in Bihar |
2022-NHAI-108244-1 |
13/04/2022 |
03/03/2022
|
25/04/2022
Time
11:30Hrs
|
|
| 1024 |
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of 4 lane CC Road on Nagpur – Katol Road NH-353J from Km 2/500 to 7/200 & Construction of Two lane CC road with paved shoulder from Km 7/200 to 13/000 (Including Feasibility Study of Flyover in Nagpur City Portion) in State of Maharashtra. |
NIT NO. 25/EENH/NGP/2021-22/1026 |
08/03/2022 |
02/03/2022
|
21/03/2022
Time
17:0Hrs
|
|
| 1025 |
Consultancy Services for preparation of DPR for Reconstruction of narrow ROB at km 406/8, construction of additional minor bridge and approaches with hairpin bend improvements at km 406/10, construction of additional minor bridge and footpath bridge on both sides and curve improvements at km 409/4 (laws falls), narrow RUB at km 411/2 (Katteri bridge), for eliminating a level crossing near Coonoor railway station and bus stand with junction improvements and bridge for vehicles at km 414/4 and nar |
TN.No.18/HDO/NH/2021-22/Dt.28.02.2022(2) |
16/03/2022 |
01/03/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1026 |
Consultancy Services for preparation of DPR for Construction of grade separator at Charring cross km 430/8 – 431/4 of NH 67 & Improvements and Road Safety measures at Ghat Section from km 390/0 – 434/0 of NH 67 in the state of Tamilnadu |
TN.No.18/HDO/NH/2021-22/Dt.28.02.2022(sl.3) |
16/03/2022 |
01/03/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1027 |
Consultancy Services for preparation of DPR for Providing low level elevated corridor for vehicles in Mudumalai reserve area to give free access to elephants km 488/8 – 504/4 of NH 67 in the state of Tamilnadu |
TN.No.18/HDO/NH/2021-22/Dt.28.02.2022(4) |
16/03/2022 |
01/03/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1028 |
Consultancy Services for preparation of DPR for Construction of Bypass to Mettupalayam Town from km 377/10 – 382/10 of NH 67 |
TN.No.8/2021-22/ DO/ Date. 28.02.2022 |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1029 |
Consultancy Services for preparation of DPR for Construction of Additional bridge at km 382/6 of NH 67 (km 49/6 of New NH 181) |
TN.No.8/2021-22/ DO/ Date. 28.02.2022(2) |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1030 |
Consultancy Services for preparation of DPR for Construction of flyover from km 152/9 – 153/8 of NH 209 |
TN.No.8/2021-22/ DO/ Date. 28.02.2022(4) |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1031 |
Consultancy Services for preparation of DPR for Construction of flyover from km 163/8 – 166/2 of Nh 209 (Blackspot ID – TN – 02 – 623) in Coimbatore City |
TN.No.8/2021-22/ DO/ Date. 28.02.2022(5) |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1032 |
Consultancy Services for preparation of DPR for Construction of flyover from km 331/2 – 333/8 of NH 67 |
TN.No.8/2021-22/ DO/ Date. 28.02.2022(3) |
14/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1033 |
Consultancy Services for preparation of DPR for up gradation to 2 lane with paved shoulder of MDR-29 Ch. 2.530 (end point of Takoli-Kullu section ) to Ch. 41.375 (end point of Kullu-Manali Section) in the state of Himachal Pradesh |
2022-NHAI-107811-1 |
10/03/2022 |
28/02/2022
|
05/05/2022
Time
11:0Hrs
|
|
| 1034 |
Consultancy Services for preparation of DPR for Construction of alternate bridge to the existing old and narrow steel bridge at km 394/4 & 400/4 (Kurumbadi bridge) of NH 67 and construction of bridge with curve improvements at km 396/4 & km 400/2 of NH 67 in the state of Tamilnadu |
TN.No.18/HDO/NH/2021-22/Dt.28.02.2022 |
16/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1035 |
Consultancy Services for preparation of DPR for Improvements of hairpin bend nos, 8,9, 10 & 26 from km 245/2 – 253/0 at NH 209 |
TN.No.9/2021-22/ DO/ Date. 28.02.2022 |
17/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1036 |
Consultancy Services for preparation of DPR for Providing passenger facilities like parking at km 470/0 – 470/2 ( Thavalaimalai and Oosi malai) of NH 67 |
TN.No.9/2021-22/ DO/ Date. 28.02.2022(2) |
17/03/2022 |
28/02/2022
|
30/03/2022
Time
15:0Hrs
|
|
| 1037 |
Consultancy services for Preparation of Detailed Project Report for Construction of ROB in lieu of LC 49(Km 46/0-2), LC 56(52/9-10), LC 68 (67/12-13) of NH 209 in the State of Tamilnadu |
Tender Notice No.10 /2021-22/DO dated. 25.2.2022 |
01/03/2022 |
26/02/2022
|
13/04/2022
Time
15:0Hrs
|
|
| 1038 |
Consultancy Services for preparation of DPR for Study of Landslide Mitigation in GHAT Section from Km 0/0-2/4 of NH 234 |
TN.No.09/2021-22/DO/NH/Dt.25.02.2022 |
05/03/2022 |
25/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 1039 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for 2 lane with paved shoulder of (i) Kopargaon to Aurangabad of NH-752I and (ii) Jalna–Pulgaon of NH-753C in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2021-22/33 |
25/02/2022 |
25/02/2022
|
11/04/2022
Time
11:0Hrs
|
|
| 1040 |
Consultancy Services for preparation of DPR for Construction of Vadalur Bypass at Km 28/4 of NH-532 |
TN.No.02/2021-22/DO/NH/Dt.24.02.2022 |
03/03/2022 |
24/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 1041 |
Consultancy Services for preparation of DPR for Construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, improvement of junctions, and Construction of Additional Two Lane Flyover works in the NH 532 |
TN.No.02-1/2021-22/DO/NH/Dt.24.02.2022 |
03/03/2022 |
24/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 1042 |
Consultancy Services for preparation of DPR for Construction of Additional Two Lane Flyover at Kurinjipadi (Km 22/6) and Virudhachalam (Km 51/2) in NH-532 |
TN.No.02-2/2021-22/DO/NH/Dt.24.02.2022 |
03/03/2022 |
24/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 1043 |
Consultancy Services for preparation of DPR for development of Dehradun Ring Road |
NHAI/BM/DPR/Dehradun-Road/2022 |
08/03/2022 |
23/02/2022
|
24/03/2022
Time
11:0Hrs
|
|
| 1044 |
Consultancy Service for Preparation of DPR for Construction of Flyover Bridge carrying out feasibility study Detailed Survey/ Investigation. Alignment Option, Preparation of General agreement Drawing Engineering Report for Construction of flyover Bridge and its approaches along with service road and preparation of land acquisition papers for acquisition of land, forest clearance and utility shifting details complete in all respects on Bathinda-Dabwali road from Km 9.40 to 10.40 of NH-54. |
CWD No.1 /BTI-NH/07 |
25/02/2022 |
23/02/2022
|
14/03/2022
Time
17:0Hrs
|
|
| 1045 |
Consultancy services for Preparation of Detailed Project Report for Construction of flyover at km 163/5-165/3 (Thangachimadam) of NH 49 (New NH 87) |
TN.No.7/2021-22/ JDO/ Dated. 23.02.2022 |
28/02/2022 |
23/02/2022
|
11/04/2022
Time
15:0Hrs
|
|
| 1046 |
Consultancy services for Preparation of Detailed Project Report for Providing wayside amenities (Rest area) including development of Arichalmunai of NH 49 (New NH 87) |
TN.No.8/2021-22/ JDO/ Dated. 23.02.2022 |
28/02/2022 |
23/02/2022
|
11/04/2022
Time
15:0Hrs
|
|
| 1047 |
Consultancy Services for preparation of DPR for 4 laning of NH 234 from km 0/0 to km 202/60 (excluding Vellore, Gudiyatham Bypass, Vettavalam and Kaniyambadi Bypass and Km 0/0 to 2/4 Ghat Section) |
TN.No.26/2021-22/HDO/NH/Dt.23.02.2022 |
28/02/2022 |
23/02/2022
|
29/03/2022
Time
15:0Hrs
|
|
| 1048 |
Consultancy services for Preparation of Detailed Project Report for Construction of Grade Separator in km 67/10 of NH 49 Extn. (New NH 85) (Madurai -Cochin road) on EPC Mode in the state of Tamilnadu |
Tender Notice No.15 /2021-22/DO dated.18.02.2022 |
01/03/2022 |
22/02/2022
|
21/03/2022
Time
15:0Hrs
|
|
| 1049 |
Consultancy services for Preparation of Detailed Project Report for Construction of Kalaiyarkoil Bypass in km 62/6 - 68/2 of NH 230 (New NH 85) on EPC Mode in the state of Tamilnadu |
18/2021-22/DO dated.21.02.2022 |
01/03/2022 |
22/02/2022
|
24/03/2022
Time
15:0Hrs
|
|
| 1050 |
Consultancy services for Preparation of Detailed Project Report for Connecting the NH381B with NH67 near Musiri including HLB across Cauvery in the state of Tamil Nadu. |
TN.No. 09/2021-22/DO/Date. 22.02.2022 |
28/02/2022 |
22/02/2022
|
25/03/2022
Time
15:0Hrs
|
|
| 1051 |
Consultancy services for Preparation of Detailed Project Report for Construction of Singampunari bypass in Km 4/2 9/2 of NH 383 Extn.on EPC Mode in the State of Tamilnadu |
17/2021-22/DO dated.21.02.2022 |
01/03/2022 |
22/02/2022
|
24/03/2022
Time
15:0Hrs
|
|
| 1052 |
Consultancy services for Preparation of Detailed Project Report for Construction of Thiruppathur bypass branching from km 28/4 of NH 383 Extn. and ending at Km 98/4 of NH 226 (New NH36) on EPC Mode in the state of Tamilnadu |
16 /2021-22/DO dated.18.02.2022 |
01/03/2022 |
22/02/2022
|
21/03/2022
Time
15:0Hrs
|
|
| 1053 |
Consultancy services for Preparation of Detailed Project Report for Widening to 2 lane with paved shoulder from Km 99/0 - km 119/0 of NH 49 Extn (New NH No 85) on EPC Mode in the state of Tamil Nadu. |
TN.No.19/DO/NH/2021/Dt. 22.02.2022 |
22/02/2022 |
22/02/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 1054 |
Consultancy services for Preparation of Feasibility/DPR for widening to Four lane on NH 169 from km 30.00 to 60.00 on Shimoga – Mangalore Section in the State of Karnataka |
EENHD/AE1/NH169/NIB28/2243/22 |
21/02/2022 |
21/02/2022
|
14/03/2022
Time
16:0Hrs
|
|
| 1055 |
Consultancy services for Preparation of Detailed Project Report for Widening to Four lane of NH 226 Extn (New NH No 136) from km 0/0 - 24/370, 29/210 – 53/0 and Ariyalur bypass at km 0/0 - 7/552 on EPC Mode in the state of Tamil Nadu. |
TN.No.17/DO/NH/2021/Dt. 21.02.2022 |
22/02/2022 |
21/02/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 1056 |
Consultancy services for Preparation of Detailed Project Report for Four laning of NH 230 from km 18/40 to km 111/40 (Excluding Kalayar koil and Thirubhuvanam Bypass) on EPC Mode in the state of Tamil Nadu. |
TN.No.18/DO/NH/2021/Dt. 21.02.2022 |
22/02/2022 |
21/02/2022
|
19/04/2022
Time
15:0Hrs
|
|
| 1057 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRECONSTRUCTION SERVICES (INCLUDING SELECTION OF SITE, TYPE OF BRIDGE, SUB SOIL INVESTIGATION, ESTIMATION, PREPARATION OF TENDER DOCUMENTS ETC) FOR SPECIAL TYPE OF BRIDGE (CABLE STAYED BRIDGE. SUSPENSION BRIDGE OR STEEL ARCH BRIDGE) INDICATIVE LENGTH OF BRIDGE-300 MTR OVER KODAK RIVER AT KM 2.010 (ROAD TAKE OFF FROM KM 2.600 ON TUTING-BONA) & APPROACH ROAD -2.50 KMS ON ROAD TUTING- YORTUNG- ENK |
CE (P) BMK/EPC/04/2021-22 |
15/02/2022 |
17/02/2022
|
15/04/2022
Time
11:0Hrs
|
|
| 1058 |
Consultancy Services for preparation of DPR for (i) Development of Road Connectivity from NH-16 to Astarang Port (Puri District) (ii) Development of Road Connectivity from NH-16 to Subarnarekha Port (Balasore District) under Bharatmala Pariyojana in the state of Odisha |
NHAI/BM/PC/Odisha/2022 |
21/02/2022 |
15/02/2022
|
11/04/2022
Time
11:0Hrs
|
|
| 1059 |
Project Management Consultancy Services for Up-gradation to 4 Lane for the Highway Starting from its junction with NH216 near Amalapuram connecting Palivela and terminating at its junction with NH-216A at Ravulapalem in the State of Andhra Pradesh |
SE(R&B)/NH/VJA/50/2021-22 dt.22.11.2021 |
09/02/2022 |
09/02/2022
|
08/03/2022
Time
17:0Hrs
|
|
| 1060 |
PMC for preparation of DPR, Pre construction activity and Project supervision for the work of Widening to 4 lane of Jaunpur Akbarpur section of NH135A and 4 lane Mirzapur Bypass along with 2 Nos ROBs on NH135A(Excluding Major Bridge over Ganga River) |
CE-RO/LKO/PMC/Lot-II/2021-22 Dated. 27.01.2022 |
28/01/2022 |
27/01/2022
|
11/02/2022
Time
15:0Hrs
|
|
| 1061 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22 |
EENHD/SMG/AE1/NH206/nIB11/2ndcall/corrigendum/2008 |
25/01/2022 |
25/01/2022
|
01/02/2022
Time
16:0Hrs
|
|
| 1062 |
Consultancy Services for the preparation of Feasibility Report cum Detailed Project Report (DPR) for capacity augmentation to two lane with paved shoulder configuration of NH 183 (Old NH 220) from km 137/000(Ponkunnam) to 160/300 (Mundakkayam) |
01/DPR/SENH/CC/KOCHI/2021--2022 |
25/01/2022 |
22/01/2022
|
28/02/2022
Time
15:0Hrs
|
|
| 1063 |
Carrying out survey geotechnical investigation and preparation of gads, BOQ, Detailed designing, working drawings, detailed estimates including required modifications during construction of 2 lane with pave shoulder 4 lane elevated road |
2022_HRY_205060_1 |
10/02/2022 |
21/01/2022
|
28/02/2022
Time
17:0Hrs
|
|
| 1064 |
Consultancy Services for preparation of detailed project report (DPR) / feasibility study report for Construction of uninterrupted connectivity from eastern Faridabad to Western Faridabad (a) From Sanik Colony Mod - Badkhal Chowk (NH-44) Sector 19-28 Dividing Road – Double Canal up to Greater Faridabad/ Noida/ Greater Noida link. (b) From village pali via Sohna road, Ballabgarh through Green Belt along Gurugram Canal- Greater Faridabad up to proposed Highway in Master plan 2031 |
2022_HRY_205169_1 |
15/02/2022 |
21/01/2022
|
28/02/2022
Time
17:0Hrs
|
|
| 1065 |
Consultancy services for Preparation of Feasibility/Detailed Project Report DPR for Construction of Grade Separators at km 16.490 Devegowda Circle Junction Km 25.820 Nanjanagud junction Km 30.100 Srirampura Junction Km 38.100 Bogadi Junction and at Km 40.200 Vijayanagar 4 stage junction of NH-275K Mysuru Ring Road in the State of Karnataka 2 call |
EENHD/Bng/AE2/NH-275K/Gr.Sep/DPRNIT-03/2021-22/-2nd call 11.1.2022 |
14/01/2022 |
14/01/2022
|
24/02/2022
Time
15:0Hrs
|
|
| 1066 |
Consultancy Services for preparation of DPR for Augmentation from 4 to 6 laning from Km. 0.00 Km. 119.300 of Baleshwar to Kharagpur section of NH-60 in the state of West Bengal and Odisha |
2022_NHAI_101400_1 |
01/02/2022 |
11/01/2022
|
28/03/2022
Time
10:59Hrs
|
|
| 1067 |
Consultancy Services for Preparation of DPR for Construction of 4-Lane bypass to Ras town on NH-158 and Construction of 2-Lane with paved shoulders configuration of bypass (with provision of new ROB) to Mandal town connecting NH-158 to NH-48 |
2022-MoRTH-667113-1 |
17/01/2022 |
07/01/2022
|
24/02/2022
Time
16:0Hrs
|
|
| 1068 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED SURVEY/INVESTIGATION, PREPARATION OF GENERAL ARRANGEMENT DRAWING,DETAILED PROJECT REPORT FOR CONSTRUCTION OF FOUR LANE RAIL OVER BRIDGE IN LIEU OF RAILWAY CROSSING NO. A-8-A at KM 3 600 on NH-154 (PATHANKOT-KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB |
07 of 2021-22 |
06/01/2022 |
06/01/2022
|
02/02/2022
Time
17:0Hrs
|
|
| 1069 |
Consultancy Services for preparation of DPR for widening of Coimbatore Bypass on NH-47 from Km 141/0 to Km 171/200 from existing 2 lane to 4 lane configuration in the State of Tamil Nadu. |
ChennaiMoRTH12014212018Part1 |
05/01/2022 |
03/01/2022
|
17/02/2022
Time
11:0Hrs
|
|
| 1070 |
Consultancy Services for Widening of Well foundation bridges no 10/1,14/1,15/1,25/1, 48/1,60/1,69/1,83/1,90/1,96/1,101/1,103/1,111/1,112/1,114/1,119/1,129/1,131/1 (18nos) on NH-15, Bridge no. 10/1, 21/1, 22/1, 44/1, 47/2 (5 nos) on NH-127D and Bridge No. 6/1 (1 no) on NH-427 in the State of Assam. |
2021_MoRTH_666191_1 |
31/12/2021 |
31/12/2021
|
01/02/2022
Time
14:0Hrs
|
|
| 1071 |
Project management Consultancy services for feasibility study and preparation of DPR, Supervision during construction and maintenance of NH-627(Pkj-I) |
2021_MoRTH_666123_1 |
31/12/2021 |
31/12/2021
|
07/02/2022
Time
14:0Hrs
|
|
| 1072 |
Project management Consultancy services for feasibility study and preparation of DPR, Supervision during construction and maintenance of NH-627(Pkj-II) |
2021_MoRTH_666180_1 |
31/12/2021 |
31/12/2021
|
07/02/2022
Time
14:0Hrs
|
|
| 1073 |
Project Management Consultancy Services for Feasibility Study and Preparation Of DPR, Supervision during Construction and Maintenance of New Bridge over river Jiabharali (Br. No. 166/1) on NH-15 |
2021_MoRTH_665730_1 |
31/12/2021 |
30/12/2021
|
07/02/2022
Time
14:0Hrs
|
|
| 1074 |
Project Management Consultancy Services for Feasibility Study and Preparation of DPR, Supervision during Construction and Maintenance of New Bridge over river Dikrong (Br. No. 310/1) and over river Subansiri (Br. No. 376/1) on NH-15 |
2021_MoRTH_665794_1 |
31/12/2021 |
30/12/2021
|
07/02/2022
Time
14:0Hrs
|
|
| 1075 |
Consultancy for preparation of DPR for construction of elevated corridor/grade separator connecting Indira Gandhi Square (at Km 0/0) & Rajiv Gandhi Square (at Km 1.1) on NH66 in Union Territory of Puducherry |
ROChennaiMoRTH12014DPR202122-PU |
04/01/2022 |
30/12/2021
|
14/02/2022
Time
11:0Hrs
|
|
| 1076 |
Project Management Consultancy Services for Feasibility study and detailed Engineering for Widening to 2 lane with paved shoulder and geometric improvements of NH 907A from Km 5/00 to Km 78/00 Nahan to Kumarhatti Stretch in the State of HP. |
PW-CE-NH-CTR-Tender Notice/Consultancy/21-4169-77 |
05/01/2022 |
30/12/2021
|
07/02/2022
Time
17:0Hrs
|
|
| 1077 |
Consultancy Services for Feasibility/Detail Engineering report of bypasses (Lalsot, Mandawari, Khedli, Piplai, Salimpur, Karauli) Between Lalsot Gangapur Karauli Section of NH-23 (OLD-11B) for Two lane Paved Shoulder Length of Bypasses 25.00 Km |
NIT 07/2021-22 EE PWD NH Dn.-I, Jaipur |
21/01/2022 |
29/12/2021
|
14/02/2022
Time
18:0Hrs
|
|
| 1078 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22 |
EENHD/SMG/AE1/NH206/Consultancy/NIB11/2nd call/2021-22/1793 |
27/12/2021 |
27/12/2021
|
25/01/2022
Time
16:0Hrs
|
|
| 1079 |
Preparation of DPR for eliminating a level crossing near Coonoor Railway station and Bus stand and junction improvement @ km 414/4 and reconstruction of narrow ROB @ km 406/8 (HPB-12/14), narrow RUB @ km 411/2 (Katteri bridge) and narrow RUB @ km 416/10 of NH67 |
TN.No.10/2021-22/ DO/ Date. 24.12.2021 |
21/01/2022 |
24/12/2021
|
11/02/2022
Time
15:0Hrs
|
|
| 1080 |
Preparation of DPR for construction of alternate bridges to the existing old and narrow steel bridges at Km 394/4 (10 feet bridge) and at Km 400/4 (Kurumbadi bridge) of NH 67 |
TN.No6/2021-22/ DO/ Date.24.12.21 |
21/01/2022 |
24/12/2021
|
11/02/2022
Time
15:0Hrs
|
|
| 1081 |
Consultancy Services for Detailed Project Report Preparation for Rehabilitation and Upgradation of existing 4-Lane Road to Single tier 6-lane Elevated corridor on NH-753F Jalgoan, Sillod, and Aurangabad (Tisgaon Junction, A.S. Club) Ch. Km. 160-700 t |
EENH/Aurangabad/DPR/Tender No-1/2021-22/1974 |
21/12/2021 |
21/12/2021
|
11/03/2022
Time
17:30Hrs
|
|
| 1082 |
Consultancy Services for PREPARATION OF DETAILED PROJECT REPORT (DPR) / FEASIBILITY STUDY REPORT FOR CONSTRUCTION OF 4-LANE ROB IN LIEU OF EXISTING 2-LANE ROB OVER L/C NO. 51-C OVER REWARI-HISAR RAILWAY LINE CROSSING NH-709 (EXTN.) IN KM. 122 IN BHIWANI TOWN |
PWD/NH-JIND/NH-BWN/100014(2) |
20/12/2021 |
20/12/2021
|
10/01/2022
Time
17:0Hrs
|
|
| 1083 |
Widening to 4 lane of Jaunpur Akbarpur section of NH- 135A and 4 lane Mirzapur Bypass along with 2 Nos ROBs on NH-135A(Excluding Major Bridge over Ganga River) |
CE-RO/LKO/PMC/Lot-II/2021-22 |
22/12/2021 |
18/12/2021
|
24/01/2022
Time
15:0Hrs
|
|
| 1084 |
Consultancy Services for Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane Bypasses in Kerala) - New NH from Kayamkulam (NH 66) to junction near Thiruvalla (NH 183) |
01/SENH/SC/2021--2022 |
17/12/2021 |
14/12/2021
|
14/01/2022
Time
15:0Hrs
|
|
| 1085 |
Consultancy Services for the preparation of Feasibility Report cum Detailed Project Report (DPR) for capacity augmentation to two lane with paved shoulder configuration of NH 183 (Old NH 220) from km 137/000(Ponkunnam) to 160/300 (Mundakkayam) |
01/DPR/SENH/CC/KOCHI/2021-2022 |
08/12/2021 |
08/12/2021
|
04/01/2022
Time
15:0Hrs
|
|
| 1086 |
Consultancy services for, Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 766C from Km 0.00 to 38.70 (Byndoor to Nittur) in the State of Karnataka |
eENH/AE1/766C/NIB15/2nd call/21-22/1553 |
20/11/2021 |
20/11/2021
|
13/12/2021
Time
16:0Hrs
|
|
| 1087 |
Consultancy services for preparation of DPR for Rehabilitation and Upgradation of NH 117 from km 114.975 to km 137.684 to two lane paved shoulder configuration in the Dist. of South 24 Pgs.WB. |
NIQ No. 03 of 2021-22 of SE, NHPDC (2ND CALL) |
17/11/2021 |
17/11/2021
|
07/02/2022
Time
11:0Hrs
|
|
| 1088 |
Preparation of Detailed Project Report for Construction of Bypass to Harur Town from Km.49/500 – 55/0 of NH 179A |
TN.No.7/2021-22/ DO/ Date. 17.11.2021 |
05/01/2022 |
17/11/2021
|
25/02/2022
Time
15:0Hrs
|
|
| 1089 |
Consultancy Service for Rangia Bypass |
2021_MoRTH_657698_1 |
06/12/2021 |
15/11/2021
|
15/12/2021
Time
14:0Hrs
|
|
| 1090 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Khardungla Pass Namik La & Fotu La in the Union Territory of Ladakh |
Ladakh/Tunnels/Re-invite/2021/DPR-01/02/03 |
03/11/2021 |
03/11/2021
|
24/11/2021
Time
11:0Hrs
|
|
| 1091 |
Consultancy Services for Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane Bypasses in Kerala) - New NH from Kayamkulam (NH 66) to junction near Thiruvalla (NH 183) |
01/SENH/SC2021-2022 |
04/11/2021 |
03/11/2021
|
14/12/2021
Time
15:0Hrs
|
|
| 1092 |
Consultancy services for Preparation of Feasibility/DPR for Construction of Outer Ring Road on NH 766C for Shikaripura town in Shimoga Dist in the State of Karnataka under Annual Plan 2021-22. |
EE/NHD/SMG/AE-1/NH-766C/consultancy/NIB-13/2nd call/2021-22/1462 |
02/11/2021 |
02/11/2021
|
23/11/2021
Time
16:0Hrs
|
|
| 1093 |
Consultancy services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder from Km 0.00 to Km 26.32on NH-173 in the State of Karnataka |
EE/NHD/HSN/AE-1/NH-173/Consultancy/NIT/2021-22/07 |
02/11/2021 |
29/10/2021
|
30/11/2021
Time
17:30Hrs
|
|
| 1094 |
Consultancy Services for Preparation of Feasibility/DPR for widening to 2L with PS from KM 146.400 to 194.555 on NH-73 in the state of Karnataka |
EE/NHD/HSN/AE-1/NH-73/Km.146.400 to 194.555/NIT/2021-22/09 |
08/11/2021 |
29/10/2021
|
30/11/2021
Time
17:30Hrs
|
|
| 1095 |
Consultancy Services for Preparation of feasibility/DPR for Widening to two lane with paved shoulders from Km 86.200 to Km 99.200 and Km 113.710 to Km 146.400 on NH-73 in the state of Karnataka |
EE/NHD/HSN/AE-1/NH-73/Km.86.200 to 99.200 & 113.710 to 146.400/NIT/2021-22/08 |
04/11/2021 |
29/10/2021
|
30/11/2021
Time
17:30Hrs
|
|
| 1096 |
Consultancy Services for Detailed Project Report Preparation for Construction of Single Tier 4 lane Elevated Corridor from Talegaon to Chakan to Shikrapur on NH-548D on DBFOT Toll Basis in the state of Maharashtra |
2021_MoRTH_654668_1 |
26/11/2021 |
27/10/2021
|
22/12/2021
Time
17:0Hrs
|
|
| 1097 |
Consultancy services for, Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 766C from Km 0.00 to 38.70 (Byndoor to Nittur) in the State of Karnataka |
EE/NHD/SMG/AE-1/NH766C/Consultancy/NIB15/2021-22/1436 |
27/10/2021 |
27/10/2021
|
17/11/2021
Time
16:0Hrs
|
|
| 1098 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRECONSTRUCTION SERVICES (INCLUDING SELECTION OF SITE, TYPE OF BRIDGE, SUB SOIL INVESTIGATION, ESTIMATION, PREPARATION OF TENDER DOCUMENTS ETC.) (INDICATIVE LENGTH OF BRIDGE-300 MTR OVER KODAK RIVER AT KM 2.010 (ROAD TAKE OFF FROM KM 2.600 ON TUTING-BONA) & APPROACH ROAD -2.50 KMS) ON ROAD TUTING-YORTUNG-ENKUNJI-EMRA VALLEY-KANGRI-KARPOLA FROM EXISTING SPECIFICATIONS TO NHSL SPECIFICATIONS UNDE |
CE (P) BMK/EPC/03/2021-22 |
25/10/2021 |
26/10/2021
|
15/12/2021
Time
11:0Hrs
|
|
| 1099 |
Consultancy Services for preparation of detailed project report (DPR) / feasibility study report for Construction of 4 lanning with paved shoulder of Gurgaon-Alwar road (NH-248A) Section from Nuh to Ferozepur Jhirka upto Rajasthan Border |
654404 |
22/11/2021 |
25/10/2021
|
10/12/2021
Time
17:0Hrs
|
|
| 1100 |
Consultancy Services for preparation of detailed project report (DPR) for construction of Bhiwani bye pass (Connecting Bhiwani-Hansi road (NH-148 B) to Bhiwani-Loharu road (NH-709 Extn.) and Dhigawa bye pass |
PWD/NH-JIND/NH-BWN/100013 |
17/11/2021 |
09/10/2021
|
08/12/2021
Time
17:0Hrs
|
|
| 1101 |
Consultancy Services for PREPARATION OF DETAILED PROJECT REPORT (DPR) / FEASIBILITY STUDY REPORT FOR CONSTRUCTION OF 4-LANE ROB IN LIEU OF EXISTING 2-LANE ROB OVER L/C NO. 51-C OVER REWARI-HISAR RAILWAY LINE CROSSING NH-709 (EXTN.) AT KM. 122 IN BHIWANI TOWN. |
PWD/NH-JIND/NH-BWN/100014 |
17/11/2021 |
09/10/2021
|
15/12/2021
Time
17:0Hrs
|
|
| 1102 |
PREPARATION OF RSTC (RECCE SURVEY AND TRACE CUT) AND DPR (DETAILED PROJECT REPORT) FOR CONSTRUCTION OF DAMTENG-SELUNGTHI-LUNGAR-CHUNA ROAD FROM KM 0.000 TO KM 67.000 (EXISTING LENGTH 67.00 KM) TO NHSL SPECIFICATIONS UNDER 763 BRTF/ PROJECT VARTAK IN ARUNACHAL PRADESH STATE |
CE (P) VTK/NIT-19/2021-22 |
07/10/2021 |
09/10/2021
|
03/12/2021
Time
17:0Hrs
|
|
| 1103 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of ROB’s at LC 79 (Kumsi), LC 110 (Hossur) and LC 152 (Talaguppa) of NH 206 and LC 105 (Anandapura) of NH 766C in the State of Karnataka under Annual Plan 2021-22 |
EE/NHD/SMG/AE1/NH766C/consultancy/NIB12/2nd call/2021-22/1334 |
07/10/2021 |
08/10/2021
|
04/11/2021
Time
16:0Hrs
|
|
| 1104 |
Consultancy Service for Preparation of DPR for Construction of Flyover bridge carrying out feasibility study Detailed Survey / Investigation. Alignment Option, Preparation of General agreement Drawing Engineering Report for Construction of proposed flyover Bridge and its approaches along with service road and preparation of land acquisition papers for acquisition of land, forest clearance and utility shifting details complete in all respects on Bathinda-Dabwali road from Km 9.40 to 10.40 of NH-5 |
CWD No.1 /BTI-NH/03 |
09/10/2021 |
08/10/2021
|
20/10/2021
Time
17:0Hrs
|
|
| 1105 |
Consultancy Services for preparation of Detailed project report (including Road safety audit) for Six Laning of Dhanua Ghati section from km 249.525 to km 261.150 of NH-2 in the State of Jharkhand(3rd call) |
NHAI/RO/RNC/JH/2021-22/01(2) |
11/10/2021 |
07/10/2021
|
18/10/2021
Time
11:0Hrs
|
|
| 1106 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 169A from km 33.00 to 41.00 (AgumbeGhat) in the State of Karnataka under Annual Plan 2021-22. |
EENHD/SMG/AE2/NH169A/Consultancy/NIB10/3rd call/2021-22/1324 |
07/10/2021 |
07/10/2021
|
04/11/2021
Time
16:0Hrs
|
|
| 1107 |
Consultancy Services for Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane Bypasses in Kerala) - New NH from Kayamkulam (NH 66) to junction near Thiruvalla (NH 183) |
01/SENH/SC/2021-2022 |
13/10/2021 |
01/10/2021
|
23/10/2021
Time
15:0Hrs
|
|
| 1108 |
Consultancy Services for preparation of DPR and Feasibility report for construction of two nos. of Grade separated interchanges at km 113.730 and km 139.225 on 4 laning stretch of Ranchi Bypass of NH 33 in the State of Jharkhand 2nd Call |
NHAI/RO/Jharkhand/DPR/IC/2021/43 |
30/09/2021 |
28/09/2021
|
13/10/2021
Time
11:0Hrs
|
|
| 1109 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of ROBs at LC 79 (Kumsi), LC 110 (Hossur) and LC 152 (Talaguppa) of NH 206 and LC 105 (Anandapura) of NH 766C in the State of Karnataka |
eE/NHD/SMG/AE1/NH766C/consultancy/NIB12/2021-22/1256 |
27/09/2021 |
27/09/2021
|
04/10/2021
Time
16:0Hrs
|
|
| 1110 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22 |
EENHD/AE1/NH206/NIB11/2021-22/1206 |
24/09/2021 |
24/09/2021
|
30/09/2021
Time
16:0Hrs
|
|
| 1111 |
Consultancy Services for Detailed Project Report Preparation for Widening & Improvement with footpath of Existing ROB on Bhokar Bypass of NH-61. Ch 128/400 km. Length 200 m. In state of Maharashtra. |
NHD/NED/TENDER/DPR/Nanded/2853/2021/3 |
22/09/2021 |
23/09/2021
|
29/09/2021
Time
17:30Hrs
|
|
| 1112 |
Consultancy Services for Detailed Project Report Preparation for Rehabilitation and Upgradation of Nanded Bhokar Himayatnagar Kinwat Mahur Arni Road Section of NH-161A from Mudkhed to Nanded. km 0/00 to 18/500. In state of Maharashtra |
NHD/NED/TENDER/DPR/Nanded/2853/2021/4 |
22/09/2021 |
23/09/2021
|
29/09/2021
Time
17:30Hrs
|
|
| 1113 |
Consultancy Services for Detailed Project Report Preparation for Construction of Degloor city bypass road on NH 63 in the state of Maharashtra Tentative Length 7 km. 2nd call |
NHD/NED/TENDER/DPR/2853/2021/1 |
22/09/2021 |
22/09/2021
|
29/09/2021
Time
17:30Hrs
|
|
| 1114 |
Consultancy Services for Detailed Project Report Preparation for Widening of Existing ROB in Udgir City Portion stretch Length 0.710 km of NH 50 and Widening of Existing ROB in Udgir City Portion stretch Length 0.600 km of NH 63 in state of Maharasht |
NHD/NED/TENDER/DPR/2853/2021/2 |
22/09/2021 |
22/09/2021
|
29/09/2021
Time
17:30Hrs
|
|
| 1115 |
Consultancy services for Preparation of Feasibility/DPR for Construction of Outer Ring Road on NH 766C for Shikaripura town in Shimoga Dist in the State of Karnataka under Annual Plan 2021-22. |
EE/NHD/SMG /AE-1/NH-766C/Consultancy/NIB-13/2021-22/1203 |
22/09/2021 |
21/09/2021
|
22/10/2021
Time
16:0Hrs
|
|
| 1116 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY DETAIL SURVEY INVESTIGATION PREPARATION OFGENERAL ARRANGEMENT DRWAING DPR FOR CONSTRUCTIONOF FOUR LANE RAIL OVER BRIDGE INLIEU OF RAILWAY CROSSING NO A 47E2 ON PHAGWARA HOSHIARPUR ROAD NH 344B |
7 |
23/09/2021 |
20/09/2021
|
09/10/2021
Time
16:0Hrs
|
|
| 1117 |
Consultancy Service for Preparation of DPR for Construction of Flyover bridge carrying out feasibility study Detailed Survey / Investigation. Alignment Option, Preparation of General agreement Drawing Engineering Report for Construction of proposed flyover Bridge and its approaches along with service road and preparation of land acquisition papers for acquisition of land, forest clearance and utility shifting details complete in all respects on Bathinda-Dabwali road from Km 9.40 to 10.40 |
CWD-1/BTI-NH/03 |
18/09/2021 |
18/09/2021
|
27/09/2021
Time
17:0Hrs
|
|
| 1118 |
Consultancy Services for preparation of Detailed project report including Road safety audit for Six Laning of Dhanua Ghati section from km 249.525 to km 261.150 of NH 2 in the State of Jharkhand 2nd Call |
NHAI/RO/RNC/JH/2021-22/01(1) |
25/09/2021 |
17/09/2021
|
04/10/2021
Time
15:0Hrs
|
|
| 1119 |
Consultancy Services for preparation of DPR for construction of Guwahati Ring Road from Khanapara-Narengi Chowki (Tinali)-Narengi End-Kurua End- Dumunichowki- Baihata Chairali- Jalukbari of approx. 72.45 km length under Bharatmala Pariyojana in the State of Assam |
2021NHAI886431 |
14/10/2021 |
17/09/2021
|
22/11/2021
Time
17:0Hrs
|
|
| 1120 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 169A from km 33.00 to 41.00 (Agumbe Ghat) in the State of Karnataka under Annual Plan 2021-22. |
EENHD/AE2/NIB10/2nd call/2021-22/1164 |
14/09/2021 |
14/09/2021
|
30/09/2021
Time
16:0Hrs
|
|
| 1121 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PROVIDING PRECONSTRUCTION SERVICES (INCLUDING SELECTION OF SITE, TYPE OF BRIDGE, SUB SOIL INVESTIGATION, ESTIMATION, PREPARATION OF TENDER DOCUMENTS ETC.) (INDICATIVE LENGTH OF BRIDGE-300 MTR OVER KODAK RIVER & APPROACH ROAD -2.50 KMS) BETWEEN TUTING AND KANGRI KARPOLA FROM EXISTING SPECIFICATIONS TO NHSL SPECIFICATIONS UNDER 761 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE |
CE (P) BMK/EPC/02/2021-22 |
04/09/2021 |
11/09/2021
|
11/10/2021
Time
18:0Hrs
|
|
| 1122 |
Consultancy Services for Preparation of Detailed Project Report of Rehabilitation and Upgradation of NH-117 from km 114.975 to km 137.684 km to two-lane paved shoulder configuration in the District of South 24 Parganas,West Bengal |
e-NIQ No. 02 of 2021-22 of SE, NHPDC. |
10/09/2021 |
10/09/2021
|
02/11/2021
Time
11:0Hrs
|
|
| 1123 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder of NH 169 from Km 124.00 to 153.00(Tanikod to SK Border) in the State of Karnataka under Annual Plan 2021-22. |
EENHD/AE2/NIB9/2nd call/2021-22/789 |
14/09/2021 |
09/09/2021
|
30/09/2021
Time
16:0Hrs
|
|
| 1124 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Khardungla Pass, Namik La & Fotu La in the Union Territory of Ladakh |
2021/NHIDC/647035/1 |
08/09/2021 |
07/09/2021
|
11/10/2021
Time
11:0Hrs
|
|
| 1125 |
Consultancy Services for Detailed Project Report Preparation for upgradation of existing 6 Lane road including elevated corridor as per site requirements from km 0 to km 12 of NH 47 (Narol Jn to Ujala Jn) in the State of Gujarat |
2021_MoRTH_636047_2 |
06/09/2021 |
06/09/2021
|
30/09/2021
Time
15:0Hrs
|
|
| 1126 |
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing 2 lane/2L PSS road to 2 lane with paved side shoulder/4L from km 62/00 to km 92/320 and km 115/320 to km 160/320 of NH-58 (Vadali to Palanpur) including Vadgam Bypass, Vadali Bypass and Chansol Bypass in the State of Gujarat |
2021_MoRTH_637769_2 |
06/09/2021 |
06/09/2021
|
30/09/2021
Time
15:0Hrs
|
|
| 1127 |
Consultancy Services for Detailed Project Report Preparation for upgradation of existing single Lane/2 lane road to 2 lane with paved side shoulder from km 221/800 to km 291/450 of NH-41 (Naliya Jn to Nayaran Sarovar) in the State of Gujarat |
2021_MoRTH_637489_2 |
06/09/2021 |
06/09/2021
|
30/09/2021
Time
15:0Hrs
|
|
| 1128 |
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing road to 2 lane with paved side shoulder/4L from km 61/658 to km 105/00 of NH-953 (Ahwa to Maharashtra Border) in the State of Gujarat. |
2021_MoRTH_638140_2 |
06/09/2021 |
06/09/2021
|
30/09/2021
Time
15:0Hrs
|
|
| 1129 |
Consultancy Service for Preparation of DPR for Construction of Flyover bridge carrying out feasibility study Detailed Survey Investgation and prepration of land acquisition papers |
CWD-1/BTI-NH/02 |
03/09/2021 |
06/09/2021
|
15/09/2021
Time
17:0Hrs
|
|
| 1130 |
Project Management Consultancy Services for Feasibility study and detailed Engineering for Widening to 2- lane with paved shoulder and geometric improvements of NH-907A from Km 5/00 to Km 78/00 (Nahan to Kumarhatti Stretch) in the State of Himachal Pradesh. |
PW-CE-NH-CTR-Ten Notice/Consultancy/21-2208-17 |
03/09/2021 |
03/09/2021
|
07/10/2021
Time
11:0Hrs
|
|
| 1131 |
PMC Services for construction of Highway 2- lane Tunnel including approaches across the Nahan Town on Nahan Sarahan Kumarhatti Road NH 907A from Km. 0 00 to Km. 5 00 in the State of Himachal Pradesh. |
PW-CE-NH-CTR-Ten Notice/Consultancy/21-2218-27 |
09/09/2021 |
03/09/2021
|
07/10/2021
Time
11:0Hrs
|
|
| 1132 |
Consultancy Services for Identification & Preparation of Detailed Project Report for Slope Protection work on Hill & Valley Side, Sinking Zones and Bridges in between Km 368.000 to Km 468.000 (NH-07) , in the State of Uttarakhand |
NHIDCL/UK/NH-07/20-21/Slope protection-bridges/ |
09/09/2021 |
01/09/2021
|
11/10/2021
Time
15:0Hrs
|
|
| 1133 |
Consultancy services for, Preparation of Feasibility/DPR for Construction of 4 lane Fly over and its Approaches in Shimoga city limit on NH 206 at Km 209.90 near Ashoka circle and at Km 212.60 Alkola circle on NH 206 in the State of Karnataka under Annual Plan 2021-22. |
EENHD/AE1/NH206/NIB11/2021-22/1023 |
30/08/2021 |
30/08/2021
|
20/09/2021
Time
16:0Hrs
|
|
| 1134 |
Consultancy services for Preparation of Feasibility DPR for Construction of ROBs at LC 79 Kumsi LC 110 Hossur and LC 152 Talaguppa of NH 206 and LC 105 Anandapura of NH 766C in the State of Karnataka under Annual Plan 2021-22 |
EENHD/AE1/NH766C/NIB12/2021-22/1024 |
31/08/2021 |
30/08/2021
|
20/09/2021
Time
16:0Hrs
|
|
| 1135 |
Consultancy Services for Detailed Project Report Preparation for Rehabilation and Upgradation of Nanded Bhokar Himayatnagar Kinwat Mahur Arni Road Section of NH 161A from Mudkhed to Nanded in state of Maharashtra. |
NHD/NED/TENDER/DPR/2416/2021/4 |
29/08/2021 |
29/08/2021
|
09/09/2021
Time
17:30Hrs
|
|
| 1136 |
Consultancy Services for Detailed Project Report Preparation for Widening and Improvement with footpath of Existing ROB on Bhokar Bypass of NH 61km128.400 in state of Maharashtra. |
NHD/NED/TENDER/DPR/2416/2021/3 |
26/08/2021 |
27/08/2021
|
09/09/2021
Time
17:30Hrs
|
|
| 1137 |
Consultancy services for preparation of detailed project report for 4 laning of NH-60 (New NH-14) from km 115.000 (Kharagpur) to Km. 422.450 (Moregram) in the State of West Bengal |
e-NIQ No 01 of 2021-22 |
26/08/2021 |
25/08/2021
|
26/10/2021
Time
11:0Hrs
|
|
| 1138 |
Consultancy services for Preparation of Feasibility Detailed Project Report DPR for Construction of Grade Separators at km 16 490 Devegowda Circle Junction Km 25 820Nanjanagud junction Km 30 100 Srirampura Junction Km 38 100 Bogadi Junction and at Km 40 200 Vijayanagar 4 stage junction of NH 275K Mysuru Ring Road in the State of Karnataka |
EE/NHD/Bng/AE2/NH-275K/Grade-Separator/DPR/NIT-03/2021-22/ Dated 13.08.2021 |
18/08/2021 |
18/08/2021
|
27/09/2021
Time
16:0Hrs
|
|
| 1139 |
Consultancy services for, preparation of feasibility /Detailed project report (DPR) for widening to two lane with paved shoulders from km.72.10 to 121.000 of NH-173 kadur to Holalkere section in the state of karnataka |
ENHD/CTA/NH-173/AE4/2021-22/279 |
18/08/2021 |
18/08/2021
|
31/08/2021
Time
11:0Hrs
|
|
| 1140 |
Consultancy Services for Preparation of Detailed Project Report for upgradation to four lane/ two lane with paved shoulders configuration of Kalyan – Murbad – Malshej Ghat – Nirmal road NH- 61 km 15/200 to 84/000 including RoB at km 9/500 district Thane in the state of Maharashtra |
2021_MoRTH_643543_1 |
10/09/2021 |
17/08/2021
|
23/10/2021
Time
17:30Hrs
|
|
| 1141 |
Consultancy services for preparation of Detailed Project Report for Rehabilitation Upgradation Widening of existing Highway to Rigid Pavement two Lane with Paved Shoulder of NH 965DD from Lonand Shirvar Bhor Mandangad Pachral |
2021_MoRTH_643566_1 |
16/09/2021 |
13/08/2021
|
27/09/2021
Time
17:0Hrs
|
|
| 1142 |
Consultancy Services for Detailed Project Report Preparation for Widening of Existing ROB in Udgir City Portion stretch Length 0.710 km of NH 50 and Widening of Existing ROB in Udgir City Portion stretch Length 0.600 km of NH 63 in state of Maharashtra |
NHD/NED/TENDER/DPR/2416/2 |
24/08/2021 |
13/08/2021
|
14/09/2021
Time
17:30Hrs
|
|
| 1143 |
Consultancy Services for Detailed Project Report Preparation for Construction of Degloor city bypass road on NH 63 in the state of Maharashtra Tentative Length 7 km. |
NHD/NED/TENDER/DPR/2416/2021/1 |
17/08/2021 |
13/08/2021
|
14/09/2021
Time
17:30Hrs
|
|
| 1144 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway 8.5 Km. Tunnel including approaches at Pir Ki Gali Pass in the Union Territory of Jammu Kashmir. |
NHIDCL/JK/Mughal Road/ Pir Ki Gali Tunnel/2021 |
13/08/2021 |
10/08/2021
|
07/10/2021
Time
11:0Hrs
|
|
| 1145 |
DPR for 4/6 laning of Mumbai-Pune NH-4 from Shilphata (Km 131/200 To Nigadi (KM 20/400) |
NH/PUNE/DPR/02/2021-22 |
04/08/2021 |
02/08/2021
|
01/10/2021
Time
17:0Hrs
|
|
| 1146 |
Detailed Project Report of Consultancy Services for preparation of DPR Feasibility Report for upgradation for Four Laning of km 10.900 to km 12.390 of NH 32 including construction of ROB at km 11.500 on NH 32 in the State of Jharkhand |
NHAI/RO/RNC/JH/2021-22/15 |
06/09/2021 |
02/08/2021
|
15/09/2021
Time
11:0Hrs
|
|
| 1147 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder of NH 169 from Km 124.00 to 153.00(Tanikod to SK Border) in the State of Karnataka |
EENHD/AE2/NIB9/2021-22/789 |
30/07/2021 |
30/07/2021
|
21/08/2021
Time
16:0Hrs
|
|
| 1148 |
Consultancy Services for Preparation of Feasibility/DPR for widening to two lane with paved shoulder on NH 169A from km 33.00 to 41.00 (Agumbe Ghat) in the State of Karnataka |
EENHD/AE2/NIB10/2021-22/790 |
30/07/2021 |
30/07/2021
|
21/08/2021
Time
16:0Hrs
|
|
| 1149 |
Project Management Consultancy services for Widening to 4-lane of NH-105 from Km 35/00 to 66/275 of Nalagarh to Swarghat road in the State of Himachal Pradesh |
PW-CE-CTR-Tender Notice/Consultancy/21-1474-81 |
02/08/2021 |
29/07/2021
|
04/09/2021
Time
17:0Hrs
|
|
| 1150 |
Project Management Consultancy services for Widening to 4-lane of NH-07 from Km 46/00 to 96/00 of Kala Amb Paonta Sahib Dehradun road in the State of Himachal Pradesh. |
PW-CE-NH-CTR-Tender Notice/Consultancy/21-1490-98 |
02/08/2021 |
29/07/2021
|
04/09/2021
Time
17:0Hrs
|
|
| 1151 |
Project Management Consultancy Services for Feasibility study and detailed engineering for Widening to 2- lane with paved shoulder and geometric improvements of NH 907A from Km 0/00 to Km 78/00 (Nahan to Kumarhatti Stretch) in the State of HP. |
PW-CE-NH-CTR-Tender /Consultancy/21-1499-1506 |
02/08/2021 |
29/07/2021
|
28/08/2021
Time
17:0Hrs
|
|
| 1152 |
Consultancy Services for Detailed Project Report Preparation for Construction of double tier Elevated Corridor from Pune to Shirur on NH- 753F on DBFOT (Toll Basis) in the state of Maharashtra |
NH/PUNE/DPR/01/2021-22 |
04/08/2021 |
29/07/2021
|
01/10/2021
Time
17:0Hrs
|
|
| 1153 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY DETAILED SURVEY INVESTIGATION PREPARATION OF GENERAL ARRANGEMENT DRAWING DPR FOR CONSTRUCTION OF FOUR LANE RAIL OVER BRIDGE IN LIEU OF RAILWAY CROSSING NO A 47 E 2 ON PHAGWARA HOSHIARPUR ROAD NH 344B |
5 of 2021-22 |
17/08/2021 |
27/07/2021
|
13/09/2021
Time
17:0Hrs
|
|
| 1154 |
Consultancy services for, preparation of feasibility /Detailed project report (DPR) for widening to two lane with paved shoulders from km.72.10 to 121.000 of NH-173 kadur to Holalkere section in the state of karnataka |
ENHD/CTA/NH173/AE4/2021-22/279 |
28/07/2021 |
26/07/2021
|
17/08/2021
Time
11:0Hrs
|
|
| 1155 |
Consultancy service for preparation of DPR for Rehabilitation of Bridges Swarnamati at 4.123 km of NH-31C, Panchanai at 75.03 km of NH-55, Coronation at 595.200 km of NH-31, Sukha Nadi at 604.00 km of NH-31, Leesh at 607.151 km of NH-31, Gheesh at 611.740 km of NH-31, Chell at 614.70 km of NH-31, Mal at 628.720 km of NH-31, Newra at 630.12 km of NH-31 and Jarda New and Jarda Old at 672.830 km and 673.12 km of NH-31 under NH Division IX in the district of Darjeeling and Jalpaiguri. |
e_RFP3 |
02/08/2021 |
22/07/2021
|
09/09/2021
Time
17:0Hrs
|
|
| 1156 |
Consultancy Services for Preparation of Feasibility/DPR for Realignment of NH 766 C from Km 56.00 to 86.00 (With realignment of 16.00 Km) with a major Bridge across Sharavathi Tributory/Backwater near Beckodi in the state of Karnataka under annual Plan 2021-22 |
EENHD/AE1/NIB07/2021-22/490 |
20/07/2021 |
16/07/2021
|
06/08/2021
Time
16:0Hrs
|
|
| 1157 |
Consultancy services for, Consultancy Services for Preparation of Feasibility/DPR for Widening to 4 lane . Paved shoulder from Km 220.00 to Km 259.00 (Shimoga to Anandpura) in the State of Karnataka under Annual Plan 2021-22. |
EENHD/AE1/NIB08/2021-22/491 |
20/07/2021 |
16/07/2021
|
06/08/2021
Time
16:0Hrs
|
|
| 1158 |
Consultancy services for DPR for 6 laning of Pune Hyderabad section of NH 65 from KM 493.0 to 524.0 from Sangareddy X road to Madinaguda in the state of Telangana |
SE RandB NH HYD 10 2021 22 dt. 29.05.2021 |
15/07/2021 |
15/07/2021
|
30/08/2021
Time
15:0Hrs
|
|
| 1159 |
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing road to 2 lane with paved side shoulder/4L from km 61/658 to km 105/00 of NH-953 (Ahwa to Maharashtra Border) in the State of Gujarat |
2021_MoRTH_638140_1 |
12/07/2021 |
13/07/2021
|
15/09/2021
Time
15:0Hrs
|
|
| 1160 |
Consultancy Services for Detailed Project Report Preparation for upgradation/geometric improvement of existing 2 lane/2L PSS road to 2 lane with paved side shoulder/4L from km 62/00 to km 92/320 and km 115/320 to km 160/320 of NH-58 (Vadali to Palanpur) including Vadgam Bypass, Vadali Bypass and Chansol Bypass in the State of Gujarat. |
2021_MoRTH_637769_1 |
09/07/2021 |
09/07/2021
|
15/09/2021
Time
15:0Hrs
|
|
| 1161 |
Consultancy Services for Detailed Project Report Preparation for upgradation of existing single Lane/ 2 lane road to 2 lane with paved side shoulder from km 221/800 to km 291/450 of NH-41 (Naliya Jn to Nayaran Sarovar) in the State of Gujarat. |
2021_MoRTH_637489_1 |
07/07/2021 |
07/07/2021
|
15/09/2021
Time
15:0Hrs
|
|
| 1162 |
nsultancy Services for Preparation of Feasibilty DPR for 4 laning from Km 290.200 to 343.800 SiraMadhugiri Section of NH 234 in the State of Karnataka |
ENHD_TMK_NH234_DPR_2021_22_225 |
08/07/2021 |
03/07/2021
|
27/07/2021
Time
16:0Hrs
|
|
| 1163 |
Project Management Consultancy Services for feasibility study and detailed engineering for rehablitation and upgradation of NH 154A from km 84 00 to km 93 00 and km 130 00 to km 172 00 in the State of Himachal Pradesh. |
2021_MoRTH_636330_1 |
01/07/2021 |
30/06/2021
|
23/08/2021
Time
17:0Hrs
|
|
| 1164 |
Consultancy Services for preparation of DPR for Augmentation of existing 4 lane Section of NH-44 from Km.22.00 (Near Hyderabad Airport) to Km. 211.00 (Kurnool) to 6 lane Partial Access Controlled Highway standard in Telangana |
2021_NHAI_81017_1 |
22/07/2021 |
30/06/2021
|
16/08/2021
Time
11:0Hrs
|
|
| 1165 |
CS for preparation of DPR for Augmentation of existing 4 lane Section of NH-44 from Km.211.00 (Kurnool) to Km. 534.72 (Devanahalli Village in the State of Karnataka) to 6 lane Partial Access Controlled Highway in Andhra Pradesh and Karnataka |
2021_NHAI_81019_1 |
22/07/2021 |
30/06/2021
|
16/08/2021
Time
11:0Hrs
|
|
| 1166 |
DPR for formation of Bypass to Chengalpet Town on the Eastern Side of NH32 (Old NH45) to join ECR (NH-332A) |
TN.No.08/2022-23/HDO/NH/Date.30.06.2022 |
01/07/2022 |
30/06/2021
|
17/08/2022
Time
15:0Hrs
|
|
| 1167 |
Consultancy Services for Detailed Project Report Preparation for upgradation of existing 6 Lane road including elevated corridor as per site requirements from km 0 to km 12 of NH 47 (Narol Jn to Ujala Jn) in the State of Gujarat |
2021_MoRTH_636047_1 |
29/06/2021 |
29/06/2021
|
15/09/2021
Time
15:0Hrs
|
|
| 1168 |
CONSULTANCY SERVICES FOR PREPARTION OF DPR FOR ARIFKE-AMARKOT ROAD FROM 165.610 TO 201.500 SECTION OF NH-354 |
02 of 2021-22 |
29/06/2021 |
29/06/2021
|
23/07/2021
Time
12:0Hrs
|
|
| 1169 |
PMC services for Widening to 4 lane of NH 503 Extn from Km 0 to 28 900 Amb to Una in the State of HP and Widening to 4lane of NH 70 New 03 Jallandhar Hoshiarpur Gagret Amb Nadaun Hamirpur TauniDevi Sarkaghat Mandi KM 58 400 to 114 0 |
2021_MoRTH_634088_1 |
16/06/2021 |
15/06/2021
|
26/07/2021
Time
17:0Hrs
|
|
| 1170 |
Consultancy Services for preparation of Feasibility study and detailed project report for construction of NH-133 section from Ekchari to Mahagama (tentative length 40 km) in the State of Jharkhand. |
2021_NHAI_79234_1 |
10/06/2021 |
10/06/2021
|
29/07/2021
Time
11:0Hrs
|
|
| 1171 |
Consultancy Services for preparation of Detailed project report (including Road safety audit) for Six Laning of Dhanua Ghati section from km 249.525 to km 261.150 of NH-2 in the State of Jharkhand (as per Annexure-I) |
NHAI/RO/RNC/JH/2021-22/01 |
01/07/2021 |
02/06/2021
|
15/07/2021
Time
11:0Hrs
|
|
| 1172 |
Consultancy Services for preparation of DPR and Feasibility report for construction of two nos. of Grade separated interchanges at km 113.730 and km 139.225 on 4 laning stretch of Ranchi Bypass of NH 33 in the State of Jharkhand |
NHAI/RO/JH/DPR/NH33/IC/2021/43 |
28/05/2021 |
25/05/2021
|
16/07/2021
Time
11:0Hrs
|
|
| 1173 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of National Highways in the State of Uttar Pradesh ( RO/LKO/DPR/Package-I) |
RO/LKO/DPR/Package-I |
05/05/2021 |
04/05/2021
|
08/06/2021
Time
11:0Hrs
|
|
| 1174 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of National Highways in the State of Uttar Pradesh ( RO/LKO/DPR/Package-II) |
RO/LKO/DPR/Package-II |
05/05/2021 |
04/05/2021
|
08/06/2021
Time
11:0Hrs
|
|
| 1175 |
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches of National Highways in the State of Uttar Pradesh ( RO/LKO/DPR/Package-III) |
RO/LKO/DPR/Package-III |
05/05/2021 |
04/05/2021
|
08/06/2021
Time
11:0Hrs
|
|
| 1176 |
CONSULTANCY SERVICES FOR PREPARTION OF DPR FOR ARIFKE-AMARKOT ROAD FROM 165.610 TO 201.500 SECTION OF NH-354 |
01 of 2021 |
26/04/2021 |
28/04/2021
|
15/06/2021
Time
12:0Hrs
|
|
| 1177 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-I |
24/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 1178 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-II |
25/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 1179 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-III |
25/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 1180 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-IV |
25/05/2021 |
22/04/2021
|
14/06/2021
Time
15:0Hrs
|
|
| 1181 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar Pradesh |
CE-RO/LKO/PMC/2021-22/PKG-V |
26/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 1182 |
Preparation of Detailed Project Report, Pre construction activities and Project Supervision of various selected stretches, ROBs, flyover, bridge on National Highways in the State of Uttar PradeshNH |
CE-RO/LKO/PMC/2021-22/PKG-VI |
26/05/2021 |
22/04/2021
|
21/06/2021
Time
15:0Hrs
|
|
| 1183 |
ENGAGING TECHNICAL CONSULTANT FOR FINALIZATION OF ALIGNMENT AND PREPARATION OF FEASIBILITY STUDY (FS) ON EPC MODE FOR DEVELOPMENT OF POONCH-URI ROAD TO NHDL SPECIFICATIONS (TENTATIVE LENGTH - 120 KM) IN UT OF JAMMU AND KASHMIR UNDER BHARATMALA PRIYOJANA |
CE(P)BCN/CON(EPC)/01/2021-22 |
21/04/2021 |
20/04/2021
|
24/06/2021
Time
11:0Hrs
|
|
| 1184 |
consultancy services for preparation of DPR for development of Northern portion of Hyderabad Regional Ring Road Expressway under Bharatmala Pariyojana Phase-I in the State of Telangana |
NHAI/Tech/Telangana/DPR /HRRR/North-Part/2021 |
15/04/2021 |
09/04/2021
|
01/06/2021
Time
11:30Hrs
|
|
| 1185 |
Consultancy Services for preparation of DPR/ Feasibility Report for upgradation to 4/6 lane Elevated Corridor of Kalimandir-Dimna Chowk-Baliguma (Jamshedpur) Section of NH-33 (from Km.243.000 to km. 248.500) (Tentative Length 5.5 Km) under NHDP Phase–III in the State of Jharkhand |
NIT No. NHAI/RO/Jharkhand/DPR/NH-33/2021/36 |
27/04/2021 |
18/03/2021
|
03/06/2021
Time
11:0Hrs
|
|
| 1186 |
Consultancy Services for Preparation of DPR on NH 112 (New NH-25) Bar-Bilara-Jodhpur-Barmer road. (Khokhariya Phanta to Panch batti circle via circuit House) From km 111/0 to km 125/0 |
04/2020-21 |
01/04/2021 |
12/03/2021
|
27/04/2021
Time
11:0Hrs
|
|
| 1187 |
Sample Project |
Sample Project |
03/03/2021 |
01/03/2021
|
31/03/2028
Time
15:0Hrs
|
|
| 1188 |
BRIDGEDPR |
2021MORTH6117111 |
23/02/2021 |
23/01/2021
|
11/03/2021
Time
14:0Hrs
|
|