S.No |
Project Name |
Tender No |
Tender Date |
Tender Start Date |
Tender End Date |
Document |
1 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Missing Link from Birhu to Lathiani into 4-Lane & Paved Shoulder Configuration from Km 35/550 (Design Chainage 0.000) to 42/800 (Design Chainage 8.153) on NH-503A including Cable Stayed Bridge (0.860 Km) on Back Water of Govind Sagar Reservoir and its Approaches in Himachal Pradesh on EPC Mode |
2025-MoRTH-874994-1 |
28/08/2025 |
28/08/2025
|
13/10/2025
Time
17:0Hrs
|
-
|
2 |
Consultancy Services for Supervision Consultants of Operation and Maintenance of Four Lane Zirakpur-Start of Sangrur bypass Section of NH-64 (New NH-07) from Km 0.000 to Km 110.720 in the State of Punjab. |
2025-NHAI-246021-1 |
28/08/2025 |
21/08/2025
|
18/09/2025
Time
15:0Hrs
|
-
|
3 |
IE Services for 4 -Laning of Silchar (near Budha Nagar) at Existing Km 233.000 (D. Ch.24.560) to Jiribam at Existing km 212.060 (D. Ch.37.650) of NH- 37 (Length-13.09 km) in the State of Assam and Manipur under NH(O)-NE on Hybrid Annuity Mode (HAM) (Pkg-2) |
NHIDCL/Assam/NH-37/SJ-II/IE/2024-25 |
20/08/2025 |
20/08/2025
|
02/09/2025
Time
15:0Hrs
|
-
|
4 |
Supervision Consultant for supervision during O and M of Obedullganj Itarsi section of NH46 from km. 2.800 to Km. 63.000 in the state of MP 2nd Call |
NHAI/ROBPL/SC/NH46/OI/2025 |
19/08/2025 |
18/08/2025
|
17/09/2025
Time
11:0Hrs
|
-
|
5 |
Independent Engineer Services during Operation and Maintenance period for 4- laning of Ambala – Chandigarh Section (i) from km. 5.735 to km. 39.960 of NH-22, (ii) from km. 0.000 to km. 0.871 of NH-21 and (iii) from km. 236.845 to km. 237.654 of section of Chandigarh-UT Boundary to Zirakpur of NH-05 in the State of Haryana and Punjab on BOT. |
2025-NHAI-244748-1 |
20/08/2025 |
11/08/2025
|
08/09/2025
Time
11:0Hrs
|
-
|
6 |
Supervision Consultant Services during Operation and Maintenance period for 4/6 of Yamunanagar-Saha-Barwala-Panchkula section of NH-73 (New NH-07) from km. 160.357 to km. 179.248 (Design km. 157.192 to km. 176.400) in the State of Haryana |
2025-NHAI-244824-1 |
20/08/2025 |
11/08/2025
|
08/09/2025
Time
11:0Hrs
|
-
|
7 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF CONSTRUCTION OF MIPI-ANDRATHANG ROAD FROM KM 20.000 TO 50.000 (DESIGN LENGTH 34.880 KM BETWEEN KM 20.000 TO 54.880) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 62 RCC UNDER 752 BRTF OF PROJECT UDAYAK IN UPPER DIBANG VALLEY DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE |
CE(P) UDK/NIB/EPC-07/2025-26 |
14/08/2025 |
08/08/2025
|
22/09/2025
Time
11:0Hrs
|
-
|
8 |
Consultancy services for AE for supervision of Construction of Major bridge ( Ahilya Bridge) on bhima River and Bori River. |
NHD/TC/2101/2025 DT 04/08/2025 |
16/08/2025 |
06/08/2025
|
10/09/2025
Time
17:30Hrs
|
-
|
9 |
Independent Engineer services during Operation & Maintenance Period for Four laning from Km 23.284 (Hariharganj) to Km 57.049 (Near Parwa More) on NH- 139 (Old NH-98) in the State of Jharkhand & Bihar. |
NHAI/RO/RNC/JH/2025-26/07 |
07/08/2025 |
06/08/2025
|
02/09/2025
Time
11:0Hrs
|
-
|
10 |
Independent Engineer services during Operation & Maintenance Period for 4 laning of Rehla-Garhwa Bypass Section from Km. 196.870 to Km. 219.600 (length. 22.730 Km) of NH-39, Pkg-IV in the State of Jharkhand |
NHAI/RO/RNC/JH/2025-26/08 |
08/08/2025 |
06/08/2025
|
02/09/2025
Time
11:0Hrs
|
-
|
11 |
Independent Engineer Services during Operation and Maintenance Period for Eight lane Vadodara Kim Expressway from km 190.000 to km 217.500 (Package VII - Gandeva to Ena Section) and from km 217.500 to km 254.430 (Package VI - Ena to Kim Section) in the State of Gujarat under Bharatmala Pariyojana on HAM |
NHAI/ROGNR/NE-4/VME-6,7/IE/OM/2025 |
07/08/2025 |
05/08/2025
|
08/09/2025
Time
12:0Hrs
|
-
|
12 |
Independent Engineer Services during Operation and Maintenance period for four-laning of Kurali-Kiratpur Section of NH-21 (New NH-205) from Km. 28.600 to Km. 71.500 in the states of Punjab on DBFOT Basis under NHDP- Phase-III |
2025-NHAI-243568-1 |
05/08/2025 |
01/08/2025
|
28/08/2025
Time
11:0Hrs
|
-
|
13 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF DONG-JACHEP ROAD GREEN-FIELD ALIGNMENT TO NHSL SPECIFICATIONS FROM KM 15.000 TO KM 45.000 (NET LENGTH 30.000KM) UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE UNDER EPC MODE |
CE(P) UDK/NIB/EPC-06/2025-26 |
05/08/2025 |
01/08/2025
|
15/09/2025
Time
11:0Hrs
|
-
|
14 |
Consultancy services for Authority Engineer for Construction of elevated corridor for Gammon Junction at Km 903-265 (Blackspot ID No AP-(05)-092) and Diwancheruvu junction at Km 902-308 (Blackspot ID No AP -(03)-299) on NH-16 in the state of Andhra Pradesh under NH(O) on EPC mode |
2025NHAI2435961 |
25/08/2025 |
01/08/2025
|
11/09/2025
Time
11:0Hrs
|
-
|
15 |
Consultancy services for Authoritys Engineer for supervision of Construction of 6 no. of Mangobandhar, Kendua, Tolesono, Jhajha, Narganjo and Bhairoganj Bypass (Total Length –19.450 km) along with 2 no. of DLP free Sections (total length- 21.821 km) to two lanes with paved shoulders standard in State of Bihar on EPC mode. |
RW/PAT/NH-333A(Pkg.2)/CS/2025 |
01/08/2025 |
31/07/2025
|
15/09/2025
Time
17:0Hrs
|
-
|
16 |
Independent Engineer Services for Construction of 4 lane Greenfield Section of NH- 33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode. |
2025-NHAI-242359-1 |
19/08/2025 |
30/07/2025
|
16/09/2025
Time
11:0Hrs
|
-
|
17 |
Consultancy Services for Independent Engineer services for Development of 4 lane Badvel to Nellore Highway from Badvel Gopavaram Village on National Highway NH-67 (Design Ch 630-960) to Guruvindapudi Village on NH-16 (Design Ch 739-094) in the State of Andhra Pradesh on Build-Operate-Transfer (Toll) mode for a total length of 108-134 km |
2025NHAI2429531 |
14/08/2025 |
29/07/2025
|
10/09/2025
Time
11:0Hrs
|
-
|
18 |
Independent Engineer Services during O and M Period for 8 lane Vadodara Kim Expressway from km 279.00 to km 292.00 (Package IV - Ankleshwar to Manubar) and from km 254.430 to km 279.00 (Package V - Kim to Ankleshwar) in the State of Gujarat on HAM |
NHAI/ROGNR/VME/Pkg-4,5/IE/OM/2025 |
26/07/2025 |
25/07/2025
|
29/08/2025
Time
12:0Hrs
|
-
|
19 |
Authority Engineer Services for Construction of underpasses at 7 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh |
2025-NHAI-242269-1 |
30/07/2025 |
23/07/2025
|
26/08/2025
Time
11:0Hrs
|
-
|
20 |
Consultancy Services for Supervision Consultant of Strengthening, Road Safety works Including improvement and Routine Operation & Maintenance of Delhi-Gurgaon section of NH-48 & Other works along the project highway from Km. 14.300 to Km. 42.000 (Rao Tula Ram Marg in Delhi to Kherki Dhaula Fee Plaza in Haryana) in the state of Delhi & Haryana for a period of two year on Item Rate basis |
2025-NHAI-242300-1 |
24/07/2025 |
23/07/2025
|
21/08/2025
Time
11:0Hrs
|
-
|
21 |
Consultancy Services as Authority’s Engineer for Supervision of i Construction of two lane with paved shoulders road from Tamenglong to Mahur NH-137 in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu Package-5 on EPC mode. ii Construction of two lane with paved shoulders road from Tamenglong to Mahur NH-137 in the State of Manipur starting from km 80.630 near Mandeu to km 96.870 near Jiri River Package-6 on EPC mode |
NHIDCL/Manipur/2020-21/AE/TMP56 |
24/07/2025 |
23/07/2025
|
11/09/2025
Time
15:0Hrs
|
-
|
22 |
Consultancy services for AE for Supervision of Nagaon By-pass to Teliagaon, Teliagaon to Rangagara, Rangagara to Kaliabhor Tiniali, Kaliabor Tinali to Dolabari, Dolabari and Jamuguri, Jia Bharali Bridge, Kaliabor-Tinali in the state of Assam |
NHIDCL/Assam / Dolabari-Jamuguri/AE/ |
25/07/2025 |
22/07/2025
|
28/08/2025
Time
15:0Hrs
|
-
|
23 |
Consultancy Services of Authority Engineer for Haridwar Nagina section of NH 74 including EUPs mitigation measures |
2025 -NHAI -241777-1 |
22/07/2025 |
22/07/2025
|
01/09/2025
Time
11:0Hrs
|
-
|
24 |
Consultancy services of Independent Engineer for Upgradation to Four lane with paved shoulders divided carriageway from Design km 0.000 to km 37.087 of Pardi NH-48 |
GJ/NH-848/IE |
21/07/2025 |
21/07/2025
|
22/10/2025
Time
15:0Hrs
|
-
|
25 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF(i) Balance Works of Rehabilitation and Upgradation to 4-lane configuration of Ras-Beawar Section (Km 0.000 to Km 30.050) of NH-158 in the State of Rajasthan under Green National Highways Corridor Project (GNHCP) on EPC mode. (ii) Construction of 2-Lane with paved shoulder configuration of bypass (with provision of new ROB) to Mandal town (District- Bhilwara) with connecting NH-158 to NH-48 in the state of Rajasthan (To be developed a |
NIT No. NH- 12014/5/2024-RO Jaipur/05 |
31/07/2025 |
17/07/2025
|
29/08/2025
Time
11:0Hrs
|
-
|
26 |
IE Services during Operation and Maintenance stage Of 2LPS of Khajuwala Poogal section and Poogal Bap section of NH 911 on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Rajasthan |
NHAI/11011/1/Tenders-ROJ/IE/KP |
25/08/2025 |
16/07/2025
|
28/08/2025
Time
15:0Hrs
|
|
27 |
Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance of Ennore Expressway, Manali Oil Refinery Road, Thiruvottiyur-Ponneri-Panchetty Road and Inner Ring Road in the State of Tamil Nadu |
NHAI/RO Chennai/SC/OM/2025-26/223 |
18/07/2025 |
16/07/2025
|
01/09/2025
Time
17:0Hrs
|
-
|
28 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF Widening to 2 Lane with Paved Shoulder of Raipur-Jassakhera section Km 0.000 to Km 29.770 of NH-458 on EPC mode in the State of Rajasthan |
NIT-02-Jaipur-AE-RJ |
16/07/2025 |
15/07/2025
|
28/08/2025
Time
11:0Hrs
|
-
|
29 |
Independent Engineer services for Construction of Nagaur bypass (Balance length) from existing km161.000(Amarpura on NH-58) to km 173.100 (Gogelao on NH-62) and widening to four lane with paved shoulders from Nagaur to Netra (from design km 180.500 to designchainage km 269.314) in the State of Rajasthan on HAM Mode |
15-07-2025 |
17/07/2025 |
15/07/2025
|
29/08/2025
Time
11:0Hrs
|
-
|
30 |
Independent Engineer services for Construction of Nagaur bypass (Balance length) from existing km161.000(Amarpura on NH-58) to km 173.100 (Gogelao on NH-62) and widening to four lane with paved shoulders from Nagaur to Netra (from design km 180.500 to designchainage km 269.314) in the State of Rajasthan on HAM Mode |
RJ/DPP/AP/2025-261327/AE/04/ |
26/08/2025 |
15/07/2025
|
02/09/2025
Time
11:0Hrs
|
-
|
31 |
Consultancy services of Independent Engineer for Upgradation to Two lane with paved shoulder of Porbandar-Bhanvad-Jamjodhpur-Kalavad section of NH-151K from Design km 0.000 to Design km 119.500 in the State of Gujarat |
GJ/NH-151K/IE |
14/07/2025 |
14/07/2025
|
22/10/2025
Time
15:0Hrs
|
-
|
32 |
IE Services during OnM Period for Four laning of NH-365A from Kodad (Design Km 0.00/ Existing Km.185.00 of NH-65) to Khammam (Design Km.31.800/ Existing Km.29.400) (Design Length 31.800 Km) in the State of Telangana under Bharatmala Pariyojana on HAM |
2025-NHAI-239239-1 |
12/07/2025 |
12/07/2025
|
11/08/2025
Time
14:0Hrs
|
-
|
33 |
Consultancy Services for Authority Engineer for Supervision of Construction of 4L with Paved shoulders Bypass Nalgonda to Town from km 0.0 to km 14.0 Ext. km 18.710 to km 28.685 of Nakrekal to Nagarjuna Sagar section of NH 565 in Telangana |
RW/HYD/Misc-28/NIT/AE 2025-26/07 Dt 12.07.2025 |
07/08/2025 |
12/07/2025
|
25/08/2025
Time
15:0Hrs
|
-
|
34 |
Consultancy service for Authority Engineer for Improvement and Widening to two lane with paved shoulder of road from km 101.300 Khowai to km 236.213 Harina Total length 134.913 km of NH 208 in the State of Tripura under JICA ODA Loan |
NHIDCL/Tripura/NH-208/ K-T-H/AE/JICA/2024/ |
18/07/2025 |
11/07/2025
|
19/08/2025
Time
15:0Hrs
|
|
35 |
engaging an Independent Engineer (IE) during Operation and Maintenance stage and Supervision of Black Spots construction for Hyderabad - Bangalore section NH-44 contract packages AP-03, AP-04, AP-05 in the State of Telangana. |
237523 |
11/07/2025 |
11/07/2025
|
18/07/2025
Time
10:0Hrs
|
-
|
36 |
CS for Supervision of Ramnagar ByPass of NH 116B in the District of Purba Medinipur West Bengal in EPC Mode |
MORTH/RO-KOL/NIT/AE/2025-26/04 |
11/07/2025 |
11/07/2025
|
25/08/2025
Time
17:0Hrs
|
-
|
37 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF UPGRADATION OF PACKAGE-I RAJPURI KHURD VILLAGE TO PADIH VILLAGE SECTION FROM EXISTING KM 7.830 TO KM 57.650 (DESIGN CH.13.700 TO CH. 62.700) AND PACKAGE-III BADKI MAHRI VILLAGE TO RAMANUJGANJ SECTION FROM EXISTING KM 80.600 TO KM 110.330 (DESIGN CH. 85.370 TO CH. 114.800) OF NH-343 TO TWO LANE WITH PAVED SHOULDERS WITH FLEXIBLE PAVEMENT IN THE STATE OF CHHATTISGARH ON EPC MODE. |
RW/RO/CG/AE/NH343 |
11/07/2025 |
10/07/2025
|
29/08/2025
Time
11:0Hrs
|
-
|
38 |
Consultancy services of Independent Engineer for Upgradation to Four lane with paved shoulder of Kalavad- Jamnagar section (Package-II) of NH-927D from Design km 0.000 (Ex. km 50.925) to Design km 47.572 (Ex. km 3.720) in the State of Gujarat |
GJ/NH-927D PKG II/IE |
10/07/2025 |
10/07/2025
|
22/10/2025
Time
15:0Hrs
|
-
|
39 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF TWO LANE WITH PAVED SHOULDER OF (i) AMBIKAPUR BYPASS (FROM DESIGN CH. KM 373.505 TO KM 388.700) SITAPUR BYPASS (FROM DESIGN CH. KM 436.030 TO KM 439.400) AND PATHALGAON BYPASS (FROM DESIGN CH. KM 466.600 TO KM 469.200) OF AMBIKAPUR-PATHALGAON KATNI-GUMLA ROAD NH-43 AND (ii) AMBIKAPUR BYPASS (FROM SANJAYNAGAR TO RAJPURI KHURD) (DESIGN CH. KM 0.000 TO KM 13.700) ON AMBIKAPUR –RAMANUJGANJ - GARHWA ROAD OF NH-343 ON E |
RW/RO/CG/AE/NH-43 |
17/07/2025 |
10/07/2025
|
22/08/2025
Time
11:0Hrs
|
-
|
40 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF (i) UPGRADATION OF KEONCHI-RATANPUR ROAD OF NH-45 PACKAGE-I FROM DESIGN CHAINAGE KM. 237.860 TO KM. 273.200 (LENGTH 35.340 KM.) TO TWO LANE WITH PAVED SHOULDERS (ii) UPGRADATION OF KEONCHI-RATANPUR ROAD OF NH-45 PACKAGE-II FROM DESIGN CHAINAGE KM. 278.750 TO KM. 321.348 (LENGTH 42.598 KM.) TO TWO LANE WITH PAVED SHOULDERS AND (iii) CONSTRUCTION OF KEONCHI - RATANPUR ROAD OF NH-45 PACKAGE-III FROM KM. 273.200 TO KM. 278.750 (DESIGN |
RW/RO/CG/AE/NH-45 |
15/07/2025 |
10/07/2025
|
29/08/2025
Time
11:0Hrs
|
-
|
41 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF BALANCE WORKS OF REHABILITATION AND UPGRADATION OF NH-43 (NEW NH-30) FROM KM 162-120 TO KM 173-500 LENGTH 11.380 KM. (KESHKAL BYPASS) 4-LANE WITH PAVED SHOULDER IN THE STATE OF CHHATTISGARH UNDER NHDP-IV THROUGH ENGINEERING, PROCUREMENT and CONSTRUCTION (EPC) BASIS. |
RW/RO/CG/AE/NH30 |
14/07/2025 |
10/07/2025
|
29/08/2025
Time
11:0Hrs
|
-
|
42 |
Supervision Consultant (SC) Services for Rectification work of Blackspot location Slope stability and protection work of 7 nos of vulnerable location of Jowai-Ratacherra (NH-6) and Operation and Maintenance of package |
2025-NHAI-240792-1 |
14/07/2025 |
09/07/2025
|
25/08/2025
Time
17:0Hrs
|
-
|
43 |
Independent Engineer Services during Operation and Maintenance of (i) Four Laning of Sethiyathope to Cholapuram section from Km 65.960 to Km 116.440 of NH-36 (Old No. NH-45C) and (ii) Four Laning of Cholapuram to Thanjavur section from Km 116.440 to Km 164.275 of NH-36 (Old No. NH-45C) in the State of Tamil Nadu |
NHAI/17011/02/39/2025/RO Madurai |
11/07/2025 |
09/07/2025
|
14/08/2025
Time
18:0Hrs
|
-
|
44 |
Consultancy services for Authority Engineer for Supervision of Widening and Improvement of Shangshak Tengnoupal road Pkg-1 and Widening and Improvement of Shangshak-Tengnoupal road Pkg-3 of NH-102A into 2 lane with hard shoulder. |
RW/GHT/MN/AE(Job41 and Job42)/2025-26/259 |
10/07/2025 |
09/07/2025
|
01/09/2025
Time
15:0Hrs
|
|
45 |
RFP for Independent Engineer Services during Operation & Maintenance period of Tolling Operation Maintenance & Transfer of Four lane with Paved Shoulders of (i) NH-27 (Old NH 31 C) from Kachugaon to Rakhaldubi Bus Junction (existing Km 30 000 to Km 92 671) (ii) NH-27 (Old NH 31) from Rakhaldubi Bus Junction to Kaljhar (Km 961 500 to Km 1013 000) and (iii) NH-27 from Kaljhar to Pattacharkuchi (existing Km 1013 000 to Km 1040 300) in the State of Assam |
FINDIV-16012(14)/2/2025-TOT/ INVIT Division /e-284740/39 |
08/07/2025 |
08/07/2025
|
21/07/2025
Time
11:0Hrs
|
-
|
46 |
Consultancy Services as Authority’s Engineer for Supervision of i Widening to 2- (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH 37 from Design Chainage km 66.610 to km 101.280 Existing Chainage from km 67.496 to km 103.557 PKG-IV) ii from Design Chainage km 101.280 to km 131.280 Existing Chainage from km 103.557 to km 134.821 PKG-V iii from Design Chainage km 131.280 to km 169.570 Existing Chainage from km 134.821 to km 175.105 PKG-VI iv from Design Chainage km 169.570 to km |
NHIDCL/Manipur/AE/I-J(Pkg-4 5 67)/NH-37/2021 |
16/07/2025 |
08/07/2025
|
06/08/2025
Time
15:0Hrs
|
-
|
47 |
Consultancy services for Authority’s Engineer for Supervision of Construction of 4 Lane Bypass to Vellore Town starting from Km 47.400 of NH-75 & ending at km 12.650 of NH-38 (Length 20.492 km) in the state of Tamil Nadu through an Engineering, Procurement and Construction (EPC) Contract |
NH12014/20/2024/TN/South-II/AE |
08/07/2025 |
07/07/2025
|
29/09/2025
Time
15:0Hrs
|
-
|
48 |
CS for Supervision of Construction of major Bridge with 4lane configuration on NH 14 over Kangsabati and Shilabati river in Paschim Medinipur of West Bengal on EPC mode |
MORTH/RO-KOL/NIT/AE/2025-26/02 |
08/07/2025 |
04/07/2025
|
25/08/2025
Time
17:0Hrs
|
-
|
49 |
Consultancy Services for Authority Engineer for Supervision of New Construction of Major Bridge with approaches from km 0.000 to 1.200 Madhopur -Badabanta section of NH-20 in the state of Odisha |
02-ROBBSR-2025-26-AE |
11/07/2025 |
04/07/2025
|
26/08/2025
Time
15:0Hrs
|
-
|
50 |
CS for Supervision of Dubrajpur Bypass with 4-lane configuration of length 5.676 km on NH 60 (new NH-14) from design chainage 0.00 (existing km 316.135 on NH60) to design chainage 5.676 (existing km 320.980 on NH 60) in Birbhum West Bengal in EPC Mode |
MORTH/RO-KOL/NIT/AE/2025-26/03 |
08/07/2025 |
02/07/2025
|
25/08/2025
Time
17:0Hrs
|
-
|
51 |
SC during O and M for NH-56 Sultanpur to Varanasi |
RO-PIUVNS-NH56-I II-2025 |
12/08/2025 |
02/07/2025
|
27/08/2025
Time
11:0Hrs
|
-
|
52 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF DAMTENG –SELUNGTHI- LUNGAR- CHUNA ROAD (PACKAGE-2) FROM KM 7.40 TO KM 57.5 NHSL SPECIFICATIONS (DESIGN CHAINAGE KM 7.45 TO KM 56.29 & LENGTH – 48.84 KM) UNDER PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH THROUGH EPC MODE |
CE (P) VTK/NIB/02/2025-26 |
02/07/2025 |
02/07/2025
|
25/08/2025
Time
11:0Hrs
|
-
|
53 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of 4 lane with PS Idar-Badoli bypass section from Design chainage km 81.300 to 95.500 of NH-168G in the state of Gujarat ,Total Length 14.2 Km, on EPC mode |
RW- AE -2025-26-NH-168G-Pkg-II |
01/07/2025 |
01/07/2025
|
16/08/2025
Time
18:0Hrs
|
-
|
54 |
Consultancy Services for Authority’s Engineer for supervision of Rehabilitation and Up-gradation from single lane to two lane with paved shoulder from existing Km 195.175 to Km 220.00 (Design Chainage from Km 71.300 to Km 95.947 Paligad to Jankichatti) on NH 134 in the state of Uttarakhand under EPC mode. |
2025-MoRTH-866664-1 |
30/06/2025 |
01/07/2025
|
22/08/2025
Time
11:0Hrs
|
-
|
55 |
Consultancy Services for Authority Engineer for supervision of Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 Design chainage km 53.365 to km 78.785 on NH-507 in the State of Uttarakhand. |
2025-MoRTH-866650-1 |
01/07/2025 |
01/07/2025
|
22/08/2025
Time
11:0Hrs
|
-
|
56 |
SC for O&M NH 128A 128B 128C |
2025-NHAI-239963-1 |
12/08/2025 |
01/07/2025
|
27/08/2025
Time
11:0Hrs
|
-
|
57 |
Supervision COnsultant for OM for NH-31 |
2025/NHAI/239968/1 |
12/08/2025 |
01/07/2025
|
27/08/2025
Time
11:0Hrs
|
-
|
58 |
SC for Operation and Maintenance phase of Raebareli Prayagraj section of NH-30, Excluding Bypasses |
2025-NHAI-239972-1 |
12/08/2025 |
01/07/2025
|
27/08/2025
Time
11:0Hrs
|
-
|
59 |
Consultancy Services for Authoritys Engineer for Supervision of Construction of A-VOP at Manegaon village at km 468.260 (Wainganga Bridge to MH/CG Border section of NH-53) and B-VOP at km 120.213 at Basamba phata (Washim-Pangare section of on NH-161) and Improvement of Kalmeshwar Town Internal Road (SH-250 and SH-248) and Improvement of bypassed section of NH-53 in Bhandara city in Maharashtra on EPC Mode |
NHAI/RO-NAG/AE/Tender/25-26/06 |
11/08/2025 |
30/06/2025
|
30/08/2025
Time
18:0Hrs
|
-
|
60 |
Construction Supervision Cum Design Consultancy Services for Construction of 2 lane Major Bridge including approaches over Brahmaputra between Majuli on North Bank and Jorhat on South Bank from km.11.690 to km. 19.715 (length of bridge 6,812.5 m) (Package - II) on NH-715K in the state of Assam. (Job No 715/AS/2020-21/213). |
RW/GHT/DP/AS/2020-21/213/234 |
01/07/2025 |
30/06/2025
|
02/09/2025
Time
15:0Hrs
|
|
61 |
Consultancy services as Independent Engineer during Operation and Maintenance for the project Four laning of Kundapur-Surathkal section (Km283.300 to Km.368.080) (Section-1) Mangalore to Kerala Border (Km.375.300 to Km 376.700) (i.e. Nantoor circle to Mahaveer Circle) and Mahaveer Circle to Kerala Border (Km.3.700 to Km.17.200) (Section-2) of NH-66 (Old-NH-17) in the State of Karnataka on DBFOT basis under NHDP-III. B. Consultancy services as Independent Engineer during Operation and Mainten |
NIT No.11/NHAI/RO-BNG/IE-OnM/Tender/2025-26 dated 28.06.2025 |
10/07/2025 |
28/06/2025
|
29/07/2025
Time
15:0Hrs
|
-
|
62 |
Independent Engineering Services during Operation and Maintenance of (i) Oddanchatram to Madathukulam section of NH-83 and (ii) Oddanchatram Bypass of NH-83 in the State of Tamil Nadu (3rd Call) |
NHAI/17011/02/32/2024/RO M |
11/07/2025 |
27/06/2025
|
28/07/2025
Time
12:0Hrs
|
-
|
63 |
Consultancy services for Authority’s Engineer for Supervision of Construction of missing link from Birhu to Lathiani into 4-lane & paved shoulder configuration from km 35/550 (Design Chainage 0.000) to km 42/800 (Design Chainage 8.153) on NH-503A including Cable Stayed Bridge (0.860 km) on Back water of Govind Sagar Reservoir and its approaches in Himachal Pradesh on EPC Mode. |
2025-MoRTH-866452-1 |
30/06/2025 |
27/06/2025
|
11/08/2025
Time
17:0Hrs
|
-
|
64 |
Consultancy services for Authoritys Engineer for Supervision of Work of Up-gradation and Construction to 2L with PS of Chanderi-Pichhore road section of NH-346, Design Length-55.150 Chanderi link bypass in the State of Madhya Pradesh |
866227 |
30/06/2025 |
26/06/2025
|
27/08/2026
Time
11:0Hrs
|
-
|
65 |
Consultancy Services as Authoritys Engineer for supervision of works including Specialized Slope protection Works at various locations between Ch. 0.000 and Ch. 52.100 on NH-10 in the State of West Bengal(2nd Call) |
NHIDCL/HQ/WB/NH-10/Rangpo-Sevoke/AE/2025/2nd call |
26/06/2025 |
26/06/2025
|
21/07/2025
Time
15:0Hrs
|
-
|
66 |
Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation of Shahgarh - Buxwaha - Narsinghgarh - Damoh section of NH-34 (from Ch. 113/00 to Ch 176/500) to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode |
866193 |
18/07/2025 |
26/06/2025
|
11/09/2025
Time
11:0Hrs
|
-
|
67 |
Consultancy Services for Authority Engineer for Supervision of Four Laning of Hospet Bellary section AP Boarder from Km 280.080 to Km 375.450 design length 95.370 NH67 in the state of Karnataka under NHDP PhaseIV B on EPC mode |
NIT No.10/RO-BNG/17017/AE/2025-26 dated 24.06.2025 |
01/07/2025 |
24/06/2025
|
15/07/2025
Time
15:0Hrs
|
-
|
68 |
Consultancy Services for Supervision Consultant for Operation Maintenance of Four lane of Hisar- Dabwali section of NH-9 (Old NH- 10) from Km. 170.000 to 314.660 in the State of Haryana |
2025-NHAI-239225-1 |
27/06/2025 |
23/06/2025
|
22/07/2025
Time
15:0Hrs
|
-
|
69 |
Consultancy Services for Supervision Consultants (SC) of Operation & Maintenance of Two Lane with Paved Shoulder of Dindigul to Nattham section from Km 0.000 to Km 38.000 of NH-383 in the State of Tamil Nadu |
NHAI/17011/02/37/2025/RO Madurai |
11/07/2025 |
21/06/2025
|
12/08/2025
Time
11:0Hrs
|
-
|
70 |
Consultancy Services for Supervision Consultants (SC) of Operation & Maintenance of Two Lane with Paved Shoulder of Thanjavur to Perambalur section from Km 6.000 to Km 74.912 of NH-136 (Old No. NH-226E) in the State of Tamil Nadu |
NHAI/17011/02/38/2025/RO Madurai |
11/07/2025 |
21/06/2025
|
12/08/2025
Time
12:0Hrs
|
-
|
71 |
Consultancy Services for Authority Engineer for Road Safety Improvement of existing Four Lane Section of Dehradun-Lal Tappar-Nepali Farm Section of NH-7 Design Chainage 501-930 to 531-330 and Nepali Farm-Motichur Section of NH-34 Design Chainage 531-330 to 538-750 on EPC Mode in the State of Uttarakhand under NH-O |
UK DIV-20013/10/2024-O/o GM Tech |
17/07/2025 |
20/06/2025
|
12/08/2025
Time
11:0Hrs
|
-
|
72 |
Independent Engineer services for operation and maintenance of 6 lane Extra Dosed Cable Stayed Sister Nivedita Bridge (2nd Vivekananda Bridge) Tollway Project over river Hooghly along with its approaches (km 653.010 to km 659.051 on NH-2) on BOT (Toll) Basis under NHDP-Phase-I in the state of West Bengal |
NHAI/RO-KOL/SVBTC/IE/25-26/07 |
19/06/2025 |
18/06/2025
|
24/07/2025
Time
12:0Hrs
|
-
|
73 |
Consultancy services for Independent Engineer during Operation and Maintenance of 4-Laning from km 0.000 to km 26.400 (along with 0.700km approach towards NH 207 with interchange on NH4 at start point) of Bangalore to Malur Section (Package-I) from km 26.400 to km 53.500 of Malur to Bangarpet Section (Package-II) and from 53.500 to km of Bangarpet to Bethamangala Section (Package-III) of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka |
NIT No.09/NHAI/RO-BNG/IE/BCE/Tender/2025-26 dated 16.06.2025 |
09/07/2025 |
16/06/2025
|
31/07/2025
Time
15:0Hrs
|
-
|
74 |
Consultancy Services for Supervision Consultant for Operation and Maintenance of Four Lane Divided Highway from Madurai - Chettikulam - Natham section from Km 0.000 to Km 36.690 of NH-785 in the State of Tamil Nadu (2nd Call) |
NHAI/17011/02/33/2024/RO |
07/07/2025 |
14/06/2025
|
21/07/2025
Time
12:0Hrs
|
-
|
75 |
Independent Engineer Services during Operation and Maintenance stage of four lane Zirakpur-Parwanoo Section of NH-05 (Old NH-22) from Km. 39.960 to Km. 67.550 including Pinjore-Kalka-Parwanoo Bypass in the states of Punjab, Haryana and Himachal Pradesh under NHDP Phase-III A on BOT Basis. |
2025-NHAI-238364-1 |
17/06/2025 |
13/06/2025
|
10/07/2025
Time
15:0Hrs
|
-
|
76 |
Independent Engineer Services for 4 Laning of Parmakudi - Ramanathapuram Section of NH-87 in Tamil Nadu on HAM under NH(O) (Project Length-46/665 km) |
2025-NHAI-237977-1 |
03/07/2025 |
10/06/2025
|
24/07/2025
Time
11:0Hrs
|
-
|
77 |
Consultancy services for Construction of Jharsuguda Bypass including ROB including land acquisition on NH-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of Odisha. |
01-ROBBSR-2025-26-AE |
10/06/2025 |
09/06/2025
|
30/07/2025
Time
15:0Hrs
|
-
|
78 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Bomdila 9th Mile Nafra Lada section of Frontier Highway NH 913 9th mile Nafra 19.554 to 70.00 =50.446 km |
RW/NH-913/FH/AE/Tender/25-26/1 |
06/06/2025 |
07/06/2025
|
15/09/2025
Time
13:0Hrs
|
-
|
79 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Bomdilla 9th Mile Nafra Lada section of Frontier Highway NH 913 Dishum Sachung Lada 70.00 to 167.75= 97.75km |
RW/NH-913/FH/AE/Tender/25-26/2 |
06/06/2025 |
07/06/2025
|
15/09/2025
Time
14:0Hrs
|
-
|
80 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Lada Sarli section of Frontier Highway NH-913 Lada to Bameng 0.00 to 43.65 =43.65 km |
RW/NH-913/FH/AE/Tender/25-26/3 |
06/06/2025 |
07/06/2025
|
15/09/2025
Time
15:0Hrs
|
-
|
81 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Lada Sarli section of Frontier Highway NH-913 Bameng Khenewa 43.65 to 85.60 = 41.950 km |
RW/NH-913/FH/AE/Tender/25-26/4 |
06/06/2025 |
07/06/2025
|
15/09/2025
Time
16:0Hrs
|
-
|
82 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Khenewa to Koloriang 85.60 to 168.00 km = 82.400 km |
RW/NH-913/FH/AE/Tender/25-26/5 |
06/06/2025 |
07/06/2025
|
15/09/2025
Time
17:0Hrs
|
-
|
83 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 koloriang to Sarli km 168.0 to 183.40 15.40 km and Sarli to Huri km 0.00 to 78.38 =78.38km |
RW/NH-913/FH/AE/Tender/25-26/6 |
06/06/2025 |
07/06/2025
|
16/09/2025
Time
13:0Hrs
|
-
|
84 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 Huri Parsi Palo km 0.00 to 55.725 = 55.725 km |
RW/NH-913/FH/AE/Tender/25-26/7 |
06/06/2025 |
07/06/2025
|
16/09/2025
Time
14:0Hrs
|
-
|
85 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 55.725 to 113.25 = 57.525 km |
RW/NH-913/FH/AE/Tender/25-26/8 |
06/06/2025 |
07/06/2025
|
16/09/2025
Time
15:0Hrs
|
-
|
86 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 km 160.750 to km 209.9 =49.15 km |
RW/NH-913/FH/AE/Tender/25-26/9 |
06/06/2025 |
07/06/2025
|
16/09/2025
Time
16:0Hrs
|
-
|
87 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Taliha to Tato section of Frontier Highway NH 913 km 0.00 to 60.25= 60.25km |
RW/NH913/FH/AE/Tender/25-26/10 |
06/06/2025 |
07/06/2025
|
16/09/2025
Time
17:0Hrs
|
-
|
88 |
Consultancy Services for Authority Engineer for supervision of Construction of road from Taliha to Tato section of Frontier Highway (NH-913) km 87.13 to 121.541 = 34.411 km |
RW/NH-913/FH/AE/Tender/25-26/11 |
06/06/2025 |
07/06/2025
|
17/09/2025
Time
13:0Hrs
|
-
|
89 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Bile Migging section of Frontier Highway NH 913 km 0.00 from Migging end to 17.812 17.812 km km 17.812 to 55.377 Migging end 37.565 km km 0.000 at Bile end to 27.430 |
RW/NH913/FH/AE/Tender/25-26/12 |
06/06/2025 |
07/06/2025
|
17/09/2025
Time
14:0Hrs
|
-
|
90 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 113.25 to 160.75= 47.500 km |
RW/NH913/FH/AE/Tender/25-26/13 |
06/06/2025 |
07/06/2025
|
17/09/2025
Time
15:0Hrs
|
-
|
91 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Kharsang Miao Vijaynagar section of Frontier Highway NH 913 km 0.000 to 81.400= 81.400km |
RW/NH913/FH/AE/Tender/25-26/14 |
06/06/2025 |
07/06/2025
|
17/09/2025
Time
16:0Hrs
|
-
|
92 |
Consultancy services for Authoritys Engineer for Supervision of Construction of road from Kharsang Miao Vijaynagar section of Frontier Highway NH 913 km 81.400 to 156.095=74.695km |
RW/NH913/FH/AE/Tender/25-26/15 |
06/06/2025 |
07/06/2025
|
17/09/2025
Time
17:0Hrs
|
-
|
93 |
IE Services during OnM stage of 4Laned divided carriageway from Km.175(MH TG Border) to Km.308 (Armur)(Package Nos.NS-2/BOT/AP-6,AP-7,AP-8) on Nag Hyd Sec of NH44) in the State of Telangana on BOT (Annuity) Basis under NS Corr (NHDP Phase-II) |
236352 |
06/06/2025 |
06/06/2025
|
10/07/2025
Time
11:0Hrs
|
-
|
94 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar Village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under NH(O) – 2nd Call |
NHAI/Tech/Pathankot LinkRoad/ 2024/AE/ E-187006 |
19/06/2025 |
04/06/2025
|
08/07/2025
Time
11:0Hrs
|
-
|
95 |
IE Services for O and M of Four laning of Nanasa to Pidgaon section of NH 47 Old NH59A Indore Harda Package III Length 47.445 km Design Ch. 95.000 km to 142.445 Km under Bharatmala Pariyojna Phase I Economic Corridor in the State of MP HAM |
NHAI/RO-BPL/O&M/HD/N-P/2025 |
17/06/2025 |
03/06/2025
|
08/07/2025
Time
11:0Hrs
|
-
|
96 |
Consultancy Service for Authority Engineer for Supervision of Up-gradation to two lane with Paved Shoulder from Design Chainage Km. 118.813 to Km. 148.810 and Km. 155 to Km. 165.082 of NH-351 in the state of Gujarat |
RW- AE -2025-26-NH351-Pkg-IV |
03/06/2025 |
03/06/2025
|
06/09/2025
Time
18:0Hrs
|
-
|
97 |
Consultancy Services for Supervision of Construction of 4 Lane Raniganj By-Pass of length 5.261 Km on NH-60 (New NH-14) from Km 275.20 of NH-60 to Km 478.18 of NH-2 (New NH-19) in Paschim Bardhaman, West Bengal in EPC Mode. (Job No. 014-WB-2022-23/514) |
MORTH/RO-KOL/NIT/AE/2025-26/01 |
03/06/2025 |
03/06/2025
|
24/07/2025
Time
15:0Hrs
|
-
|
98 |
Consultancy Services as Authoritys Engineer for supervision of works including Specialized Slope protection Works at various locations between Ch. 0.000 and Ch. 52.100 on NH-10 in the State of West Bengal |
NHIDCL/HQ/WB/NH-10/Rangpo-Sevoke/AE/2025 |
03/06/2025 |
03/06/2025
|
02/07/2025
Time
15:0Hrs
|
-
|
99 |
Consultancy Services for Authoritys Engineer for Development of 6 lane green field (Package-IIA) starts from Design Ch.23.325 to Design ch. 32.090 around Kanpur city (Length 8.765 kms) in the state of Uttar Pradesh on EPC mode and Development of 6 lane green field (Package-IIB) starts from Design Start from Ch.32.090 to Ch. 51.200 around Kanpur city (Length 19.110 kms) in the state of Uttar Pradesh on EPC mode |
NHAI/HQ/UP(W)/II-A and II-B/6L/AE/2025 |
02/06/2025 |
02/06/2025
|
23/06/2025
Time
11:0Hrs
|
-
|
100 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF UP-GRADATION OF PICHHORE-DINARA SECTION OF NH-346 FROM KM 292.750 TO 334.550 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF MADHYA PRADESH ON EPC MODE |
862758 |
15/07/2025 |
02/06/2025
|
02/09/2025
Time
17:30Hrs
|
-
|
101 |
Independent Engineer Services during Operation and Maintenance Period for Four Lane Bhavnagar-Talaja Section of NH-51 (Old NH-8E) from km 07.090 to km 53.585 (Design Ch. from km 6.945 to km 54.990) in the State of Gujarat on Hybrid Annuity Mode (Pkg-I) |
NHAI/ROGNR/NH-8E/Bhav-Tal/IE/OM/2025 |
02/06/2025 |
31/05/2025
|
11/09/2025
Time
12:0Hrs
|
-
|
102 |
IE services for Construction of 4 lane of Dewas Ujjain Section of NH752D from Design Ch 0.000 to 19.733 and Construction of 4 lane Ujjain Bypass from Design Ch 19.733 to 26.900 Part 1 and construction of 4 lane Dewas Bypass from Design Ch 0.000 to 14.520 Part 2 with a total design length of 41.42 km in the State of MP on HAM Mode |
2025-NHAI-236852-1 |
13/06/2025 |
29/05/2025
|
14/07/2025
Time
11:0Hrs
|
-
|
103 |
Independent Engineer Services during O and M Period for Four Lane Kagvadar- Una- Kodinar- Veraval Section of NH-8E from km 139.915 to km 222.400 and km 230.000 to km 263.000 in the State of Gujarat on HAM mode and Kodinar bypass km 222.400 to km 230.000 in the State of Gujarat on Item Rate mode (Pkg-IV, V, VI-A, and VI-B) |
NHAI/ROGNR/NH-8E/Kag-Ver/IE/OM/2025 |
02/06/2025 |
28/05/2025
|
12/08/2025
Time
12:0Hrs
|
-
|
104 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF Upgradation to 2L PS from Km 0 to 47 Mahuva Badhada section of NH 351 in the State of Gujarat on EPC mode |
AE of 2025-26 |
27/05/2025 |
27/05/2025
|
23/06/2025
Time
17:0Hrs
|
-
|
105 |
RFP for Independent Engineer Services during Operation & Maintenance period of Tolling, Operation, Maintenance & Transfer of Orai- Bara Section from Km 1515 713 to Km 1578 872 of NH-25 in the State of Uttar Pradesh. |
FINDIV-16012(14)/1/2025-TOT/ INVIT Division/07 |
22/05/2025 |
22/05/2025
|
13/06/2025
Time
15:0Hrs
|
-
|
106 |
Independent Engineer Services during O and M Period for Six Laned Ahmedabad-Vadodara Section of NH-48 from km 6.400 to km 108.700 (Length-102.300 km) and Ahmedabad-Vadodara Expressway NE-1 from km 0.000 to km 93.302 (Length 93.302 km) in the State of Gujarat under NHDP Phase-V on DBFOT Toll Basis |
NHAI/ROGNR/Ahmd-Vad/NH-48,NE-1/IE/OM/2025 |
02/06/2025 |
22/05/2025
|
14/07/2025
Time
15:0Hrs
|
-
|
107 |
Independent Engineering Services for Operation and Maintenance of Churhat bypass section including Tunnel on Rewa Sidhi section of NH 75E from Ch. 33.200 to Ch. 55.400 Design length 15.350 km. in the State of MP on Hybrid Annuity Mode |
NHAI/ROBPL/Katni/IE/OM/NH39/2025/ |
30/05/2025 |
21/05/2025
|
15/07/2025
Time
12:0Hrs
|
-
|
108 |
Consultancy Services as Authority Engineer for supervision of works including Landslides Mitigation Treatment and Road Maintenance Works in the highway section from km 368.00 to km 468.00 on NH-07 in the state of Uttarakhand |
NHIDCL/UK/SP/AE/2024 |
27/05/2025 |
21/05/2025
|
07/07/2025
Time
15:0Hrs
|
-
|
109 |
RFP for Independent Engineer Services during Operation & Maintenance period of Tolling, Operation, Maintenance & Transfer of Chichra-Kharagpur Section of NH-49 from Existing km 185 150 (Design Km 16 130) to km 129 000 (Design km 72 250) in the state of West Bengal. |
FINDIV-16/1/2025-TOT/ INVIT Division/06 |
21/05/2025 |
21/05/2025
|
09/06/2025
Time
11:0Hrs
|
-
|
110 |
Independent Engineer services during Operation and Maintenance Stage of four laning of Kaithal Rajasthan Border section of NH-65 (New NH-52-152) from Km. 33.250 (Design Km. -0.500) to Km. 241.580 (Design Km. 165.759) in the state of Haryana under NHDP Phase- IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. |
2025-NHAI-236023-1 |
22/05/2025 |
21/05/2025
|
23/06/2025
Time
11:0Hrs
|
-
|
111 |
IE services during O and M Period for 4 laning of Berhampore Farakka Section of NH-12 (old NH-34) from Km 191.700 to Km 292.300 in the State of West Bengal on DBFOT Toll Basis under NHDP Phase-III |
05/OandM/IE/NH-12/2024-25 |
20/05/2025 |
20/05/2025
|
15/07/2025
Time
12:0Hrs
|
-
|
112 |
Independent Engineer (IE) Services during O and M Period of Four Laning of Gujarat-Maharashtra Border-Surat-Hazira Port Section of NH-6 (approx. length 131.500 km) in the state of Gujarat under NHDP Phase III on DBFOT mode |
2025-NHAI-235968-1 |
21/05/2025 |
20/05/2025
|
26/06/2025
Time
15:0Hrs
|
-
|
113 |
6 laning of Hapur Bypass to Moradabad Section including Hapur Bypass from Km 50 to Km 148.277 of NH-9 and from Km 148 to Km 149.250 (including existing flyover) in the state of up on DBFOT (Toll) under NHDP Phase-V 2nd Call |
NHAI/OM/IE /HapurMoradabad 2nd Call |
14/06/2025 |
19/05/2025
|
28/07/2025
Time
14:0Hrs
|
|
114 |
Consultancy services for appointment of Authoritys Engineer for CONSTRUCTION OF 2 LANE 386 MTR SPAN 260 plus 63 plus 63 EXTRADOSED CABLE STAYED BRIDGE BRIDGE OVER RIVER SIANG AT DESIGN CHAINAGE KM 2 pt 908 AND 63 pt 50 MTR SPAN MAJOR BRIDGE AT DESIGN CHAINAGE KM 2 pt 590 IN BETWEEN KM 118 pt 8 JUNCTION OF NH 513 WITH YINGKIONG TO MOYING VILLAGE JUNCTION AT KM 93 pt 50 OF DITTE DIMME MIGGING ROAD UNDER 761 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH ON EPC MODE |
CE (P) BMK/03/2024-25 (4th Call) |
18/05/2025 |
18/05/2025
|
09/07/2025
Time
11:0Hrs
|
|
115 |
Consultancy Services for Supervision Consultant for Four laned Rohtak to Panipat section of NH-709 (Old NH-71A) from km. 0.000 to km. 80.858 in the state of Haryana executed on DBFOT mode (Terminated). |
2025-NHAI-235507-1 |
20/05/2025 |
15/05/2025
|
19/06/2025
Time
11:0Hrs
|
-
|
116 |
Independent Engineer Services for Construction to 2-Lane with Paved Shoulder of Tura Bypass between Existing km 57.500 of NH-127B (near km 85.800 of NH-217) (design chainage km 0.000) and ending at existing km 108.750 of NH-217 (design chainage km 29.030) (Length 29.030km) on Hybrid Annuity Mode |
2025-NHIDC-860163-1 |
15/05/2025 |
15/05/2025
|
23/06/2025
Time
15:0Hrs
|
-
|
117 |
Independent Engineer Services for Supervision of 4-lane Pathalgaon-Kunkuri CG JH border section of NH-43 starting from end point of NH-130A, design Ch 00.000 to Ch. 104.250 from Turua Ama village to Putrichoura village as part of Raipur-Dhanbad Economic Corridor under Bharatmala Pariyojana Lot-5/Pkg-7 in the state of Chhattisgarh- 2nd Call |
NHAI/11012/CG/Pathalgaon-Kunkuri/IE/2025 |
16/05/2025 |
14/05/2025
|
03/06/2025
Time
11:0Hrs
|
-
|
118 |
Consultancy services for Authoritys Engineer for supervision of Construction of four lane of Chausa Buxar Bypass from km 45.000 to km 65.915 (Package 2) of NH 319A in the state of Bihar on EPC mode. |
RW/PAT/NH-319A(Pkg2)/CS/2024 |
16/05/2025 |
13/05/2025
|
04/07/2025
Time
17:0Hrs
|
-
|
119 |
Independent Engineer Services for 4 Laning of Marakkanam - Puducherry Section of NH-332A in Tamil Nadu on HAM (Project Length-46 km) (Mahabalipuram - Puducherry Package-III) |
2025-NHAI-234703-1 |
09/05/2025 |
07/05/2025
|
28/08/2025
Time
11:0Hrs
|
-
|
120 |
Independent Engineer Services 4 Laning of Rajapalayam to Shenkottai Section of NH-744 in Tamil Nadu on HAM (Project Length-68.3Km) |
2025-NHAI-234722-1 |
09/05/2025 |
07/05/2025
|
24/07/2025
Time
11:0Hrs
|
-
|
121 |
Consultancy services for Authority Engineer for Construction of Descoped Portion of Binnaguri Bypass in Binnaguri Mouza of NH 27 Old NH-31D from Chainage 17.500 to 23.000 of old NH 31D in the District of Jalpaiguri West Bengal on EPC Mode under NH O |
2025 NHAI 234473 1 |
05/05/2025 |
05/05/2025
|
04/06/2025
Time
15:0Hrs
|
-
|
122 |
Balance Works for Four laning of Vikravandi to Sethiyathope section (from Km 0.0 to Km 65.96) of NH-45C in Tamil Nadu under NHDP Phase-IV on EPC mode – (2nd Call) |
2025-NHAI-234333-1 |
02/05/2025 |
02/05/2025
|
22/05/2025
Time
11:0Hrs
|
-
|
123 |
Consultancy services for AE for supervision of Rehabilitation and Upgradation of NH 7538 from Nandurbar to Taloda to 4LPS in the States of Maharashtra-Gujarat on EPC mode. |
NH/MAH/RO/Pune-4/AE/PKG-10 |
30/05/2025 |
30/04/2025
|
27/06/2025
Time
17:0Hrs
|
-
|
124 |
Consultancy services for Authoritys Engineer for Supervision of Work of Rehabilitation and Upgradation of Sendhwa to Khetiya (MP/MH Border) Section from km 0/000 to km 55/600 of NH-752(G) to 2L with PS in the State of Madhya Pradesh on EPC mode |
857846 |
06/05/2025 |
29/04/2025
|
02/09/2025
Time
11:0Hrs
|
-
|
125 |
Independent Engineer services for Construction/Upgradation of Existing Road to Two Lane with Paved Shoulder for the Stretch of Tikamgarh-Badagon-Ghuwara-Shahgarh from km 75/000 to km 155/700 (NH-539) in the State of Madhya Pradesh on Hybrid Annuity Mode |
2025-MoRTH-857774-1 |
13/05/2025 |
28/04/2025
|
10/09/2025
Time
17:30Hrs
|
-
|
126 |
Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation of Existing Intermediate Lane Flexible Pavement to 2L with PS from Km 0.00 to Km 75.00 on Orchha Tikamgarh Shahgarh NH 539 in the State of Madhya Pradesh on EPC Mode |
2025-MoRTH-857688-1 |
13/05/2025 |
28/04/2025
|
10/09/2025
Time
17:30Hrs
|
-
|
127 |
Consultancy Services for Authority Engineer for Construction of Six laning of Aurangabad to BiharJharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode |
2025-NHAI-233869-1 |
29/04/2025 |
28/04/2025
|
27/05/2025
Time
11:0Hrs
|
-
|
128 |
Consultancy Services for Authority Engineer for Supervision of Construction of Two Lane with Paved Shoulders for Gowrelly to Valigonda Section from Km 0.000 to Km 41.920 Green Field Alignment of NH 930P in the State of Telangana on EPC Mode |
RW/HYD/Misc-28/NIT/AE 2025-26/01 dt 24-04-2025 |
26/04/2025 |
24/04/2025
|
09/06/2025
Time
15:0Hrs
|
-
|
129 |
Consultancy Services for Supervision Consultant of Operation and Maintenance of four-laning of Ambala-Kaithal section of NH-65 (new NH-152) from Km. 0.000 to 3.700 and 46.200 to Km 95.360 and Ambala-Saha section of NH-444A from Km. 0.000 to Km. 14.840 (total length 67.7 kms) in the State of Haryana. |
2025-NHAI-233591-1 |
29/04/2025 |
24/04/2025
|
09/06/2025
Time
11:0Hrs
|
-
|
130 |
AE for Construction of new 6 Lane Access Control Prayagraj Southern Greenfield Bypass from design Km 34.4 near Dandupur to design Km. 43.2 near Mahuwari pkg 1 under Phase 1 in the state of UP under NH O on EPC mode |
2025-NHAI-233620-1 |
30/04/2025 |
24/04/2025
|
27/05/2025
Time
11:0Hrs
|
-
|
131 |
Additional works to ensure Road Safety for 6 lane Bangalore Mysore access controlled section of NH275 in Karnataka on Hybrid Annuity Model HAM under NH O Project Length 2.017 Km 2nd Call |
2025NHAI2335131 |
23/04/2025 |
23/04/2025
|
15/05/2025
Time
15:0Hrs
|
-
|
132 |
Consultancy Services for Authority Engineer for Supervision of 2 Lane Paved Shoulder 4 laning of Damoh Jabalpur Section of NH-34 in the State of Madhya Pradesh [From Damoh (Design Ch.0.000km) to Jabera (Design Ch.43.500)] (Project Length – 43.500 km) under NH(O) on EPC Mode |
233364 |
23/04/2025 |
22/04/2025
|
20/08/2025
Time
11:0Hrs
|
-
|
133 |
Independent Engineer Services for Access Controlled Highway of 4 Lane with Paved Shoulders from Walajapet/ Ranipet to TN/AP Border of NH-40 in Tamil Nadu on HAM under NH(O) (Project Length – 28.021 Km) - (2nd Call) |
2025-NHAI-233339-1 |
22/04/2025 |
22/04/2025
|
14/05/2025
Time
11:0Hrs
|
-
|
134 |
Consultancy services for AE for supervision of Rehabilitation and upgradation of Wardha (Salod Hirapur) – Pulgaon Section 2LPS configuration in the state of Maharashtra on EPC mode |
NH/MAH/RO/Ngp-1/AE/PKG-5 |
06/05/2025 |
17/04/2025
|
27/06/2025
Time
17:0Hrs
|
-
|
135 |
Consultancy services for AE for supervision of Rehabilitation and Up-gradation of NH-166G Gaganbawada to Kale to 2-Lane with paved shoulder configuration in the state of Maharashtra on EPC mode. |
NH/MAH/RO/Pune-1/AE/PKG-3 |
07/05/2025 |
17/04/2025
|
27/06/2025
Time
17:0Hrs
|
-
|
136 |
Services of IE for Widening, Reconstruction and Up-gradation to 2LPS for the work of Bhimashankar- Taleghar-Wada-Rajgurunagar Road (NH-60 Spur) in the State of Maharashtra HAM. |
NH/MAH/RO/Pune-2/IE/PKG-8 |
22/05/2025 |
17/04/2025
|
27/06/2025
Time
17:0Hrs
|
-
|
137 |
Services of IE for Widening, Reconstruction and Up-gradation to 2LPS for the work of Junnar- Ghodegaon - Taleghar Road (NH-61 Spur) from km 13-880 to km 69-820 (Design length -55.940 Km) in the state of Maharashtra on Hybrid Annuity Mode. |
NH/MAH/RO/Pune-3/IE/PKG-9 |
23/05/2025 |
17/04/2025
|
27/06/2025
Time
17:0Hrs
|
-
|
138 |
Consultancy services for AE for supervision of Construction of ROB with approaches in lieu of Railway crossing LC 20 on NH 161H at km 24-913 (near Nandura) in the state of Maharashtra on EPC mode. |
NH/MAH/RO/Ngp-2/AE/PKG-7 |
21/05/2025 |
17/04/2025
|
27/06/2025
Time
17:0Hrs
|
-
|
139 |
Consultancy services for AE for supervision of Rehabilitation and Up-gradation to 2LPS of Kalyan - Murbad - Malshej Ghat - Nirmal Road NH-61 from km 37-850 to km 57-900 (Murbad to Kadampada section) in the State of Maharashtra on EPC Mode. |
NH/MAH/RO/Mum-1/AE/PKG-4. |
02/05/2025 |
17/04/2025
|
27/06/2025
Time
17:0Hrs
|
-
|
140 |
Consultancy services for AE for supervision of Rehabilitation and upgradation from of Kolde to Visarwadi (Near Junction with NH-6) section of NH752G (total length -4.40) to 2LPS/ four lanes in the State of Maharashtra on EPC mode. |
NH/MAH/RO/Pune-2/AE/PKG-6 |
04/05/2025 |
17/04/2025
|
27/06/2025
Time
17:0Hrs
|
-
|
141 |
IE Services for O and M stage of 4 laning of Dhangaon Boregaon section of NH 347BG and 753L Indore Boregaon PKG IV from Design Ch. 81.000 to Km. 139.000 Length 58.00 Km under Bharatmala Pariyojana Phase I in the State of MP on HAM |
NHAI/ROBPL/KHW/IE/DB/2025 |
21/04/2025 |
11/04/2025
|
13/05/2025
Time
11:0Hrs
|
-
|
142 |
Independent Engineer services for Development of 4 lane Economic Corridor from Before Mayurakshi Bridge Approach to Moregram section Km 180.000 to Km 230.957 of NH 116A (Package-5) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode |
NHAI/WB/Kharagpur-Moregram/Pkg5/IE/2025/2nd Call/E-227538 |
21/04/2025 |
11/04/2025
|
14/05/2025
Time
15:0Hrs
|
-
|
143 |
Independent Engineer Services for Construction of 4-lane Greenfield Sagar Western Bypass from Design Km 0.000 (Ex Km 181.000 on NH-146) near Lahdara Village Junction on NH-146 to Design Km 20.193 (Ex Km 223.200 on NH-44) near Berkheri Guru village Junction on NH-44 of Length-20.193 km in the State of Madhya Pradesh on Hybrid Annuity mode |
MPDIV-23011/1/2025-MP Division |
09/04/2025 |
09/04/2025
|
13/08/2025
Time
11:0Hrs
|
-
|
144 |
Consultancy Services for Supervision Consultant for O and M of Four lane Rohtak-Bawal section of NH-352 (Old NH- 71) from Km. 363.300 (intersection with NH-09) to Km. 446.955 (intersection with NH-48) in the State of Haryana in the state of Haryana executed on DBFOT mode (Terminated) |
2025-NHAI-232500-1 |
29/04/2025 |
09/04/2025
|
09/06/2025
Time
11:0Hrs
|
-
|
145 |
Consultancy Services of AE for Construction of 6-Lane Patna Ring Road Highway NH-131G from Kanhauli to Sherpur from Km.0.000-Km8.480 including Junction Development with Bihta-Danapur elevated corridor App.length-1.5 Km on EPC Mode in Bihar |
2025-NHAI-232524-1 |
18/08/2025 |
09/04/2025
|
08/09/2025
Time
11:0Hrs
|
-
|
146 |
Independent Engineer Services for 4 - Laning of Silchar (near Budha Nagar) at Existing Km 233.000 (D. Ch.24.560) to Jiribam at Existing km 212.060 (D. Ch. 37.650) of NH-37 (Length- 13.09 km) in the State of Assam and Manipur under NH(O)-NE on Hybrid Annuity Mode (HAM) (Pkg-2). |
NHIDCL/Assam/NH-37/SJ-II/IE/25 |
04/04/2025 |
04/04/2025
|
13/05/2025
Time
15:0Hrs
|
-
|
147 |
Independent Engineer Services during Operation and Maintenance of Six-laning of NH-71 from Renigunta (Km. 0.000) to Naidupeta (Km.57.046) (Length-57.046 Km.) on Hybrid Annuity Mode in the State of Andhra Pradesh under Bharatmala Pariyojana. |
2025-NHAI-232055-1 |
07/04/2025 |
04/04/2025
|
20/05/2025
Time
11:0Hrs
|
-
|
148 |
Consultancy Services of AE from Ch.0-2 MajorBridge of 680m (ii)Construction/Upg of Existing Road to 2L PS from Ranipool to Pakyong from Km 2-16.167 (Balance Work) of NH-717-A Construction of 48m Chuba Khola Bridge fromKm 75.300 - 75.800 on NH-10 |
NHIDCL/HQ/Sikkim/AE/Ranipool-Pakyong/2025 |
02/04/2025 |
02/04/2025
|
28/04/2025
Time
15:29Hrs
|
-
|
149 |
Consultancy services for AE for Supervision of work from Nagaon to Dolabari in the state of Assam |
NHIDCL/Assam/Dola-Jamu/AE/ |
03/04/2025 |
01/04/2025
|
05/05/2025
Time
15:0Hrs
|
-
|
150 |
Consultancy Services as IE during Operation and Maintenance of ZMorh tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of JK on DBFOT annuity basis |
NHIDCL/JK/ Z-Morhtunnel/IE/2024 |
08/04/2025 |
01/04/2025
|
09/05/2025
Time
15:0Hrs
|
-
|
151 |
Consultancy Services as Supervision Consultant during Operation and Maintenance DLP for Four Laning of Varanasi Gorakhpur section of NH29 |
227524 |
31/03/2025 |
01/04/2025
|
29/04/2025
Time
16:30Hrs
|
-
|
152 |
Independent Engineer Services during Operation and Maintenance stage of the Project Construction of Bridges across Dibang and Lohit river systems including approach roads between Chowkham-Digaru and Bomjur-Meka (Bomjur-Meka Ch. km 613.51 to Km 632.45 and Chowkham-Digaru ch. Km 689.80 to Km 701.80) in the state of Arunachal Pradesh on DBFOT Annuity basis under Arunachal Pradesh Package of SARDP-NE |
052/Ar.Pkg/BOT/2024-25/RO-Ita |
30/03/2025 |
31/03/2025
|
21/04/2025
Time
11:0Hrs
|
-
|
153 |
RFP for Independent Engineer Services during Operation and Maintenance of the stretch Tolling, Operation, Maintenance & Transfer of Kota Bypass from Km. 1052 429 to Km. 1080 249 of NH-27 including Cable Stayed Bridge (TOT-13) in the State of Rajasthan- (2nd Call). |
2025-NHAI-231707-1 |
17/04/2025 |
29/03/2025
|
28/04/2025
Time
11:0Hrs
|
-
|
154 |
CS fro AE for sup. of Strengthening Construction of i.3L ROB at km.406.300 (LHS), ii. 3L ROB at km.431.415 (LHS) of Chilakaluripeta-Vijayawada sec. of NH-16 and iii. 2L ROB at km.5.467 (RHS) at Ibrahimpatnam Chadragudem section of NH-30 in the AP |
2025-NHAI-231481-1 |
08/04/2025 |
28/03/2025
|
25/04/2025
Time
18:0Hrs
|
-
|
155 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF DAMTENG –SELUNGTHI- LUNGAR- CHUNA ROAD (PACKAGE-2) FROM KM 7.40 TO KM 57.5 NHSL SPECIFICATIONS (DESIGN CHAINAGE KM 7.45 TO KM 56.29 & LENGTH – 48.84 KM) UNDER PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH THROUGH EPC MODE |
CE (P) VTK/NIB/09/2024-25 |
28/03/2025 |
28/03/2025
|
27/06/2025
Time
11:0Hrs
|
-
|
156 |
SC Services during On M stage of Jaisalmer Barmer section and Barmer Sanchore Gandhav Gujarat border section (Total Length 269.377) of NH 68 in the state of Rajasthan |
NHAI/11011/1/Tenders-ROJ/ SC-JB-BSG/ |
28/04/2025 |
27/03/2025
|
15/05/2025
Time
11:0Hrs
|
|
157 |
SC Services for Strengthening or Overlay and Operation and Maintenance work on Kota Baran section of NH 27 from Km 1080.263 to Km 1184.322 (length 104.059 km) in the State of Rajasthan |
NHAI/11011/1/Tenders-ROJ/SC-KB |
29/04/2025 |
27/03/2025
|
15/05/2025
Time
11:0Hrs
|
|
158 |
Consultancy Services for Authority Engineer for Supervision of Construction of Underpass on NH–31 (old NH–56) for proposed Expansion of Runway of Lal Bahadur Shastri International Airport at Varanasi in the state of Uttar Pradesh on deposit basis. |
NHAI/HQ/UP(E) /Varanasi Airport/AE/2025 |
01/04/2025 |
26/03/2025
|
06/05/2025
Time
11:0Hrs
|
-
|
159 |
Supervision Consultancy (SC) services during Operation and Maintenance (Total length 131.813 Km) of Chauka to Baharagorasection of NH-33 (from km 217.300 to km 333.500) & from km. 199.200 to km 183.587 of NH-06 in the State of Jharkhand |
NHAI/RO/RNC/JH/2024-25/18 |
23/04/2025 |
25/03/2025
|
19/05/2025
Time
11:0Hrs
|
-
|
160 |
Supervision Consultancy (SC) services during Operation and Maintenance of the stretch from km0.0000 to km 41.279 in the state of Jharkhand (Total Length 41.279 Km) of Barhi- Hazaribagh section of NH-20 (Old NH-33) in the State of Jharkhand |
NHAI/RO/RNC/JH/202425/17 |
01/05/2025 |
25/03/2025
|
19/05/2025
Time
11:0Hrs
|
-
|
161 |
Supervision Consultancy for OnM of NH 68 from Tanot Ramgarh Bhadasar Jaisalmer and NH 968 from Bhadasar Sarkaritala upto Pakistan Border under Phase I of Bharatmala Pariyojana |
NHAI/11011/2/Tenders-ROJ/SC-JT |
25/03/2025 |
22/03/2025
|
22/04/2025
Time
11:0Hrs
|
|
162 |
Independent Engineer services for Operation and Maintenance of Four laning of Sinnar-Shirdi section of NH 160 from Km 0 000 to Km 50 943 in the State of Maharashtra 2nd call |
RO/MUM/NSK/SS/IE/2ndcall |
21/03/2025 |
21/03/2025
|
28/04/2025
Time
11:0Hrs
|
-
|
163 |
Consultancy Services of Authority Engineer for Improvement Construction To 2 Lane with Paved Shoulder of old NH 40 new NH 206 from Km 37.550 to Km 45.760 Design Km 0.000 to Km 7.760 Package 3 Pynursla Bypass on EPC mode |
2025-NHIDC-853302-1 |
19/03/2025 |
13/03/2025
|
14/04/2025
Time
15:0Hrs
|
-
|
164 |
Consultancy Services for Authority’s Engineer for supervision of balance works of Package-I, Package-II, Major Bridge over Humphrey Strait Creek, Package-VIII, Reconstruction of 94 Nos. culverts, Rehabilitation and Upgradation from Km 239.425 to Km 242.000, 5 nos. Minor Bridges on NH-4 in Union Territory of Andaman & Nicobar Islands.-2nd Call |
NHIDCL/HQ/AN/AE/2025 |
12/03/2025 |
11/03/2025
|
01/04/2025
Time
15:0Hrs
|
-
|
165 |
Independent Engineer Services for Construction work of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.516 in the State of Madhya Pradesh on Hybrid Annuity Mode under NH(O) scheme |
MPDIV-21/4/2025-MP Division |
08/03/2025 |
08/03/2025
|
27/03/2025
Time
11:0Hrs
|
-
|
166 |
Supervision Consultancy Services for Operation and maintenance of existing two/four lane stretch from km 535.930 (Near Nasarpore village) to km 714.010 (Vapi) section (Pkg-6 to Pkg-9) of NH-56 in the state of Gujarat |
NHAI/RO-GNR/NH-56/ Nasarpore-Vapi/SC/2025 |
08/03/2025 |
03/03/2025
|
21/04/2025
Time
12:0Hrs
|
-
|
167 |
Independent Engineer services for operation and maintenance Period for Four Laning of Patna-Bakhtiyarpur section of NH 30 from Km 181.300 to km. 231.950 in the state of Bihar under NHDP III on Design Build Finance Operate and Transfer DBFOT Toll Basis |
272/RO-PATNA/NHAI/2025 |
07/03/2025 |
01/03/2025
|
25/03/2025
Time
12:0Hrs
|
-
|
168 |
Supervision Consultancy (SC) Service during O&M Stage of Six – Laning of Surat – Vapi Section of NH-8 from Km 263.000 to Km 381.000 (Length – 118 Km) in the State of Gujarat under PBMC mode including the Various standalone work of Grade Separated Structures |
NHAI/RO-GNR/NH-48/Surat-Vapi/SC/2025 |
08/03/2025 |
28/02/2025
|
01/04/2025
Time
15:0Hrs
|
-
|
169 |
Independent Engineer Services during O and M period for the project of Four laning of Harda to Temagav section from Design Ch. 0.000 Existing Ch. 141.750 to Design Ch. 30.000 Existing Ch. 180.500 and Chicholi Existing Ch. Km 235.800 Design Ch Km 81.000 to Betul existing chainage km 275.000 Design Ch km121.248 of NH-47 Total length 70.248 in the State of MP on Hybrid Annuity Mode |
NHAI/ROBPL/Harda/IE/NH47/2025/ |
21/03/2025 |
28/02/2025
|
22/04/2025
Time
11:0Hrs
|
-
|
170 |
Supervision Consultant for supervision for four laning of Itarsi to Betul Section of NH 46 from km 63.000 to km 137.000 Design length 53.045 km in the State of MP Package II NH69 on EPC mode |
NHAI/ROBPL/HD/SC/NH46/IB/2025 |
21/03/2025 |
28/02/2025
|
22/04/2025
Time
11:0Hrs
|
-
|
171 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road NH -353D in Km 109.650 and 111.175 In State Of Maharashtra On EPC Mode. |
36/EENH/NGP/2024-25/1049 |
25/04/2025 |
28/02/2025
|
30/04/2025
Time
17:0Hrs
|
-
|
172 |
Independent Engineer Services during Operation and Maintenance stage of the Project Construction of Bridges across Dibang and Lohit river systems including approach roads between Chowkham-Digaru and Bomjur-Meka (Bomjur-Meka Ch. km 613.51 to Km 632.45 and Chowkham-Digaru ch. Km 689.80 to Km 701.80) in the state of Arunachal Pradesh on DBFOT Annuity basis under Arunachal Pradesh Package of SARDP-NE |
052/Ar.Pkg/BOT/2024-25/RO-Ita |
12/03/2025 |
27/02/2025
|
27/03/2025
Time
11:0Hrs
|
-
|
173 |
Consultancy services of Independent Engineer for Upgradation to two lane with paved shoulder configuration from Km. 0/000 to 62/822 (Limbdi-Dhrangadhra section) of NH-51 in the State of Gujarat (Total Length- 62.822Km) on HAM Mode |
NH-51/IE |
27/02/2025 |
27/02/2025
|
02/09/2025
Time
15:0Hrs
|
|
174 |
Consultancy Services for Authority Engineer during operation and maintenance of Six laning of Aurangabad to Bihar Jharkhand boarder Chordaha Section from km. 209.827 to Km. 249.525 PKG- II of NH 2 in the State of Bihar under NHDP Phase V on EPC Mode Total 39.698 Km |
271/RO-PATNA/NHAI/2025 |
01/03/2025 |
25/02/2025
|
27/03/2025
Time
12:0Hrs
|
|
175 |
Consultancy services for Authority Engineer for const of service road str at specified major junc for imp corridor eff of Domel Udh NH44 in UT of JK on EPC mode |
2025-NHAI-227977-1 |
08/03/2025 |
25/02/2025
|
05/04/2025
Time
16:0Hrs
|
-
|
176 |
Independent Engineer Services for 4 Laning of Parmakudi - Ramanathapuram Section of NH-87 in Tamil Nadu on HAM under NH(O) (Project Length-46/665 km) |
2025-NHAI-228091-1 |
07/03/2025 |
25/02/2025
|
22/05/2025
Time
11:0Hrs
|
-
|
177 |
CS for O and M of Solan Kaithlighat section of NH 5 including AE Services for Slope Stability Erosion Control Landslide Correction measures on Parwanoo Solan and Solan Kaithlighat section of NH05 in the state of HP on EPC Mode |
2025NHAI2276391 |
06/03/2025 |
21/02/2025
|
03/04/2025
Time
15:0Hrs
|
-
|
178 |
Independent Engineer services for supervision Construction of New 4 Lane with Paved Shoulder from Dareota Village to Kalar Bala Village of NH-205 (Design Chainage Km 33 175 to Km 41 000 Design Length – 7 825 Km) including twin tube tunnel Package-IIB in the State of Himachal Pradesh under NH (O) on Hybrid Annuity Mode |
2025-NHAI-227665-1 |
07/03/2025 |
21/02/2025
|
26/06/2025
Time
11:0Hrs
|
-
|
179 |
Supervision Consultancy for OnM of Construction or Upgradation to 2LPS of NH from Raisinghnagar Poogal under Phase I of under Bharatmala Pariyojana on EPC Mode in the state of Rajasthan |
NHAI/11011/3/2025-ROJ /Tenders-SC-RP |
23/03/2025 |
21/02/2025
|
10/04/2025
Time
11:0Hrs
|
|
180 |
Consultancy Services as Independent Engineer during Operation & Maintenance Period for 6 Laning of Tumkur-Chitradurga (Excluding Tumkur n Chitradurga Bypasses) Section from Km. 75.000 to Km. 189.000 of NH4 in the State of Karnataka to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase V and (ii) Four Laning from Km. 358.500 to Km. 414.205, Challakere to Hariyur section of NH-150 A (Pkg.III), On Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka. |
NIT No.38/NHAI/RO-BNG/IE-O&M/Tender/2024-25 dated 20.02.2025 |
21/02/2025 |
20/02/2025
|
20/03/2025
Time
11:0Hrs
|
|
181 |
Consultancy services of Authority Engineer for the Work of development of NH 147 (Old NH 8C) including 6 laning with service road on either side from Km 0/00 To Km. 44/040 in the State of Gujarat, during DLP |
AE of 2024-25 |
19/02/2025 |
19/02/2025
|
04/03/2025
Time
15:0Hrs
|
|
182 |
Consultancy Services for Supervision Consultant for Operation and Maintenance of 6-Lane/4-Lane Jalandhar-Amritsar Section of NH-03 from Km 387.100 to Km 456.100 Bidhipur to Verka junction in the state of Punjab. |
2025-NHAI-227378-1 |
20/03/2025 |
19/02/2025
|
08/04/2025
Time
11:0Hrs
|
-
|
183 |
IE Services during Operation and Maintenance period for six laning of Krishnagiri – Walajahpet section of NH-48 (Old NH-46) from km.0.000 to km.148.300 in the State of Tamil Nadu |
NHAI/RO Chennai/IE /OM/2024-25/202 |
05/03/2025 |
13/02/2025
|
03/04/2025
Time
15:0Hrs
|
-
|
184 |
Independent Engineer services for Widening & strengthening of 2 Lane with Paved Shoulder from Myajlar Jaisalmer from design chainage 0000 to design chainage 98350 Section of NH11 & Sundra Myajlar Ambasingh ki Dhani Road from design chainage 46000 to 81601 part of Munabao Tanot along with strengthening/widening existing connection of NH 70 & NH11 of length is 0914 m of in the State of Rajasthan under NH(O) on HAM Mode |
NHAI/RAJ/M-J S-M-AKD/2025/Efile-274293 |
05/03/2025 |
12/02/2025
|
27/03/2025
Time
11:0Hrs
|
-
|
185 |
Supervision Consultant Services on following National Highway works being executed on EPC mode as under- (1) Upgradation to 2-Lane with Paved Shoulder from Design Km 36-300 (Existing Km 36-300) to Design Chainage 47-918 (existing Km 48-700) and from Design Ch 69-900 (existing Km 69-550) to Design Ch 83-940 (existing Km 83-780) of NH-248A (2) Upgradation to 4 lane carriageway from km 3/100 to 7/050 (Ajmer-Nasirabad section) (3) Construction of grade separated structure VUP on Ajmer – Nagaur Sect |
02/2024-25 |
10/02/2025 |
10/02/2025
|
18/03/2025
Time
18:0Hrs
|
|
186 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF 1)Strengthening of Vadkhal Alibag NH 166A KM 0.00 to KM 22.200 on EPC Mode in the State of Maharashtra 2)Rehabilitation and Upgradation existing Highway to 2 Lane 4 Lane with paved sh |
No.NHD/PEN/AB/TC/346/2024-25 |
25/02/2025 |
07/02/2025
|
01/04/2025
Time
17:30Hrs
|
|
187 |
Consultancy services for AE for supervision of balance work 1. Indapur Bypass to Mangaon Bypass NH 66 2. Mahad Junction to Raigad Fort NH 66 3. Pacharal-Mandangad and Ambadave connector (Birth place of Dr. Baba Saheb Ambedkar) NH 965DD |
No.NHD/PEN/AB/TC/345/2024-25 |
26/02/2025 |
07/02/2025
|
01/04/2025
Time
17:30Hrs
|
|
188 |
Independent Engineer services for 4 Laning of NH-133 section from Ekchari design km 0.00 (start at junction of NH 33 (old NH 80) at design chainage Ch 157.35 Km) in the State of Bihar to Mahagama design km 27.250 (Existing chainage Ch 42.490 Km of NH 133) in the State of Jharkhand on Hybrid Annuity Mode |
2025-NHAI-225934-1 |
12/02/2025 |
06/02/2025
|
29/04/2025
Time
11:0Hrs
|
|
189 |
Consultancy services as IE during O-M for the project 6L of Vijayawada bypass from Chinna Avutupalli (Design Ch.0.000) to Gollapudi (Design Ch. 30.000) in Vijayawada-Gundugolanu Section of NH-16 in the State of AP under Bharatmala Pariyojana on HAM |
2025-NHAI-225618-1 |
04/02/2025 |
04/02/2025
|
20/03/2025
Time
11:0Hrs
|
|
190 |
Consultancy Services for Authority Engineer for Road Safety Improvement of Critical Junctions and Overlay on Muzaffarnagar – Haridwar Section of NH-334 from Km 130-360 to Km 208-600 in the State of Uttar Pradesh & Uttarakhand on EPC Mode |
2025-NHAI-225678-1 |
24/02/2025 |
04/02/2025
|
23/04/2025
Time
11:0Hrs
|
|
191 |
Consultancy services for Authoritys Engineer for supervision of Rehabilitation and Upgradation to four lane with paved shoulder configuration from km 24-350 to km 61-875 (Jawale - Borgaon Kale) of NH-63 in the State of Maharashtra on EPC mode. |
NH/MAH/RO/Chh. Shambhajinagar-2/AE/PKG-2 |
03/03/2025 |
04/02/2025
|
25/03/2025
Time
17:0Hrs
|
-
|
192 |
Consultancy services as Authority Engineer during Operation and Maintenance for Four Lanning of Hassan (Existing Km 189.700, Design Ch 184.912) To Maranahally (Existing Km 237.000, Design Ch 230.060) Section of NH-75 (Old NH No 48) Under EPC Mode in the State of Karnataka. |
NIT No.36/NHAI/RO-BNG/AE-OM/Tender/2024-25 dated 03.02.2025 |
05/02/2025 |
03/02/2025
|
04/03/2025
Time
15:0Hrs
|
|
193 |
Consultancy Services as Authority’s Engineer for Supervision of Four laning of Balachera to Harangajao section of NH-54 (Ext) from km 275.000 to Km 244.000 in the State of Assam on EPC mode. |
NHIDCL/Assam/ NH-54(Ext.)/B-H/AE/2024 |
03/02/2025 |
03/02/2025
|
17/03/2025
Time
11:0Hrs
|
|
194 |
Consultancy Services as Independent Engineer during Operation & Maintenance Period for the Project 4 lane Unnao-Lalganj section of NH-232A (NH-31) from design Km 00.000 to design Km 70.000 under Bharatmala Pariyojana on Hybrid Annuity Mode in the state of Uttar Pradesh 3rd Call |
NHAI/RO-UP (W)/OandM/IE /Unnao Lalganj/2024/3rd Call |
12/02/2025 |
03/02/2025
|
18/03/2025
Time
14:0Hrs
|
|
195 |
Supervision Consultancy Services during O and M period of 4 laning of Patna Gaya Dobhi PKG I (km. 0to km 39) PKG II (39 to km 83), PKG – III (83 to 127. 217)and Nathupur – Saristabad from km 0.000 to 3.914 km of NH – 22 (Old NH – 83) in the state of Bihar. Total Length – 131.131km |
268/RO-PATNA/NHAI/2025 |
13/02/2025 |
03/02/2025
|
27/02/2025
Time
12:0Hrs
|
|
196 |
Supervision Consultancy Services (SC) for Opetation and Maintenance of Davulapalli - Markapuram - Vaggampalle Section from km 154.900 to 293.266 of 2-Lane paved shoulder configuration of NH 565 in the state of Andhra Pradesh on PBMC Mode |
2025-NHAI-225454-1 |
01/02/2025 |
01/02/2025
|
20/03/2025
Time
11:0Hrs
|
|
197 |
SC for OM of NH-16 from Gundugolanu (km.1023.280) to Kanaka Durga Varadhi (km.1100.254), PKG-I, PKG-II including 6L Hanuman Junction Bypass, 4L from Chinna Autupalli to Kanaka Durga Varadhi including HF at Airport, 3L WSBCF in the state of AP. |
2025-NHAI-225462-1 |
01/02/2025 |
01/02/2025
|
20/03/2025
Time
11:0Hrs
|
|
198 |
IE Services during OnM Period of 4Lane divided carriageway from Repallewada (KM. 42.000) to Telangana/Maharashtra border (KM 94.602) (Design length - 52.602 KM) section of NH 363 in the state of Telangana under NH (O) On HAM |
229404 |
10/03/2025 |
01/02/2025
|
20/03/2025
Time
15:0Hrs
|
-
|
199 |
Consultancy Services for Authority Engineer for Supervision of Upgradation to 2 Lane / 4 Lane with paved shoulder of Shirwal to Lonand section from Km 159-900 to Km 188-025 of NH-965DD (Section I) and 2 lane with paved shoulder of Lonand to Satara Section from Km 51-500 to Km 96-246 of NH-965D (Section II) in Satara district in the State of Maharashtra on EPC mode |
2025-NHAI-225338-1 |
04/03/2025 |
31/01/2025
|
17/03/2025
Time
11:0Hrs
|
-
|
200 |
Consultancy Services for Authority Engineer for Supervision of Upgradation & rehabilitation of Service Roads on both sides in urban areas of Pune City on Pune-Satara section of NH-48 in the state of Maharashtra on EPC Mode under NH (O) Projects |
2025-NHAI-225437-1 |
04/03/2025 |
31/01/2025
|
17/03/2025
Time
11:0Hrs
|
|
201 |
Independent Engineer Services during O and M Period for 4-Laning of Aligarh-Kanpur section from km 289.000 (Design chainage 302.108) to km 356.000 (Design chainage 373.085) (Packages-IV from Naviganj-Mitrasen) and from Km 356.000 (Design chainage 373.085) to km 414.000 (Design chainage 433.728) (Package-V from Mitrasen-Kanpur) of NH-91 in the State of Uttar Pradesh on HAM under Bharatmala Pariyojana |
NHAI/O-M/IE /Aligarh- Kanpur PKG 4-5 |
03/02/2025 |
30/01/2025
|
28/02/2025
Time
14:0Hrs
|
|
202 |
Independent Engineer Services for Construction of 6 lane Zirakpur Bypass (Starting from Junction with NH-7 (Zirakpur-Patiala) (Design Ch. 0.000) and ending at Junction with NH-5 (Zirakpur-Parwanoo) (Design Ch. 16.800) (Total Length 19.200 Km) in state of Punjab and Haryana under NH(O) on Hybrid Annuity Mode |
PUNDIV 22011/1/2025 Punjab Division e 273095 |
03/02/2025 |
30/01/2025
|
19/08/2025
Time
11:0Hrs
|
|
203 |
Consultancy Services of Authoritys Engineer for the following projects-4-laning of Haridwar Nagina Section of NH-74 from Km 0000 (design chainage Km 0000) to Km 73000 (design chainage Km 71614) in the states of Uttarakhand and Uttar Pradesh under NHDP Phase-IV on EPC mode 2 Four Laning of Haridwar-Nagina section of EUP mitigation measures on NH-74 in the state of Uttarakhand |
NHAI/RO-UKD/HDR-NGN/AE/2025 |
13/02/2025 |
30/01/2025
|
17/03/2025
Time
11:0Hrs
|
|
204 |
Independent Engineering Services during Operation and Maintenance of (i) Oddanchatram to Madathukulam section of NH-83 and (ii) Oddanchatram Bypass of NH-83 in the State of Tamil Nadu (2nd Call) |
NHAI/17011/02/32/2024/ROMadurai |
30/01/2025 |
30/01/2025
|
27/02/2025
Time
11:0Hrs
|
|
205 |
Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation and reconstruction of Mandla - Nainpur Section of NH 543 from Km 190/400 to Km 236/500 to 2L with PS configuration in the State of Madhya Pradesh on EPC mode |
846024 |
31/01/2025 |
30/01/2025
|
02/09/2025
Time
11:0Hrs
|
|
206 |
SC Services for Strengthening/Major Maintenance work of Chhindwara-Soaner Section and Chhindwara ring road (133.222 km)-Package-1 Chhindwara-Amarwara-Narsingpur Section (113.000 km) -Package-2 Chhindwara-Multai and Sonakhar - Seoni section (136.877 km) -Package-3 of NH - 347 and NH- 547 in the state of MP and MH on EPC mode (383.099 km) including Supervision of Routine Maintenance / IM /Toll Operation / SP / PR/Civil Works of NH-547 and NH-347 in the state of Madhya Pradesh and Maharashtra |
NHAI/ROMP/CHW/SC/OM/2025 |
29/01/2025 |
28/01/2025
|
03/03/2025
Time
15:0Hrs
|
|
207 |
Consultancy Service for Authority Engineer for Supervision of Construction of Two lane with paved shoulder from Km 55 60 to 90 70 (existing chainage) of NH 766C (Complete Realignment of 13 832 Km) with 2 Major Bridge across Sharavathi Backwaters on EPC mode in the State of Karnataka |
2025-MoRTH-842224-1 |
28/01/2025 |
28/01/2025
|
20/02/2025
Time
15:0Hrs
|
|
208 |
Independent Engineer services during OM phase for 4 lane with paved shoulder configuration of Pathrapali Katghora from Km 53.300 to Km 92.600 section of New NH 130 in the State of Chhattisgarh |
11052/NHAI/RORaipur/IE/OM/P-K |
10/02/2025 |
27/01/2025
|
10/03/2025
Time
15:0Hrs
|
|
209 |
Supervision Consultancy Services for O&M of km. 410.700 to km 447.000 (EW 04 & EW -12 Package) (Purnea – Dalkhola Section) and 2nd Flyover (LCW) in Kishanganj town starting from km 472.300 to km 475.480 of NH- 27 (old NH – 31) in the State of Bihar (Total Length 39.480) |
NIT No- 265/RO-PATNA/NHAI/2024-25 |
07/02/2025 |
24/01/2025
|
24/02/2025
Time
12:0Hrs
|
|
210 |
Consultancy Services for Authority’s Engineer for supervision of balance works of Package-I, Package-II, Major Bridge over Humphrey Strait Creek, Package-VIII, Reconstruction of 94 Nos. culverts, Rehabilitation and Upgradation from Km 239.425 to Km 242.000, 5 nos. Minor Bridges on NH-4 in the Union Territory of Andaman & Nicobar Islands. |
NHIDCL/HQ/AN/AE/ |
24/01/2025 |
24/01/2025
|
21/02/2025
Time
15:0Hrs
|
|
211 |
Independent Engineer Services for O&M Period for the work 4 lane Bridge across river Kosi and including its Approaches & Guide Bund & Afflux Bund from km. 148.550 to Km. 159.185 in the state of Bihar on Annuity Basis. |
264/RO-PATNA/NHAI/2024-25 |
24/01/2025 |
22/01/2025
|
24/02/2025
Time
11:0Hrs
|
|
212 |
Independent Engineer Services for Construction of new four lane Access controlled Highway from Cuttack (end point of CRRR at NH-16 near Tangi) to Kandarpur on SH-12 from Design Ch. 0.000 km to 21.225 under NH(O) on Hybrid Annuity Mode in the state of Odisha. |
2025-NHAI-224514-1 |
22/01/2025 |
21/01/2025
|
10/03/2025
Time
11:30Hrs
|
|
213 |
Consultancy services as Independent Engineer during Operation and Maintenance for the project Four laning from Km.0.00 to Km.42.00 of Dobaspet to Dodaballapur bypass and Four laning from Km.42.00 to 80.00 of Dodaballapura Bypass to Hoskote section of NH-648 (Old NH - 207) in the state of Karnataka |
NIT No.34/NHAI/RO-BNG/IE/Tender/2024-25 dated 20.01.2025 |
25/01/2025 |
20/01/2025
|
28/02/2025
Time
11:0Hrs
|
|
214 |
Independent Engineer Services for Operation and Maintenance of 4 lanning NH 131A from Km 34.600 (design km 6.000) Narenpur to Km 82.000 (design km 55.000) near Purnea in the State of Bihar on Hybrid Annuity Mode. |
263/RO-PATNA/NHAI/2024-25 |
25/01/2025 |
17/01/2025
|
11/03/2025
Time
12:0Hrs
|
|
215 |
Consultancy Services for Authority Engineer for Supervision of Construction of 07 Nos of Standalone safety structures/works at different locations on various NHs in the State of Maharashtra on EPC Mode |
2025-NHAI-224077-1 |
27/01/2025 |
16/01/2025
|
25/02/2025
Time
11:0Hrs
|
|
216 |
Independent Engineer Services during Operation and Maintenance stage of the Project Construction of Bridges across Dibang and Lohit river systems including approach roads between Chowkham-Digaru and Bomjur-Meka (Bomjur-Meka Ch. km 613.51 to Km 632.45 and Chowkham-Digaru ch. Km 689.80 to Km 701.80) in the state of Arunachal Pradesh on DBFOT Annuity basis under Arunachal Pradesh Package of SARDP-NE |
052/Ar.Pkg/BOT/2024-25/RO-Ita |
17/01/2025 |
15/01/2025
|
17/02/2025
Time
11:0Hrs
|
|
217 |
Independent Engineer services for Operation and Maintenance of Four laning of Sinnar Shirdi section of NH 160 from Km 0 000 to Km 50 943 in the State of Maharashtra |
RO/MUM/NSK/SS/IE/2025/20 |
14/01/2025 |
14/01/2025
|
17/02/2025
Time
11:0Hrs
|
|
218 |
Services of IE for Rehabilitation and Up-gradation of NH-63 section from Udgir to Degloor and Aadampur phata to Sagroli Phata to 2LPS in the State of Maharashtra on HAM mode |
NH/MAH/RO/Chh. Shambhajinagar-1/IE/PKG-1 |
09/02/2025 |
14/01/2025
|
07/03/2025
Time
17:0Hrs
|
|
219 |
Independent Engineer Services during O and M of Four Laning of Sethiyathope to Cholapuram section and Cholapuram to Thanjavur of NH-36 Old NH-45C in the State of Tamil Nadu |
NHAI/17011/02/35/2025/RO Madurai |
25/01/2025 |
11/01/2025
|
10/02/2025
Time
11:0Hrs
|
|
220 |
Independent Engineer Services for construction of STRR West side NH948A Obalapura Nelamangala Taluk to Kunigal Ramanagara Taluk from Km 0 to km 79 Design Chainage Phase-I in Karnataka on HAM Project Length 79 km |
2025NHAI2237201 |
24/03/2025 |
10/01/2025
|
04/08/2025
Time
11:0Hrs
|
-
|
221 |
Independent Engineer Services for Construction of STRR (West side) NH948A Kunigal (Ramanagara Taluk) to S. Mudugadapalli (Hosur Taluk) from Km 79 to km 144.25/144.00 (Design Chainage) Phase-II in Karnataka on HAM (Project Length 65.25 km) |
2025NHAI2237241 |
25/03/2025 |
10/01/2025
|
04/08/2025
Time
11:0Hrs
|
-
|
222 |
Consultancy Services as IE during Operation and Maintenance of ZMorh tunnel including approaches on Srinagar Sonamarg section connecting National Highway no. 1 in the UT of JK on DBFOT annuity basis |
NHIDCL/JK/Z-Morhtunnel/IE/2024 |
16/01/2025 |
09/01/2025
|
28/02/2025
Time
15:0Hrs
|
|
223 |
Consultancy Services for AE for Supervision of Construction and upgradation of Pandaach to Manigam section as part of Srinagar Ring Road Phase 2A on EPC Mode under NH O in the UT of JK |
2024/NHAI/215447/1 |
09/01/2025 |
09/01/2025
|
11/03/2025
Time
11:0Hrs
|
|
224 |
Consultancy Services for Authority Engineer for Supervision of Construction of two numbers of Grade separated interchanges at Km 113.730 (Junction of Ranchi-Hazaribagh Road) and Km 139.225 (Junction with Ranchi-Jamshedpur Road) on 4 laning stretch of Ranchi Bypass of NH-33 in the State of Jharkhand |
2025-NHAI-222722-1 |
27/01/2025 |
03/01/2025
|
03/03/2025
Time
11:0Hrs
|
|
225 |
CS for AE of RU Gandhigram Realignment alongwith reconstruction of major bridge on purna river from ch km 24.250 to ch km 27.200 (length 2.95 km) on nh 161a akola akot and Major bridge on wrdha river |
2024-MoRTH-842172-1 |
13/01/2025 |
02/01/2025
|
20/02/2025
Time
17:30Hrs
|
|
226 |
Supervision Consultancy Services (SC) for Strengthening and Major Maintenance of Anandapuram-Visakhapatnam-Anakapalli section from Km 682.980 to Km 741.256 of NH-16 in the State of Andhra Pradesh on Performance Based Maintenance Contract (PBMC) Basis |
2025-NHAI-222372-1 |
09/01/2025 |
01/01/2025
|
31/01/2025
Time
10:0Hrs
|
|
227 |
Independent Engineer Services during Operation and Maintenance of Jodhpur – Pali Section of NH-65 from Km. 308.000 to Km.366.000 and including Bypass to Pali starting from Km. 366.000 of NH-65, Connecting NH - 14 at Km. 114.000 in the state of Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer Basis stage of selected road stretches under BOT projects in the State of Rajasthan |
2024 MoRTH 840345 1 |
30/12/2024 |
31/12/2024
|
27/01/2025
Time
11:0Hrs
|
|
228 |
Supervision Consultant for monitoring (i) 5 nos VUPs at KM 305-640 KM 307-630 KM 339-100 KM 345-300 and KM 364-200 and (ii) Strengthening and improvement of NH 27 for 36.616. |
NHAI/PIU-GKP/SC/NH-27/01 |
01/01/2025 |
30/12/2024
|
29/01/2025
Time
11:0Hrs
|
-
|
229 |
[Consultancy services for Authority Engineer for Supervision of Construction of new 2 Lane with paved shoulders of NH Standards from km 0.080 to km 11.690 in Majuli and from km 19.715 to km 27.484 in Jorhat on the newly declared NH 715K |
NHR.40/2024/3 |
06/01/2025 |
30/12/2024
|
15/02/2025
Time
14:0Hrs
|
|
230 |
Independent Engineer services for 4 laning of NH-80 section of Mirza Chauki to Farakka section from existing km 190.00 to design km 200.75 km (junction at km 3.100 of NH 133 B) and from existing km 260.00 to existing km 283.00 (design km 274.133) in the State of Jharkhand (Package-II) on Hybrid Annuity Mode |
2024-NHAI-222060-1 |
11/02/2025 |
30/12/2024
|
17/03/2025
Time
11:0Hrs
|
|
231 |
IE Services for 4-laning of Navelim to Cuncolim Section of NH-66 from Km 554.245 to Km 561.480 on Hybrid Annuity Mode in the State of Goa. |
NH-12014/8/2024-GOA/ZONE-IV/IE |
11/01/2025 |
26/12/2024
|
24/02/2025
Time
17:0Hrs
|
|
232 |
IE Services for 4-Laning of Bendordem to Canacona Bypass and Canacona Bypass to Karnataka border Length -22.10 Km section of NH-66 on HAM in the State of Goa. |
NH-12014/9/24-GOA/Zone-IV/IE |
12/01/2025 |
26/12/2024
|
24/02/2025
Time
17:0Hrs
|
|
233 |
Construction of High Level Bridge across river Deo at km 90.850 of NH-220 in the state of Odisha on EPC Mode. |
02 CE NH AE 2024-25 |
06/01/2025 |
24/12/2024
|
14/02/2025
Time
15:0Hrs
|
-
|
234 |
Independent Engineer Services during Operation Maintenance Stage for 4 laning of Guna Biaora Section from Km. 223.130 to Km. 316.630 of NH46 Old NH 3 in the State of MP on BOT Toll on DBFOT pattern under NHDP Phase IV |
NHAI/RO-BPL/BPL/NH-46/G-B/2024 |
03/01/2025 |
24/12/2024
|
30/01/2025
Time
11:0Hrs
|
|
235 |
Consultancy Services for Authority’s Engineer for Supervision of Reconstruction of HL major Bridge across River Tel near Sonepur at at km 51.200 (Design Chainage 51.140km) of NH-57 in the state of Odisha on EPC Mode |
03 CE NH AE 2024-25 |
07/01/2025 |
24/12/2024
|
14/02/2025
Time
15:0Hrs
|
-
|
236 |
IE services for supervision of Construction of 2-Lane with Paved Shoulder Greenfield Bypasses in Lalganj Ajhara Mohanganj and Raniganj on Raebareli Jaunpur Section of NH-31 in Uttar Pradesh on HAM (Total Length50.447 Km.) |
NHAI/HQ/UP(E)/NH-31 /Raebareli-Jaunpur/IE/2024/ |
08/01/2025 |
24/12/2024
|
23/01/2025
Time
11:0Hrs
|
|
237 |
IE for 2LPS of Khajuwala Poogal section and Poogal Dantour Jaggasar Gokul Godu Ranjeetpura Charanwala Naukh Bap section of NH 911 (Length 212.107Km) on HAM under Bharatmala Pariyojna in the State of Rajasthan |
NHAI/12012/3/Tenders -ROJ/2024-25/IR-KP |
29/01/2025 |
24/12/2024
|
05/02/2025
Time
11:0Hrs
|
|
238 |
Supervision Consultant for supervision during OandM of Mandla Chilpi section of NH30 from Ch. Km. 89.600 to Ch. Km. 192.400 in the state of Madhya Pradesh. |
NHAI/RO-BPL/JBP/SC-OandM/NH-30/M-C/2024 |
21/01/2025 |
24/12/2024
|
06/02/2025
Time
11:0Hrs
|
|
239 |
Consultancy Services for AE for Supervision of Rehabilitation and Up gradation of Newly Declared NH Nandyala Kadapa Kurnool Border of NH167K to 2 lane with paved shoulders from Km 186.0 To Km 250.0 Design Ch.186.000 To Ch. 248.010 in the State of AP |
RW/NH12014/12/2022AP/ZIII756AE |
06/01/2025 |
23/12/2024
|
13/02/2025
Time
17:0Hrs
|
|
240 |
Independent Engineer Services for Construction of new Six-lane Access Controlled Capital Region Ring Road from Rameshwar (NH-16) to Bilipada from Km. 0.000 to Km. 40.700 in the State of Odisha under NH (O) on Hybrid Annuity Mode- (Package- 1). |
2024-NHAI-221074-1 |
26/12/2024 |
23/12/2024
|
11/09/2025
Time
11:30Hrs
|
|
241 |
Independent Engineer Services for Construction of new Six-lane Access Controlled Capital Region Ring Road from Rameswar (NH-16) to Gobindpur Package II from Design Ch. Km. 40.700 to Km. 70.995 in the State of Odisha under NH(O) on Hybrid Annuity Mode. |
2024-NHAI-221078-1 |
26/12/2024 |
23/12/2024
|
11/09/2025
Time
11:30Hrs
|
|
242 |
Independent Engineer Services for Construction of new Six-lane Access Controlled Capital Region Ring Road from Gobindpur (NH-55) to Tangi from Km. 70.995 to Km. 111.325 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package-3) |
2024-NHAI-221081-1 |
26/12/2024 |
23/12/2024
|
11/09/2025
Time
11:0Hrs
|
|
243 |
Independent Engineer Services for Access Controlled Highway of 4 Lane with Paved Shoulders from Walajapet/ Ranipet to TN/AP Border of NH-40 in Tamil Nadu on HAM under NH(O) (Project Length – 28.021 Km) |
2024-NHAI-209144-1 |
20/12/2024 |
20/12/2024
|
09/01/2025
Time
11:0Hrs
|
|
244 |
Consultancy Services for Authoritys Engineer for Supervision of New Construction of Major Bridge with approaches from km 0.000 to 1.200 (Madhopur -Badabanta section) of NH-20 in the state of Odisha |
01 CE NH AE 2024-25 |
04/01/2025 |
20/12/2024
|
17/02/2025
Time
15:0Hrs
|
|
245 |
Independent Engineer Services for Operation & Maintenance of Four laning of Pune-Solapur section of NH-65 from Km 40/000 to Km 150/050 (Package-I) in the State of Maharashtra |
NHAI/RO/MUM/PUNE/PS/IE/17 |
19/12/2024 |
19/12/2024
|
21/01/2025
Time
11:0Hrs
|
|
246 |
Consultancy Services for Supervision Consultants of Operation and Maintenance of Four Laning of Madurai to Aruppukottai - Tuticorin section from Km 138.800 to Km 266.865 of NH-38 Old NH-45B in the State of Tamil Nadu |
NHAI/17011/02/34/2024/RO Madurai |
10/01/2025 |
19/12/2024
|
27/01/2025
Time
11:0Hrs
|
|
247 |
Authority Engineer for Construction Supervision including Implementation of RAP for NH 127B from Km. 0.000 (End point of Dhubri-Phulbari bridge) to Km 63.224 (Goeragre) in the State of Meghalaya on EPC basis through JICA ODA Loan Phase-VII |
RW/NH12014/01/2024EAPMG/JICA |
28/01/2025 |
19/12/2024
|
10/02/2025
Time
11:0Hrs
|
|
248 |
Consultancy services for Authority’s Engineer for Supervision of widening/improvement of existing road to NHDL specifications of road Changwinti - Walong Namti from Km 0.000 to Km 54.450 and Hayuliang-Changwinti between Km 45.050 to Km 50.820 renamed as road Hawai Junction - Namti (Net Design Length 59.302 Km) under Project Udayak in Arunachal Pradesh on EPC mode |
CE (P) UDK/NIB/EPC-05/2024-25 |
28/12/2024 |
19/12/2024
|
02/06/2025
Time
11:0Hrs
|
|
249 |
Independent Engineer Services during Operation and Maintenance of 4-laning of Jind-Gohana- Sonepat Section from km 0.000 to km 78.837 (Length 78.837km) of NH-352A in the state of Haryana under Bharatmala Pariyojana under NH(O) on HAM |
2024-NHAI-220379-1 |
28/12/2024 |
19/12/2024
|
21/01/2025
Time
11:0Hrs
|
|
250 |
Consultancy Services for Supervision Consultant for O and M of 4 laning of existing two lane with paved shoulder road from Talwandi Bhai to Ferozepur NH-05 (old NH-95) from Km 170.380 to Km 194.040 in the state of Punjab on EPC mode |
2024-NHAI-220157-1 |
28/12/2024 |
18/12/2024
|
21/01/2025
Time
11:0Hrs
|
|
251 |
Consultancy Services for Supervision Consultant for Operation and Maintenance of Four Lane Divided Highway from Madurai to Chettikulam to Natham section from Km 0.000 to Km 36.690 of NH785 in the State of Tamil Nadu |
NHAI/17011/02/33/2024/RO Madurai |
09/01/2025 |
18/12/2024
|
27/01/2025
Time
11:0Hrs
|
|
252 |
Supervision Consultancy SC Services during O and M stage of 4 Laning of Sultanpur to Varanasi Section of NH 56 Package I |
219275 |
01/01/2025 |
13/12/2024
|
20/01/2025
Time
11:0Hrs
|
|
253 |
Independent Engineer services for Construction of Eight lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Package IV i.e Ankleshwar to Manubar Section) & from Km 254.430 to Km 279.00 (Package V i.e Kim to Ankleshwar Section) in the State of Gujarat under Bharatmala Pariyojana on HAM |
NHAI/RO-GNR/VME/Pkg-4,5/IE/2024/Dec |
23/12/2024 |
13/12/2024
|
20/01/2025
Time
11:30Hrs
|
|
254 |
Consultancy Services for Authoritys Engineer for supervision of Four laning of section of NH727H from Dewa to Fatehpur (km 19 000 to km 39 000) on EPC mode in the State of Uttar Pradesh. |
CE-RO/LKO/NH (O)/26/NH-727H/2022-23/AE Dt 13.12.2024 |
16/12/2024 |
13/12/2024
|
30/04/2025
Time
11:0Hrs
|
|
255 |
Consultancy services as Authority Engineer during Operation and Maintenance for Four Laning of Hubli-Hospet Section of NH-63 from Km128.850 to Km.272.571 (143.721km total length) in the state of Karnataka on EPC mode under NHDP Phase-IVB |
NIT No.30/NHAI/RO-BNG/AE-O&M/Tender/2024-25 dated 09.12.2024 |
18/12/2024 |
09/12/2024
|
16/01/2025
Time
11:0Hrs
|
|
256 |
Independent Engineer services for operation and maintenance Period for Four Laning of Patna-Bakhtiyarpur section of NH 30 from Km 181.300 to km. 231.950 in the state of Bihar under NHDP III on Design Build Finance Operate and Transfer DBFOT Toll Basis |
257/RO-PATNA/NHAI/2024-25 |
30/12/2024 |
09/12/2024
|
10/01/2025
Time
12:0Hrs
|
|
257 |
Consultancy services for appointment of Authoritys Engineer for CONSTRUCTION OF 2 LANE 386 MTR SPAN 260 plus 63 plus 63 EXTRADOSED CABLE STAYED BRIDGE BRIDGE OVER RIVER SIANG AT DESIGN CHAINAGE KM 2 pt 908 AND 63 pt 50 MTR SPAN MAJOR BRIDGE AT DESIGN CHAINAGE KM 2 pt 590 IN BETWEEN KM 118 pt 8 JUNCTION OF NH 513 WITH YINGKIONG TO MOYING VILLAGE JUNCTION AT KM 93 pt 50 OF DITTE DIMME MIGGING ROAD UNDER 761 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH ON EPC MODE |
CE (P) BMK/03/2024-25 |
24/12/2024 |
05/12/2024
|
25/02/2025
Time
11:0Hrs
|
|
258 |
Authority Engineer for the Supervision of Permanent Rectification of 3nos of black spots in NH 27 of UP Border Dewapur Kotwa section 9 nos of black spots of NH 27 of Kotwa Mehsi Muzaffarpur section 4 nos blackspots of NH 57 Muz Dar Purnea1 no blackspot at Muz Barani section 5 nos blackspots at Chhap Rewa Muz section and 2 nos of blackspots at Hajipur Muzaffarpur section Total blackspots 24 Nos in the state of Bihar on EPC |
256/RO-PATNA/NHAI/2024-25 |
13/12/2024 |
05/12/2024
|
26/12/2024
Time
11:0Hrs
|
|
259 |
Independent Engineer Services for additional works to ensure Road Safety for lane Bangalore Mysore access-controlled section of NH 275 in Karnataka on Hybrid Annuity Model HAM under NHO |
2024 NHAI 217825 1 |
13/12/2024 |
05/12/2024
|
18/12/2024
Time
11:0Hrs
|
-
|
260 |
Independent Engineer Services for Construction work of 4-laning of Sandalpur to Nasrullaganj bypass end Pkg-I of NH-146B from design km 0.000 to design km 43.250 (Design Length 43.250 km) in the State of Madhya Pradesh on Hybrid Annuity Mode under NH (O) Scheme |
MPDIV-21/12/2024-MP Division |
08/03/2025 |
05/12/2024
|
27/03/2025
Time
11:0Hrs
|
-
|
261 |
Consultancy Services for Authority’s Engineer for supervision of i Re-alignment from Ch. 0.00 to 2.00 Including Major Bridge (viaduct) of 680 m on Ranipool to Pakyong Road along NH-717A ii Construction/Upgradation of Existing Road to 2Lane Paved shoulder including Geometric Improvement from Ranipool to Pakyong from Km 2.000 to Km 16.167 (Balance Work) of NH-717-A and (iii) Construction of 48m Chuba Khola Bridge from Km 75.300 to Km 75.800 on NH-10 on EPC basis in the State of Sikkim |
NHIDCL/HQ/Sikkim/AE/Ranipool-Pakyong/2024/ |
18/11/2024 |
05/12/2024
|
23/12/2024
Time
15:0Hrs
|
|
262 |
Consultancy Services as AE for Supervision during OnM period for 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH10 2lane with paved shoulder road from km0.000 to km26.706 in Rhenock Rorathang-Pakyong of NH 717A 2Lane Chisopani Traffic Tunnel of length 250m including approaches from Km67.080 Km67.500 on NH10 2lane with paved shoulders road from km0.00 to km16.00 2-lane with paved shoulders road from km 16.00 to km 32.50 of NH-510State of Sikkim(2ndCall) |
NHIDCL/HQ/Sikkim/AE/OM/2ndcall |
20/11/2024 |
04/12/2024
|
16/01/2025
Time
15:0Hrs
|
|
263 |
Supervision Consultancy Services for O and M of km 410 .700 to km 447 EW-04 and EW 12 Package Purnea Dalkhola Section and 2nd Flyover LCW in Kishanganj town starting from km 472. 300 to km 475. 480 of NH 27 in the State of Bihar Total Length 39.480 |
255/RO-PATNA/NHAI/2024-25 |
17/12/2024 |
02/12/2024
|
03/01/2025
Time
15:0Hrs
|
|
264 |
IE Services during Operation and Maintenance period for six laning of Krishnagiri – Walajahpet section of NH-48 (Old NH-46) from km.0.000 to km.148.300 in the State of Tamil Nadu |
NHAI/RO Chennai/IE /OM/2024-25/189 |
06/12/2024 |
28/11/2024
|
19/12/2024
Time
15:0Hrs
|
|
265 |
IE for Development of 6lane Greenfield Southern Ludhiana Bypass from Intersection with NH44 near Village Rajgarh to the Intersection with Delhi Katra Exp (NE5) near Ballowal, km 0 to Km 25.240 as part of Ludhiana Ajmer on HAM under NH (O) in Punjab |
PUNDIV-20018/6/2024- Punjab Division (e-266869) |
06/12/2024 |
27/11/2024
|
02/01/2025
Time
11:0Hrs
|
|
266 |
SC Services during OnM stage of 4 laning of Deoli Kota section of New NH 52 and 2 laning with paved shoulder of Gulabpura Uniara section of NH 148D Total Length 286.497 in the state of Rajasthan |
NHAI/RAJDIV-20011/ 25/2024-NHAI- RO Jaipur |
30/12/2024 |
26/11/2024
|
15/01/2025
Time
11:0Hrs
|
|
267 |
Supervision Consultant for Operation and Maintenance of Four laning of Takoli Kullu section of NH21 from Km 242to Km 272 on EPC mode in the state of Himachal Pradesh including Authority Engineer Services for Slope Stability Erosion Control Landslide Correction measures at various section on Takoli Kullu section of NH21 from km 262to km 265in the state of HP on EPC Mode |
2024-NHAI-216022-1 |
29/11/2024 |
25/11/2024
|
23/12/2024
Time
15:0Hrs
|
|
268 |
Consultancy Services for Authority’s Engineer for Supervision of Balance work of Up-gradation to 4 Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to Km 163.400 (Start of Ahmednagar Bypass) (Design Length – 75.000 km) section of NH-160 in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode |
2024-NHAI-215929-1 |
09/12/2024 |
22/11/2024
|
06/01/2025
Time
11:0Hrs
|
|
269 |
Independent Engineer services during Operation and Maintenance Period for 4 laning of Hazaribag-Ranchi Section from Km. 40.500 to Km. 114.000 (length. 73.799 Km) including Ramgarh and Kujju bypass of NH-33 in the State of Jharkhand |
NHAI/RO/RNC/JH/2024-25/07 |
21/11/2024 |
21/11/2024
|
10/12/2024
Time
11:0Hrs
|
|
270 |
Consultancy services for Authority’s Engineer for Supervision of Construction of missing link from Birhu to Lathiani into 4-lane & paved shoulder configuration from km 35/550 (Design Chainage 0.000) to km 42/800 (Design Chainage 8.153) on NH-503A including Cable Stayed Bridge (0.860 km) on Back water of Govind Sagar Reservoir and its approaches in Himachal Pradesh on EPC Mode. |
2024-MoRTH-836203-1 |
27/11/2024 |
21/11/2024
|
29/01/2025
Time
14:0Hrs
|
|
271 |
Independent Engineer services for Construction of 4 Lane with Paved Shoulders from Design Ch 182/300 to Design Ch. 228/500 (Pkg-5) and Design Ch 228/500 to Design Ch 273/400 (Pkg-6) in Belgaum – Hungund – Raichur section of NH-748A (Ext SH-20) on Hybrid Annuity Mode [Total Project Length – 91/100 Kms] (Package-5 and 6) |
2024-NHAI-215168-1 |
20/11/2024 |
19/11/2024
|
03/12/2024
Time
11:0Hrs
|
|
272 |
Consultancy services for Assisting Authoritys Engineer for supervision of Construction of 2-lane ROB with approaches in lieu of existing L.C.No.41E at Km 86/100 (Railway Chainage Km 64/5-6) of NH-42 under Setu Bharatam in the State of Andhra Pradesh under NH(O) for year 2022-23 on EPC Mode |
NIT.No 10 AAE SE.NH.ATP AEE 1 2024 25, Date 12.11.2024 |
06/12/2024 |
16/11/2024
|
23/12/2024
Time
15:0Hrs
|
|
273 |
IE services for Upgradation of Existing 2 to 4 Ln Divided Carriageway from Ch 94 030 in Bodeli to Ch 132 320 in Naswadi and from Ch 179 780 in Netrang to Ch 208 900 in Umarpada (TL 67410 m) of NH56 in Gujarat on HAM (Pkg 3 n 5) |
NHAI/Bodeli-Vapi/Gujarat/IE/Pkg-III and V/e-266400/2024 |
28/11/2024 |
14/11/2024
|
16/12/2024
Time
11:0Hrs
|
|
274 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar Village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under NH(O |
NHAI/Tech/PathankotLinkRoad/2024/AE/E-187006 |
22/11/2024 |
14/11/2024
|
14/01/2025
Time
11:0Hrs
|
|
275 |
Supervision Consultant Services for-1 Routine Maintenance from Km 00 to KM 7950 (Katni Bypass) and from Km 4600 to Km 68400 (Design length 69100 km) to NH-78 (New NH-43) (Katni Umaria) in the State of Madhya Pradesh for 2 lanes with paved shoulders road stretch constructed on EPC mode 2 Routine Maintenance and incident management of two lanning with paved shoulder Shahdol Anuppur at Madhya Pradesh Chhattisgarh Border Section from design chainage km 142200 to km 234000 of NH43 State of MP of EPC |
NHAI/RO-BPL/Katni/SC-OM/NH-43/2024 |
20/11/2024 |
11/11/2024
|
18/12/2024
Time
11:0Hrs
|
|
276 |
Consultancy Services for Supervision Consultant for O and M of New NH- 354 (Old-SH-25) of Section Ramdas to Gurdaspur from Design Ch. Km140.000 (Ex. Km46.320) to Design Ch. Km187.492 (Ex. Km3.185) (47.492 Km) in the State of Punjab (2nd Call). |
2024-NHAI-214105-1 |
19/11/2024 |
11/11/2024
|
17/12/2024
Time
11:0Hrs
|
|
277 |
Consultancy services for Supervision Consultant for O and M of Bhiwani-Jind-Karnal section from existing Km.6.875 to Km. 168.889 of NH-709A and km 163.460 to 197.200 of NH-148-B of Bhiwani-Hansi section in the State of Haryana (3rd Call) |
2024-NHAI-214086-1 |
19/11/2024 |
11/11/2024
|
10/12/2024
Time
11:0Hrs
|
|
278 |
Consultancy Services for Independent Engineer for Supervision of Operation and maintenance of 4-Lane Pathankot-Amritsar section of NH-54 from ch. Km 6.820 to km 108.502 in the State of Punjab (2nd Call). |
2024-NHAI-214092-1 |
19/11/2024 |
11/11/2024
|
17/12/2024
Time
11:0Hrs
|
|
279 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF UPGRADATION TO 2-LANE WITH HARD SHOULDER CONFIGURATION OF SURAITHOTA (CH 29.725 KM) MALARI (CH 60.550 KM) ROAD ON NH-107B UNDER BHARATMALA PARIYOJANA ON EPC MODE IN THE STATE OF UTTARAKHAND (TOTAL TH 30.825 KM)LENG |
85064/AE/J-M road 115/EPC Cell dated 04.10.2024 |
24/10/2024 |
02/11/2024
|
16/11/2024
Time
11:0Hrs
|
|
280 |
Consultancy services for AE for supervision of 4-laning of Ponda to Bhoma section of NH-748 from Km 125.440 to Km 135.050 in the State of Goa on EPC Mode. |
RO/MUM/GOA/TENDER/24-25/AE/01 |
23/11/2024 |
01/11/2024
|
16/12/2024
Time
17:0Hrs
|
|
281 |
Independent Engineering Services during Operation and Maintenance of (i) Oddanchatram to Madathukulam section of NH-83 and (ii) Oddanchatram Bypass of NH-83 in the State of Tamil Nadu |
NHAI/17011/02/32/2024/RO Madurai |
23/11/2024 |
30/10/2024
|
29/11/2024
Time
11:0Hrs
|
|
282 |
Independent Engineer Services during Operation & Maintenance Period for 4 Laning of Panikoili Rimuli of NH 20 from km 0 to km 163 BOT Project under NHDP Phase III in the state of Odisha |
NHAI/13012/191/RO/OD/2142/2024 |
18/11/2024 |
29/10/2024
|
10/12/2024
Time
11:0Hrs
|
|
283 |
Independent Engineer Services during Operation and Maintenance of 4 laning of UP/Haryana Border-Rohna-Hassangarh-Jhajjar Section of NH-334B from Km 0.000 to Km 80.250 on HAM mode in State of Haryana (3rd Call) |
2024-NHAI-212792-1 |
18/11/2024 |
28/10/2024
|
04/12/2024
Time
11:0Hrs
|
|
284 |
Consultancy Services for Independent Engineer services for Operation and Maintenance of 4/6 laning of Delhi/Haryana Border to Rohtak section of NH-9 from Km. 29.650 to Km. 93.140 including Bahadurgarh and Rohtak bye-passes in the State of Haryana (2nd Call) |
2024-NHAI-212845-1 |
18/11/2024 |
28/10/2024
|
04/12/2024
Time
11:0Hrs
|
|
285 |
Consultancy services for Authority Engineer for supervision of 2 lane with paved shoulder from Jind-Gohana section from km. 0.000 to km. 50.505 of NH-352 A in the State of Haryana 3rd call |
2024-NHAI-212808-1 |
18/11/2024 |
28/10/2024
|
04/12/2024
Time
11:0Hrs
|
|
286 |
Consultancy services for Authority Engineer for supervision of Construction of 6 lane H.L./Extra-dosed Cable Bridge on river Ganga parallel to western side of Digha-Sonepur Rail-cum-Road Bridge at Patna on Ganga River on NH-139W in the state of Bihar on EPC mode. |
NH-12014/1/2023-ROPatna |
14/11/2024 |
28/10/2024
|
29/11/2024
Time
17:0Hrs
|
|
287 |
Independent Engineer services for Development of Four laning of Gudebellur (Design Km. 182.930) to Marikal (Design Km 228.500) in Hyderabad-Panaji section of NH-167 (Length 45.57km) under NH(O) in the state of Telangana on Hybrid Annuity Mode |
TGDIV-20016/14/2024-Telangana Division |
25/11/2024 |
25/10/2024
|
10/12/2024
Time
11:0Hrs
|
|
288 |
Independent Engineer services for Development of 4-Laning of Marikal (Design Km 228.500) to Junction with NH 167N (Bhootpur – Chincholi road) (Design Km 262.940) near Palamuru University section of NH-167 in Hyderabad-Panaji Economic Corridor under NH(O) in the State of Telangana on Hybrid Annuity Mode |
TGDIV-20016/15/2024-Telangana Division |
25/11/2024 |
25/10/2024
|
10/12/2024
Time
11:0Hrs
|
|
289 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHDL SPECIFICATIONS OF ROAD CHANGWINTI WALONG NAMTI FROM KM 0.000 TO KM 54.450 AND HAYULIANG-CHANGWINTI BETWEEN KM 45.050 TO KM 50.820 RENAMED AS ROAD HAWAI JUNCTION NAMTI (NET DESIGN LENGTH 59.302 KM) UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH ON EPC MODE |
CE (P) UDK/NIB/EPC-04/2024-25 |
26/10/2024 |
25/10/2024
|
26/12/2024
Time
11:0Hrs
|
|
290 |
Independent Engineer services for operation and maintenance of 6 lane Extra Dosed Cable Stayed Sister Nivedita Bridge (2nd Vivekananda Bridge) Tollway Project over river Hooghly along with its approaches (km 653.010 to km 659.051 on NH-2) on BOT (Toll) Basis under NHDP-Phase-I in the state of West Bengal |
NHAI/RO-KOL/TENDERS/2024-25/IE/06 |
28/10/2024 |
24/10/2024
|
27/01/2025
Time
11:0Hrs
|
|
291 |
Independent Engineer Services during Operation and Maintenance period for “4-laned stretch from Km.308.000 (Armur) to Km.367.000 (Adloor Yellareddy) on Nagpur-Hyderabad section of NH-44 in the State of Telangana on BOT (Toll) basis under North South Corridor (NHDP Phase-II) Package No.NS-2/BOT/AP-1 and 4-laned stretch from Km.367.000 (Adloor Yellareddy) to Km.454.000 (Kalakallu) on Nagpur-Hyderabad section of NH-44 in the State of Telangana on BOT (Annuity) basis under North South Corridor (NHDP |
208258 |
23/10/2024 |
23/10/2024
|
13/11/2024
Time
11:0Hrs
|
|
292 |
Consultancy services for Authority Engineer for Construction of Six lane elevated flyover including reconstruction/rehabilitation of existing pavement from Km 406100 to Km 411150 ( Length 5.05 Km) at Gobindpur Area and from Km 426230 to Km 430500 ( Length = 4.27 Km) at Nirsa Area in the Barwa Adda Panagarh section of NH-19 in West Bengal on EPC Mode under NH(O) |
NHAI/WB/Nirsa Govindpur/Flyovers/NH-19/AE/2024 |
22/10/2024 |
22/10/2024
|
21/01/2025
Time
11:0Hrs
|
-
|
293 |
Independent Engineer Services for Construction of New four lane Sambalpur Bypass from Km 0.000 to Km 35.384 under NHO on Hybrid Annuity Mode in the state of Odisha. |
2024-NHAI-212187-1 |
30/10/2024 |
22/10/2024
|
12/03/2025
Time
11:30Hrs
|
|
294 |
Independent Engineer Services for Four laning from Godibandha to Ballahar Chhak, Ballhar Chhak to Banarapal Banarapal to Start of Anugul by-pass at Km.314.130 to Km.321.035 of NH-53 at Km.75.200 to Km.84.000 of NH-149 at Km.84.000 to Km.85.750 of NH-55 under NHO on Hybrid Annuity Mode in Odisha State |
2024-NHAI-212198-1 |
30/10/2024 |
22/10/2024
|
21/02/2025
Time
11:0Hrs
|
|
295 |
Authority Engineer Services for Balance Works for Four laning of Vikravandi to Sethiyathope section (from Km 0/0 to Km 65/96) of NH-45C in Tamil Nadu under NHDP Phase-IV on EPC mode |
2024-NHAI-212095-1 |
22/10/2024 |
21/10/2024
|
13/02/2025
Time
11:0Hrs
|
|
296 |
Authority Engineer Services for Balance Works for Six Laning of Sriperumbudur to Karapettai Section of NH-4 (New NH-48) from Km 37/000 (Existing Km 37/000) to Km 71/015 (Existing Km 71/000) in Tamil Nadu on EPC Mode under NHDP Phase-V |
2024-NHAI-212092-1 |
22/10/2024 |
21/10/2024
|
28/11/2024
Time
11:0Hrs
|
|
297 |
Supervision Consultant for supervision during O and M of Obedullganj Itarsi section of NH46 from km. 2.800 to Km. 63.000 in the state of MP |
NHAI/ROBPL/SC/NH46/OI/2024 |
06/11/2024 |
21/10/2024
|
20/11/2024
Time
11:0Hrs
|
|
298 |
Supervision Consultant Services for O and M stage of 4 lane Lalghati Mubarakpur Biaora section of NH46 from Km. 318.000 to km. 423.400 in the State of MP |
NHAI/ROBPL/SC/OandM/NH46/2024 |
05/11/2024 |
19/10/2024
|
21/11/2024
Time
11:0Hrs
|
|
299 |
Independent Engineer Services for supervision of Tolling, Operation, Maintenance & Transfer of four lane section from Sleemnabad to Lakhadon section of NH-30 (km. 813.257 to km. 891.780 ) and NH-34 (km. 1358.00 to km. 1428.557) in the State of Madhya Pradesh. |
NHAI/RO-BPL/JBP/IE O and M/NH30 and 34/S-L/2024 |
04/11/2024 |
18/10/2024
|
18/11/2024
Time
11:0Hrs
|
|
300 |
Independent Engineer Services for Construction work of 4 lane Highway from Km 0.000 to Km 42.040 Bhopal to Vidisha section of NH-146 under Bharatmala Pariyojana in the State of Madhya Pradesh on HAM Hybrid Annuity Mode Mode. |
MPDIV-11/5/2024-MP Division |
21/10/2024 |
18/10/2024
|
16/12/2024
Time
11:0Hrs
|
|
301 |
Independent Engineer Services for 4 laning of Vidisha-Gyaraspur section of NH-146 from km 59.475 to km 88.361, 4- laning of Gyaraspur –Rahatgarh section NH-146 from KM 88.361 to km 124.470 and 4-Laning of Rahatgarh-Berkhedi section NH-146 from Km124.470 to Km134.549 under NH(O) in the State of Madhya Pradesh on Hybrid Annuity Mode |
MPDIV-11/4/2024-MP Division |
21/10/2024 |
18/10/2024
|
16/12/2024
Time
11:0Hrs
|
|
302 |
Independent Engineer Services for supervision of Tolling, Operation, Maintenance & Transfer of four lane section from Rewa to Sleemnabad section of NH-30 (km. 656.000 to Km. 813.257) in the State of Madhya Pradesh on TOT (InvIT) model |
NHAI/ROBPL/KTE/IE O and M/NH30/R S/2024 |
04/11/2024 |
18/10/2024
|
18/11/2024
Time
11:0Hrs
|
|
303 |
Consultancy Services for Authoritys Engineer for Supervision of i Construction of Paderu bypass of 2L PS And ii Construction of 2 lane ROB in lieu of the LC no. KK 26 Railway Km 109 20 21 on NH 516E in the State of Andhra Pradesh |
MoRTH/PIU/VSKP/PaderuBypass |
25/10/2024 |
16/10/2024
|
02/12/2024
Time
15:0Hrs
|
|
304 |
Consultancy Services for Authority’s Engineer for supervision of Improvement and upgradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Package–V, from Design Km. 140.960 (Patranga) to Km. 160.200 (Bahuvan Madar Majha) Design length 19.240 Km. on Engineering, Procurement & Construction (EPC) mode in the State of Uttar Pradesh. |
CE-RO/LKO/NH(O)/22/NH-227B (Pkg-V)/2022-23/AE Dt.16.10.2024 |
18/10/2024 |
16/10/2024
|
30/04/2025
Time
11:0Hrs
|
|
305 |
Independent Engineer (IE) Services during Operation and Maintenance Period of Four Laning of Godhra to Gujarat/Madhya Pradesh Border Section of NH-47 (Old NH-59) from Km. 129.300 to Km. 215.900 in the State of Gujarat on DBFOT mode under NHDP Phase III |
NHAI/ROGNR/Godhra-GujMP/NH-47/IE/ OM/2024 |
16/10/2024 |
16/10/2024
|
19/11/2024
Time
11:0Hrs
|
|
306 |
Consultancy Services as Authoritys Engineer for Supervision during OM period for |
NHIDCL/HQ/Sikkim/AE/OM |
15/10/2024 |
15/10/2024
|
05/11/2024
Time
15:0Hrs
|
|
307 |
Consultancy Services for Independent Engineer for Supervision of Construction of Four Lane Access controlled Highway from Vakalapudi Light House to Annavaram (on NH-16) section of NH-516F from Km 000 to Km 40621 on HAM under Bharatmala Pariyojana Phase-1 in the State of Andhra Pradesh |
2024-NHAI-211372-1 |
23/12/2024 |
15/10/2024
|
30/01/2025
Time
11:0Hrs
|
|
308 |
Consultancy Services for Authority’s Engineer for supervision of Improvement and Upgradation from Km. 73.300 Km (Bikapur) to Km. 140.960 (Patranga) (Design length 67.660 Km (84 Kosi Parikrama Marg)) to two Lane with paved shoulder configuration along with Parikrama Path under EPC mode in the State of Uttar Pradesh. |
CE-RO/LKO/NH(O)/07/NH-227B (Pkg-IV)/2022-23/AE Dt 14.10.2024 |
17/10/2024 |
14/10/2024
|
27/01/2025
Time
11:0Hrs
|
|
309 |
Consultancy Services for Authoritys Engineer for Construction of Additional Structures, Improvement of Service Road Maintenance of Six Lane Gurgaon-Jaipur Section of NH-48 (old NH-8) between km 42-700 to km 107-100 in the States of Haryana on EPC Mode |
2024-NHAI-211264-1 |
25/10/2024 |
14/10/2024
|
26/11/2024
Time
11:0Hrs
|
|
310 |
Consultancy services for AE for Rehabilitation and upgradation 2-4 LPS for the work of Gangakhed Palam Loha road NH361F in state of Maharashtra on EPC mode |
9/EENH/NED/3937/2024-25 |
02/11/2024 |
11/10/2024
|
27/11/2024
Time
17:30Hrs
|
|
311 |
Authority Engineer for Construction of Additional Structures including approaches in Vadodara – Surat section of NH-48 between Existing Km 108.000 to Km 250.000 of NH-48 on EPC mode under NH(O) in the state of Gujarat 2nd Call |
2024-NHAI-211201-1 |
14/10/2024 |
11/10/2024
|
11/11/2024
Time
11:0Hrs
|
|
312 |
Authority Engineer Services for The Consultancy and Supervision of Strengthening, Upgradation and Widening of Nandur Shingote - Kolhar Section in the State of Maharashtra on EPC Mode |
2024-MoRTH-830490-1 |
26/11/2024 |
11/10/2024
|
20/12/2024
Time
17:30Hrs
|
|
313 |
Consultancy services for Independent Engineer for Construction of flyovers (i) from Old Pune Naka NH-9 to Sat Rasta Chowk on NH-13 till ROB at Vijayapura Road and (ii) from Boramani Naka of NH-9 to Patrakar Bhavan Chowk on NH-13 along with road development in Solapur city limit in the State of Maharashtra on HAM under NH(O) |
2024-NHAI-211083-1 |
12/02/2025 |
11/10/2024
|
25/03/2025
Time
11:0Hrs
|
|
314 |
Independent Engineer services for Improvement and up-gradation in 2 lane with PS configuration of newly declared NH-227B Bahuvan Madar Majha to Jagarnathpur(Design Km 160.200 to Km 224.040) 84 Kosi Parikrama Marg in the State of UP on HAM PackageVI. |
CE-RO/LKO/NH(O)/25/NH-227B(Pkg VI)2022-23/IE Dated.10.10.2024 |
14/10/2024 |
10/10/2024
|
02/01/2025
Time
11:0Hrs
|
|
315 |
Consultancy services for Independent Engineer for Construction of Four Laning of Karmala to Tembhurni section of NH-561A (Pkg-III of Ahmednagar to Tembhurni corridor) from Ch.80.390 to Ch.140.652 in the State of Maharashtra on Hybrid Annuity Mode under NH (O) |
NHAI/Tech/MH/IE/Karmala -Tembhurni/2024/E-240589 |
29/10/2024 |
10/10/2024
|
10/12/2024
Time
11:0Hrs
|
|
316 |
Independent Engineer Services during O andd M Period of 4 lane Shivpuri Guna Including Guna Bypass section of NH 46 from Km 125.430 to Km 223.130 Total Length 97.700 Km under DBFOT pattern BOT Toll Mode NHDP Phase IV |
NHAI/ROBPL/Gwalior/IE/O&M/SG/2024 |
15/10/2024 |
09/10/2024
|
08/11/2024
Time
15:0Hrs
|
|
317 |
Consultancy services for Independent Engineer services for Four Laning Section of NH-166 from Chokak to Sangli (Ankali) Km. 145.300 to Km. 171.133 and Shiroli (Sangli Phata) to Chokak from Km. 0.00 to Km 7.719, between Kolhapur & Sangli, in the state of Maharashtra to be executed on Hybrid Annuity Mode in the State of Maharashtra on under NH (O) |
2024-NHAI-210776-1 |
19/11/2024 |
08/10/2024
|
10/12/2024
Time
11:0Hrs
|
|
318 |
Independent Engineer Services during Operation & Maintenance period for Four laning of Trichy - Dindigul section of NH-45 (New NH-83) from Km 334/000 to Km 421/273 in the State of Tamil Nadu (2nd Call)Independent Engineer Services during Operation & Maintenance period for Four laning of Trichy - Dindigul section of NH-45 (New NH-83) from Km 334/000 to Km 421/273 in the State of Tamil Nadu (2nd Call) |
NHAI 17011 02 30 2024 RO Madurai |
23/10/2024 |
05/10/2024
|
04/11/2024
Time
11:0Hrs
|
|
319 |
Consultancy Service For Authority Engineer for Khowai Teliamura Harina Section of NH-208 section in the state of Tripura under JICA ODA Loan |
NHIDCL/Tripura/NH-208/K-T-H/AE/JICA/2024/ |
04/10/2024 |
04/10/2024
|
17/12/2024
Time
14:0Hrs
|
|
320 |
Consultancy services for Authority’s Engineer for Supervision of Construction of 4 lane Gauripur Bypass Starting from Km 852.56 of NH-31 (Dumardoha Pt-II) and Terminating at Km 862.17 (Baladmara) via. Khudimari Pt.- II, Fulkumari, Charaldanga, Sajuakuti, Geramari Pt.-III and finally meeting at km 862.17 of NH-17 (New)/NH-31 (Old) in the State of Assam under EPC mode. |
RW/GHT/AS/AE/TENDER/2024-25/495 |
08/10/2024 |
03/10/2024
|
19/12/2024
Time
15:0Hrs
|
|
321 |
Supervision Consultancy Services for Operation and Maintenance of Hyderabad to Bangalore Section from Km 211.000 to 462.164 on NH 44 old NH 7 in the State of Andhra Pradesh |
2024-NHAI-209690-1 |
01/10/2024 |
01/10/2024
|
14/11/2024
Time
11:0Hrs
|
|
322 |
Consultancy services as Independent Engineer during Operation and Maintenance for the project i. Four laning of Belgaum-Khanapur section form Km0.000 to Km. 30.800 (Length-20.76) of NH-4A in the State of Karnataka on Hybrid Annuity Mode & ii. Six laning of Belgaum Dharwad section of NH-4 from Km.433.000 to Km.515.000 (Length 79.36) in the State of Karnataka to be executed as BOT (Toll) on DBFO pattern under NHDP phase-V |
NIT No.27/NHAI/RO-BNG/IE/Tender/2024-25 dated 30.09.2024 |
17/10/2024 |
30/09/2024
|
03/12/2024
Time
11:0Hrs
|
|
323 |
Consultancy Services for Authority Engineer for Road Safety Improvement of existing Four Lane Section of Dehradun-Lal Tappar-Nepali Farm Section of NH-7 (Design Chainage 501-930 to 531-330) and Nepali Farm-Motichur Section of NH-34 (Design Chainage 531-330 to 538-750) on EPC Mode in the State of Uttarakhand under NH (O) |
2024-NHAI-209809-1 |
11/11/2024 |
30/09/2024
|
08/01/2025
Time
11:0Hrs
|
|
324 |
Consultancy services for Independent Engineer for Construction of 6 lane connectivity to Visakhapatnam Port Road from Km 0.000 (Sabbavaram bypass of Anakapalli – Anandapuram corridor) to Km 12.660 (Sheelanagar junction) of NH 516C on Hybrid Annuity Mode in the State of Andhra Pradesh under NH(O) |
2024-NHAI-209823-1 |
12/11/2024 |
30/09/2024
|
20/11/2024
Time
11:0Hrs
|
|
325 |
Consultancy Services for Authority Engineer for Road Safety Improvement of existing Four Lane Section of Dehradun-Lal Tappar-Nepali Farm Section of NH-7 (Design Chainage 501-930 to 531-330) and Nepali Farm-Motichur Section of NH-34 (Design Chainage 531-330 to 538-750) on EPC Mode in the State of Uttarakhand under NH (O) |
2024-NHAI-209809-1 |
28/01/2025 |
30/09/2024
|
23/04/2025
Time
11:0Hrs
|
|
326 |
Consultancy Services for Supervision Consultants (SC) of Operation and Maintenance of Four Laning of Thanjavur – Trichy section from Km 80.000 to Km 136.490 of NH-67 (New NH-83) in the State of Tamil Nadu |
NHAI 17011 02 31 2024 RO Madurai |
23/10/2024 |
27/09/2024
|
04/11/2024
Time
11:0Hrs
|
|
327 |
Supervision Consultant services during OnM phase for 4lane with paved shoulder config of NH709B in the stretch from EPE Crossing to start of Shamli Bypass in Uttar Pradesh on EPC mode |
11052/NHAI/ RO-DELHI/ TENDER/SC/ OnM/ BSP-PATH |
04/11/2024 |
26/09/2024
|
10/12/2024
Time
11:0Hrs
|
|
328 |
Independent Engineer services for supervision of Four Lane Highway from Chandan Nagar Existing Km96-200 of NH 530B Design Km 179-500 to Bareilly Bypass Start Existing Km 59-025 of NH 530B Design Km 218-000 section of NH 530B in the State of Uttar Pradesh on HAM mode under NH(O) scheme and Construction of 4/6 Lane Highway of Southern Bareilly Bypass Length 29-920 km starting at Ch 237-000 of NH 530 near Jhumka Chauraha Dhantiya Village and ending at Ch 267-000 of NH 30 near Invertis University in |
NHAI/HQ/UP(W)/ChandanNagar BareillySpur/4L/IE/2024 |
26/09/2024 |
26/09/2024
|
27/11/2024
Time
11:0Hrs
|
|
329 |
Authority Engineer Services for The Consultancy and Supervision of A) [Rehabilitation & up-gradation for Talere – Gaganbawada - kolhapur Road (NH 166G) stretch start from km. 0/00 to Km. 06/00 and km. 13/00 to km 19/440 of NH-166G, length 12.440 km in the State of Maharashtra] B) [Construction of Approaches of RUB at LC-21 at Kokisare.nearaibhavwadi village on new alignment (design length 1.770 Km) on Talere - Gaganbawada - Kolhapur NH-166G in the State of Maharashtra on EPC mode. C) S |
No. 03/NHD/AB/TC/2022-23/ 2524 |
12/10/2024 |
25/09/2024
|
13/11/2024
Time
17:30Hrs
|
|
330 |
RFP for procurement of services of Authoritys Engineer for 4-Laning from End of Zuari approaches to Start of Margao Bypass section of NH-66 from Km.536/800 to Km.543/450 on EPC Mode in the state of Goa under Annual Plan 2024-25 |
13/1/2024-25/PWD/WDXIV/NH/ASW/07 Dt 23/09/2024 |
30/09/2024 |
23/09/2024
|
12/11/2024
Time
15:0Hrs
|
|
331 |
Consultancy Services for Authoritys Engineer for supervision of Improvement and up-gradation of newly declared NH-227B (84 Kosi Parikrama Marg) PKGII Design Km 29.000 (Sarpur) to Km 47.878/47.800 (Gosaiganj) on (EPC) basis in the State of U.P. |
CE-RO/LKO/NH(O)/12/NH-227B (Pkg-II)/2022-23/AE dt.20.09.2024 |
28/09/2024 |
20/09/2024
|
02/01/2025
Time
11:0Hrs
|
|
332 |
IE Services during OnM stage of 4L of Gomati Chauraha Udaipur section of New NH 58) (Length 79.310 Km.) and 4L of Rajsamand Bhilwara section of NH 758 (Length 87.250 Km.) under NHDP Phase IV (Total Length 166.56 Km. |
NHAI/11011/Tenders-ROJ/IE-GU |
03/10/2024 |
17/09/2024
|
06/11/2024
Time
11:0Hrs
|
|
333 |
Consultancy Services for Authoritys Engineer for Development of 6 lane green field (Package-IIA) starts from Design Ch 23-325 to Design ch 32-090 around Kanpur city (Length=8-765 kms) in the state of Uttar Pradesh on EPC mode and Development of 6 lane green field (Package-IIB) starts from Design Start from Ch 32-090 to Ch 51-200 around Kanpur city (Length=19-110 kms) in the state of Uttar Pradesh on EPC mode |
NHAI/HQ/UP(W)/II-A-II-B/ 6L/AE/2024 |
11/09/2024 |
11/09/2024
|
30/09/2024
Time
11:0Hrs
|
|
334 |
Consultancy services for Independent Engineer for Construction of Six Laning of Surat - Nashik - Ahmednagar - Solapur - MH/KNT Border Greenfield stretch [Package-VIII] and [Package-IX] in the State of Maharashtra on Hybrid Annuity Mode under NH(O) |
2024-NHAI-207711-1 |
10/09/2024 |
09/09/2024
|
01/04/2025
Time
11:0Hrs
|
|
335 |
Consultancy services for Independent Engineer for Construction of Six Laning of Surat - Nashik - Ahmednagar - Solapur - MH/KNT Border Greenfield stretch [Package-X] and [Package–XI] in the State of Maharashtra on Hybrid Annuity Mode under NH(O) |
2024-NHAI-207714-1 |
10/09/2024 |
09/09/2024
|
01/04/2025
Time
11:0Hrs
|
|
336 |
Consultancy services for Independent Engineer for Construction of Six Laning of Surat - Nashik - Ahmednagar - Solapur - MH/KNT Border Greenfield stretch [Package -XII] and [Package – XIII] in the State of Maharashtra on Hybrid Annuity Mode under NH(O) |
2024-NHAI-207723-1 |
10/09/2024 |
09/09/2024
|
01/04/2025
Time
11:0Hrs
|
|
337 |
Consultancy services for Independent Engineer for Construction of Six Laning of Surat - Nashik - Ahmednagar - Solapur - MH/KNT Border Greenfield stretch [Package -XV] and [Package – XVI] in the State of Maharashtra on Hybrid Annuity Mode under NH(O) |
2024-NHAI-207725-1 |
11/09/2024 |
09/09/2024
|
01/04/2025
Time
11:0Hrs
|
|
338 |
Consultancy services for Independent Engineer for Construction of Six Laning of Surat - Nashik - Ahmednagar - Solapur - MH/KNT Border Greenfield stretch [Package -1] in the State of Maharashtra on Hybrid Annuity Mode under NH(O) |
NHAI/Tech/MH/IE/S–N–A–S (Pkg-1)/2024/259825 |
28/11/2024 |
07/09/2024
|
01/04/2025
Time
11:0Hrs
|
|
339 |
Consultancy services for Independent Engineer for Construction of Six Laning of Surat - Nashik - Ahmednagar - Solapur - MH/KNT Border Greenfield stretch [Package -2] in the State of Maharashtra on Hybrid Annuity Mode under NH(O) |
NHAI/Tech/MH/IE/S–N–A–S (Pkg-2)/2024/259830 |
29/11/2024 |
07/09/2024
|
01/04/2025
Time
11:0Hrs
|
|
340 |
Consultancy services for Independent Engineer for Construction of Six Laning of Surat - Nashik - Ahmednagar - Solapur - MH/KNT Border Greenfield stretch [Package –3] in the State of Maharashtra on Hybrid Annuity Mode under NH(O) |
2024-NHAI-207609-1 |
17/12/2024 |
07/09/2024
|
01/04/2025
Time
11:0Hrs
|
|
341 |
Consultancy services as Independent Engineer during Operation and Maintenance for the project Two Four Laning of BRT Tiger Reserve Boundary to Bangalore Section of NH 209 (Existing Chainage from 287.520 to 461.550) in the State of Karnataka to be executed on BOT (Hybrid Annuity) basis under NHDP Phase– IV |
NIT No.24/NHAI/RO-BNG/IE-O M/Tender/2024-25 dated 06.09.2024 |
09/09/2024 |
06/09/2024
|
05/10/2024
Time
11:0Hrs
|
|
342 |
IE Services during O and M Period of 6 laning of Gorhar to Khairatunda from km. 320.810 to km. 360 to 300 Total length 40.192 and 6 laning of Khairatunda to Barwa Adda from km. 360.300 to km. 400.132 Total length 40.33km section NH02 State Jharkhand |
NHAI/RO/RNC/JH/2024-25/04 |
08/10/2024 |
05/09/2024
|
18/10/2024
Time
11:0Hrs
|
|
343 |
Independent Engineer Services during Operation & Maintenance period for Four laning of Trichy - Dindigul section of NH-45 (New NH-83) from Km 334/000 to Km 421/273 in the State of Tamil Nadu |
NHAI/17011/02/30/2024/RO Madurai |
01/10/2024 |
04/09/2024
|
03/10/2024
Time
11:0Hrs
|
|
344 |
Consultancy services for appointment of Authoritys Engineer for CONSTRUCTION OF 2 LANE 386 MTR SPAN 260 plus 63 plus 63 EXTRADOSED CABLE STAYED BRIDGE BRIDGE OVER RIVER SIANG AT DESIGN CHAINAGE KM 2 pt 908 AND 63 pt 50 MTR SPAN MAJOR BRIDGE AT DESIGN CHAINAGE KM 2 pt 590 IN BETWEEN KM 118 pt 8 JUNCTION OF NH 513 WITH YINGKIONG TO MOYING VILLAGE JUNCTION AT KM 93 pt 50 OF DITTE DIMME MIGGING ROAD UNDER 761 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH ON EPC MODE |
CE(P)BMK-EPC-03/2024-25 |
23/09/2024 |
02/09/2024
|
19/11/2024
Time
11:0Hrs
|
|
345 |
Consultancy Services for Authoritys Engineer for Supervision of Construction of 4 Nos of Standalone safety structures/works at different locations on various NHs (Package II) in the State of Maharashtra on EPC Mode |
2024-NHAI-206217-1 |
04/09/2024 |
27/08/2024
|
26/09/2024
Time
11:0Hrs
|
|
346 |
Consultancy services as Independent Engineer during Operation and maintenance and Fee collection of Elevated Highway Project from Silk Board Junction to Electronic City Junction (Km 8/765 to Km 18/750) and six laning from Electronic city to Attibele (Karnataka/Tamil Nadu Border) (Km 18/750 to Km 33/130) on Bangalore - Hosur section of NH-7 |
NIT No.21/NHAI/RO-BNG/IE/Tender/2023-24 dated 27.08.2024 |
29/08/2024 |
27/08/2024
|
26/09/2024
Time
11:0Hrs
|
|
347 |
Consultancy Services of Authority Engineer during O and M Period of Four Laning of Koilwar to Bhojpur of NH-30 and 84 Chainage Km. 33.250 to Km. 77.100( Length- 43.850 Km.) and Four Laning of Bhojpur to Buxar Section Chainage from km. 77.100 to km. 125.000 under O&M period of NH – 84 (length – 47.900 km.) in the State of Bihar under NHDP Phase-III on EPC Mode. (Total Km 91.750) |
245/RO-PATNA/NHAI/2024-25 |
30/08/2024 |
24/08/2024
|
11/09/2024
Time
11:0Hrs
|
|
348 |
Supervision Consultant (SC) Services for Balance work of Six Laning of Shamlaji- Motachiloda from Km. 401.200 to Km.494.410 section (Design Chainage Km.447.385 to Km 540.595, Length- 93.210 Km) of old NH-8 (NH-48) in the state of Gujarat on single Percentage Item Rate Contract |
2024-NHAI-205992-1 |
14/09/2024 |
24/08/2024
|
25/09/2024
Time
11:0Hrs
|
-
|
349 |
Consultancy services as Independent Engineer during Operation and Maintenance for the project Four/Six Laning of Hungund - Hospet Section of NH – 13 from Km 202.000 to Km 299.000 in the state of Karnataka under NHDP Phase – III on Design, Build, Finance, Operate and Transfer (DBFOT) basis under NHDP III |
NIT No.18/NHAI/RO-BNG/IE/Tender/2023-24 dated 22.08.2024 |
24/08/2024 |
22/08/2024
|
21/09/2024
Time
11:0Hrs
|
|
350 |
Consultancy services as Independent Engineer during Operation and Maintenance for the projects of NH-66 and NH-73 under NMPRCL Developed New Mangalore Port Road Connectivity in the state of Karnataka |
NIT No.17/NHAI/RO-BNG/15017/Tender/2024-25 dated 21.08.2024 |
24/08/2024 |
21/08/2024
|
20/09/2024
Time
11:0Hrs
|
|
351 |
Supervision Consultancy Services (SC) for Operation and Maintenance of four lane NH-4 from AP/TN Border to Nalagampalli (Length 37.110 Km) and Nalagampalli AP/Karnataka Border (Length 47.687 Km) in the state of Andhra Pradesh |
2024-NHAI-204667-1 |
13/08/2024 |
12/08/2024
|
15/10/2024
Time
11:30Hrs
|
|
352 |
Consultancy services for Authoritys Engineer for Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A along with Chitrakoot Bypass on EPC Mode in the State of Uttar Pradesh. |
CE-RO/LKO/NH (O)/23/NH-731A(Pkg-V) /2022-23/AE dated 08.08.2024 |
09/08/2024 |
08/08/2024
|
23/09/2024
Time
15:0Hrs
|
|
353 |
Consultancy services for Authoritys Engineer for Supervision of 4-Laning from Nagaon By-pass to Jia Bharali Bridge on in the State of Assam on EPC Mode |
NHIDCL/Assam/Dola-Jamuguri/AE |
08/08/2024 |
07/08/2024
|
12/09/2024
Time
15:0Hrs
|
|
354 |
Independent Engineering Services for Construction of Four Lane from Sahebganj (Design Ch Km 44 650) to Areraj (Design Ch Km 82 200) section of NH139W in the State of Bihar on Hybrid annuity Mode |
2024-NHAI-204041-1 |
21/08/2024 |
06/08/2024
|
09/07/2025
Time
11:0Hrs
|
|
355 |
Independent Engineer Services during O and M Period for 6-laning of Barwa Adda – Panagarh section of NH-2 from Km 398.240 to Km 521.120 including Panagarh By pass in the state of Jharkhand and West Bengal under NHDP Phase-V on BOT (Toll) on DBFOT pattern |
03/O and M/IE/NH-19/2024-25 |
05/08/2024 |
05/08/2024
|
19/09/2024
Time
12:0Hrs
|
|
356 |
Consultancy Services For Authoritys Engineer For Supervision of Construction of ROB In Lieu of L.C. - 1A Gandhidham - Tuna Port Railway Crossing At Km 363.625 On NH-8A (New NH 141 Km. 6.465 K.F.T.Z.-Kandla Road In The State Of Gujarat On EPC |
NO.10 of 2023-24 |
03/08/2024 |
03/08/2024
|
21/09/2024
Time
18:0Hrs
|
|
357 |
Supervision Consultancy Services (SC) for Operation and Maintenance of NH-30 from Ibrahimpatnam Circle (Km.0.000) to Tiruvuru AP Telangana Border (Km.70.200) section of two lanes with paved shoulders in the State of Andhra Pradesh. |
2024-NHAI-203405-1 |
01/08/2024 |
02/08/2024
|
19/09/2024
Time
11:0Hrs
|
|
358 |
Supervision Consultancy Services for Operation and Maintenance of NH-30 from Ibrahimpatnam Circle Km.0.000 to Tiruvuru AP Telangana Border Km.70.200 section of two lanes with paved shoulders in the State of Andhra Pradesh |
2024 NHAI 203405 1 |
02/08/2024 |
02/08/2024
|
19/09/2024
Time
15:0Hrs
|
|
359 |
Independent Engineer Services for Four laning of Phagwara to Hoshiarpur road (NH 344B) including Phagwara and Hoshiarpur Bypass under Bharatmala Pariyojana (from Ch. -0.600 to Ch. 46.902 of NH-344B and Ch. 7.780 to Ch. 8.900 of NH-344A, Total design length 48.622 km) in the State of Punjab on Hybrid Annuity Mode (2nd Call) |
NHAI/32044/1/2022/PB/(e 158598) |
14/08/2024 |
02/08/2024
|
02/09/2024
Time
11:0Hrs
|
|
360 |
CONSULTANCY SERVICES FOR AE OF THE WORK OF WIDENING AND STRENGTHENING TO 2 LANE WITH PS FROM EX CH 56.720 TO 100.820 AND DESIGN CH 62.600 TO 106.360 (TOTAL LENGTH is 43.760 KM) SBU NH 1 ON THE UT OF JAMMU AND KASHMIR UNDER BEACON BRO ON EPC MODE. |
RW/CH/W(34)/AE/JK/2023 |
05/08/2024 |
31/07/2024
|
02/09/2024
Time
15:0Hrs
|
|
361 |
Consultancy Services of Authoritys Engineer for Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109 700 to Km 122 300) including widening of the existing NH-31 (from Km 196 700 to Km 198 600) as part of the Amas-Darbhanga highway in the state of Bihar on EPC Mode |
2024-NHAI-203120-1 |
21/08/2024 |
30/07/2024
|
03/02/2025
Time
11:0Hrs
|
|
362 |
Independent Engineering Services for Construction and Upgradation to Four Lane from Manikpur (Design Ch Km 0 000) to Sahebganj (Design Ch Km 44 650) section of NH139W in the State of Bihar on HAM Mode (2nd call) |
2024-NHAI-203107-1 |
20/08/2024 |
30/07/2024
|
02/01/2025
Time
11:0Hrs
|
|
363 |
Independent Engineer services for Construction of four laning of Kishanganj- Bahadurganj section as a spur connectivity between NH-27(new)/NH-31(old) and NH-327E starting near village Uttar Rampur (0 000) and terminating at NH- 327E, near village Satal Istmarar, Bahadurganj (23 649) and interchange at start point (length-1 200 km) in the State of Bihar on hybrid annuity mode (2nd call) |
2024-NHAI-202838-1 |
21/08/2024 |
26/07/2024
|
10/02/2025
Time
11:0Hrs
|
|
364 |
Consultancy services for authority engineer and PMC for supervision of Rehabilitation and Up- Gradation to Four Lane Road From Km. 70.500 to Km. 78.600 of NH-92 Under EPC Mode in The State of Uttar Pradesh on EPC. |
1070M/13M-NHCK/24 dated 23.07.2024 |
08/08/2024 |
26/07/2024
|
06/09/2024
Time
15:0Hrs
|
|
365 |
Consultancy services for Authoritys Engineer for supervision of Construction of four lane of Chausa -Buxar Bypass from km 45.000 to km 65.915 (Package 2) of NH-319A in the state of Bihar on EPC mode |
RW/PAT/NH-319A(Pkg2)/CS/2024 |
29/07/2024 |
26/07/2024
|
18/09/2024
Time
17:0Hrs
|
|
366 |
Consultancy Services for Authoritys Engineer for Supervision of Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode |
818389 |
30/07/2024 |
26/07/2024
|
26/08/2024
Time
17:30Hrs
|
|
367 |
Consultancy services for Authority Engineer for Supervision of Widening Reconstruction and Upgradation to 2 lanes with paved shoulder Four lane configuration for the work of Sautada to Shirapur section of NH561 from Design km 86.300 to km.125.589 i |
EENHD/Latur/NIT No.11/AE/1145 /2024-25 |
23/07/2024 |
22/07/2024
|
06/09/2024
Time
17:30Hrs
|
|
368 |
Consultancy Services for Assisting Authoritys Engineer for supervision of Construction of Tadipatri bypass from Km 0/000 to Km 6/285 of 4 lane on NH67 in Ananthapuramu district in the State of Andhra Pradesh on EPC mode under Annual Plan 2022 23 |
NIT No.05/SE,NH,ATP/2024-25 |
31/07/2024 |
22/07/2024
|
22/08/2024
Time
15:0Hrs
|
|
369 |
Supervision Consultancy Services (SC) for Operation and Maintenance of Penchalakona to Yerpedu section of NH 565 from Km 425.400 to Km 509.400 (Total length 84 Km) to 2-lane with paved shoulder in the state of Andhra Pradesh on PBMC Mode. |
2024-NHAI-202157-1 |
06/08/2024 |
22/07/2024
|
09/09/2024
Time
11:30Hrs
|
|
370 |
Consultancy Services as Authoritys Engineer for Supervision of mitigation measures of Landslides Sinking zone and Minor bridge in between Km 368.00 to Km 468.00 on NH-07 (Old NH-58) on EPC mode in the state of Uttarakhand (Package-I -II- III) |
NHIDCL/UK/NH-07/P123/AE/2024 |
03/09/2024 |
22/07/2024
|
03/10/2024
Time
15:0Hrs
|
|
371 |
Supervision Consultancy Services (SC) for Operation and Maintenance of Vaggampalle to Dornala T-junction section from Km. 293.266 to 359.422 of NH-565 (Total length 66.156 Km) to 2-lane with paved shoulder in the state of Andhra Pradesh on PBMC Mode. |
2024-NHAI-201595-1 |
06/08/2024 |
16/07/2024
|
09/09/2024
Time
11:0Hrs
|
|
372 |
Consultancy Services for Consultant assisting AE for Supervision of Widening of existing road to 2 lane with PS configuration from Km 0.0 to 26.0 and Km 45.200 to 59.622 of NH 365BB in the state of Andhra Pradesh under Annual Plan 2023-24 on EPC mode |
SENHVJA/02/2024-25 Dated 15.07.2024 |
08/08/2024 |
16/07/2024
|
24/09/2024
Time
17:0Hrs
|
|
373 |
Consultancy services for AE for Supervision of Improvement and up-gradation of newly declared NH227B(84 Kosi Parikrama Marg)PkgI,Design Km 228.920 (Jagarnathpur)to Km 235.960/0.000(Makhauda Dham) toKm 29.000(Sarpur)in the State of UP on (EPC) basis. |
CE-RO/LKO/NH(O)/24/NH-227B(Pkg -I)/2021-22/AE dated 16.07.2024 |
19/07/2024 |
16/07/2024
|
14/09/2024
Time
11:0Hrs
|
|
374 |
Operation and Maintenance of Balance work of 4 Laning from Ramban Km 151.00 to Banihal Km 187.00 excluding realignment portion of NH1A (Now NH44) with value addition at critical location on Engineering Procurement and construction Mode NHDP Phase II |
ROJMU/IE/RMBN/24-25/OM/01 |
12/07/2024 |
08/07/2024
|
22/08/2024
Time
16:0Hrs
|
|
375 |
IE Services during OnM stage of 4L of Dangiyawas to Jajiwal Section Package I of Jodhpur Ring Road Section of NH 125A in the State of Rajasthan on HAM under NHDP Phase VII |
NHAI/RO-JPR/Jodhpur/JRR-I/ NH-125A/IE/2024/ |
22/07/2024 |
06/07/2024
|
20/08/2024
Time
17:0Hrs
|
|
376 |
Supervision Consultancy (SC) during Oand M Period of Four lane of Talaja-Mahua-Kagvadar section of NH-8E (New NH-51) from km 53.585 to km. 139.915 (Design chainage from km 54.990 to km to Km. 140.470) in the State of Gujarat (Package-II, III). |
NHAI/RO-GNR/NH-8E/Tal-Mah-Kag/IE/2024 |
25/07/2024 |
05/07/2024
|
27/08/2024
Time
16:0Hrs
|
|
377 |
Consultancy Services during operation and Maintenance of 2 lane road with paved shoulders of Mangrulpir to Mahan (NH 161 A from 971A74 b 641574) Design km 75 000 to km 107 5001(Total Length 32.5 Km) in the state of Maharashtra on EPC Basis mode(2nd C |
2024-MoRTH-799890-2 |
25/07/2024 |
05/07/2024
|
31/07/2024
Time
17:30Hrs
|
|
378 |
Supervision Consultancy Services for Operation and maintenance of from km 0.000 to km 123.454 Jetpur-Somnath Section of NH-8D (New NH-151) including OandM of existing Junagadh bypass and Construction of Flyovers, VUPs and service road for Long Term Rectification of MoRTH Identified Blackspots at 04 locations viz. Sorath, Keshod, Gadu and Santipara Patiya in the state of Gujarat |
NHAI/RO-GNR/NH-8AD/Jet-Som/ SC/2024 |
30/07/2024 |
04/07/2024
|
03/09/2024
Time
16:0Hrs
|
|
379 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF THE WORK OF CONSTRUCTION OF 4-LANE WITH PAVED SHOULDER OF SRI MUKTSAR SAHIB BYPASS FROM EXISTING KM 269.960 of NH-354 TO EXISTING KM 39.280 OF NH - 754 IN THE STATE OF PUNJAB |
RW/CH/PB/W87/AE/2024 |
04/07/2024 |
04/07/2024
|
08/08/2024
Time
15:0Hrs
|
|
380 |
Consultancy services for Authoritys Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka - Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon to Km 95-400 to Kwaram Taro village at Km 113-330 (Design KM 96-400 to Km 113-830) in the state of Assam on EPC mode |
NHIDCL/Assam/AE/Dab-Man /Pkg-5/-Part(1)/2024 |
03/07/2024 |
03/07/2024
|
23/07/2024
Time
15:0Hrs
|
|
381 |
IE Services during Operation and Maintenance period for six laning of Krishnagiri – Walajahpet section of NH-48 (Old NH-46) from km.0.000 to km.148.300 in the State of Tamil Nadu |
NHAI/RO Chennai/IE /OM/2024-25/176 |
06/07/2024 |
01/07/2024
|
30/07/2024
Time
17:0Hrs
|
|
382 |
Consultancy Services for Assisting Authoritys Engineer for supervision of 1) Rehabilitation and Upgradation from Km. 0/000 to 18/000 of Mydukur to Mudireddipalli section of NH-167B two lane with paved shoulder configuration in the State of Andhra Pradesh in Annual Plan 2023-24. 2) Rehabilitation and Upgradation of existing road to two lane with paved shoulder configuration from Km 22/300 (Mudireddypalli) to 58/635 (Kadapa Nellore Border section) of NH-167B in the state of Andhra Pradesh unde |
NIT No.03/SE,NH,ATP/2024-25 |
01/07/2024 |
01/07/2024
|
30/07/2024
Time
15:0Hrs
|
|
383 |
Consultancy services for Authority’s Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road, NH -353D in Km 109.650 & 111.175 In State of Maharashtra on EPC Mode |
03/EENH/NGP/2024-25/2827 |
11/07/2024 |
28/06/2024
|
26/07/2024
Time
15:0Hrs
|
|
384 |
Independent Engineering Services for Construction of 4 laning of Patna-Arrah-Sasaram corridor Package 2 Section 1 - Garhani at Ch Km 73 700 to Patar at Ch Km 84 300 & Section 2 - Greenfield from Sadisopur at Patna Ring Road ( NH-131G) Ch Km 0 000 to Asani (at NH-319) at Ch Km 35 800 of NH-119A in the State of Bihar on HAM Mode |
2024-NHAI-199659-1 |
20/08/2024 |
27/06/2024
|
21/04/2025
Time
11:0Hrs
|
|
385 |
Independent Engineer services for Up-gradation of Shyampur to Sabalgarh Road section of NH-552Ext. from Design Chainage 111.800 to 166.850 Km (Total length 55.05 km) to Two Lane with Paved Shoulder configuration in the State of Madhya Pradesh on HAM mode |
2024-MoRTH-812990-1 |
10/07/2024 |
21/06/2024
|
06/08/2024
Time
17:30Hrs
|
|
386 |
Consultancy Services for assisting Authority’s Engineer for supervision of Construction of Bypass road to V Kota (Km.333/400 to 340/900) and Byreddypalli town (Km.315/900 to 318/250) to two lane with paved shoulder of NH-42 (Palamaneru Krishnagiri Boarder) in Chittoor District of Andhra Pradesh on EPC mode under Annual Plan 2022-23 (2nd call) |
NIT No.01/SE,NH,ATP /2024-25,Dt.24.6.2024 |
24/06/2024 |
21/06/2024
|
22/07/2024
Time
15:0Hrs
|
|
387 |
Consultancy services for Authoritys Engineer for Supervision of W/S to 2lane with PS/4lane with PS configur.from km.61.500 of NH727B near Nawalpur i.e. endpoint of Salempur Bypass tokm.106.495 of NH727B near Sikanderpur under EPC Mode in the state of UP |
CE-RO/LKO/NH(O)/20/NH 727B/2022-23/AE dt.21.06.2024 |
25/06/2024 |
21/06/2024
|
08/08/2024
Time
11:0Hrs
|
|
388 |
Independent Engineering Services for Construction of 4 laning Greenfield corridor from Suara (sasaram) at Ch 0 000 to Garhani (at SH-12) at Ch 74 432 package-1 of Patna-Arrah-sasaram corridor of NH-119A in the State of Bihar on HAM Mode (3rd call) |
2024-NHAI-199116-1 |
25/06/2024 |
21/06/2024
|
08/08/2024
Time
15:0Hrs
|
|
389 |
Independent Engineer services during Operation & Maintenance Period for (i) Nagpur-Wainganga Bridge Section of NH-53 (Old NH-6) from km 498.000 to km 544.200 under NHDP-III on BOT (Toll) under (DBFOT) Pattern and (ii) Chhattisgarh / Maharashtra Border – Wainganga Bridge section from Km.405.000 to Km.485.000 of NH-53 (Old NH-6) under NHDP Phase IIIA on BOT basis - Consultancy Package No.IE-O&M/NH-53/NAG-24 |
NHAI/RO-NAG/TENDERS/2024-25/04 |
20/06/2024 |
20/06/2024
|
18/07/2024
Time
11:0Hrs
|
|
390 |
AE Services during OM Period for 4 Laning of Talebani to Sambalpur of NH 6,4 laning of Angul Sambalpur of NH 42 and Construction of 6L Flyover at Ainthapalli junction and construction of 6L Elephant Corridor in Angul Sambalpur of NH 55 in Odisha |
NHAI/13012/186/RO/OD/2024 |
08/07/2024 |
20/06/2024
|
30/07/2024
Time
11:0Hrs
|
|
391 |
Independent Engineering Services for Construction of 4 laning Greenfield corridor from Suara (sasaram) at Ch 0 000 to Garhani (at SH-12) at Ch 74 432 package-1 of Patna-Arrah-sasaram corridor of NH-119A in the State of Bihar on HAM Mode (3rd call) |
2024-NHAI-198776-1 |
28/06/2024 |
19/06/2024
|
21/04/2025
Time
11:0Hrs
|
|
392 |
Independent Engineer services during Operation & Maintenance Period for (i) 4-laned Loha-Waranga and (ii) Waranga-Mahagaon Sections of NH-361 in the State of Maharashtra on Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IV–Consultancy Package No.IE-O&M/NH-361/NAG-22 |
NHAI/RO-NAG/TENDERS/2024-25/02 |
19/06/2024 |
19/06/2024
|
18/07/2024
Time
11:0Hrs
|
|
393 |
Independent Engineer services during Operation & Maintenance Period for (i) 4-laned Stand Alone Ring Road / Bypasses for Nagpur City – Package – I from Km.0.500 to Km.34.000 (Total length – 33.500 Km.) and (ii) 4-laning Stand Alone Ring Road / Bypasses for Nagpur City – Package – II from Km.34.000 to Km.62.035 (Total length – 28.035 Km.) in the State of Maharashtra on BOT (Hybrid Annuity) basis- Consultancy Package No.IE-O&M/ORR/NAG-23 |
NHAI/RO-NAG/TENDERS/2024-25/03 |
19/06/2024 |
19/06/2024
|
18/07/2024
Time
11:0Hrs
|
|
394 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF THE WORK OF CONSTRUCTION OF 4-LANE WITH PAVED SHOULDER OF FEROZEPUR BYPASS FROM EXISTING CH KM 212.500 TO KM 229.690 (DESIGN CH KM 231.270) SECTION OF NH - 354 ON EPC MODE IN PUNJAB |
RW/CH/PB/AE/W(61)/2024 |
19/06/2024 |
19/06/2024
|
11/07/2024
Time
15:0Hrs
|
|
395 |
Consultancy services for (AE) for supervision of Construction of Shohratgarh Bypass (Design Length 6.273 Km) to 2lane with paved shoulder on NH-730 starts near ch. 413.700 and ends near ch. 419.000) under EPC mode in the State of UP. |
1035/08Com- NH Circle/24 Date.11.06.2024 |
26/06/2024 |
14/06/2024
|
10/07/2024
Time
11:0Hrs
|
|
396 |
Independent Engineer services during Operation & Maintenance Period for (i) 4–laned Ausa – Chakur and (ii) 4-laned Chakur-Loha Sections of NH-361 in the State of Maharashtra on Hybrid Annuity Mode (DBFOT Annuity) Pattern under NHDP Phase-IV–Consultancy Package No.IE-O&M/NH-53/NAG-21 |
NHAI/RO-NAG/TENDERS/2024-25/01 |
12/06/2024 |
12/06/2024
|
18/07/2024
Time
11:0Hrs
|
|
397 |
RFP for procurement of services of Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Risod Town to Four Lane with Paved Shoulders standards from KM.36.845 to KM. 39.340 and KM. 41.520 to 44.220 (Totat length = 5.20 KM) of NH 461 B in the state of Maharashtra on EPC mode. |
2024-MoRTH-797401-2 |
14/06/2024 |
11/06/2024
|
03/07/2024
Time
17:30Hrs
|
|
398 |
Consultancy services for Authoritys Engineer for Supervision of Construction of New 2 lane Bridge over Purna River including approaches in Shegaon Deori fata section of NH548 C in the State of Maharashtra on EPC Mode.(2nd Call) |
2024-MoRTH-797282-2 |
15/06/2024 |
11/06/2024
|
03/07/2024
Time
17:30Hrs
|
|
399 |
Independent Engineer services for supervision of Four laning of Agra-Aligarh Section from Km 0000 (junction of NH-34 Aligarh) to Km 28 000 (near Asroi village in Hathras) in the state of Uttar Pradesh on HAM mode under NH(O) Scheme (Package-I) and Four laning of Agra-Aligarh Section from Km. 28 000 (near Asroi village in Hathras) to Km. 65 119 Junction with Yamuna Expressway (Km 151 50) Khandauli village Agra District in the state of Uttar Pradesh on HAM mode under NH(O) Scheme (Package-II) |
NHAI/HQ/UP(W)/Agra-Aligarh/4L/IE/2024/ITB |
19/06/2024 |
11/06/2024
|
11/07/2024
Time
11:0Hrs
|
|
400 |
Engagement of Authority Engineer for Supervision of Construction of Elevated Road with Service Road from Delhi Agra road NH19 to DND FARIDABAD BALLABGARH BYEPASS KMP LINK SPUR to Delhi Mumbai Expressway via Ballabgarh Mohna road in Faridabad District in the State of Haryana on EPC Mode |
2024/HRY/376153/1 |
11/06/2024 |
11/06/2024
|
01/07/2024
Time
17:0Hrs
|
|
401 |
Consultancy Services for Supervision Consultants of Operation and Maintenance of Chennai – Tada section of NH-5 from Km.21.400 to Km.54.400 (33.00 Km) in the State of Tamil Nadu |
NHAI/ROC/SC/2024-25/174 |
26/06/2024 |
10/06/2024
|
15/07/2024
Time
17:0Hrs
|
|
402 |
Consultancy services for Upgradation from single lane/two lane to 2 lane with PS from Ch. Km. 0/00 to 56/620 on NH-58 in State of Gujarat on HAM |
2023-2024/NH-58/IE |
06/06/2024 |
06/06/2024
|
06/07/2024
Time
18:0Hrs
|
|
403 |
2nd Call for Consultancy services for Supervision Consultant (SC) for Operation and Maintenance of NH-200 (New NH 130) (Package-II) from Km 48.580 to Km 91.026 (Simga-Sargaon).(Total length-42.446 km) of Raipur- Bilaspur Road in the State of Chhattisgarh under NHDP- IV on EPC mode. |
11052/RO-Raipur/Tender/2nd/AE/SS |
04/07/2024 |
06/06/2024
|
18/07/2024
Time
15:0Hrs
|
|
404 |
CONSULTANCY SERVICE FOR AUTHORITY ENGINEER FOR SUPERVISION OF WIDENING/IMPROVEMENT OF ROAD CHANGWINTI WALONG NAMTI FROM KM 0.00 TO KM 54.45 AND HAYULIANG-CHANGWINTI BETWEEN KM 45.050 TO KM 50.820 UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH ON EPC MODE |
CE (P) UDK/NIB/07/2024-25 |
07/06/2024 |
03/06/2024
|
19/08/2024
Time
11:0Hrs
|
|
405 |
IE Services for Tolling Operation Maintenance and Transfer during O and M of Kota Bypass from Km 1052 429 to Km 1080 249 of NH27 including Cable Stayed Bridge in Rajasthan |
2024-NHAI-196568-1 |
15/06/2024 |
27/05/2024
|
26/06/2024
Time
11:0Hrs
|
|
406 |
Consultancy services of Independent Engineer for Upgradation of Mehsana-Idar section of NH 168G) in the State of Gujarat on HAM |
2023-2024/NH168G/IE |
24/05/2024 |
24/05/2024
|
13/07/2024
Time
18:0Hrs
|
|
407 |
Consultancy services for Authoritys Engineer for supervision of Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.590 km to 2 Lane with paved shoulder configuration along in the State of Madhya Pradesh on EPC |
2024-MoRTH-807881-1 |
28/06/2024 |
18/05/2024
|
10/09/2024
Time
17:30Hrs
|
|
408 |
Consultancy services for Authoritys Engineer for supervision of Upgradation of Multai to MP/MH Boarder section of NH-347A from 0.00 to 23.94 to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode |
01/SAC/NH/AE/IND/2024 |
31/05/2024 |
17/05/2024
|
10/09/2024
Time
17:30Hrs
|
|
409 |
Consultancy services for appointment of Authoritys Engineer for CONSTRUCTION OF 2 LANE 386 MTR SPAN 260 plus 63 plus 63 EXTRADOSED CABLE STAYED BRIDGE BRIDGE OVER RIVER SIANG AT DESIGN CHAINAGE KM 2 pt 908 AND 63 pt 50 MTR SPAN MAJOR BRIDGE AT DESIGN CHAINAGE KM 2 pt 590 IN BETWEEN KM 118 pt 8 JUNCTION OF NH 513 WITH YINGKIONG TO MOYING VILLAGE JUNCTION AT KM 93 pt 50 OF DITTE DIMME MIGGING ROAD UNDER 761 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH ON EPC MODE |
CE (P) BMK/03/2024-25 |
20/05/2024 |
17/05/2024
|
18/07/2024
Time
11:0Hrs
|
|
410 |
Consultancy services of Independent Engineer for Up-gradation of existing 6 Lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of NH 47 (Narol Junction to Sarkhej Junction) in the State of Gujarat |
2023-24-NH/47/IE |
03/05/2024 |
03/05/2024
|
06/07/2024
Time
18:0Hrs
|
|
411 |
N/04005/13002/TS IE Services during OnM Period of Four laning of NH 161 from Kandi (Design Km 0.000) (Km 498.25 of NH 65) to Ramsanpalle (Design Km 39.980 Existing Km 44.757) (Design length 39.980 Kms) in the state of Telangana under BP on HAM. |
194577 |
10/06/2024 |
01/05/2024
|
18/06/2024
Time
15:0Hrs
|
|
412 |
Consultancy services for Authority’s Engineer for Supervision of Widening and Strengthening to two lane with Paved Shoulder/Four Lane with paved shoulder configuration from km. 61.500 of NH-727B near Nawalpur (km 178.500 of Sonauli-Balia Marg, Old SH-01) i.e. end point of Salempur Bypass to km. 106.495 of NH 727B near Sikanderpur under EPC Mode in the state of Uttar Pradesh |
CE-RO/LKO/NH(O)/ 20/NH-727B/2022-23/AE dt.29.04.2024 |
30/04/2024 |
29/04/2024
|
13/06/2024
Time
11:0Hrs
|
|
413 |
Independent Engineer services for supervision of Construction of 4-lane of NH-8 on Silchar-Churaibari Pkg-5 in the state of Assam on Hybrid Annuity Mode |
NHIDCL/Assam/NH-8/HAM/IE /S-C/Pkg-V/2024 |
12/04/2024 |
15/04/2024
|
10/06/2024
Time
15:0Hrs
|
|
414 |
Independent Engineer services for supervision of Construction of 4 Lane with Paved Shoulder of Chandkhira village Churaibari section of NH-8 in the state of Assam on Hybrid Annuity Mode. Package- VI |
NHIDCL/Assam/ NH-8/HAM/IE/S-C/Pkg-VI/ 2024 |
12/04/2024 |
15/04/2024
|
10/06/2024
Time
15:0Hrs
|
|
415 |
Consultancy Services for Authority Engineer for Supervision of Construction of bypass around Lohardaga Town of NH143A on EPC mode in the State of Jharkhand |
RW/Ranchi/AP-13/2020-21/Tender |
16/04/2024 |
05/04/2024
|
22/07/2024
Time
16:0Hrs
|
|
416 |
Consultancy services for Supervision Consultant of 4 lane of Thalassery-Mahe Bypass section of NH-66 from 170/600 to 189/200 in the State of Kerala |
RO-Kerala/PIU KKD/ SC/TM Bypass/664 |
03/04/2024 |
03/04/2024
|
27/04/2024
Time
15:0Hrs
|
|
417 |
Consultancy services for Supervision Consultant (SC) for Operation and Maintenance of NH-200 (New NH 130) (Package-II) from Km 48.580 to Km 91.026 (Simga-Sargaon).(Total length-42.446 km) of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC mode |
11052/RO-Raipur/Tender/AE/SS |
16/04/2024 |
16/03/2024
|
16/04/2024
Time
15:0Hrs
|
|
418 |
Independent Engineer Services during Operation Maintenance Period for the project of Design Construction Development Finance Operation and Maintenance |
NHAI/RO-MP/JBP/MP2/IE |
15/04/2024 |
16/03/2024
|
08/05/2024
Time
17:0Hrs
|
|
419 |
Independent Engineer services for supervision of Construction of 4 Lane of Karimganj - Sutarkandi section in the state of Assam on Hybrid Annuity Mode. Package- VII |
NHIDCL/Assam/NH-8/HAM/IE/S C/Pkg-VII/2024 |
12/04/2024 |
15/03/2024
|
10/06/2024
Time
15:0Hrs
|
|
420 |
Independent Engineer Services for supervision of Four laning of Silchar SJ-1 of NH-37 in the State of Assam under Bharatmala Pariyojna on Hybrid Annuity Mode |
NHIDCL/Assam/NH-37/HAM /IE/S-J/Pkg-1/2024 |
09/04/2024 |
15/03/2024
|
20/05/2024
Time
15:0Hrs
|
|
421 |
Consultancy services for authority engineer for supervision of Rehabilitation and Upgradation of existing intermediate lane to 2L with PL from Gulganj Bypass to Barna River length 76.40 Km on Gulganj Amanganj Pawai Katni NH-43Ext. in the State of MP |
800898 |
10/04/2024 |
15/03/2024
|
05/06/2024
Time
17:30Hrs
|
|
422 |
Independent Engineer services for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Bilasipura- Guwahati Road Package-1 in the state of Assam on HAM mode |
NHIDCL/Assam/NH-17/ B-G/Pkg-1/HAM / IE/2024 |
12/04/2024 |
15/03/2024
|
09/05/2024
Time
15:0Hrs
|
|
423 |
Independent Engineer services for Widening/Improvement to 4 (Four) Lane with Paved Shoulder FROM Bilasipura- Guwahati Package-2 of in the state of Assam on Hybrid Annuity Mode |
NHIDCL/Assam/NH-17/IE/Bil-Ghy /Pkg-2/HAM/2024 |
12/04/2024 |
15/03/2024
|
09/05/2024
Time
15:0Hrs
|
|
424 |
Independent Engineer Services for 4 Laning and Greenfield alignment of Karimganj - Silchar section in the state of Assam on HAM mode. Package -I |
NHIDCL/Assam/NH-37/HAM/IE /S-C/Pkg-I/2024 |
12/04/2024 |
15/03/2024
|
10/06/2024
Time
15:0Hrs
|
|
425 |
Independent Engineer Services for Four Laning of Badarpur -Churaibari section of NH-37 NH-8 in the state of Assam (Package-IV) on Hybrid Annuity Mode. |
NHIDCL/Assam/NH-37 8/HAM/IE/S-C/Pkg-IV/2024 |
12/04/2024 |
15/03/2024
|
10/06/2024
Time
15:0Hrs
|
|
426 |
UPC N/08002/06008/TS Supervision Consultancy Services for OnM of 2/4 Lane with paved shoulders of stretch from i.Km 154 to 187 of Mangalwarpet to Mallampalli section ii.Km.72.600 to 121 of Tanamcherla to Jamandlapally Sec.of NH365 in the state of Telangana |
191337 |
14/03/2024 |
15/03/2024
|
01/05/2024
Time
17:0Hrs
|
|
427 |
Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance of 4-lane Vijayawada-Machilipatnam section of NH-65 from Benz Circle Vijayawada (Km 0.000) to Three Pillars center at Machilipatnam (Km 64.611) in the State of Andhra Pradesh on PBMC Mode |
2024-NHAI-191573-1 |
15/03/2024 |
15/03/2024
|
11/06/2024
Time
11:0Hrs
|
|
428 |
IE Services during Operation and Maintenance stage of 4 Lane of Jaipur Deoli Section of NH 52 from Km. 18.700 to 165.000 (Total Length 148.770 km) in the state of Rajasthan on DBFOT (Toll) mode |
NHAI/RO-JPR/JAIPUR-DEOLI/NH-12 (New NH-52)/IE/2024 |
26/06/2024 |
15/03/2024
|
03/07/2024
Time
11:0Hrs
|
|
429 |
SC Services during Operation and Maintenance stage of 6 Lane of Jaipur Kishangarh Section of NH 48 from Km. 273.500 to 363.885 (Total Length 90.385 km) in the state of Rajasthan |
NHAI/RO JPR/JAIPUR KSG/NH 48/SC/2024/ |
27/06/2024 |
15/03/2024
|
03/07/2024
Time
11:0Hrs
|
|
430 |
SC Services during Operation and Maintenance stage of 2LPS/4L of Gagaria Baori Kalan Serva Bakhasar Section of NH 925 and Sata Gandhav Section NH 925A(Total length 196.970km.) in the state of Rajasthan |
NHAI/RO-JPR/11011/2024/NH-925 925A/SC-GBKSB |
15/06/2024 |
15/03/2024
|
04/07/2024
Time
15:30Hrs
|
|
431 |
Consultancy Services for Supervision Consultant of Operation and Maintenance of two lane with paved shoulder Bhopal Sanchi section from km 0.000 to km 53.775 of NH146 old NH86 Extn. in the state of MP |
NHAI/ROBPL/Bhopal/OandM/NH146/BS/2024 |
03/06/2024 |
14/03/2024
|
10/06/2024
Time
15:0Hrs
|
|
432 |
Construction of 4 lane access controlled Northern Patiala Bypass starting from Km 273 615 of NH-7 (village Wazidpur) and terminating at Km 300 465 of NH-7 (village Chamarheri) (Total length 28 900 Kms) in the State of Punjab under NH(O) on Hybrid Annuity Mode |
2024-NHAI-191288-1 |
10/11/2024 |
14/03/2024
|
18/11/2024
Time
11:0Hrs
|
|
433 |
Consultancy services for Independent Engineer Construction of 4/6 Lane bypass for Belagavi city from Km 11/00 (Goa side) of NH-4A to Km 516/000 (Pune side) of NH-4 (Design Length 34/48 km) in the state of Karnataka on Hybrid Annuity Mode Package 1A (3rd Call) |
2024-NHAI-191452-1 |
18/03/2024 |
14/03/2024
|
15/04/2024
Time
11:0Hrs
|
|
434 |
Independent Engineer services for Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial–Warangal) from Narva village at Design Ch. 3.834 Km to Puttapaka village at Design Ch. 35.300 Km (Total length 31.466 km) under Other Economic Corridor (NH(O)) programme as part of Nagpur - Vijayawada Corridor on Hybrid Annuity mode in the state of Telangana (Package-I)-2nd call |
NHAI/Telangana/ Mancherial Warangal IE/PkgI 2023 |
15/03/2024 |
14/03/2024
|
15/04/2024
Time
11:0Hrs
|
|
435 |
Independent Engineer (IE) services during Operation & Maintenance Period of Four laning of Dwarka (Kuranga-Khambhaliya-Devariya section from New Chainage km 0.000(Kurunga) to Km 76.270(Vadinar Junction) (Design length 76.270 km) on NH 151-A in the state of Gujarat on Hybrid Annuity Mode |
2024-NHAI-191367-1 |
28/03/2024 |
14/03/2024
|
29/04/2024
Time
16:0Hrs
|
|
436 |
SC Services during O-M stage of 4L Ahmedabad - Godhra section from km 4.200 to km 122.420 of NH-47 (Old NH-59) in the State of Gujarat |
2024-NHAI-191446-1 |
28/03/2024 |
14/03/2024
|
18/04/2024
Time
16:0Hrs
|
|
437 |
Consultancy Services for Authority Engineer for Supervision of Construction of 4 Nos of Standalone safety structures/works at different locations on various NHs (Package-II) in the State of Maharashtra on EPC Mode |
2024-NHAI-191196-1 |
01/04/2024 |
13/03/2024
|
16/04/2024
Time
11:30Hrs
|
|
438 |
Consultancy Services for Authority Engineer for Supervision of Construction of 12 Nos of standalone structures at different locations of NH-3 (Package-I) in the state of Maharashtra on EPC Mode |
2024-NHAI-191185-1 |
23/03/2024 |
13/03/2024
|
12/04/2024
Time
11:0Hrs
|
|
439 |
Construction of 11 Nos of Standalone structures/Safety works (Package III) at different locations on various NHs in the state of Maharashtra on EPC Mode |
2024-NHAI-191191-1 |
23/03/2024 |
13/03/2024
|
12/04/2024
Time
11:0Hrs
|
|
440 |
Services of Independent Engineer for Rehabilitation and Upgradation of NH-753B to 4LPS configuration from Section-Taloda Gujarat-Maharashtra Border in the State of Maharashtra on Hybrid Annuity Mode. |
NH/MAH/RO/Pune-5/IE/PKG-8 |
04/06/2024 |
13/03/2024
|
14/06/2024
Time
17:0Hrs
|
|
441 |
Consultancy Services for Authoritys Engineer for supervision of Construction of 6 lane flyover from Khapari ROB to Mihan existing 4 LPS road to 6 LPS with service road by flexible pavement in section of Nagpur - Hyderabad in the state of Maharashtra. |
NH/MAH/RO/Ngp-1/AE/PKG-6 |
04/06/2024 |
13/03/2024
|
14/06/2024
Time
17:0Hrs
|
|
442 |
Consultancy Services for Authoritys Engineer for supervision of Rehabilitation, upgradation and widening of existing highway to 2L-4LPS (Rigid Pavement) of NH 160 section- Phaltan to Mhaisal near Karnataka Border Package-I in the State of Maharashtra |
NH/MAH/RO/Pune-4/AE/PKG-5 |
20/05/2024 |
12/03/2024
|
11/06/2024
Time
17:0Hrs
|
|
443 |
Consultancy Services for Authoritys Engineer for supervision of Rehabilitation and Upgradation of Injegaon to Pathari , Borgavhan to Selu and Digras Phata to Deogaon Phata sections of NH 548 B to 2-4 LPS configuration on EPC mode in the state of Maharashtra. |
NH/MAH/RO/Aur-2/AE/PKG-7 |
20/05/2024 |
12/03/2024
|
11/06/2024
Time
17:0Hrs
|
|
444 |
Consultancy services for Authoritys Engineer for Supervision of Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH - 548 D from existing chainage km 54.000 to 82.300 and Design chainage km 54.000 to 82.120 Shikrapur to Nhavara |
No14/EENH/PUNE/1555/24 dt 12.03.2024 |
02/04/2024 |
12/03/2024
|
12/06/2024
Time
17:5Hrs
|
|
445 |
Consultancy services for Authoritys Engineer for Supervision of Reconstruction Widening Strengthening of Belhe Shirur from Single Lane Intermediate Lane and Two lane to Two lane with paved Shoulders of NH 761 from Design Ch. Km 0.000 to KM 37.97 |
15/EENH/PUNE/554/24dt12.3.2024 |
02/04/2024 |
12/03/2024
|
12/06/2024
Time
17:5Hrs
|
|
446 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF NEW 2LANE ROB AT RAILWAY IN LINE OF LC165B KM 921.450 BETWEEN CHONDI BASMAT BHENDEGAON STATIONS IN THE STATE OF MAHARASHTRA ON EPC MODE. |
NIT No 10/EENH/NED/764/2023-24 |
19/04/2024 |
12/03/2024
|
24/05/2024
Time
17:30Hrs
|
|
447 |
Consultancy Services as Authoritys Engineer for Supervision of i) Ukhrul bypass (Pkg-1 Length-6.571 km) ii) Finch Corner to Ukhrul section (Pkg-3 Length-14.63 km) iii) Ukhrul to Choithar section (Pkg-4 Length-8.612 km) in the state of Manipur on EPC mode. |
NHIDCL/Manipur/AE/ UTT1-YUJ3-YUJ4/2024 |
15/03/2024 |
12/03/2024
|
09/05/2024
Time
15:0Hrs
|
|
448 |
Consultancy Services during operation and Maintenance of 2 lane road with paved shoulders of Mangrulpir to Mahan (NH 161 A from 971A74 b 641574) (Designkm.75.000 to km.107.500(Total Length 32.5 Km) in the state of Maharashtra on EPC Basis mode. |
2024-MoRTH-799890-1 |
12/03/2024 |
11/03/2024
|
22/03/2024
Time
17:30Hrs
|
|
449 |
Independent Engineer services for 4 Laning of Rewa Bypass from Km 00.000 to 19.200 of NH-30 in the State of Madhya Pradesh on HAM mode |
799786 |
26/03/2024 |
11/03/2024
|
02/07/2024
Time
15:0Hrs
|
|
450 |
Independent Engineer services for Upgradation of Shahdol- Sagartola Section of NH 543 from km 0/000 to km 69/400 to Two lane with paved shoulder configuration on HAM mode in the State of Madhya Pradesh |
799757 |
27/03/2024 |
11/03/2024
|
25/11/2024
Time
15:30Hrs
|
|
451 |
Consultancy Services as AE for Supervision of construction of IL with HS of Hunli to Hayuliang (Pkg-III) from design Km 60 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of NH-913, in the state of Arunachal Pradesh. |
NHIDCL/Ar.Pr./AE/Hunli- Hyualiang/Pkg-III)/2024 |
13/02/2024 |
11/03/2024
|
19/03/2024
Time
15:0Hrs
|
|
452 |
Consultancy Services for Authoritys Engineer for supervision of Rehabilitation, upgradation and widening of existing highway to 2L/4LPS (Rigid Pavement) of NH 160 section- Phaltan to Mhaishal near Karnataka Border Dahiwadi Village to ending at Vita. |
NH/MAH/RO/Pune-2/AE/PKG-2 |
17/05/2024 |
11/03/2024
|
11/06/2024
Time
17:0Hrs
|
|
453 |
Consultancy Services for Authoritys Engineer for supervision of Widening, Reconstruction and Up- gradation to 2 LPS/ Four Lane configuration for the work of Ahmednagar to Sabalkhed and Ashti to Chinchpur Section of NH-561 in the state of Maharashtra. |
NH/MAH/RO/Pune-3/AE/PKG-3 |
17/05/2024 |
11/03/2024
|
11/06/2024
Time
17:0Hrs
|
|
454 |
Consultancy Services for Authoritys Engineer for supervision of Rehabilitation and Up-gradation of Jarud - Sirsala section of NH-361F to 2LPS- Four Lane in the state of Maharashtra on EPC mode. |
NH/MAH/RO/Aur-1/AE/PKG-4 |
20/05/2024 |
11/03/2024
|
11/06/2024
Time
17:0Hrs
|
|
455 |
Consultancy Services for Supervision Consultants of Operation and Maintenance of Four Laning of Madurai – Aruppukottai - Tuticorin section from Km 138.800 to Km 266.865 of NH-38 Old NH-45B in the State of Tamil Nadu |
NHAI/17011/02/25/2024/RO Madurai |
09/03/2024 |
09/03/2024
|
08/04/2024
Time
17:0Hrs
|
|
456 |
Independent Engineer services for Construction of Deoria Bypass from existing Km.27.140 to existing Km.46.780(Design Km. 49.109)on NH727A(Design length 21.969 Km.)to 4 lane with paved shoulder configuration under(HAM) in the State of UP |
CE-RO/LKO/NH(O)/06/Deoria Bypass(NH727A)/22-23/IE dated 09.03.2024 |
14/03/2024 |
09/03/2024
|
18/05/2024
Time
11:0Hrs
|
|
457 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Major Bridge on Wardha River at Ch 28.362.50 alongwith approaches from km 28.107 to km 28.684 (total length of the project 0.577 km) on Talegaon Warud Gonapur road section of NH 347A on EPC Mode in the state of Maharashtra. |
22/EENH/AMT/2023-24 |
15/03/2024 |
08/03/2024
|
13/05/2024
Time
17:30Hrs
|
|
458 |
Consultancy services for Authoritys Engineer for Supervision of Construction of New High level Major Bridge on Katepurna River at design chainage 133.450 along with approaches of 640 m from Km.133.025 to Km. 133.875 (total Length of the project 8katepurna malegaon washim |
2024-MoRTH-797056-2 |
18/03/2024 |
08/03/2024
|
13/05/2024
Time
17:30Hrs
|
|
459 |
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to Two lane with paved shoulders from 106/830 to 158/496 of Yellareddy to Rudrur Section of NH 765D in the state of Telangana on EPC mode |
2024-MoRTH-799724-1 |
20/03/2024 |
08/03/2024
|
01/08/2024
Time
15:0Hrs
|
|
460 |
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders from Km 62/920 to Km 106/830 of Medak toYellareddy Section of NH 765D in the state of Telangana on EPC mode |
2024-MoRTH-799723-1 |
20/03/2024 |
08/03/2024
|
24/07/2024
Time
15:0Hrs
|
|
461 |
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders from km 34/250 to km 71/675 of Khammam Kuravi Section of NH 365A on EPC mode in the State of Telangana |
2024-MoRTH-799725-1 |
21/03/2024 |
08/03/2024
|
01/08/2024
Time
15:0Hrs
|
|
462 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders from Km 0/00 to km 32/970 of Adilabad to bela section of NH 353B in the State of Telangana on EPC Mode |
2024-MoRTH-799721-1 |
30/03/2024 |
08/03/2024
|
25/07/2024
Time
15:0Hrs
|
|
463 |
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF 6 Lanning of Pune to Hyderabad section of NH 65 from km 493/00 to 524/000 from Sangareddy X Road to Madinaguda Excluding BHEL Flyover from Km 520/000 to Km 521/650 in the State of TS |
2024-MoRTH-799726-1 |
30/03/2024 |
08/03/2024
|
31/07/2024
Time
15:0Hrs
|
|
464 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Major Bridge on Chargad River at design chainage 27 650 with approaches from Km 27/427 to Km 27/782 Minor Bridge on Khar Nallah at Ch 47-020 with approaches From Km46/905 to Km 47/101 (total length of the project 0 551 km) on Nandgaon peth-Morshi Road NH-353 K Tal Morshi Dist Amravati on EPC mode in the state of Maharashtra |
2024-MoRTH-797908-2 |
18/04/2024 |
08/03/2024
|
13/05/2024
Time
17:30Hrs
|
|
465 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation Upgradation of Gandhigram Realignment alongwith reconstruction of Major Bridge on Purna River from Ch km 24 250 to Ch km 27 200 (Length of the project 2 95 km) onAkot Dist Akola |
2024-MoRTH-797348-2 |
18/04/2024 |
08/03/2024
|
13/05/2024
Time
17:30Hrs
|
|
466 |
Consultancy Services as Authority Engineer for Supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0 to Design Km 40, Total Length 40 Km, Pkg-I, Greenfield Alignment) in the State of Arunachal Pradesh |
NHIDCL/Ar.Pr./AE/P-J(0-40, Pkg-I)/2024 |
05/02/2024 |
08/03/2024
|
14/03/2024
Time
15:0Hrs
|
|
467 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation to two lane road with paved shoulders of NH-752G from Sakri to Pimpalner Section (Design Ch km 0-000 to Ch km 21-411) in the State of Maharashtra on EPC mode |
NITNo16 /EENH/DN |
27/04/2024 |
07/03/2024
|
24/05/2024
Time
17:30Hrs
|
|
468 |
Consultancy services for AE for supervision of rehabilitation and upgradation of shewali fata to kalambhir and Nizampur to chadwel section of NH 753B to 2LPS configuratuion in the state of maharashtra on EPC mode |
NIT-15/Dhule/174/2024 |
27/04/2024 |
07/03/2024
|
24/05/2024
Time
17:30Hrs
|
|
469 |
IE Services for Construction of Six-Lane Access Controlled Greenfield Highway from Hingani village to Katgaon village section of Surat – Nashik – Ahmednagar – Solapur – Akkalkot PackageXII (Km 450-000 to Km 486-000) and Package- XIII (Km 486-000 to Km 512-000) in the State of Maharashtra under Bharatmala Pariyojana |
2024-NHAI-190307-1 |
08/03/2024 |
07/03/2024
|
20/08/2024
Time
11:0Hrs
|
|
470 |
Independent Engineer Services for Supervision of Construction of 4 lane Pathalgaon Kunkuri CG JH border section of NH 43 starting from end point of NH130A, design Ch. 00.000 to Ch. 104.250 from Turua Ama village to Putrichoura village under Bharatmala Pariyojana Lot 5 Pkg 7 in the state of Chhattisgarh on HAM |
HAI 11012CG Pathalgaon Kunkuri IE 2024 |
19/06/2024 |
05/03/2024
|
29/08/2024
Time
15:0Hrs
|
|
471 |
Independent Engineer services for Four Laning Section of NH-166 from Chokak to Sangli (Ankali) Km 145-300 to Km 171-133 and Shiroli (Sangli Phata) to Chokak from Km 0-00 to Km 7-719 between Kolhapur & Sangli in the state of Maharashtra to be executed on BOT (Toll) mode under NH (O) |
2024-NHAI-189303-1 |
02/03/2024 |
02/03/2024
|
29/07/2024
Time
11:0Hrs
|
|
472 |
Independent Engineering services during Operation Maintenance Period for 4Lane Jammu Udhampur Section of NH44 from Km 15.00 Jammu Bypass to Km 67.00 on BOT Annuity on DBFOT pattern in Jammu Kashmir under NHDP Phase II |
ROJMU/IE/JU/24-25/OM/01 |
22/03/2024 |
02/03/2024
|
29/04/2024
Time
11:0Hrs
|
|
473 |
Six Laning of Surat - Nashik - Ahmednagar - Solapur - MH/KNT Border Greenfield stretch (Package –X) from Chinchpur (B) village (km 370-000) to Nagobachiwadi village (km 415-500) & (Package – XI) from Nagobachiwadi Village (Km 415-500) to Katgaon Village (Km 450-000) in the State of Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana |
2024-NHAI-189239-1 |
02/03/2024 |
01/03/2024
|
20/08/2024
Time
11:0Hrs
|
|
474 |
IE services for supervision of 4 Laning of Aligarh-Palwal Section from km. 0.00 (starting from junction of NH-34 Aligarh) to km. 46.390 (Design chainage) package-I from (Khereshwar Junction-Kurana) of NH-334D, Including Khair & Jattari Bypass in the state of UP and 4 laning of Aligarh-Palwal Section from Km. 46.390 (Design Chainage) to Km. 69.110 (Terminating at junction EPE) (Package-II from Kurana- Eastern Peripheral Expressway) of NH-334D, in the state of UP & Haryana on HAM mode |
NHAI/HQ/UP(W)//NH- 334D/Aligarh-Palwal Pkg-IandII |
16/03/2024 |
01/03/2024
|
23/04/2024
Time
11:0Hrs
|
|
475 |
4-laning of Haridwar Nagina Section of NH-74 from Km 0-000 (design chainage Km 0-000) to Km 73-000 (design chainage Km 71-614) in the states of Uttarakhand and Uttar Pradesh under NHDP Phase-IV on EPC mode and Four Laning of Haridwar-Nagina section of EUP mitigation measures on NH-74 in the state of Uttarakhand under NHDP phase-IV on EPC mode (from design chainage LME from Km 13-829 to Km 17-110 & Km. 26-077 to Km. 27-508 and design chainage RME from Km 13-839 to Km 17-120 & Km 26-078 to Km |
2023-NHAI-189022-1 |
28/03/2024 |
29/02/2024
|
09/04/2024
Time
11:0Hrs
|
|
476 |
Independent Engineer services for Construction of Eight lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Package IV i.e Ankleshwar to Manubar Section) and from Km 254.430 to Km 279.00 (Package V i.e Kim to Ankleshwar Section) in the State of Gujarat under Bharatmala Pariyojana on HAM |
2024-NHAI-188557-1 |
20/03/2024 |
27/02/2024
|
19/04/2024
Time
16:0Hrs
|
|
477 |
Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Davulapally to Mallapalem Section Design Ch. Km 133.922 to Km 154.216 Existing Ch. Km 133.922 to Km 154.900 of NH 565 to 2 Lane with Paved shoulder in the State of Andhra |
RW/NH-12014/03/2023 24/AP/Z-S-I |
04/03/2024 |
27/02/2024
|
15/04/2024
Time
15:0Hrs
|
|
478 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Risod Town to Four Lane with Paved Shoulders standards from KM.36.845 to KM. 39.340 and KM.41.520 to 44.220 (Totat length 5.20 KM) of NH 461 B in the state of Maharashtra on EPC mode. |
2024-MoRTH-797401-1 |
02/03/2024 |
26/02/2024
|
11/03/2024
Time
17:30Hrs
|
|
479 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Major Bridge on Painganga River along with approaches (having length ol 1130m) from design chainage Km. 52.450 to km 53.680 of NH 548CC (Total Length of the project 1230m) of section of Mehkar Chikhli Khamgaon Road on NH548 CC in the state of Maharashtra on EPC Mode |
2024-MoRTH-797192-1 |
02/03/2024 |
26/02/2024
|
11/03/2024
Time
17:30Hrs
|
|
480 |
Consultancy services for Authoritys Engineer for Supervision of Construction of New 2lane Bridge over Purna River including approaches in Shegaon Deori fata section of NH548 C in the State of Maharashtra on EPC Mode |
2024-MoRTH-797282-1 |
02/03/2024 |
26/02/2024
|
11/03/2024
Time
17:30Hrs
|
|
481 |
UPC N/08002/04001/TS IE Services during O and M Period of 4 Lane divided carriageway from Mancherial (Km.0) to Repallewada (Km.42) (Design length 42Kms) section of NH 363 in the state of Telangana under NH (O) on HAM for a period of 5 years |
184874 |
24/02/2024 |
24/02/2024
|
26/03/2024
Time
15:0Hrs
|
|
482 |
Independent Engineer services for Four Laning of Ahmednagar-Solapur District Border to Tembhurni section of NH-561A from Ch 80-390 to Ch 139-750 in the State of Maharashtra to be executed on BOT (Toll) mode under NH (O) |
2024-NHAI-187532-1 |
23/02/2024 |
21/02/2024
|
23/10/2024
Time
11:0Hrs
|
|
483 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF THE WORK OF CONSTRUCTION OF 4-LANE WITH PAVED SHOULDER OF FEROZEPUR BYPASS FROM EXISTING CH KM 212.500 TO KM 229.690 (DESIGN CH KM 231.270) SECTION OF NH - 354 ON EPC MODE IN PUNJAB |
RW/CH/PB/AE/2024 |
20/02/2024 |
20/02/2024
|
11/06/2024
Time
15:0Hrs
|
|
484 |
Consultancy Services as Authority’s Engineer for Supervision of “Improvement & Widening of existing NH-08 from Champaknagar to Khayerpur to Four lane with paved shoulder (design Km 242.500 to Km 261.610) in the state of Tripura on EPC basis |
NHIDCL/Tripura/ NH-08/Ch-Kh/AE/2023 |
22/02/2024 |
20/02/2024
|
19/03/2024
Time
15:0Hrs
|
|
485 |
Consultancy Services for AE for the work of Construction and widening of 2 lane with paved shoulders from existing ch 0.000 to 56.600 and design ch from 0.000 to 51.000 (total length is 51 km) on RKCTC NH(701) road Project Beacon in the UT of JK |
RO/JK/RKCTC/AE/W01/PKG1/BEACON |
23/02/2024 |
19/02/2024
|
22/04/2024
Time
11:0Hrs
|
|
486 |
Consultancy services for Gwalior Shivpuri section |
NHAI/ROJBP/SC/Gwalior-Shivpuri NH-46 |
24/02/2024 |
19/02/2024
|
20/03/2024
Time
13:0Hrs
|
|
487 |
Consultancy Services for Authoritys Engineer for supervision of Rehabilitation and Upgradation of NH 753B from Nandurbar to Taloda to 4 LPS in the States of Maharashtra/Gujarat on EPC mode. |
NH/MAH/RO/Pune-1/AE/PKG-1 |
20/03/2024 |
19/02/2024
|
19/04/2024
Time
17:0Hrs
|
|
488 |
IE Services for Dev of 6lane of AC Agra-Gwalior GF highway from km 0.000 to km 88.400 in UP Raj. and MP including overlay/strength n other road safety and improv. works inclu. OnM on exis Agra Gwalior sec 1058.00 to 1148.00 of NH44 on DBFOT pattern |
NHAI-HQ/MP/Agra-Gwalior/BOT(Toll)/IE/2024 |
17/09/2024 |
19/02/2024
|
27/02/2025
Time
11:0Hrs
|
|
489 |
Consultancy Services for Independent Engineer services for Operation and Maintenance of 4/6 laning of Delhi/Haryana Border to Rohtak section of NH-9 from Km. 29.650 to Km. 93.140 including Bahadurgarh and Rohtak bye-passes in the State of Haryana. |
2024-NHAI-186916-1 |
13/03/2024 |
17/02/2024
|
19/03/2024
Time
11:0Hrs
|
|
490 |
Independent Engineer Services during Operation and Maintenance of 4 laning of UP/Haryana Border-Rohna-Hassangarh-Jhajjar Section of NH-334B from Km 0.000 to Km 80.250 on HAM mode in State of Haryana (2nd Call). |
2024-NHAI-186805-1 |
12/03/2024 |
16/02/2024
|
20/03/2024
Time
11:0Hrs
|
|
491 |
Consultancy services for Authoritys Engineer for Supervision of Strengthening and Improvement of Bareilly Sitapur section of NH 24 New NH 30 from Km 262 000 to Km 419 590 in the State of Uttar Pradesh on item rate contract Single percentage basis and Construction of balance 03 nos of major minor bridges at km327 545 km 411 105 km 415 865 and 01 VUP at 416 685 and 2 lane cross flyover at km 413 830 on existing 4laning of Bareilly Sitapur of NH 24 on EPC basis in Uttar Pradesh |
NHAI/HQ/ UP(W)/Brly Sitapur/AE/2024 |
11/03/2024 |
15/02/2024
|
27/03/2024
Time
11:0Hrs
|
|
492 |
Independent Engineer services for Construction of 4-Lane Greenfield Highway from Bishnupur (Near Pipra) Ch 36 450 to Raghunathpur Ch 71 500 including Spur Connectivity of 3 288 km with Supaul, (Parsarma-Araria Pkg-2) of NH-327E in the state of Bihar under NH (O) |
2024-NHAI-182457-1 |
21/02/2024 |
15/02/2024
|
16/01/2025
Time
15:30Hrs
|
|
493 |
Independent Engineer services for Construction of 4 Lane Greenfield Highway from Parsarma Ch 0 000 to Bishnupur (Near Pipra) Ch 36 450 including Spur Connectivity of 1 75 km with Supaul (Parsarma-Araria Pkg-1) of NH-327E in the state of Bihar under NH (O) |
2024-NHAI-182451-1 |
15/02/2024 |
15/02/2024
|
16/01/2025
Time
15:30Hrs
|
|
494 |
Independent Engineer services for Construction of 4-Lane Greenfield Highway from Bishnupur (Near Pipra) Ch 36 450 to Raghunathpur Ch 71 500 including Spur Connectivity of 3 288 km with Supaul, (Parsarma-Araria Pkg-2) of NH-327E in the state of Bihar under NH (O) |
2024-NHAI-182457-1 |
15/02/2024 |
15/02/2024
|
20/02/2024
Time
1:30Hrs
|
|
495 |
Independent Engineer services for Construction of 4-Lane Greenfield Highway from Raghunathpur Ch 71 500 to Araria Ch 107 142 with a Trumpet Interchange to connect at NH-27 of NH-327E (Parsarma-Araria Pkg-3) in the state of Bihar under NH (O) |
2024-NHAI-182461-1 |
15/02/2024 |
15/02/2024
|
16/01/2025
Time
15:30Hrs
|
|
496 |
CONSULTANCY SERVICES AS INDEPENDENT ENGINEER FOR OPERATION AND MAINTENANCE OF KM 0-000 TO KM 32-270 OF GORAKHPUR BYPASS ON NH-27 (EXISTING KM 253-000 TO 285-270) IN THE STATE OF UTTAR PRADESH ON BOT (ANNUITY) BASIS |
NHAI/PIU-GKP/IE/2024/01 |
16/02/2024 |
14/02/2024
|
30/03/2024
Time
12:0Hrs
|
|
497 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak - Patan - Karad section Km 85.000 to 133.00 |
No.10/EENH/PUNE/313/2024 dt07/02/2024 |
21/02/2024 |
13/02/2024
|
22/03/2024
Time
17:5Hrs
|
|
498 |
Authority Engineer for Construction of Additional Structures including approaches in Vadodara – Surat section of NH-48 between Existing Km 108.000 to Km 250.000 of NH-48 on EPC mode under NH(O) in the state of Gujarat |
2024-NHAI-185538-1 |
26/02/2024 |
09/02/2024
|
11/03/2024
Time
11:0Hrs
|
|
499 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Major Bridges at Ch 8 00 Ch 35 488 on Wadigodri Ambad Jalnab section and Ch 3 300 of Jalna Bypass road section of NH 753H in the State of Maharashtra. |
EENH/Jalna/NITNo/185 |
07/04/2024 |
07/02/2024
|
15/04/2024
Time
17:30Hrs
|
|
500 |
IE services for Six laning of existing 4-lane section from Gonde (km 43-038) to Pimpri Sado (km 459-905) section of NH-848 (Old NH-3) (Length 19 712 km) under NH(O) in the state of Maharashtra on Hybrid Annuity Mode |
2024-NHAI-184524-1 |
06/02/2024 |
05/02/2024
|
06/03/2024
Time
11:0Hrs
|
|
501 |
Independent Engineer Services for Improving the Alignment of Thoppur Ghat Section from Km 158.500 to 165.100 in Dharmapuri Salem Section of NH44 under NH(O) on HAM in Tamilnadu Total Project Length 6.6 Km |
NHAI/Tech/TN/NH(O)/2023/ThoppurGhat/IE |
15/02/2024 |
02/02/2024
|
04/03/2024
Time
11:0Hrs
|
|
502 |
Independent Engineer Services widening of 2lane to 4lane from Tiruvallur to TN/AP border section NH716 in TN 2lane to 4lane from TN/AP border to Puttur section NH716 in AP AND 4lane to 6lane from Mallavaram jun. to Renigunta section NH71 in AP on HAM(PkgI and PkgII) |
NHAI/Tech/TN/NH(O)/2023/TTC/IE/ Pkg-I |
15/02/2024 |
02/02/2024
|
04/03/2024
Time
11:0Hrs
|
|
503 |
Consultancy Service for Authority Engineer for supervision for the work of Upgradation and strengthening to 2 lane with PS from Km. 95/500 to km. 129/775 of NH-168G (Idar Bhiloda-Samlaji Section) in the State of Gujarat (Length 34.275 Km) |
21 of 2023-2024 |
01/02/2024 |
02/02/2024
|
28/02/2024
Time
12:0Hrs
|
|
504 |
Consultancy Services as Authority Engineer for Supervision of Construction Four laning of N. Kawnpui (N. Mualvum)-Mualkhang via Khamrang Village - Sairang section (Pkg7) (Pkg 8) of NH-6 Silchar-Vairengte - Sairang road in the state of Mizoram |
NHIDCl/Miz/AE/NH6/VS78/23-24 |
29/12/2023 |
31/01/2024
|
13/03/2024
Time
15:0Hrs
|
|
505 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 2-LANE ROB AT NH L/C NO AB-72 ON SURAJPUR TO AMBIKAPUR ROAD IN KM 357/370 OF NH-78 (NEW NH-43) AT RAILWAY CHAINAGE 1925/11-12 ON BISHRAMPUR TO AMBIKAPUR RAILWAY LINE NEAR JAINAGAR IN C AND CONSTRUCTION OF 2-LANE ROB AT L/C NO AB-27 (BELBAHARA ROB) ON MANENDRAGARH TO AMBIKAPUR SECTION OF NH-43 AT KM 264/000 & RAILWAY CHAINAGE 937/14-15 BETWEEN UDALKACHAR -BORIDAND STATION IN THE STATE OF CHHATTISGARH ON EPC MODE |
63/CE/NH/TC/44-37/2024 |
11/04/2024 |
31/01/2024
|
01/05/2024
Time
11:30Hrs
|
|
506 |
Consultancy Services for Independent Engineer for Supervision of Operation & maintenance of 4-Lane Pathankot-Amritsar section of NH-54 from ch. Km 6.820 to km 108.502 in the State of Punjab |
2024-NHAI-183894-1 |
21/02/2024 |
31/01/2024
|
06/03/2024
Time
11:0Hrs
|
|
507 |
Consultancy services for Supervision Consultant for O&M of Bhiwani-Jind-Karnal section from existing Km.6.875 to Km. 168.889 of NH-709A and km 163.460 to 197.200 of NH-148-B of Bhiwani-Hansi section in the State of Haryana (2nd Call) |
2024-NHAI-183652-1 |
21/02/2024 |
30/01/2024
|
06/03/2024
Time
11:0Hrs
|
|
508 |
Independent Engineer services for Construction of Guwahati Ring Road comprising of Section 1 Construction of 4 lane Greenfield Northern Guwahati bypass from Baihata Chariali Design Chainage km 0 0) via Kurua, Chandrapur to Sonapur Design Chainage km 55 54 Section 2 Widening of 4Lane to 6 lane project from Jayanagar Underpass existing chainage Km 163 237 to Jorabat Junction existing chainage Km 171 000 of NH 27 and Section 3 Improvement of 4 6 Lane stretch of NH 27 from existing chainage Km 1 |
2024 NHAI 183515 1 |
02/03/2024 |
30/01/2024
|
17/01/2025
Time
15:0Hrs
|
|
509 |
Independent Engineer Services for Construction of 4-Lane from Amjhar Road to Barela Jabalpur Ring Road, Pkg – 5 from design Chainage km 98.950 (Near Amjhar) to km 113.925 & km 0.000 to Km 2.900 Near Barela) (Total design Length 17.87 km, under NHO in the State of Madhya Pradesh on Hybrid Annuity Mode. |
NHAI/HQ/MP/Jabalpur Ring Road (Pkg-5)/HAM/IE/2024 |
29/01/2024 |
29/01/2024
|
28/11/2024
Time
11:0Hrs
|
|
510 |
Independent Engineer (IE) Services during Operation and Maintenance Period of Six lane Samakhiyali- Gandhidham section NH- 8A from km 306.000 to km 362.160 in the state of Gujarat executed as BOT (Toll) on Design, Build, Finance, Operation and Transfer (DBFOT) Under NHDP phase V |
NHAI/RO-GNR/Sam-Gan/IE/OM/2024 |
05/02/2024 |
25/01/2024
|
04/03/2024
Time
16:0Hrs
|
|
511 |
Supervision Consultancy (SC) Services during Operation and Maintenance of Four/Six lane Gandhidham (Kandla)-Mundra Port Section (Km 0 to Km 71.4) of NH-8A (Extn.) in the State of Gujarat |
NHAI/RO-GNR/NH-8A(Extn.)/Kan-Mun/SC/2024 |
05/02/2024 |
25/01/2024
|
26/02/2024
Time
16:0Hrs
|
|
512 |
Consultancy services for Supervision Consultant for Operation and Maintenance of Four laning of Takoli Kullusection of NH21 (new NH3) from Km 242.000 to Km 272.000 (Designed Chainage) on EPC mode in the state ofHimachal Pradesh under NHDP Phase IVB |
2024-NHAI-182901-1 |
05/02/2024 |
24/01/2024
|
22/02/2024
Time
15:0Hrs
|
-
|
513 |
Consultancy Services for Authority Engineer for Supervision of Project under O and M period of Four Laning of Bhojpur to Buxar Section from km 27 plus 370 to km 75 of NH – 84 Design Chainage km 77 plus 100 to km 125 Design length – 47 plus 900 km in the state of Bihar under NHDP Phase – III on EPC Mode |
234/RO-PATNA/NHAI/2023-24 |
01/02/2024 |
24/01/2024
|
27/02/2024
Time
10:0Hrs
|
|
514 |
Independent Engineer Services during Operation and Maintenance Period for the work of 4 laning from Km 360Plus915 to 440 of Gorakhpur (UP –Border) – Kotwa section of NH –27 Old NH -28 in the state of Bihar |
235/RO-PATNA/NHAI/2023-24 |
01/02/2024 |
24/01/2024
|
27/02/2024
Time
11:0Hrs
|
|
515 |
Consultancy Services as Authority Engineer for Supervision of (i) Construction of Intermediate Lane Road with Hard Shoulder from Design Ch 0000 to Ch 17387 (Total Design Length 17.387 Km) of Hunli to Ithun Bridge Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC mode (ii) Construction of Intermediate Lane Road with Hard Shoulder from Design Ch 0000 to Ch 53000 (Total Design Length 53000 Km) of Hunli to Hyauliang (Package-I) Section of NH-913 (Frontier Highway) |
NHIDCL/ArPr/FH/NH-913/Ithun Bridge-Hayuliang/AE/2024 |
30/01/2024 |
24/01/2024
|
13/03/2024
Time
15:0Hrs
|
|
516 |
Consultancy Services for Authority’s Engineer for Supervision of Upgradation and strengthening of Nashri - Chenani section from Km. 0.00 to Km. 39.100 of NH-244 in the UT of Jammu and Kashmir under NH (O) on EPC modeory of Jammu & Kashmir on EPC Mode under NH(O) |
2024NHAI1830801 |
31/01/2024 |
24/01/2024
|
23/02/2024
Time
11:0Hrs
|
|
517 |
Consultancy services of Authority Engineer for Construction of 2L PS Bypass for Muvattupuzha Town from Design Ch 0 to Ch 4300 (Existing Km 3820 to Km 3397) and for Kothamangalam Town from Design Ch 0 to Ch 3800 (Existing Km 4940 to Km 4358) on Kochi Munnar section of NH 85 in the State of Kerala on EPC mode under NH O Scheme |
NHAI/Kerala/ Muvattupuzha and Kothamangalam Bypasses /AE/2024 |
25/01/2024 |
24/01/2024
|
11/06/2024
Time
11:0Hrs
|
|
518 |
Consultancy Services as AE for Supervision of Improvement and Widening to two lane with Paved Shoulder of NH 13 and 15 Old NH 52 from Design Km 0.000 to Design Km 24.819 length 24.819 km and Package-II from Design Km 24.819 to Design Km 59.885 length 35.066 |
NHIDCL/Ar.Pr./NH-13 and 15/Brah-Chow/AE/Pkg-I and Pkg-II |
25/01/2024 |
23/01/2024
|
12/03/2024
Time
15:0Hrs
|
|
519 |
Independent Engineer Services during Operation & Maintenance stage of Four Laning of Rampur-Rudrapur section of NH-87 from km 0.000 (Design Chainage 0.000) to km 42.791(Design Chainage 43.446) (Package-I) in the State of Uttar Pradesh under NHDP Phase-III Design Chainage 0.000) to km 42.791(Design Chainage 43.446) (Package-I) in the State of Uttar Pradesh |
NHAI/PIU-RDR/NH-87/RKP-1/TENDER/1 |
19/02/2024 |
20/01/2024
|
27/02/2024
Time
17:0Hrs
|
|
520 |
Independent Engineer Services during Operation & Maintenance stage of ) Four Laning of Rampur-Kathgodam Section of NH-87 from Design Chainage Km 43.446 (Existing Ch. 42.791 Km) to Design Chainage 93.226 Km (Existing Chainage 88.000 Km) (Package-II) in the State of Uttarakhand under NHDP Phase III on Hybrid Annuity mode |
NHAI/PIU-RDR/NH-87/RKP-2/TENDER/1 |
19/02/2024 |
20/01/2024
|
27/02/2024
Time
17:0Hrs
|
|
521 |
Consultancy Services for Independent Engineer Services for Construction of 4-lane Highway of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 93.700) (total length 64.600 km) under NH(O), on HAM in the state of Telangana [Construction Supervision/ IE/Package-I] |
NHAI/Telangana/Armoor-Jagtial-Mancherial/IE/Pkg-I/2024 |
20/01/2024 |
19/01/2024
|
23/10/2024
Time
11:0Hrs
|
|
522 |
Consultancy Services for Independent Engineer Services for Construction of 4-lane Highway of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 93.700) to Mancherial (design km. 160.995) (total length 67.295 km) under NH(O), on HAM in the state of Telangana [Construction Supervision/IE/Package-II] |
NHAI/Telangana/Armoor-Jagtial-Mancherial/IE/Pkg-II/2024 |
22/01/2024 |
19/01/2024
|
23/10/2024
Time
11:0Hrs
|
|
523 |
IE services for Expansion of 4Lane Patna Ara Buxar as spur connectivity from Bharauli (NH922)to Haidaria (Purvanchal Expressway) including Const of addi 3Lane Bridge over River Ganga at Buxar on NH922 in Pradesh and Bihar on HAM |
2024-NHAI-182452-1 |
01/02/2024 |
19/01/2024
|
28/02/2024
Time
15:0Hrs
|
|
524 |
Consultancy Services as AEs for Supervision of (i) Construction of IL Road with hard Shoulder from design Km 0.0 to Km 46.704(TL 46.704 km) of Zido –Singha section on NH-913 (Frontier Highway) and (ii) Construction of IL Road with hard Shoulder from design Km 0.000 to Km 13.080(TL 13.080 km) of Tuting –Zido section on NH-913 (Frontier Highway) in the State of Arunachal Pradesh on EPC Mode. |
NHIDCL/ArPr/ZS&TZ/NH-913/AE/2024 |
01/02/2024 |
19/01/2024
|
05/03/2024
Time
15:0Hrs
|
|
525 |
Consultancy Services for Independent Engineer Services for Construction of 4-lane Highway of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 93.700) (total length 64.600 km) under NH(O), on HAM in the state of Telangana |
NHAI/Telangana/Armoor-Jagtial-Mancherial/IE/Pkg-I/2024 |
05/10/2024 |
19/01/2024
|
12/11/2024
Time
11:30Hrs
|
|
526 |
Consultancy Services for Independent Engineer Services for Construction of 4-lane Highway of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 93.700) to Mancherial (design km. 160.995) (total length 67.295 km) under NH(O), on HAM in the state of Telangana |
NHAI/Telangana/Armoor-Jagtial-Mancherial/IE/Pkg-II/2024 |
05/10/2024 |
19/01/2024
|
12/11/2024
Time
11:30Hrs
|
|
527 |
Independent Engineer services for Construction of additional 3-Lane Bridge over River Ganga for connection between Buxar and Bharauli on NH-922 in the State of Uttar Pradesh and Bihar on Hybrid Annuity Mode |
NHAI/HQ/BH/IE /Bharauli-Haidaria /NH922/2023 |
04/06/2024 |
19/01/2024
|
05/08/2024
Time
11:0Hrs
|
|
528 |
Independent Engineer services for Construction of 4-Lane CG/JH Border-Gumla-Bharda section of NH-43 from design ch. 0.000 (Vill. Katkaiya) to design ch. 32.370 (Vill. Bharda) in the State of Jharkhand on Hybrid Annuity Mode (HAM) under Bharatmala Pariyojana |
2024-NHAI-182081-1 |
24/01/2024 |
17/01/2024
|
08/08/2024
Time
11:0Hrs
|
|
529 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of 4 lane Elevated corridor of Kalimandir-Dimna Chowk-Baliguma (Jamshedpur) Section of NH-33 (New NH-18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in the State of Jharkhand |
2024-NHAI-182025-1 |
25/01/2024 |
17/01/2024
|
04/03/2024
Time
11:0Hrs
|
|
530 |
Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (P-2) on Sairang - Phaibawk section of NH-6 in the Mizoram |
NHIDCl/Miz/AE/NH06/ABTP2/23 |
26/12/2023 |
17/01/2024
|
06/03/2024
Time
15:0Hrs
|
|
531 |
Authority Engineer for Construction of 4-lane Kotdwar Bypass of NH-119 in the State of Uttar Pradesh and Uttarakhand on EPC Mode |
2024-NHAI-181914-1 |
12/02/2024 |
16/01/2024
|
19/02/2024
Time
11:0Hrs
|
|
532 |
Independent Engineer Services during Operation and Maintenance Period for the work of 2 laning of Muzaffarpur – Barauni Section of NH –122 ( Old NH -28 )from Km. 519.600 to Km 627.000 (Total Length -107.400 )in the state of Bihar on Design, Built, Finance, Operate and Transfer (DBOT) Annuity |
232/RO-PATNA/NHAI/2023-24 |
22/01/2024 |
16/01/2024
|
06/02/2024
Time
11:0Hrs
|
|
533 |
Consultancy services for Authority Engineer for Supervision of Widening to two lane with paved shoulders from Km 40.00 to Km 75.00 Existing chainages of Mangalore Tumkur section of NH 73 in the State of Karnataka on EPC Mode |
RW/BNG /NH-73/km 40-75/64/2021/AE (2nd Call) |
15/01/2024 |
15/01/2024
|
26/02/2024
Time
16:0Hrs
|
|
534 |
Independent Engineer services for Construction of 4 Lane with Paved Shoulders from Design Ch 182.300 to Design Ch. 228.500 (Pkg-5) and Design Ch. 228.500 to Design CH. 273.400 (Pkg-6) in Belgaum – Hungund – Raichur section of NH-748A (Ext. SH-20) on Hybrid Annuity Mode [Total Project Length – 91.100 Kms] (Package-5 & 6) |
NHAI/KNT/2024/BHR/Pkg-5&6/IE/187944 |
16/01/2024 |
15/01/2024
|
12/02/2024
Time
11:0Hrs
|
|
535 |
Consultancy services for Authority Engineer for supervision of Construction of 6 lane H.L./Extra-dosed Cable Bridge on river Ganga parallel to western side of Digha-Sonepur Rail-cum-Road Bridge at Patna on Ganga River on NH-139W in the state of Bihar on EPC mode. |
NH-12014/1/2023-RO Patna |
14/02/2024 |
11/01/2024
|
08/04/2024
Time
11:0Hrs
|
|
536 |
Consultancy services for AE for supervision of Rehabilitation and up gradation of existing 2 L to 4L standards from Duburi Chandikhole , 6L Major Bridge over Brahmani River and Pallahara Pitiri section on EPC Mode in the state of Odisha |
NHAI/13012/163/RO/OD/23 |
25/01/2024 |
10/01/2024
|
08/02/2024
Time
11:0Hrs
|
|
537 |
Consultancy services for Authoritys Engineer for Supervision of Widening to 4L PS of NH 548B from Km 118.450 Near Shirguppi to Km 128.450 Near Ankali in the State of Karnataka |
RW/BNG /NH-548B/Km.118.450-128.450/ AE/17/2022 |
09/01/2024 |
09/01/2024
|
15/02/2024
Time
15:0Hrs
|
|
538 |
Consultancy services for Authority’s Engineer for Supervision of Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design (i) Km 146.208 to Km 163.592 (Length – 17.384 Km) (Pkg-III) (ii) Km 163.592 to Km 173.850 (Length – 10.258 Km) (Pkg-IV) (iii) Km 173.850 to Km 190.850 (Length – 17.00 Km) (Pkg-V) in the state of Nagaland on EPC mode under NH(O)-TSP. |
NHIDCL/AE/PEREN-DIMAPUR-III,IV,V/2022-23 |
12/01/2024 |
09/01/2024
|
30/01/2024
Time
15:0Hrs
|
|
539 |
Independent Engineer Services for supervision of 4 lane with paved shoulders from Design Ch. 0.000 to Design Ch. 43.800 (Pkg-1) and Ch. 43.800 to Design Ch. 89.900 (Pkg-2) in Belgaum – Hungund – Raichur section of NH748A in Karnataka on HAM under NH(O) [Total Project Length – 89.900 Kms] – (Package-1 & 2) |
NHAI/KNT/2024/BHR/Pkg-1&2/IE |
12/01/2024 |
08/01/2024
|
07/02/2024
Time
11:0Hrs
|
|
540 |
Independent Engineer Services for supervision of 4L of Belgaum-Hungund-Raichur from Design Ch 89.900 to Ch 136.100 (Pkg-3) and Design Ch. 136.100 to Design Ch. 182.300 (Pkg-4) in Belgaum – Hungund – Raichur section of NH748A in Karnataka on HAM under NH(O) [Total Project Length – 92.400 Kms] – (Package-3 & 4) |
NHAI/KNT/2024/BHR/Pkg-3&4/IE |
12/01/2024 |
08/01/2024
|
07/02/2024
Time
11:0Hrs
|
|
541 |
Independent Engineer Services during operation and maintenance Period for the project of Design Construction Development Finance Operation and Maintenance of the work of Construction of New Four Lane Gwalior Bypass of the length 42.033 Km. from Km. 0.000 to 42.033 of NH - 44 in the states of Madhya Pradesh on (BOT) (Annuity) Basis |
NHAI/ROJBP/IE/Gwalior bypass NH-44 |
02/02/2024 |
06/01/2024
|
22/02/2024
Time
14:0Hrs
|
|
542 |
Independent Engineer services for 4 Laning of existing 2-Laning Stretch from Dive ghat at Km 220-900 to Hadapsar at Km 234-150 (Pkg-6) on Mohol-Alandi section (Design Length 13-25 Km) of NH-965 in the State of Maharashtra on HAM under NH (O) |
2024-NHAI-180674-1 |
16/01/2024 |
05/01/2024
|
12/02/2024
Time
11:0Hrs
|
|
543 |
IE Services for (i)Construction work of 4-laning of Budhni-Shahganj bypass section of NH-146B from km73.750-km102.000 (Pkg-III) and (ii)Construction work of 4-laning of Shahganj bypass to Badi sec-2 of NH-146B km102.000-km142.357 under NH(O) MP |
NHAI/HQ/MP/Budhni-Badi/IE/PKG-3&4/2023 |
08/01/2024 |
03/01/2024
|
04/03/2024
Time
11:0Hrs
|
|
544 |
Independent Engineer Services for Six laning with both sides Service Road of Ayodhya Nagar Bypass of Bhopal City Section of NH-46 from Design Km 0.000 near Ashram Tiraha to Km 16.439 at Ratnagiri Tiraha (Design Length 16.439 Km) under NH(O) in the state of MP on HAM. |
NHAI/HQ/MP/Ayodhya Nagar Bypass/2024 |
05/01/2024 |
03/01/2024
|
04/03/2024
Time
11:0Hrs
|
|
545 |
Consultancy Services as Independent Engineer Services during Operation and Maintenance stage of 4Laning of Devihalli Hassan Section From Km.110.00 to 189.500 Of NH 48 New NH No.75 Excluding A New 2 Lanes With Paved Shoulders Bypass For Channarayapatna Town And Widening Of Existing Hassan Bypass To 2 Lanes With Paved Shoulder In The State Of Karnataka On DBFOT BASIS NHDP PHASE IIIA |
NIT No.24/NHAI/RO-BNG/23019/Tender/2023-24 dated 02.01.2024 |
02/01/2024 |
02/01/2024
|
30/01/2024
Time
15:0Hrs
|
|
546 |
Consultancy Services for Supervision Consultant for O&M of New NH- 354 (Old-SH-25) of Section Ramdas to Gurdaspur from Design chainage Km 140.000 (Existing Km 46.320 of SH) to Design Chainage Km 187.492 (Existing Km 3.185 of SH) (47.492 Km) in the State of Punjab. |
2024-NHAI-179933-1 |
23/01/2024 |
01/01/2024
|
29/01/2024
Time
11:0Hrs
|
|
547 |
Consultancy services for Authority Engineer for supervision of 2 lane with paved shoulder from Jind-Gohana section from km. 0.000 to km. 50.505 of NH-352 A in the State of Haryana (2nd Call). |
2024-NHAI-179967-1 |
18/01/2024 |
01/01/2024
|
29/01/2024
Time
11:0Hrs
|
|
548 |
Consultancy Services For Authoritys Engineer For Supervision of Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16km) and Ater realignment to Bhind bypass (Total length 21.50 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of MP on EPC MODE |
2023-MoRTH-787790-1 |
03/01/2024 |
29/12/2023
|
19/02/2024
Time
17:30Hrs
|
|
549 |
Independent Engineer Services for Supervision of Rehabilitation and Upgrading of Existing Road from Kalar Bala Village to Nauni Chowk of NH 205 for 4 Lane with Paved Shoulder from 41 to 58450, Pkg IIC in the State of Himachal Pradesh under NH O on Hybrid Annuity Mode. |
2023NHAI1797241 |
16/01/2024 |
29/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
550 |
Consultancy Services for Authoritys Engineer for Supervision of Widening and Strengthening to 2L and PS including LA from Km 318.970 to km 353.450 (Balikuda -Mulakani section) of NH-55 under NH(O) in Annual Plan 2022-23 in the State of Odisha |
01-ROBBSR-2023-24/AE |
06/12/2023 |
29/12/2023
|
12/03/2024
Time
15:0Hrs
|
|
551 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of Elevated Structure at Raniwara Circle Sanchore town of Gandhav – Sanchore Section of NH-68 in the state of Rajasthan on EPC mode under NH(O) Scheme |
NHAI/Rajasthan/Sanchore Elevated/2023/AE |
08/01/2024 |
28/12/2023
|
05/02/2024
Time
11:0Hrs
|
|
552 |
Independent Engineer Services for Construction of 6 lane Indore western bypass from km 0.000 to Km 34.0000 (Pkg I) and Km 34.000 to Km 64.000 (Pkg-II) in the state of Madhya Pradesh on Hybrid Annuity Mode under NH(O) |
NHAI/HQ/MP/Indore western bypass/IE/PKG-1&2/2023 |
18/01/2024 |
28/12/2023
|
27/02/2024
Time
11:0Hrs
|
|
553 |
IE Services during Operation Maintenance Period for the project of 4-laning of Biaora to Dewas Section from km 426.100 to km 566.450 of NH-52 in the State of MP on BOT (Toll) |
NHAI/RO-BPL/Indore/IE-OM/B-D/2023 |
25/01/2024 |
26/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
554 |
Supervision Consultant Services for O and M stage of 6-laning of Indore- Dewas Section of NH-3, from Km. 577.550 to Km. 610.00 and Km. 0.000 to Km. 12.600 (Approx. Length 45.05 Km.) in the State of MP |
NHAI/RO-BPL/Indore/SC-OM/NH-52/I-D/2023 |
25/01/2024 |
26/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
555 |
Independent Engineer Services for Operation and Maintenance Stage of 4 laning of Indore-Gujarat/MP Border on BOT (Toll) basis from Km. 9.500 to Km. 171.000 of NH-59 on DBFOT in the State of M.P. under NHDP Phase III. |
NHAI/RO-BPL/Indore/IE-OM/NH-47/I-Guj/2023 |
29/01/2024 |
26/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
556 |
Independent Consulting Services during Operation and Maintenance Stage for 4laning of Indore-Khalghat Section of NH-52 (Old NH-3) (from km. 12.600 to km. 84.700) in the state of M.P. on BOT basis under NHDP phase-IIIA. |
NHAI/RO-BPL/Indore/IE-OM/NH-52/I-K/2023 |
29/01/2024 |
26/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
557 |
Independent Engineer Services during Operation and Maintenance Stage for 4laning of Khalghat-MP/Maharashtra border section of NH-52 (Old NH-3) (from km. 84.700 to km. 167.500) in the state of M.P. |
NHAI/RO-BPL/Indore/IE-OM/NH-52/K-MM/2023 |
29/01/2024 |
26/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
558 |
IE Services during O & M Period for 6 laning of Hapur Bypass to Moradabad Section including Hapur Bypass from Km 50.000 (Design Ch. 50.000) to Km 148.277 (Design Ch. 149.867) of NH-24 (New NH-9) and a stretch of NH-24 (New NH-9) from Km 148.277 (Design Ch. 149.867) to Km 149.250 (Design Ch. 150.840) (including existing flyover) in the state of Uttar Pradesh on DBFOT (Toll) under NHDP Phase-V |
NHAI/IE/O&M/Hapur -Moradabad |
27/12/2023 |
23/12/2023
|
06/02/2024
Time
11:0Hrs
|
|
559 |
SC of 4 laning of Bar Bilara Jodhpur section on NH 112 from Km 0.000 to Km 111.000 Existing chainage in the state of Rajasthan under EPC mode |
NHAI/11011/ Tenders-ROJ/SC-BBJ/2nd call |
28/12/2023 |
22/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
560 |
Independent Engineer Services for rehabilitation and up-graded of NH-66 (old NH-17) from Km 281/300 to km 332/200 (Kante-Waked section) to four lanes in the state of Maharashtra under NHDP-IV on Hybrid Annuity Mode (Package-IV) |
RO/MUM/IE/2023-24/01 |
12/01/2024 |
21/12/2023
|
06/02/2024
Time
17:0Hrs
|
|
561 |
Widening to 4 Lane Paved Shoulder from Km. 111.500 to 148.088 on NH 69 Old NH 206 Honnavar Chittoor Section in the State of Karnataka On EPC mode |
RW/BNG /NH-69/Km.111-148.08/AE/15 |
21/12/2023 |
21/12/2023
|
25/01/2024
Time
15:0Hrs
|
|
562 |
Consultancy services for Authority’s Engineer for Supervision of Widening to Two Lane with Paved Shoulders from KB Cross to Chunchanahalliie., Design Ch. 485 240 Km (Existing Km 494.000) to Design Ch. 523 393 Km (Existing km 533.152) & From Design Ch. 530 393 (Existing Km 540.175) to Design Ch. 534 476 (Existing Km 544.200) at Nelligere of NH-150A in the State of Karnataka on EPC Mode. (Job No. NH-150A-KNT-2022-23-977) |
RW/BNG /NH-150A/Km.494-533 540 544/AE/66/2023 |
20/12/2023 |
20/12/2023
|
29/01/2024
Time
15:0Hrs
|
|
563 |
Consultancy Services For Authority’s Engineer For Supervision Of “Widening of existing 2 lane to 4 lane with paved shoulder from design Km.25.15 to km. 56.70 (except km. 52.70 to 53.50) of NH-169 (Nellisara Camp to Thirthalli) of NH-169 on Shimoga-Mangalore section in the state of Karnataka on EPC Mode”. |
RW/BNG /NH-169/Km.25.15-56.70/AE/1 |
20/12/2023 |
20/12/2023
|
29/01/2024
Time
15:0Hrs
|
|
564 |
Consultancy Services for Authority Engineer for Supervision of Widening To 2l Ps From Km 71 To 104 Sarjapur To Pattadkallu On Bhanapur To Gaddanakeri Section Of NH 367 In The State Of Karnataka On EPC Mode |
RW/BNG/NH-367/Km. 71-104/AE/25/2023 |
20/12/2023 |
20/12/2023
|
22/01/2024
Time
15:0Hrs
|
|
565 |
Consultancy Services of Authority Engineer for construction of new major bridge over Baghmati and Lakhandei River along with approaches from design km 16 500 to km 21 500 on NH 527C in the State of Bihar on EPC mode |
2023-NHAI-178707-1 |
01/02/2024 |
20/12/2023
|
12/02/2024
Time
17:0Hrs
|
|
566 |
Widening to Four Lane with Paved Shoulders from Design Chainage Km. 27.780 SH Chainage Km. 459.500) to Km. 57.320 SH Chainage Km. 489.040 Belur to Hassan section of NH - 373 in the State of Karnataka in EPC mode |
RW/BNG /NH-373/Km.27.78-57.32/AE/25 /2023 |
19/12/2023 |
19/12/2023
|
25/01/2024
Time
15:0Hrs
|
|
567 |
Consultancy Services For Authority Engineer For Supervision Of Widening To 2l Ps From Km 0 00 To 37 850 Except 24 45 To 27 20 Of NH 766c Byndoor Ranebennur Section In The State Of Karnataka on EPC mode |
RW/BNG /NH-766C/Km.0-37.85/AE/26/2 |
19/12/2023 |
19/12/2023
|
29/01/2024
Time
15:0Hrs
|
|
568 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to Four Lane with Paved Shoulders from Design Chainage Km. 27.780 (SH Chainage Km. 459.500) to Km. 57.320 (SH Chainage Km. 489.040) (Belur to Hassan section) of NH - 373 in the State of Karnataka in EPC mode under NH(O) Annual Plan 2022-23 (Package-II) (Job No. NH-373-KNT-2022-23-988) |
RW/BNG /NH-373/Km.27.78-57.32/AE/25 /2023 |
19/12/2023 |
19/12/2023
|
30/01/2024
Time
15:0Hrs
|
|
569 |
Consultancy Services for Authoritys Engineer for Supervision of Widening to 4L PS of NH 548B from Km 80.000 Near Murgundi To Km 140.200 Near Chikkodi Excluding Length from Km. 118.450 to Km. 128.450 in the State of Karnataka |
RW/BNG /NH-548B/Km.80 -140.2/12/2022 |
16/12/2023 |
16/12/2023
|
29/01/2024
Time
15:0Hrs
|
|
570 |
Consultancy Services of Authority Engineer for Supervision of Project during O and M period of Two laning with paved shoulders of Biharsharif – Barbigha – Mokama Section of NH – 82 from Desing Chainage km 94.478 (Existing chainage Km 119.320 of NH -31) to Km 149.053 (exiting Chainage km 149.020 to NH – 82) (Total Design length – 54.575 km) in the state of Bihar |
230/RO-PATNA/NHAI/2023-24 |
20/12/2023 |
16/12/2023
|
29/01/2024
Time
11:0Hrs
|
|
571 |
Consultancy services for Authority Engineer widening to 2 lane with hard shoulder configuration of Kalimandir (Chainage 133 PT 078) and Lipulekh (Chainage 159 PT 476) road of NH-09 under Project Hirak of BRO in the state of Uttarakhand |
90004/KLM-LIPU/AE Appt/EPC |
15/12/2023 |
14/12/2023
|
08/02/2024
Time
18:0Hrs
|
|
572 |
IE services for Four laning between Existing Km 55.000/Design km 59.000 (Kuru) to Existing Km 96.470/Design km 97.600 (Udaipura) on NH75 (New NH39) Sec I in the State of Jharkhand on HAM mode |
2023-NHAI-177619-1 |
19/12/2023 |
13/12/2023
|
12/02/2024
Time
11:0Hrs
|
|
573 |
Consultancy services of Authority’s Engineer for Long Term Rectification of MoRT&H identified Blackspots (17 no’s) & Removal of 2 At-Grade Junctions and allied works on existing 4/6-Lane Hyderabad-Vijayawada section of NH-65 from Km.40.000 to Km.221.500 in the state of Telangana on EPC mode |
NHAI/Tech/TS/17BS 2VUPs/AE/2023 |
13/12/2023 |
12/12/2023
|
10/01/2024
Time
11:0Hrs
|
|
574 |
SC Services during OnM stage of 4 laning of Jaipur Reengus section of NH 11 (New NH 52) from Km. 246.300 to Km. 298.075 in the State of Rajasthan (Total Length 51.842 Kms) |
NHAI/11011/12/ Tenders-ROJ/SC-JR/01 |
26/12/2023 |
12/12/2023
|
18/01/2024
Time
11:0Hrs
|
|
575 |
IE Services during OnM stage of Reengus Sikar Section of NH 11 (New NH 52) and Salasar Nagaur Section of NH 65 (New NH58) in the State of Rajasthan |
NHAI/11011/12/ Tenders-ROJ/IE-RS-SN/02 |
28/12/2023 |
12/12/2023
|
24/01/2024
Time
11:0Hrs
|
|
576 |
Supervision Consultancy Services for Operation and Maintenance of the stretch from Km 615.000 to Km 668.600 of Kalyan to Nirmal Section of NH 61 in the State of Telangana. |
177348 |
17/01/2024 |
11/12/2023
|
13/02/2024
Time
17:0Hrs
|
|
577 |
Consultancy services as Independent Engineer during Operation and Maintenance for the projects of NH 206 on HAM under Bharathmala Pariyojana in the state of Karnataka |
NIT No.21/NHAI/RO-BNG/24016/Tender/2023-24 dated 11.12.2023 |
15/12/2023 |
11/12/2023
|
18/01/2024
Time
11:0Hrs
|
|
578 |
Consultancy Services for AE for the work of Construction and widening of 2 lane with paved shoulders from existing ch 0.000 to 56.600 and design ch from 0.000 to 51.000 (total length is 51 km) on RKCTC NH(701) road Project Beacon in the UT of JK |
RO/JK/RKCTC/AE/W01/PKG1/BEACON |
13/12/2023 |
11/12/2023
|
11/01/2024
Time
15:0Hrs
|
|
579 |
Consultancy Services for AE for supervision of Construction of Realignment Between Pandrass Pashkyum Net Length is 27.10 km on road Zozila Kargil Leh NH 01 to 2 lane specifications under Project Vijayak BRO in the UT of Ladakh on EPC Mode |
RW/JK/W(57)/BRO/Ladakh/2023 |
08/12/2023 |
08/12/2023
|
08/01/2024
Time
15:0Hrs
|
|
580 |
IE Services during OM period of 5 years for Narnaul Bypass Crossing to Pacheri Kalan 11.30 Km Package-I.Ateli Mandi to Narnaul Section of NH-11 from Km.43.445 to Km.56.900 Package-II.Ateli Mandi as Feeder Route in Haryana on HAM(Pkg-III) |
2023-NHAI-177159-1 |
27/12/2023 |
08/12/2023
|
22/01/2024
Time
11:0Hrs
|
|
581 |
Consultancy services for Authority’s Engineer for Supervision of Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design (i) Km 146.208 to Km 163.592 (Length – 17.384 Km) (Pkg-III) (ii) Km 163.592 to Km 173.850 (Length – 10.258 Km) (Pkg-IV) (iii) Km 173.850 to Km 190.850 (Length – 17.00 Km) (Pkg-V) in the state of Nagaland on EPC mode under NH(O)-TSP. |
NHIDCL/AE/PEREN-DIMPAUR-III IV V/2022-23 |
13/12/2023 |
07/12/2023
|
26/12/2023
Time
15:0Hrs
|
|
582 |
Consultancy services for Authoritys Engineer for supervision of the work of Up gradation to 2 lane with paved shoulder from Neechli Oden (Nathdwara) at design km 88.800 (existing km 55.95) to Bhatewar at Design km 142.028 (existing km 0.00) of NH-162E in the state of Rajasthan on EPC Mode. |
NIT/JAIPUR/03/23 |
13/12/2023 |
05/12/2023
|
05/01/2024
Time
11:0Hrs
|
|
583 |
Consultancy Services for assisting Authoritys Engineer for supervision of Construction of Bypass Road to Adoni town connecting NH-167 Hagari-Jadcherla Road from Km.62/700 to Km.71/400 in Kurnool District in State of Andhra Pradesh on EPC mode 2022-23(2nd call) |
39/AAE/SE,NH,ATP/2023-24,dt.4.12.2023 |
12/12/2023 |
05/12/2023
|
20/12/2023
Time
15:0Hrs
|
|
584 |
Independent Engineer Services for O&M Period for the work 4 lane Bridge across river Kosi and including its Approaches & Guide Bund & Afflux Bund from km. 148.550 to Km. 159.185 in the state of Bihar on Annuity Basis on NH 27 (old NH -57). |
229/RO-PATNA/NHAI/2023-24 |
07/12/2023 |
05/12/2023
|
20/12/2023
Time
11:0Hrs
|
|
585 |
Independent Engineer Services for O&M Period for the work 4 lane Bridge across river Kosi and including its Approaches & Guide Bund & Afflux Bund from km. 148.550 to Km. 159.185 in the state of Bihar on Annuity Basis on NH-27(old NH-57) |
229/RO-PATNA/NHAI/2023-24 |
06/12/2023 |
05/12/2023
|
20/12/2023
Time
11:0Hrs
|
|
586 |
Consultancy Services for assisting Authority’s Engineer for supervision of Rehabilitation and Upgradation of existing road to two lane with paved shoulder configuration from Km 22/300 (Mudireddypalli) to 58/635 (Kadapa Nellore Border section) of NH167B in the state of Andhra Pradesh under Plan 2021 22 on EPC Mode. |
NIT No. 38/SE,NH,ATP/2023-24, Dt. 27.11.2023 |
19/12/2023 |
05/12/2023
|
04/01/2024
Time
15:0Hrs
|
|
587 |
Independent Engineer Services during Operation & Maintenance period of Lalitpur-Sagar-Lakhnadon (existing Km 99 005 to Km 415 089) on NH-44 under TOT in the state of Uttar Pradesh and Madhya Pradesh |
2023-NHAI-176576-1 |
04/12/2023 |
04/12/2023
|
04/01/2024
Time
11:0Hrs
|
|
588 |
Supervision Consultancy (SC) Services during O&M stage of 4-Laning of Sultanpur to Varanasi Section of NH-56 (Package-I and II) including Supervision Consultant of construction work related to the Sultanpur Varanasi section of NH 56 Package- I and II |
NHAI/PIU/VNS/SC/NH-56/2023-24/3/ |
06/12/2023 |
04/12/2023
|
09/01/2024
Time
11:0Hrs
|
|
589 |
Consultancy Services for Supervision Consultants of Operation Maintenance of the (i) Chennai Bypass (NH-32) from Km 00.000 to Km 32.600 and (ii) Chennai – Tada section of NH-5 from Km.11.000 to Km.21.400 in the State of Tamil Nadu |
NHAI/ROC/SC/2022-23/156 |
16/12/2023 |
01/12/2023
|
28/12/2023
Time
17:0Hrs
|
|
590 |
Consultancy Services for IE of Supervision of 1. 4 Laning of BAHARAGORA SINGHARA section of NH 49 on EPC including seupervision of Construction work of 8 EUP,1 VUP,LVUP,PUP,FOB and Balance work of JHARPOKHARIA FLYOVER in BAHARAGORA SINGHARA Section oh NH 6 and OandM work of 4 laning of BALASORE BARIPADA JHARPOKHARIA on EPC Mode in the state of Odisha |
NHAI/13012/137/RO/OD/2137/2024 |
18/11/2024 |
29/11/2023
|
10/12/2024
Time
11:0Hrs
|
|
591 |
Supervision Consultancy (SC) services during Operation and Maintenance (Total Length 80.522 Km) period of Six Laning of Gorhar to Barwa Adda section of NH-2 from Km 320.810 to Km 400.132 in the state of Jharkhand (2nd call) |
NHAI/RO/RNC/JH/2023-24/10-1 |
30/11/2023 |
24/11/2023
|
18/12/2023
Time
11:0Hrs
|
|
592 |
Consultancy services for Authority engineer of Construction of balance work of two number of interchange at Jaipur ring road including supervision for Operation and maintenance of six laining of Jaipur ring road (km 300 to km 46700) on EPC mode |
2023-NHAI-175451-1 |
23/11/2023 |
23/11/2023
|
10/01/2024
Time
11:0Hrs
|
|
593 |
Consultancy services for Authority Engineer for Supervision of Improvement/ Construction of 2-lane with Hard shoulder of Askote – Lipulekh Road from Tawaghat village to Budhi Village (Design Km 56 PT 935 to Km 95 PT 748) and from end of Tunnel Portal to Kali Mandir (Design Km 113 PT 828 to Km 133 PT 078) Total Design Length = 58 PT 063 km under Project Hirak of BRO in the State of Uttarakhand under Bharatmala Pariyojna on EPC Mode |
90002/T-K/AE Appt/EPC |
23/11/2023 |
23/11/2023
|
03/02/2024
Time
18:0Hrs
|
|
594 |
Consultancy Services For Authority Engineer For Supervision Of Widening to 2 lane with paved shoulder from Km 0000 to Km 102310 Design Chainage of NH 548B ie Murrum Maharashtra border IB circle Bijapur Section in the State of Karnataka on EPC mode |
RW/BNG /NH-548B/km 0.0-102/ Authority Engineer/16 |
22/11/2023 |
22/11/2023
|
05/01/2024
Time
15:0Hrs
|
|
595 |
Consultancy Services of AE for Widening with 3-additional Lane abetting Existing two lane Chhapra Bypass Section of NH 19 from Km 143 200 - Km 159 255 on NH-19 (Total Length 16 055 Km) in the state of Bihar on EPC |
2023-NHAI-175396-1 |
01/02/2024 |
22/11/2023
|
12/02/2024
Time
11:0Hrs
|
|
596 |
Consultancy Services for Authoritys Engineer for Supervision of Construction of Paderu bypass of 2 lane with paved shoulder configuration on NH 516E in the State of Andhra Pradesh under NH O on EPC mode |
MoRTH/PIU/VSKP/PaderuBypass |
01/12/2023 |
21/11/2023
|
04/01/2024
Time
17:0Hrs
|
|
597 |
Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance of Anandapuram – Visakhapatnam – Anakapalle (Greater Visakhapatnam Municipality Limits) from Km.682.980 to Km.741.256 of NH-16 in the State of Andhra Pradesh |
2023-NHAI-175289-1 |
21/11/2023 |
21/11/2023
|
08/01/2024
Time
16:30Hrs
|
|
598 |
Consultancy Services as Independent Engineer Services during Operation and Maintenance stage of Four laning of Bellary Byrapura section of NH-150A from Km.266.820 to Km.277.690 and Km.278.690 to Km.308.550 on HAM mode under Bharatmala Pariyojna in the state of Karnataka |
NIT No.18/NHAI/RO-BNG/17017/Tender/2023-24 dated 20.11.2023dated 22.06.2023 |
21/11/2023 |
20/11/2023
|
19/12/2023
Time
15:0Hrs
|
|
599 |
selection of Authoritys Engineer for project supervision of Work of widening to 4 lane rigid pavement configuration from km 90.00 to km 100.800 of NH96(km42.00 tokm 53.300 as per new NH330)design length of 11.300 km under EPC mode in the State of UP |
3589/170YATA-NH Circle/23-24 dt.17.11.2023 |
25/11/2023 |
17/11/2023
|
26/12/2023
Time
11:0Hrs
|
|
600 |
Consultancy Services for Authoritys engineer for Construction of Ramnagar ByPass on NH116B and Construction of Raniganj ByPass on NH60 and Construction of Dubrajpur ByPass on NH60. |
Bid Pkg No 04/2023-24 of SE NHC-I |
01/12/2023 |
10/11/2023
|
14/03/2024
Time
15:0Hrs
|
|
601 |
Authority Engineer Services for the project of Consultancy services for Authority’s Engineer for Supervision of A)Providing Service Road on Panvel Mahad Panji Road NH 66 Km. 406/030 to 450/170, Road Safety Panvel Mahad Panji Road NH 66 Km. 406/030 to 450/170 to four lane with paved shoulder & Construction of Foot Bridge near New English High school And Jr. Collage, Kasal Tal. Kankavli, Dist. Sindhudurg, at Ch.422/600 (Design Ch 254.140) (Kalmath - Zarap Section) in the state of Maharashtra.on EP |
No. 02/NHD/AB/TC/2022-23/4636 |
26/11/2023 |
09/11/2023
|
02/01/2024
Time
17:30Hrs
|
|
602 |
Independent Engineer services for Construction of Salempur bypass to four lane with paved shoulder configuration from km 64.000 of NH-727A (Km 171.00 of Sonauli Balia Marg, old SH-01, near Mahadahan Chauraha) to km 61.500 of NH-727B (Km 178.500 of Sonauli Balia Marg, old SH-01, near Ahirauli Village),design length of 14.700 km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh. |
CE-RO/LKO/NH(O)/24/NH-Salempur bypass(NH-727Aand727B)/2022-2023/IE Dated 09.11.2023 |
10/11/2023 |
09/11/2023
|
17/01/2024
Time
11:0Hrs
|
|
603 |
Independent Engineer (IE) Services for Tolling Operation Maintenance and Transfer of Allahabad Bypass Section of NH-19 (Old NH-02) from km 628-753 to km 713-215 in the state of Uttar Pradesh (TOT Bundle-11) |
NHAI/TOT-11/IE/UP/Allahabad Bypass/2023/efile-189843 |
08/11/2023 |
08/11/2023
|
12/12/2023
Time
11:0Hrs
|
|
604 |
Consultancy Services for Authority Engineer for Supervision of Project during OandM period of Two Laning with paved shoulder of Chhapra-Gopalganj section of NH–85 from km 0 to Km 93.500 Existing Chainage and Km 0 to Km. 94.258 Design Chainage Total Design Length 94.258Km in the State of Bihar |
223/RO-PATNA/NHAI/2023-24 |
15/11/2023 |
08/11/2023
|
21/12/2023
Time
11:0Hrs
|
|
605 |
Independent Engineer services during Operation and Maintenance stage of 4 Laning of Walayar Vadakkencherry Thrissur to Angamali section and Angamali to Edappally section of NH 544 in the State of Kerala |
RO Kerala/PIUPKD/IE/KL 01 02/2163 |
16/11/2023 |
07/11/2023
|
07/12/2023
Time
15:0Hrs
|
|
606 |
CONSULTANCY SERVICES FOR AE OF THE WORK OF WIDENING AND STRENGTHENING TO 2 LANE WITH PS FROM EX CH 56.720 TO 100.820 AND DESIGN CH 62.600 TO 106.360 (TOTAL LENGTH is 43.760 KM) SBU NH 1 ON THE UT OF JAMMU AND KASHMIR UNDER BEACON BRO ON EPC MODE. |
RW/CH/W(34)/AE/JK/2023 |
11/11/2023 |
07/11/2023
|
09/12/2023
Time
17:0Hrs
|
|
607 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Balrampur bypass with 2 lane flexible pavement configuration from Km. 223.000 of NH330 to Km.328.300 of NH730,design length of 20.515km under EPC mode in the State of UP |
3476/252C(3)-NHCircle/2023 03.11.2023 |
09/11/2023 |
06/11/2023
|
06/12/2023
Time
11:0Hrs
|
|
608 |
Consultancy Services for Authority’s Engineer for Supervision of 4-laning road of Dimapur-Kohima Package- I,II, III, in the state of Nagaland |
NHIDCL/AE/DK-Package-I II III |
06/11/2023 |
03/11/2023
|
04/01/2024
Time
16:0Hrs
|
|
609 |
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation from 2 lane to Four lane of Muddanur to B. Kothapalli section of NH 716G from Km. 0.000 to Km. 56.500 in the State of Andhra Pradesh on EPC mode |
RWNH12014/30/21-AP/Z-III/741AE |
13/11/2023 |
03/11/2023
|
02/11/2024
Time
17:0Hrs
|
|
610 |
Consultancy Services for Authoritys Engineer for Supervision of Widening and Strengthening to four lane of Gorantla Hindupur section of NH-716G from km 120.300 to km 153.880 Package 03 EPC mode in the State of Andhra Pradesh Annual Plan 2022 23 |
RWNH-12014/4/2022AP/Z-III754AE |
13/11/2023 |
03/11/2023
|
02/11/2024
Time
17:0Hrs
|
|
611 |
Independent Engineer services for Development of 4 lane Economic Corridor from Kharagpur to Chandrakona-Ghatal Road Crossing section Km 0.000 to Km 41.000 of NH 116A in the state of West Bengal under Bharatmala Pariyojana (Package-I) in the State of West Bengal on Hybrid Annuity Mode |
NHAI/WB/Kharagpur-Moregram/Pkg1/IE/2023 |
14/11/2023 |
02/11/2023
|
11/09/2024
Time
15:0Hrs
|
|
612 |
Independent Engineer services for Development of 4 lane Economic Corridor from Chandrakona-Ghatal Road Crossing to Bowaichandi section Km 41.000 to Km 89.814 of NH 116A (Package-2) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode |
NHAI/WB/Kharagpur-Moregram/Pkg2/IE/2023 |
17/11/2023 |
02/11/2023
|
11/09/2024
Time
15:0Hrs
|
|
613 |
Independent Engineer services for Development of 4 lane Economic Corridor from Guskara-Katwa Road to Mayurakshi Bridge Approach section Km 133.000 to Km 180.000 of NH 116A (Package-4) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode |
NHAI/WB/Kharagpur-Moregram/Pkg4/IE/2023 |
20/11/2023 |
02/11/2023
|
11/09/2024
Time
15:0Hrs
|
|
614 |
Independent Engineer services for Development of 4 lane Economic Corridor from Before Mayurakshi Bridge Approach to Moregram section Km 180.000 to Km 230.957 of NH 116A (Package-5) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode. |
NHAI/WB/Kharagpur-Moregram/Pkg5/IE/2023 |
30/11/2023 |
02/11/2023
|
11/09/2024
Time
15:0Hrs
|
|
615 |
Consultancy Services for Independent Engineer services for Operation and Maintenance of 8-laning of section of NH-44 from Mukarba Chowk at Km. 15.500 to Panipat at Km. 86.000 on BOT (Toll) basis in the States of Delhi and Haryana. |
2023-NHAI-172922-1 |
24/11/2023 |
02/11/2023
|
29/11/2023
Time
15:0Hrs
|
|
616 |
Engaging consultancy service for proof checking assisting supervision quality control of work for widening and strengthening of Dhoraji Jamkandorana Kalavad road of NH927D btn km 0.0 to 58.115 to two lane with paved shoulder configuration on EPC mode |
18 of 2023/24 |
30/10/2023 |
31/10/2023
|
23/11/2023
Time
12:0Hrs
|
|
617 |
CS for AE for Supervision of “Construction of Greenfield Road connecting North and south industrial cluster of Khandaleru Creek near Krishnapatnam port at Thamminapatnam to Narikellapalle, Part-I from Ch 0.000 to 14.650, and extension of Dedicated port Road on NH-67, Part-II from Ch 18.000 to 19.300 in the state of Andhra Pradesh on EPC Mode under Bharatmala Pariyojana Phase-I (2nd Call). |
2023-NHAI-172162-1 |
30/10/2023 |
30/10/2023
|
28/11/2023
Time
11:0Hrs
|
|
618 |
CS for AE for Supervision of Construction of 4L Greenfield Highway from Chatrapur on NH16 to Gopalpur port (Km 0.000 to km 4.500) and upgradation to 6L elevated configuration of existing NH16 (Km 429.025 to km 430.990) under Bharatmala Pariyojana in Odisha State on EPC Mode (2nd Call) |
2023-NHAI-172150-1 |
30/10/2023 |
30/10/2023
|
28/11/2023
Time
11:0Hrs
|
|
619 |
IE Services for four laning of existing 2-lane stretch from Bamni (Design km 19-000) to MH/TG Border (Design km 51-985) (Design Length – 32-985 km) section of NH-930D in the State of Maharashtra on Hybrid Annuity Mode under NH(O) |
2023-NHAI-172571-1 |
18/11/2023 |
30/10/2023
|
14/12/2023
Time
11:0Hrs
|
|
620 |
Consultancy services of Authority s Engineer for Widening of Edamon Kollam section Edamon to Kollam of NH-744 to 2 lane with paved shoulder in the state of Kerala on EPC mode |
NHAI/Kerala/Edamon-Kollam/AE/2023 |
24/11/2023 |
27/10/2023
|
12/12/2023
Time
15:0Hrs
|
|
621 |
Independent Engineer Services during Operation & Maintenance period of Lucknow-Raebareli Section of NH-24B (New NH-30) from km. 12.700 to km. 82.700 on DBFOT (Annuity) and TOT in the State of U.P. |
2023-NHAI-172063-1 |
20/11/2023 |
25/10/2023
|
28/11/2023
Time
11:0Hrs
|
|
622 |
Independent Engineer services for Development of 4 lane Economic Corridor from Bowaichandi to Guskara-Katwa Road section Km 89.814 to Km 133.000 of NH 116A (Package-3) in the state of West Bengal under Bharatmala Pariyojana on Hybrid Annuity Mode |
NHAI/WB/Kharagpur-Moregram/Pkg3/IE/2023 |
10/11/2023 |
19/10/2023
|
11/09/2024
Time
15:0Hrs
|
|
623 |
Supervision Consultant (SC) Services during operation and Maintenance Period for Two lane with paved shoulder of Padhi-Dahod section of NH-113 (New NH-56) from Km.180.00 to Km.267.00 (Design length 85.588 ) in the state of Rajasthan and Gujarat on EPC mode |
2023-NHAI-171104-1 |
25/10/2023 |
17/10/2023
|
23/11/2023
Time
16:0Hrs
|
|
624 |
Consultancy services of Authority’s Engineer for Rectification of 12Nos Blackspots Accident spots in the stretch of Walayar - Angamaly Section of NH-544 and 4 Nos Blackspots Accident spots in the stretch of Thiruvananthapuram Bypass section of NH-66 under Annual Road Safety plan for 2023-2024 in the state of Kerala on EPC mode |
2023-NHAI-170965-1 |
02/11/2023 |
16/10/2023
|
30/11/2023
Time
11:30Hrs
|
|
625 |
Authority Engineer Services during O&M Period for Four laning of Bakhtiyarpur-Mokama section of NH-31 from Km 153.300 to Km 197.900 (Design chainage) and (Existing Chainage Km 153.300 to Km 204.741 of NH-31), Total Design Length 44.6 Km in the State of Bihar on EPC Mode |
221/RO-PATNA/NHAI/2023-24 |
18/10/2023 |
16/10/2023
|
23/11/2023
Time
11:0Hrs
|
|
626 |
Consultancy Services of Authority Engineer during O&M Period of Four Laning of Koilwar to Bhojpur of NH-30 & 84 from Existing Chainage Km. 137.375 of NH-30 to Km. 27.370 of NH-84 (Design Chainage Km. 33.250 to Km. 77.100) (Design Length- 43.850 Km.) in the State of Bihar under NHDP Phase-III on EPC Mode |
222/RO-PATNA/NHAI/2023-24 |
18/10/2023 |
16/10/2023
|
23/11/2023
Time
11:0Hrs
|
|
627 |
Independent Engineer Services for O&M Period for the work of 4 lane Muzaffarpur – Darbhanga – Purnea section of NH 57 (km. 0.00 to km. 148.550 and 159.357 to km. 287.860) (BOT Annuity section) of NH – 57 on OMT Basis in the state of Bihar. (OMT Pkg no. 20) |
219/RO-PATNA/NHAI/2023-24 |
18/10/2023 |
13/10/2023
|
23/11/2023
Time
11:0Hrs
|
|
628 |
Independent Engineer Services during O&M Period for 2 laning of Muzaffarpur – Sonbarsa Section of NH – 77 from Km. 2.800 to Km. 89.000 in the state of Bihar under NHDP Phase - III on Design, Built, Finance, Operate and Transfer (DBOT) Annuity Basis. |
220/RO-PATNA/NHAI/2023-24 |
18/10/2023 |
13/10/2023
|
23/11/2023
Time
11:0Hrs
|
|
629 |
Independent Engineer Services for O&M Period for the work 4 laning of Kotwa – Mehsi - Muzaffarpur Section of NH – 28 from Km. 440.00 to Km. 520.00 in the state of Bihar |
217/RO-PATNA/NHAI/2023-24 |
17/10/2023 |
13/10/2023
|
23/11/2023
Time
11:0Hrs
|
|
630 |
Independent Engineer Services for O&M Period for the work 4 lane Bridge across river Kosi and including its Approaches & Guide Bund & Afflux Bund from km. 148.550 to Km. 159.185 in the state of Bihar on Annuity Basis. |
218/RO-PATNA/NHAI/2023-24 |
17/10/2023 |
13/10/2023
|
07/12/2023
Time
12:0Hrs
|
|
631 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Work of development and construction of elevated corridor from km 38.660 to km 42.690 from Iscon Junction to Start point of approach of Sanand Flyover of NH 147 in the State Of Gujarat EPC mode |
NIT No. RW/NH-12014/05/2022-23-GJ/ /AE |
06/10/2023 |
11/10/2023
|
04/01/2024
Time
15:0Hrs
|
|
632 |
Consultancy Services as AE for Supervision of Widening and Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur NH-13 Package - 7 and 8 on EPC mode in the State of Assam |
NHIDCL/Assam/AE /Tamenglong - Mahur Pkg-7 and 8 /2 |
13/10/2023 |
10/10/2023
|
30/10/2023
Time
15:0Hrs
|
|
633 |
SC Services during OnM stage of 2 laning with paved shoulders of Tonk Sawaimadhopur Section from Km. 1.300 to Km. 69.750 of NH-116 in the State of Rajasthan under NHDP Phase-IV on EPC mode |
NHAI/11011/1/ Tenders-ROJ/SC-TS |
17/10/2023 |
09/10/2023
|
30/11/2023
Time
11:0Hrs
|
|
634 |
SC Services for project OnM of Tanot- Jaisalmer to Jaisalmer bypass and Jaisalmer Phalodi Section of NH11 in the State of Rajasthan |
NHAI/11011/1/ Tenders-ROJ/SC-JS |
02/11/2023 |
09/10/2023
|
06/12/2023
Time
11:0Hrs
|
|
635 |
SC for rojects Bheem Parasoli Gulabpura Section of NH 48 D and a Raipur Section of NH 58 (Length 54.763 Km.) |
NHAI/11011/1/ Tenders-ROJ/SC-BP |
07/11/2023 |
09/10/2023
|
30/11/2023
Time
11:0Hrs
|
|
636 |
IE Srvices during OnM stage of Bikaner Phalodi section on BOT (Toll) basis in the State of Rajasthan (Length 159.17Km) |
NHAI/11011/Tenders-ROJ/IE-BP/ |
17/11/2023 |
06/10/2023
|
21/11/2023
Time
11:0Hrs
|
|
637 |
IE Srvices during OnM stage of 2LPS of Khajuwala Poogal section and Poogal Dantour Jaggasar Gokul Godu Ranjeetpura Charanwala Naukh Bap section of NH911 on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Rajasthan. |
NHAI/11011/1/Tenders-ROJ/IE-KP |
17/11/2023 |
06/10/2023
|
21/11/2023
Time
11:0Hrs
|
|
638 |
Consultancy services for Authority’s Engineer for Supervision of work of Rehabilitation and Up-gradation to two-lane with paved shoulder configuration from Km. 0.000 to Km. 7.800 and km. 35.400 to Km.52.345 (Design length - 24.745 Km. except, Bihar portion) of NH-727B (Tamkuhiraj to Bihar Border and Bihar Border to Majhauli) on EPC mode in the State of Uttar Pradesh. |
CE-RO/LKO/NH(O)/19/NH 727B/2022-23/AE Dt.03.10.23 |
06/10/2023 |
03/10/2023
|
20/11/2023
Time
11:0Hrs
|
|
639 |
SC Services during OnM stage of 2 laning with paved shoulders of Jhalawar Rajasthan M.P.Border Section of NH 12 (New NH 52) from Km. 346.540 to Km. 408.700 in the State of Rajasthan |
NHAI/11011/2/ ROJ/SC-JMB/2ndcall |
07/11/2023 |
30/09/2023
|
16/11/2023
Time
11:0Hrs
|
|
640 |
Consultancy Services for Authoritys Engineer for Supervision of Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to 2lane with PS configuration in the state of Madhya Pradesh on EPC |
771491 |
15/10/2023 |
29/09/2023
|
04/12/2023
Time
17:30Hrs
|
|
641 |
CS for AE for Balance works of Rehabilitation and Upgradation to Four laning of NH31D from Km 113/200 to Km 154/854 (Package IIA) Falakata Salsalabari Section in the State of West Bengal on Engineering Procurement and Construction (EPC) Mode |
NHAI/AE/Pkg(2A)/NH31D/2023/E-222310 |
03/10/2023 |
26/09/2023
|
25/10/2023
Time
15:0Hrs
|
|
642 |
Consultancy Services for assisting Authority’s Engineer for supervision of Construction of Bypass road to V Kota (Km.333/400 to 340/900) and Byreddypalli town (Km.315/900 to 318/250) to two lane with paved shoulder of NH-42 (Palamaneru Krishnagiri Boarder) in Chittoor District of Andhra Pradesh on EPC mode under Annual Plan 2022-23 |
NIT No.27/SE,NH,ATP /2023-24,Dt.19.9.2023 |
21/09/2023 |
25/09/2023
|
25/10/2023
Time
15:0Hrs
|
|
643 |
Supervision Consultancy (SC) services during Operation and Maintenance (Total Length 42.680 Km) period of Four Laning of Barhi - Hazaribagh section of NH-33 from Km 0.000 to Km 40.500 Including supervision of under construction 6-lane Grade Separator at Km 36.530 with LVUP at Km 36.894 including Approaches to Grade-Separator and LVUP from Km 35.840 to Km 37.240 in the State of Jharkhand |
NHAI/RO/RNC/JH/2023-24/11 |
14/10/2023 |
25/09/2023
|
26/10/2023
Time
11:0Hrs
|
|
644 |
Supervision Consultancy (SC) services during Operation and Maintenance (Total Length 80.522 Km) period of Six Laning of Gorhar to Barwa Adda section of NH-2 from Km 320.810 to Km 400.132 in the state of Jharkhand |
NHAI/RO/RNC/JH/2023-24/10 |
14/10/2023 |
25/09/2023
|
26/10/2023
Time
11:0Hrs
|
|
645 |
Consultancy Services for Authority Engineer for Supervision of REHABITATION AND UP-GRADATION TO 2-LANE CONFIGURATION OF BAGESHWAR TO KANGARCHINA ROAD FROM KM 129.600 TO KM 161.600 EXISTING CHAINAGE 136.00 TO KM 169.00 OF NH 309A IN THE STATE OF Uttarakhand |
2023-MoRTH-772754-1 |
18/10/2023 |
22/09/2023
|
20/11/2023
Time
17:0Hrs
|
|
646 |
Consultancy Services for Assisting Authoritys Engineer for Widening to 2 lane with paved shoulders of Nandyal to Jammalamadugu section NH167K (from Km.250/000 to 274/000) in the state of Andhra Pradesh under NH(O) under Annual Plan 2022 23. |
NIT No. 26/AAE/SE,NH,ATP/2023-24, Dt.02.09.2023 |
25/09/2023 |
21/09/2023
|
25/10/2023
Time
15:0Hrs
|
|
647 |
Independent Engineer Services during Operation and Maintenance period for Six Laning of Chakeri Allahabad Section of NH 2 in the state of Uttar Pradesh on Hybrid Annuity Mode |
24001/1/RO-W-UP/NH-2/IE |
21/09/2023 |
21/09/2023
|
21/11/2023
Time
15:0Hrs
|
|
648 |
Consultancy Services for Authority Engineer for supervision of Operation and maintenance of 4-Laning of UR Section of NH1A from Km 67 to Km 89 from Km 130 to Km 151 on EPC Mode in defect liblity Period ,Construction of tunnelsviaducts at identified sliding,slip zones in design Ch 130600 to 130750 Ch 131170 to 131763 Ch 132560 to 133168 Ch 133590 to 133743 and Ch 147877 to 148715 on EPC mode in Udhampur Ramban section in the UT of Jammu & Kashmir under NHDP PhaseII |
2023NHAI1680211 |
25/09/2023 |
18/09/2023
|
08/11/2023
Time
11:0Hrs
|
-
|
649 |
Consultancy Services for assisting Authority s Engineer for supervision of Widening and Strengthening of existing two lane road of bypassed reaches of Punganur town limits from Km.0.000 (design chainage) to Km.10.035 (design chainage) on NH-42 as one time improvement in the state of Andhra Pradesh under NH(O) on EPC mode under Annual plan 2022-23 |
NIT No.24/SE,NH,ATP /2023-24,Dt.02.09.2023 |
14/09/2023 |
15/09/2023
|
09/10/2023
Time
15:0Hrs
|
|
650 |
Independent Engineer Services during Operation & Maintenance Period for “2 laning with paved shoulder of Agra to Aligarh Section of NH-93 from km. 0.00 to km 79.00 in the State of Uttar Pradesh on DBFOT on Toll basis under NHDP Phase-IVA |
NHAI/PIU/AGRA/MISC/36 |
29/09/2023 |
15/09/2023
|
17/10/2023
Time
11:0Hrs
|
-
|
651 |
Consultancy Services as AE for for Supervision of Widening and Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) (Package-9 and 10) in the State of Assam |
NHIDCL/Assam/AE Tamenglong -Mahur Pkg 9 and 10 /20 |
25/09/2023 |
12/09/2023
|
10/10/2023
Time
15:0Hrs
|
|
652 |
Consultancy Services for Authoritys Engineer for Supervision of Upgradation and Reconstruction of Shahpura-Dindori section of NH 45 Total length 60.88 km to Two lane with paved shoulder in the State of Madhya Pradesh on EPC mode. |
756198-1 |
24/09/2023 |
09/09/2023
|
25/10/2023
Time
17:30Hrs
|
|
653 |
Consultancy Services for assisting Authority s Engineer for supervision of Construction of proposed 2-lane ROB and its approaches in lieu of existing level Crossing No.95 at Km.183/600 (railway chainage 145/500-600) of NH 205 (Km.9/6 of new NH-71) under Setu Bharatam in the State of Andhra Pradesh under NH(O) for the year 2022-23 on EPC mode |
25/2023-24,dt.02.09.2023 |
08/09/2023 |
08/09/2023
|
09/10/2023
Time
15:0Hrs
|
|
654 |
Consultancy Services for Authority Engineer for Supervision of widening to 2-lane with Hard Shoulder configuration of Mana Ch. 0.00 to Mana Pass Ch. 50.987 road on NH-07 under Bharatmala Pariyojana in the state of Uttarakhand on EPC mode |
2023-MoRTH-770401-1 |
17/10/2023 |
08/09/2023
|
14/11/2023
Time
17:0Hrs
|
|
655 |
Consultancy Services for assisting Authoritys Engineer for supervision of Construction of two lane ROB and its approaches in lieu of existing LC No.119 at Km 226.800 of NH205 (Km 52.688 of New NH71) under Setu Bharatam in the state of Andhra Pradesh |
NIT No.23/SE,NH,ATP/2023-24, Dt. 02.09.2023 |
21/09/2023 |
07/09/2023
|
09/10/2023
Time
15:0Hrs
|
|
656 |
Independent Engineer Services for Construction of Four Laning of near Satai ghat to Chowka section NH-34 from D. Ch. 89.875 to D. Ch. 145.000 (Total Length 55.125 kms) in the State of Madhya Pradesh (Package-3) on Hybrid Annuity Mode & Four Laning of Chowka to Kaimaha near MP/UP Border section NH-34 form Design Ch. 145.000 to Design Ch. 197.266 excluding existing Chhatarpur bypass from Design Ch. 160.307 to Design Ch. 168.630 (Length - 8.323 km) [Total Length – 43.924 km] (Pkg-IV) on HAM |
NHAI/HQ/MP/Sagar-Kabrai/IE/PKG-3&4/2023 |
21/09/2023 |
06/09/2023
|
24/12/2024
Time
11:0Hrs
|
|
657 |
CS for AE for improvement and rehabilitation of Lucknow Ayodhya sec of NH28(New27) from Km 8.000 to Km 121.600 in the State of Uttar Pradesh on EPC Mode (Package I and II) |
NHAI/HQ/UP (West)/Lucknow-Ayodhya /AE/2023 |
22/09/2023 |
06/09/2023
|
26/09/2023
Time
11:0Hrs
|
|
658 |
Supervision Consultancy Services for Operation & Maintenance of Piska More- Palma section From Km. 3.500 to Km. 26.000 of NH- 23 and Kutchery Chowk Ranchi– Bijupara Section From Km. 3.560 to Km. 34.000 & Bijupara-Kuru from Km. 34.000 to Km. 55.000 section of NH-75 in the State of Jharkhand |
NHAI/RO/RNC/JH/2023-24/09 |
05/09/2023 |
04/09/2023
|
18/10/2023
Time
11:0Hrs
|
|
659 |
Selection of Authority Engineer for supervision of Joshimath Malari road 0 to 60.55 in State of Uttarakhand |
Chardham/Shivalik/02/2023-24 |
08/09/2023 |
02/09/2023
|
16/10/2023
Time
11:0Hrs
|
|
660 |
Consultancy Services for Authority’s Engineer for Development of Jhajra - Asharori Link Road (Design Ch 0-050 to Ch 12-220) in the State of Uttarakhand on EPC Mode |
2023-NHAI-166205-1 |
26/09/2023 |
31/08/2023
|
29/11/2023
Time
11:0Hrs
|
|
661 |
Independent Engineering Services for the work of Construction of Two Lane with paved Shoulder of road stretches from Bakaur to Parsarma (km 13 300 to km 18 875) NH-527A Parsarma to Bariyahi (km 0 000 to km 24 068) NH-327E Bangaon Bypass (km 0 000 to 3 820) & Mahishi Spur road (km 0 000 to km 5 720), the total length of 39 183 km under BRT Scheme in the State of Bihar on HAM Mode |
2023-NHAI-166133-1 |
12/09/2023 |
30/08/2023
|
09/10/2023
Time
11:0Hrs
|
|
662 |
Consultancy services for Independent Engineer Construction of 4/6 lane bypass for Belagavi city from Km 11/00 (Goa side) of NH-4A to Km 516/000 (Pune side) of NH-4 (Design Length 34/48 km) in the state of Karnataka on Hybrid Annuity Mode. Package 1A |
2023-NHAI-166123-1 |
31/08/2023 |
30/08/2023
|
11/10/2023
Time
11:0Hrs
|
|
663 |
Consultancy Services for Authoritys Engineer for supervision of ongoing EPC works on Surat-Dahisar (Km 381 000 to Km 502 000) section of NH 48 in the State of Maharashtra |
NHAI/RO/MUM/THANE/SD/AE/2023 |
01/09/2023 |
29/08/2023
|
27/09/2023
Time
11:0Hrs
|
|
664 |
Supervision Consultancy services during Operation and Maintenance period of Four Laning of Chauka Mahulia Baharagora section of NH 33 from Km 217.300 to Km 333.500 and Baharagora JH WB Border section of NH 6 from Km 199.200 to Km 183.587 Jharkhand |
NHAI/RO/RNC/JH/2023-24/06 |
05/09/2023 |
29/08/2023
|
16/10/2023
Time
11:0Hrs
|
|
665 |
Independent Engineer Services for Supervision of Four/Six lanning of Bhaniyawala-Jollygrant-Rishikesh spur section of NH-07 from Km 0-000 to Km 19-780 in the state of Uttarakhand under NH (O) on Hybrid Annuity Mode |
2023-NHAI-165749-1 |
13/09/2023 |
25/08/2023
|
25/09/2023
Time
11:0Hrs
|
|
666 |
Selection of AUTHORITYS Engineer (AE) for Supervision of Construction of Shohratgarh Bypass (Design Length 6.273 Km) to two lane with paved shoulder on NH-730 (starts near ch. 413.700 and ends near ch. 419.000) under EPC mode in the State of U.P. |
1346/8 Com-NH Circle/23 dt 22.08.23 |
28/08/2023 |
25/08/2023
|
12/10/2023
Time
11:0Hrs
|
|
667 |
Consultancy Services for Authoritys Engineer for Supervision of Upgradation of MP/RJ Border- Sheopur-Goras Road section of NH-552Extn, from design Ch. 0.00 to 48.400 to 2L PS configuration along with OTI of 16.6 km in the State of Madhya Pradesh |
CE-RO/BPL/NH/03/AE/2023-24 |
29/08/2023 |
25/08/2023
|
08/11/2023
Time
17:30Hrs
|
|
668 |
Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Goras to Shyampur section of NH-552Extn from design Ch 48.40 to 111.80 to 2 lane with paved shoulder configuration along with OTI of 8.91km in the State of Madhya Pradesh |
CE-RO/BPL/NH/02/AE/2023-24 |
29/08/2023 |
25/08/2023
|
08/11/2023
Time
17:30Hrs
|
|
669 |
Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Sarvardevla to Pal (MP/MH Border) section of NH-347C from design Ch 81.600 to 137.400 to 2L PS configuration along with OTI of 1.95 km in the State of Madhya Pradesh |
CE-RO/BPL/NH/04/AE/2023-24 |
29/08/2023 |
25/08/2023
|
20/11/2023
Time
17:30Hrs
|
|
670 |
Supervision Consultancy Services for Operation & Maintenance of the stretch from Km 113.730 Km 217.300 of Ranchi to Chauka Section of NH-33 in the State of Jharkhand |
NHAI/RO/RNC/JH/2023-24/05 |
05/09/2023 |
24/08/2023
|
12/10/2023
Time
11:0Hrs
|
-
|
671 |
IE Services during O and M stage for 4 laning of Suryapet (Design Ch.0.420 Existing Km.128.500 of NH65) to Khammam (Design Ch.59.046 Existing Km.50.750 of old SH42) of NH365BB (Old SH42) (Design Length 58.626) in the State of TS under BMP on HAM |
165609 |
05/10/2023 |
24/08/2023
|
18/10/2023
Time
15:0Hrs
|
|
672 |
Consultancy services for (AE)/PMC for supervision of Impr. and Upgradation to 2 Lane with PS configu.from existing Km 420.000 to Km 454.000 (dl.Km 420.000 to Km 454.643, dl.32.543 Km) of NH730(Shohratgarh to Uska Bazar)in the state of UP on(EPC)basis |
1314/03com-NHcircle/23 dated 14.08.2023 |
23/08/2023 |
19/08/2023
|
27/09/2023
Time
11:0Hrs
|
|
673 |
Independent Engineer services during Operation & Maintenance Period of the Project Construction of New Bridges/Structures, Repair of Existing Four Lane Highway from Baleshwar to Kharagpur Section of NH 60 (New NH-16) (Km 0.000 to Km 119.300) in the State of Orissa and West Bengal and its Operation and Maintenance under NHDP Phase I to be executed as BOT (Toll) on DBFOT Pattern |
10/OandM/IE/2023-24 |
20/09/2023 |
18/08/2023
|
11/10/2023
Time
12:0Hrs
|
|
674 |
IE Services for Construction of 4 laning Greenfield corridor from Suara (sasaram) at Ch 0 000 to Garhani (at SH-12) at Ch 74 432 package-1 of Patna-Arrah-sasaram corridor of NH-119A in Bihar on HAM Mode |
2023-NHAI-164729-1 |
28/08/2023 |
17/08/2023
|
21/11/2023
Time
11:0Hrs
|
|
675 |
Independent Engineer services for Operation and Maintenance Supervision of Gurgaon Faridabad and Ballabhgarh Sohna Roads in Faridabad and Gurgaon Districts on Build Operate and Transfer BOT Basis (Package No Haryana PWD (BnR) Branch BOT 4and5) |
2023 HRY 304380 1 |
01/09/2023 |
17/08/2023
|
21/09/2023
Time
17:0Hrs
|
|
676 |
Consultancy Services for Supervision Consultant (SC) during Operation and Maintenance Period of Govindpur-Chas section of NH-32 from km 0.000 to km 56.889 in the State of Jharkhand (2nd Call) |
NHAI/RO/RNC/JH/2022-23/25-1 |
21/09/2023 |
14/08/2023
|
10/10/2023
Time
11:0Hrs
|
|
677 |
Consultancy services for Authority Engineer for Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km -0/342 to Km 20/223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu-(2nd Call) |
2023-NHAI-164535-1 |
18/08/2023 |
14/08/2023
|
11/09/2023
Time
11:0Hrs
|
|
678 |
Rehabilitation and Up-gradation to Four Laning of NH-31D from Km Ch 83 340 to Km Ch.113 200 Package-II B of Dhupguri to Falakata Section in the State of West Bengal on EPC Mode |
2023-NHAI-164355-1 |
15/09/2023 |
12/08/2023
|
09/10/2023
Time
15:0Hrs
|
|
679 |
IE for 4 laning of Tejajinagar Balwara sec of NH 347BG (Indore to Boregaon Pkg 2) Design Ch. 9.000 to Design Ch. 42.400 (Length 33.400 Km) under Bharatmala Pariyojana Phase-I in Madhya Pradesh on Hybrid Annuity Mode 3rd call |
NHAI/HQ/MP/Tejajinagar balwara/Pkg II/HAM/IE/2022 |
19/08/2023 |
10/08/2023
|
12/09/2023
Time
11:0Hrs
|
|
680 |
Supervision Consultancy Services for Operation & Maintenance of 4-Laning of Nagina-Kashipur section of NH-74 from Km. 73.000 (design chainage 71.614) to Km. 175.000 (design chainage Km. 170.407) in the States of Uttarakhand and Uttar Pradesh |
NHAI/RO-DDN/PIU-NBD/OM/NGN-KSP |
05/09/2023 |
08/08/2023
|
19/09/2023
Time
15:0Hrs
|
|
681 |
Consultancy Services for assisting Authoritys Engineer for supervision of Construction of Bypass Road to Adoni town connecting NH-167 Hagari-Jadcherla Road from Km.62/700 to Km.71/400 in Kurnool District in State of Andhra Pradesh on EPC mode 2022-23 |
22/2023-24,dt.02.08.2023 |
07/08/2023 |
07/08/2023
|
13/09/2023
Time
15:0Hrs
|
|
682 |
Consultancy services for Authority Engineer for Supervision of following projects - Improvement/Widening of National Highway No. 217 (Dainadubi-Darugiri Section) to Two lane with paved shoulder and Improvement and Widening of National Highway No. 127B (Darugiri - Songsak - Williamnagar Junction Section) to two lane in the state of Meghalaya, under Bharatmala Pariyojana (Lot-1) Pkg-1B on EPC mode |
2023-NHIDC-765761-1 |
09/08/2023 |
07/08/2023
|
04/09/2023
Time
15:0Hrs
|
|
683 |
Independent Engineer services for Construction of Basti Ring Road (Phase-I) with four lane configuration (Design length 22.150 Km) for Basti City in the state of Uttar Pradesh on Hybrid Annuity Mode |
CE-RO/LKO/NH (O)/04/Basti Ring Road/2021-22/IE |
22/08/2023 |
05/08/2023
|
18/09/2023
Time
11:0Hrs
|
|
684 |
Consultancy services for Authoritys Engineer for Supervision of Work of Widening and Strengthening from design Km. 67.280 to Km. 88.622 of NH727A (Salempur-Mairwa Road) to two lane with paved shoulder configuration under EPC mode in the State of UP |
CE-RO/LKO/NH(O)/13/NH 727A/2022-23/AE |
22/08/2023 |
04/08/2023
|
11/10/2023
Time
11:0Hrs
|
|
685 |
(i) Consultancy services for preparation of DPR for widening to four lane from Km 69/750 to Km 75/750 of NH-552 Extn. and plantation, street lighting and road safety works from Km 0/00 to Km 28/00 on NH-248 & (ii) Consultancy services for preparation of DPR for grade separated structure with slip road at Achrol from km 11/00 to km 12/00 of NH-248 |
02/2023-24 |
04/08/2023 |
04/08/2023
|
05/08/2023
Time
0:1Hrs
|
|
686 |
AE for Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP & MP on EPC Mode |
NHAI/HQ/MP/Lalitpur SagarLakhnadon/26 VUP/AE/2023 |
19/08/2023 |
01/08/2023
|
31/08/2023
Time
11:0Hrs
|
|
687 |
Consultancy Services for Independent Engineer services for Supervision of Construction of Left Out work of Four laning of Talaja-Kagvadar section of NH-8E from km 53.585 to km. 139.915 (Design chainage from km 54.990 to km to Km. 140.470) in the State of Gujarat on single percentage item rate contract (Package-II , III) |
NHAI/RO-GNR/NH-8E/Tal-Mah-Kag/IE/2023/July/ |
22/09/2023 |
31/07/2023
|
24/11/2023
Time
13:0Hrs
|
|
688 |
ENGAGEMENT OF CONSULTANCY SERVICES FOR SUPERVISION OF VARIOUS EPC PROJECTS Kothun-Lalsot-Karoli-Dholpur road, ROB Existing (Railway portion & approach) at Km 76 of old NH-116 (New NH-552Extn.) in Sawaimadhopur City & Shahpura-Thanagazi and Span Bridge over Sawamadhopur- Sheopur |
1-2023/24 |
21/08/2023 |
28/07/2023
|
05/09/2023
Time
18:0Hrs
|
|
689 |
Authority Engineer for Construction of new 4 lane Prayagraj Southern Bypass from design km. 50.860 (Nababa urf Nibi Kala Uparhar) to design km. 64.763 on NH-19 (near Khodaypur Kasgaon) including Interchange loop at NH-19 (design length 14.980 km) in the state of UP Package-3 under Phase-I on EPC mode under Bharatmala Pariyojna |
2023-NHAI-162737-1 |
24/08/2023 |
28/07/2023
|
14/09/2023
Time
11:0Hrs
|
|
690 |
Authority Engineer for Construction of new 4 lane Prayagraj Southern Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of UP under Bharatmala on EPC mode |
2023-NHAI-162734-1 |
25/08/2023 |
28/07/2023
|
14/09/2023
Time
11:0Hrs
|
|
691 |
ENGAGEMENT OF CONSULTANCY SERVICES FOR SUPERVISION OF VARIOUS EPC PROJECTS Kothun-Lalsot-Karoli-Dholpur road, ROB Existing (Railway portion & approach) at Km 76 of old NH-116 (New NH-552Extn.) in Sawaimadhopur City & Shahpura-Thanagazi and Span Bridge over Sawamadhopur- Sheopur |
1/2023-24 |
28/07/2023 |
28/07/2023
|
28/08/2023
Time
18:0Hrs
|
|
692 |
Independent Engineer Services during Operations & Maintenance stage of Four laning of Amritsar to Wagah Border Section of NH-1 from Km. 456.100 to Km. 492.030 in the State of Punjab. |
2023-NHAI-162469-1 |
23/08/2023 |
26/07/2023
|
31/08/2023
Time
11:0Hrs
|
|
693 |
Independent Engineer (IE) Services for Operation and Maintenance Stage of Widening of Pipli-Bhavnagar-Section Pkg 1 from km136.025 to 169.328 (Design Chainage km 136.000 to 169.308) Near Adhelai Village to Nari Junction to 4L in the State of Gujarat |
2023-NHAI-162398-1 |
16/08/2023 |
26/07/2023
|
01/09/2023
Time
11:0Hrs
|
|
694 |
Supervision Consultancy (SC) Services during O and M of Two lane Maharashtra border-Sagbara-Dediapada-Netrang section of NH- 753B from Km. 117.400 to Km. 175.400 (Length 58.000 Km) in the state of Gujarat |
2023-NHAI-162413-1 |
16/08/2023 |
26/07/2023
|
08/09/2023
Time
12:0Hrs
|
|
695 |
Consultancy Services for Authoritys Engineer for Supervision of (i) Construction and Operation Maintenance of Long term measures for rectification of Accident Blackspots with Blackspots ID (1) Aslali Bypass - GJ 02-151, (2).Bidaj Patiya, GJ-02-219, (3). Vadala Junction GJ-02-214) on Ahmedabad - Vadodara section of NH-48 on EPC Basis (ii) Operation & Maintenance of Improvement Works at Dumad Junction at Merging of Ahmedabad Vadodara Section of NH-48, Ahmedabad Vadodara NE-1 & Sama-Savli Road |
2023-NHAI-162319-1 |
16/08/2023 |
25/07/2023
|
31/08/2023
Time
15:0Hrs
|
|
696 |
IE Services during 2 or 4 Laning with Paved shoulder from Km 0.000 to Km 83.453 of Dausa Lalsot Kothoon Section of NH 11A Extn. In the State of Rajasthan under NHDP Phase IV on Hybrid Annuity Mode |
NHAI/11011/Admn/2022-ROJ /Tenders/DLK/2nd |
28/08/2023 |
24/07/2023
|
11/09/2023
Time
11:0Hrs
|
|
697 |
Independent Engineer Services during O and M period of 4 laning of Singhara binjabahal section of NH 49 in the State of Odisha under HAM |
NHAI/13012/110/RO/OD/2076/2023 |
10/08/2023 |
22/07/2023
|
30/08/2023
Time
11:0Hrs
|
|
698 |
Supervision Consultancy (SC) Services during O&M stage of Six Laning of Km 108.700 to Km 263.000, Vadodara to Surat section of NH-48 in Gujarat |
2023-NHAI-161672-1 |
16/08/2023 |
19/07/2023
|
28/08/2023
Time
17:0Hrs
|
|
699 |
Consultancy Services for Supervision Consultants of O & M of Four laning of Punjab/ Haryana Border-Jind section of NH-71 from Km 238.695 to Km 307.000 on EPC mode in the State of Haryana. |
2023-NHAI-161323-1 |
02/08/2023 |
17/07/2023
|
14/08/2023
Time
11:0Hrs
|
|
700 |
Independent Engineer Services for Construction, Operation and Maintenance for Four Laning of Sattanathapuram to Nagapattinam (Design Ch.123.800 to 179.555) section of NH 45A (New NH32) in the state of Tamil Nadu & Puducherry U.T. under NHDP Phase–IV on Hybrid Annuity Mode (HAM) |
NHAI/RO Chennai/IE/NH-32/2023-24/136 |
25/07/2023 |
17/07/2023
|
22/08/2023
Time
17:0Hrs
|
|
701 |
Independent Engineer Services during operation & Maintenance period for 4/6 laning of Rohtak-Hisar section of NH-10 from Km. 87.000 to Km. 170.000 including connecting link from 87.000 (NH-10) to Km. 348.000 (NH-71) on DBFOT pattern under NHDP Phase-III in the state of Haryana. |
2023-NHAI-160951-1 |
02/08/2023 |
13/07/2023
|
10/08/2023
Time
11:0Hrs
|
|
702 |
Consultancy Services For Authority Engineer for Construction of Major Bridge with approaches across Andhari River on Design Km 249.724 on Mul- Chandrapur Road NH 930 in the Chandrapur District in the state of Maharashtra |
04/EENH/NGP/2022-23 |
13/07/2023 |
13/07/2023
|
04/08/2023
Time
17:0Hrs
|
|
703 |
Consultancy services for Authority Engineer for Four Laning of Left-Over Works of Hospet-Bellary-Karnataka/ AP border from Km 280 (Design Chainage) to Km 375 (Design Chainage) of NH-63 in the State of Karnataka on EPC Mode |
NHAI/KNT/Hospet-Bellary-KNT/AP-Border/4L/NH-63/AE/2023(2nd Call) |
13/07/2023 |
11/07/2023
|
14/08/2023
Time
11:0Hrs
|
|
704 |
Consultancy Services for Authority’s Engineer for Supervision of Balance Work of Construction of Two/Four Lane With Paved Shoulder From Km 422.000 To Km 523.600 (Chitradurga to Shivamogga Section) of NH-13 In the State of Karnataka on EPC Basis |
No.NH-KNT-2020-21-AE |
05/07/2023 |
05/07/2023
|
10/07/2023
Time
15:0Hrs
|
|
705 |
Consultancy Services for Authoritys Engineer for Supervision of Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana (2nd Call) |
2023-NHAI-158986-1 |
04/07/2023 |
04/07/2023
|
27/07/2023
Time
11:0Hrs
|
|
706 |
Consultancy services for Supervision Consultants (SC) of Operation & Maintenance of Balance work of two laning with paved shoulder of Tindivanam to Krishnagiri section of NH-66 from Km.37.600 to Km. 219.782 under NHDP Phase-III in the state of Tamil Nadu on Item Rate Contract |
NHAI/RO Chennai/SC/O&M/NH-66/2023-24/131 |
03/07/2023 |
30/06/2023
|
24/07/2023
Time
17:0Hrs
|
|
707 |
AUTHORITY’S ENGINEER FOR SUPERVISION OF “Upgradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of NH- 127B in the State of Assam under JICA ODA Loan assistance (Phase- V) on EPC mode. (3rd Call) |
NHIDCL/ASSAM/S-D/JICA5/AE /2021/199467/RFP/C3 |
28/06/2023 |
29/06/2023
|
27/07/2023
Time
15:0Hrs
|
|
708 |
Consultancy services for Authoritys Engineer for Supervision of following three Civil Projects under single consultancy package (i) Construction of Two lane with Paved shoulder for Rajgarh Bypass from Design km.0.000 to km.5.400 and Pilani Bypass from Design km.35.840 to km.43.120 of NH-709 Extn on EPC Mode (ii) Construction of Two lane with Paved Shoulder for Fatehpur Bypass (Design km.O.000 to km.7.400) Mandawa Bypass (Design km.20.925 to km.27.300) Jhunjhunu Bypass (Design km.41.625 to km |
NIT.No.02/2023-24 |
10/07/2023 |
28/06/2023
|
31/07/2023
Time
11:0Hrs
|
|
709 |
Consultancy services for Authoritys Engineer for Supervision of Work of Rehabilitation and up-gradation from km. 0.000 to km.40.390 of NH730S(Maharajganj Nichloul Thuthibari)to two lane with P.S. configuration under EPC mode in the State of U.P. |
CE-RO/LKO/NH(O)/16/ NH-730S/2022-23/AE dt 27.06.23 |
28/06/2023 |
27/06/2023
|
23/08/2023
Time
11:0Hrs
|
|
710 |
Independent Engineer for Operation & Maintenance for Kolaghat - Haldia section from km 0.000 to km 53.472 including ROB Cum Flyover from Km 52.080 to 53.472 at the end of NH-41 on OMT basis in the state of West Bengal |
08/O and M/IE/2023-24 |
25/07/2023 |
26/06/2023
|
23/08/2023
Time
12:0Hrs
|
|
711 |
Consultancy Services for Supervision Consultants of New NH-354 section from Khemkaran to start of Amritsar Bypass from Km 22.673 to Km 71.496 for length of 48.822 Km on EPC mode in the State of Punjab |
2023-NHAI-158960-1 |
14/07/2023 |
26/06/2023
|
31/07/2023
Time
11:0Hrs
|
|
712 |
Consultancy services as Independent Engineer during Operation and Maintenance for the projects in the state of Karnataka. Six laning of Bangalore-Nidaghatta Section, km 18.000 to km 74.200 of NH-275 Six laning of Nidagatta-Mysore Section, Km 74.200 to Km 135.304 of NH-275 |
NIT No.05/NHAI/RO-BNG/22016/Tender/2023-24 dated 22.06.2023 |
23/06/2023 |
23/06/2023
|
07/08/2023
Time
15:0Hrs
|
|
713 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Rehabilitation-Upgradation of Karanja-Kherda-Murtizapur Section to 4-LPS standards (Excluding overlapping portion with Samruddhi Mahamarg) section of NH 361C on EPC Mode in the state of Maharashtra. |
NH/MAH/RO/Amravati-1/AE/PKG-5 |
30/06/2023 |
22/06/2023
|
08/08/2023
Time
17:0Hrs
|
|
714 |
Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance Period for Bhubaneswar-Puri section of NH-316 (Old Section of NH-203) from Km.0.000 to km 67.400 in the State of Odisha to be executed as BOT (Toll) basis on DBFOT pattern under NHDP-III |
NHAI/13012/107/RO/OD/2023 |
03/07/2023 |
16/06/2023
|
25/07/2023
Time
11:0Hrs
|
|
715 |
CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 4 LANE PS PATTAN GREENFIELD BYPASS EXISTING CH.KM 24.320 TO KM 33.760 DESIGN CH. KM 24.400 TO KM 35.300 LENGTH 10.900 KM SBU (NH01) UT JK PROJECT BEACON BRO |
RW/CH/W(28)/JK/2022 |
16/06/2023 |
16/06/2023
|
24/07/2023
Time
15:0Hrs
|
|
716 |
SC Services during OnM stage of 2 laning with paved shoulders of Nimbi Jodha (Near Ladnu) Degana Merta City Section of NH 458 (Package I) from Km 0.000(Existing Km. 0.000) to Km. 139.900 (Existing Km. 144.377) in the State of Rajasthan |
NHAI/11011/2023-ROJ /Tenders-SC/NM |
17/07/2023 |
16/06/2023
|
02/08/2023
Time
11:0Hrs
|
|
717 |
Independent Engineer Services during Operation and Maintenance Period for Six-laning of Chilakaluripet to Nellore section of NH-16 from Km.1182.802 to Km.1366.547 (length 183.620) in the State of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) project on DBFOT pattern |
2023-NHAI-157727-1 |
06/07/2023 |
16/06/2023
|
31/08/2023
Time
15:0Hrs
|
|
718 |
CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 2 LANE PS BARAMULLA GREENFIELD BYPASS EXISTING CH. 47.020 TO 56.720 DESIGN CH. FROM 48.500 TO 62.600 LENGTH 14.100 KM IN AOR OF 760 BRTF SBU NH01 UT JK PROJECT BEACON BRO |
RW/CH/W(33)/JK/2022 |
14/06/2023 |
14/06/2023
|
24/07/2023
Time
15:0Hrs
|
|
719 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Rehabilitation/Up-gradation to 4 lane with paved shoulder of existing section in Sillod Town with Design Ch.(Km 54/500 to 60/679) (Length 6.179Km) section of NH 753-F (Aurangabad- Jalgaon road) on EPC Mode in the state of Maharashtra |
EENH/Aurangabad/Tender/NIT No.7/3001072 dt12/6/2023 |
23/06/2023 |
13/06/2023
|
03/08/2023
Time
17:30Hrs
|
|
720 |
Independent Engineer services during O and M phase for 4-lane with paved shoulder configuration of Bilaspur to Pathrapali from Km 0.000 to Km 53.300 (Package-1) section of NH- 111 (New NH- 130) in the State of Chhattisgarh under Bharatmala on Hybrid Annuity Mode on design, Build, operate and transfer |
11052/NHAI/RO-RAIPUR/TENDER/IE/O and M/B-P |
14/07/2023 |
10/06/2023
|
20/07/2023
Time
15:0Hrs
|
|
721 |
IE Services during Operation and Maintenance Period for Tada Nellore section of NH-16 and Nandigama - Ibrahimpatnam - Vijayawada section of NH-65 on BOT(Toll) and Nellore Bypass section of NH-16 (Total length 176 km) |
2023-NHAI-156526-1 |
07/06/2023 |
07/06/2023
|
29/08/2023
Time
15:0Hrs
|
|
722 |
Consultancy Services for AE for Supervision of Chotahapjan Bogapani section) (2-Lane PS) in(Package-3) Digboi Bypass (Green Field and Brownfield) (Package-4) and Digboi Bypass (Green Field and Brownfield) (2-Lane PS) (Package-5) in Assam |
NHIDCL/Assam/AE/Dib-Led Pkg-3 to 5/2023/218140 |
08/06/2023 |
06/06/2023
|
26/06/2023
Time
15:0Hrs
|
|
723 |
Consultancy services for Authority Engineer PMC for supervision of construction of one Flyover at Km 2.735 and one Major Bridge at Km 31.260 on NH 730 in the State of Uttar Pradesh Under EPC Mode |
1688 1 Tender Cashier BLY 23 Dated 06.06.2023 |
22/06/2023 |
06/06/2023
|
05/07/2023
Time
12:0Hrs
|
|
724 |
Independent Engineer services during Operation and Maintenance stage for Four laning of Hyderabad-Yadgiri section of NH 163 (Old NH-202) from Km.18.600 to Km.54.000 in the states of Telangana under NHDP Phase III on Design, Build, inance, Operate and Transfer (DBFOT) Toll basis Package No NHDP-III/BOT/AP-04 |
154035 |
12/07/2023 |
05/06/2023
|
08/08/2023
Time
11:0Hrs
|
|
725 |
Supervision Consultant (SC) during O and M stage of Two Lane with paved shoulder of Mandla-Chilpi Section of NH-12A (New NH-30) from Ch. 85.400 to Ch. 177.750 (Length 92.35 Km) in the state of Madhya Pradesh. |
2023-NHAI-156282-1 |
19/07/2023 |
05/06/2023
|
03/08/2023
Time
11:0Hrs
|
|
726 |
Independent Engineer Services during O and M period for 6 laning ofChandikhole Bhadrak section of NH 16 in the sttae of Odisha to be executed on HAM under NHDP Phase V |
NHAI/13012/100/RO/OD/2023 |
05/06/2023 |
01/06/2023
|
03/07/2023
Time
11:0Hrs
|
|
727 |
Consultancy services as Independent Engineer during Operation and Maintenance for the projects in the state of Karnataka |
NIT No.03/NHAI/RO-BNG/11018/Tender/2023-24 dated 31.05.2023 |
02/06/2023 |
31/05/2023
|
11/07/2023
Time
15:0Hrs
|
|
728 |
Consultancy services for AE for Supervision of Improvement Widening of National Highway No. 217 (Dainadubi-Darugiri Section) and (Darugiri - Songsak - Williamnagar Junction Section) to Two lane with paved shoulder ine of Meghalaya, (Lot-1) Pkg-1B |
2023-NHIDC-755609-1 |
01/07/2023 |
30/05/2023
|
10/08/2023
Time
15:0Hrs
|
|
729 |
CS of AE for Supervision of Construction of 4 lane flyover from MES College Junction to Bogmalo Junction on NH-566 from km 7.106 to km 10.460 and 4 lane VUP at Queeny Nagar Junction from km 3.330 to km 4.550 on EPC mode in the State of Goa under NH(O). |
NHAI/Goa/NH-566/AE/2023 |
30/05/2023 |
29/05/2023
|
14/02/2024
Time
11:0Hrs
|
|
730 |
Independent Engineer Services during Operation & Maintenance of 6-Lane Anandapuram – Pendurthi – Anakapalli section of NH-16 from Km.681.000 to Km.731.780 under Bharatmala Pariyojana on Hybrid Annuity Mode in the State of Andhra Pradesh |
2023-NHAI-155358-1 |
30/05/2023 |
26/05/2023
|
26/07/2023
Time
11:0Hrs
|
|
731 |
Consultancy services for AE for Supervision of Shillong Western Bypass Road of following green field projects of (Existing km 60.900 of NH-40) to NH-106 (OLD NH-44E) (Package-I,II and III) |
2023-NHIDC-755100-1 |
30/06/2023 |
26/05/2023
|
07/08/2023
Time
15:0Hrs
|
|
732 |
Consultancy services for Authoritys Engineer(AE)/PMC for supervision of Construction of Jasra bypass with four lane paved shoulder configuration from km 379.670 of NH-76 (New NH-35) to km 18.000 of NH-27 (New NH-30) on EPC mode in the State of U P |
1375/3 Com A(II)-NHCP/23 Dated.23.05.2023 |
05/06/2023 |
25/05/2023
|
22/06/2023
Time
11:0Hrs
|
|
733 |
CS of AE Services for Long Term Rectification of MoRTH identified Blackspots (17 nos) Removal of 2 At-Grade Junctions and allied works on existing 4/6-Lane Hyderabad-Vijayawada section of NH-65 from Km.40.000 to Km.221.500 in Telangana on EPC mode. |
NHAI/Tech/TS/ 17BS VUPs/AE/2023 |
30/05/2023 |
25/05/2023
|
24/06/2023
Time
11:0Hrs
|
|
734 |
Consultancy Services for Authority’s Engineer for Supervision of Balance Work of Construction of Two/Four Lane With Paved Shoulder From Km 422.000 To Km 523.600 (Chitradurga to Shivamogga Section) of NH-13 In the State of Karnataka on EPC Basis |
RW/BNG/NH-13R/Km 422-528/94/2020 |
25/05/2023 |
25/05/2023
|
10/07/2023
Time
15:0Hrs
|
|
735 |
IE Services for Operation & Maintenance for a) Four laning of Trichy to Kallagam (from km. 0.000 to km.38.700) (Package-I), b) Four laning of Kallagam to Karuppur (from km. 38.700 to Km. 50.382) and Two laning with paved shoulder from Karuppur to Meensurutti (from km. 50.382 to Km. 98.433) (Package-II) and c) Two laning with Paved Shoulder of Meensurutti to Chidambaram (from km. 98.433 to km. 129.965) (Package-III) section of NH-227 (New No.81) |
NHAI/RO Chennai/IE/O&M/NH-227/2023-24/125 |
02/06/2023 |
24/05/2023
|
26/06/2023
Time
15:0Hrs
|
|
736 |
Consultancy Services for Authority’s Engineer for Supervision of Const. of 4-Lane ROB and its approaches in replacement ofexisting (i) RUB of NH-2B at Bhedia (ii) LC No 21/SPL/E of NH-60 at Suri (iii) LC No 39/A/3E of NH-60 at Bishnupur-II (iv) LCNo KA-34 of NH-60 at Kubai (v) LC No 38 of NH-60 at Kadamdiha in West Bengal. (2nd Call) |
MORTH/RO-KOL/NIT/AE/2023-24/09(2nd Call) |
22/05/2023 |
22/05/2023
|
07/07/2023
Time
15:0Hrs
|
|
737 |
Consultancy services as Authoritys Engineer for Supervision of i) Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136500 near Hejaichak to km 156489 near P Leikul (Package-9) on EPC mode ii) Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156489 near P Leikul to km 176581 near Borowapu (Package-10) on EPC mode |
NHIDCL/Assam/AE Tamenglong -Mahur Pkg 9 and 10 /2 |
02/06/2023 |
19/05/2023
|
13/07/2023
Time
15:0Hrs
|
|
738 |
Consultancy Services for Authority’s Engineer for Supervision of ‘Construction of four-lane Concrete Road from Police Headquarter Gondia City to Rawanwadi Village (Birsi Airport Junction) from design km 0.000 to km 15.781 (existing km 39/720 of NH-753 to existing Km 8/400 of NH 543) on section from Kohmara - Goregaon- Police Headquarter (Karanja) - Collector Office Square - Balaghat T Point- Rawanwadi - Rajegaon of NH-753 and NH-543 in Gondia District in the state of Maharashtra on EPC Mode |
02/EENH/NGP/2023-24/ 2094 |
21/05/2023 |
19/05/2023
|
14/07/2023
Time
17:0Hrs
|
|
739 |
Consultancy Services as Authority’s Engineer for Supervision of (i) Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal- Ukhrul-Jessami Economic Corridor from Design Chainage km 53.110 to 95.700 (Package-5) in the State of Manipur on EPC Mode under Bharatmala Pariyojana (ii) Widening/Improvement to 2 (Two) lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor fr |
NHIDCL/Manipur/AE/U-J (Pkg-5, 6, 7) & (UTT Pkg-2)/2023 |
22/05/2023 |
19/05/2023
|
31/07/2023
Time
15:0Hrs
|
|
740 |
Consultancy Services as Authoritys Engineer for Supervision of i) Widening Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) starting near Jiri River (Assam/Manipur Border) at km 96870 and ending near Hangrum at km 116550 (Package – 7) (Length-1968 km) ii) Widening Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) starting from km 116480 near Hangrum to km 136500 near Hejaichak (Package-8) under NH(O)-NE |
NHIDCL/Assam/AE/Tamenglong - MahurPkg-7 and 8/202 |
31/05/2023 |
18/05/2023
|
13/07/2023
Time
15:0Hrs
|
|
741 |
Consultancy Services as AE for Supervision of) Construction of Four Lane Panchgram Bypass and Construction of Four Lane Badarpur Bypass in the State of Assam on EPC Mode |
NHIDCL/Assam/AE/PB Bypass/2023/222392 |
08/06/2023 |
18/05/2023
|
06/07/2023
Time
15:0Hrs
|
|
742 |
Consultancy Services as AE for Supervision of Four laning of Silchar - Dhanehari section (Package-1) and Dhanehari - Lailapur / Vairengte section (Package-2) in the State of Assam |
NHIDCL/Assam/Silchar-Vairengte Pkg-1&2/AE/2023/2023 |
08/06/2023 |
18/05/2023
|
06/07/2023
Time
15:0Hrs
|
|
743 |
Consultancy Services as AE for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Bilasipura- Guwahati road(NH 17) to Milmila RF in the state of Assam on EPC mode (Package-9 and 10) |
NHIDCL/Assam/Bil-Ghy Pkg-9 and 10/2023/218181 |
08/06/2023 |
17/05/2023
|
06/07/2023
Time
15:0Hrs
|
|
744 |
Consultancy Services as AE for Supervision of Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km (Kandulijan Gaon) to (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-1 -2- 3) |
NHIDCL/Assam/AE /KandulijanGaon-Oyan Pkg-1,2,3 |
07/06/2023 |
17/05/2023
|
13/07/2023
Time
16:0Hrs
|
|
745 |
Consultancy services for Authoritys Engineer for supervision of Construction of Kaithi-Padaria Kala bypass, start of Pawai Bypass to end of ChandiaGhat realignment of NH-43Extn on NH 339 in the State of Madhya Pradesh on EPC Mode |
2023-MoRTH-753202-1 |
21/05/2023 |
15/05/2023
|
08/08/2023
Time
17:30Hrs
|
|
746 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of Six lane Elevated Corridor from Km. 508.000 to Km. 513.150 including approaches on NH-66 in the State of Goa on EPC mode. |
RO/MUM/AE-2023-24 |
28/05/2023 |
15/05/2023
|
30/06/2023
Time
17:0Hrs
|
|
747 |
Independent Engineer Services for Operation and Maintenance stage under TOT mode of four laning with paved shoulder of Porbandar-Jetpur section of NH-27 from km 1-960 to 117-600 in the state of Gujarat |
2023-NHAI-154025-1 |
16/05/2023 |
12/05/2023
|
12/06/2023
Time
11:0Hrs
|
|
748 |
Consultancy Services For Authoritys Engineer For Supervision Of Rehabilitation and upgradation to 2-lane with paved shoulder configuration of Jirapur-Susner MP-RJ Border Road, Khilchipur Bypass of Section of NH-752B and Biaora Bypass of Section of NH-752B Total design length 57.29 km in the State of Madhya Pradesh under EPC Mode |
2023-MoRTH-751202-1 |
23/04/2023 |
11/05/2023
|
02/08/2023
Time
17:30Hrs
|
|
749 |
Consultancy Services For Authoritys Engineer For Supervision of Upgradation of Jirapur-Pachore road including Pachore, Jirapur, Chhapiheda and Khujner Bypasses Section of NH 752 C and Shujalpur Bypass section of NH-752C Total Design length 69.26 km in the state Madhya Pradesh on EPC mode |
2023-MoRTH-751195-1 |
23/04/2023 |
11/05/2023
|
02/08/2023
Time
17:30Hrs
|
|
750 |
CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 2 LANE PS BARAMULLA GREENFIELD BYPASS EXISTING CH. 47.020 TO 56.720 DESIGN CH. FROM 48.500 TO 62.600 LENGTH 14.100 KM IN AOR OF 760 BRTF SBU NH01 UT JK PROJECT BEACON BRO |
RW/CH/W(33)/JK/2022 |
10/05/2023 |
10/05/2023
|
09/06/2023
Time
17:0Hrs
|
|
751 |
IE Services for Operation and Maintenance of Madurai to Kayathar section from km 0-000 to km 116-500 of NH-44 on TOT mode in the state of Tamil Nadu |
2023-NHAI-153769-1 |
11/05/2023 |
10/05/2023
|
15/06/2023
Time
11:0Hrs
|
|
752 |
Independent Engineer Services for Operation & Maintenance of (i) Kayathar-Nanguneri section from km 116-500 to km 180-000 of NH-44 (old No 7) on TOT mode in the state of Tamil Nadu, and (ii) Nanguneri-Kanyakumari section from km 180-000 to km 243-470 of NH-44 (Old No 7) on TOT mode in the state of Tamil Nadu |
2023-NHAI-153776-1 |
12/05/2023 |
10/05/2023
|
15/06/2023
Time
11:0Hrs
|
|
753 |
IES for Supervision of i Construction of 4/6 Lane Northern Ayodhya Bypass total length of 35.40 kms of Part 1 north of NH27 and Part2 south of NH27 ii Construction of 4/6 Lane Southern Ayodhya Bypass from km 5.000 to km 37.172 of total length of 32.1 |
2023-NHAI-153764-1-1 |
08/09/2023 |
10/05/2023
|
29/02/2024
Time
11:0Hrs
|
|
754 |
IES for Supervision of i-Construction of 4-6 Lane Northern Ayodhya Bypass total length of 35.40 kms of Part-1 north of NH27 and Part2 south of NH27 ii-Construction of 4-6 Lane Southern Ayodhya Bypass from km 5.000 to km 37.172 of total length of 32.1 |
2023-NHAI-153764-1 |
31/08/2023 |
10/05/2023
|
05/09/2023
Time
11:0Hrs
|
|
755 |
Supervision Consultant (SC) Services for O & M phase of 4/6L of Khed (Km. 42.00) to Sinnar (Km. 177.00) of NH - 60 (Old NH - 50) in the State of Maharashtra |
NHAI/RO/MUM/PUNE/KS/SC/2023/4 |
09/05/2023 |
09/05/2023
|
22/06/2023
Time
11:0Hrs
|
|
756 |
CS FOR AE FOR SUPERVISION OF CONSTRUCTION OF 4 LANE PS PATTAN GREENFIELD BYPASS EXISTING CH. KM 24.320 TO KM 33.760 DESIGN CH. KM 24.400 TO KM 35.300 LENGTH 10.900 KM SBU(NH01) UT JK PROJECT BEACON BRO |
RW/CH/W(28)/JK/2022 |
09/05/2023 |
09/05/2023
|
09/06/2023
Time
17:0Hrs
|
|
757 |
Consultancy Services for Authoritys Engineer for Supervision of Construction of 2 lane with paved shoulders in Harpalpur bypass from km 0/000 to km 9/630 on NH 339 (old NH 76) in the State of Madhya Pradesh on EPC Mode |
2023-MoRTH-751239-1 |
27/04/2023 |
08/05/2023
|
08/08/2023
Time
17:30Hrs
|
|
758 |
Consultancy services for authority engineer/ PMC for supervision of rehabilitation and up- gradation from km. 51.600 to km. 75.700 of NH 321G (Nuhkhas to Etah section) to two lane with paved shoulder configuration under EPC Mode in the State of UP |
761M/13M-NHCK/23 Dated 03.06.2023 |
17/05/2023 |
05/05/2023
|
05/07/2023
Time
17:0Hrs
|
|
759 |
Consultancy services for authority engineer/ PMC for supervision of Rehabilitation and Up-Gradation to Four Lane Road From Km. 70.500 to Km. 78.600 of NH-92 Under EPC Mode in The State of Uttar Pradesh ON EPC |
762M/13M-NHCK/23 dated 03.05.2023 |
18/05/2023 |
05/05/2023
|
05/07/2023
Time
17:0Hrs
|
|
760 |
SC Services during OnM stage of 2 laning with paved Shoulders of Manoharpur Dausa of NH 11A (New NH-148) from Km. 62.100(Design Ch. 0.000 (Design Ch.62.318) in the State of Rajasthan |
NHAI/11011/1/tenders-ROJ/SC-MD |
29/05/2023 |
05/05/2023
|
22/06/2023
Time
11:0Hrs
|
|
761 |
Consultancy services for Authoritys Engineer for Supervision of Construction of Mihona bypass, Lahar bypass, Daboh bypass and Bhander Bypass (total length 20.60 km) to 2-lane with paved shoulder from on Mihona-Bhander-UP border section of NH 552E in the State of Madhya Pradesh |
751893 |
07/05/2023 |
04/05/2023
|
09/06/2023
Time
17:30Hrs
|
|
762 |
IE services for Improvement and Upgradation to 4Lane with PS configuration from Existing Km 0.000 to Km 39.500 Design Ch 0.500 to Ch 40.342 Design length 40.842 Km of NH227A near Mehrauna Ghat UP Bihar Border to Siwan in the state of Bihar on HAM |
NH-12030/5/2022-RO Patna/NH-227A/IE |
05/05/2023 |
03/05/2023
|
17/06/2024
Time
11:0Hrs
|
|
763 |
Consultancy Services of Supervision Consultant during Oand M phase from Malshej Ghat to Ane Ghat Km 101 000 to Km 161 570, from end of Ane Ghat to Start of Ahmednagar Bypass Km 161 570 to Km 211 000 and from Kharwandi Kasar to Junction of NH 211 Km 284 000 to Km 337 000 of two lane with paved shoulder on NH 61 in the state of Maharashtra. |
2 |
03/05/2023 |
03/05/2023
|
20/06/2023
Time
11:0Hrs
|
|
764 |
Consultancy Services for Authority Engineer of Operation & Maintenance of Pollachi to Coimbatore Section of NH-83 (Km.123.550 to Km.150.400 of Old NH 209) in the State of Tamil Nadu |
NHAI/RO-Chennai/AE/O&M/ 2023-24/118 |
11/05/2023 |
02/05/2023
|
06/06/2023
Time
15:0Hrs
|
|
765 |
Consultancy services as AEs for Supervision of Construction of four lane with paved shoulder Agartala bypass (Western side-length 25402 m) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in the state of Tripura on EPC basis |
NHIDCL/Tripura/AE/A-L/Agt Western Bypass/2023 |
04/05/2023 |
01/05/2023
|
08/06/2023
Time
15:0Hrs
|
|
766 |
Independent Engineer services during O&M phase for four laning of Sangli-Solapur section of NH-166 from Km. 182/556 to Km. 378/100 (Length 194.644 Km) in the state of Maharashtra on HAM. |
NHAI/RO/MUM/SLP/NH-166/IE/O&M/2023-24/29 |
01/05/2023 |
28/04/2023
|
22/06/2023
Time
11:0Hrs
|
|
767 |
Independent Engineer services during O&M phase for 4 laning of Solapur to Vijayapura section of NH-52 from Design Ch 0 to Ch 110 542 in the State of Maharashtra & Karnataka on DBFOT mode & Akkalkot – Solapur section of NH-150E with paved shoulders from design chainage Km 99 400 to Km 138 352/ Existing Chainage from Km 102 819 to Km 141 800 (Design length-38 952 km) including Akkalkot Bypass (Design Length 7 350 Km) in the state of Maharashtra on HAM |
NHAI/RO/MUM/SLP/NH-52/IE/O&M/2023-24/30 |
01/05/2023 |
28/04/2023
|
22/06/2023
Time
11:0Hrs
|
|
768 |
Consultancy services for Authority Engineer (AE) for supervision of Widening and Strengthening from km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to Two lane with paved shoulder configuration in the state of Uttar Pradesh |
1222/354Com-4-NH Circle/23 Dt. 21.04.2023 |
25/04/2023 |
25/04/2023
|
19/05/2023
Time
12:0Hrs
|
|
769 |
Consultancy services of AE for Supervision of Construction Widening of Structures ie MJB MNB ROB LVUP etc rectification of drainage and rain cuts and other works and operation & Maintenance of remaining stretch of Panipat Jalandhar section of NH-44 from Km 96 000 to Km 387 100 in the state of Haryana and Punjab on EPC mode |
2023-NHAI-152484-1 |
10/05/2023 |
25/04/2023
|
24/05/2023
Time
11:0Hrs
|
|
770 |
Consultancy services for authority’s engineer for supervision of rehabilitation and upgradation to 2-lanes with paved shoulder configuration of Mahud - Sangola of NH-965G from km 159.400 to 161.900 and 162.400 to 183.960 km (design from km 32.300 to km 34.800 to km 35.300 to km 56.860) on EPC mode in the state of Maharashtra |
NO/NHD/TC/873/2023 |
05/05/2023 |
21/04/2023
|
26/07/2023
Time
17:30Hrs
|
|
771 |
Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance including Supervision of Completion of Balance work of Losari to Ongole Section (4 Packages) of NH-216 (i.e. from 34.230 to 254.500 of NH-214A(NH216)) to 2 Lane with paved shoulder in the state of Andhra Pradesh on EPC Basis |
MORTH/PIU/MTM/NH-216/O/MCo |
24/04/2023 |
21/04/2023
|
08/06/2023
Time
17:0Hrs
|
|
772 |
Independent Engineer Services during Operation and Maintenance stage of Six Lane Agra-Etawah Bypass Section of NH 2 from Km. 199.660 to Km. 323.525 under NHDP Phase V in the State of Uttar Pradesh on BOT Toll basis |
NHAI/PIU/AGRA/Misc./31 |
30/05/2023 |
21/04/2023
|
05/06/2023
Time
11:0Hrs
|
|
773 |
Consultancy services for authority’s engineer for supervision of rehabilitation and upgradation to 2-lanes with paved shoulder configuration of Mahud - Sangola of NH-965G from km 159.400 to 161.900 and 162.400 to 183.960 km (design from km 32.300 to km 34.800 to km 35.300 to km 56.860) on EPC mode in the state of Maharashtra |
NO/NHD/TC/873/2023 |
19/07/2023 |
21/04/2023
|
11/08/2023
Time
17:30Hrs
|
|
774 |
Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance including Supervision of Completion of Balance work of Timmapuram to Losari Section (5 Pcakages) of NH-216 (i.e. from Km 26.150 to Km 135.740 of NH-214(New NH-216) and i.e. from Km 0.000 to Km 34.230 of NH-214A (New NH-216)to 2 Lane with paved shoulder in the state of Andhra Pradesh |
MORTH/PIU/MTM/NH-216/O/MCo. |
24/04/2023 |
20/04/2023
|
05/06/2023
Time
16:0Hrs
|
|
775 |
Consultancy services for Authority’s Engineer for Development of Six lane green field Ring Road (Package-III) starts from Design Ch.51.200 to Design Ch. 68.650 (Length=17.450 kms) around Kanpur City and Construction of 4- lane Airport link road (Length = 1.45 km) at Chainage 62.090 of Kanpur ring road in the state of Uttar Pradesh on EPC mode |
2023-NHAI-152038-1 |
17/05/2023 |
19/04/2023
|
08/06/2023
Time
11:0Hrs
|
|
776 |
Independent Engineer Services during O&M Period for 2 laning of Khagaria – Purnea Section of NH – 31 from Km. 270.00 to Km. 410.00 in the state of Bihar under NHDP III on Design, Built, Finance, Operate and Transfer (DBOT) Annuity. |
185/RO-Patna/NHAI/2023-24 |
17/04/2023 |
17/04/2023
|
15/05/2023
Time
11:0Hrs
|
|
777 |
CS for AE for Supervision of “Construction of Six Lane Elevated Kona Expressway from Km. 0.145 to Km. 7.337 of NH-117 in the state of West Bengal on EPC mode |
2023-NHAI-151542-1 |
17/04/2023 |
17/04/2023
|
18/05/2023
Time
11:0Hrs
|
|
778 |
Independent Engineer Services for Operation and Maintenance of 4/6 lane section of NH-34 from Km. 149.900 (Aligarh) to Km. 302.108 (Naviganj) (Aligarh-Kanpur Section Pkg.-I to III) in the State of Uttar Pradesh on Hybrid Annuity Mode |
NHAI/ALG/15022/Pkg-I to III/IE/OM/Tender/01 |
30/05/2023 |
15/04/2023
|
04/07/2023
Time
12:0Hrs
|
|
779 |
Independent Engineer Services during Operation & Maintenance stage of Four Laning of Garamore to Samakhiyali section (From Km 254-537 to Km 306-000) of NH-27 in the state of Gujarat under TOT project. |
2023-NHAI-151670-1 |
18/04/2023 |
14/04/2023
|
23/05/2023
Time
11:0Hrs
|
|
780 |
Independent Engineer Services during Operation and Maintenance stage of Four Laning of Bamanbore to Garamore section (from Km 182-600 to Km 254-537) of NH27 in the state of Gujarat under TOT project. |
2023-NHAI-151661-1 |
17/04/2023 |
14/04/2023
|
23/05/2023
Time
11:0Hrs
|
|
781 |
Supervision Consultancy Services during Operation and Maintenance of Lucknow-Kanpur Section (Km. 28.000 to Km. 80.960) of NH-25, Lucknow Bypass Section (Km. 0.000 to Km. 22.875) of NH-56 A&B, Lucknow Outer Ring Road-3B (Km.79.516/79.000 to Km. 94.457/93.473) and Lucknow Outer Ring Road-Kisan Path (Km.0.491/0.495 to Km. 11.660/12.210) total length 102 Km in the State of Uttar Pradesh |
PIU-LKO/SC/NH-27-LRR/2023/02 |
13/04/2023 |
13/04/2023
|
27/05/2023
Time
11:0Hrs
|
|
782 |
Consultancy services for SC of 2 laning with paved shoulders of Tonk Sawaimadhopur Section from Km. 1.300 to Km. 69.750 of NH 116 in the State of Rajasthan under NHDP Phase IV on EPC mode |
NHAI/11011/1/Tender-ROJ/SC-TSm |
24/05/2023 |
13/04/2023
|
30/05/2023
Time
11:0Hrs
|
-
|
783 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitaion and Up-gradation of Guhagar Chiplun Helwak Road 2LPS configuration in the state of Maharashtra on EPC Mode Rampur-Chiplun-Helwak Section. |
03/NHD/AB/TC/2022-23 |
04/06/2023 |
11/04/2023
|
20/06/2023
Time
17:30Hrs
|
|
784 |
Independent Engineer Services during Operation and Maintenance stage of Six Lane Handia-Rajatalab (Varanasi) Section of NH-19 (Old NH-02) from Km 712-900 to Km 785-544 in the state of Uttar Pradesh under TOT project |
2023-NHAI-151389-1 |
20/04/2023 |
11/04/2023
|
18/05/2023
Time
11:0Hrs
|
|
785 |
Authoritys Engineer for Supervision of Rehabilitation and Up- gradation for Talere Gaganbawda Kolhapur Road (NH-166G) stretches start from Start of Karul Ghat to End of Gaganbawda of NH-166G in the State of Maharashtra on EPC Mode. |
02/NHD/AB/TC/2022-23 |
03/05/2023 |
11/04/2023
|
20/06/2023
Time
17:30Hrs
|
|
786 |
Consultancy Services for Authoritys Engineer for Supervision of Upgradation of Keonchi-Ratanpur Road Package-I Design Ch. Km. 237.860 to Km. 273.200 and Package-II Design Ch. Km. 278.750 to Km. 321.348 of NH-45 to two lane with paved shoulders with Flexible Pavement in the state of Chhattisgarh on EPC mode |
01/CE/NH/TC/44-01/2023 |
17/04/2023 |
10/04/2023
|
25/05/2023
Time
11:0Hrs
|
|
787 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF UPGRADATION OF PACKAGE-II MUNGELI TO PONDI FROM NH KM 51.600 TO KM 77.870 and 80.970 TO KM 96.970 AND PACKAGE-III TAKHATPUR BYPASS FROM DESIGN CH. 18.700 TO 25.900 MUNGELI BYPASS FROM DESIGN CH. 39.600 TO 51.600 PANDARIYA BYPASS FROM DESIGN CH. 77.900 TO 81.000 and PONDI BYPASS FROM DESIGN CH. 97.000 TO 100.395 OF NH-130A TO TWO LANE WITH PAVED SHOULDERS WITH FLEXIBLE PAVEMENT IN THE STATE OF CHHATTISGARH ON EPC MODE. |
02/CE/NH/TC/44-02/2023 |
17/04/2023 |
10/04/2023
|
25/05/2023
Time
11:0Hrs
|
|
788 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF UPGRADATION OF PACKAGE-I RAJPURI KHURD VILLAGE TO PADIH VILLAGE SECTION FROM EXISTING KM 7.830 TO KM 57.650 DESIGN CH.13.700 TO CH. 62.700 AND PACKAGE-III BADKI MAHRI VILLAGE TO RAMANUJGANJ SECTION FROM EXISTING KM 80.600 TO KM 110.330 DESIGN CH. 85.370 TO CH. 114.800 OF NH-343 TO TWO LANE WITH PAVED SHOULDERS WITH FLEXIBLE PAVEMENT IN THE STATE OF CHHATTISGARH ON EPC MODE |
03/CE/NH/TC/44-03/2023 |
17/04/2023 |
10/04/2023
|
25/05/2023
Time
11:0Hrs
|
|
789 |
Consultancy Services of Independent Engineer for the project Improvement and Up-gradation of Existing Road to Four laning of NH 530B from Kasganj Bypass End (Existing Km. 150.100 of NH 530B/ Design Km. 123.100) to Chandan Nagar (Existing Km 96.200 of NH 530B/Design Km. 179.500) section of NH 530B -(Package 3) - in the State of Uttar Pradesh on HAM mode |
NHAI/11013/NH-530B/MHB/PKG-III/KB/2023/IE/E-198202 |
10/04/2023 |
10/04/2023
|
05/06/2023
Time
11:0Hrs
|
|
790 |
Consultancy Services for Supervision Consultants of Operation & Maintenance of Tambaram to Tindivanam section of NH-32 (Old No.45) from Km.28/000 to Km.121/000 in the State of Tamil Nadu |
NHAI/RO-Chennai/SC/O&M/2022-23/114 |
10/04/2023 |
07/04/2023
|
16/05/2023
Time
17:0Hrs
|
|
791 |
Independent Engineer services for Construction of 4 Lane Bypass to NH114A Connecting NH-333 and NH-133(Deoghar Bypass) from design km 0.000 to design Km 49.000(Total Length 49.000 km) in the state of Jharkhand on HAM |
2023-NHAI-151115-1 |
12/04/2023 |
06/04/2023
|
13/11/2023
Time
11:0Hrs
|
|
792 |
CS for AE for Supervision of Const. of Initial Improvement works n supervision of ATMS/TMS installation under TOT of Shivpuri-Jhansi (from km 1305.087 to km 1380.387) in MP and Agra Bypass (from km 0.000 to km 32.800) in UP. |
NHIPMPL/2022-23/ Shivpuri-Jhansi n Agra Bypass/AE/ |
06/04/2023 |
05/04/2023
|
30/05/2023
Time
11:0Hrs
|
|
793 |
Supervision Consultancy services during Operation and maintenance stage for Ghoshpukur to Dhupguri section of NH-31D and Salsalabari to Assam Bengal Section of NH-31C in the state of West Bengal |
10/Ghosh-Dhup and Salsa-Assm/SC/22-23 |
03/04/2023 |
03/04/2023
|
29/05/2023
Time
12:0Hrs
|
|
794 |
Consultancy services for AE for Supervision of Improvement and rehabilitation of Existing Ayodhya Bypass from design km 121.600 to Design km 144.020 (Length 22.420 Km) of NH-28 (New NH-27) of EPC Mode under BMP in the state of Uttar Pradesh |
NHAI/UP(W)/Existing AyodhyaBypass/AE/2023 |
17/04/2023 |
31/03/2023
|
01/05/2023
Time
11:0Hrs
|
|
795 |
Selection of AUTHORITYS Engineer (AE) PMC Services for Supervision of Construction of Mariahu Bypass with four lane paved shoulder configuration (Km. 53.540 to Km.59.200) of NH-135A on EPC mode in the state of Uttar Pradesh. |
840/NH-135A-NHCP-22/23 Dated. 27.03.2023 Tender |
01/04/2023 |
29/03/2023
|
10/06/2023
Time
11:0Hrs
|
|
796 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Up-gradation to four lane/ two lane with paved shoulders configuration of Kaylan - Murbad - Malshej Ghat - Nirmal Road NH- 61 km 15/200 to Km 38/00 and from Km. 58/00 to Km 84/00 (design length 48.55 km) of NH-61 on EPC Mode in Thane District in the state of Maharashtra |
NH/MAH/RO/Mum-1/AE/PKG-4 |
07/05/2023 |
29/03/2023
|
01/06/2023
Time
17:0Hrs
|
|
797 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WIDENING AND STRENGTHENING/RECONSTRUCTION TO FOUR LANE/FOUR LANE WITH SERVICE ROAD INCLUDING STRUCTURES FROM POKHARIA MORE AT KM47.600 (EX. KM 50.230) TO GOVINDPUR AT KM 62.949 (EX. KM 65.325) OF NH-419 IN THE STATE OF JHARKHAND UNDER EPC MODE |
RW/Ranchi/AP-24/2021-22/JHR |
29/03/2023 |
28/03/2023
|
11/05/2023
Time
10:30Hrs
|
|
798 |
Independent Engineer Services during Operation and Maintenance period of 5 years for Six laning and Strengthening of NH-248A from existing km 2.740 Rajiv Chowk to km 24.536 Design Ch Km 0.340 to Km 22.136 in in the State of Haryana under NHDP-IV on Hybrid Annuity Mode |
2023-NHAI-150439-1 |
29/03/2023 |
28/03/2023
|
20/06/2023
Time
11:0Hrs
|
|
799 |
Independent Engineering Services for Four Laning of Behsuma - Bijnor Section of NH-119 from Design Ch.39.250 km (Existing chainage 39.240) to Design Ch. 78.810 km (Existing chainage 89.590) with Design Length 39.560 km in the State of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojna |
2023-NHAI-150329-1 |
17/04/2023 |
27/03/2023
|
01/05/2023
Time
11:0Hrs
|
|
800 |
Consultancy Services For Authority Engineer for Construction of Major Bridge on Shivni River at design chainage from Km. 122.080 to Km. 123.100 on NH 353C along with approaches of 940m (Total Length . 1020m) of National Highway Sakoli Lakhandur Wa |
13/EENH/GAD/2022-23 |
10/05/2023 |
24/03/2023
|
17/05/2023
Time
17:0Hrs
|
|
801 |
Consultancy Services for Authority Engineers for Construction Of Seven Minor Bridge On Allapalli Bhamragad Laheri Binagunda Naraynpur National Highway (NH) 130D (Section from Allapalli to Bhamragd) At Chainage 2.400 km, 9.200 km, 14.200 km, 32.600 km, 34.200 km, 43.400 km and 46.400 km. in Gadchiroli District In State Of Maharashtra on EPC mode. (Total 1.645 km With Approaches.). |
NIT13/EENHD/GAD/2022-23 |
12/05/2023 |
24/03/2023
|
17/05/2023
Time
17:0Hrs
|
|
802 |
IE Services during OnM stage of 2 lane with paved shoulder of NH 70 from Munabao Sundra Myajlar Dhanana Asutar Ghotaru Tanotunder Phase I of Bharatmala Pariyojna in the state of Rajasthan on HAM |
NHAI/11011/2/ROJ-Tenders/IE-MT |
13/05/2023 |
23/03/2023
|
18/05/2023
Time
11:0Hrs
|
|
803 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Upgradation of Jharkheda- Berasia - Dholkhedi from km 0/000 to km 87/900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode |
2023-MoRTH-746890-1 |
24/03/2023 |
23/03/2023
|
12/06/2023
Time
17:30Hrs
|
|
804 |
Consultancy Services for AE for supervision of design & construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk (Design Length – 8.90 km) in Nagpur city on Nagpur-Umred section of NH-353D in the state of Maharashtra on EPC mode |
NHAI/Tech/MH/AE/Indora Flyover/2023 |
03/04/2023 |
21/03/2023
|
24/04/2023
Time
11:0Hrs
|
|
805 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation/Upgradation from Lagam to Alapalli to 2L.PS / 4 lane configuration section of NH-353 C in Gadchiroli District in the state of Maharashtra on EPC mode |
NH/MAH/RO/Ngp-1/AE/PKG-1 |
13/04/2023 |
21/03/2023
|
01/06/2023
Time
17:0Hrs
|
|
806 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Up-gradation to 4 lane configuration for the work of Peth Naka to Sangli Road (section of NH-166H in the state of Maharashtra on EPC mode. |
NH/MAH/RO/Pune-1/AE/PKG-2 |
13/04/2023 |
21/03/2023
|
01/06/2023
Time
17:0Hrs
|
|
807 |
Consultancy services for Authority’s Engineer for Supervision of balance work and Operation & Maintenance of project of Four Laning of Kodebad -Dhamtari section (Km 43.400 to Km 82.209) of NH-30 in the state of Chhattisgarh under NHDP-IV through EPC mode |
NHAI/CG/Kod-Dhamtari/NH-30/AE/2023 |
13/04/2023 |
21/03/2023
|
25/04/2023
Time
11:0Hrs
|
|
808 |
Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Audireddipalle (Ch. 160.000) to Chandrasekharpuram (Ch. 228.000) of [NH-544G] Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-III)-2nd Call |
NHAI/BM/EC/Bengaluru-Vijayawada/IE/PkgIII/2022 |
21/03/2023 |
21/03/2023
|
20/04/2023
Time
11:0Hrs
|
|
809 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Rehabilitation, Upgradation and Widening of existing Highway to Rigid Pavement 2 Lane/2LPS of NH 965DD from Lonand Shirval-Bhor Mandangad-Pachral Section Shindewadi Phata to Varandha Ghat Dist Border in the state of Maharashtra. |
NH/MAH/RO/Pune-2/AE/PKG-3 |
06/05/2023 |
21/03/2023
|
01/06/2023
Time
17:0Hrs
|
|
810 |
Consultancy services for Authority Engineer for supervision of Construction of MSL rd to NHDL Specification for Design chainage km 244pt000 to km 268pt670 on NH 03(Taken Manali as Km 0pt000) under project Himank in Ladakh(UT) on EPC mode(Length 24pt670 Km) |
HIMANK/EPC/14/2022-23 |
20/03/2023 |
20/03/2023
|
04/05/2023
Time
11:0Hrs
|
|
811 |
IE Services for Six laning of Surat – Nashik – Ahmednagar – Solapur – MH/KNT Border Greenfield stretch [(a) Package –IV and (b) Package –V] in the State of Maharashtra to be executed on HAM under Bharatmala Pariyojana |
NHAI/Tech/MH/IE/S–N–A–S (Pkg-IV & V)/2023 |
03/04/2023 |
16/03/2023
|
20/08/2024
Time
11:0Hrs
|
|
812 |
IE Services for Six laning of Surat – Nashik – Ahmednagar – Solapur – MH/KNT Border Greenfield stretch [Package –XIV from km 512.000 (Hasapur) to km 548.400 (Badadal)] in the State of Maharashtra to be executed on HAM under Bharatmala Pariyojana |
NHAI/Tech/MH/IE/S–N–A–S (Pkg-XIV)/2023 |
03/04/2023 |
16/03/2023
|
14/04/2023
Time
11:0Hrs
|
|
813 |
Operation and Maintenance of Gorakhpur Bypass |
148894 |
09/05/2023 |
15/03/2023
|
18/05/2023
Time
12:0Hrs
|
|
814 |
Independent Engineer Services for Supervision of Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua Adhaura road in Bhairopur village to Konki village (from Km. 54.000 to Km. 90.000) under Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode |
NHAI/BM/Varanasi-Kolkata/2023/Pkg3/IE |
22/03/2023 |
14/03/2023
|
20/04/2023
Time
11:0Hrs
|
|
815 |
Independent Engineer Services for Supervision of Construction of 6lane Greenfield Varanasi Ranchi Kolkata Highway from junction with NH19 & Varanasi Ring Road near Rewasa village to junction with Bhabhua-Adhaura road near Palka village (from Km. 0.000 to Km. 54.000) under Bharatmala Pariyojana in the state of Uttar Pradesh & Bihar on Hybrid Annuity Mode |
NHAI/BM/Varanasi-Kolkata/2023/Pkg1&2/IE |
22/03/2023 |
10/03/2023
|
20/04/2023
Time
11:0Hrs
|
|
816 |
Supervision Consultancy Services (SC) for Supervision of Operation and Maintenance including Incident Management for the 4-laning stretch of Kathipudi to start of Kakinada bypass from Km.0.000 to Km.27.500 of NH 216 in the state of Andhra Pradesh |
2023-NHAI-148323-1 |
21/03/2023 |
08/03/2023
|
10/05/2023
Time
16:0Hrs
|
|
817 |
Independent Engineer Services during Operation and Maintenance period for Six Laning of Etawah to Chakeri (Kanpur) Section of NH-2 from Km. 323.475 to Km. 483.687 on DBFOT (Toll) Basis under NHDP Phase V in the State of Uttar Pradesh |
24001/1/RO-W-UP/E-C/IE/2023 |
27/03/2023 |
07/03/2023
|
30/03/2023
Time
12:0Hrs
|
|
818 |
Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi Ranchi Kolkata Highway from Sonepurbigha village to junction with NH 100 in Deoria village from km 184.700 to km 253.000 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode |
NHAI/BM/Varanasi-Kolkata/2023/Pkg8&9/IE |
22/03/2023 |
06/03/2023
|
25/04/2023
Time
11:0Hrs
|
|
819 |
Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi Ranchi Kolkata Highway from Deoria village to junction with NH 20 in Bongabar village from km 253.000 to km 325.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode |
NHAI/BM/Varanasi-Kolkata/2023/Pkg10&11/IE |
22/03/2023 |
06/03/2023
|
25/04/2023
Time
11:0Hrs
|
|
820 |
Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi Ranchi Kolkata Highway from junction with NH 20 in Bongabar village to Kamlapur village (JH/WB border) from km 325.500 to km 387.200 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode |
NHAI/BM/Varanasi-Kolkata/2023/Pkg12&13/IE |
22/03/2023 |
06/03/2023
|
25/04/2023
Time
11:0Hrs
|
|
821 |
Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi-Ranchi-Kolkata Highway from Pachmon village to Sagrampur village (From KM. 116.000 to KM. 184.700) under Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode |
NHAI/BM/Varanasi-Kolkata/2023/Pkg6&7/IE |
22/03/2023 |
06/03/2023
|
20/04/2023
Time
11:0Hrs
|
|
822 |
Consultancy Services for Supervision Consultants of O & M of Four lanes with paved shoulders of Lambra-Shahkot Section NH-71 (New NH-703) from existing km 12.000 to 44.600 including construction of Nakodar and Shahkot Bypasses in the State of Punjab. |
2023-NHAI-148105-1 |
03/04/2023 |
06/03/2023
|
10/04/2023
Time
11:30Hrs
|
|
823 |
Consultancy Services for Supervision Consultants of O & M of Four lanes with paved side shoulders of Tallewal-Barnala Section NH-71 (New NH-703) from existing km. 114.000 to km 136.070 of NH-71 to existing km. 149.000 of NH-64 in the State of Punjab. |
2023-NHAI-148132-1 |
03/04/2023 |
06/03/2023
|
10/04/2023
Time
11:30Hrs
|
|
824 |
Supervision Consultancy Services during O&M stage of 2 laning with paved shoulder of Piprakothi – Motihari – Raxaul Section of NH 28 A from km. 0.650 to km. 68.650, and 4 lane with Paved Shoulder from km. 68.650 to 69.240 ICP Raxaul) in the State of Bihar under NHDP Phase – III . |
173/RO-Patna/NHAI/2022-23 |
21/03/2023 |
06/03/2023
|
12/04/2023
Time
11:0Hrs
|
|
825 |
Independent Engineer Services during Operation and Maintenance for Rehabilitation and Upgradation of Giddalur – Vinukonda section of NH-544D from Design Km.212.983 (Existing Km 213.000) to Design Km.322.800 (Existing Km.322.840) (Design length – 112.797kms) in the State of Andhra Pradesh to two lane with paved shoulders under NH 16 on Hybrid Annuity Mode. |
2023-NHAI-147619-1 |
06/03/2023 |
06/03/2023
|
18/04/2023
Time
11:0Hrs
|
|
826 |
SC of 2 laning with paved shoulders of Jhalawar Rajasthan M.P.Border Section of NH 12 from Km. 346.540 to Km. 408.700 in the State of Rajasthan |
NHAI/11011/2/ROJ/SC-JMB |
02/03/2023 |
03/03/2023
|
18/05/2023
Time
11:0Hrs
|
|
827 |
Independent Engineer Services for Construction of new Six-lane Capital Region Ring Road from Rameswar NH-16 to Gobindpur NH-55 package-I from Design chainage Km. 0.000 to Km. 40.700 in the State of Odisha under Bharatmala Pariyojna on Hybrid Annuity Mode Package-I |
2023 NHAI 147593 1 |
02/03/2023 |
02/03/2023
|
04/07/2024
Time
15:0Hrs
|
|
828 |
Independent Engineer Services for Construction of new Six-lane Capital Region Ring Road from Rameswar (NH-16) to Gobindpur (NH-55) package-II from Design CH. 40.700 to 70.995, (village Bilipada to Gobindpur) in the State of Odisha under Bharatmala Pariyojna on Hybrid Annuity Mode. |
2023 NHAI 147599 1 |
02/03/2023 |
02/03/2023
|
04/07/2024
Time
15:0Hrs
|
|
829 |
Independent Engineer services for Supervision of Construction of 6-lane Greenfield Ambala Ring Road starting from junction with Shamli-Ambala section of NH-344GM near Village Kapuri (Design km 18.226) and terminating at Ismailabad - Ambala Section of NH-152G near Village Bhari (Design km 40.750) (Total length 22.524 Kms) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode |
NHAI/AmbalaRingRoad/IE/2023/HR |
14/03/2023 |
02/03/2023
|
01/04/2023
Time
11:0Hrs
|
|
830 |
Consultancy services of Authority’s Engineer for Upgradation of existing 4 lane IsmailabadAmbala section of NH-152 (Km. 0.000 to Km 42.500) (Part of Ambala-Kotputli Corridor) to 4- lane access controlled stretch by providing grade separated structures and service/Slip roads under Bharatmala Pariyojana-I in the state of Haryana on EPC mode. |
NHAI/ Ismailabad-Ambala/ AE/2023/HR |
14/03/2023 |
02/03/2023
|
01/04/2023
Time
11:0Hrs
|
|
831 |
Independent Engineer Services for Rehabilitation and Upgrading of Existing Road from Dareota Village to Nauni Chowk of NH 205 for 2/4 Lane with Paved Shoulder Design Chainage – Km 33.175 to Km 40.300 (Two Lane), Design Length 7.125 Km including single tube tunnel & Km 40.300 to Km 58.450 (Four Lane), Design Length 18.150 Km (Total length 25.275km) Package IIB in the State of Himachal Pradesh under NH (O) on Hybrid Annuity Mode |
2023 NHAI 147440 1 |
10/03/2023 |
01/03/2023
|
26/06/2023
Time
11:0Hrs
|
|
832 |
Consultancy services for Authority Engineer services for Construction of 4 lane Greenfield North - East side Gorakhpur bypass (26.616 kms) starting from NH-29E (Km 83.308) and end at NH-28 (Km 285.100) in the state of Uttar Pradesh under Bharatmala pariyojana on EPC mode. |
147111 |
07/03/2023 |
27/02/2023
|
03/05/2023
Time
11:0Hrs
|
|
833 |
Consultancy services for Independent Engineer Construction of 4/6 lane bypass for Belagavi city from Km 11.00 (Goa side) of NH-4A to Km 516.000 (Pune side) of NH-4 (Design Length 34.48 km) in the state of Karnataka on Hybrid Annuity Mode. Package 1A |
2023-NHAI-146930-1 |
09/03/2023 |
24/02/2023
|
22/03/2023
Time
11:0Hrs
|
-
|
834 |
AUTHORITY’S ENGINEER FOR SUPERVISION OF “Upgradation /widening andconstruction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154km) of NH- 127B in the State of Assam under JICA ODA Loan assistance (Phase- V) onEPC mode. 2nd Call |
NHIDCL/ASSAM/S-D/JICA5/AE/2021 /199467/RFP/C2 |
21/02/2023 |
24/02/2023
|
16/03/2023
Time
15:0Hrs
|
|
835 |
Consultancy Services for AE for Supervision of Rehabilitation Upgradation of Existing two Lane Road to 4Lane With Paved Shoulders from km 32.0 to km 79.650 D c Km 32.000 to km 78.760 Puttaparthi Koduru Section of NH342 in the State of Andhra Pradesh |
RW/NH-12014/7/AP/Z-III/745/AE |
24/02/2023 |
23/02/2023
|
17/04/2023
Time
17:0Hrs
|
|
836 |
Consultancy Services for AE for Supervision of Rehabilitation Upgradation of Newly Declared NH Somayajulapalli Dhone Road of NH 340B from Km.0.0 To 56.200 D Ch. Km 0.00 to km 53.33 to two lane with paved shoulders in the State Of Andhra Pradesh |
RW/NH-12014/1/AP/Z-III/744/AE |
24/02/2023 |
23/02/2023
|
18/04/2023
Time
17:0Hrs
|
|
837 |
Consultancy Services for Supervision Consultant (SC) during Operation and Maintenance Period of Govindpur-Chas section of NH-32 from km 0.000 to km 56.889 in the State of Jharkhand |
NHAI/RO/RNC/JH/2022-23/25 |
09/05/2023 |
22/02/2023
|
25/05/2023
Time
15:0Hrs
|
|
838 |
Consultancy services for Authoritys Engineer for Operation and Maintenance of project of Four Laning of Raipur – Kodebad section (Km 10.200 to Km 43.400) of NH-30 in the state of Chhattisgarh under NHDP-IV through EPC mode. |
11052/RO-Raipur/Tender/AE/R-K |
22/02/2023 |
21/02/2023
|
23/03/2023
Time
15:0Hrs
|
|
839 |
Consultancy Services for Authoritys Engineer for Supervision of Widening and Strengthening/Reconstruction to Two Lane with Paved Shoulder/Two lane paved shoulder with service road from km 0.000 to 42.250 (excluding design ch. 03.220 to 04.200 and 28.350 to 29.060) and from km 98.00 to 176.310 of NH-320G in the State of Jharkhand under EPC mode |
RW/Ranchi/DPR/NH/IAHE/36/2017 |
20/03/2023 |
20/02/2023
|
29/03/2023
Time
16:0Hrs
|
|
840 |
Independent Engineer services for supervision of Rudrapur Bypass from Design Km 00-000 to Design Km 20-640 in the State of Uttarakhand on Hybrid Annuity mode |
2023-NHAI-146059-1 |
15/03/2023 |
20/02/2023
|
23/03/2023
Time
11:0Hrs
|
|
841 |
Consultancy services for Authority Engineer for construction of four laning with paved shoulder from Hassan to Adihalli EC-20 Ch. Km 00.000 Hassan to Ch. Km 37.000 Adihalli Village under Bharatmala Pariyojana on EPC Mode in the state of Karnataka (Package-I) |
NHAI/ KNT/Hassan Adihalli/Pkg1/AE /2023/190744 |
20/02/2023 |
20/02/2023
|
20/03/2023
Time
11:0Hrs
|
|
842 |
Consultancy services for Independent Engineer for Construction of STRR (West side) (i) Kunagal-Thattekere from km 79.000 to km 112.600 with length of 33.6 Km (Pkg-1) and (ii) Bagganadoddi S.Mudugadapalli from km120.980 to 144.17 with length of 23.44 Km (Pkg-3) in the state of Karnataka & Tamil Nadu on Hybrid Annuity Mode (HAM) under Bharatmala Pariyojana |
NHAI/KNT/STRR/Phase-II/Pkg-1-3/IE/2023/191113 |
21/02/2023 |
17/02/2023
|
15/01/2024
Time
11:0Hrs
|
|
843 |
Operation and Maintenance of Dindigul Theni Kumili section of NH183 in the State of Tamil Nadu |
NHAI/17011/02/14/2023 |
17/02/2023 |
17/02/2023
|
18/03/2023
Time
13:0Hrs
|
|
844 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Shirapur Junction to Shivaji Chowk section of NH-561 and Barshi Naka to Jarud Phata section of NH-361F to 2LPS/ Four Lanes configuration on EPC mode. |
EENHD/Latur/NITNo-10/293/22-23 |
21/02/2023 |
16/02/2023
|
03/04/2023
Time
17:30Hrs
|
|
845 |
Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Warangal-Khammam) from Oorugonda village in Hanamkonda District at Design Ch. 112.240 Km to Venkatpur village in Warangal District at Design Ch. 150.240 Km (total length 38.000 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-I) |
NHAI/GM(T) /DGM(T)/War Kha(PkgI)/ IE/02-2023 |
21/02/2023 |
16/02/2023
|
22/03/2023
Time
11:0Hrs
|
|
846 |
Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Warangal-Khammam) from Venkatpur village in Warangal District at Design Ch. 150.240 Km to Thallasenkesa village in Mahabubabed District at Design Ch. 189.650 km (total length 39.410 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-II). |
NHAI/GM(T)/DGM(T)/War Kha(PkgII)/IE/02-2023 |
21/02/2023 |
16/02/2023
|
22/03/2023
Time
11:0Hrs
|
|
847 |
Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Warangal-Khammam) from Thallasenkesa village at Design Ch. 189.650 km to V.Vekatayapalem village in Khammam District at Design Ch. 220.480 Km (total length 30.830 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-III) |
NHAI/GM(T)/DGM(T)/War Kha(Pkg-III)/ IE/02-2023 |
21/02/2023 |
16/02/2023
|
22/03/2023
Time
11:0Hrs
|
|
848 |
Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Khammam– Vijayawada) from V.Venkatayapalem village at Design Ch. 220.480 Km to Brahmanapalli(K) village at Design Ch. 250.400 Km (total length 29.920 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-I) |
NHAI/GM(T)/DGM(T)/Kha Vij (Pkg-I)/ IE/02-2023 |
21/02/2023 |
16/02/2023
|
22/03/2023
Time
11:0Hrs
|
|
849 |
Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Khammam – Vijayawada) from Brahmanapalli(K) village at Design Ch. 250.400 Km to Remidicherla village at Design Ch. 280.200 Km (total length 29.800 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana & AP (Package-II) |
NHAI/GM(T)/ DGM(T)/Kha-Vij (PkgII)/IE/ 02-2023 |
21/02/2023 |
16/02/2023
|
22/03/2023
Time
11:0Hrs
|
|
850 |
Independent Engineer services for Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Khammam – Vijayawada) from Remidicherla village at Design Ch. 280.200 Km to Jakkampudi village (on NH-16) at Design Ch. 309.909 Km (total length 29.709 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana & AP (Package-III) |
NHAI/GM(T)/DGM(T)/Kha Vij(Pkg-III)/IE/ 02-2023 |
21/02/2023 |
16/02/2023
|
22/03/2023
Time
11:0Hrs
|
|
851 |
CS for AE for Supervision of R and U of Hoshiarpur-Una of NH-503A to 2 lane paved shoulder configuration (from km 15.200-km 30.348)and construction of 4 lane Hoshiarpur Bypass (from km 2.425-km 15.200) (Total 27.923 Kms) in Punjab (Package-IV) on EPC |
NHAI/34044/1/2023/PB/ |
07/03/2023 |
16/02/2023
|
20/03/2023
Time
11:0Hrs
|
|
852 |
Consultancy services for Independent Engineer for Construction of 4 lane Thiruvananthapuram Outer Ring Road (ORR)-( Civil Package I &and II) from Navaikulam to Vizhinjam (Ch-(-)0.450 to Ch-62.200 Design length-62.65 km in the State of Kerala on HAM mode under Bharatmala Pariyojana in the State of Kerala in HAM mode under Bharatmala Pariyojana |
2023-NHAI-145824-1 |
27/02/2023 |
16/02/2023
|
11/09/2023
Time
11:0Hrs
|
|
853 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Parli to Sirsala section of NH-361F (km 136.700 to115.000) to Two lanes with paved shoulder/Four lane configuration on EPC mode in the State of Mahrashtra |
EENHD/Latur/NITNo-10/293/22-23 |
28/02/2023 |
16/02/2023
|
03/04/2023
Time
17:0Hrs
|
|
854 |
Independent Engineer services for Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial – Warangal) from Puttapaka village at Design Ch. 35.300 Km to Pangidipalle village at Design Ch. 72.350 Km (Total length 37.050 km) under Other Economic Corridor (NH(O)) programme as part of Nagpur – Vijayawada Corridor on Hybrid Annuity mode in the state of Telangana (Package-II) |
NHAI/GM(T)/DGM(T)/Man-War (Pkg-II)/IE/02-2023 |
17/02/2023 |
15/02/2023
|
21/03/2023
Time
11:0Hrs
|
|
855 |
Independent Engineer services for Construction of 4 lane Access Controlled New Greenfield Highway Section Mancherial – Warangal) from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 Km (Total length 39.890 km) under Other Economic Corridor (NH(O)) programme as part of Nagpur - Vijayawada Corridor on Hybrid Annuity mode in the state of Telangana (Pkg-III) |
NHAI/GM(T)/DGM(T)/Man-War (Pkg-III)/IE/02-2023 |
18/02/2023 |
15/02/2023
|
21/03/2023
Time
11:0Hrs
|
|
856 |
Independent Engineer services for Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial–Warangal) from Narva village at Design Ch. 3.834 Km to Puttapaka village at Design Ch. 35.300 Km (Total length 31.466 km) under Other Economic Corridor (NH(O)) programme as part of Nagpur - Vijayawada Corridor on Hybrid Annuity mode in the state of Telangana (Package-I). |
NHAI/GM(T)/DGM(T)/Man-War (Pkg-I)/IE/02-2023 |
17/02/2023 |
15/02/2023
|
21/03/2023
Time
11:0Hrs
|
|
857 |
Independent Engineer services for Four Laning of NH-39 (old NH-75) from design Km 97.600 (existing Km 96.470) (Udaipura village) to design km 147.540 (existing Km 148.020) (Bhogu Village) in the State of Jharkhand on Hybrid Annuity mode (Package – II) |
2023-NHAI-145548-1 |
16/02/2023 |
14/02/2023
|
05/04/2023
Time
11:0Hrs
|
|
858 |
Independent Engineer services for Four laning of Basukinath to Deoghar section of NH- 114A from design Km 85.081 to design Km. 130.240 (Design Length 45.159 Km.) in the State of Jharkhand on Hybrid Annuity Mode |
2023-NHAI-145542-1 |
16/02/2023 |
14/02/2023
|
05/04/2023
Time
11:0Hrs
|
|
859 |
Consultancy Services for Authoritys Engineer for supervision of Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, section of NH-752C and Upgradation of Nasrullagani-Rehti-Budhni Section of NH-146B, total length-47.300 Km from Km 0/150 to Km 50/500 in the state of Madhya Pradesh on EPC mode |
19/SAC/NIT/AE/2022-23 |
09/02/2023 |
13/02/2023
|
28/03/2023
Time
15:0Hrs
|
|
860 |
Consultancy Services for AE for Supervision of Rehabilitation and Upgradation of Existing Road to 2 Lane with Paved Shoulder Configuration from Seetharamapuram to Duttaluru Section of NH167 BG From Km. 0.000 To Km. 36.400 Km in the State Of AP |
RW/NH22-23-AP/167BG-Z-III/AE |
18/02/2023 |
13/02/2023
|
29/03/2023
Time
15:0Hrs
|
|
861 |
Consultancy Services For Authoritys Engineer For Supervision of Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77/100 to Km 170/580 (Total length 93.48km) to Two lane with paved shoulder in the State of Madhya Pradesh on EPC |
RO/BPL/02/AE/Din-Man2022-23 |
26/02/2023 |
13/02/2023
|
05/04/2023
Time
15:0Hrs
|
|
862 |
IE SC of 4-Laning with Paved Shoulder of Bijni to Mandi Section from existing Km 202.815-Km 208.000 of NH-20 including construction of Twin Tube Tunnel for a length of 3.500 Km of Pathankot-Mandi under NH(O) in Himachal Pradesh on HAM basis (PKG-VB |
2023 NHAI 145349 1 |
23/02/2023 |
13/02/2023
|
21/03/2023
Time
11:0Hrs
|
|
863 |
Consultancy Services for Authoritys Engineer for supervision of Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, section of NH-752C and Upgradation of Nasrullagani-Rehti-Budhni Section of NH-146B, total length-47.300 Km from Km 0/150 to Km 50/500 in the state of Madhya Pradesh on EPC mode |
2023-MoRTH-739976-1 |
25/03/2023 |
13/02/2023
|
25/04/2023
Time
17:30Hrs
|
|
864 |
Consultancy Services for Authority’s Engineer for Supervision of (i) Construction and Operation & Maintenance of Viaduct from Sahakarijin Junction to Motipura Circle from Km.490.940 to Km.493.290 of the Shamlaji – Motachiloda section of NH-48 in the state of Gujarat on EPC Basis (ii) Operation & Maintenance of Six-lane Motachiloda - Nanachiloda section of NH-48 from Km.540.595 to Km.555.905 in the state of Gujarat implemented on EPC Basis |
2023-NHAI-145178-1 |
17/02/2023 |
11/02/2023
|
13/03/2023
Time
15:0Hrs
|
|
865 |
Independent Engineer services during Operation and Maintenance Period for 4laned Chikhali to Tarsod (Package-IIA) Section of NH-53 from Km.360.000 to Km.422.700 in the State of Maharashtra on Hybrid Annuity Mode (DBFOT Annuity) under NHDP Ph-IV-2nd call |
NHAI/RO-NAG/TENDERS/2022-23/37 |
11/02/2023 |
11/02/2023
|
16/03/2023
Time
11:0Hrs
|
|
866 |
Supervision Consultant (SC) for maintenance works and activities on Chunculuru - Nellore section from km.652.200 to km 741.950 (length 89.75) of NH 67 |
NHAI/ROVJA/ Badvel-Nellore /2023 |
10/02/2023 |
10/02/2023
|
15/03/2023
Time
11:0Hrs
|
|
867 |
Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Audireddipalle (Ch. 160.000) to Chandrasekharpuram (Ch. 228.000) of (NH-544G) Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-III) |
NHAI/BM/EC/Bengaluru-Vijayawada/IE/Pkg-III/2022 |
17/02/2023 |
10/02/2023
|
14/03/2023
Time
11:0Hrs
|
|
868 |
Consultancy Services for Authority Engineer for Supervision of Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under Bharatmala Pariyojana in the UT of J and K (Phase II Package XVIII) |
NHAI/BM/DAKExpressway/2022/Pkg XVIII/AE |
03/03/2023 |
10/02/2023
|
30/03/2023
Time
11:0Hrs
|
|
869 |
Independent Engineer Services for Construction of Four Lane Access Controlled Greenfield Atal Progressway (Chambal Expressway) From Km 206.000 (Village Jhundpura In Morena District) To Km 265.000 (Village Maithana In Morena District) under Bharatmala Pariyojna in the State of Madhya Pradesh (Package-V) on Hybrid Annuity Mode & Construction of four lane access controlled Greenfield Atal Progressway (Chambal Expressway) from km 265.000 (village Maithana Morena District) to km 312.950 in MP |
NHAI/HQ/MP/AtalProgressway/IE/Pkg-V & VI/2023 |
06/03/2023 |
10/02/2023
|
21/03/2023
Time
11:0Hrs
|
|
870 |
Independent Engineer Services for Construction of four lane access controlled Greenfield Atal Progressway (Chambal Expressway) from km 94.100 (village sada ka pada in Sheopur District) to km 155.400 (village Chhavar in Sheopur District) under Bharatmala Pariyojna in the State of Madhya Pradesh Pkg III & Construction of four lane access controlled Greenfield Atal Progressway (Chambal Expressway) from km 155.400 (village Chhavar in Sheopur District) to km 206.000 in the state of MP |
NHAI/HQ/MP/AtalProgressway/IE/Pkg-III & IV/2023 |
06/03/2023 |
09/02/2023
|
21/03/2023
Time
11:0Hrs
|
|
871 |
IE Services for Four Laning of Abohar 75.500 to Fazilka (114.080) and Construction of 4-lane Greenfield highway of Abohar bypass (From 0.000 Malout-Abohar Road on NH-07 to chainage 6.380 AboharFazilka) 44.96 km on HAM Mode in Punjab under BMP |
NHAI/25044/1/2022/PB/ABH-FZL |
14/02/2023 |
09/02/2023
|
13/03/2023
Time
11:0Hrs
|
|
872 |
Consultancy Services for AE for Supervision of Chotahapjan Bogapani section) (2-Lane PS) in(Package-3) Digboi Bypass (Green Field and Brownfield) (Package-4) and Digboi Bypass (Green Field and Brownfield) (2-Lane PS) (Package-5) in Assam |
NHIDCL/Assam/AE/Dib-Led Pkg-1 to 3/2023/218140 |
01/02/2023 |
09/02/2023
|
16/02/2023
Time
16:0Hrs
|
|
873 |
Consultancy Services for assisting Authoritys Engineer for supervision of Construction of 4 Lane ROB at Km 510/8 of NH565 (Near Yerpedu) in Lieu of L.C.No.36 in the State of Andhra Pradesh on EPC Mode |
NIT No.40/SE,NH,ATP/2022-23, Dt.02.02.2023 |
15/02/2023 |
08/02/2023
|
16/03/2023
Time
15:0Hrs
|
|
874 |
IE Services for the work of Construction of four laning of Bakarpur-Manikpur road section starting from village chitarsenpur km 0 00 and terminating at SH 74 near Manikpur (38 814) at NH-139W under BMP on HAM mode in Bihar |
2023-NHAI-144670-1 |
06/03/2023 |
08/02/2023
|
28/03/2023
Time
11:0Hrs
|
|
875 |
CS for AE for Supervision of Construction of 4L Greenfield Highway from Chatrapur on NH16 to Gopalpur port (Km 0.000 to km 4.500) and upgradation to 6L elevated configuration of existing NH16 (Km 429.025 to km 430.990) under Bharatmala Pariyojana in Odisha State on EPC Mode |
2023-NHAI-142347-1 |
07/02/2023 |
07/02/2023
|
28/02/2023
Time
11:0Hrs
|
|
876 |
CS for AE for Supervision of Six laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km 0.000 to Km 6.140 (Effective Length – 5.16 km) on EPC Mode in the state of Tamil Nadu on EPC mode |
2023-NHAI-142353-1 |
07/02/2023 |
07/02/2023
|
10/03/2023
Time
11:0Hrs
|
|
877 |
CS for Independent Engineer Services for Rehabilitation and upgradation from 4 to 8 laning of Chandikhole – Paradip Section of NH-53 (Old NH-5A) from km 0.000 to km 76.646 in the state of Odisha on HAM Mode under NH(O) |
2023-NHAI-143351-1 |
07/02/2023 |
07/02/2023
|
21/03/2023
Time
11:0Hrs
|
|
878 |
Consultancy Services for Authority Engineer for Supervision of Construction of four six lane Greenfield connectivity from Talwara Jattan Village on NH 44 to Gobindsar village on Delhi Amritsar Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under Bharatmala Pariyojana |
NHAI/Tech/BM/Pathankot Link Road/2021/AE |
03/03/2023 |
06/02/2023
|
28/03/2023
Time
11:0Hrs
|
|
879 |
Independent Engineer services during O and M stage for 4/6 laned stretch from Km.40.000 to Km.221.500 of Hyderabad to Vijayawada Section of NH65 (Old NH No.9) of 181.500 kms, Package No.NHDP-III/BOT/AP01 in the State of TS and AP |
144034 |
06/03/2023 |
03/02/2023
|
18/04/2023
Time
15:0Hrs
|
|
880 |
CS FOR AE FOR SUPERN OF REHABILITATION UPGRADATN 2 LANE PS EXISTG CH KM 166 100 TO KM 192 980 (DC KM 146 700 TO KM 162 800)(PKGVII) INCL CONSTN OF BHIMBER GALI TUNNEL (LENGTH 1.100 KM) UNDER 31 TF ON AKHNOOR POONCH ROAD (NH144A) UT JK BRO ON EPC |
RW/SR/W(53)/JK/2021/ |
03/02/2023 |
03/02/2023
|
15/02/2023
Time
15:0Hrs
|
|
881 |
Consultancy Services for AE for Supervision of Jamugurihat to end of Biswanath Chariali Bypass from end of Biswanath Chariali by pass (Km.208) to Gohpur and Gohpur to Holongi in the state of Assam |
NHIDCL/Assam/AE/Jamugurihat-Holongi/2022/216559 |
14/02/2023 |
03/02/2023
|
23/02/2023
Time
15:0Hrs
|
|
882 |
Consultancy Services for Authoritys Engineer for Supervision of Up-gradation of Daultabad T point to Shivoor from existing km 222.893 On SH-16, Daulatabad Jn. to km 64.000 On SH51, Shivoor Design km.0.000 to km 4.000 Daultabad T oint to Maliwada |
EENH/Aurangabad/Tender/NIT No-5/3000204 |
19/02/2023 |
03/02/2023
|
20/03/2023
Time
17:30Hrs
|
|
883 |
Consultancy services as Authority’s Engineer for Supervision of “Construction of Uni-Directional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev-Goha-Khellani-Kishtwar-Vailoo-Khanabal stretch (Design Length 38.61 Km including Uni directional twin tube Tunnel 10.3km/10.3 Km) on NH-244 in the Union Territory of Jammu and Kashmir on EPC mode |
NHIDCL/J&K/NH-244/AE(SVT)/2023 |
16/01/2023 |
02/02/2023
|
12/04/2023
Time
15:0Hrs
|
|
884 |
Independent Engineer Services during Operation and Maintenance of 4 laning of UP/Haryana Border-Rohna-Hassangarh- Jhajjar Section of NH-334B from Km 0.000 to Km 80.250 on HAM mode in State of Haryana |
2023-NHAI-143698-1 |
14/02/2023 |
01/02/2023
|
09/03/2023
Time
11:0Hrs
|
|
885 |
Consultancy services for Independent Engineer for Construction of 4 Lane with Paved Shoulders from AP/KN Border (Design Ch 0-000) to KN/TS Border (Design Ch 54-566) in AP/KN Border – Raichur - KN/TS Border Section of NH 167 in the State of Karnataka on Hybrid Annuity Mode |
2023-NHAI-143528-1 |
14/02/2023 |
31/01/2023
|
06/03/2023
Time
11:0Hrs
|
|
886 |
Consultancy services for Section I Construction of Four laning of Bellary Bypass from junction with NH67 (Old NH 63) Design Chainage -0-454 km to Design Chainage 10-00kms (Length 10-454Kms) junction of NH150A Siruguppa-Bellary Road and from NH150A - Bellary Bypass Ch 53-600Km to Ch 255-150Km (Length 1-550Kms) in the State of Karnataka under Hybrid Annuity Mode AND Section II- Construction of four lane with paved shoulder of Bellary Bypass from Design Ch-255-150Km (Ex Ch 255-150) and Ends at Ju |
2023-NHAI-143518-1 |
15/02/2023 |
31/01/2023
|
06/03/2023
Time
11:0Hrs
|
|
887 |
Consultancy services for 4 Lane with Paved Shoulders from Design Ch 182/300 to Design Ch 228/500 in Belgaum – Hungund – Raichur Section of NH 748A (Ext SH-20) in the State of Karnataka on Hybrid Annuity Mode |
2023-NHAI-143540-1 |
16/02/2023 |
31/01/2023
|
06/03/2023
Time
11:0Hrs
|
|
888 |
Consultancy services for Construction of 4 Lane with Paved Shoulders from Design Ch 228/500 to Design CH 273/400 in Belgaum – Hungund – Raichur section of NH-748A (Ext SH-20) on Hybrid Annuity Mode (Package-6) |
2023-NHAI-143544-1 |
20/02/2023 |
31/01/2023
|
06/03/2023
Time
11:0Hrs
|
|
889 |
Independent Engineer Services during O&M stage of 2 laning of Mokama - Munger Section of NH -80 from Km. 1.430 to Km. 70.000 in the state of Bihar under NHDP – Phase III on BOT (Annuity) on DBFOT Basis. |
170/RO-Patna/NHAI/2022-23 |
21/03/2023 |
31/01/2023
|
13/04/2023
Time
11:0Hrs
|
|
890 |
Consultancy services for Authoritys Engineer for Supervision of (i) Rehabilitation and upgradation of Panvel Mahad Panji Road NH-66 L 406/030 to 450/170 Section Kalmath to Zarap Section in the State of Maharashtra (ii) Construction of Flyover in Km.468/500 Vehicular Under pass in Km 470/00 and Overpass in Km 451/300 to 453/600 Including Road Safety Along with avenue and Midean Plantation from Km 450/170 to 471/330 (Zarap to Patradevi) Section of NH-66 (Panvel Mahad Panjim) on EPC Mode. |
02/NHD/AB/TC/2022-23/ 354 |
03/03/2023 |
27/01/2023
|
20/03/2023
Time
17:30Hrs
|
|
891 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF IMP.AND UPGRADATION OF NEWLY DECLARED NH-227B (84 KOSI PARIKRAMA MARG) Pkg-I,DESIGN KM 228.920(JAGARNATHPUR)TO KM 235.960/0.000(MAKHAUDA DHAM)TO KM 29.000(SARPUR) IN THE STATE OF U.P. ON (EPC) BASIS. |
CE-RO/LKO/NH(O) /24/AE/NH227B(PkgI)/21-22 dt25.01.2023 |
04/02/2023 |
25/01/2023
|
27/03/2023
Time
11:0Hrs
|
|
892 |
Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Chandrasekharapuram (Ch. 228.000) to Muppavaram (Ch.343.240) of Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-IV) |
NHAI/BM/EC/Bengaluru-Vijayawada/IE/Pkg-IV/2022 |
01/02/2023 |
25/01/2023
|
27/02/2023
Time
11:0Hrs
|
|
893 |
Consultancy Services for Independent Engineer for Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Design Ch. Km 122.200 (Existing Km 124.488) near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 214.535 joining (at Ch. Km 131.180 Approx) to Srirangapatna Bypass Near Paschima Vahini on Hybrid Annuity Mode under NH (O) in the state of Karnataka |
NHAI/KNT/Mysore-Kushalanagara/ Pkg-2-3-4-5/IE/2023 |
20/02/2023 |
24/01/2023
|
10/03/2023
Time
11:0Hrs
|
|
894 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 From Design Chainage 0.000 to 81.300 km (Total Length 81.300 km) Two Lane With Paved Shoulder Configuration along with one time improvement in 07 Nos of Bypassd built-up area in total length of 22.625 km in the State Of Madhya Pradesh On EPC |
10/SAC/Kurwai/GWL/AE/2022-23 |
17/01/2023 |
23/01/2023
|
15/03/2023
Time
17:30Hrs
|
|
895 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 From Design Chainage 0.000 to 81.300 km (Total Length 81.300 km) Two Lane With Paved Shoulder Configuration along with one time improvement in 07 Nos of Bypassd built-up area in total length of 22.625 km in the State Of Madhya Pradesh On EPC Basis |
2023-MoRTH-736489-1 |
19/03/2023 |
23/01/2023
|
31/03/2023
Time
17:30Hrs
|
|
896 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 From Design Chainage 0.000 to 81.300 km (Total Length 81.300 km) Two Lane With Paved Shoulder Configuration along with one time improvement in 07 Nos of Bypassd built-up area in total length of 22.625 km in the State Of Madhya Pradesh On EPC Basis |
2023-MoRTH-736489-2 |
11/04/2023 |
23/01/2023
|
24/04/2023
Time
17:30Hrs
|
|
897 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of kurwai-Mungaoli Chanderi Road Section of NH-346 From Design Chainage 0.000 to 81.300 km (Total Length 81.300 km) Two Lane With Paved Shoulder Configuration along with one time improvement in 07 Nos of Bypassd built-up area in total length of 22.625 km in the State Of Madhya Pradesh On EPC Basis |
2023-MoRTH-736489 |
05/04/2023 |
23/01/2023
|
24/04/2023
Time
17:30Hrs
|
|
898 |
Consultancy Services as Authority’s Engineer for Supervision of Consultancy Services as Authority’s Engineer for Supervision of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0.000 to Ch. 53.040 (Total Design Length = 53.04 Km) of Tato to Manigong Section of NH-913 (Frontier Highway) in the State of Arunachal Pradesh” on EPC mode |
NHIDCL/Ar.Pr./Tato-Manigong//NH-913/AE/ 32558 |
02/02/2024 |
23/01/2023
|
06/03/2024
Time
15:0Hrs
|
|
899 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Pathri to Selu section design chainage from km 41/000 to 47/900 and Selu to Deogaon Phata section design chainage from km 63/100 to km 68/700 of Injegaon- Sonpeth- Pathri-Selu- Degaon Phata road NH-548B to 2-lane/4-lane with paved shoulder (Rigid Pavement) configuration on EPC Mode in the State of Maharashtra |
EENH /JALNA /Tender/NIT-02/ 110 |
03/02/2023 |
20/01/2023
|
06/03/2023
Time
17:30Hrs
|
|
900 |
Independent Engineer services during Operation and & Maintenance Period for Four laining of Krishnagar-Baharampore section of NH-34 from Km. 115.00 to KM. 193.000 in the state of West Bengal under NHDP phase III on (Package No NHDP/III/BOT/WB/02)- on DBFOT(Annuity) Basis |
12/O and M/Krish-Bah/2nd Call |
23/01/2023 |
20/01/2023
|
10/04/2023
Time
12:0Hrs
|
|
901 |
Consultancy Services For Authoritys Engineer For Supervision of Widening and strengthening to 4 lane 2-lane with paved shoulders of Mahabubnagar Chincholi section from km 60.255 to Km 102.834 of NH-167N in the State of Telangana |
RW/HYD/Misc28 NIT AE/2022-23/08dt20.01.2023 |
24/01/2023 |
20/01/2023
|
06/03/2023
Time
15:0Hrs
|
|
902 |
Consultancy services for Authoritys Engineer for Supervision of Rehabitation /Upgradation of New Highway to 2L-PS from Bhokardan to Kumbhari Phata (Km13-500 to 17-000) and Rajur to Jalna (39-850 to Km 62-420) section of NH753H i e Sillod -Bhokardan-Kumbhari Fata-Rajur-Jalna on EPC Mode in the State of Maharashtra. (Total Length- 26-07 Km) |
EENH /JALNA /Tender/NIT-02/110 |
05/02/2023 |
20/01/2023
|
06/03/2023
Time
16:30Hrs
|
|
903 |
Consultancy Services For Authoritys Engineer For Supervision of Upgradation and reconstruction of Jabalpur – Kundam - Shahpura section of NH-45 from design km 40.500 to 68.100 to 103.700 including Kundam bypass (total Length 63.20 km) to Two lane with paved shoulder configuration alongwith one time improvement of bypassed built up areas in the total length of 14.470 Km in the State of Mandhya Pradesh on EPC Mode |
39/SAC/NIT/AE/2022-23 |
31/12/2022 |
19/01/2023
|
28/02/2023
Time
17:30Hrs
|
|
904 |
Consultancy Services For Authoritys Engineer For Supervision of Upgradation and reconstruction of Jabalpur – Kundam - Shahpura section of NH-45 from design km 40.500 to 68.100 to 103.700 including Kundam bypass (total Length 63.20 km) to Two lane with paved shoulder configuration alongwith one time improvement of bypassed built up areas in the total length of 14.470 Km in the State of Mandhya Pradesh on EPC Mode |
39/SAC/NIT/AE/2022-202323 |
15/03/2023 |
19/01/2023
|
03/04/2023
Time
17:30Hrs
|
|
905 |
Consultancy Services for assisting Authoritys Engineer for supervision of Construction of Major Bridge across Papagni river including approaches at Km 153/200 of Renigunta Kadapa Muddanur road NH716 in the state of Andhra Pradesh on EPC Mode |
NIT No.35/2022-23, Dt.10.01.2023 |
17/02/2023 |
18/01/2023
|
06/03/2023
Time
15:0Hrs
|
|
906 |
Consultancy service OF Authority Engineer for- Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38500 to Km 51246 (Design Chainage 38500 to 50959) with proposed Daboka Bypass of Daboka – Parokhaowa (Package-1) of NH- 29 in the state of Assam on EPC mode. |
NHIDCL/Assam/NH-29/AE/Dab-Man Pkg-1/199774 |
08/02/2023 |
17/01/2023
|
13/02/2023
Time
16:0Hrs
|
|
907 |
Widening/Improvement to 4 Four Lane with Paved Shoulder from Ch 99930 km to Ch 143680 km Design Ch96000 km to Ch 139750 km for Package-8 of Bilasipura- Guwahati road NH 17 Section Paikan to Dhupdhara Sahar in the state of Assam on EPC mode |
NHIDCL/Assam/AE/Bil-Ghy Pkg-8/2023/218170 |
08/02/2023 |
17/01/2023
|
13/02/2023
Time
16:0Hrs
|
|
908 |
CS for IE for Rehabilitation and upgradation of NH340C PKG1- from Kurnool to Mandlem 4 lane with paved shoulders (DL 30.600 kms) in AP under NH(O) on HAM. PKG-2-from Mandlem Atmakur to 4 lane paved shoulders(DL 35.515 kms)in AP under NH(O)on HAM. |
NHAI/Tech/IE/NH-340C/KRN-MAN-ATK/2023 |
23/02/2023 |
17/01/2023
|
03/03/2023
Time
11:0Hrs
|
|
909 |
Consultancy services for Independent Engineer for Construction of STRR (West side), NH948A - Obalapura (Nelamangala Taluk)) to Somakkanamutta (Magadi Taluk) from km 0.000 to km 46.300 (Design) Phase-I Package-I & Consultancy services for Independent Engineer for Construction of STRR (West side), NH948A - Somakkanamutta (Magadi Taluk) to Kunigal (Ramanagara Taluk) from km 46.300 to km 79.000 (Design Chainage) Phase-I Package-II in the state of Karnataka on (HAM) under Bharatmala Pariyojana. |
2023-NHAI-141571-1 |
07/02/2023 |
13/01/2023
|
27/02/2023
Time
11:0Hrs
|
|
910 |
CS FOR AE FOR SUPERN OF REHABILITATION UPGRADATN 2 LANE PS EXISTG CH KM 166 100 TO KM 192 980 (DC KM 146 700 TO KM 162 800)(PKGVII) INCL CONSTN OF BHIMBER GALI TUNNEL (LENGTH 1.100 KM) UNDER 31 TF ON AKHNOOR POONCH ROAD (NH144A) UT JK BRO ON EPC |
RW/SR/W(53)/JK/2021/ |
11/01/2023 |
11/01/2023
|
08/02/2023
Time
15:0Hrs
|
|
911 |
Consultancy Services as AE for Supervision of Construction of Uni-directional Sudhmahadev - Dranga Twin Tube Tunnel and its approach roads on NH-244 in the Union Territory of Jammu and Kashmir |
NHIDCL/JK/NH-244/AE(SDT)/2023 |
12/01/2023 |
11/01/2023
|
01/05/2023
Time
15:0Hrs
|
|
912 |
IE Services for Operation and Maintenance of Madurai to Kayathar section from km 0-000 to Km 116-500 of NH-44 on TOT mode in the state of Tamil Nadu |
2023-NHAI-141152-1 |
25/01/2023 |
10/01/2023
|
13/02/2023
Time
11:0Hrs
|
|
913 |
Independent Engineer Services for Operation & Maintenance of (i) Kayathar- Nanguneri section from Km 116-500 to Km 180-000 of NH-44 (Old No 7) on TOT mode in the state of Tamil Nadu, and (ii) Nanguneri - Kanyakumari section from Km 180-000 to Km 243-470 of NH-44 (Old No 7) on TOT mode in the state of Tamil Nadu |
2023-NHAI-141156-1 |
25/01/2023 |
10/01/2023
|
13/02/2023
Time
11:0Hrs
|
|
914 |
Consultancy services as Independent Engineer during Operation and Maintenance for the project of Design Engineering Finance Construction Operation and Maintenance of access controlled highway project of Bangalore Nelmangala section of NH-4 from Km. 10.000 to km. 29.500 in the State of Karnataka on Build Operate Transfer Basis |
30 |
13/01/2023 |
10/01/2023
|
31/01/2023
Time
15:0Hrs
|
-
|
915 |
Consultancy services for Authority s Engineer for supervision of Construction of 6 lane HL/Extra-dosed Cable Bridge on river Ganga parallel to western side (180 meter upstream) of Digha- Sonepur Rail- cum-Road Bridge at Patna on Ganga River on NH-139W in the state of Bihar on EPC Mode |
NH-12014/1/2023-RO Patna |
18/01/2023 |
10/01/2023
|
10/05/2023
Time
17:0Hrs
|
|
916 |
Independent Engineer services for supervision of Four laning of Bhaniyawala Jollygrant Rishikesh spur section of NH 07 from km 0 00 to km 20 600 in the state of Uttarakhand under NH O on Hybrid Annuity Mode |
2023 NHAI 141046 1 |
27/01/2023 |
10/01/2023
|
10/02/2023
Time
11:0Hrs
|
|
917 |
Consultancy Services for AE for Supervision of Rehabilitation and widening work for 2Lane with PS of Existing National Highway 122B Alignmentfrom Km 29.730 to Km 72.348 of Mahnar Bachhwara section in the State of Bihar on EPC Mode |
NH-12014/52/2021-RO Patna- Part(1) |
27/01/2023 |
07/01/2023
|
02/03/2023
Time
17:0Hrs
|
|
918 |
Consultancy Services for Authority Engineer for Supervision of (i) Upgradation to two lane with paved shoulder of Hanumangarh to Kenchiyan from km 0/000 (existing Chainage km 23.200) to km 49/605 (existing Chainage km 23.200) of NH-54 in the State of Rajasthan on EPC Mode (ii) Construction of flyover at Indira Circle along with LVUP a with provosion of RE walls in approaches in the State of Rajasthan on EPC Mode |
NIT No. 05/ 2022-23 |
17/01/2023 |
06/01/2023
|
20/02/2023
Time
11:0Hrs
|
|
919 |
Consultancy services for Independent Engineer services for Package-II Four Laning Byrapura to Challakere section of NH 150 A from Km.308.550 to Km.358.500 on HAM Mode under Bharatmala Pariyojana in the State of Karnataka |
NIT No.29 |
06/01/2023 |
06/01/2023
|
06/02/2023
Time
15:0Hrs
|
|
920 |
Consultancy Services for Authority’s Engineer for Supervision of (i) “4-lane ROB (twin’s 2-lane) & its approaches in replacement of existing level crossing at (Railway km 226/0) km 3.950 of NH-2B at Talit [Job No.NH-2B/WB (18)/15-16/018-S&R (B)]” & (ii) “Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T km 307.050 of NH-60 at Bhimgarh [Job No.NH-60/WB/ (9)/15-16/013-S&R (B)]” in the State of West Bengal. |
MORTH/RO-KOL/NIT/AE/2022-23/05 |
05/01/2023 |
05/01/2023
|
01/03/2023
Time
15:0Hrs
|
|
921 |
Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from km 0.000 to km 10.600 (Package-1) and km 15.200 to km 34.500 (Package-3) on Sairang-Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC mode |
NHIDCL/Mizoram/NH-6/AE/Aizawl Bypass/Pkg-1 and 3 |
19/12/2022 |
04/01/2023
|
30/01/2023
Time
11:0Hrs
|
|
922 |
Consultancy Services for Authority’s Engineer for Supervision of Const. of 4-Lane ROB and its approaches in replacement of existing (i) RUB of NH-2B at Bhedia (ii) LC No 21/SPL/E of NH-60 at Suri (iii) LC No 39/A/3E of NH-60 at Bishnupur-II (iv) LC No KA-34 of NH-60 at Kubai (v) LC No 38 of NH-60 at Kadamdiha in West Bengal. |
MORTH/RO-KOL/NIT/AE/2022-23/04 |
04/01/2023 |
03/01/2023
|
27/02/2023
Time
15:0Hrs
|
|
923 |
CS FOR AE FOR SUPERVISION FOR WORK WIDENING STRENGTHENING UPGRADATION TO 2LANE WITH PS EXIST CH KM 192 980 TO KM 229 820 DC KM 162 800 TO KM 198 180 PKGVIII UNDER 31TF ON AKHNOOR POONCH ROAD NH144A IN UT JK UNDER PROJECT SAMPARK BRO ON EPC |
RO-CH-SR-W(19)/AE/JnK-2022 |
03/01/2023 |
03/01/2023
|
26/01/2023
Time
15:0Hrs
|
|
924 |
RFP For Consultancy Services for Authoritys Engineer for Supervision of Construction of 4Lane Chapra Manjhi ByPass Connecting NH19 and NH85 Length 7.155 Km in the State of Bihar through an EPC Contract. |
02/NHCHAPRA/2022-23 |
09/01/2023 |
03/01/2023
|
03/03/2023
Time
11:0Hrs
|
|
925 |
Consultancy services for Authority Engineer for supervision of (i) Strengthening/Reconstruction in km 0/0 to 1/200,1/800 to 42/400,43/900 to 44/100, 47/400 to 59/100,64/450 to 72/080,72/680 to 78/750,79/050 to 88/330 of NH-752 in State of Rajasthan (Total length-76.680 km) on EPC Mode.(ii) Construction of 2 lane with paved shoulders of Northern Bypass Phase-II of Kota City in the State of Rajasthan on EPC Mode. |
NIT No. 04/ 2022-23 |
10/01/2023 |
03/01/2023
|
23/02/2023
Time
11:0Hrs
|
|
926 |
Consultancy services for Authoritys Engineer for Supervision of (i) Rehabilitation and upgradation of Panvel Mahad Panji Road NH-66 L 406/030 to 450/170 Section Kalmath to Zarap Section in the State of Maharashtra (ii) Construction of Flyover in Km.468/500 Vehicular Under pass in Km 470/00 and Overpass in Km 451/300 to 453/600 Including Road Safety Along with avenue and Midean Plantation from Km 450/170 to 471/330 (Zarap to Patradevi) Section of NH-66 (Panvel Mahad Panjim) on EPC Mode in the st |
02/NHD/AB/TC/2022-23/ 4444 |
06/01/2023 |
02/01/2023
|
01/02/2023
Time
17:30Hrs
|
|
927 |
Consultancy Services for Authority Engineer for i) Development of Six Lane greenfield Ring Road (Package-I) starts from Design Ch 0 to Design Ch 23-325 ( Length 23-325 kms ) around Kanpur City in the state of Uttar Pradesh on EPC mode ii Development of Six Lane greenfield Ring Road (PackageIV) starts from Design Ch 68-650 to Design Ch 93-209 ( Length 24-559 kms ) around Kanpur City in the state of Uttar Pradesh on EPC mode |
2022-NHAI-139859-1 |
25/01/2023 |
29/12/2022
|
22/02/2023
Time
15:0Hrs
|
-
|
928 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and up-gradation of Sabalkhed to Ashti and Chinchpur to Jamkhed of NH-561 to 2PLS/Four lane configurations in the state of Maharashtra on EPC mode |
No.EENHD/Latur/NIT No. 09/AE/2299/2022-23 |
05/01/2023 |
28/12/2022
|
03/03/2023
Time
17:30Hrs
|
|
929 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and up-gradation to 2-4LPS of NH-63 in section Aashta mode to Aashta Village and section Tiwatgyal pati to Malkapur-Udgir) with Rigid pavement on EPC mode in the State of Maharashtra |
No.EENHD-Latur-NIT No.09-AE-2299-2022-23 |
02/01/2023 |
28/12/2022
|
27/02/2023
Time
17:30Hrs
|
|
930 |
Consultancy services for Authoritys Engineer for Supervision of Up-gradation and Rehabilitation of section of NH-361 F from Parli 00-000 to Gangakhed 30-400 to Two lanes with paved shoulder Four lane configurations on EPC mode in the state of Maharashtra. |
No EENHD/Latur/NIT No 09/AE/2299/2022-23 |
30/12/2022 |
28/12/2022
|
03/03/2023
Time
17:30Hrs
|
|
931 |
Consultancy services for Independent Engineer of four-lane greenfield highway from Edamon (Design km 20-730/Existing km 38-000 of NH-744) to Kadampattukonam near Paripally (Design km 59-347/Existing km 517-567 of NH-66) in the State of Kerala in HAM mode under Bharatmala Pariyojana |
2022-NHAI-139486-1 |
12/01/2023 |
26/12/2022
|
12/02/2024
Time
11:0Hrs
|
|
932 |
Consultancy services as AE for Supervision of Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I,II and III (in the State of Nagaland on EPC mode |
NHIDCL/Nagaland/AE/ Akegwo- Avangkhu/Pkg 1,2,3/20 |
28/12/2022 |
23/12/2022
|
08/05/2023
Time
15:0Hrs
|
|
933 |
Consultancy services for Supervision Consultant for Operation and Maintenance of Four laning of Parwanoo - Solan section of NH-22 (Now NH-05) from Km 67.000 to Km 106.139 under NHDP Phase-III on EPC basis in the State of Himachal Pradesh including Authority Engineer services for Construction of Two Viaducts at Km 88.440 (LHS) and Km 103.320 (LHS) at Parwanoo-Solan section of NH 05 in the State of Himachal Pradesh (HP) on EPC Mode (2nd Call) |
2022-NHAI-139126-1 |
27/12/2022 |
22/12/2022
|
12/01/2023
Time
11:0Hrs
|
|
934 |
Consultancy Services for assisting Authority’s Engineer for supervision of (i) Construction of proposed 2-Lane ROB and its approaches in lieu of existing level crossing no120 at km 56.700 of NH-18 (new NH-40) under SETU-BHARATAM in the state of Andhra Pradesh under NH(O) for the year 2021-22 on EPC mode (ii) Widening to 4-Lane of missing link between NH-40 andNH-69 from existing chainage km 351.460 to km 358.260(Design Chainage 351.460 to 358.130(6.67Km) of NH-40 in the State of Andhra Pradesh |
34/2022-23,dt-1-12-2022 |
21/12/2022 |
21/12/2022
|
06/02/2023
Time
15:0Hrs
|
|
935 |
Consultancy Services for IE for 4/6 laning of Marutharoad to Edathanattukara section of NH966 from Km. 0.000 to Km.61.440 (Design Length 61.279 Km) (Civil Package 1 and 2) in Kerala in HAM mode under Bharatmala Pariyojana. |
2022-NHAI-138881-1 |
05/02/2023 |
21/12/2022
|
20/03/2025
Time
11:0Hrs
|
|
936 |
Consultancy Services For Authority Engineer Services for supervision of Rehabilitation and Upgradation to Mudkhed to Nanded section from Km 372000 to Km 388400 of NH161A Length 15.65 Km to 2LPS configuration in the State of Maharashtra on EPC mode |
2022-MoRTH-730305-1 |
13/01/2023 |
20/12/2022
|
10/02/2023
Time
17:30Hrs
|
|
937 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of major bridge across Wainganga River in Km 134.000 (Near Armori) on Nagpur-Umred- Nagbhir-Armori section of NH-353D in the State of Maharashtra on EPC mode. |
16/EENH/NGP/2022-23/ 5649 |
22/12/2022 |
20/12/2022
|
20/02/2023
Time
17:0Hrs
|
|
938 |
Consultancy services for Authority’s Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road NH -353D in Km 109.650 & 111.175 In State Of Maharashtra On EPC Mode. |
17/EENH/NGP/2022-23/ 5650 |
15/12/2022 |
20/12/2022
|
20/02/2023
Time
17:0Hrs
|
|
939 |
Consultancy Services for Independent Engineer services for Construction of Four laning of NH 530B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530B/Design Km. 66.000) to Kasganj Bypass (End) (Existing Km.150.100 of NH 530B/ Design Km. 123.100) in the State of Uttar Pradesh on Hybrid Annuity mode |
NHAI/HQ/UP(W)/Hathras- Kasganj/HAM/IE/2022 |
27/12/2022 |
19/12/2022
|
21/02/2023
Time
11:0Hrs
|
|
940 |
Independent Engineer services for Balance Construction and Operation & Maintenance of Six-laning of Shamlaji – Motachiloda section of NH-48 from Km.447.385 to Km.540.595 (Length - 93.210 Km) in the State of Gujarat (Package VI) on Hybrid Annuity Mode |
2022-NHAI-138742-1 |
09/01/2023 |
19/12/2022
|
27/01/2023
Time
13:0Hrs
|
|
941 |
AE for i) Const and OM of LT measures for rect of Blackspots at 1).Aslali Bypass - GJ02151, 2).Bidaj Patiya, GJ02219, 3).Vadala Jn GJ02214 of A-V sect NH48 on EPC ii) OM of Impr Works at Dumad Jn at Merging ofA-V Sect NH48, A-V NE1 and Sama-Savli Rd |
2022-NHAI-138770-1 |
09/01/2023 |
19/12/2022
|
24/01/2023
Time
15:0Hrs
|
|
942 |
AE for Supervision of 1. Const and OM of Viaduct from Sahakarijin Jn to Motipura Circle Km.490.940 to Km.493.290 of the Shamlaji-Motachiloda section of NH-48 on EPC 2. OM of 6L Motachiloda-Nanachiloda section of NH-48 Km540.595 to Km555.905 on EPC |
2022-NHAI-138749-1 |
09/01/2023 |
19/12/2022
|
27/01/2023
Time
15:0Hrs
|
|
943 |
REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER INCLDING 260M LONG KANDI TUNNEL FROM EXISTING CHAINAGE KM 30.053 TO KM 49.150 (DESIGN CHAINAGE KM 30.000 TO KM 46.450) (PACKAGE-I)ON EPC BASISUNDER 35 BRTF ON AKHNOOR - POONCH ROAD (NH-144A) UNDER PROJECT SAMPARK (BRO) IN THE UT OF JAMMU & KASHMIR ON EPC MODE (3RD CALL). |
CE (P) SPK/AE/A-P RD/PKG-I(3rd CALL)/2022-23 |
20/12/2022 |
15/12/2022
|
23/01/2023
Time
11:0Hrs
|
|
944 |
Consultancy services for Authority Engineer for Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from Km -0/342 to Km 20/593 on EPC mode under Bharatmala Pariyojana in the State of TamilNadu |
138293 |
18/12/2022 |
15/12/2022
|
07/02/2023
Time
11:0Hrs
|
|
945 |
AE services for 4laning of left over works including Additional Structures in KL-TN Border Kanyakumari from Km43/000 to Km96/714 of NH47 in TN on EPC and O-M Period for Nagercoil to Kavalkinaru Sec from Km0000 to Km16/276 of NH47B in TN |
138292 |
18/12/2022 |
15/12/2022
|
24/01/2023
Time
11:0Hrs
|
|
946 |
Consultancy Services as Authoritys Engineer for Supervision of Four laning of (i) Jhanji toDemow section of NH-37 from km 491 050 to km 535 250 (Design Chainage) from Km 490800 to Km 534 800 (ii) Section between Demow (km 534 800) to End of Moran Bypass (km561 700) (iii) end of Moran Bypass (km 561 700) to Bogibeel junction near Lapetketa (km 580875) (iv) Construction of Dibrugarh Bypass/ Realignment from Bogibeel Junction at Km580/875 to Km 596/322 in the state of Assam under SARDP-NE |
NHIDCL/Assam/AE/Jhanji- Dibrugarh/2022/208578 |
05/12/2022 |
15/12/2022
|
22/12/2022
Time
15:0Hrs
|
|
947 |
INDEPENDENT ENGINEER (IE) SERVICES FOR OPERATION AND MAINTENANCE STAGE UNDER TOT MODE OF FOUR LANING OF BAMANBORE-GARAMORE AND GARAMORE - SAMAKHIYALI SECTION OF NH - 27 IN THE STATE OF GUJARAT - 2nd Call |
2022-NHAI-130984-2 |
15/12/2022 |
14/12/2022
|
30/01/2023
Time
13:0Hrs
|
|
948 |
IE Services for Construction of Four laning of Marakkanam (Design Km 62/000) to Puducherry (Design Km 108/042) of Mamallapuram Puducherry section of NH332A in the state of Tamil Nadu on HAM |
138289 |
18/12/2022 |
14/12/2022
|
30/01/2023
Time
11:0Hrs
|
|
949 |
Four laning of Jamugurihat to end of Biswanath Chariali Bypass from Km 18200 to Km 20800 of NH-52 (ii) Four Laning of NH-52 from end of Biswanath Chariali by pass (Km 208) to Gohpur (Km 26550 (iii) Four laning of NH-52A from Gohpur (Km 264100 on NH-52) to Holongi (Km20.370 on NH-52A) (Total Length 10080 Km) in the state of Assam on EPC basis under SARDP-NE |
NHIDCL/Assam/AE/ Jamugurihat- Holongi/2022/216559 |
04/01/2023 |
13/12/2022
|
11/01/2023
Time
15:0Hrs
|
|
950 |
INDEPENDENT ENGINEER (IE) SERVICES FOR O and M STAGE AND BALANCE CONSTRUCTION WORK FOR FOUR LANING OF BHAVNAGAR-TALAJA SECTION OF NH-51 FROM KM 07.090 TO KM 53.585 (DESIGN CH FROM KM 6.945 TO KM 54.990) (PKG-1) THROUGH HAM IN THE STATE OF GUJARAT |
2022-NHAI-138125-1 |
14/12/2022 |
13/12/2022
|
03/02/2023
Time
13:0Hrs
|
|
951 |
Independent Engineer services for 4-laning of Tejajinagar - Balwara section of NH-347BG (Indore to Boregaon- Pkg II) Design Ch. 9.000 to Design Ch. 42.400 (Length 33.400 Km) under Bharatmala Pariyojana Phase-I in the State of Madhya Pradesh on Hybrid Annuity Mode |
NHAI/HQ/MP/Tejajinagar-balwara/Pkg II/HAM/IE/2022 |
12/12/2022 |
12/12/2022
|
17/01/2023
Time
11:0Hrs
|
|
952 |
Completion of Balance works (item rate and EPC mode) and Operation of Maintenance of Tirupati- Tiruttani-Chennai Section of NH-205 from Km 274/800 to Km 338/030 in Andhra Pradesh and from Km 0/000 to Km 61/470 in Tamil Nadu |
137725 |
18/12/2022 |
09/12/2022
|
09/01/2023
Time
11:0Hrs
|
|
953 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-gradation of Tirora-Gondia (Design Km. 87.000 to 115.200) NH 753 to Two lane with Paved Shoulders& Up-Gradation of Amgaon-Gondia, NH 543 in Km 41.880 To Km 21.620 on EPC Mode. |
14//EENH/NGP/2022-23/5511 |
26/12/2022 |
09/12/2022
|
25/01/2023
Time
17:0Hrs
|
|
954 |
IE Services for Four laning of Rajapalayam to Senkottai Section of NH744 from Km 71/600 to Km 107/000 (Design Chainage) under Bharatmala Pariyojana on HAM Mode in Tamil Nadu (Pkg -1) |
137716 |
19/12/2022 |
09/12/2022
|
23/01/2023
Time
11:0Hrs
|
|
955 |
IE Services for Four laning of Rajapalayam to Senkottai Section of NH-744 from Km107/000 to Km 139/900 (Design Chainage) under Bharatmala Pariyojana on HAM Mode in Tamil Nadu (Package-2) |
137721 |
19/12/2022 |
09/12/2022
|
23/01/2023
Time
11:0Hrs
|
|
956 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-gradation of Tirora-Gondia (Design Km. 87.000 to 115.200) NH 753 to Two lane with Paved Shoulders& Up-Gradation of Amgaon-Gondia, NH 543 in Km 41.880 To Km 21.620 on EPC Mode. |
14//EENH/NGP/2022-23/5511 |
27/01/2023 |
09/12/2022
|
20/02/2023
Time
17:0Hrs
|
|
957 |
CS FOR AE FOR SUPERVISION FOR WORK WIDENING ND STRENGTHENING UPGRADATION TO 2LANE WITH PS FRM EXIST CH.KM192.980 TO KM229.820(DSGN CH.KM162.800 TO KM198.180) (PKGVIII)UNDER 31TF ON AKHNOOR POONCH ROAD(NH144A)IN UT JK UNDER PROJECT SAMPARK BRO ON EPC. |
RO-CH-SR-W(19)/AE/JnK-2022 |
08/12/2022 |
08/12/2022
|
20/01/2023
Time
15:0Hrs
|
|
958 |
IE Services for 4 Laning of Ariyanendal to Perungulam Sec of NH49 (New NH87) from Design Ch 80/360 (Existing km 80/360) to Design Ch 127/025 (Existing km 127/289)(Design length 46/665km) on HAM in the State of Tamil Nadu |
137557 |
18/12/2022 |
07/12/2022
|
23/01/2023
Time
11:0Hrs
|
|
959 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF SECTION WATUR (00) TO CHARTHANA (27) OF NH 752 I TO TWO LANE WITH PAVED SHOULDER CONFIGURATION ON EPC MODE IN THE STATE OF MAHARASHTRA |
2022-MoRTH-727733-1 |
17/12/2022 |
07/12/2022
|
10/02/2023
Time
17:30Hrs
|
|
960 |
Independent Engineer services for Construction of Raebareli Ring Road Phase-II with four lane configurations (Design Length 21.888 km) for Rae-Bareli City in the state of Uttar Pradesh on Hybrid Annuity Model (HAM) basis. |
CE-RO/LKO/IE/NH(O) /25/Rbly Ring Road Ph-II/21-22 |
08/12/2022 |
06/12/2022
|
23/08/2023
Time
11:0Hrs
|
|
961 |
Consultancy services for AE for Supervision of Rehabi and Upgradation to 2 lane with PS from existing km 166.100 to km 192.980 (Design km 146.600 to km 162.800) (Package VII) inclu constr of Bhimber Gali Tunnel (total length of tunnel 1.100 km) |
RW/CH/W(53)/JK/2021/02-12-2022 |
06/12/2022 |
06/12/2022
|
17/01/2023
Time
15:0Hrs
|
|
962 |
Independent Engineer Services during Operation and Maintenance Period of (i) Four Laning of NH161 from Ramsanpally Village to Mangloor Village. (ii) Four laning of NH161 from Mangloor to TS / MH Border in the state of TS under BPHAM |
137386 |
04/01/2023 |
06/12/2022
|
18/01/2023
Time
15:0Hrs
|
|
963 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of Initial Improvement works & supervision of ATMS/TMS installation under Tolling, Operation, Maintenance & Transfer of Borkhedi-Wadner-Deodhari-Kelapur (from km 36 600 to km 175 000 in the state of Maharashtra |
2022-NHAI-137299-1 |
06/01/2023 |
06/12/2022
|
08/05/2023
Time
11:0Hrs
|
|
964 |
CS for AE for Supervision of Construction of Initial Improvement works and supervision of ATMS or TMS installation under TOT of Shivpuri Jhansi (from km 1305-087 to km 1380-387) in the state of Madhya Pradesh (InvIT Bundle 2) |
2022-NHAI-137301-1 |
04/01/2023 |
06/12/2022
|
15/02/2023
Time
11:0Hrs
|
|
965 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of Improvement works & supervision of ATMS/TMS installation under Tolling, Operation, and Maintenance & Transfer of Agra Bypass (from km 0 000 to km 32 800) in the state of Uttar Pradesh (InvIT Bundle 2) |
2022-NHAI-137298-1 |
07/01/2023 |
06/12/2022
|
15/02/2023
Time
11:0Hrs
|
|
966 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of Two Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 (of existing SH-19 Km 26.530) near Hinotiya Village to Design Km 75.700 (of existing SH-19 Km 74.820) near Mehulwa village Section of NH-346 Vidisha –Talbehat of length 48.700 kms in the State of Madhya Pradesh (Package 2) on EPC Mode. |
NHAI/HQ/MP/Hinotiya-Mehulwa/Pkg-2/Proc/AE /2022 |
26/12/2022 |
02/12/2022
|
10/01/2023
Time
11:0Hrs
|
|
967 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 (Balaghat-Gondia section) of NH-543 (Design Length 41.210 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra on EPC Mode |
NHAI/HQ/MP/Balaghat-Gondia/EPC/AE/2022 |
26/12/2022 |
02/12/2022
|
17/01/2023
Time
11:0Hrs
|
|
968 |
Consultancy services for Authority’s Engineer for Operation and Maintenance of NH-43 (New NH-30) from Dhamtari - Kanker (Km 81.500 to Km 130.000), Bedma-Dahikonga (Km.180.000 to Km.241.000) & Dahikonga-Jagdalpur (Km.241.000 to Km.298.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. |
11052/RO-Raipur/Tender/DJ |
26/12/2022 |
02/12/2022
|
18/01/2023
Time
15:0Hrs
|
|
969 |
IE Services for 6 aning of Walajahpet/Ranipet to Tamil Nadu/Andhra Pradesh Border from Km 106/800 to Km 134/879 of NH4 (New NH 40) under NHDP Phase III in Tamil Nadu on HAM |
137053 |
17/12/2022 |
02/12/2022
|
24/01/2023
Time
11:0Hrs
|
|
970 |
Consultancy Services for Authority’s Engineer for Supervision of (i) Construction of 2-lane with paved shoulder of Ashapur to Rudhi (Betul – Khandwa Pkg – IV) from Design CH km 114.000 to km 149.000 section in State of MP on EPC Mode (ii) Construction of 4-Laning of Khandwa bypass from Rudhi to Deshgaon, Km 149.000 to Km 177.680 section of SH-71/NH-347B/NH-753L (Betul – Khandwa Pkg-V) in State of MP on EPC Mode. |
NHAI/HQ/MP/Ashapur-Deshgaon/AE/2022 |
05/12/2022 |
01/12/2022
|
18/01/2023
Time
11:0Hrs
|
|
971 |
Independent Engineer Services for Construction of Four Laning of Raghogarh (Design Ch. 29.300/Existing Ch. 29.555) to Nanasa (Design Ch. 92.811/Existing Ch. 95.000) Section of NH-47 (Old NH-59A) (Design Length 63.511 km) under Bharatmala Pariyojana Phase I (Economic Corridor) in the State of Madhya Pradesh on HAM |
NHAI/HQ/MP/Indore-HardaPkg-2/Raghogarh-Nanasa/IE/2022 |
26/12/2022 |
01/12/2022
|
17/01/2023
Time
15:0Hrs
|
|
972 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Pathri to Selu section design chainage from km 41/000 to 47/900 and Selu to Deogaon Phata section design chainage from km 63/100 to km 68/700 of Injegaon- Sonpeth- Pathri-Selu- Degaon Phata road NH-548B to 2-lane/4-lane with paved shoulder (Rigid Pavement) configuration on EPC Mode in the State of Maharashtra |
EENH /JALNA /Tender/NIT-02/ 1497 |
04/01/2023 |
01/12/2022
|
13/01/2023
Time
17:30Hrs
|
|
973 |
Consultancy services for Authoritys Engineer for Supervision of Rehabitation /Upgradation of New Highway to 2L-PS from Bhokardan to Kumbhari Phata (Km13-500 to 17-000) and Rajur to Jalna (Km 39-850 to Km 62-420) section of NH753H i e Sillod -Bhokardan-Kumbhari Fata-Rajur-Jalna on EPC Mode in the State of Maharashtra. (Total Length- 26-07 Km) |
EENH/Jalna/Tender/NIT-01/1497 |
03/01/2023 |
01/12/2022
|
13/01/2023
Time
17:30Hrs
|
|
974 |
Independent Engineer services for 4-Laning of NH-39 (old NH-75) from design Km 147.540 (existing Km 148.020)(Bhogu Village) to design km 196.870 (existing Km 197.420) (Sankha Garhwa Road) in the State of Jharkhand on HAM (PKG-III) |
2022-NHAI-136791-1 |
06/12/2022 |
29/11/2022
|
11/01/2023
Time
11:0Hrs
|
|
975 |
Supervision Consultancy services during O and M stage of two lane with paved shoulder from Km 1.300 to Km 74.349 (Existing chainage from Km 1.300 to Km 74.200) of Chhapra-Rewaghat-Muzaffarpur of NH-102 in State of Bihar |
NIT No - 164/RO-PATNA/NHAI/2022-23 |
06/12/2022 |
26/11/2022
|
05/01/2023
Time
11:0Hrs
|
|
976 |
Supervision Consultancy services during O&M stage of four laning of Forbesganj to Jogbani section from km. 0.00 to 9.26 (ICP at Jogbani) of NH – 57-A in state of Bihar. |
NIT No - 165/RO-PATNA/NHAI/2022-23 |
06/12/2022 |
26/11/2022
|
05/01/2023
Time
11:30Hrs
|
|
977 |
IE Services for supervision of Borkhedi Wadner Deodhari Kelapur Maharashtra/Telangana Border (from km 36.600 to km 175.000 of NH44 old NH7)on toll operate maintain and transfer basis (InvIT Bundle 2 |
2022-NHAI-136324-1 |
15/12/2022 |
24/11/2022
|
09/01/2023
Time
11:0Hrs
|
|
978 |
Independent Engineer Services for Operation & Maintenance of km 0-000 to km 99-005 of NH-26 in the state of UP& MP under North-South corridor (NHDP Phase- II) on TOT Mode ( TOT Bundle 3) Package No. NS-1/BOT/UP- 2/UP-3 |
2022-NHAI-136429-1 |
29/11/2022 |
24/11/2022
|
09/01/2023
Time
11:0Hrs
|
|
979 |
Independent Engineer Services for Supervision of Agra Bypass (From Km 0-000 to Km 32-800) in the state of Uttar Pradesh on Toll, Operate, maintain and transfer basis (InvIT Bundle 2) |
2022-NHAI-136420-1 |
29/11/2022 |
24/11/2022
|
09/01/2023
Time
11:0Hrs
|
|
980 |
Independent Engineer Services during Operation Maintenance stage of Two laning with paved shoulders of Kanpur to Kabrai Section of NH86 from Km.7.430 to Km.130.100 BOT Project in the State of Uttar Pradesh |
2022-23/KANPUR-KABRAI/IE/PIU KANPUR |
03/01/2023 |
24/11/2022
|
24/01/2023
Time
12:0Hrs
|
|
981 |
Consultancy Services for Supervision Consultants of Chandigarh-Kharar from km 0.000 to km 10.185 and Kharar-Kurali from km 15.765 to 29.900 of NH-21 and NH-95 in the State of Punjab. |
2022-NHAI-136254-1 |
26/12/2022 |
23/11/2022
|
05/01/2023
Time
11:0Hrs
|
|
982 |
IE Services for supervision of Shivpuri to Jhansi from Chainage km 1305-000 to Chainage km 1380-300 of NH 27 in Madhya Pradesh on toll operate maintain and transfer basis (InvIT Bundle 2) |
2022-NHAI-136321-1 |
24/11/2022 |
23/11/2022
|
09/01/2023
Time
11:0Hrs
|
|
983 |
Consultancy Services for Supervision Consultants of Amritsar-Tarn-Taran-Harike-Zira-Faridkot-Bathinda section of NH-15 (New NH-54) from existing km 445.250 of NH-01 to Km 287.615 of NH-15 (New NH-54) in the State of Punjab. |
2022-NHAI-136184-1 |
26/12/2022 |
22/11/2022
|
05/01/2023
Time
11:0Hrs
|
|
984 |
Consultancy Services for Authoritys Engineer for Supervision of Up-gradation of Daultabad T point to Shivoor from existing km 222.893 On SH 16 Daulatabad Jn to km 64.000 On SH51 Shivoor Design km.0.000 to km 4.000aultabad T point to Maliwada |
EENH-Aurangabad-tender-nit-5-3002051 |
29/12/2022 |
22/11/2022
|
13/01/2023
Time
15:0Hrs
|
-
|
985 |
Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Kodur (Ch. 0.000) to Odulaplle (Ch. 72.000) of Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-I) |
NHAI/BM/EC/Bengaluru-Vijayawada/IE/Pkg-I/2022 |
01/12/2022 |
22/11/2022
|
29/12/2022
Time
11:0Hrs
|
|
986 |
Consultancy Services for Independent Engineer services for Supervision of Development of Six-Lane Access Controlled Greenfield Highway from Odulaplle (Ch. 72.000) to Audireddipalle (Ch. 160.000) of Bengaluru –Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh (Package-II) |
NHAI/BM/EC/Bengaluru-Vijayawada/IE/Pkg-II/2022 |
01/12/2022 |
22/11/2022
|
29/12/2022
Time
11:0Hrs
|
|
987 |
CS for AE for Supervision of Const of 4L with PS from Exitg Ch 14200 to 24320 Ch 33760 to 42780 and Ch 43440 to 47020 Delina Flyover-incl flyover length 1704 km of total length 22736 kms in AOR of 760 BRTF on road Srinagar-Baramula-URI NH01 in UT JK |
RW/SR/Wroks(3)/AE/JnK/2022 |
21/11/2022 |
21/11/2022
|
05/12/2022
Time
11:0Hrs
|
|
988 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF BALANCE WORK OF I) REHABILITATION AND UPGRADATION OF PANVEL MAHAD PANJI ROAD NH-66 |
02/NHD/AB/TC/2022-23/3583 |
27/11/2022 |
19/11/2022
|
02/01/2023
Time
17:30Hrs
|
|
989 |
Consultancy services for Authoritys Engineer for Supervision of ( CONSTRUCTION OF 4-LANE MANGALDOI BYPASS FROM KM 26.400 to km 41.500 ON NH 15 ( L- 15.10 km) UNDER RANGIA NH DIVISION IN THE STATE OF ASSAM under EPC mode |
RW/GHT/AS/AE/Tender/932 |
23/11/2022 |
18/11/2022
|
13/01/2023
Time
15:0Hrs
|
|
990 |
Consultancy Services for AE for Supervision of Widening of Existing Road to Two lane with paved shoulder from Km 0.000 to Km 32.000 Mudigubba to Puttaparthi of NH 342 in the State of Andhra Pradesh through Engineering procurement Construction EPC |
RW/NH-12014/31/2021-AP/ZoneIII |
21/11/2022 |
18/11/2022
|
12/01/2023
Time
17:0Hrs
|
|
991 |
Independent Engineer Services for four laning of existing 2 – lane stretch from Govindpur (MH/TG Border) (Design km 32.910) to Rajura (Design km 89.090) (Design Length – 56.180 km) section of NH-353B in the State of Maharashtra on Hybrid Annuity Mode under NH (O) |
NHAI/Tech/MH/IE/NH-353B/2022 |
16/12/2022 |
18/11/2022
|
22/12/2022
Time
11:0Hrs
|
|
992 |
Consultancy Services of Authority Engineer for Supervision and O n M of Cuttack Angul PKG 1 and 2 on EPC Mode in the state of Odisha |
NHAI/13012/137/RO/OD/2962/2023 |
11/12/2023 |
17/11/2022
|
21/12/2023
Time
11:0Hrs
|
|
993 |
Consultancy Services for Authoritys Engineer for supervision of Upgradation of Dindori Sagartola Kabirchabutra(MP/CG border) Section of NH 45 from Km 0/00 to Km 77/00 total length 77km 2lane with paved shoulder in the State of Madhya Pradesh on EPC |
2022-MoRTH-723561-1 |
19/11/2022 |
16/11/2022
|
11/01/2023
Time
17:30Hrs
|
|
994 |
Independent Engineer Services for National Highways Stretches under Bundle1 of Tolling, Operation, Maintenance and Transfer (TOT) Projects from Km. 741.255 to Km. 1022.494 (IE for the sections Anakapalli to Annavaram and Annavaram to Diwancheruvu sections of NH-16 and Diwancheruvu to Siddantham and Siddantham to Gundugolanu sections of NH 216A in the state of Andhra Pradesh). |
2022-NHAI-135571-1 |
17/11/2022 |
16/11/2022
|
10/01/2023
Time
15:0Hrs
|
|
995 |
IE Services during OnM stage of Jaipur Reengus Section, Reengus Sikar section and Salasar Nagaur Section in the State of Rajasthan (Total Length 215.323 KM) |
NHAI/11011/ROJ-Tenders -JR-RS-SN/2ndcall |
18/11/2022 |
16/11/2022
|
02/01/2023
Time
11:0Hrs
|
|
996 |
Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui - Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode” |
NHIDCL/Mizoram/NH-502A/AE/2021-22 |
16/11/2022 |
15/11/2022
|
12/01/2023
Time
11:0Hrs
|
|
997 |
Consultancy Services as Authoritys Engineer for Supervision of Four laning of (i) Jhanji to Demow section of NH-37 from km 491 050 to km 535 250 (Design Chainage) from Km 490 800 to Km 534 800 (ii) Section between Demow (km 534 800) to End of Moran Bypass (km 561 700) (iii) end of Moran Bypass (km 561 700) to Bogibeel junction near Lapetketa (km 580 875) (iv) Construction of Dibrugarh Bypass/ Realignment from Bogibeel Junction at Km 580/875 to Km 596/322 in the state of Assam under SARDP-NE. |
NHIDCL/Assam/AE/Jhanji- Dibrugarh/ 2022/208578 |
10/11/2022 |
15/11/2022
|
22/11/2022
Time
15:0Hrs
|
|
998 |
IE Services during OnM stage of 4 lane Road on New NH 52 Darah Jhalawar Teendhar section in the State of Rajasthan under NHDP Phase III on HAM (Length 48.880 Km.),Package II |
NHAI/11011/2022/ ROJ-Tenders/IEDJT |
18/11/2022 |
11/11/2022
|
10/01/2023
Time
11:0Hrs
|
|
999 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UPGRADATION TO 2LPS OF SHEWALI (SAKRI) – NANDURBAR SECTION OF NH-753B FROM KM 0.000 TO KM 49.050 (EXCLUDING KM 0.300 TO KM 4.500 & KM 13.485 TO KM 25.975 (DESIGN CHAINAGE) TO TWO LANE WITH PAVED SHOULDER CONFIGURATION ADDITIONAL BRIDGE WORKS AT KM 13.915 (60M), & KM 19.845 (70M) IN THE STATE OF MAHARASHTRA ON EPC MODE. |
2022-MoRTH-723024-1 |
29/11/2022 |
11/11/2022
|
09/12/2022
Time
17:30Hrs
|
|
1000 |
Independent Engineering Services for the work of Construction and Upgradation to Four Lane from Manikpur (Design Ch Km 0 000) to Sahebganj (Design Ch Km 44 650) section of NH139W under Bharatmala Pariyojana scheme in the State of Bihar on HAM Mode |
2022-NHAI-135127-1 |
07/02/2023 |
11/11/2022
|
22/06/2023
Time
17:0Hrs
|
|
1001 |
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of existing highway to 2 lane with paved shoulders (rigid pavement) from Start of Kolhapur Municipal Corporation near Phulewadi to Kale Section of NH-166G |
2022-MoRTH-722706-1 |
15/11/2022 |
10/11/2022
|
23/12/2022
Time
17:0Hrs
|
|
1002 |
Independent Engineer Services for Construction of new 4-lane coastal road with paved shoulder from Rameshwar to Puri (km.0 to km. 47.050) on Hybrid Annuity Mode in the State of Odisha (Package-I) |
2022 NHAI 134739 1 |
14/11/2022 |
07/11/2022
|
07/02/2023
Time
11:0Hrs
|
|
1003 |
Independent Engineer Services for Construction of new 4 Lane Coastal road with paved shoulder from Puri to kakatpur (Km.47.050 to km.91.600) on Hybrid Annuity Mode in the state of Odisha (Package-II) |
2022 NHAI 134741 1 |
14/11/2022 |
07/11/2022
|
07/02/2023
Time
11:0Hrs
|
|
1004 |
Independent Engineer Services for Construction of new 6-lane Capital Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) on Hybrid Annuity Mode in the State of Odisha. |
2022 NHAI 134744 1 |
14/11/2022 |
07/11/2022
|
07/02/2023
Time
11:0Hrs
|
|
1005 |
Consultancy Services for Supervision Consultants of Operation and Maintenance of Dalkhola to Ghoshpukur Section including Islampur Bypass of NH-31 from km 447.000 to km 551.000 in the state of West Bengal |
06/OandM/Dalkhola-Ghoshpukur/SC/2022-23 |
04/11/2022 |
04/11/2022
|
03/01/2023
Time
12:0Hrs
|
|
1006 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and up-gradation of existing road to 2 lane from km 84/000 to km 101/000 of Malshej Ghat of NH-61 in the state of Maharashtra on EPC basis contract. |
2022-MoRTH-721566-1 |
12/11/2022 |
03/11/2022
|
05/12/2022
Time
17:30Hrs
|
|
1007 |
IE services for 6Laning of Kottukulangara(Design Km454.500) Start of Kollam Bypass(Km486.000) Kadambattukonam(Design Km517.250) sec of New NH66(Old NH47)in Kerala in HAM mode under BMP. |
2022-NHAI-134273-1 |
29/11/2022 |
03/11/2022
|
12/12/2022
Time
11:0Hrs
|
|
1008 |
AUTHORITY’S ENGINEER FOR SUPERVISION OF “Upgradation /widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of NH- 127B in the State of Assam under JICA ODA Loan assistance (Phase- V) on EPC mode. |
NHIDCL/ASSAM/S-D/JICA5/AE /2021/199467/RFP |
25/10/2022 |
02/11/2022
|
16/12/2022
Time
15:0Hrs
|
|
1009 |
Supervision Consultancy Services for Operation and Maintenance of Barabanki to Jarwal Section from Km. 0.000 to Km. 42.546 (Pkg-1), Jarwal to Bahraich Bypass Section from Km. 42.546 to Km. 93.037 (Pkg-2) and Bahraich Bypass to Rupaidiha Section from Km.99.000 to Km.152.847 (Pkg-3) of NH-927 (Old NH-28C) with 2-Lane Paved Shoulders in the State of Uttar Pradesh |
NHAI/PIU-LKO/SC/NH-927/2022/15 |
19/11/2022 |
01/11/2022
|
21/12/2022
Time
11:0Hrs
|
|
1010 |
Independent Engineer services during Operation & Maintenance Period for 6 laned Satara-Pune (Km 725.000 to Km 865.350) Section of NH-48 (Old NH-4) on DBOFT basis in the State of Maharashtra |
NHAI/RO/MUM/PUNE/IE/O&M/2022/18 |
05/11/2022 |
01/11/2022
|
14/12/2022
Time
11:0Hrs
|
|
1011 |
Project Management Consultancy services for Up-gradation to existing 2 lanes highway with construction of elevated flyover (section Talegaon-Chakan – Shikrapur of NH-548D (from Km. 0.000 to Km. 54.000)). |
NHAI/RO/MUM/Pune/TCS/PMC/2nd Call |
04/11/2022 |
01/11/2022
|
07/12/2022
Time
11:0Hrs
|
|
1012 |
Supervision Consultancy Services for Operation & Maintenance of Barabanki to Jarwal Section from Km. 0.000 to Km. 42.546 (Pkg-1), Jarwal to Bahraich Bypass Section from Km. 42.546 to Km. 93.037 (Pkg-2) and Bahraich Bypass to Rupaidiha Section from Km.99.000 to Km.152.847 (Pkg-3) of NH-927 (Old NH-28C) with 2-Lane Paved Shoulders in the State of Uttar Pradesh |
NHAI/PIULKO/ SC /NH-927 /2022/15 |
15/12/2022 |
01/11/2022
|
21/12/2022
Time
15:0Hrs
|
|
1013 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of 4-laning of NH-45 to Amjhar Road from km 38.400 to Km 98.950 (Jabalpur Ring Road, Pkg – 3 & 4) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode |
NHAI/HQ/MP/NH-45 to Amjhar/Pkg-3&4/EPC/AE/2022 |
15/11/2022 |
31/10/2022
|
24/01/2023
Time
11:0Hrs
|
|
1014 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation Up-gradation to 2L PS 4 L to Nhavara to Chaufulla Section of NH 548DG i.e. Nhavara to Choufula Section ch. 0.00 to km. 24.037 of state highway in the state of MH |
No.3/EENH/Pune/2103/2022 dated 21/10/2022 |
31/10/2022 |
31/10/2022
|
07/12/2022
Time
17:5Hrs
|
|
1015 |
Consultancy Services for Authority’s Engineer for supervision of the work of “Widening to two lane with paved Shoulders from Km 40.00 to Km 75.00 (Existing chainages) of Mangalore - Tumkur section of NH-73 in the State of Karnataka under Annual Plan 2021-22 on EPC mode. (Job No NH-73-KNT-2021-22-945)”. |
NoNH-73-KNT-2022-23-AE |
28/10/2022 |
28/10/2022
|
29/12/2022
Time
15:0Hrs
|
|
1016 |
Consultancy services for Authority’s Engineer for Supervision of (i) Rehabilitation and up-gradation to two lane with paved shoulders of Rajewadi to Warandh village Section (km. 75.100 to 88.100) part of Lonand- Bhor- Mahad - Mhapral - Mandangad - Pachral - Ambadave, NH-965 DD and (ii) Construction of Major high-level bridges across panvel-mahad-panjim road nh-66 (old 17) at km91/400 god river, 94/400 kal river & km 161/400 choradi river in Raigad District in the state of Maharashtra on EPC Mode |
NIT/01/1631 |
25/10/2022 |
25/10/2022
|
22/11/2022
Time
17:0Hrs
|
|
1017 |
AUTHORITY Engineer AE PMC Services for supervision of construction of one Flyover at Km 2.735 and one Major Bridge at Km 31.260 on NH 730 in the State of Uttar Pradesh Under EPC Mode |
3079 1 Tender cashier bly Dt 20.10.2022 |
21/10/2022 |
22/10/2022
|
21/11/2022
Time
12:0Hrs
|
|
1018 |
Consultancy services for AUHORITY ENGINEER / PMC FOR SUPERVISION OF Construction of 1 ROB & 3 Flyovers of National Highway No. 730 at the section from Km 133.230 to Km 134.330, Km 134.550 to Km 135.650, Km 136.200 to Km 137.800 under EPC mode in the State of Uttar Pradesh |
3080 638C NH CIRCLE 22 Dated 20.10.2022 |
22/10/2022 |
22/10/2022
|
21/11/2022
Time
12:0Hrs
|
|
1019 |
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation for Kopargaon to Savali Vihir Section from Km.354.000 to 362.663 Total length 8.663 Km of NH752 G to 4L PS in the state of Maharashtra on EPC mode |
02/EENH/Nashik |
11/11/2022 |
22/10/2022
|
05/12/2022
Time
17:45Hrs
|
|
1020 |
Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of Jamkhed to Saudata section of NH- 548D (From Km.195.375 to Km.208.774, Length-13.399 Km) to 2L PS/4L configuration with rigid pavement in the state of Maharashtra on EPC mode. |
2022-MoRTH-719621-1 |
17/11/2022 |
22/10/2022
|
05/12/2022
Time
17:45Hrs
|
|
1021 |
Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 208 900 (Existing Km 535 930) in Nasarpore Village in Umarpada Taluka to Ch 241 700 (Existing Km 582 000) in Bedkuva Dur Village in Vyara Taluka (Length 32 800 Km) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode (Package VI) |
NHAI/Gujarat/IE/Pkg-VI/2022 |
16/11/2022 |
21/10/2022
|
01/07/2024
Time
15:0Hrs
|
|
1022 |
Independent Engineer services for Upgradation to Six Lane with paved Shoulder of NH 27 from Samakhiyali to Santalpur section from km 339 700 to Km. 430 100 in the State of Gujarat on BOT (Toll) Mode |
NHAI/Gujarat/NH-27/Samakhiyali-Santalpur/BOT/IE/2022 |
23/11/2022 |
21/10/2022
|
23/12/2022
Time
15:0Hrs
|
|
1023 |
Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 241 700 (Existing Km 582 000) in Bedkuva Dur Village in Vyara Taluka to Ch 290 050 (Existing Km. 629 690) in Pathakwadi Village in Dolvan Taluka (Length 48 350 m) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode (Package VII) |
NHAI/Gujarat/IE/Pkg-VII/2022 |
21/11/2022 |
21/10/2022
|
15/01/2024
Time
15:0Hrs
|
|
1024 |
Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 290 050 (Existing Km 629 690) in Pathakwadi Village in Dolvan Taluka to Ch 330 800 (Existing Km 671 850) in Karanjveri Village in Dharampur Taluka (Length 40 750 Km) Section of NH-56 in the State of Gujarat Hybrid Annuity Mode |
NHAI/Gujarat/IE/Pkg-VIII/2022 |
21/11/2022 |
21/10/2022
|
22/01/2024
Time
15:0Hrs
|
|
1025 |
Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch. 330 800 (Existing Km671 850) in Karanjveri Village in Dharampur Taluka to Ch 372 185 (Existing Km 714 010) in Karvad Village near Vapi, post junction with Mumbai Vadodara Expressway (Length 41 385 Km) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode (Package IX) |
NHAI/Gujarat/IE/Pkg-IX/2022 |
21/11/2022 |
21/10/2022
|
22/01/2024
Time
15:0Hrs
|
|
1026 |
Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 179 780 (Existing Km 506 660) in Bitada/Movi Village in Netrang Taluka to Ch 208 900 (Existing Km 535 930) in Nasarpore Village in Umarpada Taluka (Length 29120 m) Section of NH 56 in the State of Gujarat on Hybrid Annuity Mode (Package V) |
NHAI/Gujarat/IE/Pkg-V/2022 |
11/11/2022 |
21/10/2022
|
20/11/2023
Time
15:0Hrs
|
|
1027 |
Independent Engineer services for Upgradation of Existing Two Lane Carriageway to Four Lane Divided Carriageway from Ch 94 030 Junction with Existing NH-56 (Km 414 646) in Jabugam Village in Bodeli Taluka to Ch 132 320 (Existing Km 454 500) in Dhamasiya Village in Naswadi Taluka (Length 38290 m) Section of NH-56 in the State of Gujarat on Hybrid Annuity Mode (Package III) |
NHAI/Gujarat/IE/Pkg-III/2022 |
04/11/2022 |
21/10/2022
|
20/11/2023
Time
15:0Hrs
|
|
1028 |
Independent Engineer services for Construction of Six lane access controlled Expressway from Km 0 000 to Km 43 500 (Tharad to Khimana of Tharad Ahmedabad Expressway- Design length 43500 m) under Bharatmala Pariyojana in the State of Gujarat (Package I) on Hybrid Annuity Mode |
NHAI/Gujarat/ Tharad to Khimana /IE/Pkg-I/2022 |
29/11/2022 |
21/10/2022
|
08/11/2023
Time
15:0Hrs
|
|
1029 |
Independent Engineer services for Construction of Six lane access controlled Expressway from Km 43 500 to Km 83 500 (Khimana to Diodarda of Tharad Ahmedabad Expressway Design length 40 kms) under Bharatmala Pariyojana in the State of Gujarat (Package II) on Hybrid Annuity Mode |
NHAI/Gujarat/ Khimana toDiodarda /IE/Pkg-II/2022 |
29/11/2022 |
21/10/2022
|
08/11/2023
Time
15:0Hrs
|
|
1030 |
Independent Engineer services for Construction of Six lane access controlled Expressway from Km 83 500 to Km 127 000 (Diodarda to Udalpur of Tharad Ahmedabad Expressway- Design length 43500 kms) under Bharatmala Pariyojana in the State of Gujarat (Package III) on Hybrid Annuity Mode |
NHAI/Gujarat/ Diodarda to Udalpur/IE/Pkg-III/2022 |
29/11/2022 |
21/10/2022
|
08/11/2023
Time
15:0Hrs
|
|
1031 |
Independent Engineer services for Construction of Six lane access controlled Expressway from Km 127 000 to Km 173 500 (Udalpur to Giyod of Tharad Ahmedabad Expressway Design length 46 5 kms) under Bharatmala Pariyojana in the State of Gujarat (Package IV) on Hybrid Annuity Mode |
NHAI/Gujarat/ Udalpur to Giyod /IE/Pkg-IV/2022 |
29/11/2022 |
21/10/2022
|
08/11/2023
Time
15:0Hrs
|
|
1032 |
Independent Engineer services for Construction of Six lane access controlled Expressway from Km 173 500 to Km 213 803 (Giyod to Bhuval of Tharad Ahmedabad Expressway- Design length 40303 m) under Bharatmala Pariyojana in the State of Gujarat (Package V) on Hybrid Annuity Mode |
NHAI/Gujarat/ Giyod to Bhuval /IE/Pkg-V/2022 |
29/11/2022 |
21/10/2022
|
08/11/2023
Time
15:0Hrs
|
|
1033 |
Supervision Consultancy Services for Operation & Maintenance of the stretch from Km 00.000 to Km 52.200 of Sitarganj to Tanakpur Section of NH-125 (new NH-09) in the State of Uttarakhand |
NHAI/PIU-RUPC/NH-125/SC/2022 |
15/11/2022 |
18/10/2022
|
18/11/2022
Time
11:0Hrs
|
|
1034 |
Independent Engineer services for Construction of 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km to Design Ch. 58.866 km at Karimnagar Bypass End (Design Length 58.866 km) in the State of Telangana on HAM under BMP |
NHAI/HQ/GM-Tel./DGM(T)/ Jag-Kar/IE/10-2022 |
17/10/2022 |
17/10/2022
|
15/12/2022
Time
11:0Hrs
|
|
1035 |
IE services for Construction of 4-laning of existing 2-lane from Gudebellur (Deosugur) to Marikal (Design Chainage 182.930 km to 228.500 km with design length 45.57 km) in Telangana of Hyderabad-Panaji section of NH-167 on HAM under BMP (Package-l) |
NHAI/HQ/GM-Tel./DGM/ Gude-Mari/PKG-I/IE/10-2022 |
20/10/2022 |
17/10/2022
|
15/12/2022
Time
11:0Hrs
|
|
1036 |
IE services for Construction of Four laning of Marikal-Hasnapur Potulamadugu section of NH-167 from Design Km 228.500 to Km 267.360 in Telangana as a part of development of EC to improve the efficiency of freight movement in India on HAM Package-II |
NHAI/HQ/GM-Tel./DGM/Mari-Hasn/ Pkg-II/IE/10-2022 |
20/10/2022 |
17/10/2022
|
27/02/2023
Time
11:0Hrs
|
|
1037 |
Independent Engineer (IE) Services during OandM period for Const of 8L VKE from km355 to km378.74(Pkg I-Padra to Vadodara) from km323 to km355 (Pkg II -Sanpa to Padra) and from km292 to km323 (Pkg III -Manubar to Sanpa) in the State of Gujarat on HAM |
2022-NHAI-132312-1 |
06/12/2022 |
17/10/2022
|
06/01/2023
Time
11:0Hrs
|
|
1038 |
Consultancy Services for Independent Engineer for Four laning from Godibandha to Ballahar Chhak Ballhar Chhak to Banarapal Banarapal to Start of Anugul bypass at Km 314.130 to Km.321.035 of NH 53 at Km.75.200 to Km.84.000 of NH 149 and at Km.84.000 to Km.86.100 of NH 55 on HAM in the state of Odisha |
2022 NHAI 130166 1 |
14/10/2022 |
14/10/2022
|
14/02/2023
Time
11:0Hrs
|
|
1039 |
Consultancy Services for Supervision Consultant SC during Operation and Maintenance Period of 4 laning of Ghaghra Bridge to Varanasi Section of NH 233 from Km 180420 to Km 240340 Package II from Bhudanpur Urban section of start of Gossai bazar bypass and from Km 240340 to Km 299350 Package III from start of Gossai Bazar bypass to Varanasi in the State of Uttar Pradesh |
2022-NHAI-131916-1 |
18/10/2022 |
13/10/2022
|
31/10/2022
Time
11:0Hrs
|
|
1040 |
Consultancy services for Independent Engineer for 4/6 laning of Edathanattukara to Iringaullur section of NH-966 from Km. 61.440 to Km.121.006 (Design Length=59.566 Km) (Civil Package 3,4 and 5) in the State of Kerala in HAM mode under Bharatmala Pariyojana. |
2022-NHAI-132030-1 |
30/12/2022 |
13/10/2022
|
20/03/2025
Time
11:0Hrs
|
|
1041 |
Consultancy Services for Authoritys Engineer for Supervision of (i) Construction of ROB at Km 116 of NH-99 (new NH-22) at Chandwa (LC No. 12A/T) in the State of Jharkhand on EPC mode (ii) Construction of RoB at Km-11 of NH-419 at Chittranjan (LC No. 5 SPL/E) in the State of Jharkhand on EPC mode (iii) Construction of ROB at Km. 209 of NH-114A at Jagdishpur (LC No. 5/B/E) in the State of Jharkhand on EPC mode for the Year 2020-21, (iv) Construction of ROB at km 204 of NH-114A at Patharia (LC No. |
NH/RANCHI/EPC/AE/2022-23/13 |
10/10/2022 |
10/10/2022
|
28/11/2022
Time
11:0Hrs
|
|
1042 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of Six lane access-controlled Paniyala-Barodameo Inter Corridor Route from Km 0.000 to Km 86.513 in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana |
NHAI/Bharatmala/ICR/PAB/AE/2022 |
10/11/2022 |
10/10/2022
|
01/12/2022
Time
11:0Hrs
|
|
1043 |
CS for AE for Supervision of Construction of 4L Elevated Corridor and at-grade improvements from Design Ch0-000 to Design Ch19-870 of Danapur–Bihta Section with providing connectivity to the existing RoB near Danapur station (0.231 km) 1.35 Km ramps & at-grade improvements to 4L section on Danapur side and Upgradation of existing 2L carriageway to 4L carriageway from Design Ch19-870 to Design Ch23-500 of Bihta-Koilwar section (Total Length 25.081 Kms) in Bihar on EPC Mode |
2022-NHAI-131330-1 |
27/10/2022 |
07/10/2022
|
13/12/2022
Time
11:0Hrs
|
|
1044 |
CS for AE for Supervision of Const of 4L with PS from Exitg Ch 14200 to 24320 Ch 33760 to 42780 and Ch 43440 to 47020 Delina Flyover-incl flyover length 1704 km of total length 22736 kms in AOR of 760 BRTF on road Srinagar-Baramula-URI NH01 in UT JK |
RW/SR/Wroks(3)/AE/JnK/2022 |
06/10/2022 |
06/10/2022
|
18/11/2022
Time
11:0Hrs
|
|
1045 |
Consultancy Services for Authority’s Engineer for Supervision of (i) Construction of 4-lane from Barela to Manegaon section of NH-30 from design Ch. 2.900 to design Ch 19.050 (Jabalpur Ring Road, Package-1) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC mode (ii) Construction of 4-Laning of Manegaon to NH-45 from Km.19.050 to Km. 39.180 (Jabalpur Ring Road, Package-2) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode. |
NHAI/HQ/MP/Barela-NH-45/Pkg-1&2/EPC/AE/2022 |
04/10/2022 |
04/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
1046 |
Consultancy Services For Authority’s Engineer For Supervision of “Widening to 2- Lane with Paved shoulders of Bodhan-Basar-Bhainsa section of NH-161BB in the state of Telangana |
RW/HYD/Misc-28 NIT AE/2022-23/07dt03.10.2022 |
07/10/2022 |
03/10/2022
|
17/11/2022
Time
15:0Hrs
|
|
1047 |
Consultancy Services for Authority’s Engineer for Development of existing 2 Lane NH-1 from km 8.660 to km 33.775 (Sumbal to Wayul) to 4 lane dual carriageway NH standard as part of Srinagar Ring Road Phase – II [Design Ch 41 907 to Ch 66 609] under Bharatmala Pariyojna Phase I in the Union Territory of Jammu and Kashmir on EPC mode |
2022 NHAI 130994 1 |
10/10/2022 |
03/10/2022
|
10/11/2022
Time
11:0Hrs
|
|
1048 |
Independent Engineer services for Operation & Maintenance of (i) Chennai Bypass from Km 0.000 to Km 32.600 in the State of Tamil Nadu, (ii) Chennai – Tada Section of NH-5 from Km 11.000 to Km 21.400 in the State of Tamil Nadu and (iii) Koyambedu - Maduravoyal section of NH-4 from Km 9.410 to 13.535 in the state of Tamil Nadu |
NHAI/RO-Chennai/IE/O&M/2022/23/100 |
03/10/2022 |
03/10/2022
|
13/10/2022
Time
17:0Hrs
|
|
1049 |
Supervision Consultancy Services during Operation Maintenance of 4-laning of Ghaghra Bridge to Varanasi section of NH-233 from Km. 121.800 to Km. 180.420 (Package-1) from Ghaghra Bridge Abutment on Basti side to Bhudanpur Urban section in the State of Uttar Pradesh under on EPC mode (3rd Call). |
11015/NHAI/PIU-AZM/SC/2022-23/ |
03/10/2022 |
03/10/2022
|
25/11/2022
Time
12:0Hrs
|
|
1050 |
Independent Engineer (IE) Services for Operation and Maintenance stage under TOT Mode of Four Laning of Bamanbore - Garamore and Garamore-Samakhiyali Section of NH - 27 in the State of Gujarat |
2022-NHAI-130984-1 |
01/11/2022 |
03/10/2022
|
17/11/2022
Time
11:0Hrs
|
|
1051 |
Consultancy Services for AE for Supervision of Widening and Reconstruction of existing road to 4-lane from Km 56/400 to Km 120/300 (i.e. from B. Kothapalli Junction to Gorantla) (excluding Kadiri Bypass from Km 70/200 to Km 77/105) of NH-716G in the State of Andhra Pradesh on EPC mode under Annual Plan 2021-22 |
12014/31/2021AP/ZoneIII/742/AE |
04/10/2022 |
30/09/2022
|
14/11/2022
Time
17:0Hrs
|
|
1052 |
Independent Engineer Services for Operation and Maintenance of Jhansi Orai section Stretch of NH-27 Old NH-25 KM 90.300 New Ch.-1380.300 to KM 225.713 New Ch. 1515.713 |
2022-23/Jhansi-Orai/IE/PIU Kanpur |
07/11/2022 |
29/09/2022
|
14/12/2022
Time
12:0Hrs
|
|
1053 |
Consultancy services for Authoritys Engineer for Supervision of Work of Imp. and up-gradation of newly declared NH, NH-227B (84 Kosi Parikrama Marg)PkgIII, Design Km 47 800(Gosaiganj)to Km 73 300 (Bikapur) on (EPC) basis in the State of U.P. |
4088/733C (3)-NH Circle/2022 Date.19.09.2022 |
28/10/2022 |
22/09/2022
|
14/03/2023
Time
15:0Hrs
|
|
1054 |
Construction/upgradation of existing 2 Lane with paved shoulder Km 504.871 to Km 508.610 and Km 468 to Km 489.35 |
85053/Auth Engg/5C Joshimath bypass/01/EPC C |
27/10/2022 |
22/09/2022
|
03/03/2023
Time
11:0Hrs
|
|
1055 |
CS for AE for Supervision of Construction of 6Lane Bridge with approaches from Km 8.480 near Sherpur to Km 23.000 near Dighwara across River Ganga as Part of Patna Ring Road in Bihar on EPC Basis |
2022-NHAI-129635-1 |
12/10/2022 |
21/09/2022
|
13/12/2022
Time
11:0Hrs
|
|
1056 |
Consultancy Services for Authority s Engineer for Supervision of Widening and Strengthening/Reconstruction of existing pavement to two lane with paved shoulder from km 116.00 to 176.220 (except km 155.00 to 156.00 km 160.368 to 161.368 km 164.500 to 165.500 and km 168.800 to 169.800) of NH 75E (New NH-20) in the State of Jharkhand under EPC mode |
NH/CHAIBASA/EPC/AE/2022-23/01 |
06/10/2022 |
20/09/2022
|
20/10/2022
Time
11:0Hrs
|
|
1057 |
AE services for Pkg-I/II/III of NH-734 Moradabad Kashipur |
2022NHAI1295951 |
28/09/2022 |
20/09/2022
|
08/11/2022
Time
15:0Hrs
|
|
1058 |
Consultancy Services for Authority Engineer for Supervision of Rehabilitation And Upgradation of existing road to 4 lane from Km 0.000 to Km 56.500 Muddanur to B. Kothapalli of NH-716G in the State of Andhra Pradesh on EPC mode under Annual Plan 2021-22 |
RW/NH-12014/30/2021-AP/ZoneIII |
29/09/2022 |
20/09/2022
|
18/11/2022
Time
17:0Hrs
|
|
1059 |
Consultancy Services for AE for Construction of 6 lane Elevated Corridor along with development of existing 4 lane road at ground level from Aroor to Thuravoor Thekku section of NH66 Km.366.330 to Km. 379.082 of NH66 under BMP in Kerala on EPC |
2022-NHAI-129632-1 |
11/11/2022 |
20/09/2022
|
06/12/2022
Time
11:0Hrs
|
|
1060 |
Consultancy Services for Supervision of Routine Maintenance Incident Management Toll Operation Special Repairs Periodical Renewals Civil Works Contract from Km 1184/322 to Km 1380/387 on Four Lane of Baran-Shivpuri-Jhansi section of NH-27 in the state of Raj MP UP |
2022/NHAI/129598/1 |
04/11/2022 |
20/09/2022
|
16/11/2022
Time
11:0Hrs
|
-
|
1061 |
Consultancy for AE services for Widening and Development of Existing NH85 from Km 0.000 to km 124.636 section of NH85 to 2L and 2L plus PS section in Kerala on EPC mode. |
2022/NHAI/129627/1 |
05/11/2022 |
20/09/2022
|
22/11/2022
Time
11:0Hrs
|
|
1062 |
Independent Engineer services during O & M phase of Four laning of Solapur Yedshi section of NH 211 from Km 0 000 to Km 100 000 Design Length 98 717 Km Four Laning of Solapur MAH KNT Border from Km 249 000 to Km 348 800 Section of NH 9 Design Length 100 06 Km and Four laning of Pune Solapur section of NH 9 from Km 144 400 to Km 249 000 in the State of Maharashtra |
2022 NHAI 129143 1 |
20/09/2022 |
20/09/2022
|
10/11/2022
Time
11:0Hrs
|
|
1063 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER SERVICES FOR FOUR LANING OF GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31 (I) HRIDAIPUR (KM 0.000) TO SHAHAPUR (KM 42.500) (PACKAGE-I) AND (II) BUXAR SPUR OF LENGTH 17.270 KM (PACKAGE-IV) IN THE STATE OF UTTAR PRADESH ON EPC MODE |
NHAI/Tech/Gazipur/ Ballia/Pkg-IandIV/AE/2022 |
21/09/2022 |
20/09/2022
|
09/11/2022
Time
11:0Hrs
|
|
1064 |
Consultancy services for Authority Engineer services for Four Laning of Gazipur - Ballia - UP/Bihar State Border (Greenfield) section of NH-31 (i) Package II [from Shahapur (km 42.500) to Pindari (km 78.150)] and (ii) Package III [from Pindari (km 78.150) to Rawalganj Bypass (km 117.120)] in the state of Uttar Pradesh on EPC Mode |
NHAI/Tech/Gazipur /Ballia/Pkg-IIandIII/AE/2022 |
21/09/2022 |
20/09/2022
|
09/11/2022
Time
11:0Hrs
|
|
1065 |
Consultancy Services for 6-laning of Chittor - Mallavaram Section of NH-140 |
NHAI/RO-VJA/IE/C-M/2022 |
30/09/2022 |
19/09/2022
|
09/11/2022
Time
11:0Hrs
|
|
1066 |
Consultancy Services of Independent Engineer for (i) Improvement and Up-gradation of Existing Road to 4- lane with paved shoulder from Km. 88-750 to 123-650, Start of Shahjahanpur bypass to Start of Shahabad bypass of Nh-731 on HAM basis in the state of Uttar Pradesh (Package-2A) and (ii) Improvement and Up-gradation of Existing Road to 4–lane with Paved Shoulder from Km 123-650 to 175-080, Start of Shahabad bypass to End of Hardoi bypass of NH-731 on HAM basis in the state of Uttar Pradesh (Pac |
2022NHAI1292061 |
30/09/2022 |
16/09/2022
|
08/11/2022
Time
15:0Hrs
|
|
1067 |
Supervision Consultant Services for Operation and Maintenance of Shillong Bypass from Km 61.8 of NH 40 to Km 34.85 of NH 44 connecting NH40 and NH44 along with supervision of construction of the new bridge at Km 12.865 of Shillong Bypass |
2022-NHAI-129226-1 |
22/09/2022 |
16/09/2022
|
10/11/2022
Time
17:30Hrs
|
|
1068 |
Consultancy Services of Independent Engineer for Improvement and Up-gradation of NH-74 (New NH-30) Bareilly -Pilibhit - Sitarganj NH-74 (New -30) on following projects-Package-I of Bareilly -Pilibhit from Km 0-00 to Km 32-500 on HAM basis in the state of Uttar Pradesh Package-II of Pilibhit - Sitarganj from Km 32-500 to Km 64-800 Ch 0-00 to 6-00 (Sitarganj Bypass) on HAM basis in the state of Uttar Pradesh -Uttarkhand |
NHAI/11013/Brly/IE/NH-74(NH-30)/BS/2022/E-166990 |
20/12/2022 |
16/09/2022
|
24/01/2023
Time
11:0Hrs
|
|
1069 |
Independent Engineering Services for the work of Rehabilitation and Up-gradation of Chorma – Bargania section of NH-227F from Design Chainage Km 0 000 to Km 34 566 to two under lanes with paved shoulders in the state of Bihar |
2022-NHAI-129077-1 |
28/09/2022 |
15/09/2022
|
21/11/2022
Time
11:0Hrs
|
|
1070 |
Independent Engineering Services for the work of Construction of Two Lane with paved Shoulder of road stretches from Bakaur to Parsarma (km 13 300 to km 18 875) NH-527A Parsarma to Bariyahi (km 0 000 to km 24 068) NH-327E Bangaon Bypass (km 0 000 to 3 820) & Mahishi Spur road (km 0 000 to km 5 720) the total length of 39 183 km under BRT Scheme in the State of Bihar on HAM Mode |
2022-NHAI-129058-1 |
28/09/2022 |
15/09/2022
|
21/11/2022
Time
11:0Hrs
|
|
1071 |
CS FOR PREPARATION OF DPR CARRYING OUT FS DETAILED SURVEY INVESTIGATION ALIGNMENT OPTION PREPARATION OF GAD ENGINEERING REPORT FOR CONSTRUCTION OF PROPOSED FOB AND ITS APPROACHES ALONG WITH SERVICE ROAD AND PREPARATION OF LA-UTILITY ON BATHINDA |
RW/CH/W(40)/PB/2022 |
14/09/2022 |
14/09/2022
|
28/10/2022
Time
16:0Hrs
|
|
1072 |
CS FOR AE FOR SUPERVISION OF Const 2Lane ROB in replacement of LCNo3ESPL3 on Gudivada Machilipatnam rly sec at Km231.7 of NH165 and LCNo52 on VJA Bhimavaram rly sec at Km230.6 of NH165 inc. one time imp of bypass Gudiwada Km228 to 233.540 in AP EPC |
SE/NH/VJA/17/2022-23 dt 11.08.2022 |
21/09/2022 |
12/09/2022
|
07/10/2022
Time
17:0Hrs
|
|
1073 |
Consultancy Services for AE for Supervision of 69 standalone bridges including Approach Road on the Tamu Kalewa Kyigone (TKK) section from Km 0-00 to Km149-70of Trilateral Highway in Myanmarto be executed on EPC Mode |
2022-NHAI-128503-1 |
11/10/2022 |
09/09/2022
|
27/10/2022
Time
17:0Hrs
|
|
1074 |
Independent Engineer Services for (i) Construction of 4-laning of Boregaon Buzurg to Shahpur section of NH-753L from Km. 139.000 to Km. 186.000 (length 47 Km) under Bharatmala Pariyojana in the State of Madhya Pradesh on Hybrid Annuity Mode (ii) Construction of 4-laning of Shahpur Bypass to Muktainagar section of NH-753L from Km. 186.000 to km 216.278 under Bharatmala Pariyojana in the State of MP and MH on Hybrid Annuity Mode. |
NHAI/HQ/MP/Boregaon Buzurg to Muktainagar/IE/2022 |
04/10/2022 |
09/09/2022
|
17/11/2022
Time
11:0Hrs
|
|
1075 |
Independent Engineer Services for Construction of 4 -Laning of MP/UP Border to Kabarai section of NH-34&35 from km 197.000 to km 242.991 (Length= 45.991 Km) (Sagar-Kabrai Package-5) under Bharat Mala Pariyojana (EC) in MP & UP on HAM. |
NHAI/HQ/MP/Sagar- Kabrai-Pkg-V/Proc/IE/2022 |
12/09/2022 |
09/09/2022
|
09/11/2022
Time
11:0Hrs
|
|
1076 |
Consultancy Services for AE for Supervision of 69 standalone bridges including Approach Road on the Tamu Kalewa Kyigone (TKK) section from Km 0-00 to Km149-70of Trilateral Highway in Myanmarto be executed on EPC Mode |
2022-NHAI-128503-1 |
16/09/2022 |
09/09/2022
|
20/10/2022
Time
11:0Hrs
|
|
1077 |
4 laning of Haridwar to Muzzaffarnagar section from 356.450 km to 360.270 km of NH-34 & from 0.000 km to 36.400 km of NH-334. [Package1] & from CH. 36.400 to CH. 71.900 section of NH 334 [Package2] in the State of Uttar Pradesh & Uttarakhand |
NHAI/RO-DDN/UKD/SC/NH-34 334/2022-23/ |
21/09/2022 |
07/09/2022
|
12/10/2022
Time
11:0Hrs
|
|
1078 |
Consultancy services for Authority’s Engineer for Supervision of Construction of Animal Underpasses at Nagbhid - Bramhapuri - Armori Road, NH -353D in Km. 109.650 and 111.175 In State of Maharashtra on EPC Mode. |
10/EENH/NGP/2022-23/4026 |
23/09/2022 |
06/09/2022
|
30/09/2022
Time
17:0Hrs
|
|
1079 |
Consultancy services for Independent Engineer for Four-Laning of NH-716 from Kadapa (Junction with Kadapa Bypass Road) (Design Km 0.000/Existing Km 260.652 of NH-716) to Chinna Orampadu (Design Km 64.200 / Existing km 196.125) (Design Length = 64.200 Km) (Package-1) on HAM under Bharatmala Pariyojna in the state of Andhra Pradesh |
NHAI/AP/Tech/IE/NH-716/ Kad-Reni/Pkg-I/2022 |
03/10/2022 |
06/09/2022
|
01/11/2022
Time
11:0Hrs
|
|
1080 |
Consultancy services for Independent Engineer for Four-Laning of NH 716 from Chinna Orampadu (Design Km 64.200/ Existing km 196.125 of NH-716) to Renigunta on NH 565 near Tirupati Airport Road (Design Km 121.935 / Existing km 137.000) (Design Length = 57.735 Km) (Package-2) on HAM under Bharatmala Pariyojna in the state of Andhra Pradesh |
NHAI/AP/Tech/IE/NH-716/ Kad-Reni/Pkg-II/2022 |
03/10/2022 |
06/09/2022
|
01/11/2022
Time
11:0Hrs
|
|
1081 |
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to two lane with paved shoulder from Km 0.000 to Km 45.946 of Nizampet Narayankhed Bidar section of NH 161B in the State of Telangana |
RW/HYD/Misc28/NIT/AE/2022 23/06 dt 02.09.2022 |
08/09/2022 |
02/09/2022
|
26/10/2022
Time
15:0Hrs
|
|
1082 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Widening and strengthening to 2 Lane 4 lane with paved shoulders from km 0.000 to km 60.255 of Mahabubnagar Chincholi section of NH 167N in the State of Telangana |
RW/HYD/Misc-28/NIT/AE/2022-23/05 dt 02.09.2022 |
09/09/2022 |
02/09/2022
|
25/10/2022
Time
15:0Hrs
|
|
1083 |
Consultancy services for authoritys engineer for supervision of construction of rudraprayag tunnel of length 900.30 m including approaches and one major bridge on river alaknanda connecting nh-107 (old-109) to nh-07 (old nh-58) on epc mode in the state of Uttarakhand |
4154/13 yata-NH-10/2022 dated 29.08.2022 |
02/09/2022 |
01/09/2022
|
30/09/2022
Time
15:0Hrs
|
|
1084 |
Consultancy Services for Supervision Consultants of Operation & Maintenance of Start of Sangrur Bypass to Tapa including Dhanaula Bypass from km 110.720 to km 175.000 of NH-64 (New NH-07) & Sangrur to Punjab/Haryana Border section of NH-71 (New NH- 52) from km 181.805 to km 238.695 in the State of Punjab |
2022-NHAI-127597-1 |
26/09/2022 |
01/09/2022
|
10/10/2022
Time
15:0Hrs
|
|
1085 |
Independent Engineer Services for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km 51.000 to Km 72.000 of NH 20 (New NH 154) (Design Length 18.450 KM) of Pathankot Mandi Section under NH (O) in HP on HAM basis (Package IIA |
2022 NHAI 127502 1 |
06/09/2022 |
31/08/2022
|
21/09/2022
Time
11:0Hrs
|
-
|
1086 |
Consultancy Services for Supervision Consultant (SC) of Routine Maintenance including Incident Management for Operation and Maintenance of Mydukur – Dornala T junction from Km 589.00 to Km.641.000 of NH 67 and Dornala T junction - Nellore section from Km.641.000 to Km 741.950 of NH 67 (3rd call) |
NHAI/ROVJA/M-D-N/2022-3C |
13/09/2022 |
31/08/2022
|
27/09/2022
Time
11:0Hrs
|
|
1087 |
Independent Engineer services during Operation & Maintenance period of four-laning of Kashipur-Sitarganj section of NH-74 from km 175.000 to km 252.200 in the State of Uttarakhand and Uttar Pradesh under NHDP Phase-IV on DBFOT (Toll) Basis.Independent Engineer services during Operation & Maintenance period of four-laning of Kashipur-Sitarganj section of NH-74 from km 175.000 to km 252.200 in the State of Uttarakhand and Uttar Pradesh under NHDP Phase-IV on DBFOT (Toll) Basis |
NHAI/RO-UKD/RUP/KSH-SIT/NH-74 |
01/09/2022 |
31/08/2022
|
10/10/2022
Time
11:0Hrs
|
-
|
1088 |
Consultancy services for Independent Engineer Services for Construction of 4 Lane Access controlled Highway from Vakalapudi Light House to Annavaram on NH 16 section of NH 516 F from Km 0 00 to Km 40 621 on HAM under BP Phase 1 in the State of Andhra Pradesh |
2022-NHAI-127330-1 |
30/08/2022 |
30/08/2022
|
21/03/2023
Time
11:0Hrs
|
|
1089 |
Independent Engineer Services for Construction of (i) 4-lane highway from Vidisha to Hinotiya from km 0.000 to Km 27.000 (Length = 27 Km) (Vidisha – Mehulwa-Talbehat Pkg-I) Section of NH- 346 and (ii) 4-laning of Vidisha to Morikori from Km 39.000 to 59.476 (Length = 20.476Km.) section of NH-146 under Bharatmala Pariyojana in the State of Madhya Pradesh on Hybrid Annuity basis. |
NHAI/HQ/MP/Vidisha -Mehulwa/HAM/IE/2022 |
15/09/2022 |
30/08/2022
|
29/11/2022
Time
11:0Hrs
|
|
1090 |
AE Services for supervision of Four laning of Aurangabad to Paithan section of NH-752E from design km 0.000 to design km 42.417 (Design Length – 42.417 km) in the State of Maharashtra to be executed on EPC mode under BMP |
NHAI/Tech/MH/AE/A - P/2022 |
19/09/2022 |
30/08/2022
|
06/10/2022
Time
11:0Hrs
|
|
1091 |
Consultancy services for Authority Engineer for Upgradation of Bijapur Gulbarga Homnabad section of NH 218 to 2 lane With Paved Shoulders from Km.195.000 to Km.418.000 in the State of Karnataka under NHDP Phase IV executed on Engineering, Procurement and Construction EPC mode under Operation and Maintenance Phase |
NIT No.20/NHAI/RO-BNG/16019/Tender/2022-23 dated 29.08.2022 |
30/08/2022 |
29/08/2022
|
26/09/2022
Time
15:0Hrs
|
|
1092 |
Widening and strengthening to 4LPS2LPS from km 0.000 to 35.800 Kuakhia -Mangalpur Section of NH20 in the State of Odisha on EPC mode |
02-ROBBSR-2022-23/AE |
26/08/2022 |
26/08/2022
|
12/01/2023
Time
15:0Hrs
|
|
1093 |
Independent Engineer Services during Operation & Maintenance Period for Two Laning of Raebareli to Jaunpur section of NH-31 (Old NH-231) from Km 0.000 to Km 166.400 in the State of Uttar Pradesh under NHDP Phase-IVA on BOT (Annuity) on DBFOT pattern |
NHAI/PIU-RBLY/IE/NH31/2022 |
26/08/2022 |
26/08/2022
|
09/09/2022
Time
13:0Hrs
|
|
1094 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM RAMNAGAR TO ROSEDA FROM KM 3.500 TO KM 43.000 OF NH 527E ON EPC MODE IN STATE OF BIHAR. |
NH-12014/80/2021-RO Patna |
09/09/2022 |
25/08/2022
|
07/11/2022
Time
16:0Hrs
|
|
1095 |
RFP for providing Independent Engineer (IE) services during O & M phase of 4/6 laned Dhule –Pimpalgaon-Nashik-Gonde- Vadape (Km 265 - Km 539.500) section of NH-3 (New NH-60/160) in the State of Maharashtra |
NHAI/RO/MUM/NSK/IE/O&M/2022/15 |
24/08/2022 |
23/08/2022
|
06/10/2022
Time
12:0Hrs
|
|
1096 |
Independent Engineer services for Construction of 4-lane highway with paved shoulders from Km 74.700 to Km 112.950 of NH-731A (i/cYamuna Bridge ) on HAM in the state of Uttar Pradesh. |
CE-RO/LKO/IE/NH-731A(Pkg IV)/2021-22 dt.23.08.2022 |
25/08/2022 |
23/08/2022
|
17/03/2023
Time
17:0Hrs
|
|
1097 |
Consultancy Services for Authority Engineer for Supervision of 4- Laning of Mohari to Satai Ghat section NH-934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package-2) in the State of Madhya Pradesh on EPC Mode |
NHAI/HQ/MP/Mohari-Satai Ghat/Pkg-2/EPC/ AE /2022 |
08/09/2022 |
22/08/2022
|
15/11/2022
Time
11:0Hrs
|
|
1098 |
4 Laning of NH 544D from existing km 346.300 of NH 44 (Design Chainage km 0.000) to km 39.380 (Design Chainage km 37.000) of Anantapur - Muchukota on Hybrid Annuity Mode under NH (O) in the state of Andhra Pradesh & (ii) 4 Laning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of Muchukota – Bugga section of NH-544D on Hybrid Annuity Mode under NH (O), in the state of Andhra Pradesh. |
NHAI/AP/Tech/IE/NH-544D/ATP-MKT-BUGGA/2022 |
21/09/2022 |
18/08/2022
|
03/10/2022
Time
11:0Hrs
|
|
1099 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF (i) Up gradation and Rehabilitation to Two lane with Paved Shoulder of Barmer -Ghagariya section from Km 0.972 to 69.910 of NH-25 Ext. (ii) Construction of 4 lane ROB and its approaches in lieu of existing level crossing no. 328A at km. 0.500 of NH-25E. (iii) Construction of 4 lane Road Over Bridge from Design Chainage at Km 0.000 (km. 102 of NH-325) to Design Chainage at km 1.060 in a length of 1.060 kms on EPC in the State of Raj |
NIT No. 03/ 2022-23 |
22/08/2022 |
18/08/2022
|
20/09/2022
Time
11:0Hrs
|
|
1100 |
Independent Engineer services for supervision of Upgradation and Four Laning of Haridwar Bypass Package-1 From Ch 0-000 (Km 188-100 of NH-58) to Ch 15-100 (Km 5-100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode |
2022-NHAI-125835-1 |
18/08/2022 |
17/08/2022
|
16/09/2022
Time
11:30Hrs
|
|
1101 |
Consultancy services for Authority Engineer for Supervision of Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0-335 to km 34-039 to 2-Lane under SARDP-NE Phase-A in the state of Meghalaya on EPC mode (Package-I) |
NHIDCL/Megh/AE/NRK-I/2021 |
03/08/2022 |
17/08/2022
|
31/08/2022
Time
15:0Hrs
|
|
1102 |
Consultancy Services for Supervision Consultants of Operation & Maintenance of four laning of Hisar to Dabwali Section of NH-10 from km 170.000 to 227.000 (Package-I) and km 227.000 to km 314.660 (Package-2) with paved shoulder in the State of Haryana |
2022-NHAI-125789-1 |
14/09/2022 |
16/08/2022
|
19/09/2022
Time
11:0Hrs
|
|
1103 |
Independent Engineer Services for Construction of 6 - lane Greenfield Karnal Ring Road starting from NH-44 near Village Shamgarh (Design km 0 000 ) and terminating at Karnal – Munak Road (MDR - 115) near Village Samalakha (Design km 34 500) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode |
2022-NHAI-125689-1 |
24/08/2022 |
13/08/2022
|
26/09/2022
Time
11:0Hrs
|
|
1104 |
Independent Engineer Services for 4-Laning of Bhiwani - Hansi road section of NH 148B (Design Length 42 934 km) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode |
2022-NHAI-125690-1 |
24/08/2022 |
13/08/2022
|
26/09/2022
Time
11:0Hrs
|
|
1105 |
Independent Engineer Services for 4-laning of Ambala-Kala Amb section of NH-72 (Part of New NH-344 from Ambala Ring road (Design Chainage (-) 0 800) to Shahzadpur and Part of New NH-7 from Shahzadpur to Kala Amb (HR/HP Border) (Design Chainage 33 015)) in the state of Haryana and Punjab (Design Length 33 815 Km) on Hybrid Annuity Mode under NH(O) |
2022-NHAI-125687-1 |
24/08/2022 |
12/08/2022
|
26/09/2022
Time
11:0Hrs
|
|
1106 |
IE Services for the work of Const and Upgrad to 4 Lane from Siwan (Design Ch. Km 4.217) to Mashrakh (Design Ch. Km 50.123) of NH 227A including const of 4 Lane Tanrwa/Siwan Bypass (Km 0.000 to Km 4.217) of NH 531 in Bihar on HAM Mode |
2022-NHAI-125398-1 |
20/08/2022 |
11/08/2022
|
06/10/2022
Time
17:0Hrs
|
|
1107 |
IE Services for the work of Construction of 4 laning of Kishanganj Bahadurganj road sec starting from NH 31 near village Uttar Rampur (Km. 0.000) and terminating at NH 327E near Village Satal Istamarar under BMP in Bihar on HAM |
2022-NHAI-125396-1 |
20/08/2022 |
10/08/2022
|
06/10/2022
Time
17:0Hrs
|
|
1108 |
Selection of AUTHORITYS Engineer (AE)/PMC Services for Supervision of Construction of two lane with paved shoulder from Km. 0 000 to Km. 10 603) (UP Bihar Border to Chandauli) of NH-219 on EPC mode in the state of Uttar Pradesh. |
1403/219 NHCP/22 Date.08/08/2022 |
17/08/2022 |
10/08/2022
|
08/09/2022
Time
11:0Hrs
|
|
1109 |
Project Management Consultancy services for Construction of Double Tier Elevated Highway Corridor including provision for metro (section from Pune to Shirur of NH-753F (from Km. 0.000 to Km. 56.000)) |
NHAI/RO/MUM/Pune/Pune-Shirur/2022/13 |
11/08/2022 |
10/08/2022
|
26/09/2022
Time
11:0Hrs
|
|
1110 |
Project Management Consultancy services for Up-gradation to existing 2 lanes highway with construction of elevated flyover (section Talegaon-Chakan –Shikrapur of NH- 548D (from Km. 0.000 to Km. 54.000)). |
NHAI/RO/MUM/Pune/TCS/2022/14 |
11/08/2022 |
10/08/2022
|
26/09/2022
Time
11:0Hrs
|
|
1111 |
Consultancy services for Authority Engineer (AE) for supervision of Widening of Existing four lane to Six lane road from Chainage 3.000 to 7.469 of NH-235 (New NH-334) Meerut (Hapur Adda to bijli bamba chauraha) in the State of Uttar Pradesh |
1881/1tender cashier(GZB)-28/21 dt. 06.08.2022 |
10/08/2022 |
09/08/2022
|
05/09/2022
Time
15:0Hrs
|
|
1112 |
Consultancy services for Authority Engineer (AE) for supervision of Widening and Strengthening from km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to Two lane with paved shoulder configuration in the state of Uttar Pradesh |
1880/1tender cashier(GZB)-28/21 dt. 06.08.2022 |
10/08/2022 |
09/08/2022
|
05/09/2022
Time
12:0Hrs
|
|
1113 |
Supervision Consultant during O and M period for 4L of Chandikhole Paradip section of NH 53 in the state of Odisha |
NHAI/RO/OD/13012/56/2022 |
26/08/2022 |
09/08/2022
|
21/09/2022
Time
11:0Hrs
|
|
1114 |
Independent Engineer Services during O and M Period for 6L of Chandikhole Jagatpur Bhubaneswar of NH 16 in the state of Odisha |
NHAI/13012/RO/OD/2022 |
30/08/2022 |
08/08/2022
|
21/09/2022
Time
11:0Hrs
|
|
1115 |
Consultancy services for Supervision Consultant for Operation and Maintenance of Up gradation of Kullu-Manali section of NH-21 (new NH-3) from Km 272.00 to Km 309.345 (Designed Chainage) on EPC mode in the state of Himachal Pradesh under NHDP Phase IVB. |
2022-NHAI-125018-1 |
05/09/2022 |
06/08/2022
|
20/09/2022
Time
15:0Hrs
|
|
1116 |
Supervision Consultancy Services During Maintenance of Two-Lane with Paved Shoulders of Tanda- Raebareli Section Of NH-128 (Total Design Length-162.050 Km Including 13.060 Km Of NH-330) On EPC Mode Under NHDP Phase-IVB in the State Of Uttar Pradesh. |
NHAI/PIU-RBLY/SC/NH128/2022 |
03/08/2022 |
03/08/2022
|
09/09/2022
Time
13:0Hrs
|
|
1117 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Widening of Pachpadra-Bagundi section to 4- Lane of NH-25 on EPC Mode and (ii) 4 lane divided carriageway from km 0.000 (Km. 144.200 of NH-15 (NewNH-68)) to km 21.042 (Km. 160.700 of NH-15 (New NH-68)) Barmer Bypass of NH-15 (New NH-68) on EPC mode in the State of Rajasthan. |
NIT No. 02/ 2022-23 |
05/08/2022 |
03/08/2022
|
06/09/2022
Time
11:0Hrs
|
|
1118 |
4 laning of Ghaghra Bridge to Varanasi Section of NH233 from Km. 180420 to Km 240340 Package II from Bhudanpur Urban section of start of Gossai bazar bypass and from Km. 240340 to Km 299350 PackageIII from start of Gossai Bazar bypass to Varanasi in the State of Uttar Pradesh |
2022-NHAI-124392-1 |
31/08/2022 |
02/08/2022
|
29/09/2022
Time
15:0Hrs
|
|
1119 |
(i) Construction of ROB at km 154/831 of NH-75E between Singhpokaharia and Jhinkpani railway station (LC No RBK-21) (ii) Construction of ROB at km 160/327 of NH-75E between Jhinkani and Talaburu railway station (LC no RBK-24) (iii) Construction of ROB at km 164/444 of NH-75E between Jhinkpani and Talaburu Railway station (LC no RBK-26) (iv) Construction of ROB at km 168.954 of NH-75E between Talaburu and Kendposi railway station (LC no. RBK-30) in the State of Jharkhand |
RW/Ranchi/AP-27/2021-22/AE |
01/09/2022 |
27/07/2022
|
14/10/2022
Time
15:0Hrs
|
|
1120 |
Independent Engineer Services for Four Laning of Neraluru - Thorapalli Agraharam section of NH-844 from Km 0 to Km 23350 (Design Chainage) under Bharatmala Pariyojana Phase I (National Corridor) on Hybrid Annuity Mode in the States of Karnataka & Tamil Nadu 2nd Call (Package-I of Hosur-Dharmapuri Section) |
NHAI/11024/NT/HAM/P1/IE/2022 |
23/08/2022 |
27/07/2022
|
05/09/2022
Time
11:0Hrs
|
|
1121 |
CS for AE for Supervision of Const of 4L with PS from Exitg Ch 14200 to 24320 Ch 33760 to 42780 and Ch 43440 to 47020 Delina Flyover-incl flyover length 1704 km of total length 22736 kms in AOR of 760 BRTF on road Srinagar-Baramula-URI NH01 in UT JK |
RW/SR/Wroks(3)/AE/JnK/2022 |
27/07/2022 |
27/07/2022
|
08/09/2022
Time
11:0Hrs
|
|
1122 |
Consultancy Services for Authority’s Engineer for Supervision of Civil Construction works for Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage Km 30.000 to Km 49.150 (design chainage Km 30.000 to Km 46.450) under 35 BRTF on Akhnoor - Poonch road (NH-144A) in UT of Jammu & Kashmir under Project Sampark, Border Roads Organization (BRO) on EPC mode (Package-I) |
CE (P) SPK/AE/A-P RD/PKG-I/2022-23 |
27/07/2022 |
27/07/2022
|
10/09/2022
Time
11:0Hrs
|
|
1123 |
Consultancy services for Authoritys Engineer for Supervision of Work of Widening to four lane with paved shoulder from design km 49.200 to Km 89.285 of NH-731B on EPC Mode in the State of Uttar Pradesh. |
CE-RO/LKO/NH(O)/27/ NH-731B(Pkg-II)/AE/2021-22 27.07.2022 |
27/07/2022 |
27/07/2022
|
14/03/2023
Time
17:0Hrs
|
|
1124 |
Consultancy services for Authority Engineer (AE) for supervision of Widening and Strengthening from km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to Two lane with paved shoulder configuration in the state of Uttar Pradesh |
1715/1tender cashier(GZB)-NHC/22 dt. 23.07.2022 |
02/08/2022 |
27/07/2022
|
26/08/2022
Time
12:0Hrs
|
|
1125 |
Consultancy services for Authority Engineer (AE) for supervision of Widening of Existing four lane to Six lane road from Chainage 3.000 to 7.469 of NH-235 (New NH-334) Meerut (Hapur Adda to bijli bamba chauraha) in the State of Uttar Pradesh under EPC mode. |
1748/1tender cashier(GZB)-NHC/22 dt. 26.07.2022 |
02/08/2022 |
27/07/2022
|
26/08/2022
Time
12:0Hrs
|
|
1126 |
Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis |
NHIDCL/Ar.Pr.Roing/Hunli/AE/2022 |
10/08/2022 |
26/07/2022
|
08/09/2022
Time
11:0Hrs
|
|
1127 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane Durg – Raipur – Arang Bypass section of NH-53 from Design Ch. 0.000 (Vill. Tendesara) to Design Ch. 44.500 (Vill. Parsada) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - I) |
NHAI/BM/ Durg–Raipur-Arang /AE/Pkg-I/2022 |
26/07/2022 |
25/07/2022
|
25/08/2022
Time
11:0Hrs
|
|
1128 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of 6-lane Durg – Raipur – Arang Bypass section of NH-53 from Design Ch. 44.500 (Vill. Parsada) to Design Ch. 92.230 (Vill. Paragaon) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - II) |
NHAI/BM/ Durg–Raipur-Arang /AE/Pkg-II/2022 |
26/07/2022 |
25/07/2022
|
25/08/2022
Time
11:0Hrs
|
|
1129 |
SC services during O and M stage of 2 laning with paved shoulder of Karauli Dholpur section and Uncha Nagla Khanuan Roopvas Dholpur section of NH 123 length 75.008 km in the state of Rajasthan or Uttar Pradesh under NHDP Phase IV on EPC mode |
NHAI/11011/Tenders-ROJ/KD-UD |
01/09/2022 |
22/07/2022
|
05/09/2022
Time
11:0Hrs
|
|
1130 |
Independent Engineer (IE) for Operation and Maintenance on the basis of International Competitive Bidding for the Bridge between Dhola and Sadia Ghats along with 2-lane connecting roads from near about Dhola to Islampur Tiniali (about 28.511 km) |
RW/GHT/TENDER/IE/DHOLA SADIA IE/2022-23/394 |
18/07/2022 |
21/07/2022
|
12/09/2022
Time
15:0Hrs
|
|
1131 |
Supervision Consultant Services for Operation and Maintenance of package AS-27, AS-26, AS-25 and AS-24 |
2022-NHAI -123044-1 |
20/07/2022 |
20/07/2022
|
06/09/2022
Time
17:30Hrs
|
|
1132 |
Supervision Consult ant Services f or Rectification work of Blackspot location at Tihu, Society Chowk and Changsari Madanpur and Operation and Maintenance of package AS-06, AS-05, AS-04 and AS28 |
2022-NHAI -122782-1 |
07/07/2022 |
18/07/2022
|
06/09/2022
Time
17:30Hrs
|
|
1133 |
(i) Four laning of Jhanji to Demow section of NH-37 from km 491/050 to km 535/250 (Design Chainage) from Km 490/800 to Km 534/800 (ii) 4-laning of NH-37 Section between Demow (km 534/800) to End of Moran Bypass (km 561/700) under SARDP-NE (iii) Four laning of NH-37 from end of Moran Bypass (km 561/700) to Bogibeel junction near Lapetketa (km 580/875) Construction of Dibrugarh Bypass/ Realignment of NH-37 from Bogibeel Junction at Km 580/875 to Km 596/322 in the state of Assam under SARDP-NE. |
NHIDCL/Assam/AE/Jhanji-Dibrugarh/2022/208578 |
08/07/2022 |
18/07/2022
|
25/07/2022
Time
15:0Hrs
|
|
1134 |
Consultancy Services for Supervision Consultant of Operation and Maintenance of 4 Lane NH Connectivity to ICTT Vallarpadam and additional charge of Independent Engineer services for Operation and maintenance of Edapally-Vytilla-Aroor section Kerala |
11203/RO Kerala/Tender Consultants/0988 |
15/07/2022 |
15/07/2022
|
19/08/2022
Time
11:30Hrs
|
|
1135 |
Independent Engineer Services for Four laning of Phagwara to Hoshiarpur road (NH 344B) including Phagwara and Hoshiarpur Bypass under Bharatmala Pariyojana (from Ch -0.600 to Ch 46.902 of NH-344B & Ch 7.780 to Ch 8.900 of NH-344A Total design length 48.622 km) in the State of Punjab on Hybrid Annuity Mode |
NHAI/32044/1/2022/PB/ |
15/07/2022 |
15/07/2022
|
05/01/2023
Time
11:0Hrs
|
|
1136 |
IE Services for supervision of Eastern Peripheral Expressways (6 lane from Km 1-000 to Km 136-000) of NE-2 in the National Capital Region on toll operate maintain and transfer basis. |
2022-NHAI-122588-1 |
20/07/2022 |
15/07/2022
|
13/09/2022
Time
11:0Hrs
|
|
1137 |
Operation and Maintenance of Ayodhya - Gorakhpur Section (From km. 137.970 to km 252.860) of NH-28(new NH-27) in the state of UP on OMT basis (Total Length- 116.101 Km) |
NHAI/GKP/IE/Ayo-Gkp/OMT/22-23 |
16/08/2022 |
11/07/2022
|
24/08/2022
Time
11:0Hrs
|
|
1138 |
Operation and Maintenance of Ayodhya - Gorakhpur Section (From km. 137.970 to km 252.860) of NH-28(new NH-27) in the state of UP on OMT basis (Total Length- 116.101 Km) |
NHAI/GKP/IE/Ayo-Gkp/OMT/22-2023 |
25/08/2022 |
11/07/2022
|
08/09/2022
Time
11:0Hrs
|
-
|
1139 |
Independent Engineer services during Operation and Maintenance period of 6-laning of Vadakkechery-Thrissur section of NH-544 from Design Ch 236.135 to Ch. 264.490 in the State of Kerala under NHDP Phase-II on DBFOT (Toll) Basis for a Total Design Length of 28.355 Km. |
11203/RO Kerala/Tender Consultants/0963 |
12/07/2022 |
11/07/2022
|
19/08/2022
Time
11:30Hrs
|
|
1140 |
Consultancy Services For Authoritys Engineer For Supervision of Development to 4/6-lanning of NH-31 (New NH-10) with both side service roads from km 569.258 to km 581.030 (end of AH-02 project on NH- 31 near Shivmandir to Sevoke Army Cantonment) in districts of Darjeeling and Jalpaiguri in the state of West Bengal on EPC Mode (Job No. 010/WB/2021-22/490) |
MORTH/RO-KOL/NIT/AE/2022-23/01 |
08/07/2022 |
08/07/2022
|
01/09/2022
Time
15:0Hrs
|
|
1141 |
Supervision Consultant and Services for Operation and Maintenance of package AS-03,AS-20,AS-19,AS02 ANDAS-18 |
2022-NHAI -121770-1 |
19/07/2022 |
08/07/2022
|
23/08/2022
Time
17:30Hrs
|
|
1142 |
Supervision Consultant Services for Rectification work of Blackspot location at Daboka section and Operation and Maintenance of package AS-17,AS-16 AND AS-15 |
2022-NHAI-121721-1 |
20/07/2022 |
08/07/2022
|
26/08/2022
Time
17:30Hrs
|
|
1143 |
Supervision Consultant Services for Operation and Maintenance of package AS-23 and 01 |
2022-NHAI -121743-1 |
20/07/2022 |
08/07/2022
|
30/08/2022
Time
17:30Hrs
|
|
1144 |
Supervision Consultant Services for Rectification work of Blackspot location at Sundari, Kishanbazar, Manikpur and Operation and Maintenance of package AS-11,AS-10,AS-09 and AS-08 |
2022-NHAI -121662-1 |
14/07/2022 |
07/07/2022
|
30/08/2022
Time
17:30Hrs
|
|
1145 |
Consultancy services for Authority Engineer for supervision of Development and Upgradation of Bijapur Gulbarga Homnabad section of NH 218 of 2 lane With Paved Shoulders from Km.195.000 to Km.418.000 in the State of Karnataka under NHDP Phase IV to be executed on Engineering, Procurement and Construction mode |
NIT No.07 |
03/08/2022 |
06/07/2022
|
11/08/2022
Time
15:0Hrs
|
|
1146 |
Meerut-Muzaffarnagar Section of NH-58 from Km. 52.250 to Km. 131.000 in the State of Uttar Pradesh |
NHAI/PIU/MEERUT/02 |
16/07/2022 |
01/07/2022
|
26/07/2022
Time
11:0Hrs
|
|
1147 |
Supervision Consultancy Services for Operation and Maintenance of the stretch from Km.71.200 to Km.121.000 of AP/Telangana Border to Rudrampur Section of NH-30 in the State of Telangana. |
120827 |
05/07/2022 |
30/06/2022
|
22/08/2022
Time
15:0Hrs
|
|
1148 |
Independent Consultancy Services during O and M Period of 4-Lane Dual Carriageway from km 488.270 to km 413.200 (Lucknow–Sitapur Section) of NH-30 (old NH-24) in the State of Uttar Pradesh on BOT basis-2nd Call |
NHAI/PIU-LKO/IC/NH-30/2nd Call/2022/11 |
30/06/2022 |
29/06/2022
|
12/08/2022
Time
11:0Hrs
|
|
1149 |
Consultancy Services for Authority’s Engineer for Supervision of “Widening of existing road to 4 lane with paved shoulder from Km 0/000 to Km 51/119 [existing chainage km 476/700 to km 523/530] (51.119 Km) of Tadipatri to Muddanur Bypass section of NH-67 in the State of Andhra Pradesh on EPC mode |
12014/30/2021-AP/Z-III/739/AE |
02/07/2022 |
29/06/2022
|
12/08/2022
Time
17:0Hrs
|
|
1150 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation to 4 LPS configuration from Undewadi Kade pathar - Deshmukh Chowk ) and Dhawan Patil Chowk (Baramati)-Phaltan section of NH-160 in the State of Maharashtra. |
NH/MAH/RO/Pune -1/AE/Pkg-4 |
06/07/2022 |
29/06/2022
|
23/09/2022
Time
17:0Hrs
|
|
1151 |
Consultancy services for Authoritys Engineer for Supervision of Construction of new four lane bypass to Parbhani city (Parwa to Asola) section of NH-61 on EPC mode in the State of Maharashtra. |
NH/MAH/RO/Aur-1/AE/Pkg-1 |
12/07/2022 |
29/06/2022
|
23/09/2022
Time
17:0Hrs
|
|
1152 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation of Jintur- Shirad Shahapur Section of NH-752 I to 2PLS configuration on EPC Mode in the State of Maharashtra. |
NH/MAH/RO/Aur -2/AE/Pkg-2 |
14/07/2022 |
29/06/2022
|
23/09/2022
Time
17:0Hrs
|
|
1153 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation to 2LPS- 4 laning configuration of Chikhli-Dabhadi-Talegaon-Pal Phata section of NH-752H in the State of Maharashtra on EPC Mode. |
NH/MAH/RO/Aur-3/AE/Pkg-3 |
19/07/2022 |
29/06/2022
|
23/09/2022
Time
17:0Hrs
|
|
1154 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Satana to Mangrul (Chandwad) section of NH- 752G 2LPS/ Four Lane configuration in the state of Maharashtra on EPC mode. |
NH/MAH/RO/Pune -2/AE/Pkg-5 |
21/07/2022 |
29/06/2022
|
23/09/2022
Time
17:0Hrs
|
|
1155 |
Independent Consultancy Services during O and M Period of 4-Lane Dual Carriageway from km 488.270 to km 413.200 (Lucknow–Sitapur Section) of NH-30 (old NH-24) in the State of Uttar Pradesh on BOT basis-2nd Call |
NHAI/PIU-LKO/IC/NH-30/2ndCall/2022/11 |
16/08/2022 |
29/06/2022
|
23/08/2022
Time
11:0Hrs
|
|
1156 |
CS for AE for Supervision of Improvement-Upgradation of Existing Two Lane Bypass to 6-laning from Km 403-100 (Design Ch 402-600) to Km 433-000 (Design Ch 433-200) of Hubli-Dharwad Bypass section of NH-48 in Karnataka on EPC mode |
2022-NHAI-120490-1 |
14/07/2022 |
27/06/2022
|
27/07/2022
Time
11:0Hrs
|
-
|
1157 |
AE Services for supervision of Balance Work of four laning of Panvel - Indapur section of NH-66 from km 42.300 (Kasu) to km 84.600 (Indpaur) in the State of Maharashtra under BMP on EPC mode |
NHAI/Tech/MH/AE/BW/Pan-Ind/2022 |
15/07/2022 |
24/06/2022
|
28/07/2022
Time
11:0Hrs
|
|
1158 |
AE services for supervision of six laning of Kagal-Satara section of NH-48 (old NH-4) (Package – I from km 592.240 to km 658.000) in the State of Maharashtra to be executed on EPC mode under BMP |
NHAI/Tech/MH/AE/K – S/Pkg-I/2022 |
15/07/2022 |
23/06/2022
|
28/07/2022
Time
11:0Hrs
|
|
1159 |
Independent Engineer Services during Operation and Maintenance Period for Four laning of Gundugolanu – Devarapalli - Kovvuru section of NH - 16 from Design Ch. Km 15.320 (Existing Km 15.700) to Design Ch.85.204 (Existing Km 81.400) in the State of Andhra Pradesh under Bharatamala Pariyojana on Hybrid Annuity Mode |
2022-NHAI-120012-1 |
23/06/2022 |
23/06/2022
|
17/08/2022
Time
15:0Hrs
|
|
1160 |
Supervision Consultancy Services for Operation and Maintenance of the stretch 4 Laning of Yadgiri to Warangal section of NH 163 from Km.54.0 to km.150.0 (Design length 99.103km) in the State of Telangana. |
119794 |
08/07/2022 |
21/06/2022
|
08/08/2022
Time
15:0Hrs
|
|
1161 |
IE Services during OnM stage of 4/2 laning with paved shoulder from Km 0.000 to 83.453 of Dausa Lalsot Kothoon section of NH 11A Extn. under NHDP Phase IV on Hybrid Annuity Mode |
NHAI/11011/Admn/2022-ROJ /Tenders/DLK/2nd |
21/07/2022 |
21/06/2022
|
04/08/2022
Time
11:0Hrs
|
|
1162 |
Consultancy Services for Supervision Consultants of Operation & Maintenance of Four Lane Yamunanagar-Saha- Barwala-Panchkula section of NH-344 (Old NH-73) from Km. 70.830 to Km. 157.192 (Package-I & II) in the State of Haryana. |
2022-NHAI-119294-1 |
17/07/2022 |
16/06/2022
|
21/07/2022
Time
11:0Hrs
|
|
1163 |
Consultancy Services for Authority’s Engineer for Supervision of Widening to two lane with paved shoulder of Rampachodavaram Koyyuru section of NH-516E from Km 43/700 to Km 113/820 in the State of Andhra Pradesh on Engineering, Procurement & Construction (EPC) Basis Contract |
RW/NH-12014/29/2021AP/737/AE |
19/06/2022 |
16/06/2022
|
05/08/2022
Time
15:0Hrs
|
|
1164 |
Consultancy services for Authority Engineer for Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 (existing km 150.00) to Neechli Oden (Nathdwara) at Design ch. Km 88.800 (existing km 55.950) of NH-162E on EPC Mode |
NIT No. 01/ 2022-23 |
16/06/2022 |
15/06/2022
|
08/08/2022
Time
17:0Hrs
|
|
1165 |
Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation & widening work for 2- Lane with Paved Shouldering of Existing National Highway 122BAlignmentfrom Km 29.730 to Km 72.348 of Mahnar - Bachhwara section in the State of Bihar through an Engineering, Procurement and Construction (EPC)Contract |
NH-12014/52/2021-RO PATNA-PART(1) |
28/06/2022 |
09/06/2022
|
22/08/2022
Time
16:0Hrs
|
|
1166 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WIDENING OF EXISTING SINGLE/ INTERMEDIATE LANE ROAD TO 2 LANE ROAD FROM KM 101.00 TO KM 125.00 ON (PACKAGE-I) & FROM KM 135.00 TO KM 147.00 & KM 156.00 TO KM 168.00 (PACKAGE-II) ON NH-61 (NEW NH-2)IN THE STATE OF NAGALAND |
CE/NH/AE-GEN/2021-22/I |
20/05/2022 |
09/06/2022
|
27/08/2022
Time
18:0Hrs
|
|
1167 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WIDENING OF EXISTING SINGLE LANE ROAD TO INTERMEDIATE LANE ROAD FROM MOKOKCHUNG TO CHARE VIA DIKHU IN THE STATE OF NAGALAND (PACKAGE-I) & WIDENING TO 2-LANE FROM KM185.00 TO KM 220.00 OF NH-61 (NEW NH-02) (PACKAGE-II) IN THE STATE OF NAGALAND |
CE/NH/AE-GEN/2021-22/ll |
27/05/2022 |
09/06/2022
|
27/08/2022
Time
18:0Hrs
|
|
1168 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION REHABILITATION & UP-GRADATION TO 2 LANE WITH PAVED SHOULDER INCLDING 260 M LONG KANDI TUNNEL FROM EXISTING CHAINAGE KM 30.000 TO KM 49.150 (DESIGN CHAINAGE KM 30.000 TO KM 46.450) (PACKAGE-I) UNDER 35 BRTF ON A- P RD (NH-144A) PROJECT SAMPARK (BRO) IN THE UT OF J&K ON EPC MODE |
SPK/AP RD/AE/PKG-I/2022-23 |
09/06/2022 |
09/06/2022
|
29/07/2022
Time
11:0Hrs
|
|
1169 |
Consultancy Services for Authority Engineer services for Four laning of i Thirumangalam Vadugapatti section from Km 0/000 to Km 36/000 of NH 744 Package I and ii Vadugapatti-Therkuvenganallur section from Km. 36/000 to KM. 71/600 of NH-744 Package-II in the state of Tamil Nadu on EPC Mode under Bharatmala Pariyojana |
NHAI/Tech/TN/ Thiru-Ther/AE/2022 |
06/07/2022 |
08/06/2022
|
01/08/2022
Time
11:0Hrs
|
|
1170 |
Consultancy Services for Supervision Consultants of Operation & Maintenance of Four Lane Zirakpur - Start of Sangrur bypass section of NH-64 (New NH-07) from Km 0.000 to Km. 110.720 in the State of Punjab. |
2022-NHAI-118523-1 |
06/07/2022 |
08/06/2022
|
10/10/2022
Time
15:0Hrs
|
-
|
1171 |
Independent Engineer Services for Capacity Augmentation from 2 lane to 4 lane of Rajasthan Border-Fatehpur-Salasar Section of NH-65 (new NH-52 and 58) in the state of Rajasthan on Design Build Finance Operate and Transfer (DBFOT) basis |
2022-NHAI-118232-1 |
14/07/2022 |
06/06/2022
|
26/07/2022
Time
11:0Hrs
|
|
1172 |
CS of AE for Supervision of Construction of Emergency Landing facility on NH Development of emergency landing facility on Balasore Kharagpur sec from Km 83.400 to Km 88.400(total 5 Km) of NH60(NewNH16) in West Bengal on EPC Mode. |
NHAI/HQ/WB/ Balasore-Kharagpur section/ AE/2022 |
10/06/2022 |
03/06/2022
|
21/07/2022
Time
11:30Hrs
|
|
1173 |
Supervision Consultancy (SC) services during O&M stage of Six Laning of Surat-Dahisar Section of NH-8 from Km 263.000 to Km 502.000 (Length Km 239.000) in the state of Gujarat and Maharashtra executed as BOT (Toll) on DBFO pattern NHDP Phase V |
2022-NHAI-117925-1 |
06/07/2022 |
02/06/2022
|
25/07/2022
Time
11:0Hrs
|
|
1174 |
Consultancy services for Authority Engineer for Supervision of Improvement/widening to Two laning with earthen shoulder of (i) Nongjri (Design Ch 30 00km) to Maheshkola (Design Ch 55 525km) (R-M-B Package-II) (ii) stretch from km 55 525 to km 79 680 (Package-III) (iii) Panda (Design Ch 112 300 km) to Baghmara (Design Ch 129 385 km) [R-M-B Package-VI] on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis |
NHIDCL/Megh/AE/R-M-B/Pkg-II III and VI/SH-4/2021 |
12/05/2022 |
02/06/2022
|
16/06/2022
Time
15:0Hrs
|
|
1175 |
Consultancy services for Authoritys Engineer for supervision of Balance work of Rehabilitation and up-gradation to 2 lane with paved shoulder/4lane with paved shoulder configuration from Km. 343.800 to 401.300 of Madhugiri-Chikkaballapura section of NH-69 (old NH-234) except Gauribidnur bypass (from Km, 362.400 to 368.400) in the State of Karnataka on EPC mode |
NH-69-KNT-2021-22-AE |
01/06/2022 |
01/06/2022
|
11/07/2022
Time
15:0Hrs
|
|
1176 |
Project Management Consultancy services for JNPT Package V Part 1 |
NHAI/RO/MUM/PNVL/JNPT-V/PMC/10 |
01/06/2022 |
01/06/2022
|
18/07/2022
Time
11:0Hrs
|
|
1177 |
Consultancy services for Supervision Consultant (SC) for Operation and Maintenance of NH-200 (New NH 130) (Package-I) from Km 0.000 to Km 48.580 (Raipur-Simga). (Total length-48.580 km) of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC mode |
11052/RO-Raipur/Tender/AE/Raipur-Simga |
02/06/2022 |
31/05/2022
|
11/07/2022
Time
15:0Hrs
|
|
1178 |
INDEPENDENT ENGINEER (IE) SERVICES FOR OPERATION AND MAINTENANCE STAGE UNDER TOT MODE OF FOUR LANING WITH PAVED SHOULDER OF PORBANDAR - JETPUR SECTION OF NH - 27 FROM KM. 1.960 TO 117.600 IN THE STATE OF GUJARAT |
2022-NHAI-117563-1 |
06/07/2022 |
31/05/2022
|
27/07/2022
Time
11:0Hrs
|
|
1179 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF RUDRAPRAYAG TUNNEL OF LENGTH 900.30 M INCLUDING APPROACHES AND ONE MAJOR BRIDGE ON RIVER ALAKNANDA CONNECTING NH-107 (OLD-109) TO NH-07 (OLD NH-58) ON EPC MODE IN THE |
2244/13Yata-NH-10/2022 dated 26.05.2022 |
30/05/2022 |
28/05/2022
|
29/06/2022
Time
15:0Hrs
|
|
1180 |
Consultancy services for Supervision Consultant for Operation and Maintenance of Four laning of Parwanoo - Solan section of NH-22 (Now NH-05) from Km 67.000 to Km 106.139, under NHDP Phase-III on EPC basis in the State of Himachal Pradesh. |
2022-NHAI-117464-1 |
12/07/2022 |
28/05/2022
|
27/07/2022
Time
15:0Hrs
|
|
1181 |
Independent Engineering Services for the work of Six Laning of Varansi-Aurangabad section of NH-2 from Km 786-00 to Km 978-400 in the state of UP/Bihar on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis under NHDP Phase-V |
2022-NHAI-117344-1 |
08/06/2022 |
27/05/2022
|
23/06/2022
Time
11:0Hrs
|
-
|
1182 |
Consultancy services for Supervision Consultant (SC) for Operation and Maintenance of NH-200 (New NH 130) (Package-II) from Km 48.580 to Km 91.026 (Simga-Sargaon).(Total length-42.446 km) of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC mode. |
11052/RO-Raipur/Tender/AE/Simga-Sargaon |
01/06/2022 |
27/05/2022
|
11/07/2022
Time
15:0Hrs
|
|
1183 |
Project Management Consultancy services for construction of elevated flyover including provision for metro (section from Nashik Phata to Khed of NH-60 (from Km. 12.190 to Km. 42.000)) |
NHAI/RO/MUM/Pune/ Nashik Phata-Khed/2022/09 |
27/05/2022 |
27/05/2022
|
23/06/2022
Time
15:0Hrs
|
|
1184 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR CONSTRUCTION OF STRENGTHENING AND WIDENING TO 2-LANE WITH PAVED SHOULDER ON NH-319A FROM KM 0 000 TO KM 45 000 (MOHANIA – CHAUSA ROAD) IN THE STATE OF BIHAR |
NH-12014/107/2021-RO Patna-Part(1) |
25/05/2022 |
26/05/2022
|
02/08/2022
Time
16:0Hrs
|
|
1185 |
Consultancy Services for Supervision Consultants Services during Operation and Maintenance of Ludhiana to Talwandi Section of NH-95 from Km 85-980 to 170-000 in the State of Punjab |
2022-NHAI-117023-1 |
20/06/2022 |
25/05/2022
|
05/07/2022
Time
11:0Hrs
|
|
1186 |
Consultancy-services-for-Authoritys-Engineer-for-Supervision-of-Construction-of-Initial-Improvement-works-and-supervision-of-ATMS/TMS-installation-under-Tolling-Operation-and-Maintenance-and-Transfer-of-Palanpur-AbuRoad-Swaroopganj-section(from-km-601-to-km 677)-of-NH-27-in-the-state-of-Rajasthan-Gujarat |
2022-NHAI-116906-1 |
11/06/2022 |
24/05/2022
|
06/07/2022
Time
15:0Hrs
|
|
1187 |
Consultancy Services for Authoritys Engineer for Supervision of Construction of Initial Improvement works and supervision of ATMS/TMS installation under Tolling, Operation, and Maintenance and Transfer of Kothakota Bypass- Kurnool section (from km 135469 to km 211000) of NH-44 in the state of Telangana |
2022/NHAI/116899/1 |
11/06/2022 |
24/05/2022
|
30/08/2022
Time
11:0Hrs
|
|
1188 |
Consultancy Services for Authority Engineer for Supervision of Construction of Initial Improvement works supervision of ATMS/TMS installation under Tolling Operation and Maintenance Transfer of Chittorgarh Bypass- Kota section (from km 891-929 to km 1052-429) of NH-27 in the state of Rajasthan |
2022-NHAI-116892-1 |
10/06/2022 |
24/05/2022
|
06/07/2022
Time
11:0Hrs
|
|
1189 |
CS for AE for Supervision of Construction of Standalone Flyovers and ROB on stretches of NH 31 NH 31C NH 36 and NH 37 in the state of Assam under BMP (Pkg-1 and Pkg-2) on EPC Basis |
NHAI/Tech/NE/ 10Flyover 1ROB/AE/2022 |
03/06/2022 |
23/05/2022
|
22/06/2022
Time
11:0Hrs
|
|
1190 |
Project Management Consultancy services for construction of elevated flyover including provision for metro (section from Nashik Phata to Khed of NH-60 (from Km. 12.190 to Km. 42.000)) |
NHAI/RO/MUM/Pune/ Nashik Phata-Khed/2022/09 |
18/05/2022 |
23/05/2022
|
22/06/2022
Time
15:0Hrs
|
|
1191 |
Supervision Consultancy (SC) Services for DLP/ O&M stage of 2 projects (Item Rate basis projects) & for construction supervision & O&M of 1 project (EPC mode project) in the State of Uttarakhand |
NHAI/RO-UKD/HDR-DDN Dudhahdari/NH-58 72/SC/2021-22/3rd Call |
03/06/2022 |
21/05/2022
|
21/06/2022
Time
11:0Hrs
|
-
|
1192 |
Consultancy services for Authority’s Engineer for Operation and Maintenance of NH-43 (New NH-30) from Dhamtari - Kanker (Km 81.500 to Km 130.000), Bedma-Dahikonga (Km.180.000 to Km.241.000) & Dahikonga-Jagdalpur (Km.241.000 to Km.298.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. |
11052/RO-Raipur/Tender/AE/ Dhamtari-Kanker-Bedma-Dahikonga-Jagdalpur |
03/06/2022 |
20/05/2022
|
11/07/2022
Time
15:0Hrs
|
|
1193 |
IE services during O and M stage of Beawar Pali Pindwara Section and Kishangarh Ajmer Beawar section in the State of Rajasthan |
NHAI/11011/1/Admn/2021-ROJ/ Tender/IE/KAB-BPP/2nd |
09/06/2022 |
20/05/2022
|
29/06/2022
Time
11:0Hrs
|
|
1194 |
Independent Engineer Services during O and M period for Six Laning of Etawah-Chakeri (Kanpur) Section of NH-2 from Km. 323.475 to Km. 483.687 on DBFOT (Toll) Basis under NHDP Phase V in the State of Uttar Pradesh |
NHAI/NH-19/IE/2022-23 |
06/07/2022 |
20/05/2022
|
18/07/2022
Time
12:0Hrs
|
|
1195 |
Consultancy services for Supervision Consultant (SC) for Operation and Maintenance of NH-200 (New NH 130) (Package-III) from Km 91.026 to Km 126.525.(Total length-35.499 km) of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC mode. |
11052/RO-Raipur/Tender/AE/Sargaon-Bilaspur |
03/06/2022 |
19/05/2022
|
11/07/2022
Time
15:0Hrs
|
|
1196 |
Consultancy Service as Authority Engineer for Supervision of Widening to 2 (Two) Lane with Hard shoulder of Jessami to Akhegwo (Package-1 & 2) from (Design Chainage 283-000 Km to 325-440 Km to 340-160 Km) in the State of Nagaland and Manipur on EPC mode under NH(O)-NE |
2022-nhidc-685848-1 |
18/05/2022 |
18/05/2022
|
06/06/2022
Time
11:0Hrs
|
|
1197 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF BYPASS AROUND LOHARDAGA TOWN OF NH-143A ON EPC MODE IN THE STATE OF JHARKHAND |
RW/Ranchi/AP-13/2020-21/JHR |
18/05/2022 |
17/05/2022
|
25/07/2022
Time
15:0Hrs
|
|
1198 |
Consultancy Services as Authoritys Engineer for Supervision of (i) Four laning of Jhanji to Demow section of NH-37 from km 491/050 to km 535/250 on EPC mode (ii) 4-laning of NH-37 Section between Demow (km 534/800) to End of Moran Bypass (km 561/700) (iii) Four laning of NH-37 from end of Moran Bypass (km 561/700) to Bogibeel junction (km 580/875) on EPC mode (iv) Construction of Dibrugarh Bypass/ Realignment of NH-37 from Bogibeel Junction at Km 580/875 to Km 596/322 in the state of Assam |
NHIDCL/Assam/J-D/Re/2022 |
12/05/2022 |
17/05/2022
|
07/06/2022
Time
15:0Hrs
|
|
1199 |
Consultancy services for AE for Supervision of Construction of Realignment-Pandrass-Pashkyum on road Zozila-Kargil-Leh (NH-1) to 2 lane specifications (Drass Realignment, Kharboo Realignment and Kargil Alignment) under Vijayak (BRO) in UT of Ladakh |
RW-CH-W(57)-BRO-Ladakh-2022 |
12/05/2022 |
12/05/2022
|
07/07/2022
Time
11:0Hrs
|
|
1200 |
Consultancy Services for Supervision Consultant during Operation and Maintenance Period of Varanasi Gorakhpur Section of NH29 from Km 12000 Design Chainage Km 12010 to Km 88000 Design Chainage 84160 PackageII from Sandaha to Birnon in the State of Uttar Pradesh |
2022-NHAI-115149-1 |
13/05/2022 |
07/05/2022
|
06/06/2022
Time
11:0Hrs
|
|
1201 |
Consultancy Services of Authoritys Engineer for the following projects (i) Two laned with paved shoulders of Nazibabad-Kotdwar Section of NH-119 from Design Chainage 122-200 to 137-760 (ii) 4 laning of Najibabad Bypass of NH-119 from Km. 105-423 to Km 118-373 (excluding 2-45 Km of NH-74 Bypass) |
NHAI/11013/SPUR/N-K / Bypass/2022/AE/Re-Invitation/126327 |
05/05/2022 |
05/05/2022
|
07/06/2022
Time
11:0Hrs
|
|
1202 |
Independent Engineer Services during Operation and Maintenance Period for Four laning of Jhansi-Khajuraho section (Package-I) from km 0.00 to km 76.603 (existing km 108.300 of NH-25 Kanpur-Jhansi Section to km 82.10 of NH-75/76) in the state of UP/MP under NHDP Phase-III on Hybrid Annuity Mode. |
NHAI/ROMP/CHHP/JK/IE OandM/PKGI/2022 |
25/05/2022 |
05/05/2022
|
13/06/2022
Time
11:0Hrs
|
|
1203 |
Authority Engineer/PMC for Supervision of Construction of 1 ROB and 3 Flyovers of National Highway No. 730 at the section from Km 133.230 to Km 134.330, Km 134.550 to Km 135.650, Km 136.200 to Km 137.800 under EPC mode in the State of Uttar Pradesh. |
1471/638C-NH Circle /2021-2022 Dated. 29.04.2022 |
06/05/2022 |
05/05/2022
|
04/06/2022
Time
11:0Hrs
|
|
1204 |
Widening to 2 lane with paved shoulder from km 58.635 to 99.409 of Kadapa Nellore Border to CS Puram Section of NH 167B and from Km 99.103 to Km 143.320 CS puram to Malakonda section in the state of Andhra Pradesh on EPC |
RW/NH-12014/15/ 2021-AP/Zone-III/724/AE |
06/05/2022 |
04/05/2022
|
29/06/2022
Time
15:0Hrs
|
|
1205 |
Consultancy services for Authority’s Engineer for Supervision of (i) Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from Design Chainage 50.850 km to 81.870 km (Package-3) in the State of Manipur on EPC Mode (ii) Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from Design Chainage 81.870 km to 105.825 km (Package-4) in the State of Manipur on EPC Mode |
NHIDCL/Manipur/AE/UTT (Pkg-3 &4)/NH-102A/2021 |
12/04/2022 |
04/05/2022
|
11/05/2022
Time
15:0Hrs
|
|
1206 |
Supervision Consultant (SC) Services for Operation and Maintenance of package AS-03, AS-20, AS-19, AS-02, AS-18, AS-17 AS-16, AS-15, AS-27, AS-26, AS-25,and AS-24, Total 274.152 Km |
022-NHAI-114717-1 |
20/05/2022 |
04/05/2022
|
16/06/2022
Time
17:30Hrs
|
|
1207 |
Consultancy Services for AE for Supervision of Widening of existing 2L with PS road to 4L with PS Bathalapalli to Mudigubba Section from Design Ch. Km. 96.300 to 129.300 incl. Bathalapalli Bypass of NH42 in the State of AP through EPC basis |
RW/NH-12014/26/ 2021-AP/Zone-III/731/AE |
06/05/2022 |
02/05/2022
|
27/06/2022
Time
15:0Hrs
|
|
1208 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of 4 lane access-controlled highway from Samarlakota to Achampeta Junction (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH-16 connectivity in the State of Andhra Pradesh on EPC mode under Bharatmala Pariyojana |
2022-NHAI-114408-1 |
06/05/2022 |
29/04/2022
|
06/09/2022
Time
11:0Hrs
|
|
1209 |
Consultancy services for (AE) for supervision of Widening and Strengthening from Km. 15.000 to Km. 58.600 (Bhadewara-Dramandganj section) of National Highway No. 135 C in the state of Uttar Pradesh on (EPC) Mode |
530/01 Com B-18/22 dated 21.04.2022 |
08/05/2022 |
27/04/2022
|
26/05/2022
Time
11:0Hrs
|
|
1210 |
Consultancy services for (AE) for supervision of Widening and strengthening from km 0.00 to 18.450 (Rajapur- Raipura section) of National Highway No. 731 AG in the state of Uttar Pradesh on EPC Mode.(Length 18.450km). |
528/731AG/18-2022 dated 21.04.2022 |
08/05/2022 |
27/04/2022
|
26/05/2022
Time
11:0Hrs
|
|
1211 |
Supervision Consultancy (SC) Services for Operation and Maintenance of the stretch from Km.23.000 to Km.108.800 of Hyderabad to Dindi Section of NH765 in the State of Telangana. |
113945 |
10/05/2022 |
25/04/2022
|
10/06/2022
Time
15:0Hrs
|
|
1212 |
Consultancy services for Authority Engineer for Supervision of Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0 335 to km 34 039 to 2-Lane under SARDP-NE Phase-A in the state of Meghalaya on EPC mode (Package-I) |
NHIDCL/Megh./AE/NRK-I/2021 |
05/04/2022 |
22/04/2022
|
13/05/2022
Time
15:0Hrs
|
|
1213 |
IE Services for supervision of Chittorgarh Bypass to Kota section (from Km 891.929 to Km 1052.429) of NH 27 in State of Rajasthan on toll operate maintain and transfer basis |
2022-NHAI-113574-1 |
24/05/2022 |
21/04/2022
|
06/06/2022
Time
11:0Hrs
|
|
1214 |
Independent Engineer Services during Operation and Maintenance Period for 4-Laning of Moradabad-Bareilly Section of NH-24 from Km 149.250 to Km 271.050 in the state of Uttar Pradesh on DBFOT basis under NHDP Phase-III A |
11017/1/2022/IE/Tender/PIU-MBD |
25/05/2022 |
21/04/2022
|
20/06/2022
Time
12:0Hrs
|
|
1215 |
Consultancy services for Authoritys Engineer for Supervision of Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III length 34.494 km) from Design Chainage km 75-000 to km 109-494 on NH-129A in the State of Manipur on EPC Mode |
NHIDCL/Manipur/AE/M-P(Pkg-3)/NH-129A/2021 |
29/03/2022 |
20/04/2022
|
27/04/2022
Time
15:0Hrs
|
|
1216 |
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders of Siddipet Elkathurthy section from km 69.978 to km 133.619 of NH 765DG in the State of Telangana |
RW HYD Misc28 NIT AE 2022 23/01dt 20.04.2022 |
06/05/2022 |
20/04/2022
|
06/06/2022
Time
15:0Hrs
|
|
1217 |
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders of Siddipet Elkathurthy section from km 69.978 to km 133.619 of NH 765DG in the State of Telangana |
[RW HYD Misc28 NIT AE 2022 23/01dt 20.04.2022 |
25/04/2022 |
20/04/2022
|
06/06/2022
Time
15:0Hrs
|
|
1218 |
Consultancy Services For Authority s Engineer For Supervision of Widening to 2 lane with paved shoulders of Medak Siddipet section from km 0.000 to km 69.978 of NH 765DG in the State of Telangana |
RW/HYD/Misc28 NIT AE 2022-23/04 dt.20.04.2022 |
27/04/2022 |
20/04/2022
|
16/06/2022
Time
15:0Hrs
|
|
1219 |
Consultancy Services For Authority s Engineer For Supervision of Widening and improvement of existing carriageway to 2 lane with paved shoulders from km 86.160 to 131.730 of Jangaon Duddeda section of NH 365B in the State of Telangana |
RW/HYD/Misc28 NIT AE 2022-23/03 dt 20.04.2022 |
28/04/2022 |
20/04/2022
|
08/06/2022
Time
15:0Hrs
|
|
1220 |
Consultancy Services For Authority s Engineer For Supervision of Rehabilitation and Up gradation of Valigonda to Thorrur Section to Two Lane with Paved Shoulders from Km 39.180 to Km 108.300 of NH 930P in the State of Telangana |
RW/HYD/Misc28 NIT AE 2022-23/02dt20.04.2022 |
28/04/2022 |
20/04/2022
|
07/06/2022
Time
15:0Hrs
|
|
1221 |
Independent Engineer (IE) Services for operation and maintenance for the projects (i) 4 Lane divided carriageway of Roorkee-Chutmalpur-Gagalheri, NH-344 (Old NH73) & Chutmalpur – Ganeshpur, NH-307 (Old NH-72A) in the State of Uttarakhand & Uttar Pradesh under NHDP Phase IV on HAM, (ii) 4 Lane divided carriageway of Gagalheri-Saharanpur-Yamunanagar (UP/Haryana border) section of NH-344 (Old NH-73) Uttar Pradesh & Haryana under NHDP Phase IV on HAM |
NHAI/RO-UKD/CGRG-GSY/2022 |
09/05/2022 |
13/04/2022
|
24/05/2022
Time
11:0Hrs
|
|
1222 |
Independent Engineer (IE) Services for operation and maintenance for the projects (i) 4 Lane divided carriageway of Roorkee-Chutmalpur-Gagalheri, NH-344 (Old NH-73) & Chutmalpur – Ganeshpur, NH-307 (Old NH-72A) in the State of Uttarakhand & Uttar Pradesh under NHDP Phase IV on HAM, (ii) 4 Lane divided carriageway of Gagalheri-Saharanpur-Yamunanagar (UP/Haryana border) section of NH-344 (Old NH-73) Uttar Pradesh & Haryana under NHDP Phase IV on HAM |
NHAI/RO-UKD/CGRG-GSY/2022 |
05/05/2022 |
13/04/2022
|
12/05/2022
Time
11:0Hrs
|
|
1223 |
Consultancy Services for Authority Engineer for Supervision of Improvement of 4 lane to 6 lane road and Construction of 4 lane dedicated Port Road for the Port Connectivity Road from Convent Junction to Sheela Nagar Junction in the state of Andhra Pradesh on EPC Mode |
2022-NHAI-112851-1 |
12/04/2022 |
12/04/2022
|
06/09/2022
Time
11:0Hrs
|
|
1224 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH 09 (Old NH-125) (Sitarganj – Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode |
2022-NHAI-112881-1 |
19/04/2022 |
12/04/2022
|
15/06/2022
Time
11:0Hrs
|
|
1225 |
Consultancy Services as Authoritys Engineer for Supervision of (i) 4 laning of Numaligarh to Jorhat section from Km 402.500 to Km 453.00 of NH-37 except construction of Dergaon Bypass from Km 426.80 to Km 437.42 (ii) Dergaon Town to 4 laning from km. 426.800 to km 437.420 on NH-37 in the state of Assam (iii) Four laning of Jorhat to Jhanji Section of NH-37 from Km 453.000 to Km 491.050 (Design Km 453.000 to 490.800) in the state of Assam . |
NHIDCL/Assam/AE/Numaligarh-Jhanji/2021 |
30/03/2022 |
11/04/2022
|
18/04/2022
Time
15:0Hrs
|
|
1226 |
Independent Engineer Services during Operation and Maintenance stage of Six Laning of Agra Etawah Bypass Section of NH 2 from Km. 199.660 to Km. 323.525 under NHDP Phase V in the State of Uttar Pradesh on BOT Toll basis |
NHAI/PIU/AGRA/Misc./21 |
18/05/2022 |
09/04/2022
|
30/05/2022
Time
11:0Hrs
|
|
1227 |
IE services for Tolling Operation Maintenance and Transfer of Palanpur Radhanpur Samakhiyali Sect of NH 27 from Km 589-600 to Km 536-000 in Gujarat (TOT Bundle 5(A-1)) |
2022-NHAI-112398-1 |
12/05/2022 |
08/04/2022
|
07/06/2022
Time
11:0Hrs
|
|
1228 |
Independent Engineer services for Tolling Operation Maintenance and Transfer of Palanpur- Radhanpur-Samakhiyali Section of NH-27 from Km 536 000 to Km 430100 in the state of Gujarat (TOT Bundle- 5A2) |
NHAI/AM/TOT/2022-23/IE/TOT 5A2 |
11/05/2022 |
08/04/2022
|
07/06/2022
Time
11:0Hrs
|
|
1229 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with Kapurthala – Sultanpur Lodhi road (NH-703A) near Isharwal village ch.24.000 to MDR Junction at ch. 40.900 Dhunda Village on EPC mode under Bharatmala Pariyojna in the state of Punjab [NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg2] -2nd call |
NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg2 (2nd Call) |
12/04/2022 |
08/04/2022
|
09/05/2022
Time
11:0Hrs
|
|
1230 |
Consultancy Services for Authority Engineer for Supervision of Construction of Rudraprayag Tunnel of length 900.30 m including approaches and one major bridge on river Alaknanda connecting NH-107 (old-109) to NH-07 (old NH-58) on EPC mode in the of Uttarakhand |
1316/13yata-NH-10/2022 dated 16.04.2022 |
23/04/2022 |
07/04/2022
|
23/05/2022
Time
12:0Hrs
|
|
1231 |
CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF i Up-gradation to two lane with Paved shoulder from Km. 12 850 to Km 20 300 of 7.450 Km length on Goha-Khellani section and a link road to Goha Village of 2 016 Km on NH 244 in UT of Jammu & Kashmir on EPC mode. ii Up-gradation to two lane with paved shoulder from Km 20 300 to Km29 030 of 8730 Km length on Goha Khellani section on NH 244 in Union Territory of Jammu & Kashmir on EPC mode. iii Construction of Bi-directional Tunnel at |
NHIDCL/JK/NH-244/G-Krd 83rd Tunnel/AE/2022 |
13/04/2022 |
06/04/2022
|
17/05/2022
Time
15:0Hrs
|
|
1232 |
Supervision Consultant (SC) Services for Operation and Maintenance of package AS-27 AS-26 AS-25 and AS-24 |
2022/NHAI/112050/1 |
13/04/2022 |
04/04/2022
|
19/05/2022
Time
15:0Hrs
|
|
1233 |
Supervision Consultant (SC) Services for Operation and Maintenance of package AS-17 AS-16 and AS-15 |
2022/NHAI/112035/1 |
12/04/2022 |
04/04/2022
|
19/05/2022
Time
15:0Hrs
|
|
1234 |
Consultancy Services of Authoritys Engineer for Supervision of Road Bakhasar Mavasari fm Km 0 to 32Pt49 Design Length 31pt703 Km existing CL9 to NHDL specifications under 45 TF Project Chetak in Rajasthan and Gujarat in EPC |
CE(P) CTK/EPC/03/2021-22 |
29/03/2022 |
29/03/2022
|
07/05/2022
Time
11:0Hrs
|
|
1235 |
Operation and Maintenance of Four laning of Binjabahal – Tileibani Section, Km.414.000 to Km.491.710 (Design Chainage Km.414.982 to Km.493.300) of NH-6 (New NH-49) in the State of Odisha under NHDP-IV, on Hybrid Annuity Mode- 2nd Call |
NHAI/13012/56/RO/OD/2022 |
01/04/2022 |
29/03/2022
|
28/04/2022
Time
12:30Hrs
|
|
1236 |
IE service during O and M stage of 2 lane with paved shoulder of NH 70 from Munabao (NH 25E) Sundra Myajlar Dhanan Asutar Ghotaru Tanot under Phase 1 of Bharatmala Pariyojana in the State of Rajasthan on HAM. |
NHAI/11011/1/Admn/2021-ROJ /Tenders/IE/MT/3rd |
20/04/2022 |
26/03/2022
|
05/05/2022
Time
11:0Hrs
|
|
1237 |
Independent Engineer Services during Operation and Maintenance of 4-6 laning of Kharar-Ludhiana Section of NH-95 from Km 10.185 to Km 86.199 Samrala Chowk and 4 laning of Ladowall Bypass section from km 0.00 to km 17.041 linking NH 95 with NH 1 in State of Punjab on Hybrid Annuity Mode. |
2022-NHAI-111256-1 |
11/04/2022 |
25/03/2022
|
23/05/2022
Time
11:0Hrs
|
|
1238 |
Supervision Consultancy Services during operation and maintenance of Two Lane with paved shoulder of indo Nepal Border Kakrwhwa to Rudhauli town, section of NH-233 from Km. 0.000 to Km. 65.870 and Rudhauli to Basti Section Km. 65.870 to 122.270 in Uttar Pradesh |
NHAI/PIU-GKP/SC/21-22/4th call |
28/03/2022 |
25/03/2022
|
09/05/2022
Time
12:0Hrs
|
|
1239 |
Independent Engineer services for 4-laning of Tejajinagar Balwara section of NH-347BG (Indore to Boregaon- Pkg II) Design Ch. 9.000 to Design Ch. 42.400 (Length 33.400 Km) under BMP Phase-I in Madhya Pradesh on HAM |
110981 |
30/03/2022 |
23/03/2022
|
19/05/2022
Time
11:0Hrs
|
|
1240 |
Consultancy services for AE for Supervision of Rehabilitation and up-gradation of Manu-Simlung on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-II and IV). |
NHIDCL/Tripura/AE/L-K/V-S/M-s/NH-44A/2020 |
03/03/2022 |
21/03/2022
|
11/04/2022
Time
14:30Hrs
|
|
1241 |
Supervision Consultancy Services for (i)OM of Borkhedi-Jam-Wadner(ii)Periodical Renewal of Borkhedi–Jam–Wadner and (iii) OM of Wadner–Pimplakhutti, Repairs of Pohana Underpass approaches, Repairs of Service Road at Karanji and Repairs and Rehabilitation of Major Bridge at Km.109.995 on Nagpur-Hyderabad Section of NH-44 in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2021-22/35 |
21/03/2022 |
21/03/2022
|
11/04/2022
Time
11:0Hrs
|
|
1242 |
Consultancy Services for Authority Engineer for Supervision of Construction of 4 lane Elevated viaduct at km 7.500 (Munshi Pulia) of NH-24A including development of at grade road, service road and junctions on EPC basis in the State of Uttar Pradesh. |
704/168C(6)-NH Circle/2021-2022, dt 09.03.2022 |
06/04/2022 |
16/03/2022
|
21/04/2022
Time
11:0Hrs
|
|
1243 |
Consultancy Services for Supervision Consultants of Operation & Maintenance of Four Lane Bathinda to Harike section of NH-15 (New NH No. 54) from existing Km 287.615 to Km 166.225 in the State of Punjab. |
2022-NHAI-109860-1 |
11/04/2022 |
14/03/2022
|
18/04/2022
Time
11:0Hrs
|
|
1244 |
Supervision Consultant (SC) Services for Operation and Maintenance of package AS-03 AS-20 AS-19 AS-02 and AS-18 Total 114.79 Km |
2022-NHAI -109688-1a |
29/03/2022 |
14/03/2022
|
28/04/2022
Time
15:0Hrs
|
|
1245 |
IE for the work of 6 Laning of Varansi Aurangabad sec of NH2 from Km 786 00 to Km 978 400 in UP or Bihar on Design Build Finance Operate and Transfer (DBFOT) Toll Basis under NHDP Phase V |
2022-NHAI-109962-1 |
25/03/2022 |
14/03/2022
|
20/04/2022
Time
11:0Hrs
|
|
1246 |
Supervision Consultant (SC) Services for Operation and Maintenance of package AS-06 AS-05 AS-04 and AS-28 |
2022-NHAI-109680-1 |
22/03/2022 |
14/03/2022
|
28/04/2022
Time
15:0Hrs
|
|
1247 |
SC services during O and M stage of 4 Lane of Swaroopganj Pindwara Section and Debari to Pratapnagar Section, 2 lane existing Udaipur Bypass from Pratapnagar to Balicha and 4 Lane of Balicha to Kaya Section of in the state of Rajasthan |
NHAI/11011/ROJ-Tech/ Tenders/SC/SP-DU |
26/03/2022 |
12/03/2022
|
12/04/2022
Time
11:0Hrs
|
|
1248 |
Independent Engineer Services for supervision of Construction of 4 lane Greenfield Jalbehra Shahbad section of NH-152G from km 0 000 to km 22 850 in the state of Haryana (Part of Shahbad – Thol Feeder Route) on Hybrid Annuity Mode under Bharatmala Pariyojna Phase-I |
2022-NHAI-109660-1 |
25/03/2022 |
11/03/2022
|
11/04/2022
Time
11:0Hrs
|
|
1249 |
Consultancy Services for Authority’s Engineer for Supervision of 4-laning of Jagadhri – Tajewala road section from Yamunanagar bypass (Design Ch - 0 223) to Tajewala (Design Ch 32 300) of NH-907 (Old NH 73A) under NH(O) (Design length 32 523 km)(Pkg-1) in the State of Haryana on EPC Mode |
2022-NHAI-109643-1 |
25/03/2022 |
11/03/2022
|
11/04/2022
Time
11:0Hrs
|
|
1250 |
Independent Engineer Services for Operation & Maintenance of four lane Jalandhar to Punjab/J&K Border from Km. 4.230 to Km. 117.750/ Km. 4.000 and 4.000 to Km. 16.350 of NH-1A, OMT basis in the State of Punjab, Package OMT-21-A |
2022-NHAI-109563-1 |
31/03/2022 |
11/03/2022
|
19/04/2022
Time
11:0Hrs
|
|
1251 |
Consultancy Services for Authority’s Engineer for Supervision of 4- laning of Indore to Raghav Garh section of NH 59 (Indore-Harda package 1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Length 26.653 Km) under Bharatmala Pariyojana Phase-I (Economic Corridor) in the state of MP on EPC Mode |
109099 |
21/03/2022 |
08/03/2022
|
07/04/2022
Time
11:0Hrs
|
|
1252 |
Consultancy Services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH-306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode” |
NHIDCL/Mizoram/NH-306 and 6/S-V-S/AE/Pkg-3,4,5&6/2021-22 |
04/03/2022 |
04/03/2022
|
04/04/2022
Time
11:0Hrs
|
|
1253 |
Consultancy Services for Supervision Consultant SC for DLP/ OM stage of 2 projects Item Rate basis projects for construction supervision OM of 1 project EPC mode project in the State of Uttarakhand |
NHAI/ROUKD/HDRDDN Dudhahdari/NH-58 72/SC/2nd |
07/03/2022 |
04/03/2022
|
04/04/2022
Time
11:0Hrs
|
|
1254 |
Consultancy services for Authoritys Engineer for supervision of construction of new 4-Lane -Bridge(Parallel to the existing MG Setu) with its approaches from km 0/000 to km 14/500 across River Ganga on NH -19 at Patna in the state of Bihar on EPC Mode |
RW/NH-12014/95/2019-Z1 |
05/03/2022 |
03/03/2022
|
04/05/2022
Time
17:0Hrs
|
|
1255 |
Independent Engineer services during Operation and Maintenance Period for 4 laned Talegaon–Amravati (Km.100.000 to Km.166.725) Section of NH-53 on DBFOT basis in the State of Maharashtra–Consultancy Package No.IE-OMNH53NAG-20 |
NHAI/RO-NAG/TENDERS/2021-22/34 |
02/03/2022 |
03/03/2022
|
30/03/2022
Time
11:0Hrs
|
|
1256 |
Consultancy Services of Authority’s Engineer for Construction of 4 lane Greenfield highway from km 134.737 to Km 163.253 Sagar Link Road Berkhedi Sagar under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode |
108289 |
22/03/2022 |
03/03/2022
|
05/04/2022
Time
11:0Hrs
|
|
1257 |
AE/PMC FOR SUPERVI. OF W.and U. to 4lane confi.from km34.90(Bhadohi)to km54.150 and km58.80tokm70.40(JNPR bypass sec.)and to 2lane with P.S from km54.150 tokm58.80andKm70.40(JNPR Bypass sec.)toKm73.134(Jaunpur)of NH135A in the state of U.P.on EPCmode |
287/79 com B-18/2022 Date- 02.03.2022 |
28/03/2022 |
03/03/2022
|
04/04/2022
Time
11:0Hrs
|
|
1258 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of Two lane with Paved Shoulder/Four laning of Harda-Betul section of NH-47 from Temagaon Ch. km 30.000 to Chicholi Ch. km 80.952 (length-50.952 km) (Harda - Betul Pkg-II) in the state of Madhya Pradesh on EPC Mode. |
108130 |
22/03/2022 |
02/03/2022
|
05/04/2022
Time
11:0Hrs
|
|
1259 |
Independent Engineer Services during Operation & Maintenance period for 6 laning of Hosur - Krishnagiri section of NH-44 (Old NH-7) from Km.33.130 to Km.93.000 in the state of Tamil Nadu under NHDP Phase V executed as BOT (Toll) under DBFO Pattern |
NHAI/RO Chennai/IE/O&M/2022/28 |
25/03/2022 |
02/03/2022
|
12/04/2022
Time
13:0Hrs
|
|
1260 |
Consultancy Services for Authority’s Engineer for Supervision of Development of six lane access control highway of Bareilly – Ludhiana economic corridor under Bharatmala Pariyojana from Ranipur Barsi Saharanpur district to Sadopur Ambala district Ch. 45.500 to 121.786 of Shamli Ambala section in the state of Haryana on EPC Mode (Package-II) |
NHAI/BM/ Bareilly–Ludhiana /SA/AE/Pkg-II/2021 |
17/03/2022 |
02/03/2022
|
26/05/2022
Time
11:0Hrs
|
|
1261 |
Consultancy Services for Authority’s Engineer for Supervision of Development of six lane access control highway of Bareilly – Ludhiana economic corridor under Bharatmala Pariyojana from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli Ambala section in the state of Uttar Pradesh on EPC Mode (Package-I). |
NHAI/BM/ Bareilly–Ludhiana /SA/AE/Pkg-I/2021. |
12/03/2022 |
02/03/2022
|
26/05/2022
Time
11:0Hrs
|
|
1262 |
(AE)/PMC Services for Supervision Of Improvement and Up-gradation to 2 Lane with P.Sh. Configuration from Existing km.90.00tokm.130.000(Design length 39.15 km)Package-III of NH-227A (Sikriganj to Bahralganj) in the state of UP on(EPC) basis. |
523/427(1)-Yata-NH Circle/2021 Date 24.02.2022 |
13/03/2022 |
28/02/2022
|
28/03/2022
Time
11:0Hrs
|
|
1263 |
Consultancy services for Authoritys Engineer for the construction of new 4 lane Bridge (Parallel to existing Vikramshila Setu)from Km 8-920 to Km 13-375 (including approach road 35m in Naugachhia side and 53m in Bhagalpur side) across river ganga on newly decleared NH131B at Bhagalpur in the state of Bihar in EPC Mode |
RW/NH-12014/75/2020-RO Patna |
03/03/2022 |
28/02/2022
|
25/04/2022
Time
17:0Hrs
|
|
1264 |
Supervision Consultant (SC) Services for (1) Operation and Maintenance of Four lane section of Prayagraj to UP/MP Border of NH-27 (New NH-30) from Km. 4.285 to Km. 45.627 in the state of UP. (2) Operation & Maintenance of Naini Cable Stayed bridge with Approaches from Km. -1.117 to Km. 4.293 on NH-27 (New NH No. 30) at Prayagraj in the State of UP. (3) Maintenance of Prayagraj Bypass Junction - Mungra Badshahpur Section from Km 21.000 to Km 53.170 of NH-319D project in the State of UP |
NHAI/PIU/Prg./2021-22/10 |
04/03/2022 |
26/02/2022
|
28/03/2022
Time
11:0Hrs
|
|
1265 |
AE/PMC Services for Supervision of Improvement and up-gradation to two lane with paved shoulder configuration from existing km55.00tokm90.00(Design length 34.76)of NH227A(Near Chhapia Village to near Sikriganj)in the state of UP on EPC mode Contract. |
522/708C(1)/NH Circle Lucknow Dated 24.02.2022 |
13/03/2022 |
26/02/2022
|
28/03/2022
Time
11:0Hrs
|
|
1266 |
Consultancy Services for Authority Engineer services for Widening to Six Lane of Existing Four lane Jetpur - Gondal - Rajkot Section from Km 117 600 to Km 185 00 on National Highway No 27 in the state of Gujarat on EPC Mode under Bharatmala Pariyojana |
NHAI/Guj/Jetpur-Gondal-Rajkot/AE/2022 |
14/03/2022 |
25/02/2022
|
24/03/2022
Time
17:0Hrs
|
|
1267 |
Independent Engineer services for Upgradation to Four Lane with paved shoulder of NH 341 from Bhimasar Junction of NH 41 to Anjar Bhuj upto Airport Junction km 0 000 to km 65 478 in the State of Gujarat |
NHAI/Guj/AnjarBhuj/HAM/2021/IE |
15/03/2022 |
25/02/2022
|
24/03/2022
Time
17:0Hrs
|
|
1268 |
Independent Engineer services for Supervision of Development of Four/Six-lane Access Control Expressway from Design Chainage Km 515.000 to Km 528.300 (Kunjwani to Sidhra Section of NH 44) and from Design Chainage Km 550.900 to Km 566.520 (Domel to Katra Section) on Hybrid Annuity Mode under Bharatmala Pariyojana in the UT of J&K. (Phase II-Package XVII) |
NHAI/BM/DAKExpressway/2021/PkgXVII/IE |
30/03/2022 |
25/02/2022
|
28/06/2022
Time
11:0Hrs
|
|
1269 |
Independent Engineer services for Supervision of Construction of greenfield connectivity to Jewar International Airport from DND Faridabad Ballabhagh Bypass KMP Link Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Uttar Pradesh and Haryana |
NHAI/BM/JewarConnectivity/2021/IE |
01/04/2022 |
25/02/2022
|
04/07/2022
Time
11:0Hrs
|
|
1270 |
Independent Engineer services for four laning from km 218.500 (Khajuri) to km 259.640 (Wyndhamganj) on NH-75 (Section- V) in the state of Jharkhand on HAM |
2022-NHAI-107504-1 |
28/02/2022 |
25/02/2022
|
11/04/2022
Time
11:0Hrs
|
|
1271 |
Independent Engineer Services for Operation & Maintenance of 6-Lane Handia-Rajatalab Section from Km. 712.900 to Km. 785.544 of NH-19 (Old NH-2) in the State of Uttar Pradesh under NHDP-V on Hybrid Annuity Mode |
106809 |
28/02/2022 |
21/02/2022
|
23/03/2022
Time
11:0Hrs
|
|
1272 |
IE Services for four laning of existing 2 – lane stretches from (a) Bamni to MH/TG Border section of NH-930D and (b) Govindpur to Rajura section of NH-353B in the State of Maharashtra on HAM under NH (O) |
2022-NHAI-106403-1 |
05/03/2022 |
18/02/2022
|
17/03/2022
Time
11:0Hrs
|
|
1273 |
Independent Engineer Services for Operation & Maintenance of 4- lane divided carriageway of Tindivanam – Ulundurpet section of NH-45 ( New No.32, 132 & 38) from Km.121.000 to Km.193.900 under BOT (Toll) under NHDP-III in the State of Tamil Nadu |
NHAI/RO Chennai/IE/O&M/NH-45/2021-22/70 |
26/02/2022 |
16/02/2022
|
24/03/2022
Time
17:0Hrs
|
|
1274 |
Consultancy Services for Independent Engineer services for Supervision of Development of Six Lane Basanwahi Marangpuri Section of NH 130CD from km 99.500 to km 124.661 of Raipur-Visakhapatnam Economic Corridor in the state of Chhattisgarh on Hybrid Annuity Mode Package CG 3 |
NHAI/BM/EC/Raipur-Visakhapatnam/Chhattisgarh/IE/Pkg-III/2021 |
17/02/2022 |
16/02/2022
|
28/03/2022
Time
11:0Hrs
|
|
1275 |
Independent Engineer services for Four Laning from km 585.930 (Design Chainage 585.820) to km 628.555 (Design Chainage 630.960) of Mydukur – Badvel section of NH-67 on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh |
NHAI/Tech/AP/Myd-Bad/IE/ 2021-22 |
16/02/2022 |
15/02/2022
|
07/06/2022
Time
11:0Hrs
|
|
1276 |
Independent Engineer Services for 6-lane Access Controlled Greenfield Highways from Km 162 500 to Km 203 100 Baswantpur to Singnodi section of NH-150C (Package-IV of Akkalkot-KNT/TS Border) on HAM Mode under Bharatmala Pariyojna |
2022 NHAI 105724 1 |
26/02/2022 |
14/02/2022
|
16/03/2022
Time
11:0Hrs
|
|
1277 |
Independent Engineer Services for Construction of STRR (West side) NH948A Balagondapalli (Tamil Nadu) to Karnataka/Tamil Nadu border from km 144 170 to km 179 936 in the state of Tamil Nadu on Hybrid Annuity Mode under Bharatmala Pariyojana |
2022 NHAI 105555 1 |
08/03/2022 |
14/02/2022
|
14/03/2022
Time
11:0Hrs
|
|
1278 |
Project Name Consultancy Services for AE for Supervision of Rehabilitation and upgradation from 2 lane to 2 or 4 lane with paved shoulders of Mulakalacheruvu to Madanapalle section of NH 42 from Km 202050 to Km 245640 Length of 40.460 Km in the State of AP on EPC |
RW/NH-12014/18/2021-AP/Zone-III/719/AE |
08/03/2022 |
11/02/2022
|
11/04/2022
Time
15:0Hrs
|
|
1279 |
Consultancy Services for AE for Supervision of Rehabilitation and up gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53 590 Km of Rayachoty to Vempalli section of NH 440 in the State of AP on EPC |
RW/NH-12014/10/2021-AP/Zone-III/725/AE |
08/03/2022 |
11/02/2022
|
04/04/2022
Time
15:0Hrs
|
|
1280 |
Consultancy Services For Authority Engineer For Supervision of Widening and Strengthening from Km. 0.000 to Km. 35.000 (Mohan Ganj to Autarpur) of NH-731A to two lane paved shoulder in the State of Uttar Pradesh on EPC mode. |
201/03ComA(NH731A)pkg1-18/2021 dt 11-02-2022 |
11/02/2022 |
11/02/2022
|
21/03/2022
Time
17:0Hrs
|
|
1281 |
Consultancy Services for AE for Supervision of Rehabilitation and upgradation from 2 lane to 2 or 4 lane with paved shoulders of Mulakalacheruvu to Madanapalle section of NH 42 from Km 202050 to Km 245640 Length of 40.460 Km in the State of AP on EPC |
RW/NH-12014/18/ 2021-AP/Zone-III/719/AE |
14/02/2022 |
11/02/2022
|
26/03/2022
Time
15:0Hrs
|
|
1282 |
Consultancy Services for AE for Supervision of Rehabilitation and up gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53 590 Km of Rayachoty to Vempalli section of NH 440 in the State of AP on EPC |
RW/NH-12014/10/ 2021-AP/Zone-III/725/AE |
14/02/2022 |
11/02/2022
|
26/03/2022
Time
15:0Hrs
|
|
1283 |
Independent Engineer Services for 6 Lane with Access Controlled Greenfield Highway from km 26 000 to km 97 000 MH/KN Border (Badadal) to Maradgi S Andola section of NH – 150C (Package-II of Akkalkot to KN/TS Border section) on Hybrid Annuity Mode under Bharatmala Pariyojna |
2022 NHAI 105372 1 |
26/02/2022 |
10/02/2022
|
14/03/2022
Time
11:0Hrs
|
|
1284 |
Independent Engineer services for supervision of Upgradation and Four Laning of Haridwar Bypass Package-1 From Ch. 0.000 (Km 188.100 of NH-58) to Ch. 15.100 (Km 5.100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode |
2022-NHAI-105349-1 |
15/02/2022 |
10/02/2022
|
14/03/2022
Time
11:0Hrs
|
|
1285 |
Independent Engineering Services for Construction of Two Lane with paved Shoulder of Selected Road stretches from Hatwaria to Kaluahi (Ch Km 0 00 – 21 609) NH-227L Saharghat to Rahika (Ch Km 0 00-26 130) NH-227J Rahika to Rampatti (Ch Km 0 00 – 15 000) Madubani Bypass NH-527A & Bideshwarsthan to Bheja (Ch Km 0 00 – 25 915) NH-527A total length of 88 655 km in the state of Bihar |
2022-NHAI-105343-1 |
02/03/2022 |
10/02/2022
|
24/03/2022
Time
11:0Hrs
|
-
|
1286 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 4 LANE REALIGNMENT OF OLD NH 207 (NEW NH 648) FROM TN/KA BORDER (CH 0 000) TO HOSKOTE (CH 20 900) UNDER BHARATMALA PARIYOJANA AS A PART OF BANGALORE RING ROAD IN THE STATE KARNATAKA ON EPC MODE |
2022-NHAI-105540-1 |
08/03/2022 |
09/02/2022
|
14/03/2022
Time
11:0Hrs
|
|
1287 |
Independent Engineer Services during Operation and Maintenance of four laning of Phagwara-Rupnagar Section of NH-344A from km 0.000 to km 80.820 in the State of Punjab (Total Length 80.82 Km) |
2022-NHAI-105167-1 |
25/02/2022 |
09/02/2022
|
16/03/2022
Time
11:0Hrs
|
|
1288 |
Independent Engineer services for 6-lane Access Controlled Greenfield Highway from Km 97/000 to Km 162/500 Maradgi S Andola to Baswantpur section of NH-150C (Package-III of Akkalkot-KNT-TS Border) on HAM Mode under Bharatmala Pariyojana |
2022 NHAI 104988 1 |
23/02/2022 |
08/02/2022
|
10/03/2022
Time
11:0Hrs
|
|
1289 |
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Up gradation from Km 170 700 Bhadrachalam to Km 234 567 Konta of NH 30 to Two Lane with Paved Shoulders in the State of Andhra Pradesh on EPC mode |
RW/NH-12014/12/ 2021-AP/Zone-III/718/AE |
10/02/2022 |
08/02/2022
|
24/03/2022
Time
15:0Hrs
|
|
1290 |
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and upgradation of NH 167AD from Macherla to Dachepalli from Km 0 000 to 43 659 to two lanes with paved shoulders in the state of Andhra Pradesh EPC basis |
RW/NH-12014/11/ 2021-AP/Zone-III/729/AE |
10/02/2022 |
08/02/2022
|
24/03/2022
Time
15:0Hrs
|
|
1291 |
onsultancy Services for Authoritys Engineer for Supervision of Rehabilitation and upgradation of NH 167AD from Macherla to Dachepalli from Km 0 000 to 43 659 to two lanes with paved shoulders in the state of Andhra Pradesh EPC basis |
RW/NH-12014/11/ 2021-AP/Zone-III/729/AE-1 |
08/03/2022 |
08/02/2022
|
07/04/2022
Time
15:0Hrs
|
|
1292 |
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Up gradation from Km 170 700 Bhadrachalam to Km 234 567 Konta of NH 30 to Two Lane with Paved Shoulders in the State of Andhra Pradesh on EPC mode |
RW/NH12014/12/ 2021-AP/Zone-III/718/AE |
07/03/2022 |
08/02/2022
|
24/03/2022
Time
15:0Hrs
|
|
1293 |
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Up gradation from Km 170 700 Bhadrachalam to Km 234 567 Konta of NH 30 to Two Lane with Paved Shoulders in the State of Andhra Pradesh on EPC mode |
W/NH-12014/12/2021-AP/Zone-III/718/AE |
08/03/2022 |
08/02/2022
|
07/04/2022
Time
15:0Hrs
|
|
1294 |
Independent Engineer services for 4-Laning of Urga – Pathalgaon section of NH-130A from design Ch 70-200 to Ch 157-745 under Bharatmala Pariyojana (Raipur – Dhanbad economic corridor) in the State of Chhattisgarh on Hybrid Annuity Mode |
2022-NHAI-104934-1 |
28/02/2022 |
08/02/2022
|
04/04/2022
Time
11:0Hrs
|
|
1295 |
Consultancy services for Authority Engineer for Supervision of Construction of Two-Lanes with/without paved shoulders from km 000 to km 69 480 (Design) of Sanquelim to Belagavi Section of NH-748AA in the State of Goa and Karnataka on EPC Mode under Bharatmala Pariyojana |
2022 NHAI 104528 1 |
04/03/2022 |
04/02/2022
|
14/03/2022
Time
11:0Hrs
|
|
1296 |
Authority Engineer services for 6lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length 11.844 Km) on Hyderabad- Banglore Section of NH-44 in the State of Telangana under Bharatmala Pariyojana on EPC Mode. |
NHAI/HQ/ TS/GM(T)/ DGM(T)/ThonKoth/AE/02-2022 |
15/02/2022 |
04/02/2022
|
15/03/2022
Time
11:0Hrs
|
|
1297 |
Independent Engineer services for Construction of Two lane with paved shoulder from Km. 0.0 to Km. 80.0 on NH 548B (Vijayapura-Sankeshwar section) in the state of Karnataka on Hybrid Annuity Mode (HAM) Contract |
NH-548B-KNT-2021-22-IE |
04/02/2022 |
04/02/2022
|
28/03/2022
Time
14:0Hrs
|
|
1298 |
Independent Engineer Services for Rehabilitation and Upgradation to 2 Lane with Paved Shoulder configuration & Strengthening of Padhar to Bijni section from Km 180 000 to Km 202 815 of NH-154 (Design Length-19 050 KM) of Pathankot-Mandi under NH(O) in HP on HAM basis (Package-VA) |
NHAI/Pathankot-Mandi/Pkg-VA/IE/HP/2022 NHAI/Pathankot-Mandi/Pkg-VA/IE/HP/2022 |
07/02/2022 |
04/02/2022
|
21/06/2022
Time
11:0Hrs
|
|
1299 |
Authority Engineer Services for 6 laning of existing 4 lane stretch of NH-44 on Nagpur-Hyderabad Section in the State of Telangana under Bharatmala Pariyojana on EPC Mode (i) from Kallakal at Km. 454.000 to Gundlapochampally at Km 471.000, (Design Length 17.00 Km) & (ii) from Gundlapochampally at Km. 471.300 to Bowenpally at Km 481.331 (Design Length 10.031 km) |
NHAI/HQ/TS/GM(T)/DGM(T)/Kal-Bown/2-Pkgs/AE/02-2022 |
08/02/2022 |
04/02/2022
|
15/03/2022
Time
11:0Hrs
|
|
1300 |
Consultancy Services for Authority’s Engineer for supervision of Rehabilitation and Up-gradation to 4 Lane configurations & Strengthening of Thanpuri to Paror section from Km 85.135 to Km 100.840 of NH-20 (New NH-154) (Design Length 16.275 KM) of Pathankot-Mandi under NH (O) in H.P (Package-IIC) on EPC mode |
NHAI/Pathankot-Mandi/Pkg-IIC/EPC/HP/2022 /AE |
09/02/2022 |
04/02/2022
|
22/06/2022
Time
11:0Hrs
|
-
|
1301 |
Consultancy Services for Supervision Consultant of Operation and Maintenance of 3 projects under PIU Trivandrum |
11203/RO Kerala/Tender Consultants/0138 |
09/02/2022 |
03/02/2022
|
28/02/2022
Time
15:0Hrs
|
|
1302 |
Independent Engineer Services for Construction of Four laning of NH-5 from Kaithlighat to Shakral Village (Package I from Km 128 835 to Km 146 300 for Design length – 17.465 Km ) in the state of Himachal Pradesh on HAM Construction of 4 laning of NH-5 from Shakral Village to Dhalli Section (Shimla Bypass Package II from Km 146.300 to Km 156.560 and Shimla connectivity from Km 0.000 to Km 0.725 for Design Length -10.985 km) in Himachal Pradesh on Hybrid Annuity Mode |
NHAI/Shimla bypass/Pkg-I&II/IE/HP/2022 |
21/02/2022 |
03/02/2022
|
17/05/2022
Time
11:0Hrs
|
|
1303 |
IE during O and M of 6 laning kishangarh gulabpura Pkg I and Kishangarh Udaipur section Pkg II |
NHAI/11011/1/Admn/2021-ROJ/ Tenders/IE/KUAI-II/ |
28/02/2022 |
03/02/2022
|
30/03/2022
Time
11:0Hrs
|
|
1304 |
Supervision Consultancy Services for construction supervision of Balance works of Widening and Strengthening of existing NH-31C from 2-lane to 4 lane from Shrirampur (Km. 0.000) to Kochugaon (km 30.000) of Bijni to Assam/West Bengal Border Section of NH-31C in Assam on Item rate Basis (2nd call) |
NHAI/NE/AS-12(Bal)/CSC/E-118956(2nd call) |
03/02/2022 |
02/02/2022
|
02/03/2022
Time
11:0Hrs
|
|
1305 |
Consultancy Services of Authority’ Engineer for the following projects (1) Two laned with paved shoulders of Nazibabad-Kotdwar Section of NH-119 from Design Chainage 122 to 138 (2)4 laning of Najibabad Bypass of NH-119 from Km. 105 423 to Km. 118 373 (excluding 2-45 Km. of NH-74 Bypass) |
NHAI/11013/N-K & NByepass/2021/AE/126327 |
08/01/2022 |
02/02/2022
|
08/02/2022
Time
15:0Hrs
|
|
1306 |
Independent Engineer services for Improvement and Up-gradation to 2 Lane with Paved Shoulder/Four Lane configuration from existing Km130.000 to Km191.000(design km131.500 to Km188.735,Design length 57.235Km)of NH227A in the state of U.P. on HAM basis |
CE-RO/LKO/IE/NH-227A/2021-22 date.01.02.2022 |
02/02/2022 |
01/02/2022
|
16/01/2023
Time
11:0Hrs
|
|
1307 |
Independent Engineer services for Four Laning of Mehgama Hansdiha section of NH 133 from existing Km 41-900 to existing Km 93-000 in the State of Jharkhand on Hybrid Annuity mode |
2022-NHAI-103702-1 |
14/02/2022 |
31/01/2022
|
06/04/2022
Time
11:0Hrs
|
|
1308 |
Independent Engineer services for Four Laning with paved shoulder of section from km 21-110 (Bokaro (Jaina More) on NH-320) to km 53-600 (Gola on NH-320) in the state of Jharkhand on Hybrid Annuity Mode |
2022-NHAI-103696-1 |
14/02/2022 |
31/01/2022
|
16/03/2022
Time
11:0Hrs
|
|
1309 |
Independent Engineer services for Four Laning with paved shoulder of section from km 53-600 (Gola on NH-320) to km 81-446 (Ormanjhi on NH-320B) in the state of Jharkhand on Hybrid Annuity Mode |
2022-NHAI-103684-1 |
14/02/2022 |
31/01/2022
|
16/03/2022
Time
11:0Hrs
|
|
1310 |
Independent Engineer services for Construction of 4-lane green field highway from Km. 35.000 to Km. 49.155 of NH-731A with paved shoulders on Hybrid Annuity Mode in the state of Uttar Pradesh |
CE-RO/LKO/IE/NH-731A (PKG-II)/2021-22 31.01.2022 |
01/02/2022 |
31/01/2022
|
12/10/2022
Time
11:0Hrs
|
|
1311 |
Independent Engineer services for Construction of 4-lane highway with paved shoulders from Km 49.155 to Km 74.700 of NH-731A on Hybrid annuity mode in the state of Uttar Pradesh |
CE-RO/LKO/IE/NH-731A(Pkg III)/2021-22 31.01.2022 |
01/02/2022 |
31/01/2022
|
31/01/2023
Time
17:0Hrs
|
|
1312 |
IE Services for NH stretches under Bundele-1 of TOT projects in Andhra Pradesh (From Anakapalli-Annavaram - Diwancheruvu of NH-16 and from Diwancheruvu - Siddantham - Gundugolanu Sections of NH-216A) |
2022-NHAI-103452-1 |
02/02/2022 |
29/01/2022
|
06/04/2022
Time
15:0Hrs
|
|
1313 |
Independent Engineering Services for Construction of Four Lane Access Controlled Greenfield National Highway (NH-119D) from village Kalyanpur (Ch 00 000) to Balbhadarpur (Ch 47 000) pkg-03 & Balbhadarpur (Ch 47 000 Km) to Bela Nawada (Ch 89 1 000 km) pkg-04 at NH-119D under Bharatmala Pariyojna in the state of Bihar |
2022-NHAI-102872-1 |
28/01/2022 |
28/01/2022
|
03/03/2022
Time
11:0Hrs
|
-
|
1314 |
Consultancy Services for Authority Engineer for supervision of Construction of Elevated Corridor in Ranchi city from Km 0.00 to Km 3.260 of NH 75 including down ramp on NH 23 from Km 0.100 to Km 0.600 in the State of Jharkhand on EPC mode |
2022 NHAI 103372 1 |
28/01/2022 |
28/01/2022
|
09/03/2022
Time
11:0Hrs
|
|
1315 |
Independent Engineer services for Development and Operation of Bikaner-Suratgarh Section of NH-15 (from Km 553/869 of NH-11 to Km 173/000 of NH-15 via Km 10/630 of NH-15)by two Laning with paved shoulder in the state Rajasthan through Public Private Partnership (PPP) on Design, Build, Operate and Transfer (the “DBFOT”) Basis. |
02/2021-22 |
30/01/2022 |
27/01/2022
|
24/03/2022
Time
11:0Hrs
|
|
1316 |
Authority Engineer (AE)Services during OandM stage of 2 lane with paved shoulders configuration in Jowai-Meghalaya/ Assam Border section of NH-44 from Km 69.200 to Km 173.200 (102.255 Km) in the state of Meghalaya on EPC mode |
NHAI / J-R/ RFQ/ 2022 |
04/02/2022 |
27/01/2022
|
16/03/2022
Time
17:0Hrs
|
|
1317 |
Independent Engineer services for Development and Operation of Sikar-Bikaner Section of NH-11 from Km 340.188 of NH-11 to Km 557.775 of NH-11 via Sikar Bypass and Bikaner Bypass from Km 553.869 of NH-11 to km 267.325 of NH-89 by two laning with paved shoulder in the state Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the “DBFOT”) Basis. |
01/2021-22 |
24/02/2022 |
25/01/2022
|
24/03/2022
Time
11:0Hrs
|
|
1318 |
Consultancy services for Authority’s Engineer for supervision of Operation and Maintenance of NH-43 (New NH-30) from Dahikonga-Jagdalpur (Km.241.000 to Km.298.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. |
11052/RO-Raipur/Tender/AE/Dahikonga-Jagdalpur |
16/02/2022 |
24/01/2022
|
10/03/2022
Time
15:0Hrs
|
|
1319 |
Consultancy services for Authority’s’s Engineer for supervision of Operation and Maintenance of NH-43 (New NH-30) from Dhamtari - Kanker (Km 81.500 to Km 130.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. |
11052/RO-Raipur/Tender/AE/Dhamtari-Kanker |
16/02/2022 |
24/01/2022
|
10/03/2022
Time
15:0Hrs
|
|
1320 |
Consultancy services for Authority’s Engineer for Operation and Maintenance of NH-43 (New NH-30) from Bedma-Dahikonga (Km.180.000 to Km.241.000) to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP-IV through EPC mode. |
11052/RO-Raipur/Tender/AE/Bedma-Dahikonga |
15/02/2022 |
24/01/2022
|
10/03/2022
Time
15:0Hrs
|
|
1321 |
Consultancy Services for AE for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from. km 581.700 of NH 37 to to km 626.030 of NH-37 on existing Dibrugarh Lahoal - Chabua Bypass in the State of Assam (Package I and II) |
NHIDCL/Assam/AE/Lahoal- Chabua-1 and 2/2021 |
31/12/2021 |
20/01/2022
|
27/01/2022
Time
15:0Hrs
|
|
1322 |
Consultancy Services for Authority Engineer for Supervisiuon of Construction of 2 lane with paved shoulder for the work of Development of remaining section of NH-325(Balotra to Sanderao via Jalore) to 2 lane with paved shoulder configuration in the State of Rajasthan |
04/2021-22 |
20/01/2022 |
19/01/2022
|
18/02/2022
Time
11:0Hrs
|
|
1323 |
Consultancy Services For Authority Engineer for Supervision of Rehabilitation and Upgradation of L B Nagar to Malkapur Section To 6 Lane Main Carriageway with Service Roads from Km 15 To Km 40 of NH 65 in Telangana |
RW/HYD/Misc-28/NIT/2021-22/003 dt 17-01-2021 |
18/01/2022 |
17/01/2022
|
24/03/2022
Time
15:0Hrs
|
|
1324 |
Construction of Four Laning of part of Ramban to Banihal Section of NH-1A including Construction of Twin Tube Tunnel (Package-I) (ii) Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (including construction of Twin Tube Tunnel (Package-II) (iii) Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Package-III)in the UT of Jammu & Kashmir on EPC Mode |
2022-NHAI-101896-1 |
17/01/2022 |
14/01/2022
|
07/02/2022
Time
11:0Hrs
|
|
1325 |
Independent Engineer Services for Construction of 6-lane Greenfield Southern Ludhiana Bypass from intersection with NH-44 near Village Rajgarh to intersection with Delhi Katra Expressway NE-5 near Village Ballowal km 00 000 to km 25 240 as part of Ludhiana-Ajmer economic corridor on HAM Mode under Bharatmala Pariyojna Phase-I in the state of Punjab |
2022-NHAI-101719-1 |
14/01/2022 |
14/01/2022
|
28/02/2022
Time
11:0Hrs
|
|
1326 |
Supervision Consultancy Services for Operation and Maintenance of Samakhiyali-Santalpur (from Km.339.700 to Km.430.100) and Chadotar to Palanpur (from Km.589.600 to Km.601.000) section of NH-27 in State of Gujarat and preparation of feasibility report and bidding documents for Six Laning of Samakhiyali to Maliya (from Km.265.525 to Km.306.000) section of NH-8A and Six laning of Santalpur to Samakhiyali (Km.339.700 to Km. 430.100) section of NH-27 in State of Gujarat |
2022-NHAI-101856-1 |
28/03/2022 |
14/01/2022
|
07/04/2022
Time
11:0Hrs
|
|
1327 |
Consultancy Services for Supervision Consultants of Operation & Maintenance of Four Lane with paved side shoulders of Tapa to Bathinda Section Nh-64 (New NH No.7) from existing Km 168.00 to 209.405 in the State of Punjab |
2022-NHAI-101517-1 |
10/02/2022 |
12/01/2022
|
24/02/2022
Time
11:0Hrs
|
|
1328 |
Independent Engineer(IE) Services for operation and maintenance works and supervision of balance construction works for the projects (i) Pkg-4 (ii) Pkg-5 (iii) Pkg-6 of NH-8E through HAM in the state of Gujarat |
2022-NHAI-101148-1 |
22/02/2022 |
10/01/2022
|
09/06/2022
Time
11:0Hrs
|
|
1329 |
Independent Engineer Services during Operation and Maintenance period of 5 years for 6 Laning of Delhi Agra section from Km. 20.500 to Km. 200 in the State of Haryana and U.P on Design, Build, Finance Operate and Transfer (DBFOT) basis. |
2022-NHAI-101085-1 |
03/02/2022 |
08/01/2022
|
03/03/2022
Time
11:0Hrs
|
|
1330 |
Consultancy services for Authoritys Engineer for Supervision of Work of Widening to two Lane with paved shoulder from Design Km 0.000 to Km 49.200 of NH-731B on EPC Mode in the State of Uttar Pradesh. |
CE-RO/LKO/NH(O)/23/NH-731B/AE (Pkg-I)/2021-22 |
10/01/2022 |
06/01/2022
|
16/01/2023
Time
17:0Hrs
|
|
1331 |
Independent Engineer Services for National Highways Stretch under Tolling, Operation, Maintenance & Transfer (TOT)/ O&M (Capacity Augmentation) Projects in the State of Odisha & Andhra Pradesh for the Section Icchapuram – Puintola Section of NH-16 (Old NH-5) from km.419.600 to km.484.000.Independent Engineer Services for National Highways Stretch under Tolling, Operation, Maintenance & Transfer (TOT)/ O&M (Capacity Augmentation) Projects in the State of Odisha & Andhra Pradesh for the Section Ic |
NHAI/13012/58/RO/OD/2022 |
10/01/2022 |
06/01/2022
|
17/02/2022
Time
11:0Hrs
|
|
1332 |
Consultancy Services of Supervision Consultant (SC) for Operation, Maintenance and Incident Management of the stretch from Km.0.000 to Km.68.000 (Kanaktora – Jharsuguda Section) up to 2-lane with paved shoulder including by-pass at Belpahar at 52nd Km. of NH-200 (from Km.197.300 to Km.265.300 including bypass at 249th Km. of NH-49) and Urgent Repair & Maintenance of Teleibani- Sambalpur section of NH-53 from Km.519.150 to Km.545.176 (Badarama Wildlife Sanctuary Area) in the State of Odisha- 2nd |
NHAI/13012/23/RO/OD/2022 |
07/01/2022 |
05/01/2022
|
10/02/2022
Time
11:0Hrs
|
|
1333 |
Consultancy Services for Authority’s Engineer for Supervision of Operation & Maintenance of four-laning of Ambala-Kaithal section of NH-65 (new NH-152) for Package-1 & 2 from Km 0.000 (Ambala) to Km 95.360 (Kaithal) in the State of Haryana. |
NHAI/RO/CHD/11011/PD-AMB/Ambala-Kaithal/AE/RFP |
23/01/2022 |
31/12/2021
|
03/03/2022
Time
11:0Hrs
|
|
1334 |
Consultancy services for AE for Supervision of Rehabi and Upgradation to 2 lane with PS from existing km 166.100 to km 192.980 (Design km 146.600 to km 162.800) (Package VII) inclu constr of Bhimber Gali Tunnel (total length of tunnel 1.100 km) under |
RW/CH/W(53)/JK/2021 |
31/12/2021 |
31/12/2021
|
21/03/2022
Time
11:0Hrs
|
|
1335 |
IE services for Construction of 4 Lane Greenfield expressway spur from Delhi Vadodra Greenfield expressway near Bandikui to Jaipur in Bharatmala Pariyojana Phase I on Hybrid Annuity Mode in the state of Rajasthan |
2021-NHAI-100049-1 |
24/01/2022 |
30/12/2021
|
07/03/2022
Time
11:0Hrs
|
|
1336 |
Consultancy Services of Authority’s Engineer for Four laning of Honnavar Port Connectivity road from km 0.00 (Kasarkod side of Honnavar Port) to km 2.58 (towards NH-66) connecting Honnavar Port with NH-66 at km 196.00 and to improve NH-66 from km 195.00 to km 197.00 to integrate port connectivity road on EPC mode under Bharatmala Phase-1 in the state of Karnataka |
2021-NHAI-99852-1 |
31/01/2022 |
28/12/2021
|
09/02/2022
Time
11:0Hrs
|
|
1337 |
Consultancy services for Authoritys Engineer for Supervision of Work of Construction of two lane with paved shoulder from existing Km. 0.000 to Km. 55.610(Design Km. 0.000 to Km. 54.048) (Mardah to Saidpur) of NH-124D on EPC mode in the state of U.P. |
CE-RO/LKO/NH-124D/AE/2021-22 Dated 28.12.2021 |
31/12/2021 |
28/12/2021
|
22/03/2022
Time
17:0Hrs
|
|
1338 |
Consultancy Services for SC Trichy Ramanathapuram |
17012 02 14 2021 RO Madurai |
29/12/2021 |
28/12/2021
|
15/02/2022
Time
15:0Hrs
|
|
1339 |
Consultancy Services for Authoritys Engineer for supervision of Construction of 4lane Elevated Section and atgrade improvements at Begusarai town section of NH-31 from design Chainage 221 047 to 225 302 in Bihar |
2021-NHAI-99683-1 |
06/01/2022 |
27/12/2021
|
25/01/2022
Time
15:0Hrs
|
-
|
1340 |
Consultancy Services for Supervision Consultant (SC) during Operation and Maintenance Period of Chas- Ramgarh section of NH-23 from km 0.000 to km 78.125 in the State of Jharkhand |
NHAI/RO/RNC/JH/2021-22/20 |
15/01/2022 |
21/12/2021
|
03/02/2022
Time
11:0Hrs
|
|
1341 |
IE services for O and M for 6 lane Chittorgarh Udaipur section of NH-76 and New Greenfield proposed Udaipur Bypass and Udaipur-Ratanpur-Shamlaji section from Km. 287 400 to km. 401.200 of NH 8 in the state of Rajasthan |
NHAI/11011/1/Admn/2021-ROJ/ Tenders/Proposal- |
14/01/2022 |
17/12/2021
|
15/02/2022
Time
11:0Hrs
|
|
1342 |
Consultancy services for Authoritys Engineer for Supervision of REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 102.000 TO KM 134.950 (DESIGN CHAINAGE KM 90.150 TO KM 116.980) (PACKAGE -V) INCLUDING CONSTRUCTIO |
RW/CH/W(52)/JK/2021 |
16/12/2021 |
16/12/2021
|
21/03/2022
Time
11:0Hrs
|
|
1343 |
Supervision Consultancy SC services during O and M stage of 4Lane Varanasi bypass from Km 000 starting point at Km 271 300 of NH-56 to Km 15 250 end point at Km 11 170 of NH29 including 4Laning of NH29 from Km 10 700 to Km 12 000 Package I in the state of UP under NHDP Phase IV in EPC Mode Total Length 16 550 Km |
2021-NHAI-98643-1 |
17/12/2021 |
16/12/2021
|
10/01/2022
Time
11:0Hrs
|
|
1344 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with Kapurthala – Sultanpur Lodhi road (NH-703A) near Isharwal village ch.24.000 to MDR Junction at ch. 40.900 Dhunda Village on EPC mode under Bharatmala Pariyojna in the state of Punjab (NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg2) |
NHAI/BM/DAKExpressway/Spur/2020/AE/Pkg2 |
13/01/2022 |
15/12/2021
|
14/02/2022
Time
11:0Hrs
|
|
1345 |
Independent Engineer Services during Development, Operation and maintenance of Chittorgarh- Neemuch (MP Boarder) NH-79 Section (PWD Km. 183.000 to Km.221.400) or (Design Ch. 183.000 to 227.082) and Nimbahera- Pratapgarh NH- 113 Section (Km. 5.400 to Km. 80.00) or ((Design Ch. 0.000 to 72.915) in the State of Rajasthan Through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the “DBFOT”) Basis |
NIT No. 06/2021-22 SE PWD NH Circle UDAIPUR |
19/01/2022 |
15/12/2021
|
07/02/2022
Time
11:0Hrs
|
|
1346 |
Independent Engineering Services for Construction of Four Lane Access Controlled Greenfield National Highway (NH-119D) Package-I from village Amas (on NH-02) (Design Ch 00-000) to village Shivrampur (Design Ch 55-002) pkg-01 & Shivrampur (Ch 55-002 Km) to Ramnagar (Ch 109-324 km) pkg-02, at NH-119D under Bharatmala Pariyojna in the state of Bihar |
2021-NHAI-98319-1 |
07/01/2022 |
14/12/2021
|
07/02/2022
Time
11:0Hrs
|
|
1347 |
Consultancy services for Authoritys Engineer for Supervision of Work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D(Sitapur to Kurain Section)to two lane with paved shoulder configuration under EPC mode in the State of U.P. |
CE-RO/LKO/NH-330D/AE/2021-22 Dated 11.12.2021 |
14/12/2021 |
11/12/2021
|
08/02/2022
Time
11:0Hrs
|
|
1348 |
Consultancy Services for Supervision Consultant SC for DLP/ OM stage of 2 projects Item Rate basis projects for construction supervision OM of 1 project EPC mode project in the State of Uttarakhand |
NHAI/ROUKD/HDRDDN Dudhahdari/NH-58 72/SC/202 |
20/12/2021 |
06/12/2021
|
08/01/2022
Time
11:0Hrs
|
-
|
1349 |
Consultancy services for Authoritys Engineer for supervision Rehabilitation and Widening work for 2-lane with paved shouldering of existing National Highway 80 Alignment from 1- Km 70.150 to Km121,025 and 132.895 to 190.150 in the state of Bihar on EPC Mode |
RW/NH-24035/4/2008-P&M/PIC |
23/12/2021 |
02/12/2021
|
18/01/2022
Time
16:0Hrs
|
|
1350 |
Consultancy services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH-306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode” |
NHIDCL/Mizoram/NH-306&6/S-V-S/AE/Pkg-3,4,5&6/2021-22 |
02/12/2021 |
02/12/2021
|
17/01/2022
Time
11:0Hrs
|
|
1351 |
Consultancy Services for Authoritys Engineer for Supervision of Upgradation of NH 130A Mungeli to Pondi from NH Km 51.600 to Km 77.870 and Km 77.870 to Km 96.970 to two/Four lane with paved shoulders in the state of Chhattisgarh on Engineering Procurement and Construction (EPC) mode |
56/CE/NH/TC/44-29/2021 |
17/12/2021 |
01/12/2021
|
11/01/2022
Time
11:0Hrs
|
|
1352 |
Consultancy services for Authority Engineer for Supervision of (i) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0 335 to km 34 039 to 2-Lane under SARDP-NE Phase-A (Package-I) (ii) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 35 155 to km 72 863 to 2-Lane under NH (O)- NE in the state of Meghalaya on EPC mode (Package-II) |
NHIDCL/Megh/AE/NRK-IandII/2021 |
17/11/2021 |
23/11/2021
|
14/12/2021
Time
15:0Hrs
|
|
1353 |
Consultancy services for Authority Engineer for Supervision of Improvement/widening to Two laning with earthen shoulder of (i) Nongjri (Design Ch 30-00km) to Maheshkola (Design Ch 55-525km) (R-M-B Package-II) (ii) Stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project under SARDP-NE Phase-A (Package-III) (iii)Panda (Design Ch 112-300 km) to Baghmara (Design Ch 129-385 km) (R-M-B Package-VI) on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis |
NHIDCL/Megh/AE/R-M-B-/Pkg-II, III & VI/SH-4/2021 |
18/11/2021 |
23/11/2021
|
14/12/2021
Time
15:0Hrs
|
|
1354 |
Consultancy services for AE for Supervision of Rehabilitation and up-gradation of Lalchara- Kanchanpur via Shivbari section of Manu-Simlung (package-II) and Vaghmun- Simlung on NH-44A in the state of Tripura (Package-IV) |
NHIDCL/Tripura/AE/L-K/V-S/Manu-Simlung/NH-44A/2020 |
18/11/2021 |
23/11/2021
|
14/12/2021
Time
15:0Hrs
|
|
1355 |
Operation and Maintenance of Four laning of Binjabahal – Tileibani Section, Km.414.000 to Km.491.710 (Design Chainage Km.414.982 to Km.493.300) of NH-6 (New NH-49) in the State of Odisha under NHDP-IV, on Hybrid Annuity Mode |
NHAI/13012/56/RO/OD/2021 |
12/11/2021 |
09/11/2021
|
09/12/2021
Time
11:0Hrs
|
|
1356 |
CONSULTANCYSERVICES FOR AE FOR SUPERVISION OF Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A (Package-3 and 4) in the State of Manipur on EPC Mode |
NHIDCL/Manipur/AE/UTT (Pkg-3 and 4)/NH-102A/2021 |
29/10/2021 |
28/10/2021
|
26/11/2021
Time
15:0Hrs
|
|
1357 |
AE FOR SUPERVISION “REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER FROM EXISTING CHAINAGE KM 134.950 TO KM 166.100 (DESIGN CHAINAGE KM 116.980 TO KM 146.700) (PKG-VI) A-P RD (NH-144A) IN THE UT OF J&K PROJECT SAMPARK, (BRO)”ON EPC MODE |
SPK/AE/AP RD/PKG-VI/02/2021-22 |
25/10/2021 |
25/10/2021
|
15/02/2022
Time
11:0Hrs
|
|
1358 |
Consultancy services as Authority’s Engineer for Supervision of “Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 & 6) of NH-306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode” |
NHIDCL/Mizoram/NH-306 & NH-6/S-V-S/AE/Pkg-3,4,5&6/2021-22 |
25/10/2021 |
22/10/2021
|
29/11/2021
Time
11:0Hrs
|
|
1359 |
Independent Engineer Services for Operation & Maintenance of Allahabad Bypass (Including Ganga Bridge PKG ABP-1) from Km.158.000 (628.753) to Km. 242.708 (713.461) of NH-19 (Old NH-2) in the State of Uttar Pradesh under NHDP-V on OMT Basis |
NHAI/PIU/Prg./2021-22/06 |
29/10/2021 |
20/10/2021
|
11/01/2022
Time
11:0Hrs
|
|
1360 |
Consultancy services for AE for Supervision of Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 (PKG-IV, V, VI and VII) in the State of Manipur -2nd Call |
NHIDCL/Manipur/AE/I-J (Pkg- 4,5, 6 7)/NH-37/2021 |
18/10/2021 |
12/10/2021
|
28/12/2021
Time
15:0Hrs
|
|
1361 |
Consultancy services for AE for Supervision of Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III) in the State of Manipur on EPC Mode - 2nd Call |
NHIDCL/Manipur/AE/M-P (Pkg-3)/NH129A/2021 |
22/10/2021 |
12/10/2021
|
16/11/2021
Time
15:0Hrs
|
|
1362 |
Consultancy Services for SC Madurai Ramanathapuram |
17012 02 13 2021 RO Madurai |
05/10/2021 |
25/09/2021
|
01/12/2021
Time
15:0Hrs
|
|
1363 |
CONSULTANCY SERVICES AS AE FOR SUPERVISION OF Construction of a 4 lane flyover with paved shoulder configuration for along with service road on Jammu-Akhnoor road section of NH-144A in UT of J and K (P-I and IIIB) |
NHIDCL/JK/NH-144A/ JA(PI and IIIB)/AE/2021-22 |
01/10/2021 |
24/09/2021
|
11/04/2022
Time
11:0Hrs
|
|
1364 |
Consultancy services for Authority’s Engineer for Supervision of CONSTRUCTION OF SIX LANE LINK ROAD (NH-166S) WITH PAVED SHOULDER CONFIGURATIFON TO MOPA AIRPORT IN THE STATE OF GOA ON EPC MODE |
2021-22/WD-VII(NH)/PWD/ASW/15 dt 20.09.2021 |
20/09/2021 |
20/09/2021
|
15/12/2021
Time
17:0Hrs
|
|
1365 |
Consultancy services for AE for Supervision of Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III) from Design Chainage km 75.000 to km 109.494 on NH-129A in Manipur |
NHIDCL/Manipur/AE/M-P (Pkg-3)/NH-129A/2021 |
29/09/2021 |
13/09/2021
|
12/10/2021
Time
15:0Hrs
|
|
1366 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF (i) Widening/Improvement to 2 (Two) Lane with Earthen Shoulder of Langdang/Choithar to Marrem Khullen (PKG-5 and 6) of Yaingangpokpi to Jessami Road (NH 202) in the state of Manipur |
NHIDCL/Manipur/AE/Y-J(Pkg- 5 and6)/NH-202/2021 |
27/09/2021 |
10/09/2021
|
11/10/2021
Time
15:0Hrs
|
|
1367 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 (PKG-IV,V,VI,VII) in the State of Manipur |
NHIDCL/Manipur/AE/I-J (Pkg- 4, 5, 6 and 7)/NH-37/2021 |
28/09/2021 |
10/09/2021
|
11/10/2021
Time
15:0Hrs
|
|
1368 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Construction of New Two-Lane Bridge with its approaches across River Brahmaputra on NH-17 at Jogighopa in the State of Assam (2nd call) |
NHIDCL/ASSAM/2020-21 /AE/JogiBridge/197510 |
20/09/2021 |
10/09/2021
|
18/10/2021
Time
15:0Hrs
|
|
1369 |
Consultancy services for Authority’s Engineer for Supervision of (i) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border to 2-Lane under SARDP-NE Phase-A in the state of Meghalaya on EPC mode (Package-I) (ii) Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border (PKG-II) to 2-Lane under NH (O)- NE in the state of Meghalaya on EPC mode |
NHIDCL/Megh/AE/NRK-I and II/2021 |
10/09/2021 |
08/09/2021
|
21/10/2021
Time
15:0Hrs
|
|
1370 |
Consultancy services for Authority’s Engineer for Supervision of Improvement/widening to Two laning with earthen shoulder of Nongjri to Maheshkola (R-M-B Package-II III & VI) on SH-4 section of Ranikor- Maheshkhola-Baghmara Project in the state of Meghalaya on EPC basis |
NHIDCL/Megh/AE/R-M-B/Pkg-II III&VI/SH-4/2021 |
13/09/2021 |
08/09/2021
|
21/10/2021
Time
15:0Hrs
|
|
1371 |
CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-Gradation to intermediate lane of NH301 Kargil-Zanskar in the UT of Ladakh on EPC mode (Package-IV/V/VI/VII) |
NHIDCL/Ladakh/NH-301/K-Z/AE(RE-Invite) (P-IV/V/VI & VII)/2021-22 |
30/08/2021 |
30/08/2021
|
22/09/2021
Time
11:0Hrs
|
|
1372 |
CONSULTANCY SERVICES AS AUTHORITYS ENGINEER FOR SUPERVISION OF Construction and Upgradation of Khellani – Khanabal-Alstop section of NH-244-44 (P6 and 7) Strengthening and upgradation of baramulla-Gulmarg Section of Nh-701 A in Jammu and Kashmir in the Union Territory of Jammu and Kashmir on EPC mode |
NHIDCL/JK/NH-244-44 and 701A/K-K67 BG/2021-22(Re invite) |
05/09/2021 |
27/08/2021
|
16/09/2021
Time
11:0Hrs
|
|
1373 |
CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar in the UT of Ladakh on EPC mode (Package-I/II/III/VIII) |
NHIDCL/K-Z/AE(Re-Invite) (P-I/II/III /VIII)/2021-22 |
27/08/2021 |
26/08/2021
|
22/09/2021
Time
11:0Hrs
|
|
1374 |
CS for Authoritys Engineer for Supervision of the work Rehabilitation and Upgradation of NH-167B from km 143/320 (Malakonda) to 189/050 (Singarayakonda) (on NH16) to two lane with paved shoulders in Andhra Pradesh through EPC mode |
SENHVJA/41/2021-22 DT.17.08.2021 |
24/09/2021 |
24/08/2021
|
18/10/2021
Time
15:0Hrs
|
|
1375 |
Consultancy services for Authority’s Engineer for Supervision of (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka Dimapur stretch from km 113 300 to km 146 250 (Design Chainage 113 830 to 145 712) of Kwaram Taro Village – Manja Section - (Package-6) of NH-29 in the state of Assam on EPC mode and (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 146 250 to Km 157 460 (Design Chainage145 712 to 156 502) of DillaiLahorijan (Package-7) of NH 29 in Assam |
NHIDCL/Assam / NH-29/Dab- Man/Pkg 6 and7/AE/199769 |
26/08/2021 |
20/08/2021
|
18/09/2021
Time
14:30Hrs
|
|
1376 |
Consultancy Services for AE for Supervision of Construction of 4-Lane Panchgram Bypass and Construction of Four Lane Badarpur Bypass at Kandigram Chaita Village in the State of Assam |
NHIDCL/Assam/AE/Panchgram- Badarpur Bypass/199712 |
25/08/2021 |
19/08/2021
|
16/11/2021
Time
15:0Hrs
|
|
1377 |
Consultancy services as Authority’s Engineer for Supervision of Four laning of Vairengte – N. Kawnpui section (Package-3, 4, 5 and 6) of NH-306 & NH-6 from Existing Chainage Km 43.000 to Km 126.315 (Design Chainage Km 46.000 to Km 111.850) in the State of Mizoram under Bharatmala Pariyojna on EPC mode |
NHIDCL/Mizoram/NH-306 & 6/S-V-S/AE/Pkg-3,4,5&6/2021-22 |
23/08/2021 |
14/08/2021
|
04/10/2021
Time
11:0Hrs
|
|
1378 |
Selection of Authoritys Engineers (AE) for supervision of construction of bypass for providing Interconnectivity amongst National Highways (NHs) arround the pratapghar city (Pratapgarh Bypass ) on EPC Mode in the state of Uttar Pradesh |
2480/160A-Yata-NH-Circle/2021 Dated 04.08.2021 |
11/08/2021 |
11/08/2021
|
14/09/2021
Time
11:0Hrs
|
|
1379 |
SC services of Trichy Madurai of NH45B |
2021 NHAI 83746 1 |
12/08/2021 |
02/08/2021
|
01/09/2021
Time
15:0Hrs
|
|
1380 |
AE Services of Thanjavur Pudukottai Thirumayam Manamadurai |
17012 02 09 2021 RO Madurai |
12/08/2021 |
29/07/2021
|
07/09/2021
Time
17:0Hrs
|
|
1381 |
AE services of Tuticorin Tirunelveli |
NHAI 17012 02 10 2021 RO Madurai |
12/08/2021 |
29/07/2021
|
08/09/2021
Time
17:0Hrs
|
|
1382 |
IE Services of Trichy Karur |
2021-NHAI-83455-1 |
29/07/2021 |
29/07/2021
|
30/08/2021
Time
18:0Hrs
|
|
1383 |
Consultancy services as AE for Supervision of Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 in the UT of J and K and Ladakh |
NHIDCL/JK/NH-01/Zojila /AE(Re-invite)/2021-22 |
25/07/2021 |
25/07/2021
|
24/08/2021
Time
11:0Hrs
|
|
1384 |
Consultancy Services of Supervision Consultant (SC) for Operation, Maintenance and Incident Management of the stretch from Km.0.000 to Km.68.000 (Kanaktora – Jharsuguda Section) up to 2-lane with paved shoulder including by-pass at Belpahar at 52nd Km. of NH-200 (from Km.197.300 to Km.265.300 including bypass at 249th Km. of NH-49) and Urgent Repair & Maintenance of Teleibani- Sambalpur section of NH-53 from Km.519.150 to Km.545.176 (Badarama Wildlife Sanctuary Area) in the State of Odisha-Reg |
NHAI/13012/53/RO/OD/2021 |
06/09/2021 |
21/07/2021
|
16/09/2021
Time
11:0Hrs
|
|
1385 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of 4 lane Connector from Delhi-Meerut Expressway (Km. 50.000 of Package-IV) to Km. 8.520 of NH-235 in the State of Uttar Pradesh on EPC Basis (Length-14.600 Km) under Bharatmala Pariyojana |
2021-NHAI-82005-1 |
19/07/2021 |
13/07/2021
|
14/09/2021
Time
11:0Hrs
|
|
1386 |
Consultancy services for Authority’s Engineer for Supervision of (i) Improvement and Widening to two lane with paved shoulder of Manu - Simlung section of NH-44A (Package-II) (ii) Rehabilitation and up-gradation of road of Vaghmun- Simlung section (Package-IV) in the state of Tripura. |
NHIDCL/Tripura/AE/L-K/V-S/Manu-Simlung/NH-44A/202 |
16/08/2021 |
13/07/2021
|
09/09/2021
Time
14:30Hrs
|
|
1387 |
Consultancy services for Authoritys Engineer for Supervision of Construction Of 4 Lane Flyover At Nagpur Rto Chowk To Nagpur University Campus From Ch 2/250 To 5/100 and 4 lane flyover at wadi/midc junction from km 8/360 to km 10/300 On NH 53 In State Of Maharashtra On Epc Mode |
RW/NH-12014/72/2020-21 |
28/07/2021 |
13/07/2021
|
17/09/2021
Time
17:0Hrs
|
|
1388 |
Consultancy services for Authoritys Engineer for supervision Rehabilitation and Widening work for 2-lane with paved shouldering of existing National Highway 80 Alignment from 1- Km 70.150 to Km121,025 and 132.895 to 190.150 in the state of Bihar on EPC Mode |
2021-MoRTH-637959-1 |
12/08/2021 |
09/07/2021
|
13/09/2021
Time
16:0Hrs
|
|
1389 |
Consultancy services for Authoritys Engineer for Supervision of Upgradation/ Reconstruction to two lane with paved shoulders/ four lane configuration (Package No Nashik IV) – Nhavra – Inamgaon – Kaashti – Shrigonda – Jalgaon – Jamkhed of SH-55 (Now New NH-548D) in the state of Maharashtra Secton – 2 Adhalgaon to Jamkhed from km 132-600 to km 195-375 |
RW/NH-12014/02/2020-21 |
04/08/2021 |
05/07/2021
|
03/09/2021
Time
17:0Hrs
|
|
1390 |
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation & Up-gradation of Amboli Junction (Design Ch 71-530) to Ajara (Design Ch 100-835) section and section of Ajara (100-835) to Sankeshwar (132-958) of Newly declared NH No 548H Raod Network with NH-66 near Banda-Amboli-Ajara-Gadhinjia) to NH-48 near Sankeshwar to two lane with paved shoulder in the state of Maharashtra on Engineering Procurement & Construction (EPC) Mode |
RW/NH-12014/70/2020-21 |
04/08/2021 |
05/07/2021
|
03/09/2021
Time
17:0Hrs
|
|
1391 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Construction of New Two-Lane Bridge across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC mode |
NHIDCL/ASSAM/2020 -21/AE/JogiBridge |
08/08/2021 |
05/07/2021
|
25/08/2021
Time
15:0Hrs
|
|
1392 |
Consultancy Services for Authority Engineer for supervision of Balance works of rehabilitation and upgradation of Nakrekal to Nagarjunasagar section of NH-565 to 2L with PS/4L from km 1 to km 86 under NH(O) for the year 2020-21 in the state of Telangana on EPC Basis |
RW/HYD/Misc-28/NIT/2021-22/001 dt 29.06.2021 |
01/07/2021 |
05/07/2021
|
23/08/2021
Time
15:0Hrs
|
|
1393 |
CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Up-Gradation to intermediate lane of NH301 Kargil-Zanskar in the UT of Ladakh on EPC mode (Package-IV/V/VI/VII) |
NHIDCL/Ladakh/NH-301/K-Z/AE (P-IV/V/VI & VII)/2021-22 |
04/07/2021 |
04/07/2021
|
25/08/2021
Time
11:0Hrs
|
|
1394 |
Consultancy services as Authority’s Engineer for Supervision of Up-gradation to 2 lane with Paved shoulders of Tuivai – Keifang road, NH-102B of Aizawl – Imphal Economic Corridor from Existing Chainage Km 0.000 (Bridge across Tuivai River at Manipur Mizoram Border) to Km 119.108 (Near Keifang Village) (Design Chainage Km 0.000 to Km 98.579) (Package-I, II & III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode |
NHIDCL/Mizoram/NH-102B/AE/2021-22 |
06/07/2021 |
02/07/2021
|
02/08/2021
Time
11:0Hrs
|
|
1395 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur (Package-5 and 6) on EPC mode. |
NHIDCL/Manipur/AE/TMP-5 and 6/2021 |
04/08/2021 |
01/07/2021
|
20/08/2021
Time
15:0Hrs
|
|
1396 |
CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar in the UT of Ladakh on EPC mode (Package-I/II/III/VIII) |
NHIDCL/Ladakh/NH-301/K-Z/AE (P-I/II/III /VIII)/2021-22 |
30/06/2021 |
30/06/2021
|
18/08/2021
Time
11:0Hrs
|
|
1397 |
CONSULTANCY SERVICES AS AUTHORITYS ENGINEER FOR SUPERVISION OF Construction and Upgradation of Khellani – Khanabal-Alstop section of NH-244 (P6 and 7). Strengthening and upgradation of baramulla-Gulmarg Section of Nh-701 A in Jammu and Kashmir. NH-244 in the Union Territory of Jammu and Kashmir on EPC mode (Pkg –III IV V). |
NHIDCL/JK/NH-244-44 and 701 A/K-K67BG)/2021-22 |
30/06/2021 |
30/06/2021
|
25/08/2021
Time
11:0Hrs
|
|
1398 |
CONSULTANCY SERVICES AS AUTHORITYS ENGINEER FOR SUPERVISION OF Construction and Upgradation to 2 lane with paved shoulder on Khellani – Kishtwar –Chattroo section on NH-244 in the Union Territory of Jammu and Kashmir on EPC mode (Pkg –III IV V). |
NHIDCL/JK/NH-244/K-K/AE(P345)/2021-22 |
30/06/2021 |
29/06/2021
|
04/08/2021
Time
11:0Hrs
|
|
1399 |
Consultancy services for Authoritys Engineer for Supervision of Upgradation of PACKAGE-I Jhalmala To Sherpar From Km 30.600 To Km 67.800 And PACKAGE-II Sherpar To Kohka From Km 67.880 To Km 114.860 Of NH-930 To Two Lane With Paved Shoulders With Flexible Pavement In The State Of Chhattisgarh On EPC Mode. |
41/CE/NH/TC/44-20/2021 |
13/07/2021 |
29/06/2021
|
01/09/2021
Time
11:0Hrs
|
|
1400 |
Consultancy Services For Authoritys Engineer For Supervision Of Upgradation Of Package-I Abhanpur To Paund Section From Km 0.000 To Km 40.380 And Package-IV Madangmuda-Deobhog-Odisha Border From Km 168.800 To Km 196.400 Of National Highway 130C To Two Lane With Paved Shoulders With Flexible Pavement In The State Of Chhattisgarh On EPC Mode |
40/CE/NH/TC/44-19/2021 |
14/07/2021 |
29/06/2021
|
01/09/2021
Time
11:0Hrs
|
|
1401 |
Authority engineer/PMC for Supervision of Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH-24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode |
1773/168C(3)-NH Circle/2021, dated-11.06.2021 |
24/06/2021 |
21/06/2021
|
14/07/2021
Time
11:0Hrs
|
|
1402 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF RUDRAPRAYAG TUNNEL OF LENGTH 900.30 M INCLUDING APPROACHES AND ONE MAJOR BRIDGE ON RIVER ALAKNANDA CONNECTING NH-107 (OLD-109) TO NH-07 (OLD NH-58) ON EPC MODE IN THE STATE OF UTTARAKHAND |
1846(1)/13याता-रा०मा०-10/2021 date 01.06.2021 |
13/06/2021 |
05/06/2021
|
24/08/2021
Time
15:0Hrs
|
|
1403 |
Consultancy services for Authoritys Engineer for supervision of construction of new 4-Lane -Bridge(Parallel to the existing MG Setu) with its approaches from km 0/000 to km 14/500 across River Ganga on NH -19 at Patna in the state of Bihar on EPC Mode |
RW/NH-12014/95/2019/BR/Z-1 |
09/06/2021 |
20/05/2021
|
19/07/2021
Time
16:0Hrs
|
-
|
1404 |
Consultancy Services as AE for Supervision of Construction of Uni-Directional Khellani Tunnel and Construction and Upgradation to 2 lane with paved shoulder from on Khellani-Kishtwar-Chattroo of NH- 244 in Jammu and Kashmir (Package-I and II) |
NHIDCL/JK/NH-244/G-K-K/AE (GK3 KK1 KK2)/2021-22 |
17/05/2021 |
17/05/2021
|
23/06/2021
Time
11:0Hrs
|
|
1405 |
CONSULTANCY SERVICES AS AE FOR SUPERVISION OF Construction and Upgradation to 2-lane /4lane with paved shoulder from Vailoo to Donipawa of 27/943 km (Pkg-VI) and Donipawa to Ashajipora of 8/470km in Jammu and Kashmir (Pkg - VII) |
NHIDCL/JK/NH-244/ K-K/AE(P 6-7)/2021-22 |
17/05/2021 |
17/05/2021
|
23/06/2021
Time
11:30Hrs
|
|
1406 |
Consultancy services as Authority’s Engineer for Supervision of Up-gradation to 2 lane with paved shoulders of Dulte - Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to Km 111.580 (Package-I - II and III) in the State of Mizoram under Bharatmala Pariyojna on EPC mode |
NHIDCL/Mizoram/NH-6/ IC/AE/2021-22 |
06/05/2021 |
06/05/2021
|
14/06/2021
Time
11:0Hrs
|
|
1407 |
Consultancy services as Authority’s Engineer for Supervision of Construction of 2 laning with hard shoulder configuration of Lunglei – Chhumkhum - Tlabung road of NH-302 from Design Chainage Km 0.000 to km 74.950 (Package- A and B) in the State of Mizoram under Bharatmala Pariyojna on EPC mode |
NHIDCL/Mizoram/NH302/AE/2021-22 |
03/05/2021 |
03/05/2021
|
02/06/2021
Time
11:0Hrs
|
|
1408 |
Independent Engineer services during Operation and Maintenance Period for (i) ) 4-laned Mahagaon - Yavatmal Section of NH-361 (ii) 4-laned Yavatmal - Wardha Section of NH-361 (iii) 4-laned Wardha – Butibori Section of NH-361 on Hybrid Annuity Mode in the State of Maharashtra–Consultancy Package No.IE-OMNH361NAG-18 |
NHAI/RO-NAG/TENDERS/2021-22/03 |
28/04/2021 |
28/04/2021
|
02/06/2021
Time
11:0Hrs
|
|
1409 |
Independent Engineer services during Operation and Maintenance Period for 4–laned from Nagpur–Kondhali (Km.9.200 to Km.50.000) Section of NH-53 (Old NH-6) on BOT basis in the State of Maharashtra–Consultancy Package No.IE-OMNH-361NAG-19 |
NHAI/RO-NAG/TENDERS/2021-22/05 |
28/04/2021 |
28/04/2021
|
02/06/2021
Time
11:0Hrs
|
|
1410 |
Consultancy services for Authority Engineer for Supervision of (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-17) (ii) Widening/Improvement to 4 (Four) Lane with Paved Shoulder of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati road (NH 17) in the state of Assam on EPC mode |
NHIDCL/Assam/Bil-Ghy/AE /Pkg-5 and 7/195538 |
23/04/2021 |
23/04/2021
|
17/06/2021
Time
15:0Hrs
|
|
1411 |
Consultancy services for Authority Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Parokhuwa – Dokmoka Section(Package 2) of NH 29 in the state of Assam on EPC mode |
NHIDCL/Assam/AE/Dab-Man/ Pkg-2/NH-29/195582 |
23/04/2021 |
23/04/2021
|
17/06/2021
Time
15:0Hrs
|
|
1412 |
Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka - Khatkhati stretch of NH-29 of Package 5 starting from Near Ganpath Gaur Gaon at Km 95 400 to Kwaram Taro village at Km 113 330 (Design KM 96 400 to Km 113 830) in the state of Assam on EPC mode |
NHIDCL/Assam/AE/Dab-Man/Pkg-5/NH-29/195592 |
22/04/2021 |
22/04/2021
|
17/06/2021
Time
15:0Hrs
|
|
1413 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section (Package-IA IB IIA and IIB) on NH-129A in the State of Manipur |
NHIDCL/Manipur/AE/MP(Pkg-1A 1B 2A 2B)/NH-129A/2020 |
22/04/2021 |
19/04/2021
|
09/06/2021
Time
15:15Hrs
|
|
1414 |
Independent Engineer Services during Operation and Maintenance of Jodhpur – Pali Section of NH-65 from Km. 308.000 to Km.366.000 and including Bypass to Pali starting from Km. 366.000 of NH-65, Connecting NH - 14 at Km. 114.000 in the state of Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer Basis stage of selected road stretches under BOT projects in the State of Rajasthan |
2021 MoRTH 625657 1 |
19/04/2021 |
17/04/2021
|
05/05/2021
Time
11:0Hrs
|
|
1415 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION FOR Rehabilitation and upgradation of Askot Lipulekh on EPC basis for Phase I Design Chainage Km 21.330 to Km 56.935 under Project Hirak of BRO in the State of Uttarakhand under Bharatmala |
2021MoRTH6269961 |
16/04/2021 |
16/04/2021
|
09/07/2021
Time
11:0Hrs
|
|
1416 |
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 (PKG- 1,2 and 3) and Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road in the State of Manipur |
NHIDCL/Manipur /AE/IJ(Pkg-1,2,3) IB/2021 |
22/04/2021 |
13/04/2021
|
11/06/2021
Time
15:0Hrs
|
|
1417 |
CS for AE for Supervision of Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B (PKG-3) in the State of Manipur on EPC mode |
NHIDCL/Manipur/AE/ CT(Pkg-3) /NH-102B/2021 |
26/04/2021 |
13/04/2021
|
11/06/2021
Time
15:0Hrs
|
|
1418 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF RUDRAPRAYAG TUNNEL OF LENGTH 900.30 M INCLUDING APPROACHES AND ONE MAJOR BRIDGE ON RIVERALAKNANDA CONNECTING NH-107 (OLD-109) TO NH-07 (OLD NH-58) ON EPC MODE IN THE STATE OF UTTARAKHAND |
1372/13Yata-NH-10/2021 dated 26.03.2021 |
27/03/2021 |
27/03/2021
|
01/06/2021
Time
11:0Hrs
|
|
1419 |
Authority’s Engineer for “Improvement and Widening to two lane with paved shoulder of Kailashahar - Khowai section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - starting near Kirtanthali (near Kailashahar town) at km 21.100 and ending near Ganki in Khowai district at km 101.300 (Package-I, II, III, IV & V) under JICA ODA loan Phase-IV on Engineering, Procurement, Construction (EPC) Mode |
NHIDCL/Tripura/AE/NH-208/Kail-Khowai/JICA/2020 |
24/03/2021 |
18/03/2021
|
12/04/2021
Time
14:30Hrs
|
|
1420 |
Sample Project |
Sample Project |
03/03/2021 |
01/03/2021
|
31/03/2025
Time
15:0Hrs
|
|
1421 |
Consultancy services for Authority’s Engineer for Supervision of i) fConstruction of 2 Laning with Hard Shoulder of Peren – Dimapur section(Length – 17.384 Km) (Pkg – III) (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section (Pkg – IV) (iii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) - TSP |
NHIDCL/Nagaland/AE/Peren Dimapur 345/2020 |
24/02/2021 |
24/02/2021
|
19/03/2021
Time
11:0Hrs
|
|
1422 |
Consultancy services for AE for Supervision of (i) Construction of 2-lane Chisopani Traffic Tunnel of length 250 m (ii) Special protection work on rehabilitation and restoration of sliding/sinking zone on NH-10 (Rangpo to Ranipool section) |
614224 |
08/03/2021 |
04/02/2021
|
19/04/2021
Time
15:0Hrs
|
|
1423 |
Consultancy services for Authoritys Engineer for Supervision of Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur (PKG-1,2,3 and 4) on EPC mode |
NHIDCL/Manipur/ T-M(Pkg1-4)/AE |
31/03/2021 |
27/01/2021
|
19/04/2021
Time
15:0Hrs
|
|
1424 |
Consultancy services as IE during O and M Period for the Project Two laning with paved shoulders of Aligarh-Moradabad section of NH-509 from km. 79.000 to km.232.020 in the state of Uttar Pradesh on Performance -Based Maintenance Contract (PBMC) |
RO-UPWEST/OM/IE/Aligarh-MBD |
14/06/2025 |
29/05/1991
|
04/08/2025
Time
14:0Hrs
|
|