S.No |
Project Name |
Tender No |
Tender Date |
Tender Start Date |
Tender End Date |
Document |
1 |
PMC SERVICE FOR CONSTRUCTION OF JIABHARALI BRIDGE, SUBANSIRI BRIDGE AND DIKRONG BRIDGE ON NH-15. |
2021MORTH6551311 |
17/11/2021 |
29/10/2021 |
30/11/2021
Time
11:0Hrs
|
|
2 |
RFPPMCNH627 |
2021MoRTH6437741 |
01/09/2021 |
18/08/2021 |
18/09/2021
Time
14:0Hrs
|
|
3 |
PMCSERVICEFORCONSTRUCTIONOFJIABHARALIBRIDGE |
2021MORTH6410301 |
05/08/2021 |
30/07/2021 |
15/09/2021
Time
11:0Hrs
|
|
4 |
PMCSERVICEFORCONSTRUCTIONOFDIKRONGBRIDGE |
2021MORTH6409681 |
05/08/2021 |
30/07/2021 |
15/09/2021
Time
11:0Hrs
|
|
5 |
PMCSERVICEFORCONSTRUCTIONOFSUBANSIRIBRIDGE |
2021MORTH6410321 |
05/08/2021 |
30/07/2021 |
15/09/2021
Time
11:0Hrs
|
|
6 |
Request for Proposal for qualification and empanelment of agencies for Traffic Due Diligence of the National Highways stretches under consideration for award on various asset monetization models |
2021-NHAI-83003-1 |
29/07/2021 |
23/07/2021 |
09/08/2021
Time
11:0Hrs
|
|
7 |
Consultancy Services for Preparation of FS / DPR for Construction of Two lane / Four lane with paved shoulders for newly declared NH-548B, Vijayapur-Sankeshwar Section in the State of Karnataka from Km.80.00 (Muragundi) to Km.169.00 (Gotur terminating at NH-48) of NH-548B and from Km 211.00 (MH border) to Km 213.60 (Kagwad cross) of NH-160. |
ENH/VJP/PB/AE.2/TND/2020-21/2015 |
23/07/2021 |
22/07/2021 |
04/09/2021
Time
17:0Hrs
|
|
8 |
Consultancy Services for Widening two lane with paved shoulder from Km 0.00 to 24.00 of NH-166E (Tikota Bijjargi Kanamadi MH Border Section) in the state of Karnataka. |
ENHD/VJP/DPR/TENDER/20-21/1995 |
22/07/2021 |
20/07/2021 |
02/09/2021
Time
17:0Hrs
|
|
9 |
Consultancy Services for Widening two lane with paved shoulder from Km 89.300 to 113.00 and 184.700 to 198.920 of NH-150A (Jewaragi Chamarajnagar Section) in the state of Karnataka. |
ENHD/VJP/DPR/TENDER/20-21/1996 |
22/07/2021 |
20/07/2021 |
02/09/2021
Time
17:0Hrs
|
|
10 |
Request for Proposal for qualification and empanelment of agencies for Traffic Due Diligence of the National Highways stretches under consideration for award on various asset monetization models |
2021-NHAI-81125-1 |
08/07/2021 |
01/07/2021 |
14/07/2021
Time
11:0Hrs
|
|
11 |
Request for Proposal for qualification and empanelment of agencies for technical due diligence of the National Highways stretches under consideration for award on Assets Monetisation |
2021-NHAI-80073-1 |
22/06/2021 |
21/06/2021 |
30/06/2021
Time
11:0Hrs
|
|
12 |
Request for Proposal for qualification and empanelment of agencies for Traffic Due Diligence of the National Highways stretches under consideration for award on various asset monetization models |
2021-NHAI-80017-1 |
22/06/2021 |
19/06/2021 |
30/06/2021
Time
11:0Hrs
|
|
13 |
Consultancy service for preparation of detailed Project Report including LA and Other clearances for construction of Pipra bypass at km 44 on NH-106(Old)/ NH-131(New) in the state of Bihar |
10/NH-MADHEPURA/2020-21 |
16/03/2021 |
12/03/2021 |
25/03/2021
Time
17:0Hrs
|
|
14 |
Consultancy Services for Preparation of Detailed Project Report for 2 laning with hard shoulder from Mon connecting Longwa – Pangsha – Khiphire to Avankhu in the state of Nagaland |
NHIDCL/Nagaland/DPR/Mon - Avankhu/2021 |
18/02/2021 |
18/02/2021 |
16/03/2021
Time
15:0Hrs
|
|
15 |
Preparation of Detailed Project eport for New Alignment for 2 lanes /2 lane with paved shoulders configuration of stretch from km. 95.200 near S.S.B. Camp (Ausani village) to near U.P. Border on NH-727– in the boundary zone of Valmiki wildlife Sanctuary & Tiger Reserve& Tiger Reserve along Gandak river bank in Bihar State.) |
NH/MOT/DPR/02/2020-21 |
06/02/2021 |
03/02/2021 |
25/02/2021
Time
15:0Hrs
|
|
16 |
Consultancy services for preparation of detailed project report including LA and other clearances for Construction of Pipra Bazar Bypass at km 44 on NH-106(Old)/NH-131(New) in the state of Bihar. |
NIT No. 07/NH-MADHEPURA/2020-21 |
08/02/2021 |
02/02/2021 |
26/02/2021
Time
17:0Hrs
|
|
17 |
Consultancy services for preparation of detailed project report including LA and other clearances for Construction of Supaul Bypass on NH-327E in the state of Bihar. |
NIT No. 07/NH-MADHEPURA/2020-21 |
08/02/2021 |
02/02/2021 |
26/02/2021
Time
17:0Hrs
|
|
18 |
Consultancy services for preparation of detailed project report including LA and other clearances for Construction of Singheshwar Bypass on NH-106(Old)/NH-131(New) in the state of Bihar. |
07/NH-MADHEPURA/2020-21 |
08/02/2021 |
02/02/2021 |
26/02/2021
Time
17:0Hrs
|
|
19 |
Consultancy Services to carry out detailed technical assessment of the corridor to identify issues impacting the efficiency of the corridor and its Design solutions on Panipat-Jalandhar section of NH-1 (new NH-44) from Km. 96.00 to Km. 387.100 in the State of Haryana and Punjab |
NHAI/RO/CHD/11011/PAN-JAL/DPR/RFP |
21/01/2021 |
20/01/2021 |
01/03/2021
Time
11:0Hrs
|
|
20 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase II (Lot 10) (Package I) |
NHAI/Bharatmala/DPR/Lot-10/2021/PackageI |
22/01/2021 |
18/01/2021 |
08/03/2021
Time
11:0Hrs
|
|
21 |
Consultancy services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase II (Lot10) (Package II) |
NHAI/Bharatmala/DPR/Lot-10/2021 (PackageII) |
22/01/2021 |
18/01/2021 |
08/03/2021
Time
11:0Hrs
|
|
22 |
Consultancy services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase II (Lot 10) (Package III) |
NHAI/Bharatmala/DPR/Lot-10/2021 (Package III) |
22/01/2021 |
18/01/2021 |
08/03/2021
Time
11:0Hrs
|
|
23 |
Consultancy services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase II (Lot 10) (Package IV) |
NHAI/Bharatmala/DPR/Lot-10/2021 (Package IV) |
22/01/2021 |
18/01/2021 |
08/03/2021
Time
11:0Hrs
|
|
24 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Sagara Havinahalli Holebaglu Kalasvalli Sighandoor Markutka junction with NH-766C |
EENHD/AE1/NIB14/2020-21/1667 |
16/01/2021 |
15/01/2021 |
15/02/2021
Time
16:0Hrs
|
|
25 |
Project Management Consultancy Services for up-gradation to 2/4 lane with paved shoulders configuration of newly declared NH 167K starting from its junction with NH 167 near Kalwakurthy connecting Nagarkurnool, Kollapur, Rampur in the state of Telangana, Mandugula, Sivapuram, Karivena and terminating at its junction with NH 40 near Nandyal in the state of Andhra Pradesh for a length of 185.90 Kms (approx) including four lane major bridge across river Krishna |
SE R and B NH.HYD.42.2020 21, dt. 29.12.2020 |
06/01/2021 |
06/01/2021 |
01/03/2021
Time
15:0Hrs
|
|
26 |
Consultancy services for preparation of DPR for NH-79 (New-448) Ajmer- Nasirabad Road |
NIT12/2020-21 EEPWD NH DN AJMER |
20/01/2021 |
04/01/2021 |
22/01/2021
Time
15:0Hrs
|
|
27 |
Consultancy Services for preparation of Detailed Project Report of Bemetara Bypass from existing Ch.285.900 to Ch. 299.400 on RHS of National Highway-30 (Kawardha-Simga Road) for construction in two lane with paved shoulder configuration in the state of Chhattisgarh |
2020-MoRTH-599642-1 |
15/02/2021 |
04/01/2021 |
18/02/2021
Time
17:0Hrs
|
|
28 |
Consultancy Services for preparation of Feasibility Report for Construction of Ring Road for Siliguri city |
06/2020-21/Siliguri Ring Road |
14/12/2020 |
21/12/2020 |
04/03/2021
Time
15:0Hrs
|
|
29 |
Consultancy Services for Improvements/Widening to two lane with paved shoulders of NH-548B from Km 0.00 (Maharashtra border Murrum) to Km.106.00 (Bijapur junction terminating at IB Circle Junction). |
ENHD/VJP/DPR/TENDER/20-21/958 |
17/12/2020 |
15/12/2020 |
29/01/2021
Time
17:30Hrs
|
|
30 |
Consultancy Services for Preparation of Detailed Project Report for the work of 4 laning of Muzaffarpur – Sitamarhi – Sonbarsa Section of NH -77 (Total Length - 84 Km). |
NIT No- 112/RO-PATNA/NHAI/2020-21 |
14/12/2020 |
07/12/2020 |
19/01/2021
Time
11:0Hrs
|
|
31 |
Consultancy Services for preparation of DPR for upgradation to 2 4 6 lane with PS of newly declared NH 167K starting from its jn with NH 167 near Kalwakurthy in Telangana and terminating at its jn with NH 40 near Nandyal in AP for length of 185.90 Km approx |
SE RandB NH.HYD.35.2020 21, dt. 27.11.2020 |
10/12/2020 |
03/12/2020 |
04/01/2021
Time
15:0Hrs
|
|
32 |
Consultancy Services for Preparation of Feasibility Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana |
NHIDCL/MMLP/Silchar/Assam/2020 |
11/12/2020 |
27/11/2020 |
14/12/2020
Time
11:0Hrs
|
|
33 |
Consultancy Services for Preparation of Detailed Project Report for the work of 4 laning of Khagaria - Purnia Section of NH -31 (Total Length - 80 Km). |
NIT No- 108/RO-PATNA/NHAI/2020-21 |
03/12/2020 |
26/11/2020 |
07/01/2021
Time
11:0Hrs
|
|
34 |
Consultancy Services for preparation of detailed project report forConstruction of Elevated Corridor in Ranchi city from km 0.00 to km 3.260of NH-75 including down ramp on NH-23 from km 0.100 to km 0.600 inthe State of Jharkhand on EPC mode (Balance work) |
NHAI/RO/RNC/JH/202021/30 |
19/11/2020 |
23/10/2020 |
23/11/2020
Time
15:0Hrs
|
|
35 |
Consultancy Services for preparation of detailed project report for Construction of Elevated Corridor in Ranchi city from km 0.00 to km 3.260 of NH-75 including down ramp on NH-23 from km 0.100 to km 0.600 in the State of Jharkhand on EPC mode (Balance work) |
NHAI/RO/RNC/JH/2020-21/30 |
06/11/2020 |
23/10/2020 |
16/11/2020
Time
15:0Hrs
|
|
36 |
Consultancy Services for Improvements/Widening to two lane with paved shoulders of NH-548B from Km.52.00 to Km.106.00 Indi Junction to Bijapur junction terminating at IB Circle Junction. |
ENHD/VJP/DPR/TENDER/20-21/732 |
21/10/2020 |
21/10/2020 |
04/12/2020
Time
17:0Hrs
|
|
37 |
Consultancy services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9) - (Package -1) |
NHAI/Bharatmala/DPR/Lot-9/2020/Pkg-1 |
14/10/2020 |
13/10/2020 |
27/11/2020
Time
11:0Hrs
|
|
38 |
Consultancy services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9) - (Package -2) |
NHAI/Bharatmala/DPR/Lot-/2020/Pkg-2 |
15/10/2020 |
13/10/2020 |
27/11/2020
Time
11:0Hrs
|
|
39 |
Consultancy services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9) - (Package -3) |
NHAI/Bharatmala/DPR/Lot-/2020/Pkg-3 |
15/10/2020 |
13/10/2020 |
27/11/2020
Time
11:0Hrs
|
|
40 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation to 2/4/6 lane NH/ Port/Coastal connectivity under BharatmalaPariyojana in the State of Kerala |
NHAI/Tech/KL/PC-BMP/2020 |
25/10/2020 |
08/10/2020 |
23/11/2020
Time
11:0Hrs
|
|
41 |
Consultancy Services for Preparation of DPR/ Feasibility report for Pune Bengaluru Expressway green field alignment under Bharatmala Phase II in the state of Maharashtra and Karnataka |
2020 NHAI 58896 1 |
05/10/2020 |
01/10/2020 |
23/12/2020
Time
11:0Hrs
|
|
42 |
Consultancy Services for preparation of Feasibility study and detailed project report for Construction of Bypass to NH-114A connecting NH-333 and NH-133 (Deoghar Bypass) in the State of Jharkhand |
NHAI/RO/RNC/JH/2020-21/25 |
06/11/2020 |
23/09/2020 |
16/11/2020
Time
15:0Hrs
|
|
43 |
Consultancy Services for preparation of Feasibility study and detailed project report for Construction of Bypass to NH-114A connecting NH-333and NH-133 (Deoghar Bypass) in the State of Jharkhand |
NHAI/RO/RNC/JH/202021/25 |
19/11/2020 |
23/09/2020 |
23/11/2020
Time
15:0Hrs
|
|
44 |
Consultancy Services for preparation of Feasibility study and detailed project report for up-gradation of NH-80 section from km 190.00 to km 215.00 into four laning including Sahibganj bypass (between km 197.00 to km 207.00) and from km. 260.00 to km 283.00 in the State of Jharkhand |
2020-NHAI-55450-1 |
26/08/2020 |
18/08/2020 |
05/10/2020
Time
11:0Hrs
|
|
45 |
Consultancy Services for preparation of DPR Feasibility Report for upgradation to 6-8 laning of Aroor to Thuravoor Thekku section of new NH 66 (from Km 358.750 to Km 379.100 of Old NH-47) (Length 13 Km) under Bharatmala Pariyojana in the State of Kerala |
NHAI/HQ/Kerala/ DPR/NH-66/2020 |
10/08/2020 |
10/08/2020 |
17/11/2020
Time
11:0Hrs
|
|
46 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of National Highway No 731B starting from the junction with NH 31 near Machhlisahar connecting Janghai Durgaganj Bhadohi Kapsethi and terminating at its junction with Lahartara Mohansarai Road (ODR) near Varanasi in the State of UttarPradesh |
1145/DPR-731B-18/2020 dt 10-07-2020 |
16/07/2020 |
10/08/2020 |
14/10/2020
Time
15:0Hrs
|
|
47 |
Consultancy Services for preparation of DPR/ Feasibility Report for construction starting from NH-19 (near bakarpur-haat) via maker-taraiya- rajapatti- Baikunthpur – ending at khajuriya (Dumariya ghat) |
NHAI/BH/DPR/2020/Bakarpur |
20/07/2020 |
20/07/2020 |
03/09/2020
Time
11:0Hrs
|
-
|
48 |
Consultancy Services for Preparation of Detailed Project Report of the work of 4/6 laning new bridge across river Ganga Connecting Matihani-Shambo Village in Begusarai District in the state of Bihar. (Total Length – 22 Km) |
NIT No- 84/RO-PATNA/NHAI/2019-20 |
30/06/2020 |
30/06/2020 |
20/07/2020
Time
11:0Hrs
|
|
49 |
Preparation of Detailed Project eport for New Alignment for 2 lanes /2 lane with paved shoulders configuration of stretch from km. 95.200 near S.S.B. Camp (Ausani village) to near U.P. Border on NH-727 – in the boundary zone of Valmiki wildlife Sanctuary & Tiger Reserve& Tiger Reserve along Gandak river bank in Bihar State.) |
NH/MOT/DPR/RE4/02/2020-21 |
22/05/2020 |
05/05/2020 |
09/06/2020
Time
11:0Hrs
|
|
50 |
Consultancy Services for Project Preparation of Feasibility Study/ Detailed Project Report of Road Safety Advocacy Park at Kanyakumari-End Point (at Km 234/170 of NH-7) in the State of Tamil Nadu |
NHAI/1101/RSC/RSAdvocacy/2018 |
30/04/2020 |
28/04/2020 |
25/06/2020
Time
11:0Hrs
|
-
|
51 |
Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Pkg 1) |
NHAI/BM/CorridorImprovement/RFP/2017/Package1 |
07/05/2020 |
03/03/2020 |
15/07/2020
Time
11:0Hrs
|
|
52 |
Preparation of Detailed Project Report for New Alignment for 2 lanes /2 lane with paved shoulders configuration of stretch from km. 95.200 near S.S.B. Camp (Ausani village) to near U.P. Border on NH-727 – in the boundary zone of Valmiki wildlife Sanctuary & Tiger Reserve along Gandak river bank in Bihar State |
NH/MOT/DPR/RE/08/2019-20 |
24/02/2020 |
25/02/2020 |
26/03/2020
Time
11:0Hrs
|
|
53 |
Consultancy Services for preparation of Detailed Project Report of Ambala Ring Road connecting NH-152 (at km 9.750, old chainage) to NH-72 (at Village Handesra) to NH-444A (at Village Khudda Kalan) to NH-44 (at Village Mohra) and NH-65 (at Village Balana) in the State of Haryana |
RO/CHD/11011/PD-AMB/AMB-Ring Road /DPR/RFP |
30/01/2020 |
28/01/2020 |
16/03/2020
Time
11:0Hrs
|
|
54 |
Supervision Consultancy Services for Supervision of Operation and Maintenance of Borkhedi-Jam-Wadner Devadhari–Kelapur–Pimpalkhutti section from Km.36.600 to Km.175.000 of NH-44 in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2019-20/34 |
07/01/2020 |
07/01/2020 |
14/01/2020
Time
11:0Hrs
|
|
55 |
Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Pkg 1) |
NHAI/BM/Corridor Improvement/RFP/2017/Pkg1 |
16/01/2020 |
03/01/2020 |
16/03/2020
Time
11:0Hrs
|
|
56 |
Consultancy Services for Project Preparation of Feasibility Study/ Detailed Project Report of Road Safety Advocacy Park at Kanyakumari-End Point (at Km 234/170 of NH-7) in the State of Tamil Nadu |
NHAI/1101/RSC/RS Advocay/2018 |
20/11/2019 |
20/11/2019 |
19/12/2019
Time
11:0Hrs
|
|
57 |
Consultancy Services for preparation of Detailed Project Report for Rajpura-Kharar New Greenfield Highway project connecting NH-44 (at CH. 233.280 on Rajpura Bypass) with NH-205 (at CH. 19.700 near village Ghataur) in the State of Punjab |
NHAI/RO/CHD/11011/PD-MHL/Raj-Kha/DPR/RFP |
05/10/2019 |
04/10/2019 |
20/11/2019
Time
11:0Hrs
|
|
58 |
Consultancy Services for Project Preparation of Feasibility Study/ Detailed Project Report of Road Safety Advocacy Park at Kanyakumari-End Point (at Km 234/170 of NH-7) in the State of Tamil Nadu |
NHAI/1101/RSC/RS Advocacy/2018 |
24/09/2019 |
24/09/2019 |
07/11/2019
Time
11:0Hrs
|
-
|
59 |
Consultancy Services for preparation of Detailed Project Report for construction of New Bridge near Old Bridge across Sharavathi River at Honnavara on NH-66 in the State of Karnataka |
NHAI /KNT/DPR/Sharavathi Bridge/NH-66/2019 |
27/06/2019 |
26/06/2019 |
08/08/2019
Time
11:0Hrs
|
|
60 |
Consultancy Services for preparation 6-laning of Lucknow - Ayodhya - Gorakhpur section from Km 8.00 to Km 252.860 section of NH-28 (New NH-27) length 244.86 km. in the state of UP |
NHAI/UP/Div.(East) DPR-6laning/2019 |
05/07/2019 |
26/06/2019 |
20/08/2019
Time
11:0Hrs
|
|
61 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) CONSTRUCTION OF HIGH LEVEL RCC MAJOR BRIDGE AT KM. 89 (AKLERA) ON PARWAN ALONG WITH APPROACHES AND OTHER STRUCTURE ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN. (II) CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS RIVER LAHASI IN KM. 63 INCLUDING APPROACHES ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN ON EPC MODE |
NITNO-10-2018-19 |
19/05/2019 |
08/05/2019 |
11/06/2019
Time
11:0Hrs
|
|
62 |
Consultancy Services for Preparation of DPR for construction of Bypass on Western side of Gwalior city in the State of Madhya Pradesh. |
NHAI/MP/DPR/Gwalior City (western side)/Bypass/2019 |
21/02/2019 |
21/02/2019 |
28/05/2019
Time
11:0Hrs
|
|
63 |
CONSULTANTS FOR ENGAGING AUTHORITITY’S ENGINEER (AE) FOR CONSTRUCTION OF |
NH-JHALAWAR-NITNO-10-2018-19 |
17/04/2019 |
11/02/2019 |
09/05/2019
Time
11:0Hrs
|
|
64 |
Consultancy Services for preparation of DPR/ Feasibility report for Construction of Ring Road for Jabalpur city. |
NHAI/MP/HQ/Jabalpur Ring Road/2019 |
20/02/2019 |
08/02/2019 |
22/04/2019
Time
11:0Hrs
|
|
65 |
Consultancy Services for Development of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method (Package-1) |
RW/NH-34049/3/2008-S&R(B)-1 |
31/01/2019 |
31/01/2019 |
18/03/2019
Time
13:0Hrs
|
|
66 |
Consultancy Services for Development of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method (Package-3) |
RW/NH-34049/3/2008-S&R(B)-3 |
31/01/2019 |
31/01/2019 |
18/03/2019
Time
13:0Hrs
|
|
67 |
Consultancy Services for Preparation of DPR for Upgradation of Highways (Lot-1/Package-1) in the state of UP. |
NHAI/11013/UP/Tech./DPR/Lot-1/2019/Pkg-1 |
25/01/2019 |
10/01/2019 |
15/05/2019
Time
11:0Hrs
|
|
68 |
Consultancy Services for Preparation of DPR for Upgradation of Highways (Lot-1/Package-2) in the state of UP. |
NHAI/11013/UP/Tech./DPR/Lot-1/2019/Pkg-2 |
25/01/2019 |
10/01/2019 |
15/05/2019
Time
11:0Hrs
|
|
69 |
Consultancy Services for Preparation of DPR for Upgradation of Highways (Lot-1/Package-3) in the state of UP. |
NHAI/11013/UP/Tech./DPR/Lot-1/2019/Pkg-3 |
25/01/2019 |
10/01/2019 |
15/05/2019
Time
11:0Hrs
|
|
70 |
Consultancy Services for Preparation of DPR for Upgradation of Highways (Lot-1/Package-4) in the state of UP. |
NHAI/11013/UP/Tech./DPR/Lot-1/2019/Pkg-4 |
25/01/2019 |
10/01/2019 |
15/05/2019
Time
11:0Hrs
|
|
71 |
Consultancy Services for Preparation of DPR for Upgradation of Highways (Lot-1/Package-5) in the state of UP. |
NHAI/11013/UP/Tech./DPR/Lot-1/2019/Pkg-5 |
25/01/2019 |
10/01/2019 |
15/05/2019
Time
11:0Hrs
|
|
72 |
Consultancy Services for Preparation of DPR for Upgradation of Highways (Lot-1/Package-6) in the state of UP. |
NHAI/11013/UP/Tech./DPR/Lot-1/2019/Pkg-6 |
25/01/2019 |
10/01/2019 |
15/05/2019
Time
11:0Hrs
|
|
73 |
Preparation of Detailed Project Report for Construction of Vettavalam bypass at Km 165/0 -167/0 and Kanniyambadi bypass at Km 75/0 of NH-234 (New NH.38) Mangalore - Villupuram Road |
TN01NHKaniyambadiBypass |
30/01/2019 |
12/12/2018 |
06/02/2019
Time
11:0Hrs
|
|
74 |
Preparation of DPR for bypasses to Karamadai Town, Coonoor Town, Ooty Town (Hilly terrain) of NH 67 (Nagapattinam-Gudalur-Mysore road) |
TN01NHKaramadai |
30/01/2019 |
12/12/2018 |
06/02/2019
Time
11:0Hrs
|
|
75 |
Preparation of DPR for Elephant Corridor from Km 389/0 - 391/4 of NH 67 (Nagapattinam-Gudalur-Mysore road) |
TN01ElephantCorridor |
30/01/2019 |
12/12/2018 |
06/02/2019
Time
11:0Hrs
|
|
76 |
Consultancy Services for proof checking of standard designs and plans for various types of bridge superstructures based on Limit State Method (Package-II) |
RW/NH-34049/3/2008-S&R(B)-Pt-III |
07/12/2018 |
07/12/2018 |
08/01/2019
Time
13:0Hrs
|
|
77 |
Consultancy Services for preparation of Detailed Project Report for 4-laning of Palwal-Tappal-Aligarh section of NH-334D in the state of Uttar Pradesh. |
NHAI/11013/ UP/Tech./DPR/NH-334D/Palwal -Tappal- Aligarh |
06/12/2018 |
04/12/2018 |
06/05/2019
Time
11:0Hrs
|
|
78 |
Consultancy Services for Preparation of DPR for 6 lane Vijayawada bypass (from Km 1076.480 to Km 1112.440) Design chainage Km. 0.000 to Km.47.880 (Design length of 47.880 Km) including Major Bridge (Iconic) across river Krishna in Vijayawada- Gundugolanu section of NH 16 in the state of Andhra Pradesh |
NHAI/RO-VJA/PIU-VIJ/V-G/2018-19/ |
04/12/2018 |
03/12/2018 |
02/01/2019
Time
11:0Hrs
|
|
79 |
Consultancy Services for proof checking of standard designs and plans for various types of bridge superstructures based on Limit State Method (Package-II) |
34049/3/2008-S&R(B)-Pt.III |
15/10/2018 |
15/10/2018 |
14/11/2018
Time
13:0Hrs
|
|
80 |
Consultancy Services for Preparation of Feasibility Study/Detailed Project Report of “In-Principle” declared National Highway--- for Stretch “Firozabad-Jalesar-Hathras Road” in the State of Uttar Pradesh. |
1656M/13M-NHCK/18 dated-29.08.2018 |
09/10/2018 |
31/08/2018 |
29/10/2018
Time
15:0Hrs
|
|
81 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of Rajgir Elevated corridor from Vanganga to SDM office on N.H. 82 New N.H. 120 from km 68.00 to km 74.00 Gaya Rajgir Biharsharif Section Length 7.00 km in the state of Bihar |
.01/NH-Biharsharif-2/2018-19 |
29/08/2018 |
28/08/2018 |
22/09/2018
Time
17:0Hrs
|
|
82 |
Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam on EPC Mode |
NHAI/11012/Guwahati Bypass/DPR/NE/ 2017 |
13/09/2018 |
10/08/2018 |
25/09/2018
Time
11:0Hrs
|
-
|
83 |
Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam on EPC Mode |
NHAI/11012/Guwahati Bypass/DPR/NE/2017 |
14/08/2018 |
10/08/2018 |
10/09/2018
Time
11:0Hrs
|
-
|
84 |
Consultancy Services for carrying out detailed feasibility study of Six laning of Existing Four lane Jetpur Gondal Rajkot Section from Km. 117.60 to Km. 185.00 on National Highway No 27 in the state of Gujarat |
NHAI/Guj/Jet-Rajkot/6 lane Feasibility/2018 |
07/08/2018 |
07/08/2018 |
24/09/2018
Time
11:0Hrs
|
|
85 |
DPR Paonta Saheb Ballupur |
NHAI/Tech/UKD/03/2018 |
28/08/2018 |
02/08/2018 |
30/08/2018
Time
15:0Hrs
|
|
86 |
Consultancy Services for project management including preparation Feasibility Study Detailed Project Report of selected road stretches for NH connectivity from (i)Anand-Kathlal-Kapadvanj-Boyad-Dhansura-Modasa to NH-8 (ii)NH-56 from Jalod-Limdi-Dahod to Alirajpur (iii)Bodeli -Rajpipla-Netrang-Vyara-Vansada-Dharmpur-Vapi to NH-48 section in the state of Gujarat |
NHAI/BRT/Proc/01/DPR/Guj/2015 |
13/07/2018 |
12/07/2018 |
23/08/2018
Time
11:0Hrs
|
|
87 |
Consultancy Services for preparation of Detailed Project Report (DPR) for Replacement Reconstruction of Superstructure of 2 lane Old Narmada Bridge Constructed in 1977 across Narmada River on section from Km 192.00 to Km 198.00 of NH 8 passing through District Bharuch in between Vadodara Surat Section in the state of Gujarat |
NHAI/PIU Surat (Expressway)/71 DPR/2018 |
13/07/2018 |
10/07/2018 |
30/07/2018
Time
11:0Hrs
|
|
88 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highway in the State of Uttar Pradesh (section Joya-Sambhal-Bahjoi) |
1610/1-Tender cashier (Bareilly)-28/18 Dated 17.05.2018 |
15/06/2018 |
15/06/2018 |
22/06/2018
Time
15:0Hrs
|
|
89 |
Consultancy Services for Preparation of DPR for 6 lane Vijayawada bypass (from Km 1076.480 to Km 1112.440) Design chainage Km. 0.000 to Km.47.880 (Design length of 47.880 Km) including Major Bridge (Iconic) across river Krishna in Vijayawada-Gundugolanu section of NH 16 in the state of Andhra Pradesh |
NHAI/RO-VJA/V-G/2018-19/1144 |
17/05/2018 |
17/05/2018 |
16/06/2018
Time
12:0Hrs
|
-
|
90 |
Consultancy Services for detail Road Safety Audit of existing roads (i) from ch. 281.00 km ( Raipur) to ch. 306.60 km( Durg) of NH-53 and (ii) from ch. 0.00 km (Ghodaari) to ch. 65.60 km( CG/Odisha border) of NH-353 in the state of Chhattisgarh |
317099 |
03/04/2018 |
04/04/2018 |
10/04/2018
Time
17:0Hrs
|
|
91 |
Consultancy Services for detail Road Safety Audit of existing road (i) from ch. 288.00 Km (Teemed) to ch. 504.00 Km (Jagdalpur) of NH-63 (ii) from ch. 0.00 Km (Bhopalpattanam) to ch. 36.00 Km (Tarlaguda) of NH-163 and (iii) from ch. 14.20 Km (Keshloor) to ch. 184.80 Km (Konta) of NH-30 in the state of Chhattisgarh |
317093 |
03/04/2018 |
04/04/2018 |
10/04/2018
Time
17:0Hrs
|
|
92 |
Consultancy Services for Development of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method (Package-1) |
RW/NH-34049/3/2008-S&R (B) |
23/03/2018 |
23/03/2018 |
01/05/2018
Time
13:0Hrs
|
|
93 |
Consultancy Services for Development of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method (Package-3) |
RW/NH-34049/3/2008-S&R (B)-II |
23/03/2018 |
23/03/2018 |
01/05/2018
Time
13:0Hrs
|
|
94 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase - I (as per Annexure I) |
NHAI/PC/SM/BM Ph- I/SM 08 |
15/03/2018 |
14/03/2018 |
15/05/2018
Time
11:0Hrs
|
-
|
95 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase - I (as per Annexure I) |
NHAI/PC/SM/BM Ph- I/SM 09 |
15/03/2018 |
14/03/2018 |
15/05/2018
Time
11:0Hrs
|
|
96 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase - I (as per Annexure I) |
NHAI/PC/SM/BM Ph- I/SM 10 |
15/03/2018 |
14/03/2018 |
15/05/2018
Time
11:0Hrs
|
|
97 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase - I (as per Annexure I) |
NHAI/PC/SM/BM Ph- I/SM 11 |
15/03/2018 |
14/03/2018 |
15/05/2018
Time
11:0Hrs
|
|
98 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase - I (as per Annexure I) |
NHAI/PC/SM/BM Ph- I//SM 12 |
15/03/2018 |
14/03/2018 |
15/05/2018
Time
11:0Hrs
|
|
99 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase - I (as per Annexure I) |
NHAI/PC/SM/BM Ph- I/SM 13 |
15/03/2018 |
14/03/2018 |
15/05/2018
Time
11:0Hrs
|
|
100 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase - I (as per Annexure I) |
NHAI/PC/SM/BM Ph- I/SM 14 |
15/03/2018 |
14/03/2018 |
15/05/2018
Time
11:0Hrs
|
|
101 |
Consultancy Services for proof checking of standard designs and plans for various types of bridge superstructures based on Limit State Method (Package-II) |
RW/NH-34049/3/2008-S&R(B)-Pt.III |
23/03/2018 |
09/03/2018 |
09/04/2018
Time
13:0Hrs
|
|
102 |
Consultancy services preparation of detail project report for widening & strengthing upto 7m/10m/4-lane,from km 18/100 to 127/740, of N.H.64 as as (Bareja-Aslali-Navagam-Vansar-Dabhan-Nadiyad city- Anand-Borsad-Ras-Amberavpura-Kankapura section) in the State of Gujarat |
TN-01(Fouth Attempt)-2017-18 |
27/02/2018 |
01/03/2018 |
19/03/2018
Time
11:0Hrs
|
-
|
103 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode for the road Gurdaspur- Mukerian-Talwara-Mubarikpur |
9 A |
27/02/2018 |
26/02/2018 |
19/03/2018
Time
14:0Hrs
|
|
104 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Sagara – Havinahalli – Holebaglu – Kalasvalli – Sighandoor – Markutka (junction with NH-766C) in the state of Karnataka |
EE/NHD/CTA/AE4/CS/NIT/2017-18/2062 |
24/02/2018 |
24/02/2018 |
23/03/2018
Time
11:0Hrs
|
|
105 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from junction of NH 48 near Chitradurga connecting Challakere, Pavagada in the state of Karnataka and terminating at its junction of NH 44 near Penukonda in the state of Andra Pradesh |
EE/NHD/CTA/AE4/CS/NIT/2017-18/2062-2 |
24/02/2018 |
24/02/2018 |
23/03/2018
Time
11:0Hrs
|
|
106 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode for the road Stretch from NH-5 near Prem Nagar- Morinda- Chamkaur Sahib- Bela- Paniyali and connecting to NH-344 A |
15 A |
23/02/2018 |
21/02/2018 |
21/03/2018
Time
15:0Hrs
|
|
107 |
Consultancy Services for preparation of Feasibility study and Detailed Project Report in the State of Punjab on BOT/EPC/Hybrid annunity Mode for the road strecth from Tarn Taran Goindwal Sahib Kapurthala Length 50 Km. |
04 of 2017-18 |
17/02/2018 |
17/02/2018 |
19/03/2018
Time
14:0Hrs
|
|
108 |
Technical Consultancy Services for preparation of Feasibility Study and Detailed Project Report for the Road Stretch from NH 344A Near Nawanshahar Rahon Machiwara Samrala Khanna road and connecting to NH 1 (NEW 44) (Lentgh-65 KM in the State of Punjab on BOT EPC Hybrid Annuity Mode |
Tender Notice No . 2 of 2017-2018 |
17/02/2018 |
17/02/2018 |
03/03/2018
Time
15:0Hrs
|
|
109 |
Stretch from Varanasi-Kapsethi-bhadohi-Durgagunj-Janghai-Machhalishahar Road PKG-1 |
123ST/107 COM B /2018 Dated23.01.2018 |
03/02/2018 |
03/02/2018 |
28/02/2018
Time
17:0Hrs
|
|
110 |
Mathura-Bharatpur-Bayana-Hindaun (U.P. 24km Rajasthan 0 km) Mathrua-Govardhan-Deeh-Naagar Road (U.P.31km, Rajasthan 31km)Agra-Jagner-Masalpur (U.P. 60.00 Rajasthan 33.00 PKG II |
123ST/107 COM B /2018 Dated 23.01.2018 PKG II |
03/02/2018 |
03/02/2018 |
28/02/2018
Time
17:0Hrs
|
|
111 |
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Haridwar Ring Road. |
11012/NHAI/TECH/UKD/HAR RING ROAD/2017 |
16/02/2018 |
01/02/2018 |
24/04/2018
Time
11:0Hrs
|
|
112 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Sagara – Havinahalli – Holebaglu – Kalasvalli – Sighandoor – Markutka (junction with NH-766C) in the State of Karnataka |
EE/NHD/CTA/AE4/CS/NIT/5th Call/2017-18/1782 |
01/02/2018 |
01/02/2018 |
22/02/2018
Time
11:0Hrs
|
|
113 |
Consultancy Services for preparation of feasibility study and detailed project report for the work for Vadgam Bypass, Vadali Bypass and Chansol Bypass and for diversion and curvature improvement of NH-58 in the State of Gujarat. |
17 of 2017-18 (4th Attempt) |
31/01/2018 |
31/01/2018 |
14/02/2018
Time
12:0Hrs
|
-
|
114 |
Consultancy Services for Preparation of Pre-Feasibility Study of Delhi-Yamunanagar Expressway having an approximate length of 180 Km (the Project) (4th Call) |
NHAI /Expressway /DY /2017 |
05/03/2018 |
30/01/2018 |
06/03/2018
Time
11:0Hrs
|
|
115 |
Consultancy Services for Preparation of DPR for 6 lane bypass from Km 47.880 to Km 17.600 (Design length of 30.28 Km) as a part of Vijayawada bypass from Km 1076.480 to Km 1112.440 ( Total bypass length of 47.880 Km) in Vijayawada - Gundugolanu section of NH 16 in the state of Andhra Pradesh ( Package-3) |
NHAI/RO-VJA/PIU-VIJ/V-G/2018/P3 |
20/01/2018 |
19/01/2018 |
19/02/2018
Time
12:0Hrs
|
|
116 |
Consultancy Services for preparation of feasibility study and detailed project report for the work for Vadgam Bypass, Vadali Bypass and Chansol Bypass and for diversion and curvature improvement of NH-58 in the State of Gujarat. |
08 of 2017-18 (3rd Attempt) |
28/12/2017 |
28/12/2017 |
16/01/2018
Time
12:0Hrs
|
-
|
117 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation from 3.5m/7.0m to 10m as per NH standard geometrics of NH-58 from Khokhara border (00/00 km)-Vijaynagar-Antarsuba-Mathasur (56/620 km) road of National Highway 58 in State of Gujarat. |
09 of 2017-18 (4th Attempt) |
28/12/2017 |
28/12/2017 |
16/01/2018
Time
12:0Hrs
|
-
|
118 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for Construction of Subway from Ram Niwas Bagh to Jorawar Singh Gate including underground parking below Johri Bazar to link Jaipur city with Delhi By-Pass in the State of Rajasthan |
NHAI/Tech/Raj/Jaipur City/DPR/2017 |
29/12/2017 |
27/12/2017 |
07/03/2018
Time
11:0Hrs
|
|
119 |
Consultancy Services for Preparation of Detailed Project report of Hyderabad-Vijaywada-Amravathi Expressway, having an approximate length of 280 km (the Project) including spurs through BOT and EPC basis (5th Call) |
NHAI/HVA Expressway /2017 |
02/01/2018 |
26/12/2017 |
01/02/2018
Time
11:0Hrs
|
|
120 |
Consultancy services preparation of detail project report for widening & strengthing upto 7m/10m/4-lane,from km 18/100 to 127/740, of N.H.64 as as (Bareja-Aslali-Navagam-Vansar-Dabhan-Nadiyad city- Anand-Borsad-Ras-Amberavpura-Kankapura section) in the State of Gujarat |
TN-01(Third Attempt)-2017-18 |
22/12/2017 |
24/12/2017 |
10/01/2018
Time
11:0Hrs
|
|
121 |
Appointment of Technical Consultant for preparation of feasibility study and detailed project report Stretch from NH 5 near prem nagar Morinda Chamkaur Sahib Bela Paniyali and connecting to NH 344A |
13 A |
27/12/2017 |
22/12/2017 |
08/01/2018
Time
15:0Hrs
|
|
122 |
Consultancy Services for Preparation of DPR for 6 lane bypass from Km 47.880 to Km 17.600 (Design length of 30.28 Km) as a part of Vijayawada bypass from Km 1076.480 to Km 1112.440 ( Total bypass length of 47.880 Km) in Vijayawada Gundugolanu section of NH 16 in the state of Andhra Pradesh ( Package-3) |
NHAI/RO-VJA/PIU-VIJ/V-G/2017-18/ |
13/12/2017 |
13/12/2017 |
11/01/2018
Time
12:0Hrs
|
|
123 |
Consultancy Services for Preparation of DPR for 6 lane bypass from Km. 0.000 to Km.17.600 (Design length of 17.600 Km) including Major Bridge (Iconic) across river Krishna as a part of Vijayawada bypass from Km 1076.480 to Km 1112.440 in Vijayawada Gundugolanu section of NH 16 in the state of Andhra Pradesh ( Package-4) |
NHAI/RO-VJA/PIU-VIJ/V-G/2017-18/pkg-4 |
13/12/2017 |
13/12/2017 |
11/01/2018
Time
17:0Hrs
|
|
124 |
Technical Consultant for preparation of Feasibility Study and Detailed Project Report for the work Taran Taran- Goindwal Sahib - Kapurthala Road - Length 50.00 Km in the state of Punjab. |
02 |
12/12/2017 |
12/12/2017 |
19/01/2018
Time
13:0Hrs
|
|
125 |
Independent Engineer Services for Operation & Maintenance of Chilakaluripet to Nellore section of NH-16 from Km.1182.802 to Km.1366.547 under NHDP Phase V to be executed as BOT (Toll) project on DBFOT pattern in the State of Andhra Pradesh |
NHAI/RO-VJA/Nellore/2017-18/02 |
12/12/2017 |
09/12/2017 |
08/01/2018
Time
11:0Hrs
|
-
|
126 |
Independent Engineer Services during Operation & Maintenance OF Tada – Nellore (Km. 52.800 to Km. 163.600) section of NH- 16, Nandigama – Ibrahimpatnam – Vijayawada (Km. 217 to Km. 265) section of NH-65 BOT project, Nellore Bypass for the Stretch from Km.161.034 to Km.178.200 Section of NH-16 (Old NH-5) on BOT (Annuity) Basis |
NHAI/RO-VJA/NELLORE/2017-18 |
12/12/2017 |
08/12/2017 |
11/01/2018
Time
11:0Hrs
|
|
127 |
Technical Consultant for preparation of Feasibility Study and Detailed Project Report For the Following Road in the State of Punjab on BOT or EPC or Hybrid Annuity Mode Gurdaspur Mukerian Talwara Mubarikpur Road, Approx Length 83.00 km |
8 of 2017-18 |
01/12/2017 |
05/12/2017 |
16/01/2018
Time
17:0Hrs
|
|
128 |
Independent Engineer Services during Operation & Maintenance stage of Four Laning of Hyderabad-Yadgiri Section of NH-163 (Old NH No.202) from Km.18.600 to Km.54.000 in the State of Telangana under NHDP Phase-III on Design, Build, Finance, Operate and Transfer(DBFOT) Toll Basis Package No.NHDP-III/BOT/AP-04. |
4596 |
21/12/2017 |
01/12/2017 |
23/01/2018
Time
11:0Hrs
|
|
129 |
Consultancy Services for Preparation of Pre-Feasibility Study of Delhi-Yamunanagar Expressway having an approximate length of 180 Km (the Project) (3rd Call) |
NHAI/Expressway/DY/ 2017 |
03/01/2018 |
01/12/2017 |
18/01/2018
Time
11:0Hrs
|
|
130 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme (as per Annexure I) - NHAI/PC/SM08 |
NHAI/PC/Sagarmala/2017/SM 08 |
01/12/2017 |
30/11/2017 |
12/01/2018
Time
11:0Hrs
|
|
131 |
Consultancy Services for Supervision of Short term Improvement and Routine Maintenance / Special Repair works of Divancheruvu – Gundugolanu Section from Km 901.753 to Km 1022.494 of NH-5 in the State of Andhra Pradesh |
NHAI / RO -VJA/ 12007/SC - DG/2016 |
23/11/2017 |
23/11/2017 |
03/01/2018
Time
11:0Hrs
|
|
132 |
Consultancy Services for supervision of short term improvement and routine maintenance / special repairs / periodical renewals / civil works contract of a) Anandapuram- Visakhapatnam - Anakapalli section from Km 682.980 to Km 741.256 of NH-16 b) Visakhapatnam Port connectivity Project corridor from Km 0.0 to Km 10.336 with main flyover and ramps in the state of Andhra Pradesh |
NHAI/ RO-VJA/11044/SC/2016 |
23/11/2017 |
23/11/2017 |
03/01/2018
Time
11:0Hrs
|
|
133 |
Revised Consultancy Services for preparation of Detailed Project Report for the construction of new 3 lane Bridges with approaches between KM 459-500 to 483-500 of NH-56 in the State of Gujarat |
246597 |
22/11/2017 |
22/11/2017 |
28/11/2017
Time
18:0Hrs
|
|
134 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh |
5318/1-Tender Casher(Bareilly)-28/17 dated 16.11.2017 |
23/11/2017 |
22/11/2017 |
19/01/2018
Time
17:0Hrs
|
|
135 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to 2- Lane with paved shoulder of Gaya (N.H.-120)-Sherghati (N.H.-19)-Karmain (N.H.-19)-Mathurapur-Gurua-Ahiapur-Tekari-Mau-Kurtha-Kinjar (N.H.-33)-Pali-Rani Talab (N.H.-139) on EPC Mode. |
05/NH-GAYA/2017-18 |
19/11/2017 |
16/11/2017 |
04/12/2017
Time
17:0Hrs
|
|
136 |
Appointment of Independent Engineer Services during Operation & Maintenance (O&M) for 4/6 laned stretch from Km.40.000 to Km.221.500 of Hyderabad Vijayawada Section of NH-65 (Old NH No.9) Package No.NHDP-III/BOT/AP-01 in the State of Telangana and Andhra Pradesh under North – South Corridor (NHDP Phase–III) for length of 181.500km |
4243 |
15/12/2017 |
16/11/2017 |
02/01/2018
Time
11:0Hrs
|
|
137 |
Independent Engineer services during Operation & Maintenance period for (i) 4/6 laned stretch from Km.40.000 to Km.221.500 of Hyderabad Vijayawada Section of NH-65 (Old NH No.9) in the State of Telangana and Andhra Pradesh |
4243H |
04/01/2018 |
16/11/2017 |
22/01/2018
Time
11:0Hrs
|
|
138 |
Appointment of Technical Consultant for preparation of feasibility study and detailed project report from NH 344 A nawanshehar Rahon Machiwara Samrala khanna road connecting to NH 1 |
1 |
23/11/2017 |
15/11/2017 |
14/12/2017
Time
15:0Hrs
|
|
139 |
Technical Consultant for preparation of Feasibility Study and Detailed Project Report For the following Road in the state of Punjab on BOT EPC Mode Hybrid Annuity Mode Stretch from NH 5 near Prem Nagar Morinda Chamkaur Sahib Bela Paniyali and connecting to NH 344A Length 31 Km |
10 |
11/11/2017 |
11/11/2017 |
18/12/2017
Time
15:0Hrs
|
|
140 |
Consultancy Services for preparation of feasibility study and detailed project report for the work for Vadgam Bypass, Vadali Bypass and Chansol Bypass and for diversion and curvature improvement of NH-58 in the State of Gujarat. |
07 of 2017-2018 (2nd Attempt) |
02/11/2017 |
02/11/2017 |
15/11/2017
Time
12:0Hrs
|
-
|
141 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH-150A near Molkalmur-Rayadurga-Anthapura Junction at NH-44 road. |
EE/NHD/CTA/AE/CS/NIT/2017-18/1098 |
28/10/2017 |
28/10/2017 |
14/11/2017
Time
11:0Hrs
|
|
142 |
Consultancy Services for Preparation of Detailed Project Report for Construction of bridge across Moran River at Silohi-Vanderved, near Neelkanth Mahadeo Temple, Distt. Dungarpur including Topography survey, Geotechnical Investigation, Detailed Structural design, drawing, Estimate and Proof checking from NIT’s/IIT’s |
NIT 16/2017-18 PWD Dn Sagwara Distt Dungarpur Item Sr No 1 |
26/10/2017 |
26/10/2017 |
13/11/2017
Time
18:0Hrs
|
|
143 |
Consultancy Services for Preparation of Detailed Project Report for Construction of bridge across Mahi River at Bansawara-Dungarpur Border, near Boreshwar Temple Distt. Dungarpur including Topography survey, Geotechnical Investigation, Detailed Structural design, drawing, Estimate and Proof checking from NIT’s/IIT’s |
NIT 16/2017-18 PWD Dn Sagwara Distt Dungarpur Item Sr No 2 |
26/10/2017 |
26/10/2017 |
13/11/2017
Time
18:0Hrs
|
|
144 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (1) Obra (Near NH-139) Bail-Pouthu-Kurma-Dihuri-Malhad-Doval-Mahdipur-Tuturkhi-Ussah-Deohara-Khatangi-Bithra-Manikpur-Kurtha-Shakurabad-Babhna near NH-33(102 KM). (2) Barun (NH-19) to Daudnagar NH-139 (33 KM) in Bihar on EPC Mode |
08/NH-Aurangabad/2017-18 |
18/10/2017 |
18/10/2017 |
06/11/2017
Time
17:0Hrs
|
|
145 |
Consultancy Services for preparation of Detailed Project Report for the construction of new 3 lane Bridges with approaches between KM 459-500 to 483-500 of NH-56 in the State of Gujarat. |
15of 2017-18 Bharuch TOR |
18/10/2017 |
18/10/2017 |
08/11/2017
Time
18:0Hrs
|
|
146 |
Hisua NH 120 Nawada NH 20 Pakribarwan Chandradeep Aliganj Sikandara NH 333A Ramgarh Lakhisarai 93.35 and Gaya NH 22 Fatehpur Sirdala Rajauli NH 20 Excluding Gaya Sirdala section 10.00 km |
DPR/NEW NH/NHD/BIHARSHARIF-2/2017-18/07 |
09/10/2017 |
12/10/2017 |
30/10/2017
Time
15:0Hrs
|
|
147 |
CS for DPR for From junction at NH353 C Bhupalapally Anshanpally Gorlaveedu Neredupally Thanda Garmillapally Burapally Emped Vavilala Jammikunta Veenavanka Karimnagar 131 Kms for up gradation to 2 4 6 lane with PS in the State TS |
NIT No. SE (R&B) NH/KMNR/28/2016-17 19-10-2016 |
11/10/2017 |
11/10/2017 |
16/11/2017
Time
15:0Hrs
|
|
148 |
Consultancy services for preparation of DPR for In principle declared NH Rangashaipet Chintanekkonda Nekkonda Kesamudram Mahabubabad 71 Kms for up gradation to 2 4 6- lane with paved shoulders configuration in the State of Telangana |
NIT No. SE (R&B) NH/KMNR/27/2016-17 19-10-2016 |
11/10/2017 |
11/10/2017 |
16/11/2017
Time
15:0Hrs
|
|
149 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation from 3.5m/7.0m to 10m as per NH standard geometrics of NH-58 from Khokhara border (00/00 km)-Vijaynagar-Antarsuba-Mathasur (56/620 km) road of National Highway 58 in State of Gujarat. |
04 of 2017-2018 (3rd Attempt) |
09/10/2017 |
09/10/2017 |
24/10/2017
Time
12:0Hrs
|
-
|
150 |
Appointment of Technical Consultant for preparation of Feasibility Study and Detailed Project Report For Khanna Malerkotla Raikot Jagraon Junction with NH 703 near Sidhwan Bet Road In Principle NH in the State of Punjab in the State of Punjab |
4 |
08/10/2017 |
08/10/2017 |
30/10/2017
Time
16:0Hrs
|
|
151 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH-150A near Molkalmur-Rayadurga-Anthapura Junction at NH-44 road |
EE/NHD/CTA/AE/CS/NIT/2017-18/861-2 |
07/10/2017 |
07/10/2017 |
10/10/2017
Time
11:0Hrs
|
|
152 |
Consultancy Services for Preparation of Pre-Feasibility Study of Delhi-Yamunanagar Expressway having an approximate length of 180 Km (the Project) - 2nd Call |
NHAI/Expressway/DY /2017 |
31/10/2017 |
26/09/2017 |
06/11/2017
Time
11:0Hrs
|
|
153 |
Consultancy Services for Preparation of Pre-Feasibility Study of Delhi-Yamunanagar Expressway having an approximate length of 180 Km (the Project) - 2nd Call |
NHAI/Expressway/ DY /2017 |
15/11/2017 |
26/09/2017 |
20/11/2017
Time
11:0Hrs
|
|
154 |
Consultancy Services for preparation of feasibility study and detailed project report for the work for Vadgam Bypass, Vadali Bypass and Chansol Bypass and for diversion and curvature improvement of NH-58 in the State of Gujarat. |
03 of 2017-18 |
20/09/2017 |
20/09/2017 |
03/10/2017
Time
18:10Hrs
|
|
155 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH-150A near Molkalmur-Rayadurga-Anthapura Junction at NH-44 road |
EE/NHD/CTA/AE/CS/NIT/2017-18/861 |
20/09/2017 |
20/09/2017 |
03/10/2017
Time
11:0Hrs
|
|
156 |
Appointment of consultants for development of standard designs and plans for various types of bridge superstructures based on Limit State Method, , PACKAGE-3 |
RW/NH-34049/3/2008-S and R (B)- Package 3 |
03/10/2017 |
19/09/2017 |
26/10/2017
Time
15:0Hrs
|
|
157 |
Appointment of consultants for development of standard designs and plans for various types of bridge superstructures based on Limit State Method, , PACKAGE-1 |
RW/NH-34049/3/2008-S and R (B)- Package 1 |
03/10/2017 |
19/09/2017 |
26/10/2017
Time
15:0Hrs
|
|
158 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh. PACKAGEI |
PKG I 2800/1 YATA / NH CIRCLE / 17 DATED 12.09.2017 |
19/09/2017 |
19/09/2017 |
25/10/2017
Time
17:0Hrs
|
|
159 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh. PACKAGE II |
PKG II 2800/1 YATA / NH CIRCLE / 17 DATED 12.09.2017 |
19/09/2017 |
19/09/2017 |
25/10/2017
Time
17:0Hrs
|
|
160 |
Consultancy services preparation of detail project report for widening & strengthing upto 7m/10m/4-lane,from km 18/100 to 127/740,except 97/600 to 104/920 & 108/200 to 117/160 of N.H.64 as as (Bareja-Aslali-Navagam-Vansar-Dabhan-Nadiyad city- Anand-Borsad-Ras-Amberavpura-Kankapura section) in the State of Gujarat. |
NIT-01 (Second Trial)of 2017-18 |
15/09/2017 |
15/09/2017 |
03/10/2017
Time
11:0Hrs
|
|
161 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh |
4559/1Tender cashier (BLY)-28/2017-18 dated 12.09.2017 |
17/10/2017 |
14/09/2017 |
31/10/2017
Time
15:0Hrs
|
|
162 |
Consultancy Services for Preparation of Detailed Project report of Hyderabad-Vijaywada-Amravathi Expressway, having an approximate length of 280 km (the Project) including spurs through BOT and EPC basis (4th Call) |
NHAI/HVA Expressway /2016 |
28/09/2017 |
12/09/2017 |
11/10/2017
Time
11:0Hrs
|
|
163 |
Independent Engineer services for Operation and Maintenance of Hyderabad – Bangalore section from Km 211.000 to Km 462.164 of NH-44 (Old NH-7) (Total length 251.164 Km) on OMT Basis in the State of Andhra Pradesh |
NHAI/RO-VJA/22012/12/ |
29/08/2017 |
29/08/2017 |
03/10/2017
Time
12:0Hrs
|
|
164 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report for JNPT-Package-V in the state of Maharashtra -2nd call |
MJPRCL/PC/DPR/JNPT-V)/2017/2nd call |
28/08/2017 |
28/08/2017 |
03/10/2017
Time
11:0Hrs
|
|
165 |
Consultancy Services for carrying out Road safety Audit of existing roads (i) Km 57/0 – 95/0 of NH 181 (Old Km 390/0 – 428/0 of NH 67) (Nagapattinam Gudalur Mysore Road) (Length-38Km) (ii) Km 387/635 – 406/635 of NH 42 (Old Km 0/0 – 19/0 of NH 219) (Krishnagiri – Kuppam Road) (Length-19Km) (iii) Km 0/0 – 19/0 of NH 648 (Old Km 0/0 – 19/0 of NH 207) (Sharjapur – Bagalur- Hosur Road) (Length-19Km) |
TN.No.15/HDO/NH/2017-18/Dt.10.08.2017 |
19/08/2017 |
19/08/2017 |
29/08/2017
Time
15:0Hrs
|
|
166 |
Consultancy Services for Preparation of Pre-Feasibility Study of Delhi-Yamunanagar Expressway having an approximate length of 180 Km (the Project) |
NHAI/Expressway/DY/2017 |
14/09/2017 |
18/08/2017 |
18/09/2017
Time
11:0Hrs
|
|
167 |
Hisua NH 120 Nawada NH 20 Pakribarwan Chandradeep Aliganj Sikandara NH 333A Ramgarh Lakhisarai 93.35 km and Gaya NH 22 Fatehpur Sirdala Rajauli NH20 Excluding Gaya Sirdala section 10.00 km |
DPR/NEW NH/NHD/BIHARSHARIF-2/2017-18/01 |
11/08/2017 |
11/08/2017 |
08/09/2017
Time
15:0Hrs
|
|
168 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to 2- Lane with paved shoulder of Gaya (N.H.-120)-Sherghati (N.H.-19)-Karmain (N.H.-19)-Mathurapur-Gurua-Ahiapur-Tekari-Mau-Kurtha-Kinjar (N.H.-33)-Pali-Rani Talab (N.H.-139) on EPC Mode. |
03/NH-GAYA/2017-18 |
16/08/2017 |
11/08/2017 |
01/09/2017
Time
15:0Hrs
|
|
169 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (1) Obra (Near NH-139) Bail-Pouthu- Kurma-Dihuri-Malhad-Doval-Mahdipur-Tuturkhi-Ussah-Deohara-Khatangi-Bithra-Manikpur- Kurtha-Shakurabad-Babhna near NH-33(102 KM). (2) Barun (NH-19) to Daudnagar NH-139 (33 KM) in Bihar on EPC Mode. |
01/NH/AURANGABAD/2017-18 |
16/08/2017 |
11/08/2017 |
04/09/2017
Time
15:0Hrs
|
|
170 |
Consultancy services preparation of detail project report for widening & strengthing upto 7m/10m/4-lane,from km 18/100 to 127/740,except 97/600 to 104/920 & 108/200 to 117/160 of N.H.64 as as (Bareja-Aslali-Navagam-Vansar-Dabhan-Nadiyad city- Anand-Borsad-Ras-Amberavpura-Kankapura section) in the State of Gujarat. |
TN-01 of 2017-18 |
29/07/2017 |
31/07/2017 |
05/09/2017
Time
11:0Hrs
|
-
|
171 |
Consultancy Services for Detailed Design and Drawing for Construction of High Level Bridge across Mahi River at Sangmeshwar on Chikhli-Anandpuri Road Distt. Dungarpur under CRF (Job No. CRF-885/RJ/2016-17) which include Topographic Survey, Hydrological Investigations, Geo-Technical Investigations and Preparation of General Arrangement Drawing |
04/2017-2018 SE PWD CIRCLE DUNGARPUR |
29/07/2017 |
29/07/2017 |
10/08/2017
Time
18:0Hrs
|
|
172 |
Consultancy Services for Preparation of Detailed Project Report for Construction of bridge across Moran River at Silohi-Vanderved, near Neelkanth Mahadeo Temple, Distt. Dungarpur including Topography survey, Geotechnical Investigation, Detailed Structural design, drawing, Estimate and Proof checking from NIT’s/IIT’s |
NIT 10/2017-18 PWD Dn Sagwara Distt Dungarpur Item Sr No 1 |
29/07/2017 |
29/07/2017 |
16/08/2017
Time
18:0Hrs
|
|
173 |
Consultancy Services for Preparation of Detailed Project Report for Construction of bridge across Mahi River at Bansawara-Dungarpur Border, near Boreshwar Temple Distt. Dungarpur including Topography survey, Geotechnical Investigation, Detailed Structural design, drawing, Estimate and Proof checking from NIT’s/IIT’s |
NIT 10/2017-18 PWD Dn Sagwara Distt Dungarpur Item Sr No 2 |
29/07/2017 |
29/07/2017 |
16/08/2017
Time
18:0Hrs
|
|
174 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report for Construction of new 4-lane Elevated Road from Chennai Port to Maduravoyal (NH-4) in the State of Tamil Nadu under NHDP Phase VII – 3rd Call |
NHAI/11011/1/2017/EE/ 3rd Call |
31/07/2017 |
28/07/2017 |
31/08/2017
Time
11:0Hrs
|
|
175 |
Consultancy Services for carrying out Road safety Audit of existing road Km 57/0 – 95/0 of NH 181 (Old Km 390/0 – 428/0 of NH 67)(Nagapattinam Gudalur Mysore Road) |
TN.No.12/HDO/NH/2017-18/Dt.13.07.2017 (SL NO.1 ) |
24/07/2017 |
24/07/2017 |
03/08/2017
Time
15:0Hrs
|
|
176 |
Consultancy Services for carrying out Road safety Audit of existing road Km 387/635 – 406/635 of NH 42 (Old Km 0/0 – 19/0 of NH 219)(Krishnagiri – Kuppam Road) |
TN.No.12/HDO/NH/2017-18/Dt.13.07.2017(SL No.2) |
24/07/2017 |
24/07/2017 |
03/08/2017
Time
15:0Hrs
|
|
177 |
Consultancy Services for carrying out Road safety Audit of existing road Km 0/0 – 19/0 of NH 648 (Old Km 0/0 – 19/0 of NH 207) (Sharjapur – Bagalur- Hosur Road) |
TN.No.12/HDO/NH/2017-18/Dt.13.07.2017(SL NO.3) |
24/07/2017 |
24/07/2017 |
03/08/2017
Time
15:0Hrs
|
|
178 |
Consultancy Services for preparation of feasibility study and Detailed Project Report for 2-lanning with paved shoulder from Imphal-Kakching Lamkhai on NH-137 A under NH(O) in the state of Manipur |
01/ACE-I/NH/ Consultancy/2017-18/ |
19/07/2017 |
17/07/2017 |
15/08/2017
Time
11:0Hrs
|
|
179 |
Consultancy Services for preparation of feasibility study and Detailed Project Report for 2-lanning with paved shoulder from Shankshak to Tengnoupal on NH-39 (102A – Extn) under NH(O) in the state of Manipur |
02/ACE-I/NH/ Consultancy/2017-18/148 |
19/07/2017 |
17/07/2017 |
15/08/2017
Time
11:0Hrs
|
|
180 |
Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance / Special Repairs / Periodical Renewals / Civil Works Contract of Divancheruvu – Gundugolanu Section from Km.901.753 to Km.1022.494 on NH-16 (old NH-5) in the State of Andhra Pradesh. |
NHAI/RO-VJA/12007/SC-DG/2016/ |
26/07/2017 |
13/07/2017 |
08/08/2017
Time
11:0Hrs
|
|
181 |
Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance / Special Repairs / Periodical Renewals / Civil Works Contract of (a) Anandapuram – Visakhapatnam – Anakapalli Section from Km 682.980 to Km 741.256 of NH-16 (b) Visakhapatnam Port Connectivity Project Corridor from Km 0.0 to Km 10.336 with main flyover and ramps in the State of Andhra Pradesh. |
NHAI/RO-VJA/11044/SC/2016/ |
26/07/2017 |
13/07/2017 |
08/08/2017
Time
11:0Hrs
|
|
182 |
Independent Engineer services for Operation and Maintenance of Hyderabad – Bangalore section from Km 211.000 to Km 462.164 of NH-44 (Old NH-7) (Total length 251.164 Km) on OMT Basis in the State of Andhra Pradesh |
NHAI/RO-VJA/22012/12/ |
06/07/2017 |
07/07/2017 |
16/08/2017
Time
11:0Hrs
|
|
183 |
Consultancy Services for carrying out Road safety Audit of existing road Km 387/635 – 406/635 of NH 42 (Old Km 0/0 – 19/0 of NH 219)(Krishnagiri – Kuppam Road) |
TN.No.3/HDO/NH/2017-18/Dt.18.05.2017 |
07/07/2017 |
07/07/2017 |
11/07/2017
Time
11:0Hrs
|
|
184 |
Consultancy Services for carrying out Road safety Audit of existing road Km 0/0 – 19/0 of NH 648 (Old Km 0/0 – 19/0 of NH 207) (Sharjapur – Bagalur- Hosur Road) |
TN.No.4/HDO/NH/2017-18/Dt.18.05.2017 |
07/07/2017 |
07/07/2017 |
11/07/2017
Time
11:0Hrs
|
|
185 |
Preparation of Detailed Project Report of Delhi-Ludhiana-Amritsar-Katra Expressway having an approximate length of 600 Km (the Project) including spurs through BOT & EPC basis (5th Call) |
NHAI/Punjab/CC/N-1 |
18/07/2017 |
06/07/2017 |
21/08/2017
Time
11:0Hrs
|
-
|
186 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana Zaheerabad–Bidar(25Kms) approved “In-Principle” for declaration as NH (Package-I |
SE R&B/NH/HYD/13/2017-18 Date24 06 2017 3rd call |
04/07/2017 |
04/07/2017 |
20/07/2017
Time
15:0Hrs
|
|
187 |
Consultancy Services for Preparation of Detailed Project Report for Construction of bridge across Moran River at Silohi-Vanderved, near Neelkanth Mahadeo Temple, Distt. Dungarpur including Topography survey, Geotechnical Investigation, Detailed Structural design, drawing, Estimate and Proof checking from NIT’s/IIT’s |
NIT 07/2017-18 PWD Dn Sagwara Distt Dungarpur Item Sr No 1 |
30/06/2017 |
30/06/2017 |
24/07/2017
Time
18:0Hrs
|
|
188 |
Consultancy Services for Preparation of Detailed Project Report for Construction of bridge across Mahi River at Bansawara-Dungarpur Border, near Boreshwar Temple Distt. Dungarpur including Topography survey, Geotechnical Investigation, Detailed Structural design, drawing, Estimate and Proof checking from NIT’s/IIT’s |
NIT 07/2017-18 PWD Dn Sagwara Distt Dungarpur Item Sr No 2 |
30/06/2017 |
30/06/2017 |
24/07/2017
Time
18:0Hrs
|
|
189 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa – Galkund – Samghan – Saputara – Maharashtra Border Section) in the State of Gujarat for up gradation to Two lane with paved shoulder configuration. |
11 of 2017-18 4th trial |
08/08/2017 |
30/06/2017 |
21/08/2017
Time
18:0Hrs
|
|
190 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from junction with NH 206 at Sagara Huvinahalli Holebaglu Kalasvalli Sighandoor Markutka Junction with NH 766C. (4th Call) |
EE/NHD/CTA/AE/CS/NIT/4th call/2016 17/ 359 |
19/06/2017 |
19/06/2017 |
24/07/2017
Time
11:0Hrs
|
|
191 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Torangal to Kudligi via Sandur in Bellary District in the State of Karnataka. (3rd Call) |
EE/NHD/CTA/AE/CS/NIT/4th call/2017-18/359-1 |
19/06/2017 |
19/06/2017 |
24/07/2017
Time
11:0Hrs
|
|
192 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Adhoni to Siruguppa via Raravi in Bellary District in the State of Karnataka. (3rd Call) |
EE/NHD/CTA/AE/CS/NIT/4thcall/2017-18/359-2 |
19/06/2017 |
19/06/2017 |
24/07/2017
Time
11:0Hrs
|
|
193 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH 48 near Davanagere and terminating at its junction with NH 369 near Chennagiri.(4th Call) |
EE/NHD/CTA/AE/CS/NIT/4thcall/2017-18/359 |
16/06/2017 |
16/06/2017 |
24/07/2017
Time
11:0Hrs
|
|
194 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report for Construction of new 4-lane Elevated Road from Chennai Port to Maduravoyal (NH-4) in the State of Tamil Nadu under NHDP Phase VII – 2nd Call |
NHAI/11011/1/2017/EE/2 nd call |
16/06/2017 |
14/06/2017 |
05/07/2017
Time
11:0Hrs
|
|
195 |
Consultancy services preparation of detail project report for widening & strengthing upto 7m/10m/4-lane,from km 18/100 to 127/740,except 97/600 to 104/920 & 108/200 to 117/160 of N.H.64 as as (Bareja-Aslali-Navagam-Vansar-Dabhan-Nadiyad city- Anand-Borsad-Ras-Amberavpura-Kankapura section) in the State of Gujarat. |
01 of 2017-18 3 |
15/06/2017 |
13/06/2017 |
21/06/2017
Time
12:0Hrs
|
-
|
196 |
Consultancy Services for preparation of Detailed Project Report of selected stretch – Nellvoy-Pallikonda Road (Sreepuram Golden Temple) road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration. |
TN 01 NH Nelvoy Road |
13/06/2017 |
09/06/2017 |
20/07/2017
Time
11:0Hrs
|
|
197 |
Consultancy Services for preparation of Detailed Project Report of selected stretch – Arcot –Tindivanam road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration |
TN 01 NH Arcot Road |
13/06/2017 |
08/06/2017 |
20/07/2017
Time
11:0Hrs
|
|
198 |
Consultancy Services for Feasibility Study cum DPR |
NO-4 /2017-18 |
07/06/2017 |
07/06/2017 |
12/07/2017
Time
16:30Hrs
|
|
199 |
Consultanct Services for Preparation of Detailed Project Report of selected streaches/corridors of National Highway-64 between km.127/740 to 386/020 (Mahisagar River – Dabha Circle – jambusar –Amod – Bharuch – Ankleshwar – Hasot – Vadoli- Sandhier – Surat- Navsari- Dandi Section) in the State of Gujarat. |
09OF2017-18OF1 |
05/06/2017 |
05/06/2017 |
17/06/2017
Time
18:0Hrs
|
|
200 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa – Galkund – Samghan – Saputara – Maharashtra Border Section) in the State of Gujarat for up gradation to Two lane with paved shoulder configuration. |
09OF2017-18OF2 |
05/06/2017 |
05/06/2017 |
17/06/2017
Time
18:0Hrs
|
|
201 |
Consultancy Services for Appointment of Technical Consultant for Feasibility Study and Preparation of DPR for 134Km section from km 0 to Km 134 of Ujjain to Jhalawar up to Rajasthan Border of SH 27 in the state of MP |
NHAI/HQ/MP/Tech/ UJJAIN-Jhalawar/2016 |
17/06/2017 |
05/06/2017 |
18/07/2017
Time
11:30Hrs
|
|
202 |
Consultancy Services for carrying out Road safety Audit of existing road Km 57/0 – 95/0 of NH 181 (Old Km 390/0 – 428/0 of NH 67)(Nagapattinam Gudalur Mysore Road) |
TN.No.02/HDO/NH/2017-18/Dt.18.05.2017 |
03/06/2017 |
03/06/2017 |
11/07/2017
Time
11:0Hrs
|
|
203 |
Consultancy Services for carrying out Road safety Audit of existing road Km 387/635 – 406/635 of NH 42 (Old Km 0/0 – 19/0 of NH 219)(Krishnagiri – Kuppam Road) |
TN.No.03/HDO/NH/2017-18/Dt.18.05.2017 |
03/06/2017 |
03/06/2017 |
06/07/2017
Time
11:0Hrs
|
|
204 |
Consultancy Services for carrying out Road safety Audit of existing road Km 0/0 – 19/0 of NH 648 (Old Km 0/0 – 19/0 of NH 207) (Sharjapur – Bagalur- Hosur Road) |
TN.No.04/HDO/NH/2017-18/Dt.18.05.2017 |
03/06/2017 |
03/06/2017 |
06/07/2017
Time
11:0Hrs
|
|
205 |
Consultancy services for feasibility study, Planning and Preparation of Detailed Project for reducing traffic congestion on NH-5 from Junction 38 (RD No. 4.03) (Rotary near The Tribune) to UT Boundary (RD No. 8.30) by providing signal free corridor and other appropriate remedial measures for smooth flow of traffic along NH-5 |
CP1/2017/RFP/DPR1 |
02/06/2017 |
02/06/2017 |
15/06/2017
Time
15:0Hrs
|
|
206 |
Consultancy services for Authority Engineer for Construction of Major Bridge over river Narmada near Garudeshwar at Km 469/00 To 470/00 of NH-56 on EPC mode in the State of Gujarat |
08of2017-18 |
01/06/2017 |
01/06/2017 |
23/06/2017
Time
18:0Hrs
|
|
207 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation from 3.5m/7.0m to 10m as per NH standard geometrics of NH-58 from Khokhara border (00/00 km)-Vijaynagar-Antarsuba-Mathasur (56/620 km) road of National Highway 58 in State of Gujarat. |
02 of 2017-18 (2nd Attempt) |
26/05/2017 |
26/05/2017 |
12/06/2017
Time
18:10Hrs
|
|
208 |
Consultancy Services for carrying out Road Safety Audit of existing road Kerala / Tamilnadu Border – Thirumangalam road Km 81/6 – 153/0 of NH 208 |
TN No. 01/2017-18/ DO/ dated 18.05.2017 |
26/05/2017 |
26/05/2017 |
06/07/2017
Time
11:0Hrs
|
|
209 |
Consultancy Services for road safety audit of NH 110 in km. 0.000 to 35.000 Biharsharif Ekangersarai Telhara Section and km 85.000 to 88.000 Jehanabad Arwal Section in the State of Bihar |
Road Safety/NH11O/Biharsharif/02/2017-18 |
18/05/2017 |
20/05/2017 |
27/05/2017
Time
15:0Hrs
|
|
210 |
Independent Engineer Services for Four Laning of Mahuva to Kagavadar Section of NH-8E from Km. 100.100 to Km 139.915 (Design Chainage from Km 100.450 to km 140.470) (Package-III) in the State of Gujarat on Hybrid Annuity Mode under NHDP Phase IV |
NHAI/11012/IE/Mahu-Kaga/2016 |
19/05/2017 |
19/05/2017 |
19/06/2017
Time
11:0Hrs
|
|
211 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report for Construction of new 4-lane Elevated Road from Chennai Port to Maduravoyal (NH-4) in the State of Tamil Nadu under NHDP Phase VII |
NHAI/11011/7/2017/EE |
17/05/2017 |
16/05/2017 |
06/06/2017
Time
11:0Hrs
|
|
212 |
Consultancy Services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for 140-45 km section from km 1-550 to Km 142-00 including construction of bypasses for Dudhiya, Double Chouki, Chapda, Kannod and Khategaon of Indore-Harda section of NH-59A in the state of Madhya Pradesh through DBFOT/EPC basis |
NHAI/PIU/Ind/Indore-Harda/2016 dated 15.5.2017 |
17/05/2017 |
15/05/2017 |
05/06/2017
Time
11:30Hrs
|
|
213 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-64 between Km. 127/740 to 386/020 (Mahisagar River – Dabha Circle – Jambusar – Amod – Bharuch – Ankleshwar – Hasot – Vadoli – Sandhier - Surat – Navsari - Dandi Section) in the State of Gujarat for up gradation to Two/Four lane with paved shoulder configuration. |
05of2017-18of3 |
15/05/2017 |
15/05/2017 |
25/05/2017
Time
18:0Hrs
|
|
214 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-848 between Km. 0/00 to 37/400 (Pardi NH-48 Junction – Sukesh – Nanaponda - Kaprada Section) in the State of Gujarat for up gradation to Two lane with paved shoulder configuration. |
05of2017-18of1 |
15/05/2017 |
15/05/2017 |
25/05/2017
Time
18:0Hrs
|
|
215 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa – Galkund – Samghan – Saputara – Maharashtra Border Section) in the State of Gujarat for up gradation to Two lane with paved shoulder configuration |
05of2017-18of2 |
15/05/2017 |
15/05/2017 |
25/05/2017
Time
18:0Hrs
|
|
216 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6-lane with paved shoulders configuration in the State of TelanganaStretch from Kothakota Gudur upto Mantralayam on NH 167 Length 70 Km (approximately) in Principle approved NH |
SE R&B/NH/HYD/9/2017-18 Date05 05 2017 |
12/05/2017 |
12/05/2017 |
08/06/2017
Time
15:0Hrs
|
|
217 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of JNPT-Package V in the state of Maharashtra (As per Annexure 1) |
MJPRCL/PC/DPR/JNPT-V)/2017 |
12/05/2017 |
11/05/2017 |
27/06/2017
Time
11:0Hrs
|
|
218 |
DPR for Two lane with paved shoulders - From Kayamkulam (NH47) to Junction near Thiruvalla (NH183) |
05/CENH/KLA/DPR/2017-18 |
05/06/2017 |
11/05/2017 |
12/06/2017
Time
15:0Hrs
|
-
|
219 |
Appointment of consultants for development of standard designs and plans for different types of bridge superstructures based on Limit State Method |
RW/NH-34049/03/2008-S and R(B) |
09/05/2017 |
08/05/2017 |
21/06/2017
Time
11:0Hrs
|
|
220 |
Appointment of consultants for development of standard designs and plans for different types of bridge superstructures based on Limit State Method |
RW/NH-34049/03/2008-SRT(B) |
10/07/2017 |
08/05/2017 |
03/08/2017
Time
11:0Hrs
|
|
221 |
Consultancy Services for Development of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method (Package2) |
RW/NH-34049/03/2008-SRT(B) Package 2 |
27/07/2017 |
08/05/2017 |
03/08/2017
Time
11:0Hrs
|
|
222 |
Consultancy Services for Development of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method (Package 3) |
RW/NH-34049/03/2008-SRT(B) Package 3 |
27/07/2017 |
08/05/2017 |
03/08/2017
Time
11:0Hrs
|
|
223 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation from 3.5m/7.0m to 10m as per NH standard geometrics of NH-58 from Khokhara border (00/00 km)-Vijaynagar-Antarsuba-Mathasur (56/620 km) road of National Highway 58 in State of Gujarat. |
20 of 2016-17 |
29/04/2017 |
29/04/2017 |
09/05/2017
Time
18:10Hrs
|
-
|
224 |
consultancy services for preparation of DPR for the bridge 186 of NH 71 |
SE R B NIT NO 70 |
28/04/2017 |
28/04/2017 |
13/06/2017
Time
15:0Hrs
|
|
225 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Chitrod(on NH 27) – Rapar – Dholavira (Upto Balasar) road as new National Highway in the State of Gujarat |
10 of 2016-17 |
28/04/2017 |
27/04/2017 |
24/05/2017
Time
17:0Hrs
|
|
226 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Lakhpat-Gaduli-Hajipir-Khavda-Dholavira-Mauvana-Santalpur road as new National Highway in the State of Gujarat |
11 of 2016-17 |
28/04/2017 |
27/04/2017 |
24/05/2017
Time
17:0Hrs
|
|
227 |
Consultancy Services for carrying out feasibility study, Detailed Survey/Investigation, Preparation of General Arrangement Drawing, Detail Project Report for Construction of proposed ROB (Six-lane configuration) & its approaches in replacement of temporary LC at Km.363.625 on NH-8A (New NH- 141) |
08 of 2016-17 |
26/04/2017 |
26/04/2017 |
24/05/2017
Time
17:0Hrs
|
|
228 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme - NHAI/PC/SM/01 - 2nd Call |
NHAI/PC/Sagarmala/2016/SM/01 |
26/04/2017 |
26/04/2017 |
08/06/2017
Time
11:0Hrs
|
|
229 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme - NHAI/PC/SM/02 - 2nd Call |
NHAI/PC/Sagarmala/2016/SM/02 |
26/04/2017 |
26/04/2017 |
08/06/2017
Time
11:0Hrs
|
|
230 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme - NHAI/PC/SM/04 - 2nd Call |
NHAI/PC/Sagarmala/2016 - SM/04 |
26/04/2017 |
26/04/2017 |
08/06/2017
Time
11:0Hrs
|
|
231 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme - NHAI/PC/SM/06 |
NHAI/PC/Sagarmala/2016/SM/06 |
26/04/2017 |
26/04/2017 |
08/06/2017
Time
11:0Hrs
|
|
232 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme - NHAI/PC/SM/07 |
NHAI/PC/Sagarmala/2016 /SM/07 |
26/04/2017 |
26/04/2017 |
08/06/2017
Time
11:0Hrs
|
|
233 |
Consultancy Services for preparation of Detailed Project Report for Construction of proposed Mandvi bypass road starting from Km. 97/200 & ending on Km.104/200 of NH-8A(Extn.) in the State of Gujarat |
09 of 2016-17 |
27/04/2017 |
26/04/2017 |
24/05/2017
Time
17:0Hrs
|
|
234 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-64 between Km. 127/740 to 386/020 (Mahisagar River – Dabha Circle – Jambusar – Amod – Bharuch – Ankleshwar – Hasot – Vadoli – Sandhier - Surat – Navsari - Dandi Section) in the State of Gujarat for up gradation to Two/Four lane with paved shoulder configuration. |
27 of 2016-17 |
25/04/2017 |
25/04/2017 |
02/05/2017
Time
18:0Hrs
|
|
235 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa – Galkund – Samghan – Saputara – Maharashtra Border Section) in the State of Gujarat for up gradation to Two lane with paved shoulder configuration. |
27 of 2016-17 of 2 |
25/04/2017 |
25/04/2017 |
02/05/2017
Time
18:0Hrs
|
|
236 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-848 between Km. 0/00 to 37/400 (Pardi NH-48 Junction – Sukesh – Nanaponda - Kaprada Section) in the State of Gujarat for up gradation to Two lane with paved shoulder configuration. |
27 of 2016-17 of 3 |
25/04/2017 |
25/04/2017 |
02/05/2017
Time
18:0Hrs
|
|
237 |
Consultancy Services for detail Road Safety Audit of existing road from Ch.0.000 Km.(Near Jn. @ village Pardi) to Ch.37.400 Km. (Kaprada) of Pardi-Chival-Jogvel-Kaprada-Hunda joining Maharashtra Border (Km.0/0 to 66/700) of N.H. No.848 (Extn.) in the State of Gujarat. |
04 of 25017-18 |
25/04/2017 |
25/04/2017 |
08/05/2017
Time
18:0Hrs
|
|
238 |
Consultancy services preparation of detail project report for widening & strengthing upto 7m/10m/4-lane,from km 18/100 to 127/740,except 97/600 to 104/920 & 108/200 to 117/160 of N.H.64 as as (Bareja-Aslali-Navagam-Vansar-Dabhan-Nadiyad city- Anand-Borsad-Ras-Amberavpura-Kankapura section) in the State of Gujarat |
Tender Notice-01 of 2017-18 |
24/04/2017 |
24/04/2017 |
11/05/2017
Time
11:0Hrs
|
-
|
239 |
Consultancy Services for Development of Economic Corridors, Inter-Corridors, Feeder routes & International connectivity roads (Lot-3) |
NHAI/Planning/EC/2017/Lot-3 |
21/04/2017 |
19/04/2017 |
19/04/2017
Time
11:0Hrs
|
-
|
240 |
Consultancy Services for Development of Economic Corridors, Inter-Corridors, Feeder routes & International connectivity roads (Lot-03) |
NHAI/Planning/EC/2017/Lot-3/Odissa & Jharkhand/Package-1 |
21/04/2017 |
19/04/2017 |
19/05/2017
Time
11:0Hrs
|
|
241 |
Consultancy Services for Development of Economic Corridors, Inter-Corridors, Feeder routes & International connectivity roads (Lot-3) |
NHAI/Planning/EC/2017/Lot-3/Odissa & Jharkhand/Package-2 |
21/04/2017 |
19/04/2017 |
19/05/2017
Time
11:0Hrs
|
|
242 |
Consultancy Services for Development of Economic Corridors, Inter-Corridors, Feeder routes & International connectivity roads (Lot-3) |
NHAI/Planning/EC/2017/Lot-3/West Bengal/Package-1 |
21/04/2017 |
19/04/2017 |
19/05/2017
Time
11:0Hrs
|
|
243 |
Consultancy Services for Development of Economic Corridors, Inter-Corridors, Feeder routes & International connectivity roads (Lot-3) |
NHAI/Planning/EC/2017/Lot-3/West Bengal/Package-2 |
21/04/2017 |
19/04/2017 |
19/05/2017
Time
11:0Hrs
|
|
244 |
Consultancy Services for preparation of Detailed Project Reports for Development of Inter-modal stations at Varanasi(Project-1) and Nagpur(Project-2) |
NHAI/BM/IMS/2016 |
21/04/2017 |
19/04/2017 |
23/05/2017
Time
11:0Hrs
|
|
245 |
CONSULTING SERVICES FOR Preparation of DPR for “Construction of Bridge at Km 199/100(Srisailam Bridge) of Hyderabad – Srisailam – Thokapalli of NH 765 in Kurnool District” |
Nit no 69/2016-17 |
06/04/2017 |
06/04/2017 |
22/05/2017
Time
17:0Hrs
|
|
246 |
Consultancy Services for Preparation of Detailed report of Hyderabad-Vijaywada -Amravathi Expressway, having an approximate length of 280 km (the Project) including spurs through BOT and EPC basis (3rd Call) |
24391 |
11/04/2017 |
31/03/2017 |
28/04/2017
Time
11:0Hrs
|
|
247 |
Consultancy services for feasibility study, Planning and Preparation of Detailed Project for reducing traffic congestion on NH-5 from Junction 38 (RD No. 4.03) (Rotary near The Tribune) to UT Boundary (RD No. 8.30) by providing signal free corridor and other appropriate remedial measures for smooth flow of traffic along NH-5 |
CP1/2017/RFP/DPR-1 |
30/03/2017 |
30/03/2017 |
02/05/2017
Time
15:0Hrs
|
|
248 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/29Sml |
HP/Shimla/29Sml |
30/03/2017 |
30/03/2017 |
21/04/2017
Time
15:0Hrs
|
|
249 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/30Sml |
HP/Shimla/30Sml |
30/03/2017 |
30/03/2017 |
21/04/2017
Time
15:0Hrs
|
|
250 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/31Sml |
HP/Shimla/31Sml |
30/03/2017 |
30/03/2017 |
21/04/2017
Time
15:0Hrs
|
|
251 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/32Sml |
HP/Shimla/32Sml |
30/03/2017 |
30/03/2017 |
21/04/2017
Time
15:0Hrs
|
|
252 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Torangal to Kudligi via Sandur in Bellary District in the State of Karnataka. (2nd Call) |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1985 - 3 |
25/03/2017 |
25/03/2017 |
17/04/2017
Time
16:59Hrs
|
|
253 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Adhoni to Siruguppa via Raravi in Bellary District in the State of Karnataka. (2nd Call) |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1985 - 4 |
25/03/2017 |
25/03/2017 |
17/04/2017
Time
16:59Hrs
|
|
254 |
Consultancy Services for detail Road Safety Audit of existing road from Ch.74.200 km Near Jn. at village Deshalpar to Ch. 174.000 km Nalia of NH-8A Extn. in the State of Gujarat. |
06 Second Attemt of 2016-17 |
25/03/2017 |
25/03/2017 |
10/04/2017
Time
18:0Hrs
|
|
255 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lane with Paved Shoulders (A) From Chinthamani(NH-69)-Chelur-Rayachervu-Tanakal(AP) (NH42) (B)From Kuppam on NH-42(AP)-Kolar on NH-75(Karnataka)(length in AP=25kms and Karnataka=40 Kms) (C)From Madakasira-Rolla(AP/Karnataka border)-Sire in the state of Karnataka (Total length =67 Kms,AP=38 Kms Karnataka=29 Kms) |
14/2016-17 dated 24.03.2017 2nd call |
10/04/2017 |
24/03/2017 |
28/04/2017
Time
16:30Hrs
|
|
256 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH 48 near Davanagere and terminating at its junction with NH 369 near Chennagiri.(3rd Call) |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1985 |
25/03/2017 |
23/03/2017 |
17/04/2017
Time
16:59Hrs
|
|
257 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from junction with NH 206 at Sagara Huvinahalli Holebaglu Kalasvalli Sighandoor Markutka Junction with NH 766C. (3rd Call) |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1985 - 2 |
25/03/2017 |
23/03/2017 |
17/04/2017
Time
16:59Hrs
|
|
258 |
Consultancy Services for Feasibility Study cum Detailed Project Report |
ENH/KLB/PB/AE3/TND/2016-17/1804 |
18/03/2017 |
18/03/2017 |
18/04/2017
Time
16:0Hrs
|
|
259 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lanes with paved shoulders from Kollegala-Hanur-MM hills-Palar Road-Tamilnadu border extended upto Mettur in the state of Tamil Nadu. |
26/14.03.2017 PKG-I |
20/03/2017 |
15/03/2017 |
28/04/2017
Time
16:30Hrs
|
|
260 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lanes with paved shoulders from Gundlupet(NH 212) to Chamaraj Nagar(NH 150A) in the state of Karnataka. |
26/14.03.2017 PKG-II |
24/03/2017 |
15/03/2017 |
28/04/2017
Time
16:30Hrs
|
|
261 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity Backward/Religious/Tourist places and Boarder areas under Bharatmala Scheme - Karnal( NH-44) – Saharanpur(NH-344) Packages-NHAI/ R/21)- 3rd Call |
NHAI/BRT/Proc/DPR/2016 dated 15.03.2017 |
10/04/2017 |
15/03/2017 |
18/04/2017
Time
17:0Hrs
|
|
262 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana. |
SE(R&B)/NH/HYD/120/2016-17 Date 10.03.2017 |
10/03/2017 |
10/03/2017 |
04/04/2017
Time
15:0Hrs
|
|
263 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaMedak Siddipet Elakurthy junction at NH 563 Length 133 Km approximately In principle approved NH packageII |
SE(R&B)/NH/HYD/121/2016-17 date 10.03.2017 |
10/03/2017 |
10/03/2017 |
04/04/2017
Time
15:0Hrs
|
|
264 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana. Junction at Hyderabad outer ring road Gatkesar Edulapur Valigonda Thorrur Nellikuduru-Mahabubabad Yellandu Kothagudam junction at NH 30 Length 234 Km approximately In principle approved NH Package-III |
SE(R&B)/NH/HYD/122/2016-17 Date 10.03.2017 |
10/03/2017 |
10/03/2017 |
04/04/2017
Time
15:0Hrs
|
|
265 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6 lane with paved shoulders configurationin the State of Telangana Telangana State Border Tandur Kodangal Kosigi Mohammadabad Mahabubnagar Length 96 Km approximately In principle approved NH. Package IV |
SE(R&B)/NH/HYD/123/2016-17 Date 10.03.2017 |
10/03/2017 |
10/03/2017 |
04/04/2017
Time
15:0Hrs
|
|
266 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6 lane with paved shoulders configurationin the State of Telangana Zaheerabad Telangana State Border Bidar Length 25 Km approximately In-principle approved NH. (Package-V) |
SE(R&B)/NH/HYD/124/2016-17 Date 10.03.2017 |
10/03/2017 |
10/03/2017 |
04/04/2017
Time
15:0Hrs
|
|
267 |
Consultancy Services for carrying out Feasibility Study/ Detailed Engineering for Rehabilitation of existing bridges on National Highways. |
Re-tenderNHConsultancyforbridges |
07/03/2017 |
07/03/2017 |
20/03/2017
Time
0:0Hrs
|
|
268 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/25Sml |
HP/Shimla/25Sml |
04/03/2017 |
03/03/2017 |
28/03/2017
Time
15:0Hrs
|
|
269 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/26Sml |
HP/Shimla/26Sml |
04/03/2017 |
03/03/2017 |
28/03/2017
Time
15:0Hrs
|
|
270 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/27Sml |
HP/Shimla/27Sml |
04/03/2017 |
03/03/2017 |
28/03/2017
Time
15:0Hrs
|
|
271 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/28Sml |
HP/Shimla/28Sml |
04/03/2017 |
03/03/2017 |
28/03/2017
Time
15:0Hrs
|
|
272 |
Consultancy services preparation of feasibility study and detail project report for improvement and up-gradation of in principle and newly declared National Highways as (Vataman-Fatehpur-Khambhat-Gambhira Bridge-Karjan) in the State of Gujarat. |
Notice no.10 of 2016-17 |
22/02/2017 |
18/02/2017 |
15/03/2017
Time
12:0Hrs
|
|
273 |
Authority’s Engineer Services for (a) Construction of ROB including one minor bridge and approaches with retaining wall at km 8.674 near Khapri (Nagpur) (b) Construction of flyover from Liberty Cinema to Mental Hospital and (c) Development of multi-lane carriageway from km 704.200 to km 723.000 (from Kanhan to Automotive Square) section of urban link of Nagpur Kamptee section |
NHAI/Tech/MH/AE/Khapri-Liberty-Kamptee/2017 |
07/03/2017 |
17/02/2017 |
05/04/2017
Time
11:0Hrs
|
|
274 |
Authoritys Engineer - Two Lane with PS NH85 (old NH49) in Kerala |
CENH/MVPA/EPC-AE/04/2016-17 |
16/02/2017 |
16/02/2017 |
20/03/2017
Time
16:30Hrs
|
|
275 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Mehsana-Visnagar-Vadnagar-Kheralu-Idar-Bhiloda-Shamlaji road as new National Highway in State of Gujarat. |
14 of 2016-17 |
23/02/2017 |
15/02/2017 |
14/03/2017
Time
18:20Hrs
|
|
276 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lane with Paved Shoulders 1)Afzalpur-Almel-Indi for an approximate length 42.00 km in the State of Karnataka 2) From Junction of joining NH-65 Murval-Aalur-Akkalkot-Indi- Zalki (NH-13)-Bijapur border (NH-13)for an approximate length 63.00 kms in the State of Karnataka |
ENH/VJP/PB/AE.2/TND/2016-17/166 Dated-10-02-2017 |
15/02/2017 |
15/02/2017 |
04/03/2017
Time
0:0Hrs
|
|
277 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of the work “Rehabilitation and up-gradation of NH-75 (Old NH-234) from Km 506/100 to Km 508/700 and Km 518/700 to Km 534/350 (Design Ch. Km 506/100 to 508/650 and 518/700 to 534/100) Mangalore to Thiruvannamalai Road to two lane with paved shoulders on EPC Basis in the State of Andhra Pradesh”. |
64/2016-17 |
15/02/2017 |
15/02/2017 |
03/04/2017
Time
0:0Hrs
|
|
278 |
Consultancy Services for Authority Engineer for supervision for Construction of 3 nos. ROB and its approaches in lieu of Level Crossing Nos. I. 27/T Habra Gate-1 at Km 23.969. II. 27T-A Habra Gate-2 at Km 22.882 and III. 26 T-A Near Ashok Nagar at Km 20.578 of NH-35 in the State of W.B. |
26/2016-17 of SE, NHC-I |
16/02/2017 |
15/02/2017 |
19/04/2017
Time
17:0Hrs
|
|
279 |
Consultancy Services for Authority’s Engineer for supervision and construction of ROB and its approaches in lieu of level crossing L.C No 23/SPL/Tat Km 52.712 of NH-35 in the State of West Bengal on EPC, JOB NO-NH-35/WB/(6)/15-16-005-S&R(B) |
27/2016-17 of SE, NHC-I |
16/02/2017 |
15/02/2017 |
19/04/2017
Time
17:0Hrs
|
|
280 |
Consultancy services for Authority’s Engineer for supervision of the works Construction of ROB and its approaches in lieu of level crossing No – 1/T/SPL (at Barasat Kazipara) at Km 3.25Km of NH-35 in the State of WestBengal on EPC, JOB NO-NH-35/WB/(16)/15-16-021-S&R(B) |
28/2016-17 of SE, NHC-I |
16/02/2017 |
15/02/2017 |
19/04/2017
Time
17:0Hrs
|
|
281 |
Consultancy services for Authority Engineer for supervision of the works twins 2 Lane ROB and its approaches in replacement of existing level crossing Gate No KA34 Rly between Midnapore and Bankura in Kubai of NH-60 in W.B. |
29/2016-17 of SE, NHC-I |
16/02/2017 |
15/02/2017 |
19/04/2017
Time
17:0Hrs
|
|
282 |
Consultancy services for carrying out feasibility study/detailed Engineering for rehabilitation of existing bridges on National HighwaysProject Report (PR) of construction/reconstruction of new bridges in replacement of weak and narrow bridges on NH |
16963-17012 dated 02-02-2017 |
21/02/2017 |
14/02/2017 |
07/03/2017
Time
0:0Hrs
|
|
283 |
Consultancy services for Authority Engineer for supervision of Rehabilitation and Upgradation to 2 lane with paved shoulder configuration of Nandakumar Contai Chandaneswar road from km 0.00 to km 25.50 and from km 41.00 to km 64.70 of NH 116B on EPC mode in the State of W.B. under Annual Plan 2016-17. |
25/2016-17 of SE, NHC-I |
10/02/2017 |
10/02/2017 |
28/03/2017
Time
0:0Hrs
|
|
284 |
Consultancy Services for Road Safety Audit of existing road Ch. 85.000 km. (Near Dharoi) to Ch. 135.000 km. (Near Pilucha) of NH-58 in State of Gujarat. |
13 of 2016-17 |
23/02/2017 |
09/02/2017 |
27/02/2017
Time
0:0Hrs
|
|
285 |
Consultancy Services for detail Road Safety Audit of existing road from Km 384.000 (Vasedi Village) to Km 459/500 (Devaliya Jn) & Km 483/500 (Rajpipla) to Km 522/000 (Netrang) of NH-56 in the State of Gujarat. |
NIT 10 of 2016-17 |
27/02/2017 |
08/02/2017 |
15/03/2017
Time
0:0Hrs
|
|
286 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Narayan Sarovar (on NH 41) – Lakhpat road as new National Highway in the State of Gujarat |
07 of 2016-17 |
22/02/2017 |
07/02/2017 |
15/03/2017
Time
18:0Hrs
|
|
287 |
Preparation of feasibility study and detailed project report for Mangalore city bypass under NHDP phase VII in Karnataka |
NHAI/Mangalore Bypass/2016 (4th call) |
09/02/2017 |
03/02/2017 |
23/03/2017
Time
11:0Hrs
|
|
288 |
Consultancy services for feasibility study, Planning and Preparation of Detailed Project for reducing traffic congestion on NH-5 from Junction 38 (RD No. 4.03) (Rotary near The Tribune) to UT Boundary (RD No. 8.30) by providing signal free corridor which may include elevated highway, construction of grade separated intersection at (Junction 38) and other appropriate remedial measures for smooth flow of traffic along NH-5 |
CP1/2017/RFP-1 |
03/02/2017 |
03/02/2017 |
21/02/2017
Time
0:0Hrs
|
|
289 |
Consultancy Services for Preparation of Feasibility Report of Jalandhar-Moga-Bhatinda-Kishangarh-Ajmer road including upgradation of existing NH Network/Construction of new 4 lane NH alignment/ Constructing Green field Expressway and Preparation of Detailed Project Report for the selected alignment in the State of Rajasthan and Punjab |
NHAI/11012/Raj/ Jalandhar -Ajmer/DPR/2017 |
01/02/2017 |
01/02/2017 |
03/03/2017
Time
11:0Hrs
|
-
|
290 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF THE WORK FOR Widening to Two Lane with Paved Shoulders from Km 0/970 to Km 40/410 of Jangaon – Thirumalgiri Section (erstwhile section of SH-16) of NH-365B on EPC mode under NH(O) in the State of Telangana |
NIT No SE R&B NH/KMNR/25/2016-17 Dated 25/01/2017 |
01/02/2017 |
01/02/2017 |
14/03/2017
Time
13:0Hrs
|
|
291 |
Consultancy Services for detail Road Safety Audit of existing road from Ch.74.200 km (Near Jn. @ village Deshalpar) to Ch. 174.000 km( Nalia) of NH-8A (Extn.) in the State of Gujarat. |
06 OF 2016-17 |
22/02/2017 |
01/02/2017 |
15/03/2017
Time
18:10Hrs
|
|
292 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF THE WORK FOR WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 59.500 TO KM 132.033 OF MANNEGUDA - RAVULAPALLY SECTION OF NH-163 (ERSTWHILE SH-4) UNDER NH (O) ANNUAL PLAN 2016-17 ON EPC MODE IN THE STATE OF TELANGANA |
NIT No SE R&B NH/HYD/108/2016-17 Dated 25/01/2017 |
01/02/2017 |
01/02/2017 |
14/03/2017
Time
13:0Hrs
|
|
293 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF THE WORK FOR WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 67.00 TO KM 114.25 OF KALWAKURTHY - MALLAPALLY SECTION OF NH-167 (ERSTWHILE SECTION OF SH-18) IN THE STATE OF TELANGANA ON EPC MODE UNDER NH (O) ANNUAL PLAN 2016-17 |
NIT No SE R&B NH/HYD/109/2016-17 Dated 25 /01 /2017 |
01/02/2017 |
01/02/2017 |
14/03/2017
Time
13:0Hrs
|
|
294 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF THE WORK FOR WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 15.525 TO KM 62.880 OF JADCHERLA-KALWAKURTHY OF NH-167 (ERSTWHILE SECTION OF SH-18) IN THE STATE OF TELANGANA ON EPC MODE UNDER NH (O) ANNUAL PLAN 2016-17 |
NIT No SE R&B NH/HYD/110/2016-17 Dated 25/01/2017 |
01/02/2017 |
01/02/2017 |
14/03/2017
Time
13:0Hrs
|
|
295 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF THE WORK FOR WIDENING TO TWO LANE WITH PAVED SHOULDERS FROM KM 40/410 TO KM 84/037 OF THIRUMALAGIRI-SURYAPET OF NH-365B (ERSTWHILE SH-16) IN THE STATE OF TELANGANA ON EPC MODE UNDER NH (O) ANNUAL PLAN 2016-17 |
NIT No SE R&B NH/HYD/111/2016-17 Dated 25/01/017 |
01/02/2017 |
01/02/2017 |
14/03/2017
Time
13:0Hrs
|
|
296 |
Consultancy Services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for 201.240 Km section from km 2+500 to Km 203+740 of Indore-Edlabad upto Maharashtra Border of SH-27 (proposed NH-Section) in the state of Madhya Pradesh (the “Project”) through DBFOT/EPC basis. |
NHAI/HQ/MP/Tech./Ind-Edlb/2016 dated 31.1.2017 |
01/02/2017 |
31/01/2017 |
03/03/2017
Time
0:0Hrs
|
|
297 |
Consultancy Services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for 134.00 Km section from km 00+00 to Km 134+00 of Ujjain-Jhalawar upto Rajasthan Border of SH-27 (proposed NH section) in the state of Madhya Pradesh (the “Project”) through DBFOT/EPC basis. |
NHAI/HQ/MP/Tech./Ujjn/Jhal/2016 dated 31.1.2017 |
01/02/2017 |
31/01/2017 |
03/03/2017
Time
0:0Hrs
|
|
298 |
Consultancy Services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for 140.45 km section from km 1.550 to Km 142.00 including construction of bypasses for Dudhiya, Double Chouki, Chapda, Kannod and Khategaon of Indore-Harda section of NH-59A in the state of Madhya Pradesh (the “Project”) through DBFOT/EPC basis. |
NHAI/HQ/MP/Tech./Ind-Har/2016 dated 31.1.2017 |
31/01/2017 |
31/01/2017 |
03/03/2017
Time
11:0Hrs
|
|
299 |
Preparation of Detailed Project Report for construction of flyover at Km. 619/2-620/2 of NH 47 (Thuckalay) |
TN.No. 19/2016-17/ DO/ dated 23.01.2017 |
16/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
300 |
Preparation of Detailed Project Report for providing pedestrian subway at Km 633/10 of NH 47 (Collector office) and providing pedestrian subway at Km 628/10 of NH47(Sunkan Kadai) |
TN.No.11/2016-17/ DO/ dated 03.12.2016 |
16/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
301 |
DPR - Two lane with Paved shoulders - From Kayamkulam (NH47) to Junction near Thiruvalla (NH183) |
07/CENH/KLA/DPR/2016-17 - Package No. CENH/DPR/05/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
302 |
DPR - 2 Lane with PS - (i) from Bharanikkavu near Adur in NH183A up to Titanium, Chavara at NH47 (new NH66) & (ii) Connecting NH183A at Elavunkal near Laha with Pampa |
07/CENH/KLA/DPR/2016-17 Package No. CENH/DPR/07/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
303 |
Makaraparambu bypass between km 53/000 and 63/000 (4 lane bypass) |
07/CENH/KLA/DPR/2016-17 – Package No. CENH/DPR/10/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
304 |
DPR - Two Lane with PS - km 5/000 (Malaparmba) to 40/000 (Puthupady) including bypasses at Koduvally and Thamarassery |
07/CENH/KLA/DPR/2016-17 – Package No. CENH/DPR/11/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
305 |
DPR - Two Lane with PS - Km 40/000 to (Puthupady) to km 117/600 (Muthanga) |
07/CENH/KLA/DPR/2016-17 – Package No. CENH/DPR/13/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
306 |
DPR - Two Lane with PS - Km 137/00 to Km 160/300 (Ponkunnam - Mundakayam) |
07/CENH/KLA/DPR/2016-17 – Package No. CENH/DPR/12/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
307 |
4 lane Thrippunithura bypass 4 lane from Km 274/000 to Km 284/550 (Mini bypass jn. Near Gandhi square) and 2 lane with paved shoulders from km 284/550 to 286/610 (up to Kundanoor) |
07/CENH/KLA/DPR/2016-17 – Package No. CENH/DPR/14/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
308 |
Road connecting International Sea Port, Vizhinjam with Karamana- Kaliakkavila stretch of NH-47 and NH Bypass 47 (New NH 66). (starts from Balaramapuram passes through Mukkola - Vizhinjam International Sea Port (Mulloor) - Pulluvila- Kanjiramkulam and meets the NH-47 at Neyyattinkara |
07/CENH/KLA/DPR/2016-17 – Package No. CENH/DPR/15/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
309 |
DPR - Two Lane with PS -Road connecting Chovva- Mattannur- Koottupuzha – Valavupara – Makkottam – Virajpetta– Madikkeri – Mysore (stretch in Kerala) |
07/CENH/KLA/DPR/2016-17 – Package No. CENH/DPR/16/2016 |
12/02/2017 |
31/01/2017 |
23/02/2017
Time
15:0Hrs
|
|
310 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/24) |
243-SESHA-2017 |
03/02/2017 |
27/01/2017 |
27/02/2017
Time
15:0Hrs
|
|
311 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/1) |
244-SESHA-2017 |
03/02/2017 |
27/01/2017 |
27/02/2017
Time
15:0Hrs
|
|
312 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and / or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/2) |
244-SESHA-2017 |
03/02/2017 |
27/01/2017 |
27/02/2017
Time
15:0Hrs
|
|
313 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/23) |
243-SESHA-2016 |
02/02/2017 |
27/01/2017 |
27/02/2017
Time
15:0Hrs
|
|
314 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/17 |
242-SESHA-2016 |
03/01/2017 |
27/01/2017 |
17/02/2017
Time
16:30Hrs
|
|
315 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/18 |
242-SESHA-2016 |
03/01/2017 |
27/01/2017 |
17/02/2017
Time
16:30Hrs
|
|
316 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/19 |
242-SESHA-2016 |
03/01/2017 |
27/01/2017 |
17/02/2017
Time
16:30Hrs
|
|
317 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/20 |
243-SESHA-2016 |
03/01/2017 |
27/01/2017 |
27/02/2017
Time
15:0Hrs
|
|
318 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/21) |
243-SESHA-2016 |
03/01/2017 |
27/01/2017 |
27/02/2017
Time
15:0Hrs
|
|
319 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/22) |
243-SESHA-2016 |
03/01/2017 |
27/01/2017 |
27/02/2017
Time
15:0Hrs
|
|
320 |
test 2 do not apply |
test |
21/01/2017 |
23/01/2017 |
30/11/2017
Time
0:0Hrs
|
-
|
321 |
Independent Engineer Services during Operation & Maintenance Period for Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the 4 Laning MP/Maharashtra Border- Dhule Section of NH-3 from Km 168.500 to Km. 265.000 in the State of Maharashtra under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Basis - Consultancy Package No.IE-O&M/NH-3/NAG-5 |
NHAI/RO-NAG/TENDERS/2016-17/10 |
23/01/2017 |
23/01/2017 |
03/02/2017
Time
0:0Hrs
|
|
322 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : KEONCHI-RATANPUR |
NH/CE/PWD/18/29611 |
23/01/2017 |
23/01/2017 |
18/02/2017
Time
0:0Hrs
|
|
323 |
test |
test |
21/01/2017 |
22/01/2017 |
22/01/2017
Time
0:0Hrs
|
-
|
324 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.(i) Zaheerabad–Bidar(25Kms) approved “In-Principle” for declaration as NH (Package-I) |
NIT No. SE(R&B)/NH/HYD./84/2016-17 Date:03.01.2017 (Package-I) |
03/01/2017 |
20/01/2017 |
16/02/2017
Time
17:0Hrs
|
|
325 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana(ii) Bhadrachalam-Jeelugumalli-Jangareddygudem(68Kms)approved “In-Principle” for declaration as NH(Package-II) |
NIT No. SE(R&B)/NH/HYD/85/2016-17 Date:03.01.2017 |
03/01/2017 |
20/01/2017 |
16/02/2017
Time
17:0Hrs
|
|
326 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana(iii) Telangana State Border-Kotlapur-Chincholi-Tandur-Kodangal-Kosigi-Mohammadabad-Mahaboobnagar(96Kms) (Package-III) |
NIT No. SE(R&B)/NH/HYD/86/2016-17 Date:03.01.2017 |
03/01/2017 |
20/01/2017 |
16/02/2017
Time
17:0Hrs
|
|
327 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaShadnagar-Chevella-Shankarpalli-Kandi (71Kms) (Package-IV) |
NIT No. SE(R&B)/NH/HYD/87/2016-17 Date:03.01.2017 |
03/01/2017 |
20/01/2017 |
16/02/2017
Time
17:0Hrs
|
|
328 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.End of Choutuppal bypass – Yacharam (Start of Yacharam bypass) of length 45kms proposed for upgradation as NH (Package-I) |
SE(R&B)NH/HYD/89/2016-17(PKG – I)(2nd call) Date: 16.01.2017 |
16/01/2017 |
20/01/2017 |
07/02/2017
Time
15:0Hrs
|
|
329 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaStart of Yacharam bypass – End of Kadthal bypass, of length 30 kms proposed for upgradation as NH (Package-II) |
SE(R&B)NH/HYD/90/2016-17(PKG – II)(2nd call) Date: 16.01.2017 |
16/01/2017 |
20/01/2017 |
07/02/2017
Time
15:0Hrs
|
|
330 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.End of Kadthal bypass – End of Shadnagar bypass, of length 40 kms proposed for upgradation as NH (Package-III) |
SE(R&B)NH/HYD/91/2016-17(PKG – III)(2nd call) Date: 16.01.2017 |
16/01/2017 |
20/01/2017 |
07/02/2017
Time
15:0Hrs
|
|
331 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.Ghatkesar – Valigonda, of length 45kms proposed for upgradation as NH (Package-IV) |
SE(R&B)NH/HYD/92/2016-17(PKG – IV)(2nd call) Date: 16.01.2017 |
16/01/2017 |
20/01/2017 |
07/02/2017
Time
15:0Hrs
|
|
332 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.Thorrur–Mahabubabad, of length 51 kms proposed for upgradation as NH (Package-V) (vi) Mahabubabad-Kothagudem |
SE(R&B)NH/HYD/93/2016-17(PKG – V)(2nd call) Date: 16.01.2017 |
16/01/2017 |
20/01/2017 |
07/02/2017
Time
15:0Hrs
|
|
333 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaMahabubabad-Kothagudem, of length 60kms proposed for upgradation as NH (Package-VI) |
SE(R&B)NH/HYD/94/2016-17(PKG – VI)(2nd call) Date: 16.01.2017 |
16/01/2017 |
20/01/2017 |
07/02/2017
Time
15:0Hrs
|
|
334 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.End of Siddipet bypass – Elakurthy, of length 65kms proposed for upgradation as NH (Package-VII) |
SE(R&B)NH/HYD/95/2016-17(PKG – VII)(2nd call) Date: 16.01.2017 |
16/01/2017 |
20/01/2017 |
07/02/2017
Time
15:0Hrs
|
|
335 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of Left Out Works including Junagadh Bypass (Length 19.80 km) on Four Laning of Jetpur – Somnath Section of NH 151 (Old NH 8D) Between Km. 0.000 to Km. 123.454 in the State of Gujarat on Engineering, Procurement & Construction (EPC) Mode. |
NHAI/Guj/ Junagadh Bypass/EPC/AE/2016 |
19/01/2017 |
19/01/2017 |
20/02/2017
Time
0:0Hrs
|
|
336 |
Independent Engineer for Four laning with paved shoulder of Porbandar - Dwarka section of NH-8E (Ext.) from km 356.766 (Design Chainage km 379.100) to km 473.000 (Design Chainage km 496.848) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode |
NHAI/Guj/Porbandar-Dwarka/IE/NH-8E/2017 |
16/01/2017 |
16/01/2017 |
16/02/2017
Time
0:0Hrs
|
|
337 |
Consultancy services for Authority’s Engineer for Supervision of 4-laning of Punjab/Haryana Border-Jind Section of NH-71 from km 238.695 to km 307.00 under NHDP-IVB in the State of Haryana on Engineering Procurement and Construction (EPC) Basis |
NHAI/EPC/AE/PHBJ/11012/2017/HR |
16/01/2017 |
16/01/2017 |
16/02/2017
Time
11:0Hrs
|
|
338 |
IE for Four laning with paved shoulder of Porbandar - Dwarka section of NH-8E (Ext.) from km 356.766 (Design Chainage km 379.100) to km 473.000 (Design Chainage km 496.848) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode |
NHAI/Guj/Porbandar-Dwarka/IE/NH-8E/2017 dated 16.01.2017 |
17/02/2017 |
16/01/2017 |
01/03/2017
Time
0:0Hrs
|
|
339 |
Consultancy Service for the appointment of Technical Consultant to carry out feasibility study of Ernakulam Bypass |
NHAI/RO-Kerala/DPR/PIU-COCHIN/Ernakulam Bypass/KL/2017-1 |
06/02/2017 |
13/01/2017 |
20/02/2017
Time
17:0Hrs
|
|
340 |
Consultancy Services for Carrying out Feasibility Study Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of Demwe-Brahmkund Section from Km 0 to Km 19 and Arrowa-Khupa-Hayuliang section from Km 44 to Km 80 total length for both is 56 Km of Demwe-Hawai Road under SARDP-NE on Engineering Procurement and Construction mode in the state of Arunachal Pradesh (Retender) |
NHIDCL/DPR/Ar Pr/Demwe-Hawai/2017 |
12/01/2017 |
12/01/2017 |
15/02/2017
Time
17:0Hrs
|
|
341 |
Consultancy Services for carrying out Feasibility Study Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration from Simaluguri-Bihubar on NH-702C in the State of Assam to Mon on NH 702 in the state of Nagaland on Engineering Procurement and Construction mode |
NHIDCL/DPR/NG/Simaluguri(NH 702C)-Mon(NH 702)/2017 |
12/01/2017 |
12/01/2017 |
15/02/2017
Time
17:0Hrs
|
|
342 |
Consultancy services for Authority’s Engineer for Supervision of Four Laning from Km 0.000 to Km 60.250 (Design Chainage Km 0.000 to Km 65.960) from Vikkaravandi to Sethiyahopu section of NH-45C in the State of Tamil Nadu under NHDP Phase IV on EPC Basis |
NHAI/AE/VS/11012/01/2017 |
12/01/2017 |
12/01/2017 |
17/02/2017
Time
11:0Hrs
|
|
343 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF HIGH LEVEL THAPRA BRIDGE ON CHORDI CHORAHA-KUBA-ANANDPURI ROAD (MDR-83) IN KM 22 OF BANSWARA DISTRICT ON EPC MODE IN STATE OF RAJASTHAN |
NIT 10/2016-17 |
12/01/2017 |
12/01/2017 |
14/02/2017
Time
0:0Hrs
|
|
344 |
Supervision Consultancy Services for construction supervision of Balance work of 4laning from Km94000 to Km123000 Contract Package NoNS60MHBal2 and Km153000 to Km175000 Contract Package NoNS62MHBal2 on Nagpur-Hyderabad Section of NH7 in the State of Maharashtra Consultancy Package NoNS6062SC |
NHAI/RO-NAG&CG/TENDERS/2016-17/09 |
10/01/2017 |
11/01/2017 |
19/01/2017
Time
0:0Hrs
|
|
345 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration : Ramgarh-Sonhat-Baikunthpur (65.00 Km.) and Harchoka-Bharatpur (20.00 Km.) |
NH/CE/PWD/03&04/29535 |
09/01/2017 |
10/01/2017 |
18/02/2017
Time
17:0Hrs
|
|
346 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration : Dhamdha-Gandai-Saletekari Road |
NH/CE/PWD/04/29536 |
09/01/2017 |
10/01/2017 |
18/02/2017
Time
17:0Hrs
|
|
347 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration :Kanker-Bhanupratappur-Manpur (excluding Sambalpur - Silpat Km. 21.00) (65.00 Km.) and Kachche-Narayanpur (90.00 Km.) |
NH/CE/PWD/06&10/29537 |
09/01/2017 |
10/01/2017 |
18/02/2017
Time
17:0Hrs
|
|
348 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration : Kondagaon-Narayanpur (48.70 Km.) and Geedam-Dantewada (12.00 Km.) |
NH/CE/PWD/16&17/29538 |
09/01/2017 |
10/01/2017 |
18/02/2017
Time
17:0Hrs
|
|
349 |
Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Namchi-Ravangla-Tashiding-Yusksum-Geyzing road section (length-122Km) in the State of Sikkim (ii) 2 laning with paved shoulder of Geyzing-Dentam-Uttarey-Chiwabhanjang road section (length-55 Km) in the State of Sikkim (iii) 2 laning with paved shoulder of Ravong-Phamtum-Dzongu-Upper Dzongu-Chungthang road section |
NHIDCL/DPR/New NH/Sikkim/2017 |
10/01/2017 |
10/01/2017 |
09/02/2017
Time
15:0Hrs
|
-
|
350 |
Consultancy services for Authority’s Engineer for supervision of Civil Construction work for Rehablitation & upgradation of NH 340 from km 0/0 to km 60/380 (Design Ch. 0/0 to 60/025 excluding Km 55.600 to 57.650(2.050 Km))(Rayachoty to Angallu section) to two lane with paved shoulders in the state of Andhra Pradesh on EPC mode under NH(O) Plan 2016-17 |
Nit no 55/SE/NH/ATP/2016-17 |
28/12/2016 |
10/01/2017 |
27/02/2017
Time
17:0Hrs
|
|
351 |
Consultancy Services for carrying out Feasibility Study/ Detailed Engineering for Rehabilitation of existing bridges on National Highways on NH 72 |
NahanFS/DE |
10/01/2017 |
10/01/2017 |
16/01/2017
Time
0:0Hrs
|
|
352 |
Consultancy Services as Independent Engineer Services during Operation & Maintenance Period for 4-lane divided carriageway of Orai-Bhognipur Section (Km. 220.00 to Km. 255.00) on NH-25 and Bhognipur-Barah Section (Km. 421.20 to Km. 449.00) on NH-2 on BOT (Annuity) Basis in the State of Uttar Pradesh. (New Chainage Km. 1515.713 to Km. 1578.513 of NH-27) |
01/NHAI/RO-LKO(East)/11012/NH-25/Tender/2016 |
08/12/2016 |
08/01/2017 |
30/01/2017
Time
0:0Hrs
|
|
353 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lanes with paved shoulders from Kollegala-Hanur-MM hills-Palar Road-Tamilnadu border extended upto Mettur in the state of Tamil Nadu for an approximate length 91.00km |
16/2016-17 |
28/12/2016 |
03/01/2017 |
20/02/2017
Time
16:30Hrs
|
|
354 |
onsultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lanes with paved shoulders from Channarayapattana- Holenarasipur-Arkalgud-Kodlipet-Madikeri in the state of Karnataka for an approximate length 138.00km |
16/2016-17 |
28/12/2016 |
03/01/2017 |
03/02/2017
Time
0:0Hrs
|
|
355 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lanes with paved shoulders from Gundlupet(NH 212) to Chamaraj Nagar(NH 150A) in the state of Karnataka for an approximate length 35.00km |
16/2016-17 |
28/12/2016 |
03/01/2017 |
20/02/2017
Time
16:30Hrs
|
|
356 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lanes with paved shoulders from Madikeri-Virajpet-Makutta(in Karnataka) and connecting kannur(in Kerala) for an approximate length 45.00km |
16/2016-17 |
28/12/2016 |
03/01/2017 |
03/02/2017
Time
0:0Hrs
|
|
357 |
Consultancy services of Authority’s Engineer for supervision of Widening & strengthening of two lane to two lane with paved shoulder from Km.58/00 to 116/100 km of NH- 153(B) on EPC mode in the State of Odisha. |
40 CENH of 2016-17 |
26/12/2016 |
03/01/2017 |
25/02/2017
Time
17:0Hrs
|
|
358 |
Consultancy services of Authority’s Engineer for supervision of Widening the existing lane to 2 lane with paved shoulder from Km.239/900 to 294/300 km (Nayagarh to Khurda) excluding Khurda bypass of NH-57 on EPC mode in the state of Odisha. |
41 CENH of 2016-17 |
26/12/2016 |
03/01/2017 |
25/02/2017
Time
17:0Hrs
|
|
359 |
Consultancy services of Authority’s Engineer for supervision of Widening to two lane with paved shoulder from Km.0/00 to 41/055 km of NH- 63 (Chandili – Borigumma section) on EPC mode in the State of Odisha. |
42 CENH of 2016-17 |
26/12/2016 |
03/01/2017 |
25/02/2017
Time
17:0Hrs
|
|
360 |
Independent Engineer services for Operation and Maintenance of Jhansi – Ori Section Stretch of NH-25 (New NH-27) from km 90.30 to km. 225.713 (Total Length 135.413) in the State Uttar Pradesh (OMT Pkg-12) on OMT basis. |
NHAI/CM/OMT-IE/RFP/P-12/2016 |
01/02/2017 |
03/01/2017 |
07/02/2017
Time
0:0Hrs
|
|
361 |
Independent Engineer services for Operation and Maintenance of Jhansi – Ori Section Stretch of NH-25 (New NH-27) from km 90.30 to km. 225.713 (Total Length 135.413) in the State Uttar Pradesh (OMT Pkg-12) on OMT basis. |
NHAI/CM/OMT-IE/RFP/P-12/2016 |
01/02/2017 |
03/01/2017 |
07/02/2017
Time
11:0Hrs
|
|
362 |
Independent Engineer services for Operation and Maintenance of Jhansi – Ori Section Stretch of NH-25 (New NH-27) from km 90.30 to km. 225.713 (Total Length 135.413) in the State Uttar Pradesh (OMT Pkg-12) on OMT basis. |
NHAI/CM/OMT-IE/RFP/P-12/2016 |
01/02/2017 |
03/01/2017 |
07/02/2017
Time
0:0Hrs
|
|
363 |
Independent Engineer services for Operation and Maintenance of Jhansi – Ori Section Stretch of NH-25 (New NH-27) from km 90.30 to km. 225.713 (Total Length 135.413) in the State Uttar Pradesh (OMT Pkg-12) on OMT basis. |
NHAI/CM/OMT-IE/RFP/P-12/2016 |
01/02/2017 |
03/01/2017 |
07/02/2017
Time
0:0Hrs
|
|
364 |
Independent Engineer services for Operation and Maintenance of Jhansi – Ori Section Stretch of NH-25 (New NH-27) from km 90.30 to km. 225.713 (Total Length 135.413) in the State Uttar Pradesh (OMT Pkg-12) on OMT basis. |
NHAI/CM/OMT-IE/RFP/P-12/2016 |
01/02/2017 |
03/01/2017 |
07/02/2017
Time
0:0Hrs
|
|
365 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/1) |
HP/SHIMLA/1 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
366 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/2) |
HP/SHIMLA/2 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
367 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/3) |
HP/SHIMLA/3 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
368 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/4) |
HP/SHIMLA/4 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
369 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/5) |
HP/SHIMLA/5 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
370 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/6) |
HP/SHIMLA/6 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
371 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/7) |
HP/SHIMLA/7 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
372 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/8) |
HP/SHIMLA/8 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
373 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/9) |
HP/SHIMLA/9 |
30/12/2016 |
31/12/2016 |
09/02/2017
Time
15:0Hrs
|
|
374 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Adhoni to Siruguppa via Raravi in Bellary District in the State of Karnataka |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1420 |
21/12/2016 |
30/12/2016 |
03/02/2017
Time
0:0Hrs
|
|
375 |
Consultancy services for feasibility study, Planning and Preparation of Detailed Project for reducing traffic congestion on NH-5 from Junction 38 (RD No. 4.03) (Rotary near The Tribune) to UT Boundary (RD No. 8.30) by providing signal free corridor which may include elevated highway, construction of grade separated intersection at (Junction 38) and other appropriate remedial measures for smooth flow of traffic along NH-5 |
CP1/2016/RFP-1 |
30/12/2016 |
30/12/2016 |
30/01/2017
Time
0:0Hrs
|
|
376 |
Engaging Authority Engineer for the work of construction of ROB including approaches in lieu of Railway Crossing No: C-57 at Km.76.340 on NH-754 at Jalalabad in the State of Punjab on EPC mode |
60/EE/CWD/FZR |
27/12/2016 |
29/12/2016 |
18/01/2017
Time
0:0Hrs
|
-
|
377 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Up gradation of State road to National Highway by adopting LiDAR or equivalent technology, for the road “Dandeli-Haliyal-Dharwad-Savadatti-Mudhol-Jamakhandi-Vijayapura” in the State of Karnataka on EPC mode. |
NIT No.ENH/NHD/HBL/PB/2016-17/2366/01 |
09/12/2016 |
28/12/2016 |
02/02/2017
Time
15:0Hrs
|
|
378 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Up gradation of State road to National Highway by adopting LiDAR or equivalent technology, for the road “Nargund-Gadag-Mundaragi-Itagi-Jagalur” in the State of Karnataka on EPC mode. |
NIT No.ENH/NHD/HBL/PB/2016-17/2366/02 Dated: 09.12.2016 |
09/12/2016 |
28/12/2016 |
02/02/2017
Time
15:0Hrs
|
|
379 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Up gradation of State road to National Highway by adopting LiDAR or equivalent technology, for the road “Gangavathi-Tavaragera-Mudgal” in the State of Karnataka on EPC mode |
NIT No.ENH/NHD/HBL/PB/2016-17/2366/03 Dated: 09.12.2016 |
09/12/2016 |
28/12/2016 |
02/02/2017
Time
15:0Hrs
|
|
380 |
CONSULTANCY SERVICES FOR SUPERVISION OF SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE CONTRACT OF CHAKERI (KANPUR) TO KOKHRAJ (ALLHABAD) SECTION FROM KM. 483.687 TO KM. 628.753 OF NH-2 (NEW -19) IN THE STATE OF UTTAR PRADESH |
03/NHAI/RO-LKO(East)/18018/NH-2/Tender/2016 |
27/12/2016 |
27/12/2016 |
30/01/2017
Time
0:0Hrs
|
|
381 |
Independent Engineer Services for Operation & Maintenance Stage of 6-laning of Indore-Dewas Section of NH-3 from Km 577.550 to 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State Madhya Pradesh under NHDP Phase-V to be executed as BOT (toll) project on DBFOT pattern. |
NHAI/RO-MP/NIT/2016 |
22/12/2016 |
23/12/2016 |
24/01/2017
Time
0:0Hrs
|
|
382 |
Consultancy Services for Preparation of DPR for Review of Capacity of Nagpur to Bhandara Road NH53 Old NH6 in the State of Maharashtra |
NHAI/RO-NAG/TENDERS/2016-17/07 |
23/12/2016 |
23/12/2016 |
24/01/2017
Time
0:0Hrs
|
|
383 |
Consultancy Services for detail Road Safety Audit of existing road from ch. 294.280km (Navrangpur) to ch. 434.787 km( Sunki ghat) of NH-26 in the state of Odisha |
36 CE-NH-16-17 |
14/12/2016 |
22/12/2016 |
23/01/2017
Time
17:0Hrs
|
|
384 |
Consultancy Services for detail Road Safety Audit of existing road from ch. 413.700km (Malkanagiri) to ch. 513.700 km(Motu) of NH-326 in the state of Odisha |
37 CE-NH-16-17 |
14/12/2016 |
22/12/2016 |
23/01/2017
Time
17:0Hrs
|
|
385 |
Consultancy Services for detail Road Safety Audit of existing roads (i) from ch. 12.370km ( Bhalumunda) to ch. 68.260 km( Belgaon) of NH-59 , (ii) from ch. 0.00km (Champua) to ch. 14.000 km( Remuli) of NH-20 and (iii) from ch. 119.000km (Bhanjanagar) to ch. 159.000 km(Aska) of NH-157. in the state of Odisha |
38 CE-NH-16-17 |
14/12/2016 |
22/12/2016 |
23/01/2017
Time
17:0Hrs
|
|
386 |
Consultancy Services for Project Report (PR) of construction/ reconstruction of new Bridges in replacement of weak and narrow Bridges on National Highways ( Mahadev I, II , III, IV and Chikani Bridge NO. IV |
NHConsultancyforbridges |
22/12/2016 |
22/12/2016 |
16/01/2017
Time
15:0Hrs
|
|
387 |
Consultancy services for Authority’s Engineer for supervision of the works of 1) Construction of ROB and its approaches in lieu of level crossing No. KA-61 at km 194.850 on NH 60 in the state of West Bengal, 2) Construction of ROB and its approaches in lieu of existing Level Crossing L. C. No. DVC/17/SPL at Km 258.600 of NH 60 in the state of West Bengal & 3) Construction of Proposed Bridge over river Shali at Ch. 247+000 on NH 60 in the District of Bankura in the state of West Bengal |
15/2016-17 of SE, NHC - II |
21/12/2016 |
22/12/2016 |
25/01/2017
Time
17:0Hrs
|
|
388 |
Consultancy Services for Authority’s Engineer for supervision of the works of 1) Construction of 4-lane ROB & its approaches in replacement of existing RUB (Rly.Km. 31/22-24) between Bhedia & Bolpur in Bhedia at Km 41.760 of NH-2B in the State of West Bengal. 2) Construction of 4-Lane ROB (Twins 2-lanes) & its approaches in replacement of level crossing at Km 3.950 on NH-2B (Railway Km 226/0) at Talit in the State of West Bengal |
16/2016-17 of SE, NHC - II |
21/12/2016 |
22/12/2016 |
25/01/2017
Time
0:0Hrs
|
|
389 |
Consultancy Services for Authority’s Engineer for supervision of the works of 1) Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T at km 307.050 of NH-60 in the state of West Bengal, 2) Construction of ROB and its approaches in lieu of Level Crossing No. 21/SPL/E at km 338.600 of NH-60 in the state of West Bengal. |
17/2016-17 of SE, NHC - II |
21/12/2016 |
22/12/2016 |
25/01/2017
Time
0:0Hrs
|
|
390 |
Consultancy Services for preparation of FS and DPR for Improvement to 2L with PS of 1 Stretch from Bhagalpur at NH 33 Dhaka mor on NH-333A 2 Stretch from Katoria Bihar at NH 333A Chandan Deoghar Jharkhand at NH33 Bihar 30 km 3 Stretch from Lakhisarai on NH33 Jamui on NH 33 4 Stretch from Dhaka mor in Bihar Hansdiha in Jharkhand Bihar 26 km 5 Stretch of Sarwan Chakai from Jamui Khagagdiha Chator Sarwan Chakai Road in Bihar 18 6 Junction of NH 20 near Fatehpur Kakolat falls in Bihar on EPC Mode |
DPR/BIHAR/NHD-MOD-PAT/03 |
07/01/2017 |
21/12/2016 |
17/01/2017
Time
15:0Hrs
|
|
391 |
(1) Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of Stretch from Chatarpur NH98 Japla Dangwa Navinagar Barun NH2 Length in JH 38 km in Bihar 34 km (2) Daltonganj On NH39 new Sagalim Tarhasi Manatu Chak Raniganj Imamganj Sherghati On NH2 in Bihar Length in Jharkhand 72 km Bihar 58 km (3) Stretch of Gaya Panchanpur Daudnagar Nasariganj Bikramganj Dawath Maliyabagh Nawanagar Dumrawn of NH12 |
DPR/BIHAR/NHD-MOD-PAT/04 |
07/01/2017 |
21/12/2016 |
17/01/2017
Time
15:0Hrs
|
|
392 |
Independent Engineer (IE) Services for Operation & Maintenance stage under BOT mode of Existing Four Lane Jetpur Gondal Rajkot section from 117.600 to 185.000 on NH-8B in the state of Gujarat |
NHAI Rajk Jetpur-Gondal-Rajko |
20/12/2016 |
21/12/2016 |
11/01/2017
Time
0:0Hrs
|
|
393 |
appointment of technical consultant for preparation of feasibility study (FS) and detailed project report (DPR) for Phagwara-Hoshiarpur NH-344 B in the State of Punjab. |
17 |
19/12/2016 |
21/12/2016 |
04/01/2017
Time
17:0Hrs
|
|
394 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of 1 Saraigarh On NH 327A Lalganj Ganpatganj upto NH 106 2 Stretch from Janarh NH 77 Muzaffarpur Dubbapur Dekhuli Dham on NH 227 3 Stretch from Hajipur on NH 22 Mahua Kumar Bajidpur Tajpur on NH 122 4 Rosera Beheri Bahera Dhansian Jaideopatti Joining the approved in Principle NH connecting Uchhait Bhagawati Sthaan Basopatti Benipatti Rahika Madhuba |
DPR/BIHAR/NHD-MOD-PAT/01 |
07/01/2017 |
21/12/2016 |
17/01/2017
Time
15:0Hrs
|
|
395 |
Consultancy Services for Two Lane with Paved shoulder of 1 Stretch from Gopalganj on NH-27 Areraj Sugauli on NH 727 2 Stretch from Bettiah on NH 727 Chanpatia Narkatiaganj Amolwa Bhitiharwa Ashram Prakhand Gawnaha Indo Nepal Border 3 Stretch from Shautarwa on NH 727 Dhanha Tamkuha Bazar Bansi Padrauna on NH 727 4 Areraj Motihari in Bihar on EPC Mode DPR BIHAR NHD MOD PAT 02 |
DPR/BIHAR/NHD-MOD-PAT/02 |
07/01/2017 |
21/12/2016 |
17/01/2017
Time
15:0Hrs
|
|
396 |
Consultancy services for preparation of Detailed Project Report of selected Stretch - Kallakkurichi - Tiruvannamalai road in the State of Tamilnadu for up-gradation to two lanes with paved shoulder or four lane configuration |
TN No.6/HDO/NH/2016-17/ dt: 20.12.2016 |
20/12/2016 |
20/12/2016 |
06/01/2017
Time
15:0Hrs
|
|
397 |
Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 34.00 to Km. 70.900 (Chittapur cross to Start of Yadgir Bypass) of NH-150 in the state of Karnataka on EPC Mode (Package -I). |
EE/NHD/KLB/NH-150/Job-828/AE/NIT/2016-17/1010 |
19/12/2016 |
19/12/2016 |
27/12/2016
Time
12:0Hrs
|
|
398 |
Consultancy services for Authority’s engineer for supervision of Construction of High Level Thapra Bridge on Chordi Choraha-Kuba-Ananduri Road (MDR-83) in Km. 22 of Banswara District in the state of Rajasthan Under ISC on EPC Mode. |
08/2016-17/1257 |
17/12/2016 |
17/12/2016 |
30/12/2016
Time
0:0Hrs
|
|
399 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Shringeri – Agalagundi – Jayapur – Balehonnur – Hyrambi – Aldur - Nadipur & Karkala – Moodabidri – Bc Road (Including Overlapping Stretch Of 19 Kms Of Existing NH-169 for a total length of 26.00 Kms in the State Of Karnataka. |
EE/NHD/MNG/AE2/Consultancy/NIT 17/2nd Call/2016-17 |
17/12/2016 |
17/12/2016 |
06/02/2017
Time
16:30Hrs
|
|
400 |
Consultancy for preparation of detailed project report for the selected stretches or corridors of VadgaonKatrajKondwaMantarwadi Chowk-Loni-Kalbhor-Theur Phata |
04 |
14/12/2016 |
16/12/2016 |
11/01/2017
Time
17:0Hrs
|
|
401 |
Consultancy services for Project Report (PR) of construction/reconstruction of new bridges in replacement of weak and narrow bridges on NH |
13776-876dated 03-12-2016 |
03/12/2016 |
15/12/2016 |
17/01/2017
Time
0:0Hrs
|
|
402 |
Four laning of Chikhali – Tarsod (Package-IIA) section of NH-6 from km. 360.000 to km. 422.700 in the State of Maharashtra to be executed on Hybrid Annuity pattern under NHDP Phase IV |
NHAI/ Tech /01/IE/Chikhli -Tarsod /2016 |
13/12/2016 |
13/12/2016 |
30/01/2017
Time
11:0Hrs
|
|
403 |
Independent Engineer services for Four laning of Tarsod – Fagne (Package-IIB) section of NH-6 from km. 422.700 to km. 510.000 in the State of Maharashtra to be executed on Hybrid Annuity pattern under NHDP Phase IV |
NHAI/ Tech /01/IE/Tarsod - Fagne /2016 |
13/12/2016 |
13/12/2016 |
30/01/2017
Time
11:0Hrs
|
|
404 |
Consultancy Services to Carry out the Feasibility Study and Preparation of Detailed Project Report for Value addition works on Four lane Lakhanpur-Vijaypur section from Km 16.35 to Km 80.00 of NH-44 (old NH 1A) in the State of Jammu and Kashmir |
NHAI/J&K/DPR/2016 |
13/12/2016 |
13/12/2016 |
15/02/2017
Time
11:0Hrs
|
|
405 |
Consultancy services for carrying out feasibility study and preparation of detailed project for construction of Bye pass from Chaura (Km 310/200) to Bhaba Nagar (327/0)on NH-22 (New NH-05) in the state of Himachal Pradesh |
NH-22 |
05/12/2016 |
12/12/2016 |
04/01/2017
Time
17:0Hrs
|
|
406 |
Consultancy Services for FS cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lane with Paved Shoulders1)Afzalpur-Almel-Indi 2)Hungund-Aihole-Pattadakal-Badami-Ramdurg3)Gurlapur-Mudhol-Bilagi cross on NH52 4) Lingasugur-Devarhipparagi-Tamba –5) Indi-Zalki-Chadachan-Shiradon 6) Jath (Maharashtra) –Athani-near Gokak in the State of Karnataka. |
ENH/VJP/PB/AE.2/TND/2016-17/116 Dated:- 05-12-2016 |
09/12/2016 |
09/12/2016 |
06/02/2017
Time
16:0Hrs
|
|
407 |
Consultancy Services for Independent Engineer services for Two/Four Laning of BRT Tiger Reserve Boundary to Bangalore Section of NH-209 (Existing Chainage from 287.520 to 461.550) in the State of Karnataka to be executed on BOT (Hybrid Annuity) basis under NHDP Phase- IV |
NHAI/TN-KNT Bdr-Bng/NH-209/P-IV/IE/2016 09 Dec, 2016 |
09/12/2016 |
09/12/2016 |
10/02/2017
Time
11:0Hrs
|
|
408 |
Consultancy Services for Feasibility Study, cum DPR, Survey and Preparation of Land plan for Upgradation of State Highway to National Highway by Adopting LiDAR or similar technology for widening to Two lane with paved Shoulders from Karwar - Kaiga - Mundgod – Savanur – Gadag - Gajendragad, for an approximate length of 318.00 Kms (including Bypass or Flyover Wherever necessary in Town/City limits) in the State of Karnataka. |
No.:EE/NHDK/AE/ TND/FS/DPR /2016-17/792 Dated: 09-12-2016 |
09/12/2016 |
09/12/2016 |
09/01/2017
Time
16:0Hrs
|
|
409 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Channarayapattana -Holenarssipur- Arkalgud-Kodlipet-Madikeri & Madikeri_Virajpet -Makutta ( in Karnataka) and connecting Kannur ( In Kerala) (Karnataka=45Kms, Kerala=55Km) in the State Of Karnataka. |
EE/NHD/MNG/AE3/Consultancy/NIT 19 /2016-17 |
09/12/2016 |
09/12/2016 |
06/02/2017
Time
16:30Hrs
|
|
410 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Kundapur-Koteswar-Halady-Someshwara (On NH-169A) in the State of Karnataka |
EE/NHD/MNG/AE3/Consultancy/NIT 20/2016-17 |
09/12/2016 |
09/12/2016 |
06/02/2017
Time
16:30Hrs
|
|
411 |
Consultancy Services For Feasibility Study, Detailed Project Report, Survey And Preparation Of Land Plan For Widening To Two Lane With Paved Shoulders For Manipal to Karkala, Manipal to Hiriyadka ,Ramasmudra to Punjalkatte, Ramasumudra to Bajegoli , Guruvayankere to Punjalkatte , Beltangadi-Shiradi Via Dharmasthala, from Beltangadi to uijre on NH-73 and 17 Kms from periyashanthi Bus stop to Gundya on NH-75 for a total length of 34 Kmsand from Gundya to Subramanya |
EE/NHD/MNG/JE/Consultancy/NIT 21/2016-17 |
09/12/2016 |
09/12/2016 |
06/02/2017
Time
16:30Hrs
|
|
412 |
Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka. |
NHD/MNG/JE/Road Safety Audit/NIT-12/2nd Call/2016-17 |
09/12/2016 |
09/12/2016 |
06/02/2017
Time
16:30Hrs
|
|
413 |
Consultancy Services as Independent Engineer (IE) services during Operation and Maintenance Period for six laning Project of Etawah (Km 323.475) to Chakeri (Km 483.687) Section of NH-2 (New NH-19) on DBFOT basis under NHDP Phase-V in the State of Uttar Pradesh. |
02/NHAI/RO-LKO(East)/17017/NH-2/Tender/2016 |
08/12/2016 |
08/12/2016 |
30/01/2017
Time
17:0Hrs
|
|
414 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme.NHAI/PC/SM/06 |
NHAI/PC/Sagarmala/2016 dated 07.12.2016 |
07/12/2016 |
07/12/2016 |
23/01/2017
Time
11:0Hrs
|
|
415 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme - NHAI/PC/SM/05 |
NHAI/PC?sagarmala/2016 dated 07.12.2016 |
07/12/2016 |
07/12/2016 |
23/01/2017
Time
11:0Hrs
|
|
416 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/37) |
229-SESHA-2016 |
18/11/2016 |
07/12/2016 |
28/12/2016
Time
15:0Hrs
|
|
417 |
Consultancy Services for Feasibility Study cum Detailed Project Report for Upgradation of Roads to National Highways |
ENH/KLB/PB/AE/TND/2016-17/967 |
06/12/2016 |
06/12/2016 |
09/01/2017
Time
16:0Hrs
|
|
418 |
Consultancy Services for preparation of Detailed Project of Selected Stretches /Corridors of Road Networks in the state of Maharashtra for up-gradations to Two Lanes with paved shoulder/four lane confirmation Miraj Sangali Peth naka on NH.4 road |
15 |
28/11/2016 |
06/12/2016 |
23/12/2016
Time
17:30Hrs
|
|
419 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Torangal to Kudligi via Sandur in Bellary District in the State of Karnataka |
EE/NHD/CTA/AE1/NEW-NH/CS/NIT/2016-17/1310 |
06/12/2016 |
06/12/2016 |
20/01/2017
Time
0:0Hrs
|
|
420 |
CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF KHUTAR-LAKHIMPUR SECTION (KM 82.000 TO KM 140.000) OF NH-730 TO TWO LANE WITH PAVED SHOULDER UNDER EPC MODE IN STATE OF UTTAR PRADESH. |
. 4102/605 yata-NH circle/16 |
02/12/2016 |
05/12/2016 |
05/01/2017
Time
0:0Hrs
|
|
421 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Pimla-Junction Diphu on NH-329 Sub-Jail junction on NH-36 to NH-129A via Thahekhu and Chumukedima to Dimapur Bypass |
CE/NH/etender/2016-17/09/02 |
01/12/2016 |
05/12/2016 |
24/02/2017
Time
17:0Hrs
|
|
422 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Nagaland Gate (NH-702D) |
CE/NH/etender/2016-17/09/01 |
01/12/2016 |
05/12/2016 |
24/02/2017
Time
17:0Hrs
|
|
423 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders from NH-29 to NH-29 (New NH Nos) Dimapur Bypass |
CE/NH/etender/2016-17/09/03 |
01/12/2016 |
05/12/2016 |
24/02/2017
Time
17:0Hrs
|
|
424 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Gandhi Ashram Chuchuyimlang (NH-2) to Pangsha (International Trade Centre) |
CE/NH/etender/2016-17/09/04 |
02/12/2016 |
05/12/2016 |
24/02/2017
Time
17:0Hrs
|
|
425 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Maibung in Tening in Nagaland to Tamenlong via Tamei in Manipur |
CE/NH/etender/2016-17/09/05 |
02/12/2016 |
05/12/2016 |
24/02/2017
Time
17:0Hrs
|
|
426 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Athibung-Khelma (Phase-B of SARDP-NE) |
CE/NH/etender/2016-17/09/06 |
02/12/2016 |
05/12/2016 |
24/02/2017
Time
17:0Hrs
|
|
427 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Khalikote-Kodala-Budhamba-Boirani-Koinphulia-Aska Road in the State of Odisha. (NH declaration Approved “In Principle”) |
35 CE-NH-16-17 |
30/11/2016 |
05/12/2016 |
26/12/2016
Time
17:0Hrs
|
|
428 |
Preparation of Detailed Project Report for construction of flyover at Km. 619/2-620/2 of NH 47 (Thuckalay) |
TN.No. 11/2016-17/ DO |
03/12/2016 |
04/12/2016 |
04/01/2017
Time
15:0Hrs
|
|
429 |
Preparation of Detailed Project Report for providing pedestrian subway at Km 633/10 of NH 47 (Collector office) and providing pedestrian subway at Km 628/10 of NH47 (Sunkan Kadai) |
TN.No. 11/2016-17/ DO/ dated 03.12.2016 |
03/12/2016 |
04/12/2016 |
04/01/2017
Time
15:0Hrs
|
|
430 |
Consultancy Services for Authority Engineer for supervision of Construction of ROB and its approaches in lieu of existing Level Crossing No:C-57 at Km.76.340 on NH-754 at Jalalabad in the State of Punjab |
58/EE/CWD/FZR |
01/12/2016 |
02/12/2016 |
22/12/2016
Time
16:0Hrs
|
|
431 |
Rehabilitation and up-gradation of (i)Machilipatnam to Avanigadda section from Km 84/550 to Km 124/200 of NH-214A (New NH-216) to two lane with paved shoulder (ii) Repalle to Eeppurpalem section from Km 129/927 to Km 195/000 of NH-214A (New NH-216) to two lanes with paved shoulder in the state of Andhra Pradesh under NHDP –IV on EPC basis |
RO/VJA/JB/NHDP/2016-17/10 |
02/12/2016 |
02/12/2016 |
01/02/2017
Time
17:0Hrs
|
|
432 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan for Widening to two lane with Paved Shoulders Vijayapura-Yatnal (Karnataka) – Guddapur-Jath-Junction of NH-166 Near Nagaj (Vijayapura-Yatnal) about 30.00 kms & Providing by pass to Vijayapura City from NH-13 (Old) Solapur-Vijayapura Section Connecting this road about 17.00 Kms for an approximate length 47.00 km in the State of Karnataka. |
ENH/VJP/PB/AE.2/TND/2016-17/1144 |
01/12/2016 |
01/12/2016 |
19/12/2016
Time
16:0Hrs
|
|
433 |
Consultancy Services for Authority’s Engineer for Supervision of Work of Development of Four-Lane Islampur Bypass of 10.31 km length from Km.0.00 (Ex.Ch. 498.500) to Km. 10.310 (Ex. Ch. 506.950) of NH-31 in the State of West Bengal under NHDP Phase II on Engineering, Procurement and Construction (EPC) Mode. |
NHAI/11015/WB-7/8/2015/AE/105 (C |
30/11/2016 |
30/11/2016 |
12/01/2017
Time
11:0Hrs
|
|
434 |
2 laning with paved shoulder of Churachandpur -Tuivai road section (length-162Km) on NH-102B in the State of Manipur. |
NHIDCL/DPR/Manipur/C-T/2016 |
30/11/2016 |
30/11/2016 |
13/01/2017
Time
17:0Hrs
|
|
435 |
2 laning with paved shoulder of Imphal-Jiribam section of NH-37 (NH-53) (length-220 Km) in the State of Manipur. |
NHIDCL/DPR/Manipur/I-J/2016 |
30/11/2016 |
30/11/2016 |
13/01/2017
Time
17:0Hrs
|
|
436 |
2 laning with paved shoulder from Tamenglong in Manipur to Peren in Nagaland via Longdi Pabram (length-100Km). |
NHIDCL/ Manipur/ DPR/Tamenglong-Peren/2016 |
30/11/2016 |
30/11/2016 |
13/01/2017
Time
17:0Hrs
|
|
437 |
Authority’s Engineer for Supervision of Work of Construction of balance work of Dhalkola Bypass (Length 5.5 km) including ROB on NH-34 (on EPC mode) in the State of West Bengal on EPC Mode |
NHAI/ NH-34/ Bal. Work./Dkhl Bypass/2016/AE |
30/11/2016 |
30/11/2016 |
11/01/2017
Time
11:0Hrs
|
|
438 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF 4-laning of Raipur – Kodebad section of NH-43 in the State of Chhattisgarh under NHDP Phase IV on Engineering Procurement and Construction (EPC) mode |
NHAI/11012/Rai-Kod/NH-43/AE/2016/ 29.11.2016 |
29/11/2016 |
29/11/2016 |
29/12/2016
Time
11:0Hrs
|
|
439 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF 4-laning of Kodebad – Dhamtari section of NH-43 in the State of Chhattisgarh under NHDP Phase IV on Engineering Procurement and Construction (EPC) mode |
NHAI/11012/Kod-Dham/NH-43/AE/2016/ 29.11.2016 |
29/11/2016 |
29/11/2016 |
29/12/2016
Time
11:0Hrs
|
|
440 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Sirsi Haveri Kudligi and terminating at its junction with NH 150A near Molkalmur |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1167 |
18/11/2016 |
22/11/2016 |
16/01/2017
Time
11:0Hrs
|
|
441 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH 48 near Davanagere and terminating at its junction with NH 369 near Chennagiri. |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1167 |
18/11/2016 |
22/11/2016 |
16/01/2017
Time
11:0Hrs
|
|
442 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity Backward/Religious/Tourist places and Boarder areas under Bharatmala Scheme(packages-NHAI/B1 )-2nd Call |
NHAI/BRT/Proc/DPR/2016 dated 22.11.2016 |
22/11/2016 |
22/11/2016 |
28/12/2016
Time
0:0Hrs
|
|
443 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity Backward/Religious/Tourist places and Boarder areas under Bharatmala Scheme(packages-NHAI/R/21)-2nd Call |
NHAI/BRT/Proc/DPR/2016 dated 22.11.2016 |
22/11/2016 |
22/11/2016 |
28/12/2016
Time
0:0Hrs
|
|
444 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from NH 4 Shimoga Honnahalli Malebennur Harihara NH 206 |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1167 |
18/11/2016 |
22/11/2016 |
17/12/2016
Time
11:0Hrs
|
|
445 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Mariyammanahalli Itagi Harapanahalli Harihar Junction with NH 4 |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1167 |
18/11/2016 |
22/11/2016 |
16/01/2017
Time
11:0Hrs
|
|
446 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Ginigera Gangavathi Manvi Sindhnur Kalmali Raichur. |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1167 |
18/11/2016 |
22/11/2016 |
16/01/2017
Time
11:0Hrs
|
|
447 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Shimoga to NH 4 via Shikarpur Hangal Tadasa |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1167 |
18/11/2016 |
22/11/2016 |
16/01/2017
Time
11:0Hrs
|
|
448 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from junction with NH 206 at Sagara Huvinahalli Holebaglu Kalasvalli Sighandoor Markutka Junction with NH 766C |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1167 |
18/11/2016 |
22/11/2016 |
16/01/2017
Time
11:0Hrs
|
|
449 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from NH 4 Shimoga Honnahalli Malebennur Harihara NH 206 |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1167 |
18/11/2016 |
22/11/2016 |
16/01/2017
Time
11:0Hrs
|
|
450 |
Consultancy services for Authority’s Engineer for supervision of project of providing long term improvement to 7 (seven) identified black spots at isolated locations on four lane Jetpur – Gondal – Rajkot section between km. 117.000 to km. 185.000 on NH-8B (now NH-27) in the State of Gujarat on EPC mode. |
NHAI/Guj/Jet-Gondal/Black Spot/EPC/AE./2016 /91229 |
21/11/2016 |
21/11/2016 |
21/12/2016
Time
0:0Hrs
|
|
451 |
RFP for Authority Engineer for the Construction of 4 lane ROB in lieu of L.C.No.122 at Km.160+800 Chittoor-Kurnool road on NH-18 (New NH-40) near Ootokuru village between CuddapahKrishnapuram Stations in the State of Andhra Pradesh” (EPC) mode) |
SE,R&B,NIT NO: 50/2016-17 |
21/11/2016 |
21/11/2016 |
09/01/2017
Time
17:0Hrs
|
|
452 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR Widening to Two/Four Lane with Paved Shoulders from Km 182.120 to km 227.600 of NH-167 on Haggari-Jadcherla Road on EPC mode under NH(O) in the State of Telangana |
NIT No.SE(R&B)NH/HYD/69/2016-17, Dt.15-11-2016 |
15/11/2016 |
21/11/2016 |
30/12/2016
Time
17:0Hrs
|
|
453 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle and newly declared National Highways in the State of Uttar Pradesh. |
RO/LKO/DPR/I.P.&New NHs/2016-17/Pkg-I |
21/11/2016 |
21/11/2016 |
24/01/2017
Time
15:0Hrs
|
|
454 |
Consultancy Services for feasibility study and preparation of DPR for improvement and up-gradation of newly declared National Highways. |
RO/LKO/DPR/I.P.&New NHs/2016-17/Pkg-II |
21/11/2016 |
21/11/2016 |
24/01/2017
Time
15:0Hrs
|
|
455 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways. |
RO/LKO/DPR/I.P.&New NHs/2016-17/Pkg-III |
21/11/2016 |
21/11/2016 |
24/01/2017
Time
15:0Hrs
|
|
456 |
Consultancy Services for feasibility study and preparation of DPR for improvement and up-gradation of in principle declared National Highways. |
RO/LKO/DPR/I.P.&New NHs/2016-17/Pkg-IV |
21/11/2016 |
21/11/2016 |
24/01/2017
Time
15:0Hrs
|
|
457 |
Consultancy Services for Feasibility Study and Preparation of Detailed Project Report for improvement to 2-lane with Paved Shoulder of inprincipally declared NH stretch from Junction with NH-119 in Bihar to NH-39 - Nagar Untari in Jharkhand via Panduka (in Bihar) – new Major Bridge across Sone River – Srinagar (in Jharkhand)- Dagar – Chaura- Makundpur – Bhawanathpur – Nagar Untari on NH-39 on EPC Mode. |
RW/NH-12014/Bihar/27/2016-S&R(B) |
18/11/2016 |
18/11/2016 |
15/12/2016
Time
15:0Hrs
|
|
458 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UPGRADATION OF FOUR LANING WITH PAVED SHOULDERS OF TALEBANI TO SAMBALPUR SECTION (KM 493.300 TO KM 521.825 AND KM 545.176 TO KM 567.400) OF NH-6 IN THE STATE OF ODISHA UNDER NHDP PHASE-IV ON EPC MODE |
NHAI/NHDP IV/OR/06/2016/AE/2016/450 NHAI/NHDP IV/OR/06/2016/AE/2016/450 |
15/11/2016 |
15/11/2016 |
30/12/2016
Time
0:0Hrs
|
|
459 |
Consultancy services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for construction of Mangalore City Bypass, alignment linking the towns from Mulky-kinnigoli Moorukaveri- Kateel –Bajpe – Kaikamba – Polali Cross – Addur – Tenka Bellur – Kalpane – B.C. Road – Panemangalore – Thokkottu for a length of 91.20 Kms (the “Project”) through BOT and EPC basis. |
NHAI/Mangalore Bypass/2016(3rd Call) |
15/11/2016 |
15/11/2016 |
08/12/2016
Time
0:0Hrs
|
-
|
460 |
Consultancy services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for construction of Mangalore City Bypass, alignment linking the towns from Mulky-kinnigoli Moorukaveri- Kateel –Bajpe – Kaikamba – Polali Cross – Addur – Tenka Bellur – Kalpane – B.C. Road – Panemangalore – Thokkottu for a length of 91.20 Kms (the “Project”) through BOT and EPC basis. |
NHAI/Mangalore Bypass/2016 |
15/11/2016 |
15/11/2016 |
08/12/2016
Time
0:0Hrs
|
-
|
461 |
Consultancy services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for construction of Mangalore City Bypass, alignment linking the towns from Mulky-kinnigoli Moorukaveri- Kateel –Bajpe – Kaikamba – Polali Cross – Addur – Tenka Bellur – Kalpane – B.C. Road – Panemangalore – Thokkottu for a length of 91.20 Kms (the “Project”) through BOT and EPC basis. |
NHAI/Mangalore Bypass/2016 |
15/11/2016 |
15/11/2016 |
08/12/2016
Time
0:0Hrs
|
-
|
462 |
appointment of technical consultant for preparation of feasibility study (FS) and detailed project report (DPR) for Phagwara-Hoshiarpur NH-344 B in the State of Punjab. |
12/2016-17 |
11/11/2016 |
12/11/2016 |
26/11/2016
Time
0:0Hrs
|
|
463 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
NHAI/Planning/EC/2016/DPR/Lot-3/Odissa & Jharkhand/Package-2 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
464 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3) |
NHAI/Planning/EC/2016/DPR/Lot-3/Odissa & Jharkhand/Package-3 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
465 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
NHAI/Planning/EC/2016/DPR/Lot-3/Tamil Nadu & Puduchery/Package-1 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
466 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
NHAI/Planning/EC/2016/DPR/Lot-3/Tamil Nadu & Puduchery/Package-2 |
11/11/2016 |
11/11/2016 |
29/11/2016
Time
11:0Hrs
|
|
467 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
NHAI/Planning/EC/2016/DPR/Lot-3/Chhatisgarh/Package-1 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
468 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
NHAI/Planning/EC/2016/DPR/Lot-3/West Bengal/Package-1 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
469 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
HAI/Planning/EC/2016/DPR/Lot-3/West Bengal/Package-2 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
470 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
NHAI/Planning/EC/2016/DPR/Lot-3/Andhra Pradesh,Karnataka, Goa and Kerala/Package-1 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
471 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISIONOF CIVIL CONSTRUCTION WORK FOR Rehablitation & upgradation of NH 167 from km 14/900 to km 70/000(Design Ch.14/900 to 69/700)(Chintakunta to Adoni section) to two lane with paved shoulders in the state of Andhra Pradesh on Engineering, Procurement & Construction (EPC) mode under NH(O) Plan 2016-17 |
S.E/R&B/NH ATP NIT.No:49/SE/EPC/2016-17, Date:26.10.2016 |
11/11/2016 |
11/11/2016 |
28/12/2016
Time
0:0Hrs
|
|
472 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3) |
NHAI/Planning/EC/2016/DPR/Lot-3/Andhra Pradesh,Karnataka, Goa and Kerala/Package-2 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
473 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3) |
NHAI/Planning/EC/2016/DPR/Lot-3/Andhra Pradesh,Karnataka, Goa and Kerala/Package-3 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
474 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
NHAI/Planning/EC/2016/DPR/LOT-3/Tamil Nadu & Puduchery/Package-2 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
475 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-3). |
NHAI/Planning/EC/2016/DPR/Lot-3/Odissa & Jharkhand/Package-1 |
11/11/2016 |
11/11/2016 |
05/01/2017
Time
11:0Hrs
|
|
476 |
Consultancy Services of Authority Engineer for Widening to 2 lane with paved shoulder from km 0 to 40 of NH 2C Dehri Banjari AKbarpur Road Construction of 05 Nos of H L R C C Major Minor Bridges in N H 110 Km 38 Km Ch 61150 Km 62 Ch 61850 Km 64 Km 71 Construction of ROB and its approach in lieu of existing level crossing at Km 119 on N H 30 Under NHO Annual Plan 2016 17 in Bihar under EPC mode of procurement |
14 NH GAYA 2016 17 |
28/10/2016 |
09/11/2016 |
14/12/2016
Time
15:0Hrs
|
-
|
477 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/30) |
225-SESHA-2016 |
18/10/2016 |
09/11/2016 |
16/12/2016
Time
15:0Hrs
|
|
478 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/31) |
225-SESHA-2016 |
18/10/2016 |
09/11/2016 |
16/12/2016
Time
15:0Hrs
|
|
479 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/32) |
225-SESHA-2016 |
18/10/2016 |
09/11/2016 |
16/12/2016
Time
15:0Hrs
|
|
480 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/33) |
225-SESHA-2016 |
18/10/2016 |
09/11/2016 |
16/12/2016
Time
15:0Hrs
|
|
481 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/34) |
225-SESHA-2016 |
18/10/2016 |
09/11/2016 |
16/12/2016
Time
15:0Hrs
|
|
482 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/35) |
225-SESHA-2016 |
18/10/2016 |
09/11/2016 |
16/12/2016
Time
15:0Hrs
|
|
483 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/36) |
225-SESHA-2016 |
18/10/2016 |
09/11/2016 |
16/12/2016
Time
15:0Hrs
|
|
484 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme.NHAI/PC/SM/01 |
NHAI/PC/Sagarmala/2016 |
04/11/2016 |
04/11/2016 |
08/12/2016
Time
11:0Hrs
|
|
485 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme NHAI/PC/SM/02. |
NHAI/PC/Sagarmala/2016 dated 04.11.2016 |
04/11/2016 |
04/11/2016 |
08/12/2016
Time
11:0Hrs
|
|
486 |
Independent Engineer Services during O&M Period for the project of “Baran- Shivpuri Section (Km. 492.322 to Km. 613.087) of NH-76 in the State of Rajasthan and Madhya Pradesh and Shivpuri-Jhansi Section (Km. 15.000 to Km. 90.300) of NH-25 in the state of Madhya Pradesh and Uttar Pradesh on OMT basis”. (Package no. E-W/OMT/IE (O&M)/NH-25 & 76) (New NH-27)-5th Call. |
23838 |
04/11/2016 |
04/11/2016 |
23/12/2016
Time
15:0Hrs
|
|
487 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routesto improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-2) |
NHAI/Planning/EC/2016/DPR/Lot-2/Gujarat/Package-1 |
04/11/2016 |
04/11/2016 |
20/12/2016
Time
11:0Hrs
|
|
488 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routesto improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-2) |
NHAI/Planning/EC/2016/DPR/LOT-2/Rajasthant/Package-1 |
04/11/2016 |
04/11/2016 |
20/12/2016
Time
11:0Hrs
|
|
489 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routesto improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-2). |
NHAI/Planning/EC/2016/DPR/LOT-2/Punjab/Package-1 |
04/11/2016 |
04/11/2016 |
20/12/2016
Time
11:0Hrs
|
|
490 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routesto improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-2). |
NHAI/Planning/EC/2016/DPR/LOT-2/Punjab/Package-2 |
04/11/2016 |
04/11/2016 |
20/12/2016
Time
11:0Hrs
|
|
491 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routesto improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-2). |
NHAI/Planning/EC/2016/DPR/LOT-2/Punjab/Package-3 |
04/11/2016 |
04/11/2016 |
20/12/2016
Time
11:0Hrs
|
|
492 |
Consultancy Services for Feasibility Study, DPR, survey and Preparation of Land Plan for Up gradation of State Highway to National Highway by Adopting LiDAR or equivalent technology, for the road 1)Tadas-Kalghatagi- Dharwad-Hebsur-Navalgund-Annigeri 2) Koppal-Belgatti-Mundaragi-Bagevadi-Belhatti-Govandi-Gurdur-Shiggaon3)Naragund-Belavanaki-Gajendragad-Kushtagi-Tavargere-Sindhanur4)Sankeshwar connecting Gokak,Yaragatti,Munavalli5)Vengurla-Math-Amboli-Chandgarh-Belgaon |
NIT No.ENH/NHD/HBL/PB-/2016-17/2052/ Dated: 26-10-2016. |
26/10/2016 |
04/11/2016 |
16/01/2017
Time
15:30Hrs
|
|
493 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme. NHAI/PC/SM/03 |
NHAI/PC/Sagarmala/2016 dated 04.11.2016 |
04/11/2016 |
04/11/2016 |
08/12/2016
Time
11:0Hrs
|
|
494 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routesto improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-2). |
NHAI/Planning/EC/2016/DPR/LOT-2/Haryana/Package-1 |
04/11/2016 |
04/11/2016 |
20/12/2016
Time
11:0Hrs
|
|
495 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routesto improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-2). |
NHAI/Planning/EC/2016/DPR/LOT-2/UP/Package-1 |
04/11/2016 |
04/11/2016 |
20/12/2016
Time
11:0Hrs
|
|
496 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme.NHAI/PC/SM/04 |
NHAI/PC/Sagarmala/2016 dated 04.11.2016 |
04/11/2016 |
04/11/2016 |
08/12/2016
Time
0:0Hrs
|
|
497 |
Consultancy Services for Feasibility Study Detailed Project Report, Survey and Land Plan for Upgradation of State Highway to National Highway by Adopting LiDAR or equivalent technology for the road Koppal-Belgatti-Mundaragi-Bagevadi-Belhatti-Govandi-Gurdur-Shiggaon in the state of Karnataka EPC mode. |
NIT No.ENH/NHD/HBL/PB-/2016-17/2052/02 Dated: 26-10-2016. |
26/10/2016 |
04/11/2016 |
16/01/2017
Time
15:30Hrs
|
|
498 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Land Plan for Upgradation of State Highway to National Highway by Adopting LiDAR or equivalent technology for the road “Naragund-Belavanaki-Gajendragad-Kushtagi-Tavargere-Sindhanur on NH-150A” in the State of Karnataka on EPC mode. |
NIT No.ENH/NHD/HBL/PB-/2016-17/2052/03 Dated: 26-10-2016. |
26/10/2016 |
04/11/2016 |
16/01/2017
Time
15:30Hrs
|
|
499 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for Upgradation of State Highway to National Highway by Adopting LiDAR or equivalent technology for the road from “Junction of NH-48 near Sankeshwar connecting Gokak, Yaragatti, Munavalli and terminating at its junction with NH-52 near Naragund” in the State of Karnataka on EPC Mode |
NIT No.ENH/NHD/HBL/PB-/2016-17/2052/04 Dated: 26-10-2016. |
26/10/2016 |
04/11/2016 |
16/01/2017
Time
15:30Hrs
|
|
500 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for Upgradation of State Highway to National Highway by Adopting LiDAR or equivalent technology for the road from “Vengurla-Math- Amboli- Chandgarh-Belgaon” in the State of Karnataka on EPC Mode. |
NIT No.ENH/NHD/HBL/PB-/2016-17/2052/05 Dated: 26-10-2016. |
26/11/2016 |
04/11/2016 |
16/01/2017
Time
15:30Hrs
|
|
501 |
up-gradation of SH - NH - Srivilliputhoor – Sivakasi – Virudhunagar – Aruppukottai – Thiruchuli – Parthibanoor (Package No. NH-TVL/1, Category-II) |
TN .No. 10/2016-17/DO Dt. 01.11.2016 |
01/11/2016 |
04/11/2016 |
19/12/2016
Time
17:0Hrs
|
|
502 |
up-gradation of SH - NH - Vallioor – Thiruchendur (Package No. NH-TVL/2, Category-I) |
TN .No. 10/2016-17/DO Dt. 01.11.2016 |
01/11/2016 |
04/11/2016 |
19/12/2016
Time
17:0Hrs
|
|
503 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of new 4-lane Bridge across Varsova Creek and its approaches with Interchange from Km 496.100 to Km 498.350 (approx. 2.250 km) between Surat-Dahisar section of NH-8 (New NH–48) in the State of Maharashtra on Engineering Procurement and Construction (EPC) mode |
NHAI/Gujarat/Varsova Creek/EPC/AE/2016 |
03/11/2016 |
03/11/2016 |
14/12/2016
Time
11:0Hrs
|
|
504 |
Independent Engineer services for two laning with paved shoulder of Gadu-Porbandar section of NH-8E (Ext.) from km 263.200 (Design Chainage km 287.430) to km 356.766 (Design Chainage km 379.100) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode. |
NHAI/Guj/Gadu-Porbandar/NH-8E/IE/2016 |
03/11/2016 |
03/11/2016 |
14/12/2016
Time
11:0Hrs
|
|
505 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/15) |
223-SESHA-2016 |
15/10/2016 |
03/11/2016 |
24/11/2016
Time
15:0Hrs
|
|
506 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/16) |
223-SESHA-2016 |
15/10/2016 |
03/11/2016 |
24/11/2016
Time
15:0Hrs
|
|
507 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/25) |
224-SESHA-2016 |
14/10/2016 |
03/11/2016 |
24/11/2016
Time
15:0Hrs
|
|
508 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/26) |
224-SESHA-2016 |
14/10/2016 |
03/11/2016 |
24/11/2016
Time
15:0Hrs
|
|
509 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/27) |
224-SESHA-2016 |
14/10/2016 |
03/11/2016 |
24/11/2016
Time
15:0Hrs
|
|
510 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/29) |
224-SESHA-2016 |
14/10/2016 |
03/11/2016 |
24/11/2016
Time
15:0Hrs
|
|
511 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/28) |
224-SESHA-2016 |
14/10/2016 |
03/11/2016 |
24/11/2016
Time
15:0Hrs
|
|
512 |
Independent Consultancy Services during Operation & Maintenance Period of 4-Lane Dual Carriageway from km 488.270 to km 413.200 (Lucknow–Sitapur Section) of NH-30 (old NH-24) in the State of Uttar Pradesh on Build, Operate and Transfer (BOT) basis. |
NHAI/PIU/LKO/Nh-24/IC/2016/04 |
03/11/2016 |
03/11/2016 |
24/11/2016
Time
11:0Hrs
|
|
513 |
Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 54.370 to 101.400 (Bidar-Humnabad) Section of NH 50 in the state of Karnataka on EPC Mode (Package -II). |
EE/NHD/KLB/NH-50/Job-816/AE/NIT/2016-17/800 |
02/11/2016 |
02/11/2016 |
01/12/2016
Time
0:0Hrs
|
|
514 |
Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 79.650 (Existing Km.85.880) to 118.470 (Existing Km.125.300)End of Yadgir Bypass to Andhra Border Section of NH 150 in the state of Karnataka on EPC Mode (Package -II). |
EE/NHD/KLB/NH-150/Job-817/AE/NIT/2016-17/799 |
02/11/2016 |
02/11/2016 |
01/12/2016
Time
0:0Hrs
|
|
515 |
Independent Engineer for Development of Delhi – Meerut Expressway from Km 0.000 to Km 27.500 including 6/8 Laning of NH – 24 from Km. 0.000 to Km. 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh under on DBOT basis- Package II from existing KM 8.360 to existing Km 27.740 (UP Border to Dasna) in the State of Uttar Pradesh- Hybrid Annuity Model |
NHAI/Delhi-Hapur/Pkg-II/IE |
02/11/2016 |
02/11/2016 |
23/12/2016
Time
11:0Hrs
|
|
516 |
Consultancy services for Authority’s Engineer for Supervision of balance work of 2- lane with paved shoulder of Bhopal-Sanchi Section from Km 0.000 to Km 53.775 of NH-86 (Extn.) on EPC mode under NHDP Phase-III in the State of Madhya Pradesh |
NHAI/MP/EPC/AE/Bhopal-Sanchi/11023/01/2016 |
01/11/2016 |
01/11/2016 |
01/12/2016
Time
11:0Hrs
|
-
|
517 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REHABILITATION AND UP-GRADATION FROM KM 180.600 TO KM 223.000 NIZAMABAD – JAGADALPUR SECTION OF NH63 (OLD NH16) TO TWO LANE WITH PAVED SHOULDER UNDER EPC MODE IN THE STATE OF TELANGANA |
NIT No. SE (R&B) NH/KMNR/3/2016-17 19-10-2016 |
19/10/2016 |
01/11/2016 |
08/12/2016
Time
15:0Hrs
|
|
518 |
ConsultancyServicesfor preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
NHAI/Planning/EC/2016/DPR/Lot-1/Telangana/Package-2 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
519 |
ConsultancyServicesfor preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
) NHAI/Planning/EC/2016/DPR/Lot-1/Madhya Pradesh/Package-1 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
520 |
ConsultancyServicesfor preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna. |
NHAI/Planning/EC/2016/DPR/Lot-1/Madhya Pradesh/Package-2 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
521 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna. |
NHAI/Planning/EC/2016/DPR/Lot-1/Madhya Pradesh/Package-3 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
522 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
NHAI/Planning/EC/2016/DPR/Lot-1/Madhya Pradesh/Package-4 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
523 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
NHAI/Planning/EC/2016/DPR/Lot-1/Madhya Pradesh /Package-5 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
524 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
NHAI/Planning/EC/2016/DPR/Lot-1/Madhya Pradesh /Package-6 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
525 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna. |
NHAI/Planning/EC/2016/DPR/Lot-1/Maharashtra/Package-1 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
526 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
NHAI/Planning/EC/2016/DPR/Lot-1/Maharashtra/Package-2 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
527 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
NHAI/Planning/EC/2016/DPR/Lot-1/Maharashtra/Package-3 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
528 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
NHAI/Planning/EC/2016/DPR/Lot-1/Maharashtra/Package-4 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
529 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads in the States of Madhya Pradesh, Maharashtra and Telangana under Bharatmala Pariyojna |
NHAI/Planning/EC/2016/DPR/Lot-1/Maharashtra/Package-5 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
530 |
Consultancy Services for Preparation of Feasibility and Detailed Project Report for upgradation to 4 lane of HP/Punjab Border to Mandi Section (Km 11.00 to Km 208.00) of NH-20 in the State of Himachal Pradesh through BOT/Hybrid Annuity/EPC mode |
NHAI/HP Border-Mandi/NH-20/DPR/HP/2016 |
31/10/2016 |
31/10/2016 |
09/12/2016
Time
11:0Hrs
|
|
531 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routesto improve the efficiency of freight movement in India under Bharatmala Pariyojna (Lot-1). |
NHAI/Planning/EC/2016/DPR/Lot-1/Telangana/Package-1 |
31/10/2016 |
31/10/2016 |
19/12/2016
Time
11:0Hrs
|
|
532 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lane with Paved Shoulders From Chinthamani(NH-69)-Chelur-Rayachervu-Tanakal(AP) (NH42) for an approximate length 55.0 kms in the State of Karnataka |
14/2016-17 |
26/10/2016 |
28/10/2016 |
26/11/2016
Time
0:0Hrs
|
|
533 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan for Widening to two lane with Paved Shoulders Stretch from Kuppam on NH-42(AP)-Kolar on NH-75(Karnataka)(length in AP=25kmsand Karnataka=40 Kms) for an approximate length 40.00 km in the State of Karnataka. |
14/2016-17 |
26/10/2016 |
28/10/2016 |
26/11/2016
Time
0:0Hrs
|
|
534 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan for Widening to two lane with Paved Shoulders Stretch from Madakasira-Rolla(AP/Karnataka border)-Sire in the state of Karnataka (Total length =67 Kms,AP=38 Kms Karnataka=29 Kms)for an approximate length 29.00 km in the State of Karnataka. |
14/2016-17 |
26/10/2016 |
28/10/2016 |
26/11/2016
Time
0:0Hrs
|
|
535 |
Consultancy Services for Feasibility Study, DPR, survey and Preparation of Land Plan for Up gradation of State Highway to National Highway by Adopting LiDAR or equivalent technology(Including Bypass or Flyover whereever necessary in town/city limits) for the roads(1) Ram Nagar and Terminating at its Junction with NH-66 near Sadashivgad-Via-Ganeshgudi-Joida – Kadra(2) Khanapur - Haliyal – Yellapur (3) Yellapur-Sirsi-Siddapur-Talaguppa and Terminating at its Junction with NH-66 Near Bhatkal |
EE/NHDK/AE/TND/FS/DPR/2016-17/667 Dated: 28-10-2016 |
28/10/2016 |
28/10/2016 |
05/12/2016
Time
16:0Hrs
|
|
536 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/19 |
HP/SHIMLA/19 |
15/10/2016 |
28/10/2016 |
12/12/2016
Time
15:0Hrs
|
|
537 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/20 |
HP/SHIMLA/20 |
15/10/2016 |
28/10/2016 |
12/12/2016
Time
15:0Hrs
|
|
538 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/21 |
HP/SHIMLA/21 |
15/10/2016 |
28/10/2016 |
12/12/2016
Time
15:0Hrs
|
|
539 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Bhubaneswar-Athgarh-Samarpur (Sankarpur) -Mahidharpur Road in the State of Odisha. |
28 CE-NH-16-17 |
20/10/2016 |
27/10/2016 |
28/11/2016
Time
17:0Hrs
|
|
540 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Digapahandi (at NH-326)-Haridakhandi (on NH-59) in the State of Odisha. |
29 CE-NH-16-17 |
20/10/2016 |
27/10/2016 |
28/11/2016
Time
17:0Hrs
|
|
541 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Jharsuguda(on NH-49)-Karamdihi- Subdega- Balishankara- up to junction with NH-43 near Ludang (Pathalgaon) (on NH-43) up to Odisha border in the State of Odisha. |
30 CE-NH-16-17 |
20/10/2016 |
27/10/2016 |
28/11/2016
Time
17:0Hrs
|
|
542 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Khalikote-Kodala-Budhamba-Boirani-Koinphulia-Aska Road in the State of Odisha. |
31 CE-NH-16-17 |
20/10/2016 |
27/10/2016 |
28/11/2016
Time
17:0Hrs
|
|
543 |
Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of Tulsipur – Barhani Section (Km. 351+000 to Km. 385+000) of NH-730 to two lane with paved shoulder under EPC mode in the State of Uttar Pradesh. |
3851/162 yata-NH Circle/2016 |
25/10/2016 |
27/10/2016 |
28/11/2016
Time
15:0Hrs
|
-
|
544 |
Consultancy services for Authority Engineer Services for Four laning of Solan-Kaithlighat Section of NH-22 (Now NH-5) from Km. 106.139 to Km.129.05 under NHDP Phase-III on EPC Mode in the State of Himachal Pradesh |
NHAI/11020/3/SK/EPC/HP/AE/2016 |
27/10/2016 |
27/10/2016 |
28/11/2016
Time
11:0Hrs
|
|
545 |
Selection of IE for ADB Package01 PPP division PWD Rajasthan |
F7(11)/BOT/PPP/D947 |
24/10/2016 |
26/10/2016 |
31/01/2017
Time
11:0Hrs
|
|
546 |
Selection of IE for ADB Package02 PPP division PWD Rajasthan |
F7(11)/BOT/PPP/D947 |
24/10/2016 |
26/10/2016 |
31/01/2017
Time
11:0Hrs
|
|
547 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Shringeri – Agalagundi – Jayapur – Balehonnur – Hyrambi – Aldur - Nadipur in the State of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 17/2016-17 Date:- 26-10-2016 |
26/10/2016 |
26/10/2016 |
09/12/2016
Time
0:0Hrs
|
|
548 |
Consultancy Services For Feasibility Study, Detailed Project Report, Survey And Preparation Of Land Plan For Widening To Two Lane With Paved Shoulders For Karkala – Moodabidri – Bc Road (Including Overlapping Stretch Of 19 Kms Of Existing NH-169 for a total length of 26.00 Kms in the State Of Karnataka. |
No: EE/NHD/MNG/AE2/Consultancy/NIT 17/2016-17 Date:- 26-10-2016 |
26/10/2016 |
26/10/2016 |
09/12/2016
Time
0:0Hrs
|
|
549 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lane with Paved Shoulders From Junction of NH-9 connecting 1) Tembhurni-Pandharpur-Mangalwedha-Vijayapur 2) Murval-Aalur-Akkalkot-Indi- Zalki(NH-13) 3) Sawantwadi-Aajara-Gadhigilanj-NH-4 |
ENH/VJP/PB/AE.2/TND/2016-17/954 |
22/10/2016 |
25/10/2016 |
16/01/2017
Time
16:0Hrs
|
|
550 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaBoddhan–Basar–Bhainsa approved “In-Principle” for declaration as NH |
NIT No. SE(R&B)/NH/HYD./55/2016-17 Date:15.10.2016 |
15/10/2016 |
25/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
551 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaMedak-Yellareddy-Bhanswada-Rudrur approved “In-Principle” for declaration as NH |
NIT No. SE(R&B)/NH/HYD/56/2016-17 Date:15.10.2016 |
15/09/2016 |
25/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
552 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaBadrachalam-Ashwaraopet approved “In-Principle” for declaration as NH |
NIT No. SE(R&B)/NH/HYD/57/2016-17 Date:15.10.2016 |
15/10/2016 |
25/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
553 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.From Km 121.000 to Km 154.000 of Nakarekal - Mallampalli section of NH-365 of length 33 Km |
NIT No. SE(R&B)/NH/HYD/58/2016-17 Date:15.10.2016 |
15/10/2016 |
25/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
554 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaFrom Km 125.000 to Km 248.800 of Warangal - Khammam section of NH-563of length 124 Km |
NIT No. SE(R&B)/NH/HYD/59/2016-17 Date:15.10.2016 |
15/10/2016 |
25/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
555 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaFrom Km 0/0 to 14/0 of Hyderabad-Vijayawada section & from Km 524/0 to 543/0 of Hyderabad-Pune section of NH-65 of length 33 Km |
NIT No. SE(R&B)/NH/HYD/60/2016-17 Date:15.10.2016 |
15/10/2016 |
25/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
556 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana From Km 0/0 to 10/0 of Hyderabad-Banglore section of NH-44 & from Km 474/0 to 485/0 of Hyderabad to Nagpur section of NH-44 & from Km 0/0 to 7/8 of Hyderabad-Warangal section of NH-163 & from Km 4/2 to 11/2 of Hyderabad - Srisailam section of NH-765 of total length 36.00 Km. |
NIT No. SE(R&B)/NH/HYD/61/2016-17 Date:15.10.2016 |
15/10/2016 |
25/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
557 |
Consultancy Services for Preparation of Feasibility and Detailed Project Report for upgradation to 4 lane of Shimla to Mataur Section (Km 0.000 to Km 223.700) of NH-88 in the State of Himachal Pradesh through BOT/Hybrid Annuity/EPC mode |
NHAI/Shimla-Mataur/NH-88/DPR/HP/2016 |
25/10/2016 |
25/10/2016 |
09/12/2016
Time
11:0Hrs
|
|
558 |
Consultancy services for carrying out feasibility study and preparation of detailed project for construction of Bye Pass from Chaura (Km 310/200) to Bhaba Nagar (327/0) on NH-22 (New NH-05) in the state of Himachal Pradesh. |
11179-228 dated 18-10-2016 |
24/10/2016 |
24/10/2016 |
18/11/2016
Time
0:0Hrs
|
|
559 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for upgradation of road from Kalpetta connecting Mananthavadi in the State of Kerala, H.D.Kote- Jayapura and terminating at Mysore in the State of Karnataka (existing SH-33) for an approximate length 90.00km. |
07/2016-17 |
21/10/2016 |
24/10/2016 |
25/11/2016
Time
0:0Hrs
|
|
560 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to four lane with paved shoulders from Mysore(on NH-766) - Bannur - Malavalli ( on NH-948) in the State of Karnataka for an approximate length 45.00km. |
07/2016-17 |
21/10/2016 |
24/10/2016 |
25/11/2016
Time
0:0Hrs
|
|
561 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lanes with paved shoulders from Karnataka border-Hunasanahalli-Kodihalli-Kanakapura-Ramanagara-Magadi-Koratagere (existing SH-3) in the state of Karnataka for an approximate length 170.00km. |
07/2016-17 |
21/10/2016 |
24/10/2016 |
25/11/2016
Time
0:0Hrs
|
|
562 |
Consultancy Services for preparation of Detailed Project of Selected Stretches /Corridors of Road Networks in the state of Maharashtra for up-gradations to Two Lanes with paved shoulder/four lane confirmation Miraj Sangali Peth naka on NH.4 road |
11 |
17/10/2016 |
24/10/2016 |
23/11/2016
Time
15:0Hrs
|
|
563 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Kanker-Bhanupratappur-Manpur(excluding Sambalpur-Silpat Km. 21.00) and Kachche-Narayanpur |
NH/CE/PWD/06 & 10 |
20/10/2016 |
22/10/2016 |
06/12/2016
Time
17:0Hrs
|
|
564 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Harchoka-Bharatpur |
NH/CE/PWD/14 |
20/10/2016 |
22/10/2016 |
06/12/2016
Time
17:0Hrs
|
|
565 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Pithora-Bagbahara |
NH/CE/PWD/15 |
20/10/2016 |
22/10/2016 |
06/12/2016
Time
17:0Hrs
|
|
566 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Kondagaon-Narayanpur (48.70 Km.) and Geedam-Dantewada (12.00 Km.) |
NH/CE/PWD/16 &17 |
20/10/2016 |
22/10/2016 |
06/12/2016
Time
17:0Hrs
|
|
567 |
Consultancy Services for Feasibility Study cum Detailed Project Report, Survey and Land plan for Up gradation of road |
ENH/KLB/PB/AE.3/TND/2016-17/752 |
21/10/2016 |
21/10/2016 |
05/12/2016
Time
0:0Hrs
|
|
568 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaBhongir - Choutuppal including bypass, of length 35 kms proposed for upgradation as NH. |
SE(R&B)NH/HYD/45/2016-17(PKG-I) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
569 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaEnd of Choutuppal bypass – Yacharam (Start of Yacharam bypass) of length 45kms proposed for upgradation as NH. |
SE(R&B)NH/HYD/46/2016-17(PKG-II) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
570 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.Start of Yacharam bypass – End of Kadthal bypass, of length 30 kms proposed for upgradation as NH. |
SE(R&B)NH/HYD/47/2016-17(PKG-III) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
571 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.End of Kadthal bypass – End of Shadnagar bypass, of length 40 kms proposed for upgradation as NH |
SE(R&B)NH/HYD/48/2016-17(PKG-IV) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
572 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.Ghatkesar – Valigonda, of length 45kms proposed for upgradation as NH |
SE(R&B)NH/HYD/49/2016-17(PKG-V) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
573 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.Valigonda–Thorrur, of length 78 kms proposed for upgradation as NH. |
SE(R&B)NH/HYD/50/2016-17(PKG-VI) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
574 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaThorrur–Mahabubabad, of length 51 kms proposed for upgradation as NH.. |
SE(R&B)NH/HYD/51/2016-17(PKG-VII) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
575 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of Telangana.Mahabubabad-Kothagudem, of length 60kms proposed for upgradation as NH. |
SE(R&B)NH/HYD/52/2016-17(PKG-VIII) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
576 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaMedak – End of Siddipet bypass, of length 67 kms proposed for upgradation as NH |
SE(R&B)NH/HYD/53/2016-17(PKG-IX) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
577 |
Consultancy services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6- lane with paved shoulders configurationin the State of TelanganaEnd of Siddipet bypass – Elakurthy, of length 65kms proposed for upgradation as NH. |
SE(R&B)NH/HYD/54/2016-17(PKG-X) Date: 21.09.2016 |
21/09/2016 |
21/10/2016 |
05/11/2016
Time
0:0Hrs
|
|
578 |
Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and up-gradation of Pilibhit- Puranpur section km. 0.000 to 38.000 of NH-730 to two lane with paved shoulder under EPC mode in the state of Uttar Pradesh. |
3557/1 Tender cashier (Bly)-28/16-17 Dated: 19.10.2016 |
19/10/2016 |
21/10/2016 |
22/11/2016
Time
17:0Hrs
|
|
579 |
Authority Engineer for Supervision of Work of Construction of Four-Laning of Chichra-Kharagpur Section of NH-6 From Km 185.150 to Km 134.400 Including Rehabilitation of Existing Four Lane from Km 134.400 to Km 129.600 in the state of West Bengal Under NHDP Phase III on EPC Mode |
NHAI/WB/EPC/2016/Chichra-Khr/NH-6/AE/455/89987 |
21/10/2016 |
21/10/2016 |
15/12/2016
Time
11:0Hrs
|
|
580 |
Consultancy Services for Authority’s Engineer for supervision of the works of (1) Construction of ROB and its approaches in lieu of level crossing No. KA-61 at km 194.850 on NH 60 in the state of West Bengal, (2) Construction of ROB and its approaches in lieu of existing Level Crossing L. C. No. DVC/17/SPL at Km 258.600 of NH 60 in the state of West Bengal & (3) Construction of Proposed Bridge over river Shali at Ch.247+000 on NH 60 in the District of Bankura in the state of West Bengal |
10/2016-17 of SE, NHC - II |
19/10/2016 |
20/10/2016 |
13/12/2016
Time
17:0Hrs
|
|
581 |
Consultancy Services for Authority’s Engineer for supervision of the works of 1) Construction of ROB and its approaches in lieu of Level Crossing No. 6/B/T at km 284.170 on NH-60 in the State of West Bengal, 2) Construction of ROB and its approaches in lieu of Unmanned Level Crossing at km. 303.900 on NH-60 in the State of West Bengal. |
11/2016-17 of SE, NHC - II |
19/10/2016 |
20/10/2016 |
13/12/2016
Time
17:0Hrs
|
|
582 |
Authority’s Engineer for supervision of the works of 1) Construction of 4-lane ROB & its approaches in replacement of existing RUB (Rly.Km. 31/22-24) between Bhedia & Bolpur in Bhedia at Km 41.760 of NH-2B in the State of West Bengal. 2) Construction of 4-Lane ROB (Twins 2-lanes) & its approaches in replacement of level crossing at Km 3.950 on NH-2B (Railway Km 226/0) at Talit in the State of West Bengal. |
12/2016-17 of SE, NHC - II |
19/10/2016 |
20/10/2016 |
13/12/2016
Time
17:0Hrs
|
|
583 |
Consultancy Services for Authority’s Engineer for supervision of the works of 1) Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T at km 307.050 of NH-60 in the state of West Bengal, 2) Construction of ROB and its approaches in lieu of Level Crossing No. 21/SPL/E at km 338.600 of NH-60 in the state of West Bengal. |
13/2016-17 of SE, NHC - II |
19/10/2016 |
20/10/2016 |
13/12/2016
Time
17:0Hrs
|
|
584 |
Consultancy Services for preparation of Detailed Project Report of selected stretch – Kallakurichi-Tiruvannamalai road in the State of Tamilnadu for up-gradation to Two Lanes with paved shoulder/ Four lane configurations |
TN No.5/HDO/NH/2016-17 |
18/10/2016 |
20/10/2016 |
14/11/2016
Time
15:0Hrs
|
|
585 |
CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF SULTANPUR-PRATAPGARH SECTION OF NH-96 FROM EXISTING KM 60/000 TO KM 90/000 (DESIGN CH. 60.000 TO 90.865 TO TWO LANE WITH PAVED SHOULDER ON EPC MODE IN STATE OF UTTAR PRADESH |
3723 /1Yata-NH Circle/16 Dated: 17.10.2016 |
20/10/2016 |
20/10/2016 |
31/01/2017
Time
0:0Hrs
|
|
586 |
Consultancy Services of Authoritys Engineer for supervision of Rehabilitation and Up-gradation of Sultanpur-Pratapgarh section of NH-96 from existing Km 60/000 to 90/000 (Design Ch. 60.000 to Ch. 90.865) to two lane with paved shoulder on EPC mode in State of Uttar Pradesh |
3723/1-Yata-NH Circle/16 |
17/10/2016 |
20/10/2016 |
05/12/2016
Time
17:0Hrs
|
|
587 |
Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for improvement of existing road from Km 28.30 (Akhnoor) to Km 108.54 (Tain Br) under 13 TF as Part-I and from Km 108.54 to Km 236.78 (Poonch) under 31 TF as Part-II on NH-144A for four lane with Paved Shoulder from existing double lane specification in the State of J&K. |
CE (P) SPK/21/2016-17 |
19/10/2016 |
19/10/2016 |
29/11/2016
Time
16:30Hrs
|
|
588 |
Independent Engineer Services during Operation & Maintenance Period for Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the 4-laning MP/Maharashtra Border- Dhule Section of NH-3 from Km 168.500 to Km. 265.000 in the State of Maharashtra under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Basis - Consultancy Package No.IE-O&M/NH-3/NAG-5 |
NHAI/RO-NAG/TENDERS/2016-17/03 |
19/10/2016 |
19/10/2016 |
08/11/2016
Time
0:0Hrs
|
|
589 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/15 |
HP/SHIMLA/15 |
05/10/2016 |
18/10/2016 |
06/12/2016
Time
15:0Hrs
|
|
590 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/16 |
HP/SHIMLA/16 |
05/10/2016 |
18/10/2016 |
06/12/2016
Time
15:0Hrs
|
|
591 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/17 |
HP/SHIMLA/17 |
05/10/2016 |
18/10/2016 |
06/12/2016
Time
15:0Hrs
|
|
592 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/18 |
HP/SHIMLA/18 |
05/10/2016 |
18/10/2016 |
06/12/2016
Time
15:0Hrs
|
|
593 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/23 |
HP/SHIMLA/23 |
05/10/2016 |
18/10/2016 |
06/12/2016
Time
15:0Hrs
|
|
594 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/10 |
HP/SHIMLA/10 |
05/10/2016 |
18/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
595 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/11 |
SE-NHCS-11 |
05/10/2016 |
18/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
596 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/12 |
SE-NHCS-12 |
05/10/2016 |
18/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
597 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/13 |
SE-NHCS-13 |
05/10/2016 |
18/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
598 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/14 |
SE-NHCS-14 |
05/10/2016 |
18/10/2016 |
29/11/2016
Time
15:0Hrs
|
|
599 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/24 |
HP/SHIMLA/24 |
05/10/2016 |
18/10/2016 |
06/12/2016
Time
15:0Hrs
|
|
600 |
Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane bypasses in Kerala - Kollam Anjilimoodu |
05/CENH/KLA/DPR/2016-17 (Re-tender) -Package CENH/DPR/03/2016 |
15/10/2016 |
15/10/2016 |
08/11/2016
Time
1:0Hrs
|
|
601 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION for Rehablitation & upgradation from km 108/850 to 160/200 (Rayachoti - Kadapa Road) of NH 18 ( New NH 40) to two lane with paved shoulder in the state of Andhra Pradesh on Engineering, Procurement & Construction (EPC) mode |
NIt 35/SE,NH,ATP/16-17 |
15/10/2016 |
15/10/2016 |
08/12/2016
Time
17:0Hrs
|
|
602 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION Rehabilitation and up-gradation of NH-42 from km 244/930 to km 299/775 (Madanapalli-Punganuru-Palamaneru Section) to two lane with paved shoulder in the state of Andhra Pradesh under Corridor Scheme on EPC Mode. |
NIT 36/ SE,NH,ATP/2016-17 |
15/10/2016 |
15/10/2016 |
08/12/2016
Time
17:0Hrs
|
|
603 |
Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors in Kerala - Kayamkulam - Thiruvalla |
05/CENH/KLA/DPR/2016-17 (Re-tender) -Package CENH/DPR/05/2016 |
15/10/2016 |
15/10/2016 |
08/11/2016
Time
15:0Hrs
|
|
604 |
DPR - 2 lane Bharanikavu - Chavara & Laha - Pampa |
05/CENH/KLA/DPR/2016-17 (Re-tender) -Package CENH/DPR/07/2016 |
15/10/2016 |
15/10/2016 |
08/11/2016
Time
15:0Hrs
|
|
605 |
Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane bypasses in Kerala - Makaraparambu bypass |
05/CENH/KLA/DPR/2016-17 (Re-tender) -Package CENH/DPR/10/2016 |
15/10/2016 |
15/10/2016 |
08/11/2016
Time
15:0Hrs
|
|
606 |
Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane bypasses in Kerala - Malaparamba - Puthupady & Puthupady - Muthanga |
05/CENH/KLA/DPR/2016-17 (Re-tender) -Package CENH/DPR/11/2016 |
15/10/2016 |
15/10/2016 |
08/11/2016
Time
15:0Hrs
|
|
607 |
Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for the Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors and four lane bypasses in Kerala - NH183 Km 137 to 160/300 and Thrippunithura bypass |
05/CENH/KLA/DPR/2016-17 (Re-tender) -Package CENH/DPR/12/2016 |
15/10/2016 |
15/10/2016 |
08/11/2016
Time
15:0Hrs
|
|
608 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/5) |
221-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
609 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/6) |
221-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
610 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/7) |
221-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
611 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/8) |
221-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
612 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/9) |
221-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
613 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/10) |
222-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
614 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/11) |
222-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
615 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/12) |
222-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
616 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/13) |
222-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
617 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/14) |
222-SESHA-2016 |
24/09/2016 |
14/10/2016 |
13/12/2016
Time
15:0Hrs
|
|
618 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lane with Paved Shoulders for Raichur Bhachi road & Yatnal road |
NIT No:EE/NH/VJP/AE-2/Consultancy services/2016-17/881 Dated:03.10.2016 |
03/10/2016 |
14/10/2016 |
21/11/2016
Time
16:0Hrs
|
|
619 |
DPR Consultancy for Mangalore City Bypass |
NHAI/Mglr Bypass/2016 |
13/10/2016 |
13/10/2016 |
08/11/2016
Time
11:0Hrs
|
|
620 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REHABILITATION AND UP-GRADATION OF NH-67FROM KM 424/650 TO 487/693 (GOOTY – TADIPATRI SECTION) TO TWO LANE WITH PAVED SHOULDER UNDER NH(O) PLAN 2016-17 IN THE STATE OF ANDHRA PRADESH ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE. |
NIT no 34/SE/NH/ATP/2016-17 |
29/09/2016 |
13/10/2016 |
08/12/2016
Time
17:0Hrs
|
|
621 |
Consultancy services of Authority’s Engineer for supervision of Widening existing 2 lane to 2 lane with 1.5m wide paved shoulder from Km 0/0 to 81/0 and Km 93/0 to 119/0 of NH-157 in the state of Odisha on EPC mode. |
26CENH of 2016-17 |
29/09/2016 |
07/10/2016 |
01/12/2016
Time
17:0Hrs
|
|
622 |
Consultancy services of Authority’s Engineer for supervision of Widening existing 2 lane to 2 lane with 1.5 m wide paved shoulder from Km 50/000 to 140/900 of NH- 57 in the State of Odisha on EPC mode. |
27 CENH of 2016-17 |
29/09/2016 |
07/10/2016 |
01/12/2016
Time
17:0Hrs
|
|
623 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF HIGH LEVEL THAPRA BRIDGE ON CHORDI CHORAHA-KUBA-ANANDPURI ROAD (MDR-83) IN KM 22 OF BANSWARA DISTRICT ON EPC MODE IN STATE OF RAJASTHAN |
06/2016-17 |
06/10/2016 |
06/10/2016 |
20/10/2016
Time
0:0Hrs
|
|
624 |
Consultancy Services for road safety audit of NH 110 in km. 0.000 to 35.000 Biharsharif Ekangersarai Telhara Section and km 85.000 to 88.000 Jehanabad Arwal Section in the State of Bihar |
Road Safety/NH11O/Biharsharif/02/2016-17 |
26/10/2016 |
06/10/2016 |
26/10/2016
Time
0:0Hrs
|
-
|
625 |
Consultancy Services for Feasibility Study and Preparation of Detailed Project Report for construction of Elevated Road in Udaipur city and on Railway Level Crossing in Bikaner city in the State of Rajasthan under Other Projects for a length of approx. 5 km (the “Project”) |
NHAI/Teck/Raj/Elevated Road/2016 |
05/10/2016 |
05/10/2016 |
08/11/2016
Time
0:0Hrs
|
|
626 |
Consultancy Service for preparation of Detailed Project report Kanpur-Lucknow Expressway, having an approximate length of 75 km (the Project) including spurs through BOT and EPC basis (2nd Call) |
NHAI/KL/Expressway/2016 |
27/10/2016 |
04/10/2016 |
27/10/2016
Time
11:0Hrs
|
-
|
627 |
Preparation of Detailed report of Hyderabad-Vijaywada -Amravathi Expressway, having an approximate length of 280 km (the Project) including spurs through BOT and EPC basis (2nd Call) |
NHAI/HVA Expressway/2016 |
27/10/2016 |
04/10/2016 |
27/10/2016
Time
11:0Hrs
|
-
|
628 |
appointment of technical consultant for preparation of feasibility study (FS) and detailed project report (DPR) for Phagwara-Hoshiarpur NH-344 B in the State of Punjab. |
9 |
03/10/2016 |
04/10/2016 |
07/11/2016
Time
17:0Hrs
|
-
|
629 |
Selection for Authority Engineer for (1) Remaining work for construction of 2 Lane PSC High Level Bridge with foot-path across the River Champa in 123 th km of NH-80 (Job No. 080-Bihar 3/2015-16/008) & (2) Remaining work for construction of 2 Lane PSC High Level Bridge with foot-path across the River Vena in 155 th km of NH-80 (Job No. 080-Bihar 2/2015-16/009) under EPC mode of procurement. |
14EPC/NH/BHAGALPUR/2016-17 |
13/10/2016 |
03/10/2016 |
12/10/2016
Time
14:0Hrs
|
|
630 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 2-LANE BRIDGE INCLUDING APPROACHES NH 202 and 16 |
25/CE/NH/TC/AE/28265 |
30/09/2016 |
01/10/2016 |
15/11/2016
Time
0:0Hrs
|
|
631 |
Consultancy Services for Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala scheme NHAI/BM/20 |
NHAI/BharatMala/Proc/01/DPR/2016 |
29/09/2015 |
29/09/2016 |
07/11/2016
Time
0:0Hrs
|
|
632 |
Consultancy Services for Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala scheme NHAI/BM/21 |
NHAI/BharatMala/Proc/01/DPR/2016 |
29/09/2016 |
29/09/2016 |
07/11/2016
Time
0:0Hrs
|
|
633 |
Consultancy Services for Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala scheme NHAI/BM/22 |
NHAI/BharatMala/Proc/01/DPR/2016 |
29/09/2016 |
29/09/2016 |
07/11/2016
Time
0:0Hrs
|
|
634 |
Consultancy Services for Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala scheme NHAI/BM/11 |
NHAI/BharatMala/Proc/01/DPR/2016 |
29/09/2016 |
29/09/2016 |
07/11/2016
Time
0:0Hrs
|
|
635 |
Consultancy Services for Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity under Bharat Mala scheme NHAI/R/5 |
NHAI/BharatMala/Proc/01/DPR/2016 |
29/09/2016 |
29/09/2016 |
07/11/2016
Time
0:0Hrs
|
|
636 |
Consultancy Services for Preparation of DPR for 6-Laning of Existing 4-Lane Gonde-Vadape Section from Km 440.00 to Km 539.500 of NH-3 in the State of Maharashtra |
NHAI/RO/MUM/NSK/DPR/VG & DP/2016-17/05 |
29/09/2016 |
29/09/2016 |
17/11/2016
Time
12:0Hrs
|
|
637 |
Preparation of DPR for 6-Laning of Existing 4-Lane Dhule-Pimpalgaon Section from Km 265.00 to Km 380.00 of NH-3 in the State of Maharashtra |
NHAI/RO/MUM/NSK/DPR/VG & DP/2016-17/05 |
29/09/2016 |
29/09/2016 |
17/11/2016
Time
12:0Hrs
|
|
638 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UPGRADATION OF NH-4 (i) FROM KM 133.36 TO KM 171.59 (ANDHRA PRADESH / TAMIL NADU BORDER TO NALAGAMPALLI VILLAGE) and (ii) FROM NALAGAMPALLI (EXISTING KM 171.590/DESIGN KM 172.00) to AP/KARNATAKA BORDER (EXISTING KM 216.912/ DESIGN KM 219.687) (DESIGN LENGTH = 47.687 KM); TO FOUR LANE WITH PAVED SHOULDER IN THE STATE OF ANDHRA PRADESH UNDER NHDP-IV ON EPC MODE. |
NHAI/Tech/AP/2016/NH-4/Authority Engineer |
29/09/2016 |
29/09/2016 |
04/11/2016
Time
11:0Hrs
|
|
639 |
4-Laning of MH-KNT Border-Sangareddy from Km.348.800 to Km.493.000 of NH-9 in the States of Karnataka and Andhra Pradesh under NHDP-III on DBFOT(BOT) basis in BOT(Toll) mode |
NHAI/NHDP-III/DBFO/NH-9/3/2013(2nd Call) |
28/09/2016 |
28/09/2016 |
28/10/2016
Time
11:0Hrs
|
|
640 |
Consultancy Services for feasibility study and comparative Study of different alternatives for widening of 4-lane to 6-lane/provision of elevated corridor/ construction of new expressway of Raipur-Durg section in Km. 281.000 to 307.600 = 26.60 Km. Of NH 006 (New N.H. 53) in the State of Chhattisgarh. |
24/CE/NH/TC/44-20/2016/III/28230 |
27/09/2016 |
28/09/2016 |
27/10/2016
Time
17:0Hrs
|
|
641 |
Independent Engineer services for development and construction of selected road stretches on DBFOT Basis /Hybrid Annuity Basis under NHDP-Phase-IV/V in the State of Rajasthan and Gujrat-6 laning of Kishangarh - Gulabpura |
NHAI/NHDP-V/2015/KUA/CU-Pkg-3/IE |
27/09/2016 |
27/09/2016 |
18/11/2016
Time
11:0Hrs
|
|
642 |
Independent Engineer services for development and construction of selected road stretches on DBFOT Basis /Hybrid Annuity Basis under NHDP-Phase-IV/V in the State of Rajasthan and Gujrat-6 laning of end of Chittorgarh bypass-start of udaipur bypass |
NHAI/NHDP-V/2015/KUA/CU-Pkg-3/IE |
27/09/2016 |
27/09/2016 |
18/11/2016
Time
11:0Hrs
|
|
643 |
Independent Engineer services for development and construction of selected road stretches on DBFOT Basis /Hybrid Annuity Basis under NHDP-Phase-IV/V in the State of Rajasthan and Gujrat-6 laning of udaipur bypass |
NHAI/NHDP-V/2015/KUA/CU-Pkg-3/IE |
27/09/2016 |
27/09/2016 |
18/11/2016
Time
11:0Hrs
|
|
644 |
Independent Engineer services for development and construction of selected road stretches on DBFOT Basis /Hybrid Annuity Basis under NHDP-Phase-IV/V in the State of Rajasthan and Gujrat-6 laning from km 287.400 to km 401.200 of NH-8 |
NHAI/NHDP-V/2015/KUA/CU-Pkg-3/IE |
27/09/2016 |
27/09/2016 |
18/11/2016
Time
11:0Hrs
|
|
645 |
Independent Engineer services for development and construction of selected road stretches on DBFOT Basis /Hybrid Annuity Basis under NHDP-Phase-IV/V in the State of Rajasthan and Gujrat-6 laning from km 401.200 to km 494.410 of NH-8 |
NHAI/NHDP-V/2015/KUA/CU-Pkg-3/IE |
27/09/2016 |
27/09/2016 |
18/11/2016
Time
11:0Hrs
|
|
646 |
Independent Engineer services for development and construction of selected road stretches on DBFOT Basis /Hybrid Annuity Basis under NHDP-Phase-IV/V in the State of Rajasthan and Gujrat- 2 lane with paved shoulders Salasar Nagaur |
NHAI/NHDP-V/2015/KUA/CU-Pkg-3/IE |
27/09/2016 |
27/09/2016 |
18/11/2016
Time
11:0Hrs
|
|
647 |
Independent Engineer services for development and construction of selected road stretches on DBFOT Basis /Hybrid Annuity Basis under NHDP-Phase-IV/V in the State of Rajasthan and Gujrat-Dausa-Lalsot-Kathun NH 11A Extn |
NHAI/NHDP-V/2015/KUA/CU-Pkg-3/IE |
27/09/2016 |
27/09/2016 |
18/11/2016
Time
11:0Hrs
|
|
648 |
Consultancy services for Authority’s Engineer for Supervision of Four laning of Nerchowk – Pandoh including Pandoh bypass section of NH-21 (Package-I km 190.000 to km 221.305) (Design length – 26.290 km) under NHDP-IVB on EPC Mode in the state of Himachal Pradesh on EPC Basis |
NHAI/EPC/NHDP-IV/11019-01-N-K/Pkg-I(N-P)/HP/AE/2016 |
27/09/2016 |
27/09/2016 |
27/10/2016
Time
11:0Hrs
|
|
649 |
Consultancy services for feasibility study and preparation of detailed project report for 4 laning of Basukinath - Deoghar section of NH-114A under NHDP Phase-IV in the state of Jharkhand. (Second Call) |
NHAI/11012/NHDP-IV/JH/Basukinath-Deoghar/2016 |
26/09/2016 |
26/09/2016 |
26/10/2016
Time
11:0Hrs
|
|
650 |
INDEPENDENT ENGINEER SERVICES FOR 4/6 LANING OF KHARAR TO LUDHIANA SECTION OF NH-95 (NEW NH-05) FROM KHARAR KM 10+185 (DESIGN CHAINAGE) TO SAMRALA CHOWK, LUDHIANA KM 86+199 (DESIGN CHAINAGE) IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE. |
NHAI/18044/1/2016/PB |
26/09/2016 |
26/09/2016 |
03/11/2016
Time
11:0Hrs
|
|
651 |
INDEPENDENT ENGINEER SERVICES FOR 4-LANING OF PHAGWARA - RUPNAGAR SECTION OF NH-344A FROM KM 0.00 (DESIGN CHAINAGE) TO KM 80.820 (DESIGN CHAINAGE) IN THE STATE OF PUNJAB ON HYBRID ANNUITY MODE. |
NHAI/13044/1/2016/PB |
26/09/2016 |
26/09/2016 |
04/11/2016
Time
11:0Hrs
|
|
652 |
Preparation of alignment cum feasibility report of Delhi - Ludhiana -Amritsar-Katra Expressway with connectivity to Chandigarh (4th Call) |
NHAI/DLK Expressway/2016 |
26/09/2016 |
26/09/2016 |
18/10/2016
Time
11:0Hrs
|
|
653 |
Four laning of Hospet - Bellary – Karnataka / AP Border from Km.280.080 (Design Ch.) to Km.375.450 (Design Ch.), design length 95.370, NH-63 in the State of Karnataka under NHDP Phase-IVB on EPC mode |
NHAI/Hos.-Bel.-KNT/AP Border/NHDP-IVB/AE/2016 |
08/11/2016 |
26/09/2016 |
08/11/2016
Time
11:0Hrs
|
|
654 |
CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF LAKHIMPUR-SISIYA SECTION (KM 140.000 TO 188.800 OF NH-730 TO TWO LANE WITH PAVED SHOULDER UNDER EPC MODE IN STATE OF UTTAR PRADESH. |
3435/605 yata-NH circle/16 |
21/09/2016 |
24/09/2016 |
17/11/2016
Time
17:0Hrs
|
|
655 |
CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF SISIYA –NANPARA SECTION (KM 188.800 TO KM 226.260 OF NH-730 TO TWO LANE WITH PAVED SHOULDER UNDER EPC MODE IN STATE OF UTTAR PRADESH |
3435/605 yata-NH circle/16 |
21/09/2016 |
24/09/2016 |
17/11/2016
Time
17:0Hrs
|
|
656 |
CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION FROM KM. 285.00 TO 326.00 OF NH-76 (KALUPUR TO LALATA ROAD TO TWO LANE WITH PAVED SHOULDER ON EPC MODE IN STATE OF UTTAR PRADESH. |
1418/13M-NHCK/16 |
21/09/2016 |
24/09/2016 |
08/11/2016
Time
17:0Hrs
|
|
657 |
CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION FROM KM 89.600 TO 133.520 OF NH-76 (HARPALPUR-SUGIRA SECTION) TO TWO LANE WITH PAVED SHOULDER ON EPC MODE IN THE STATE OF UTTAR PRADESH. |
1419/13M-NHCK/16 |
21/09/2016 |
24/09/2016 |
08/11/2016
Time
17:0Hrs
|
|
658 |
Four Laning of Hubli - Hospet Section of NH-63 in the state of Karnataka on EPC Mode, Project Road Start from Proposed Hubli Bypass at km 128+850(Design Ch. 128+850) to Hospet (Hitnal NH -13 Junction) at km 267+000 (Design Ch. 272+571) |
NHAI/Hub.-Hos./NHDP-IV/AE/2016 |
10/11/2016 |
23/09/2016 |
10/11/2016
Time
11:0Hrs
|
|
659 |
Independent Engineer services for 4-Laning of Lucknow-Sultanpur section of NH-56 from km 11.500 (design chainage km 11.500) to km 134.700 (design chainage km 138.925) in the State of Uttar Pradesh on DBFOT Basis under NHDP Phase-IV |
NHAI/GM(T)UP/NHDP-IV/NH-56-LS/HAM/IE RFP/2016 |
23/09/2016 |
23/09/2016 |
09/11/2016
Time
11:0Hrs
|
|
660 |
Independent Engineer services for 4-Laning of Rampur- Kathgodam section of NH-87(New NH No. 9) from km 0.000 (km 190.000 of NH-24) to km 42.791(Design Chainage 43.446) [Package –I] in the state of Uttarpradesh and 4-Laning of Rampur- Kathgodam section of NH-87 (New NH No. 9, 109) from km 42.791 (design chainage 43.446) to km 88.000 (design chainage 93.226) [Package-II] in the State of Uttarakhnad under NHDP-III on Hybrid Annuity Mode. |
R-K/NH-87/PKG-I/II/Hybrid Annuity/UKD/Tech/2015 |
23/09/2016 |
23/09/2016 |
16/12/2016
Time
11:0Hrs
|
|
661 |
Consultancy services for Authority’s Engineer for supervision of project of providing long term improvement to 7 (seven) identified black spots at isolated locations on four lane Jetpur – Gondal – Rajkot section between km. 117.000 to km. 185.000 on NH-8B (now NH-27) in the State of Gujarat on EPC mode. |
NHAI/Guj/Jet-Gondal/Black Spot/EPC/AE./2016 / Dated 23.09.2016 |
23/09/2016 |
23/09/2016 |
25/10/2016
Time
0:0Hrs
|
-
|
662 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/37) |
214-SESHA-2016 |
31/08/2016 |
22/09/2016 |
08/11/2016
Time
15:0Hrs
|
|
663 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders of Maur to Raman Mandi section of NH-254 from km 105.890 to 132.300 in the State of Punjab on EPC Mode |
CW-2/BTI/16 |
20/09/2016 |
21/09/2016 |
18/10/2016
Time
17:0Hrs
|
|
664 |
Consultancy Services for Two Lane with Paved shoulder of 1 Stretch from Bhagalpur at NH 33 Dhaka mor on NH 333A 2 Stretch from Katuria at NH 333A Chandan Deoghar at NH 333 in Bihar on EPC Mode. |
DPR/BIHAR/NHDG-PAT/06 |
14/10/2016 |
21/09/2016 |
14/10/2016
Time
15:0Hrs
|
|
665 |
Consultancy Services for Two Lane with Paved shoulder of Two Lane with Paved shoulder of 1 Stretch from Junction with NH 119 Panduka In Bihar Bridge on SONE river Srinagar Jharkhand Dagar Chaura Makundpur Bhawanathpur Nagar Untari on NH 39 in Bihar on EPC Mode |
DPR/BIHAR/NHDG-PAT/07 |
14/10/2016 |
21/09/2016 |
14/10/2016
Time
15:0Hrs
|
|
666 |
Consultancy Services for Construction of ROB in lieu of Level crossing A/12/B/2 at Km. 112-113 of NH-15(New NH-54) at Amritsar along with High level Bridge over adjoining UBDC Canal in the state of Punjab |
05 |
20/09/2016 |
21/09/2016 |
10/10/2016
Time
15:0Hrs
|
|
667 |
Independent Engineer Services during Operation & Maintenance Period for 4 Laning of Moradabad -Bareilly Section of NH_24 from Km 149.250 to Km 271.050 in the State of Uttar Pradesh on DBFOT_Toll_ basis under NHDP Phase-IIIA |
NHAI/PIU-MBD/02/2016-17 |
16/09/2016 |
21/09/2016 |
04/11/2016
Time
11:0Hrs
|
|
668 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Reamal on NH-53 in the State of Odisha |
21 CE-NH-16-17 |
14/09/2016 |
20/09/2016 |
14/10/2016
Time
0:0Hrs
|
|
669 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Sonepur on NH-57 in the State of Odisha |
20 CE-NH-16-17 |
14/09/2016 |
20/09/2016 |
14/10/2016
Time
0:0Hrs
|
|
670 |
Consultancy Services for Project Management including Preparation of Detailed Project Report of Upgradation to Two lane with Paved Shoulders configuration of the National HighWays from km 169.770 to 236.150 of NH 30 of Vijayawada – Jagadalpur section in the state of Andhra Pradesh (66.38 Km) 2) km 0/0 to 41/0 of NH 326A (41km) |(Total: 107.38 Km) in the state of Andhra Pradesh. |
NIT No. S E(R&B)/NH/VJA/Short Tender/09/ 2016-17, Dt. 12.09.2016 |
12/09/2016 |
16/09/2016 |
04/10/2016
Time
15:0Hrs
|
|
671 |
Consulting Services as Independent Engineer during Operation & Maintenance Period for “4-lane divided carriageway facility of the section from Rajahmundry – Dharmavaram – Tuni (Km.799.998 to Km.901.753) (Old Ch : Km.200.000 to Km.300.000) constructed on BOT (Annuity) on NH-16 (Old NH-5) in the State of Andhra Pradesh on NHDP Phase- I |
NHAI/RO-VJA/12003/IE/2016/ |
15/09/2016 |
15/09/2016 |
17/10/2016
Time
11:59Hrs
|
|
672 |
Consultancy Services for Authority’s Engineer for supervision of construction of Gorakhpur Bypass from existing km. 79.670 of NH-29E to existing Km 251.700 of NH-28 under NHDP-IV in the state of Uttar Pradesh on EPC |
NHAI/Tech/GB-29E/NHDP-IV/AE/2016 |
14/09/2016 |
14/09/2016 |
25/10/2016
Time
11:0Hrs
|
|
673 |
Consultancy services for Authority’s Engineer for Supervision of Four laning of Takoli – Kullu Section of NH 21 (Km 242+000 to Km 272+0000) under NHDP-IVB in the state of Himachal Pradesh on EPC Basis |
NHAI/EPC/NHDP-IV/11019-01-N-K/Pkg-III (T-K)/AE/2016 |
14/09/2016 |
14/09/2016 |
28/10/2016
Time
11:0Hrs
|
|
674 |
Independent Engineer Services (Balance Work along with O&M Work) for the work of rehabilitation, strengthening and Four Laning of Srinagar-Banihal Section of NH-1A from Km 187.000 to Km 189.350 (Banihal- Bypass) & Km 220.700 to Km 286.110 on DBFOT (Annuity) Basis in the State of Jammu & Kashmir under under NHDP Phase-II |
NHAI/ 12015/SB/2016/BOT(Annuity)/IE/J&K |
14/09/2016 |
14/09/2016 |
14/10/2016
Time
0:0Hrs
|
|
675 |
Consulting Services as Independent Engineer during Operation & Maintenance and fee collection of 4-lane dual carriageway from km. 52.250 to km. 131.000 of NH-58 (Meerut Muzaffarnagar Section) in the State of Uttar Pradesh on Build, Operate and Transfer (BOT) basis through a Concessionaire |
NHAI/PIU-MRT/11030/2016/1 |
12/09/2016 |
12/09/2016 |
13/10/2016
Time
11:0Hrs
|
|
676 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning ofBhiwani-Hansi-Barwala-Tohana-Punjab border (NH-148B)in the State of Haryana. |
PWD/CHD/NH-PKL/7674 |
10/09/2016 |
10/09/2016 |
03/11/2016
Time
15:0Hrs
|
|
677 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of Rail Over Bridge in Lieu of railway crossing no. B-92/A-2 on Bathinda -Barnala Dhuri Railway Section at km 110/11-12 and on NH-71 (703) section Moga-Ramgarh-Barnala road at km 140.650 at Barnala in the state of Punjab. |
16 |
10/09/2016 |
10/09/2016 |
04/10/2016
Time
16:0Hrs
|
|
678 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of Jind-Safidon-Panipat Road |
PWD/CHD/NH-PKL/7676 |
10/09/2016 |
10/09/2016 |
03/11/2016
Time
15:0Hrs
|
|
679 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning ofJind-Gohana-Sonepat (NH-352A)in the State of Haryana. |
PWD/CHD/NH-PKL/7675 |
10/09/2016 |
10/09/2016 |
03/11/2016
Time
15:0Hrs
|
|
680 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of Bhiwani bypass from Bhiwani-Jind road (NH 709A) to Bhiwani Loharu road (NH- 709-E) crossing Bhiwani Hansi road (NH-148B)in the State of Haryana. |
PWD/CHD/NH-PKL/7677 |
10/09/2016 |
10/09/2016 |
03/11/2016
Time
15:0Hrs
|
|
681 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning ofNarnaul Rewari Road (NH-11)in the State of Haryana. |
PWD/CHD/NH-PKL/7678 |
10/09/2016 |
10/09/2016 |
03/11/2016
Time
15:0Hrs
|
|
682 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Nagaland gate (NH 702D) |
CE NH etender 2016-17 08 02 |
09/09/2016 |
09/09/2016 |
21/09/2016
Time
17:0Hrs
|
|
683 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Pimla-Junction, Diphu on NH 329, sub jail junction on NH 36 to NH 129A via Thahekhu and Chumekedima to Dimapur bypass (NH 329A & NH 229) |
CE NH etender 2016-17 08 03 |
08/09/2016 |
09/09/2016 |
21/09/2016
Time
17:0Hrs
|
|
684 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF : ( PACKAGE-II) FOUR LANNING OF ADDAHOLE (NEAR GUNDYA) FROM EXISTING KM 263+000 DESIGN CH 255+703 TO BANTWALL CROSS ( EXISTING KM 328+000,DESIGN CH 318+755) OF NH-75( OLD NH NO 48) IN THE STATE OF KARNATAKA UNDER EPC MODE |
NHAI/KNT/11012/ Pkg-II//AE/2016 |
09/09/2016 |
09/09/2016 |
20/10/2016
Time
11:0Hrs
|
|
685 |
APPOINTMENT OF TECHNICAL CONSULTANT FOR FEASIBILITY STUDY AND PREPARATION OF DETAILED PROJECT REPORT FOR 4 LANING OF TAMILNADU/KARNATAKA BORDER TO HOSKOTE OF NH-207 FROM KM 16.80 TO KM 58.30 IN THE STATE OF KARNATAKA UNDER OTHER PROJECTS |
NHAI/Knt/DPR/TN Knt Bdr-Hos/2016-17/ |
09/09/2016 |
09/09/2016 |
13/10/2016
Time
17:0Hrs
|
|
686 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REPLACEMENT OF SUPERSTRUCTURE OF EXISTING 5.575 KM LONG 4 LANE MAHATMA GANDHI SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95 IN PATNA IN BIHAR STATE ON EPC MODE |
RW/NH-34048/2/2016-S&R(B) |
09/09/2016 |
09/09/2016 |
21/10/2016
Time
17:0Hrs
|
|
687 |
Independent Engineer services for Six- Laning of Vijayawada-Gundugolanu Section of NH-5 from Km 1076.48 to Km 1022.48 including 6-lane Hanuman Junction bypass (length 6.72 km) and 4-lane Vijayawada by pass (Length-47.88 km) [Total length: 103.59Km] in the state of Andhra Pradesh under NHDP Phase V to be executed in BOT (Toll) mode on DBFOT basis |
NHAI/IE/Vij-Gundu/NH-16/AP(Tech Div)/2016 |
09/09/2016 |
09/09/2016 |
02/12/2016
Time
11:0Hrs
|
|
688 |
Rehabilitation and upgradation of Eeppurapalem Ongole section from Km195/00 to Km245/500 of NH-214A(New NH-216) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP IV on EPC mode |
RO/VJA/JB/NHDP/2016-17/005 |
08/09/2016 |
08/09/2016 |
18/01/2017
Time
17:0Hrs
|
|
689 |
Consultancy services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Zunheboto and from Chazuba to Meluri via Thevopheshu, Phek, Kotisu and Tezatse (NH 702A) |
CE NH etender 2016-17 08 |
08/09/2016 |
08/09/2016 |
21/09/2016
Time
17:0Hrs
|
|
690 |
Consultancy services for Authority’s Engineer for supervision of civil construction works Rehablitat upgradation from 18350 to 56 0 on Chittoor Kurnool road of NH 18 to two lane with paved shoulder in the state of Andhra Pradesh (under EPC mode |
SE,NH,ATP,NIT NO:30/16-17 |
08/09/2016 |
08/09/2016 |
03/11/2016
Time
15:30Hrs
|
|
691 |
construction of Mangalore City Bypass, alignment linking the towns from Mulky-kinnigoli Moorukaveri- Kateel –Bajpe – Kaikamba – Polali Cross – Addur – Tenka Bellur – Kalpane – B.C. Road – Panemangalore – Thokkottu for a length of 91.20 Kms |
NHAI/Mglr Bypass/2016 |
08/09/2016 |
08/09/2016 |
07/10/2016
Time
11:0Hrs
|
|
692 |
Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation of Churachandpur – Tuivai Road Section (length-161.48 Km) on NH-102B in the state of Manipur on EPC basis |
NHIDCL/AE/Manipur/C-T/2016 |
07/09/2016 |
08/09/2016 |
25/11/2016
Time
16:0Hrs
|
|
693 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Showuba-Guzunyu-Pughoboto-Zunheboto-Aghunato-Noklak-Pangsha |
CE NH etender 2016-17 08 04 |
07/09/2016 |
08/09/2016 |
21/09/2016
Time
17:0Hrs
|
|
694 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Trans Eastern Highway from Mon-Longwa-Pangsha-Kiphire-Avangkhu |
CE NH etender 2016-17 08 05 |
07/09/2016 |
07/09/2016 |
21/09/2016
Time
17:0Hrs
|
|
695 |
RFP for Authority Engineer for the Construction of 4 lane ROB in lieu of L.C.No.122 at Km.160+800 Chittoor-Kurnool road on NH-18 (New NH-40) near Ootokuru village between CuddapahKrishnapuram Stations in the State of Andhra Pradesh” (EPC) mode) |
SE,NH,ATP,NIT NO: 29/16-17 |
07/09/2016 |
07/09/2016 |
24/10/2016
Time
15:0Hrs
|
|
696 |
Consultancy Services for Authority Engineer for Supervision of Construction of Major Bridge over river Tapi and Bypass of Mandvi and Tarsada town on NH-56 in replacement of existing Route at km 567/00 to 572/200 of NH-56 on EPC mode in state of Gujarat |
03 of 2016-17 _ 01 |
24/06/2016 |
06/09/2016 |
04/10/2016
Time
18:0Hrs
|
|
697 |
CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF PURANPUR-KHUTAR SECTION (KM 38.000 TO 82.000 OF NH-730 TO TWO LANE WITH PAVED SHOULDER UNDER EPC MODE IN STATE OF UTTAR PRADESH. |
3014/1-Tender cashier(BLY)-28/16 |
03/09/2016 |
06/09/2016 |
06/10/2016
Time
17:0Hrs
|
|
698 |
Consultancy Services for Preparation of feasibility report cum Detailed Project Report (DPR) for Capacity Augmentation to 2 lanes with paved shoulders configuration for NH Corridors in Kerala |
05/CENH/KLA/DPR/2016-17 |
03/09/2016 |
03/09/2016 |
26/09/2016
Time
15:0Hrs
|
|
699 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR FOUR LANING FROM KM 4/8 TO KM 24/6 OF NIZAMABAD-JAGDALPUR SECTION OF NH-63 (OLD NH-16) IN THE STATE OF TELANGANA UNDER NH(O) ON EPC MODE |
NIT No.SE(R&B)NH/HYD/36/2016-17, Dt.26-08-2016 |
26/08/2016 |
01/09/2016 |
03/10/2016
Time
17:0Hrs
|
|
700 |
Consultancy Services for Authority’s Engineer for Supervision of project of Rehabilitation and Up-gradation of Pollachi to Coimbatore section of NH-209 from km 123.550 to km. 150.400 to four lane with Paved Shoulders in the State of Tamil Nadu under NHDP –IV on EPC basis. |
NHAI/ EPC /Tech./NH-209/AE/2016-NHDP-IVA dated August 31, 2016 |
31/08/2016 |
31/08/2016 |
07/10/2016
Time
11:0Hrs
|
|
701 |
Independent Engineer Services during Operation & Maintenance stage of selected road stretches under BOT projects in the State of Rajasthan 4/6 Deoli - Kota Section of NH-12 |
NHAI/Tech/Raj/Misc/2016 /Aug-1 |
31/08/2016 |
31/08/2016 |
04/10/2016
Time
11:0Hrs
|
|
702 |
Independent Engineer Services during Operation & Maintenance stage of selected road stretches under BOT projects in the State of Rajasthan 4/6 Laning of Bhilwara – Rajsamand Section of NH-758 |
NHAI/Tech/Raj/Misc/2016 /Aug 2 |
31/08/2016 |
31/08/2016 |
04/10/2016
Time
11:0Hrs
|
|
703 |
Consultancy services for Authority’s Engineer for Supervision of 4-Laning of Mukkola Junction To Kerala/Tamil Nadu Border from Km 26/500 To Km 43/000 of NH-47 In The State of Kerala under NHDP Phase-III on EPC Basis |
NHAI/HQ/KL/Trivendrum Bypass-II/2015_AE |
30/08/2016 |
30/08/2016 |
13/10/2016
Time
17:0Hrs
|
|
704 |
IE services for 4 Laning of Chutmalpur-Ganeshpur section & Roorkee-Chutmalpur-Gagalheri section & Gagalheri-Saharanpur-Yamunanager section of NH-72A & NH-73 on Hybrid Auunity Mode in the State of Uttarakhand and Uttar Pradesh |
NHAI/CGGY/NH-72&73/HAM/IE/2016 |
29/08/2016 |
29/08/2016 |
06/10/2016
Time
11:0Hrs
|
|
705 |
Appointment of Authority Engineer for the Construction of R.O.B. in lieu of level crossing NO. C-184 at KM. No. 7.60 on NH-64 (Extn.) (New NH-54) at Bathinda City (on Bathinda-DAbwali road) in the State of Punjab |
CWD No.1/BTI-NH/06 |
26/08/2016 |
29/08/2016 |
28/09/2016
Time
17:0Hrs
|
-
|
706 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 2-Lane Bridge for Connectivity of Chatham Island and Bambooflat in the Union Territory region of Andaman Nicobar Islands |
NHIDCL/Chatham-Bamboo Flat/DPR/2016 |
29/08/2016 |
29/08/2016 |
25/11/2016
Time
15:0Hrs
|
|
707 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (i) Saraigarh (on NH-327A) Lalganj Ganpatganj upto NH106 and (ii) Rusera Baheri Bahera Dhansian Jaideopatti Joining the approved In Principle NH connecting Uchhait Bhagawati sthaan Basopatti Benipatti Rahika Madhubani Rampatti Awam Loufa Bheja new proposed bridge over river Koshi Mahishi Tara Sthaan Bangaon Bariyahi Sahar |
DPR/BIHAR/NHD-PAT/04 |
07/10/2016 |
26/08/2016 |
07/10/2016
Time
17:0Hrs
|
|
708 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/30) |
191-SESHA-2016 |
01/08/2016 |
26/08/2016 |
14/10/2016
Time
15:0Hrs
|
|
709 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/31) |
191-SESHA-2016 |
01/08/2016 |
26/08/2016 |
14/10/2016
Time
15:0Hrs
|
|
710 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/32) |
191-SESHA-2016 |
01/08/2016 |
26/08/2016 |
14/10/2016
Time
15:0Hrs
|
|
711 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/33) |
191-SESHA-2016 |
01/08/2016 |
26/08/2016 |
14/10/2016
Time
15:0Hrs
|
|
712 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/34) |
191-SESHA-2016 |
01/08/2016 |
26/08/2016 |
14/10/2016
Time
15:0Hrs
|
|
713 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/35) |
191-SESHA-2016 |
01/08/2016 |
26/08/2016 |
14/10/2016
Time
15:0Hrs
|
|
714 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/36) |
191-SESHA-2016 |
01/08/2016 |
26/08/2016 |
14/10/2016
Time
15:0Hrs
|
|
715 |
Consultancy Services for Preparation of DPR for Two lane with paved shoulder from Chalsa (km 105) to Telipara (km 145) Section of NH – 31C in the District of Jalpaiguri, West Bengal(2nd Call). |
e-RFP No.13 of 2016-17 of Superintending Engineer, National Highway Circle No.III |
08/08/2016 |
25/08/2016 |
31/08/2016
Time
17:0Hrs
|
|
716 |
RFP for Appointment of Technical Consultant for preparation of alignment cum feasibility- report of Nagpur - Hyderabad-Bangalore Expressway (2nd Call) |
NHAI/NHB Expressway/2016 |
24/08/2016 |
24/08/2016 |
28/09/2016
Time
11:0Hrs
|
|
717 |
Consultancy Services for Authority’s Engineer for Supervision of Projects in the State of Rajasthan and Gujarat on EPC Basis – Bar-Bilara-Jodhpur Section (km. 0.000 to 111.000) |
NHAI/RJ/11029/EPC/2016/AE TS/1(i)) |
24/08/2016 |
24/08/2016 |
04/10/2016
Time
11:0Hrs
|
-
|
718 |
Consultancy Services for Authority’s Engineer for Supervision of Projects in the State of Rajasthan and Gujarat on EPC Basis – Tonk-Sawaimadhopur Section (km. 1.30 to 69.750) |
NHAI/RJ/11029/EPC/2016/AE TS/1(ii) |
24/08/2016 |
24/08/2016 |
04/10/2016
Time
11:0Hrs
|
-
|
719 |
Consultancy Services for Authority’s Engineer for Supervision of Projects in the State of Rajasthan and Gujarat on EPC Basis – Manoharpur-Dausa Section (Km. 0.00 to 62.318) |
NHAI/RJ/11029/EPC/2016/AE TS/1(iii) |
24/08/2016 |
24/08/2016 |
04/10/2016
Time
11:0Hrs
|
-
|
720 |
Consultancy Services for Authority’s Engineer for Supervision of Projects in the State of Rajasthan and Gujarat on EPC Basis – 6-laning of Kishangarh-Udaipur-Ahmedabad (Package-7) |
NHAI/RJ/11029/EPC/2016/AE TS/1(iv) |
24/08/2016 |
24/08/2016 |
04/10/2016
Time
11:0Hrs
|
-
|
721 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF PACKAGE-I: FOUR LANNING OF HASSAN( EXISTING KM 189+700,DESIGN CH 184+912) TO MARANAHALLY( EXISTING KM 237+000,DESIGN CH 230+060) SECTION OF NH-75( OLD NH NO 48) UNDER EPC MODE IN THE STATE OF KARNATAKA |
NHAI/Knt/EPC/11012/NH-48/Pkg-I/AE/2016/87349 |
24/08/2016 |
24/08/2016 |
04/10/2016
Time
11:0Hrs
|
-
|
722 |
Consultancy Services for carrying out feasibility study and preparation of detailed project for construction of Bye Pass from Chaura (Km 310/200) on NH-22 (New NH-05) in the State of Himachal Pradesh. |
PW/EE/NH/RMP-CB-Tender/2016-8029-39 dated 12-08-2016 |
12/08/2016 |
24/08/2016 |
30/09/2016
Time
15:0Hrs
|
|
723 |
preparation of alignment cum feasibility report of Nagpur-Hyderabad-Bangalore Expressway, having an approximate length of 1100 km ( the Project) including spurs through Public Private Partnership (the PPP) on Design, Build, Finance, Operate and Transfer ( the DBFOT) basis (2nd Call) |
NHAI/NHB Expressway/2016 2nd Call |
24/08/2016 |
24/08/2016 |
18/10/2016
Time
11:0Hrs
|
|
724 |
SELECTION FOR AUTHORITY ENGINEER FOR REMAINING WORK FOR CONSTRUCTION OF 2 LANE PSC HIGH LEVEL BRIDGE WITH FOOT-PATH ACROSS THE RIVER CHAMPA IN 123 TH KM OF NH-80 UNDER EPC MODE OF PROCUREMENT. (JOB NO. 080-BIHAR 3/2015-16/008) |
12 EPC/NH BHAGALPUR /2016-1712 EPC/NH BHAGALPUR/2016-17 |
13/09/2016 |
22/08/2016 |
10/09/2016
Time
14:0Hrs
|
|
725 |
SELECTION FOR AUTHORITY ENGINEER FOR REMAINING WORK FOR CONSTRUCTION OF 2 LANE PSC HIGH LEVEL BRIDGE WITH FOOT-PATH ACROSS THE RIVER VENA IN 155 TH KM OF NH-80 UNDER EPC MODE OF PROCUREMENT. (JOB NO. 080-BIHAR 2/2015-16/009) |
12 EPC/NH BHAGALPUR 02/2016-17/008 |
13/09/2016 |
22/08/2016 |
10/09/2016
Time
14:0Hrs
|
|
726 |
Independent Engineer Services during O&M Period for the project of “Rehabilitation and Up-gradation to 2-lane with paved shoulders and maintenance of Multai-Chhindwara-Seoni Section of NH-69A and Narsinghpur-Chhindwara-Saoner Section of NH-26B in Madhya Pradesh and Maharashtra including construction and maintenance of Ring Road and Connecting Roads in Chhindwara Town”-3rd Call |
NHAI/RO-MP/NIT/2016 |
22/08/2016 |
22/08/2016 |
21/09/2016
Time
15:0Hrs
|
|
727 |
Consultancy Services for Feasibility study, Detailed project report, including conducting site investigation, sub-soil exploration and testing, preparation of plans, designs, land plan schedules and preparation of GAD for the Bypass Roads for the four towns of V.Kota and Chittoor in Chittoor District, Badvel in Kadapa District and Adoni in Kurnool District |
25/16-17 |
20/08/2016 |
20/08/2016 |
14/09/2016
Time
17:0Hrs
|
|
728 |
Consultancy Services for Feasibility study, Detailed project report, Including conducting site investigation, subsoil exploration and testing preparation of plans, designs, Land plan schedules, preparation of GAD for the byepass roads of Kadiri, Tadipatri, Muddigubba, Bathalapalli Byepasses roads in Ananthapuramu District in the state of Andhra Pradesh |
NIT 26/16-17 |
20/08/2016 |
20/08/2016 |
14/09/2016
Time
17:0Hrs
|
|
729 |
Independent Engineer services for Balance works of Four laning of MH-KNT Border-Sangareddy from Km.348.800 to Km.493.000 of NH-9 in the States of Karnataka and Andhra Pradesh on DBFOT Basis under NHDP-Phase-III |
Package No.Kar/Phase-III/IE-3/2016 |
19/08/2016 |
19/08/2016 |
18/09/2016
Time
17:0Hrs
|
|
730 |
Consultancy services for Authority’s Engineer for supervision of project of Four Laning of Kerala/Tamil Nadu Border to Villukuri from km. 43+000 to km. 70.250 section of NH-47 under NHDP Phase-III in the state of Tamil Nadu on EPC mode |
NHAI/EPC/11012/03/TN-KL-VIL/AE/2016 dated August 19, 2016 |
19/08/2016 |
19/08/2016 |
27/09/2016
Time
11:0Hrs
|
|
731 |
Consultancy Services for Authority’s Engineer for supervision of project of Four laning of Villukuri to Kanyakumari from km. 70.250 to km. 96.714 section of NH-47 and Nagercoil to Kavalkinaru from km. 0.000 to km. 16.376 section of NH-47B under NHDP Phase-III in the state of Tamil Nadu on EPC mode |
NHAI/EPC/11012/04/ VIL-KAN/AE/2016 dated Aug 19, 2016 |
19/08/2016 |
19/08/2016 |
27/09/2016
Time
11:0Hrs
|
|
732 |
Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for improvement of existing road from Km 28.30 (Akhnoor) to Km 108.54 (Tain Br) under 13 TF as Part-I and from Km 108.54 to Km 236.78 (Poonch) under 31 TF as Part-II on NH-144A for four lane with Paved Shoulder from existing double lane specification in the State of J&K. |
CE (P) SPK/16/2016-17 |
13/08/2016 |
19/08/2016 |
21/09/2016
Time
12:0Hrs
|
|
733 |
Independent Engineer Services for balance works of 4-Laning of MH-KNT Border-Sangareddy from Km.348.800 to Km.493.000 of NH-9 in the States of Karnataka and Andhra Pradesh under NHDP-III on DBFOT(BOT) basis in BOT(Toll) mode |
NHAI/NHDP-III/DBFO/NH-9/3/2013 |
19/08/2016 |
19/08/2016 |
23/09/2016
Time
0:0Hrs
|
|
734 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/27) |
190-SESHA-2016 |
30/07/2016 |
18/08/2016 |
04/10/2016
Time
15:0Hrs
|
|
735 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/28) |
190-SESHA-2016 |
30/07/2016 |
18/08/2016 |
04/10/2016
Time
15:0Hrs
|
|
736 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/29) |
190-SESHA-2016 |
30/07/2016 |
18/08/2016 |
04/10/2016
Time
15:0Hrs
|
|
737 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/25) |
190-SESHA-2016 |
30/07/2016 |
18/08/2016 |
04/10/2016
Time
15:0Hrs
|
|
738 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/26) |
190-SESHA-2016 |
30/07/2016 |
18/08/2016 |
04/10/2016
Time
15:0Hrs
|
|
739 |
INVITATION OF REQUEST FOR TECHNICAL CONSULTANT FOR FEASIBILITY STUDY AND PREPARATION OF DETAILED PROJECT REPORT OF FOUR LANING OF THIRUMANGALAM TO RAJAPALAYAM SECTION OF NH-744 (TOTAL LENGTH = 76 KM.) IN THE STATE OF TAMIL NADU UNDER NHDP PHASE-IV(2nd Call) |
NHAI/DPR/11012/07/Thiru-Raja/2016 Dated: 16.08.2016 |
16/08/2016 |
16/08/2016 |
30/09/2016
Time
11:0Hrs
|
|
740 |
INVITATION OF REQUEST FOR TECHNICAL CONSULTANT FOR FEASIBILITY STUDY AND PREPARATION OF DETAILED PROJECT REPORT FOR FOUR LANING OF MADURAI – THENI- TN/KL BORDER SECTION OF NH-49(EXT) FROM KM.36.00 TO KM. 64 & KM. 80 TO KM. 96.00 IN THE STATE OF TAMIL NADU UNDER OTHER PROJECTS(2ND CALL) |
NHAI/DPR/11012/05/Mad-Theni-TN/KL/2016 Dated: 16.08.2016 |
16/08/2016 |
16/08/2016 |
30/09/2016
Time
11:0Hrs
|
|
741 |
Consultancy services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Zunheboto and from Chazuba to Meluri via Thevopheshu, Phek, Kotisu and Tezatse (NH 702A) |
CENHetender2016-170801 |
12/08/2016 |
16/08/2016 |
07/09/2016
Time
17:0Hrs
|
|
742 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Nagaland gate (NH 702B) |
CE NH etender 2016-17 08 02 |
12/08/2016 |
16/08/2016 |
07/09/2016
Time
17:0Hrs
|
|
743 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Pimla-Junction, Diphu on NH 329, sub jail junction on NH 36 to NH 129A via Thahekhu and Chumekedima to Dimapur bypass |
CE NH etender 2016-17 08 03 |
16/08/2016 |
16/08/2016 |
07/09/2016
Time
17:0Hrs
|
|
744 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Showuba-Guzunyu-Pughoboto-Zunheboto-Aghunato-Noklak-Pangsha |
CE NH etender 2016-17 08 04 |
16/08/2016 |
16/08/2016 |
07/09/2016
Time
17:0Hrs
|
|
745 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Trans Eastern Highway from Mon-Longwa-Pangsha-Kiphire-Avangkhu |
CE NH etender 2016-17 08 05 |
16/08/2016 |
16/08/2016 |
07/09/2016
Time
17:0Hrs
|
|
746 |
RFP for Technical Consultant For Feasibility Study and Preparation of Detailed Project Report for 4 Laning of Madurai – Theni- TN/KL Border section of NH-49(Ext) from Km.36.00 to Km. 64 & Km. 80 to Km. 96.00 in the State of Tamil Nadu under Other Projects( 2nd Call) |
NHAI/DPR/11012/05/Mad-Theni-TN/KL/2016 Dated: 16.08.2016 |
16/08/2016 |
16/08/2016 |
15/09/2016
Time
11:0Hrs
|
|
747 |
RFP for Technical Consultant For Feasibility Study and Preparation of Detailed Project Report for 4 Laning of Thirumangalam to Rajapalayam section of NH-744 in the State of Tamil Nadu under NHDP Phase-IV (2nd Call) |
NHAI/DPR/11012/07/Thiru-Raja/2016 Dated: 16.08.2016 |
16/08/2016 |
16/08/2016 |
15/09/2016
Time
11:0Hrs
|
|
748 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/20) |
189-SESHA-2016 |
30/07/2016 |
12/08/2016 |
29/09/2016
Time
15:0Hrs
|
|
749 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/21) |
189-SESHA-2016 |
30/07/2016 |
12/08/2016 |
29/09/2016
Time
15:0Hrs
|
|
750 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/22) |
189-SESHA-2016 |
30/07/2016 |
12/08/2016 |
29/09/2016
Time
15:0Hrs
|
|
751 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/23) |
189-SESHA-2016 |
30/07/2016 |
12/08/2016 |
29/09/2016
Time
15:0Hrs
|
|
752 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/24) |
189-SESHA-2016 |
30/07/2016 |
12/08/2016 |
29/09/2016
Time
15:0Hrs
|
|
753 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/19 |
SE-NHCS-19 |
06/08/2016 |
11/08/2016 |
06/10/2016
Time
15:0Hrs
|
|
754 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/20 |
SE-NHCS-20 |
06/08/2016 |
11/08/2016 |
06/10/2016
Time
15:0Hrs
|
|
755 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/21 |
SE-NHCS-21 |
06/08/2016 |
11/08/2016 |
06/10/2016
Time
15:0Hrs
|
|
756 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridor under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country in the State of Arunachal Pradesh. |
NHIDCL/BM-BRT/Arunachal/2016 |
10/08/2016 |
11/08/2016 |
26/12/2016
Time
16:0Hrs
|
|
757 |
Consultancy Services for Authority Engineer for Supervision of Construction of Major Bridge over river Tapi and Bypass of Mandvi and Tarsada town on NH-56 in replacement of existing Route at km 567/00 to 572/200 of NH-56 on EPC mode in state of Gujarat |
03OF2016-17_01(TENDER ID-27491) |
11/08/2016 |
11/08/2016 |
22/08/2016
Time
18:0Hrs
|
|
758 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-I. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-I |
10/08/2016 |
10/08/2016 |
09/09/2016
Time
15:0Hrs
|
|
759 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-II. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-II |
10/08/2016 |
10/08/2016 |
09/09/2016
Time
15:0Hrs
|
|
760 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-III. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-III |
10/08/2016 |
10/08/2016 |
09/09/2016
Time
15:0Hrs
|
|
761 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-IV. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-IV |
10/08/2016 |
10/08/2016 |
09/09/2016
Time
15:0Hrs
|
|
762 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-V. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-V |
10/08/2016 |
10/08/2016 |
09/09/2016
Time
15:0Hrs
|
|
763 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-VI. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-VI |
10/08/2016 |
10/08/2016 |
09/09/2016
Time
15:0Hrs
|
|
764 |
Authority Engineer for Construction of 1210m length (Double Lane) pre-stressed/ RCC Bridge over Ravi River at village Keerian- Gandial District Kathua (J&K) along with approach roads of length 7390m under Inter State Connectivity (ISC) scheme for the year 2015-16 in the State of Jammu and Kashmir. |
72 of 2016-17/6665-6739/G |
09/08/2016 |
10/08/2016 |
19/09/2016
Time
16:0Hrs
|
|
765 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/15 |
SE-NHCS-15 |
01/08/2016 |
09/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
766 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/16 |
SE-NHCS-16 |
01/08/2016 |
09/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
767 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/17 |
SE-NHCS-17 |
01/08/2016 |
09/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
768 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/18 |
SE-NHCS-18 |
01/08/2016 |
09/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
769 |
Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of Pratapgarh to Allahabad Bypass Road Junction section of NH-96 from existing km 100/800 to km 135/230 [Design Ch.100.800 to Ch. 135.500] to Four lane with paved shoulders in the state of Uttar Pradesh on Engineering, Procurement & Construction (EPC) Basis Contract. |
RO/LKO/ NH-96/AE 100-135/2016-17 |
08/08/2016 |
08/08/2016 |
08/08/2016
Time
17:0Hrs
|
|
770 |
Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of Pratapgarh to Allahabad Bypass Road Junction section of NH-96 from existing km 100/800 to km 135/230 [Design Ch.100.800 to Ch. 135.500] to Four lane with paved shoulders in the state of Uttar Pradesh on Engineering, Procurement & Construction (EPC) Basis Contract. |
RO/LKO/ NH-96/AE 100-135/2016-17 |
08/08/2016 |
08/08/2016 |
08/09/2016
Time
17:0Hrs
|
|
771 |
Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and up-gradation of Bahraich – Shrawasti section (Km. 248.400 to Km. 310.000) of NH-730 to two-lane with paved shoulders in the State of Uttar Pradesh on EPC mode. |
RO/LKO/NH-730/AE 248-310/2016-17 |
08/08/2016 |
08/08/2016 |
08/08/2016
Time
17:0Hrs
|
|
772 |
Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and up-gradation of Bahraich – Shrawasti section (Km. 248.400 to Km. 310.000) of NH-730 to two-lane with paved shoulders in the State of Uttar Pradesh on EPC mode. |
RO/LKO/NH-730/AE 248-310/2016-17 |
08/08/2016 |
08/08/2016 |
08/09/2016
Time
17:0Hrs
|
|
773 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/18) |
188-SESHA-2016 |
28/07/2016 |
08/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
774 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/19) |
188-SESHA-2016 |
28/07/2016 |
08/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
775 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/15) |
188-SESHA-2016 |
28/07/2016 |
08/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
776 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/16) |
188-SESHA-2016 |
28/07/2016 |
08/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
777 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/17) |
188-SESHA-2016 |
28/07/2016 |
08/08/2016 |
23/09/2016
Time
15:0Hrs
|
|
778 |
Independent Engineer Services during Operation & Maintenance Period for 2 laning with paved shoulder of Raebareilly-Jaunpur Section of NH-231 from Km. 0.000 to Km. 166.400 on BOT (Annuity) |
NHAI/PIU-Rbly/NH-231/O&M/2016/9561 |
08/08/2016 |
08/08/2016 |
22/09/2016
Time
15:0Hrs
|
|
779 |
Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of Jharpokharia-Baripada-Baleshwar Section of NH-5 (Km 0.000 to Km 80.600) in the State of Odisha under NHDP Phase-IV on EPC mode |
NHAI/NHDP IV/05/2016/AE/EPC/401 |
05/08/2016 |
05/08/2016 |
21/10/2016
Time
11:0Hrs
|
|
780 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF i. Construction of ROB in lieu of Level Crossing No. B-31 at Km 224.400 on NH-15(New NH-54) at FARIDKOT on Talwandi-Faridkot Road in the State of Punjab ii. Construction of ROB in lieu of Level Crossing No. S-26 at Km 235.240 on NH-15(New NH-54) at KOTKAPURA on Faridkot-Kotkapura Road in the State of Punjab |
50 |
01/08/2016 |
04/08/2016 |
12/09/2016
Time
16:0Hrs
|
|
781 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/13) |
187-SESHA-2016 |
22/07/2016 |
04/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
782 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/12 |
187-SESHA-2016 |
22/07/2016 |
04/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
783 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/14) |
187-SESHA-2016 |
22/07/2016 |
04/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
784 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/10) |
187-SESHA-2016 |
22/07/2016 |
04/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
785 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/11) |
187-SESHA-2016 |
22/07/2016 |
04/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
786 |
Consultancy services for Authority’s Engineer for Supervision of Construction of Flyover/ Underpass for improvement of existing junctions at IFFCO Chowk at Km. 28.211, Signature Chowk at Km. 29.650 and Rajiv Chowk at Km. 33.180 on Delhi – Gurgaon Access Controlled section on NH-8 in the State of Haryana. |
23535 |
03/08/2016 |
03/08/2016 |
05/09/2016
Time
11:0Hrs
|
|
787 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/10 |
SE-NHCS-10 |
27/07/2016 |
02/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
788 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/11 |
SE-NHCS-11 |
27/07/2016 |
02/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
789 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/12 |
SE-NHCS-12 |
27/07/2016 |
02/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
790 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/13 |
SE-NHCS-13 |
27/07/2016 |
02/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
791 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/14 |
SE-NHCS-14 |
27/07/2016 |
02/08/2016 |
20/09/2016
Time
15:0Hrs
|
|
792 |
Technical Consultant for preparation of Feasibility Study and Detailed Project Report For Punjab/ Haryana border to Moonak – Jakhal – Budhladha – Bhikhi road NH- 148 B section from Km. 247.150 to 287.710 in the State of Punjab. |
15 |
02/08/2016 |
02/08/2016 |
16/08/2016
Time
16:0Hrs
|
|
793 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF HIGH LEVEL THAPRA BRIDGE ON CHORDI CHORAHA-KUBA-ANANDPURI ROAD (MDR-83) IN KM 22 OF BANSWARA DISTRICT ON EPC MODE IN STATE OF RAJASTHAN |
04/2016-17 |
01/08/2016 |
01/08/2016 |
30/08/2016
Time
17:0Hrs
|
|
794 |
Invitation of RFP for Technical Consultant for Feasibility Study and Preparation of Detailed Project Report for 4 Laning of Tamilnadu/Karnataka Border to Hoskote of NH-207 from km 16.80 to Km 58.30 in the State of Karnataka under Other Projects |
NHAI/Knt/DPR/TN/Knt Bdr-Hos/2016-17/86297 |
29/07/2016 |
29/07/2016 |
05/09/2016
Time
11:0Hrs
|
|
795 |
Request for proposal (RFP) documents for procuring Consultancy Services for Bharatmala project in the state of Goa |
F-15/2016-17/WDVII(NH)/PWD/ASW/27 |
29/07/2016 |
29/07/2016 |
24/08/2016
Time
17:0Hrs
|
|
796 |
Independent Engineer Services for Four laning of Bhavnagar-Talaja Section of NH-8E from km. 7.090 to km. 53.585 (Design ch. From km 6.945 to km 54.990) (Package–I) in the state of Gujarat on Hybrid Annuity mode under NHDP Phase IV |
NHAI/11012/Proc/IE/NH-8E/Bhav-Tala/2016/86290 |
29/07/2016 |
29/07/2016 |
30/09/2016
Time
11:0Hrs
|
|
797 |
Independent Engineer Services for Four laning of Talaja – Mahuva Section of NH – 8E from km. 53.585 to km. 100.100 (design chainage from km. 54.990 to km. 100.450) (Package–II) in the state of Gujarat on Hybrid Annuity mode under NHDP Phase IV. |
NHAI/11012/Proc/IE/NH-8E/Tala-Mahu/2016/86291 |
29/07/2016 |
29/07/2016 |
30/09/2016
Time
11:0Hrs
|
|
798 |
Independent Engineer Services for Four Laning of Mahuva to Kagavadar of NH-8E from Km. 100.100 to Km 139.915 (Design Chainage from Km 100.450 to km 140.470) (Package-III) in the State of Gujarat on Hybrid Annuity Mode under NHDP Phase IV |
NHAI/11012/Proc/IE/NH-8E/Mahu-Kaga/2016/86292 |
29/07/2016 |
29/07/2016 |
30/09/2016
Time
11:0Hrs
|
|
799 |
Independent Engineer Services for Four Laning of Kagavadar to Una of NH-8E from Km. 139.915 to Km 180.478 (Design Chainage from Km 140.470 to Km 181.450) (Package-IV) in the State of Gujarat on Hybrid Annuity Mode under NHDP Phase-IV |
NHAI/11012/Proc/IE/NH-8E/Kaga-Una/2016/86293 |
29/07/2016 |
29/07/2016 |
30/09/2016
Time
11:0Hrs
|
|
800 |
Independent Engineer Services for Four Laning of Una to Kodinar of NH-8E from Km. 180.478 to Km 221.610 (Design Chainage from Km 181.450 to Km 222.400) (Package-V) in the State of Gujarat on Hybrid Annuity Mode under NHDP Phase-IV |
NHAI/11012/Proc/IE/NH-8E/Una-Kodi/2016/86294 |
29/07/2016 |
29/07/2016 |
30/09/2016
Time
11:0Hrs
|
|
801 |
Independent Engineer Services for Four laning of Kodinar to Veraval Section of NH-8E from km 221.610 (Design Ch. Km 222.400) to km 263.000 (Design Ch. km 263.180) and from km 120.900 to km 121.150 of NH-8D (Package-VI) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) Mode under NHDP Phase-IV |
NHAI/11012/Proc/IE/NH-8E/Kodi-Vera/2016/86295 |
29/07/2016 |
29/07/2016 |
30/09/2016
Time
11:0Hrs
|
|
802 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of Road Networks in the State of Goa for up-gradation to Two Lanes with paved shoulder /Four lane configurations |
F-15/2016-17/WDVII(NH)/PWD/26 |
27/07/2016 |
28/07/2016 |
17/08/2016
Time
17:0Hrs
|
|
803 |
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR CONSTRUCTION OF HLB ACROSS RIVER SILERU INCLUDING WIDENING TO 2-LANE AND IMPROVEMENTS FROM KM 0/0 TO 10/00 OF CHINTUR-MOTU ROAD IN EAST GODAVARI DISTRICT UNDER RRP-1 LWE PROJECT OF A.P (Bridge Work Only) ON EPC MODE. |
NITNo.SE(R&B)KKD⁄NITNo.07⁄EPC⁄AEE.1⁄2016-17Dt.21-6-2016 |
21/06/2016 |
28/07/2016 |
30/12/2016
Time
17:0Hrs
|
|
804 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of Stretch from Bihar Jharkhand Border Raniganj Imamganj Sherghati of Daltonganj on NH 39 new Sagalim Tarhasi Manatu Chak Raniganj Imamganj Sherghati road stretch from Dangwa Bihar Jharkhand Border Nabinagar Barun NH 02 of Chhatarpur NH 98 Japla Dangwa Nabinagar Barun NH 02 road in Bihar on EPC Mode. |
DPR/BIHAR/NHD-PAT/05 |
07/10/2016 |
28/07/2016 |
07/10/2016
Time
17:0Hrs
|
|
805 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of i Stretch from Janarh NH 77 Muzaffarpur Dubbapur Dekhuli Dham on NH 227 ii Stretch from Hajipur on NH 22 Mahua Kumar Bejidpur Tajpur on NH 122 in Bihar on EPC Mode. |
DPR/BIHAR/NHD-PAT/06 |
07/10/2016 |
28/07/2016 |
07/10/2016
Time
17:0Hrs
|
|
806 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of i Stretch from Jahandabad on NH 22 Ghosi Hulasganj Kkhudaganj Rajgir on NH 120 ii Stretch from the junction of NH 431 near Dhaniawan Patna Islampur Hulasganj Khizr sarai Gaya on NH 120 in Bihar on EPC Mode. |
DPR/BIHAR/NHD-PAT/07 |
07/10/2016 |
28/07/2016 |
07/10/2016
Time
17:0Hrs
|
|
807 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of i Stretch from Siwan on NH 531 Maharajganj Janta Bazar Junction with NH 331 near Baniapur ii Sitalpur Patna on NH 31 Amnour Taraiya Mashrakh in Bihar on EPC Mode. |
DPR/BIHAR/NHD-PAT/08 |
07/10/2016 |
28/07/2016 |
07/10/2016
Time
17:0Hrs
|
|
808 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of i Stretch from Luckeesarai on NH 33 Jamui on NH 33 ii Stretch from Dhakamore in State of Bihar to Bihar Jharkhand Border of Dhakamore in State of Bihar Hansdiha in State of Jharkhand Road iii Stretch from Sarwan Bihar Jharkhand Border to Chakia of Jamu Kharagdiha Chator Sarwan Chakia road in Bihar on EPC Mode. |
DPR/BIHAR/NHD-PAT/09 |
07/10/2016 |
28/07/2016 |
07/10/2016
Time
17:0Hrs
|
|
809 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (i) Saraigarh (on NH-327A) - Lalganj - Ganpatganj upto NH-106 and (ii) Rusera -Baheri - Bahera - Dhansian - Jaideopatti -Joining the approved In Principle NH connecting Uchhait Bhagawati sthaan Basopatti - Benipatti - Rahika - Madhubani - Rampatti - Awam - Loufa - Bheja - new proposed bridge over river Koshi - Mahishi - Tara Sthaan - Bangaon - Bariyahi - Sahar |
DPR/BIHAR/NHD-PAT/01 |
07/10/2016 |
28/07/2016 |
07/10/2016
Time
17:0Hrs
|
|
810 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (i) Stretch from Gopalganj on NH-27-Areraj-Sugauli on NH-727 & (ii) Stretch from Areraj-Motihari in Bihar on EPC Mode. |
DPR/BIHAR/NHD-PAT/02 |
07/10/2016 |
28/07/2016 |
07/10/2016
Time
17:0Hrs
|
|
811 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (i) Stretch from Bettiah on NH-727 – Chanpatia – Narkatiaganj – Amolwa – Bhitiharawa Ashram – Prakhand Gawnaha – Indo/Nepal Border & (ii) Stretch from Shautarwa on NH-727 – Dhanha – Tamkuha Bazar – Baansi – Padrauna on NH-727 in Bihar on EPC Mode. |
DPR/BIHAR/NHD-PAT/03 |
07/10/2016 |
28/07/2016 |
07/10/2016
Time
17:0Hrs
|
|
812 |
Consultancy Services for Project Management including Preparation of Detailed Project Report of Upgradation to Two lane with Paved Shoulders configuration of the National HighWays from km 169.770 to 236.150 of NH 30 of Vijayawada – Jagadalpur section in the state of Andhra Pradesh (66.38 km) |
S E(R&B)/NH/VJA/Short Tender/06(1)/ 2016-17 |
22/07/2015 |
27/07/2016 |
12/08/2016
Time
15:0Hrs
|
|
813 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways / State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with paved shoulder configuration (1) NH 43 (New NH 26) from km 481/0 to 522/0 (41Kms) and 2) km 0/0 to 41/0 of NH 326A (41kms) |(Total: 82Kms) in the state of Andhra Pradesh |
S E(R&B)/NH/VJA/Short Tender/06(2)/ 2016-17 |
22/07/2016 |
27/07/2016 |
12/08/2016
Time
15:0Hrs
|
|
814 |
Consultancy Services for Preparation of DPR for Two lane with paved shoulder from Chalsa (km 105) to Telipara (km 145) Section of NH – 31C in the District of Jalpaiguri, West Bengal. |
e-RFP No.10 of 2016-17 of Superintending Engineer, National Highway Circle No.III, Siliguri |
05/07/2016 |
25/07/2016 |
04/08/2016
Time
17:0Hrs
|
|
815 |
Consultancy services for Authority’s engineer for supervision of four laning of Lakhnadon-Seoni section from Km.551+600 to 553+100, Km. 557+ Km 400 to Km 557+800, Km 558+930 to Km 562+450 and Km 563+760 to Km 567+550 (left out stretches) of NH 7 in the State of MP under NHDP Phase II on EPC mode |
NHAI/HQ/MP/NS-1/AE/MP-2-delink/2016 |
22/07/2016 |
23/07/2016 |
23/08/2016
Time
11:0Hrs
|
|
816 |
Consultancy services for feasibility study and preparation of detailed project report for 4 laning of Basukinath - Deoghar section of NH-114A under NHDP Phase-IV in the state of Jharkhand. |
NHAI/11012/NHDP-IV/JH/Basukinath-Deoghar/2016 |
22/07/2016 |
22/07/2016 |
02/09/2016
Time
11:0Hrs
|
|
817 |
Technical Consultant for Preparation of Alignment cum Feasibility- Report of Delhi-Ludhiana-Amritsar-Katra Expressway with connectivity to Chandigarh (3rd Call) |
NHAI/RFP/DL/2016 |
22/07/2016 |
22/07/2016 |
24/08/2016
Time
11:0Hrs
|
|
818 |
Independent Engineer Services during Operation & Maintenance Period for the project of “Design, Construction, Development, Finance, Operation and Maintenance of Km. 547.400 to Km. 596.750 on NH-7 in the State of Madhya Pradesh under North-South Corridor (NHDP-Phase-II Programme) on BOT (Annuity) Basis”-(Consultancy Package-NS1/IE (O&M)/MP-2) |
23507 |
21/07/2016 |
21/07/2016 |
22/08/2016
Time
15:0Hrs
|
|
819 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridors under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country and ADB Funded Projects in the State of Jammu & Kashmir. |
NHIDCL/BM-BRT/03/2016 |
21/07/2016 |
21/07/2016 |
02/09/2016
Time
15:0Hrs
|
|
820 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/6 |
SE-NHCS-6 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
821 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/7 |
SE-NHCS-7 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
822 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/8 |
SE-NHCS-8 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
823 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/9 |
SE-NHCS-9 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
824 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/2 |
SE-NHCS-2 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
825 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/3 |
SE-NHCS-3 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
826 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/4 |
SE-NHCS-4 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
827 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/5 |
SE-NHCS-5 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
828 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/SHIMLA/1 |
SE-NHCS-1 |
16/07/2016 |
21/07/2016 |
09/09/2016
Time
15:0Hrs
|
|
829 |
Technical Consultant for preparation of Feasibility Study and Detailed Project Report For Punjab/ Haryana border to Moonak – Jakhal – Budhladha – Bhikhi road NH- 148 B section from Km. 247.150 to 287.710 in the State of Punjab. |
13 |
20/07/2016 |
20/07/2016 |
27/07/2016
Time
16:0Hrs
|
|
830 |
Consultancy Services for the improvement by 4 laning |
PWD/CHD/NHPKL/ 7158 |
19/07/2016 |
19/07/2016 |
19/08/2016
Time
15:0Hrs
|
-
|
831 |
Independent Engineer services during Operation & Maintenance Period of 6-laning of Hosur - Krishnagiri Section of NH- 7 from Km 33/130 to Km 93/000 in the State of Tamil Nadu under NHDP Phase-V executed under DBFO Pattern |
RO Chennai/IE/O&M/2016/Package-V |
19/07/2016 |
19/07/2016 |
30/08/2016
Time
11:0Hrs
|
|
832 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/9) |
186-SESHA-2016 |
11/07/2016 |
19/07/2016 |
01/09/2016
Time
15:0Hrs
|
|
833 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh Package no. HP/Shahpur/5 |
186-SESHA-2016 |
11/07/2016 |
17/07/2016 |
01/09/2016
Time
15:0Hrs
|
|
834 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/7) |
186-SESHA-2016 |
11/07/2016 |
17/07/2016 |
01/09/2016
Time
15:0Hrs
|
|
835 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/8) |
186-SESHA-2016 |
11/07/2016 |
17/07/2016 |
01/09/2016
Time
15:0Hrs
|
|
836 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/6) |
186-SESHA-2016 |
11/07/2016 |
17/07/2016 |
01/09/2016
Time
15:0Hrs
|
|
837 |
Consultancy Services for Authority’s Engineer for Supervision of “4 Laning of Dimapur- Kohima Road from (i) Design Km 123.840 to Km 138.775 (Existing Km 124.100 to Km 140.000) (ii) Design Km 138.775 to Km 152.490 (Existing Km 140.000 to Km 156.000) (iii)Design Km 152.490 to Km 166.700 (Existing Km 156.00 to Km 172.900) in state of Nagaland under SARDP-NE on EPC basis |
39/NHIDCL/NG/Ar .Er./DK/2016 |
14/07/2016 |
14/07/2016 |
24/08/2016
Time
16:0Hrs
|
|
838 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR PROJECT OF (i) 2 Laning with paved shoulders from Km 6.250 to Km 10.40 of Silchar-Badarpur section of NH-53 (Length = 4.770 Km) on EPC Basis in the state of Assam under SARDP-NE. (ii) Construction of 1000m length Viaduct at Rangpo between Km 51.1 0 to Km 53.90 on Sevoke - Gangtok Road (NH- 31A) in the state of West Bengal/Sikkim |
NHIDCL/AE/Sil-Bad(Assam)/Rangpo (Wb/Sikkim)/2016 |
13/07/2016 |
13/07/2016 |
05/10/2016
Time
16:0Hrs
|
|
839 |
RFP for Technical Consultant For Feasibility Study and Preparation of Detailed Project Report for 4 Laning of Madurai – Theni- TN/KL Border section of NH-49(Ext) from Km.36.00 to Km. 64.00 & Km. 80.00 to Km. 96.00 in the State of Tamil Nadu under Other Projects |
NHAI/DPR/11012/05/Mad-Theni-TN/KL/2016 |
11/07/2016 |
11/07/2016 |
10/08/2016
Time
11:0Hrs
|
|
840 |
RFP for Technical Consultant For Feasibility Study and Preparation of Detailed Project Report for 4 Laning of Thirumangalam to Rajapalayam section of NH-744 in the State of Tamil Nadu under NHDP Phase-IV |
NHAI/DPR/11012/07/Thiru-Raja/2016 |
11/07/2016 |
11/07/2016 |
10/08/2016
Time
11:0Hrs
|
|
841 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF TWO/FOUR LANING WITH PAVED SHOULDERS OF GOVINDPUR (RAJGUNJ)-CHAS-WEST BENGAL BORDER SECTION OF NH-32 FROM KM. 0.000 TO KM. 56.889 IN THE STATE OF JHARKHAND UNDER NHDP PHASE-IV ON EPC MODE. |
NHAI/JH/ GCWBB/AE/2016 |
08/07/2016 |
08/07/2016 |
10/08/2016
Time
11:0Hrs
|
|
842 |
Independent Engineer Services for rehabilitation and up-gradation of NH-66 (Old NH-17) from km 205/400 to km 241/300 (Parsuram ghat - Arawali section) to four lanes in the State of Maharashtra under NHDP-IV on Hybrid Annuity Mode. |
RO/MUM/NHDP-IV/NH-66/IE/Package-II, dated 07th July, 2016 |
08/07/2016 |
08/07/2016 |
01/09/2016
Time
17:0Hrs
|
|
843 |
Independent Engineer Services for rehabilitation and up-gradation of NH-66 (Old NH-17) from km 241/300 to km 281/300 (Arawali - Kante section) to four lanes in the State of Maharashtra under NHDP-IV on Hybrid Annuity Mode. |
RO/MUM/NHDP-IV/NH-66/IE/Package-III, dated 07th July, 2016 |
07/07/2016 |
08/07/2016 |
01/09/2016
Time
17:0Hrs
|
|
844 |
Independent Engineer Services for rehabilitation and up-gradation of NH-66 (Old NH-17) from km 281/300 to km 332/200 (Kante-Waked section) to four lanes in the State of Maharashtra under NHDP-IV on Hybrid Annuity Mode. |
RO/MUM/NHDP-IV/NH-66/IE/Package-IV, dated 07th July, 2016 |
07/07/2016 |
08/07/2016 |
01/09/2016
Time
17:0Hrs
|
|
845 |
Independent Engineer Services for Four Laning of Kashedi (Khawati) - ParshuramGhat section of National Highway No. 17 (New NH-66)(Total length 42.330 Km) in the State of Maharashtra under NHDP Phase IV on Hybrid Annuity Mode |
RO/MUM/NHDP-IV/NH-66/IE/Package-I, dated 07th July, 2016 |
07/07/2016 |
08/07/2016 |
01/09/2016
Time
17:0Hrs
|
|
846 |
Consultancy Services for Project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to backward areas/Religious/Tourist places and Border area under Bharatmala schemepackage no. NHAI/R/5 |
NHAI/BRT/Proc/03/DPR/2016 |
05/07/2016 |
05/07/2016 |
25/07/2016
Time
15:0Hrs
|
|
847 |
Consultancy Services for Project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to backward areas/Religious/Tourist places and Border area under Bharatmala schemepackage no. NHAI/R/20 |
NHAI/BRT/Proc/03/DPR/2016 |
05/07/2016 |
05/07/2016 |
25/07/2016
Time
15:0Hrs
|
|
848 |
Consultancy Services for Project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to backward areas/Religious/Tourist places and Border area under Bharatmala schemepackage no. NHAI/BM/11 |
NHAI/BRT/Proc/03/DPR/2016 |
05/07/2016 |
05/07/2016 |
25/07/2016
Time
15:0Hrs
|
|
849 |
Independent Engineer Services for Two Laning with formation of Four lane of Proposed Shimla Bypass (Kaithlighat to Shimla section) of NH-22 from Km. 129.050 to km. 156.507, on Hybrid Annuity Mode in the state of Himachal Pradesh, under NHDP Phase-III |
NHAI/ 11020/3/SB-II/2016/EPC/IE/HP |
04/07/2016 |
04/07/2016 |
17/08/2016
Time
11:0Hrs
|
|
850 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for New Construction/Up-gradation to Two/Four lane with paved shoulder configuration : Baikunthpur-Sonhat-Ramgarh Road |
NH/CE/PWD/03 |
02/07/2016 |
04/07/2016 |
05/08/2016
Time
15:0Hrs
|
|
851 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for New Construction/Up-gradation to Two/Four lane with paved shoulder configuration : Dhamdha-Gandai (28/2) Road |
NH/CE/PWD/04 |
02/07/2016 |
04/07/2016 |
05/08/2016
Time
17:0Hrs
|
|
852 |
Consultancy Services for Feasibility study, Detailed project report, including conducting site investigation, sub-soil exploration and testing, preparation of plans, designs, land plan schedules and preparation of GAD for the Bypass Roads for the four towns of V.Kota and Chittoor in Chittoor District, Badvel in Kadapa District and Adoni in Kurnool District |
NIt no:20/16-17 |
04/07/2016 |
04/07/2016 |
03/08/2016
Time
15:0Hrs
|
|
853 |
Independent Engineer Services for Two Laning with formation of Four lane of Proposed Shimla Bypass (Kaithlighat to Shimla section) of NH-22 from Km. 129.050 to km. 156.507, on Hybrid Annuity Mode in the state of Himachal Pradesh, under NHDP Phase-III. (Revised RFP) |
NHAI/ 11020/3/SB-II/2016/HAM/IE/HP |
04/07/2016 |
04/07/2016 |
23/09/2016
Time
11:0Hrs
|
|
854 |
Consultancy Services for Feasibility study, Detailed project report, Including conducting site investigation, subsoil exploration and testing preparation of plans, designs, Land plan schedules, preparation of GAD for the byepass roads of Kadiri, Tadipatri, Muddigubba, Bathalapalli Byepasses roads in Ananthapuramu District in the state of Andhra Pradesh |
NIT 21/16-17 |
30/06/2016 |
30/06/2016 |
27/07/2016
Time
12:0Hrs
|
|
855 |
Consultancy services for Proj Mang incl prep of DPR of Selected Stretches of NH/State Roads (appr NH in AP for upgradation to 2/4 inprinciple for decl as lane with paved shoulder configuration for Package-III, (i)J/c of NH-69 near Chintamani connecting Chelur,Rayacheruvu in Karnataka upto J/c of NH-42 near Tanakal in AP, (ii)J/c of NH-48 near chitradurga connecting chelkere,pavagada in karnataka and terminating at j/c of nh-44 in AP (iii) Tumkur Kortagere pavagada kalyandurg joinat veparalla |
Nit no 14/Package - III/SE/NH/ATP/2016-17 |
30/06/2016 |
29/06/2016 |
22/07/2016
Time
15:0Hrs
|
|
856 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for upgradation to Two/Four lane with paved shoulder configuration for Package-4: Junction of NH- 150A near Milakamuru – Rayadurg – Anantapur at junction at NH-44 -110Km |
NIt no 15/Package - IV/SE/NH/ATP/2016-17 |
30/06/2016 |
29/06/2016 |
22/07/2016
Time
15:0Hrs
|
|
857 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for upgradation to Two/Four lane with paved shoulder configuration for Package-2:Muddanur On NH 67 – Kadapa -50Km. |
Nit no13/Package - II/SE/NH/ATP/2016-17 |
30/06/2016 |
29/06/2016 |
22/07/2016
Time
15:0Hrs
|
|
858 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for upgradation to Two/Four lane with paved shoulder configuration for Package-1: (i) Madakasir - Rolla (AP/Karnataka border) – Sira in the state of Karnataka (55Km), (ii)Patchuru on NH 46, TN, - Kuppam (22Km. |
Nit no 12/Package - I/SE/NH ATP/2016-17 |
30/06/2016 |
29/06/2016 |
22/07/2016
Time
15:0Hrs
|
|
859 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Sonepur on NH-57 in the State of Odisha. |
12 CE-NH-16-17 |
18/06/2016 |
24/06/2016 |
15/07/2016
Time
17:0Hrs
|
|
860 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Reamal on NH-53 in the State of Odisha. |
13 CE-NH-16-17 |
18/06/2016 |
24/06/2016 |
15/07/2016
Time
17:0Hrs
|
|
861 |
Consultancy Services for Authority Engineer for Supervision of Widening from 2-lane to 4-lane with paved shoulder and strengthening of existing pavement between Km 459/500 to 483/500 (Road connecting Statue of Unity) Devaliya to Rajpipla including reconstruction of old and narrow minor bridge NH-56 on EPC mode in the State of Gujarat |
03 of 2016-17_3 |
24/06/2016 |
24/06/2016 |
04/08/2016
Time
18:0Hrs
|
|
862 |
Consultancy Services for Authority Engineer for Supervision of Construction of Major Bridge over river Tapi and Bypass of Mandvi and Tarsada town on NH-56 in replacement of existing Route at km 567/00 to 572/200 of NH-56 on EPC mode in state of Gujarat |
03 of 2016-17_1 |
24/06/2016 |
24/06/2016 |
04/08/2016
Time
18:0Hrs
|
|
863 |
Consultancy Services for Authority Engineer for Supervision of Upgradation to 2 lane with paved shoulders with rigid Pavement from KM 37/400 to 66/700 on NH 848 (Kaparada to Rajbari Section)on EPC mode in the State of Gujarat |
03 of 2016-17_2 |
24/06/2016 |
24/06/2016 |
04/08/2016
Time
18:0Hrs
|
|
864 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-XII. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-XII |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
865 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-XI. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-XI |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
866 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-II. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-II |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
867 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-III. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-III |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
868 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-IV. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-IV |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
869 |
Widening to 4-lane with paved shoulder with CC pavement from km 256/550 to km 289/500 on Kota-Darah section of NH-12 (Kota-Jhalawar Road) in the State of Rajasthan on EPC mode |
RJ/DPP/AP/2015-16/940/AE |
20/06/2016 |
23/06/2016 |
13/07/2016
Time
17:0Hrs
|
|
870 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-V. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-V |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
871 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-VI. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-VI |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
872 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-VII. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-VII |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
873 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-VIII. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-VIII |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
874 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-IX. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-IX |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
875 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-X. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-X |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
876 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the State of Uttar Pradesh- Pkg-I. |
RO/LKO/DPR/I.P.NH/2016-17/Pkg-I |
23/06/2016 |
23/06/2016 |
08/08/2016
Time
15:0Hrs
|
|
877 |
Supervision Consultancy Services for construction supervision of Balance work of 4-laning from Km.94.000 to Km.123.000 [Contract Package No.NS-60(MH)-Bal-2] and Km.153.000 to Km.175.000 [Contract Package No.NS-62(MH)-Bal-2] on Nagpur-Hyderabad Section of NH-7 in the State of Maharashtra – Consultancy Package No.NS-60&62-SC |
NHAI/RO-NAG&CG/TENDERS/2016-17/01 |
23/06/2016 |
23/06/2016 |
19/07/2016
Time
12:0Hrs
|
|
878 |
SUPERVISION CONSULTANT FOR THE PROJECT OF FOUR LANING OF GAYA HISUA RAJGIR NALANDA BIHARSHARIF ROAD FROM K 0 TO KM 92 935 NH 82 IN THE STATE OF BIHAR |
IFB NO BSRDC 1729 2015 05 PPP CELL |
22/06/2016 |
22/06/2016 |
03/09/2016
Time
0:0Hrs
|
|
879 |
SUPERVISION CONSULTANT FOR THE PROJECT OF FOUR LANING OF GAYA HISUA RAJGIR NALANDA BIHARSHARIF ROAD FROM K 0 TO KM 92 935 NH 82 IN THE STATE OF BIHAR |
IFB NO BSRDC 1729 2015 05 PPP CELL |
22/06/2016 |
22/06/2016 |
03/09/2016
Time
0:0Hrs
|
|
880 |
SUPERVISION CONSULTANT FOR THE PROJECT OF FOUR LANING OF GAYA HISUA RAJGIR NALANDA BIHARSHARIF ROAD FROM K 0 TO KM 92 935 NH 82 IN THE STATE OF BIHAR |
IFB NO BSRDC 1729 2015 05 PPP CELL |
22/06/2016 |
22/06/2016 |
03/10/2016
Time
15:0Hrs
|
|
881 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of selected stretches/ corridors to 2-lane with paved shoulder configuration in the State of Meghalaya. |
NHIDCL/DPR/MG/R-01/2016 |
21/06/2016 |
21/06/2016 |
03/08/2016
Time
15:1Hrs
|
|
882 |
Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of 2 laning of (i) Maram-Peren-Dimapur section on NH 129A (Manipur & Nagaland), (ii) Pallel-Chandel Section of NH-102C and (iii) Sangshak-Nampisha on NH 102 A (A Bharatmala Project) on Engineering, Procurement and Construction mode in the state of Manipur. |
NHIDCL/DPR/IM & UJSN-DMP-PC/Manipur/2016 |
21/06/2016 |
21/06/2016 |
03/08/2016
Time
16:0Hrs
|
|
883 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected Port connectivity road stretches/corridors for up gradation to two/four lane NH configuration under Bharat Mala scheme package no. NHAI/PC/2 |
NHAI/PC/Proc/01/DPR/2016 |
21/06/2016 |
21/06/2016 |
22/07/2016
Time
15:0Hrs
|
|
884 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected Port connectivity road stretches/corridors for up gradation to two/four lane NH configuration under Bharat Mala scheme package no. NHAI/PC/1 |
NHAI/PC/Proc/01/DPR/2016 |
21/06/2016 |
21/06/2016 |
22/07/2016
Time
15:0Hrs
|
|
885 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected Port connectivity road stretches/corridors for up gradation to two/four lane NH configuration under Bharat Mala scheme package no. NHAI/PC/3 |
NHAI/PC/Proc/01/DPR/2016 |
21/06/2016 |
21/06/2016 |
22/07/2016
Time
15:0Hrs
|
|
886 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected Port connectivity road stretches/corridors for up gradation to two/four lane NH configuration under Bharat Mala scheme package no. NHAI/PC/4 |
NHAI/PC/Proc/01/DPR/2016 |
21/06/2016 |
21/06/2016 |
22/07/2016
Time
15:0Hrs
|
|
887 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR CONSTRUCTION OF BRIDGE INCLUDING APPROACHES ACROSS RIVER ZUARI ON NH-17/NH-66 ON PANJIM-MANGALORE SECTION IN THE STATE OF GOA-(PACKAGE II : CH 530/850 TO CH 531/934) ON EPC MODE |
12014/13/2015-Goa |
20/06/2016 |
20/06/2016 |
04/08/2016
Time
17:0Hrs
|
|
888 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATION.Bodhan-Basar-Bhainsa |
SE(R&B)NH/HYD/13/2016-17, Dt.6-6-2016 (2nd Call) (NH/R&B/TS/1) |
06/06/2016 |
16/06/2016 |
19/07/2016
Time
17:0Hrs
|
|
889 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATIONMedak- Yellareddy-Banswada-Rudruru |
SE(R&B)NH/HYD/14/2016-17, Dt.6-6-2016 (NH/R&B/TS/2) |
06/06/2016 |
16/06/2016 |
19/07/2016
Time
17:0Hrs
|
|
890 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATION.Bhadrachalam-Ashwaraopet |
SE(R&B)NH/HYD/16/2016-17, Dt.6-6-2016 (NH/R&B/TS/4) |
06/06/2016 |
16/06/2016 |
19/07/2016
Time
17:0Hrs
|
|
891 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATIONNakarekal-Mallampally section From Km 121.000 to Km 154.000 of NH-365 |
SE(R&B)NH/HYD/17/2016-17, Dt.6-6-2016 (2nd Call) (NH/R&B/TS/5) |
06/06/2016 |
16/06/2016 |
19/07/2016
Time
17:0Hrs
|
|
892 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report (DPR) and providing pre-construction services in respect of 4 Laning of Kohima Bypass connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) on Engineering, Procurement and Construction (EPC) mode in the state of Nagaland |
NHIDCL/DPR/Kohima Bypass/Nagaland/2016 |
14/06/2016 |
14/06/2016 |
03/08/2016
Time
16:0Hrs
|
|
893 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of Demwe-Brahmkund Section from Km. 0.00 to Km. 19.22 and Arrowa-Khupa-Hayuliang section from Km. 44.02 to Km 80.97, total length for both is 56.17 Km of Demwe-Hawai Road under SARDP-NE on Engineering, Procurement and Construction mode in the state of Arunachal Pradesh. |
NHIDCL/DPR/Ar.Pr/Demwe-Hawai/2016 |
14/06/2016 |
14/06/2016 |
02/08/2016
Time
16:0Hrs
|
|
894 |
Consultancy Services for Authority Engineer for Construction of ROB in lieu of Level Crossing No. C-221 at KM 104.95 on NH-254 at Maur on Maur-Talwandi Road in the State of Punjab |
CW-2/BTI/07 |
10/06/2016 |
13/06/2016 |
27/07/2016
Time
17:0Hrs
|
|
895 |
Technical Consultant for preparation of feasibility study and Detailed Project Report for NH-254 in KM 0.00 to 82.27 Section of Length 82.27 KM Mudki to Rampura in the State of Punjab on BOT/EPC/Hybrid Annuity Mode |
CW-2/BTI/08 |
10/06/2016 |
13/06/2016 |
05/07/2016
Time
11:0Hrs
|
|
896 |
Independent Engineer Services for Construction of 4-lane (Partial Access Controlled) Laddowal Bypass from Km 0.00 to Km. 17.041 Linking NH-95 with NH-1 via Laddowal seed Farm at Ludhiana in the state of Punjab on Hybrid Annuity mode |
NHAI/12044/1/2016/PB |
13/06/2016 |
13/06/2016 |
20/09/2016
Time
11:0Hrs
|
|
897 |
Independent Engineer Services during Operation & Maintenance stage of selected road stretches under BOT projects in the State of Rajasthan for 4/6 Laning of Jaipur- Tonk- Deoli |
NHAI/Tech/Raj/Misc/2016/180/1 |
09/06/2016 |
09/06/2016 |
27/07/2016
Time
11:0Hrs
|
|
898 |
Independent Engineer Services during Operation & Maintenance stage of selected road stretches under BOT projects in the State of Rajasthan for 6 laning of Jaipur- Kishangarh |
NHAI/Tech/Raj/Misc/2016/180/2 |
09/06/2016 |
09/06/2016 |
27/07/2016
Time
11:0Hrs
|
|
899 |
Independent Engineer Services during Operation & Maintenance stage of selected road stretches under BOT projects in the State of Rajasthan for 4/6 laning of Kishangarh- Ajmer- Beawer |
NHAI/Tech/Raj/Misc/2016/180/3 |
09/06/2016 |
09/06/2016 |
27/07/2016
Time
11:0Hrs
|
|
900 |
Independent Engineer Services during Operation & Maintenance stage of selected road stretches under BOT projects in the State of Rajasthan for 4/6 laning of Beawar - Pali – Pindwara |
NHAI/Tech/Raj/Misc/2016/180/4 |
09/06/2016 |
09/06/2016 |
27/07/2016
Time
11:0Hrs
|
|
901 |
Independent Engineer Services during Operation & Maintenance stage of selected road stretches under BOT projects in the State of Rajasthan for 4-Laning of Reengus – Sikar Section |
NHAI/Tech/Raj/Misc/2016/180/4NHAI/Tech/Raj/Misc/2016/180/5 |
09/06/2016 |
09/06/2016 |
27/07/2016
Time
11:0Hrs
|
|
902 |
Independent Engineer Services during Operation & Maintenance stage of selected road stretches under BOT projects in the State of Rajasthan for4- Laning of Gomati Chouraha –Udaipur |
NHAI/Tech/Raj/Misc/2016/180 /6 |
09/06/2016 |
09/06/2016 |
27/07/2016
Time
15:0Hrs
|
|
903 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for New Construction/Up-gradation to Two/Four lane with paved shoulder configuration : Kanker-Bhanupratappur-Manpur(excluding Sambalpur - Silpat Km. 21.00) and Kachche-Narayanpur |
NH/CE/PWD/06 &10 |
06/06/2016 |
07/06/2016 |
15/07/2016
Time
17:0Hrs
|
|
904 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for New Construction/Up-gradation to Two/Four lane with paved shoulder configuration : MH border-Farasbeda-Kutul-Narayanpur |
NH/CE/PWD/11 |
06/06/2016 |
07/06/2016 |
15/07/2016
Time
17:0Hrs
|
|
905 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for New Construction/Up-gradation to Two/Four lane with paved shoulder configuration : Ambikapur-Ramanunjganj(110 km) and Keochi- Kabirchabutara(15 km) |
NH/CE/PWD/12 & 13 |
06/06/2016 |
07/06/2016 |
15/07/2016
Time
17:0Hrs
|
|
906 |
Independent Engineer Services during O&M Period for the project of “Design, Construction, Development, Finance, Operation and Maintenance of the work of construction of New Four Lane Gwalior Bypass of the length 42.033 Km. from Km. 103.00 of NH-3 to Km. 16.00 on NH-75 in the State of Madhya Pradesh on BOT (Annuity) basis” (Consultancy Package-NS1/IE (O&M)/MP-1)-3rd Call. |
NHAI/PIU/Gwl Bypass/2016 |
06/06/2016 |
06/06/2016 |
04/07/2016
Time
15:0Hrs
|
|
907 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Four laning / Two Lane with Paved shoulder of (i) BH/WB Border – Amdabad – Manihari section of NH-131A including construction of Bridge over river Mahananda & Katihar Bypass and (ii) Geometric improvements of NH327E including Raniganj Bypass in Bihar on EPC Mode |
DPR/BIHAR/RO-PAT/03 |
04/06/2016 |
04/06/2016 |
01/07/2016
Time
15:0Hrs
|
|
908 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-II. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-II |
03/06/2016 |
03/06/2016 |
14/07/2016
Time
17:0Hrs
|
|
909 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-III. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-III |
03/06/2016 |
03/06/2016 |
14/07/2016
Time
17:0Hrs
|
|
910 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-IV. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-IV |
03/06/2016 |
03/06/2016 |
14/07/2016
Time
17:0Hrs
|
|
911 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-V. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-V |
03/06/2016 |
03/06/2016 |
14/07/2016
Time
17:0Hrs
|
|
912 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh- Pkg-VI. |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-VI |
03/06/2016 |
03/06/2016 |
14/07/2016
Time
17:0Hrs
|
|
913 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of newly declared National Highways including existing NH-91A, NH-92, NH-97 & NH-28B in the State of Uttar Pradesh - Pkg-I |
RO/LKO/DPR /New NHs/ 2016-17/Pkg-I |
03/06/2016 |
03/06/2016 |
14/07/2016
Time
17:0Hrs
|
|
914 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 4 Laning of Imphal-Moirang Road on NH-150 and (ii) 2 laning with paved shoulder of Ukhrul-Jessami road on NH-202 on Engineering, Procurement and Construction mode in the state of Manipur. |
NHIDCL/DPR/IM&UJ/Manipur/2016 |
03/06/2016 |
03/06/2016 |
11/07/2016
Time
16:0Hrs
|
|
915 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of (i) Tamenglong-Tousem-Haffong via Lia sang and Tavsem in the state of Assam and Manipur and (ii) Jiribam to Tipaimukh via NH 306A in the state of Manipur on Engineering, Procurement and Construction mode |
NHIDCL/DPR/TH&JT/Manipur/2016 |
03/06/2016 |
03/06/2016 |
11/07/2016
Time
16:0Hrs
|
|
916 |
Consultancy service for Authority’s Upgradation of NH-31C from chainage 182 km (Hasimara) to 228 km (Salsalabari) to 2-lane with paved shoulder configuration in the district of Alipurduar, West Bengal on EPC mode |
e-RFP No.3 of 2016-17 of Superintending Engineer, National Highway Circle No.III, Siliguri |
10/05/2016 |
01/06/2016 |
20/06/2016
Time
17:0Hrs
|
|
917 |
Authority’s Engineer Consultancy Services for “Rehabilitation and Upgrading to 2 lanes/2 lane with Paved Shoulders Configuration and Strengthening of Birpur –Bihpur Section (km 00.0 to km106.0) of NH-106 in the State of Bihar under Phase-I of National Highways Interconnectivity Improvement Projects (NHIIP) |
NHIIP-BR-106-AE-07(2nd Call) |
01/06/2016 |
01/06/2016 |
11/07/2016
Time
11:0Hrs
|
|
918 |
Consultancy services for Authority’s Engineer for Supervision of Construction of new road at the missing link portion of NH 81 along the approved alignment between Harischandrapur & Eastern approach of Kalindri – Bridge from Km 46.550 to Km 59.697 in the district of Malda, West Bengal on EPC mode – 2nd Call |
01/2016-17 of SE NHC - II, Sl. No. 2 |
31/05/2016 |
31/05/2016 |
29/06/2016
Time
15:0Hrs
|
|
919 |
Consultancy services for Authority’s Engineer for Supervision of Construction of 2 Lane ECL Bypass from Km 295.56 to Km 302.059 of NH 60 at Sonepur Bazari area in West Bengal, on EPC mode on deposit Basis |
01/2016-17 of SE NHC - II, Sl. No. 1 |
31/05/2016 |
31/05/2016 |
29/06/2016
Time
17:0Hrs
|
|
920 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme.Package No.- NHAI/R/5 |
NHAI/BRT/Proc/03/DPR/2016 |
27/05/2016 |
27/05/2016 |
26/06/2016
Time
17:0Hrs
|
|
921 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme. Package No. NHAI/R/20 |
NHAI/BRT/Proc/03/DPR/2016 |
27/05/2016 |
27/05/2016 |
26/06/2016
Time
17:0Hrs
|
|
922 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme. Package No. NHAI/BM/11 |
NHAI/BRT/Proc/03/DPR/2016 |
27/05/2016 |
27/05/2016 |
26/06/2016
Time
17:0Hrs
|
|
923 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF FOUR LANING OF BARHI-HAZARIBAGH SECTION OF NH-33 FROM KM 0.00 TO KM 40.500 IN THE STATE OF JHARKHAND UNDER NHDP PHASE-III ON EPC MODE. |
NHAI/JH/BH/AE/2016 |
19/05/2016 |
19/05/2016 |
21/06/2016
Time
11:0Hrs
|
|
924 |
Consultancy services for Authority’s Engineer for supervision of project of providing long term improvement to 7 (seven) identified black spots at isolated locations on four lane Jetpur – Gondal – Rajkot section between km. 117.000 to km. 185.000 on nh-8b (now nh-27) in the State of Gujarat on EPC mode |
NHAI/Guj/Jet-Gondal/Black Spot/EPC/AE./2016(2nd call) |
18/05/2016 |
18/05/2016 |
17/06/2016
Time
11:0Hrs
|
|
925 |
Consultancy Services for Finalisation of Alignment; Finalisation of AestheticDesign of Krishna River Bridges and preparation of Feasibility Study Report-cum-Preliminary Design Reports for each Sub-Projectfor Construction ofOuter Ring Road around Vijayawada-Guntur-Tenali Urban Agglomeration in the State of Andhra Pradeshon Green Field Alignment under NHDP Phase-VII |
DPR/Outer Ring Road/Vijayawada/AP/ |
12/05/2016 |
12/05/2016 |
07/06/2016
Time
11:0Hrs
|
|
926 |
Consultancy Services of Authority’s Engineer for supervision of Widening of existing single lane carriageway to two lane carriageway with paved shoulder and strengthening from Km.51.000 (50.675) to 105.500 of NH-730A in the State of Uttar Pradesh on EPC mode |
1369/1 Tender cashier(bly)-28/13-14 |
10/05/2016 |
12/05/2016 |
11/07/2016
Time
15:0Hrs
|
|
927 |
RFP for Appointment of Technical Consultant for preparation of alignment cum feasibility- report of Nagpur - Hyderabad-Bangalore Expressway |
NHAI/NHB Expressway/2016 |
12/05/2016 |
12/05/2016 |
11/08/2016
Time
11:0Hrs
|
|
928 |
RFP for Preparation of alignment cum feasibility report of Kanpur-Lucknow Expressway |
NHAI/KL Expressway/2016 |
12/05/2016 |
12/05/2016 |
11/08/2016
Time
11:0Hrs
|
|
929 |
RFP for Preparation of alignment cum feasibility report of Hyderabad-Vijaywada-Amravathi Expressway |
NHAI/HVA Expressway/2016 |
12/05/2016 |
12/05/2016 |
11/08/2016
Time
11:0Hrs
|
|
930 |
Widening of two lane with paved shoulders of Rampura to Maur Section of NH-254 from KM 82.400 to 104.200 in the State of Punjab |
CW-2/BTI/05 |
06/05/2016 |
11/05/2016 |
29/06/2016
Time
17:0Hrs
|
|
931 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Nayagarh on NH-57 in the State of Odisha |
08CENH16-17 |
27/04/2016 |
09/05/2016 |
16/06/2016
Time
17:0Hrs
|
|
932 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Sonepur on NH-57 in the State of Odisha. |
09CENH16-17 |
27/04/2016 |
09/05/2016 |
16/06/2016
Time
17:0Hrs
|
|
933 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Reamal on NH-53 in the State of Odisha. |
10CENH16-17 |
27/04/2016 |
09/05/2016 |
16/06/2016
Time
17:0Hrs
|
|
934 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR |
2 |
06/05/2016 |
06/05/2016 |
04/07/2016
Time
11:0Hrs
|
|
935 |
Independent Engineer Services during O&M Period for the project of “Baran-Shivpuri Section (Km. 492.322 to Km. 613.087) of NH-76 in the State of Rajasthan and Madhya Pradesh and Shivpuri-Jhansi Section (Km. 15.000 to Km. 90.300) of NH-25 in the state of Madhya Pradesh and Uttar Pradesh on OMT basis” (Package no. E-W/OMT/IE (O&M)/NH-25 & 76)-4th Call |
RO/Bhopal/2016/3 |
05/05/2016 |
05/05/2016 |
07/06/2016
Time
15:0Hrs
|
|
936 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR PROJECT OF (i) 2 Laning of existing Hunli-Anini road on EPC basis under SARDP-NE from Km 21.50 to Km 37.50 in the state of Arunachal Pradesh (ii) 2 Laning of existing Hunli-Anini road on EPC basis under SARDP-NE from Km 37.50 to Km 53.50 in the state of Arunachal Pradesh (iii) 2 Laning of existing Hunli-Anini road on EPC basis under SARDP-NE from Km 53.50 to Km 92.500 in the state of Arunachal Pradesh |
NHIDCL/AE/Hunli-Anini/km 21.5 – Km 92.5 /2016 |
03/05/2016 |
03/05/2016 |
27/06/2016
Time
17:0Hrs
|
|
937 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR PROJECT OF (i) 2 Laning of existing Hunli-Anini road on EPC basis under SARDP-NE from Km 92.50 to Km 106.200 in the state of Arunachal Pradesh (ii) 2 Laning of existing Hunli-Anini road on EPC basis under SARDP-NE from Km 106.200 to Km 120.000 in the state of Arunachal Pradesh (iii) 2 Laning of existing Hunli-Anini road on EPC basis under SARDP-NE from Km 120.000 to Km 131.920 in the state of Arunachal Pradesh |
NHIDCL/AE/Hunli-Anini/Km 92.5-Km 131.92/2016 |
03/05/2016 |
03/05/2016 |
27/06/2016
Time
17:0Hrs
|
|
938 |
Consultancy services of Authority’s Engineer for supervision of Widening the existing 2 lane to 2 lane with paved shoulder from Km 181/00 to 239/280 (Bhawanipatna to Kokasara) of NH-26 in the State of Odisha on Engineering, Procurement & Construction (EPC) Mode. |
07 CENH of 2016-17 |
19/04/2016 |
30/04/2016 |
27/06/2016
Time
17:0Hrs
|
|
939 |
Consultancy services of Authority’s Engineer for supervision of Widening existing Intermediate/Double lane to 2 lane with 1.5m wide paved shoulder from km 0/0 to 45/750 (Bolangir – Sonepur Section) of NH-57 in the State of Odisha on EPC mode |
Bid Ref No 06 CENH of 2016-17 |
19/04/2016 |
30/04/2016 |
20/06/2016
Time
17:0Hrs
|
|
940 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR PROJECTS OF (A) 4 Laning of Dimapur-Kohima Road from Design Km 123.840 to Km 166.700 in state of Nagaland . (B) Rehabilitation of existing road CHURACHANDPUR–SINGHAT-TUVAI (NH-102B) between km 34.500 to km 103.100 (net length 68.60 km) in the state of Manipur (C) Restoration / reconstruction of Tadubi to Phaibung Junction from Km. 00.00 to Km. 87.00 covering 87 Km Length on Tadubi-Tolloi-Ukhrul Road on NH No.-102A in the State of Manipur. |
39/NHIDCL/NG/Ar .Er./DK/2016 |
28/04/2016 |
28/04/2016 |
27/05/2016
Time
16:0Hrs
|
|
941 |
Consultancy services for Authority’s Engineer for Supervision of the project of construction of Four laning of UP/Haryana border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 from km 160.357 to km 179.249 (Design km 157.192 to km 176.400) in the State of Haryana on Engineering Procurement and Construction (EPC) basis (Package-3) |
NHAI/EPC/AE/Y-P/PKG-3/11024/2016/HR |
25/04/2016 |
25/04/2016 |
02/06/2016
Time
11:0Hrs
|
|
942 |
Rehabilitation and up-gradation of NH-200 (New NH-49) from Km 127.500 to Km.178.944 (village Theka/Darrighat to village Banari section) Package-I to 4-lane / 2-lane with paved shoulder in the State of Chhattisgarh under NHDP –IV on EPC basis contract basis |
02/CE/NHDP/44-01/2016/27064 |
22/04/2016 |
22/04/2016 |
06/06/2016
Time
17:0Hrs
|
|
943 |
Independent Engineer Services for Four lane stand alone Ring Road/bypasses for Nagpur City (Package-I) from km 0+500 to km 34+000 (Total Length - 33+500 km) in the state of Maharashtra under NHDP Phase-VII on BOT (Hybrid Annuity) basis. |
NHAI/MAH/Phase-VII/IE/NGPRR-I/2016 |
21/04/2016 |
21/04/2016 |
31/05/2016
Time
11:0Hrs
|
|
944 |
Independent Engineer Services for Four lane stand alone Ring Road/bypasses for Nagpur City (Package-II) from km 34+000 to km 62+035 (Total Length – 28+035 km) in the state of Maharashtra under NHDP Phase-VII on BOT (Hybrid Annuity) basis. |
NHAI/MAH/Phase-VII/IE/NGPRR-II/2016 |
21/04/2016 |
21/04/2016 |
31/05/2016
Time
11:0Hrs
|
|
945 |
Independent Engineer Services during O&M Period for the project of “Rehabilitation and Up-gradation to 2-lane with paved shoulders and maintenance of Multai-Chhindwara-Seoni Section of NH-69A and Narsinghpur-Chhindwara-Saoner Section of NH-26B in Madhya Pradesh and Maharashtra including construction and maintenance of Ring Road and Connecting Roads in Chhindwara Town |
2016/01 |
18/04/2016 |
18/04/2016 |
18/05/2016
Time
11:0Hrs
|
|
946 |
Consultancy services for Authority’s Engineer for supervision of project of providing long term improvement to 7 (seven) identified black spots at isolated locations on four lane Jetpur – Gondal – Rajkot section between km. 117.000 to km. 185.000 on nh-8b (now nh-27) in the State of Gujarat on EPC mode |
NHAI/Guj/Jet-Gondal/Black Spot/EPC/AE./2016 |
13/04/2016 |
13/04/2016 |
13/05/2016
Time
11:0Hrs
|
|
947 |
Consultancy services for Authority’s Engineer for supervision of project of providing long term improvement to 7 (seven) identified black spots at isolated locations on four lane Jetpur – Gondal – Rajkot section between km. 117.000 to km. 185.000 on nh-8b (now nh-27) in the State of Gujarat on EPC mode |
NHAI/Guj/Jet-Gondal/Black Spot/EPC/AE./2016 |
13/04/2016 |
13/04/2016 |
13/05/2016
Time
11:0Hrs
|
|
948 |
Consultancy Services for Authority’s Engineer for Supervision of Six-laning of Kamrej to Chalthan Section (Km. 248.100 – km. 264.350) of NH-8 (Length-16.250 Km) including long term remedial measures for 4 black spots on Bharuch Surat section of NH-8 in the state of Gujarat on EPC mode |
NHAI/12011/1/ AE/Kamrej-Chalthan./2016/81255 |
13/04/2016 |
13/04/2016 |
13/05/2016
Time
11:0Hrs
|
|
949 |
Consultancy Services for Authority’s Engineer for Supervision of Six-laning of Kamrej to Chalthan Section (Km. 248.100 – km. 264.350) of NH-8 (Length-16.250 Km) including long term remedial measures for 4 black spots on Bharuch Surat section of NH-8 in the state of Gujarat on EPC mode |
NHAI/12011/1/ AE/Kamrej-Chalthan./2016/81255 |
13/04/2016 |
13/04/2016 |
20/05/2016
Time
11:0Hrs
|
|
950 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for New Construction/Up-gradation to Two/Four lane with paved shoulder configuration : Kutul (CG-MH Border) -Narayanpur Road |
NH/CE/PWD/11 |
11/04/2016 |
12/04/2016 |
28/05/2016
Time
17:0Hrs
|
|
951 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for New Construction/Up-gradation to Two/Four lane with paved shoulder configuration : Ambikapur-Ramanujgang |
NH/CE/PWD/12 |
11/04/2016 |
12/04/2016 |
28/05/2016
Time
17:0Hrs
|
|
952 |
Independent Engineer Services during Operation and Maintenance period of 4/6 laning of Ghaziabad Aligarh section of NH-91 from km 23.600 to km 149.900 in the State of Uttar Pradesh on DBFOT basis under NHDP Phase III |
NHAI/PIU ALG/44023(O&M)/2016 |
12/04/2016 |
12/04/2016 |
09/06/2016
Time
11:0Hrs
|
|
953 |
Rehabilitation and up-gradation of Losari to Machavaram section from Km 34/230 to Km 84/550 of NH-214A (New NH-216) to two lane with paved shoulder in the state of Andhra Pradesh under NHDP –IV on EPC Mode |
RW/NH-37018/ 11/2016-NHDP-IVA |
12/04/2016 |
12/04/2016 |
30/05/2016
Time
15:0Hrs
|
|
954 |
Consultancy Services for preparation of feasibility cum detailed project report for proper structuring and implementation of project rehabilitation and up gradation to 4/6 lane for delinked portion of 28.7 km from km 624.480 to km 653.225 of NH-7 in the state of Madhya Pradesh. |
NHAI/HQ/MP/NS-1?hy.Annuity/MP-3, delinked stretch/2015 |
08/04/2016 |
10/04/2016 |
09/05/2016
Time
17:0Hrs
|
|
955 |
Consultancy Services for Authority Engineer for Supervision of Widening to 4-lane with paved shoulder with CC pavement from km 256/550 to km 289/500 on Kota-Darah Section of NH-12 (Kota-Jhalawar Road) in the State of Rajasthan On EPC Mode |
RWINH-12014/27/2015/PS-4/RJ |
05/04/2016 |
05/04/2016 |
23/05/2016
Time
11:0Hrs
|
|
956 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of The highway starting from its junction with new NH No. 85 near Adimali connecting Cheruthoni, Painavu and terminating at its junction with new NH No. 183 near Vandiperiyar in the State of Kerala for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/57 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
957 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of The highway starting from its junction with new NH No. 183 near Adur connecting Pathanamthitta, Vadserikkara, Lahai, and terminating at its junction with new NH No. 183 near Vandiperiyar in the State of Kerala. for upgradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/58 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
958 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Patiala - Pehowa - Kurukshetra - Ladwa - Yamuna Nagar (approved “In Principle” for declaration as National Highways ) in the States of Haryana and Punjab for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/59 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
959 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Madhupur - Margomunda - Laharjori - Jamtara road of National Highways / State Roads (approved “In Principle” for declaration as National Highways ) in the States of Jharkhand for up gradation to Two/Four lane with paved shoulder configuration (Lot-V) |
NH/IAHE/34 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
960 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Ghagra - Bishunpur - Netrahat - Mahuadanr road of National Highways / State Roads (approved “In Principle” for declaration as National Highways ) in the States of Jharkhand for up gradation to Two/Four lane with paved shoulder configuration (Lot-V) |
N/IAHE/35 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
961 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Highway (NH 55) starting from its junction with NH-53 near Sambalpur connecting Redhankhol -Balikuda and terminating at Naugaon in the State of Odisha for up gradation to Two/Four lane with paved shoulder configuration (Lot-V) |
NH/IAHE/39 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
962 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Badakera (Angul) - Hindol - Ganja - Daspallah - Bhanjanagar road of National Highways / State Roads (approved “In Principle” for declaration as National Highways ) in the States of Odisha for up gradation to Two/Four lane with paved shoulder configuration (Lot-V) |
NH/IAHE/40 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
963 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Junction of NH-5 (GQ) (new NH No. 16) near Jankia - Chandanpur road of National Highways / State Roads (approved “In Principle” for declaration as National Highways ) in the States of Odisha for up gradation to Two/Four lane with paved shoulder configuration (Lot-V) |
NH/IAHE/44 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
964 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Jaspur - Govindpur - Dumri - Mahuadanr Road (approved “In Principle” for declaration as National Highways ) in the States of Jharkhand for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/32 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
965 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Ghaziabad - Noida - Faridabad - Sohna Road (approved “In Principle” for declaration as National Highways ) in the States of Haryana and Uttar Pradesh for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/49 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
966 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of Palwal - Aligarh Road (approved “In Principle” for declaration as National Highways ) in the States of Haryana and Uttar Pradesh for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/51 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
|
967 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of the National Highway No. 107A from Chamoli - Gopeshwar - Okhimath - Baramwari in the State of Uttarakhand for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/53 |
04/04/2016 |
04/04/2016 |
17/06/2016
Time
15:0Hrs
|
-
|
968 |
Consultancy Services for preparation of Detailed Project Report for Rehabilitation and Up gradation of NH 565 from Km 133.922 to 154.900 to Two lanes with paved shoulder in the State of Andhra Pradesh under NHDP IV. (2nd call) |
SE(R&B)/NH/VJA/ Short Tender 35/ 2015-16, |
28/03/2016 |
02/04/2016 |
19/04/2016
Time
17:0Hrs
|
|
969 |
Consultancy for preparation of Detailed Project Report for the selected stretches/corridors of various Road Networks (Stretches in principally approved as National Highways) in the States of Maharashtra, for up-gradation of following Roads to Two lane with paved shoulder /Four lane configuration NH66 Sawantwadi Ajara Gadhinglaj NH4 |
NO./AB/NH/TENDER/ 18 /2015-16 |
01/04/2016 |
01/04/2016 |
28/04/2016
Time
17:0Hrs
|
-
|
970 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for proposed Chakradharpur-Sonua-Goelkera-Manoharpur-Jaraikela-JH/Odisha Border-upto Dhabaleswar on NH-143(Odisha portion from Jareikela to Dhabaleswar) in the State of Odisha. |
29 CE-NH-15-16 |
18/03/2016 |
30/03/2016 |
20/05/2016
Time
17:0Hrs
|
|
971 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for proposed Hatgamahria –Balandia-Majhiaon-Benisagar upto junction with NH-49 near Singda(Odisha portion from Benisagar to Singada) in the State of Odisha. |
30 CE-NH-15-16 |
18/03/2016 |
30/03/2016 |
20/05/2016
Time
17:0Hrs
|
|
972 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATIONMadnur (Junction at NH-161) – Bodhan – Nizamabad (Junction at NH-63)- |
SE(R&B)NH/HYD/76/2015-16, Dated: 17.02.2016 (Package No.NH/R&B/TS/2) |
17/02/2016 |
30/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
973 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATION.Siricilla – Siddipet – Duddeda |
SE(R&B)NH/HYD/77/2015-16, Dated: 17.02.2016 (Package No.NH/R&B/TS/3) |
17/02/2016 |
30/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
974 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATION.Nirmal (junction of NH 44 & 61) – Jagityal (junction of NH-63) via Khanapur, Mallapur, Raikal |
SE(R&B)NH/HYD/78/2015-16, Dated: 17.02.2016 (Package No.NH/R&B/TS/4) |
17/02/2016 |
30/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
975 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATION.Deverakonda-Peddavuru-Miryalguda-Kodad |
SE(R&B)NH/HYD/79/2015-16, Dated: 17.02.2016 (Package No.NH/R&B/TS/5) |
17/02/2016 |
30/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
976 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATION.Karimanagar (junction of NH- 563) – Siricilla – Kamareddy – Yellareddy – Pitlam (junction at NH-161) |
SE(R&B)NH/HYD/80/2015-16, Dated: 17.02.2016 (Package No.NH/R&B/TS/6) |
17/02/2016 |
30/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
977 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED “IN PRINCIPLE” FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATION.Khammam – Aswaraopet |
SE(R&B)NH/HYD/81/2015-16, Dated: 17.02.2016 (Package No.NH/R&B/TS/7) |
17/02/2016 |
30/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
978 |
Independent Engineer Services for Development of Delhi -Meerut Expressway from Km. 0.000 to km. 27.500 including 6/8 laning of NH-24 from km. 0.000 to km 49.346 (Hapur Bypass) in the state of Delhi and Uttar Pradesh – Package-I - from existing km 0.000 to existing km 8.360 (Delhi/UP Border) in the State of Delhi on Hybrid Annuity Model |
NHAI/Delhi-Hapur/Pkg-I/2016/25/IE-1 |
29/03/2016 |
29/03/2016 |
02/05/2016
Time
11:0Hrs
|
|
979 |
Independent Engineer Services for Development of Delhi -Meerut Expressway from Km. 0.000 to km. 27.500 including 6/8 laning of NH-24 from km. 0.000 to km 49.346 (Hapur Bypass) in the state of Delhi and Uttar Pradesh – Package-I - from existing km 0.000 to existing km 8.360 (Delhi/UP Border) in the State of Delhi on Hybrid Annuity Model |
NHAI/Delhi-Hapur/Pkg-I/2016/25/IE-1 |
29/03/2016 |
29/03/2016 |
16/05/2016
Time
11:0Hrs
|
|
980 |
Independent Engineer Services for Development of Delhi-Meerut Expressway from km 0.000 to Km 27.500 including 6/8 Laning of NH – 24 from km 0.000 to Km 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh; Package-III: Six Laning from existing Km 27.740 to existing Km 49.346 (Dasna to Hapur) in the state of Uttar Pradesh on Hybrid Annuity Mode |
NHAI/Delhi-Hapur/Pkg-III/24/2016/IE-3 |
29/03/2016 |
29/03/2016 |
16/05/2016
Time
11:0Hrs
|
|
981 |
Consultancy services for Authority’s Engineer for Supervision of Construction of new road at the missing link portion of NH 81 along the approved alignment between Harischandrapur & Eastern approach of Kalindri – Bridge from Km 46.550 to Km 59.697 in the district of Malda, West Bengal on EPC mode |
12/2015-16 of SE NHC - II, Sl. No. 1 |
28/03/2016 |
28/03/2016 |
28/04/2016
Time
17:0Hrs
|
|
982 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways / State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with paved shoulder configuration (((i) Paderu – Araku road Section (ii) Srungavarapukota – Vizianagaram on NH 26 road section) |
SE(R&B)/NH/VJA/34(5)/2015-16 |
24/03/2016 |
28/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
983 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways / State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with paved shoulder configuration (Porumamilla – Seetharampuram – CS puram road section) |
SE(R&B)/NH/VJA/34(1)/2015-16 |
24/03/2016 |
28/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
984 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways / State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with paved shoulder configuration (CS puram – Singarayakonda (On NH 16) road Section ) |
SE(R&B)/NH/VJA/34(2)/2015-16 |
24/03/2016 |
28/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
985 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways / State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with paved shoulder configuration ((i) Rampachodavaram – Koyyuru – road section (85 km) (ii) Bhimavaram on NH 165 – Tadepalligudem on NH 16 road 32km) |
SE(R&B)/NH/VJA/34(3)/2015-16 |
24/03/2016 |
28/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
986 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways / State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with paved shoulder configuration ( Koyyuru – Chintapalii – Lambasingi – Paderu road Section) |
SE(R&B)/NH/VJA/34(4)/2015-16 |
24/03/2016 |
28/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
987 |
Independent Engineer Services for 4-laning of Meerut-Bulandshehr section of NH-235 (New NH-334) from km 8.800 (Design Chainage 8.800) to km 66.482 (Design Chainage 73.512) (total length 61.19 km excluding existing 3.522 km Hapur Bypass) in the State of Uttar Pradesh under NHDP Phase-IV on Hybrid Annuity DBOT mode |
NHAI/IE/ Meerut-Bulandshehr/NH-235/UP(Tech Div)/2016 |
23/03/2016 |
23/03/2016 |
24/05/2016
Time
11:0Hrs
|
|
988 |
Technical Consultant for Preparation of Alignment cum Feasibility- Report of Delhi-Ludhiana-Amritsar-Katra Expressway with connectivity to Chandigarh (2nd Call) |
NHAI/RFP/DL/2016 |
23/03/2016 |
23/03/2016 |
02/05/2016
Time
11:0Hrs
|
|
989 |
Consultancy Services for carrying out Feasibility Study, preparation of Detailed Project Report and providing Pre-Construction Services for upgradation of following corridors in the State of Jammu & Kashmir on EPC mode: i. Upgradation to 4 lane with paved shoulder of Jammu-Akhnoor section of NH-144A; and ii. Upgradation to 2 lame with paved shoulder Chenani- Sudhmahadev-Goha-Khelani- Kishtwar-Sinthan Pass-Khanabal section of NH-244 (old NH-1B) |
NHIDCL/DPR/J&K/1/2016 |
23/03/2016 |
23/03/2016 |
21/06/2016
Time
15:0Hrs
|
|
990 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISIONOF CIVIL CONSTRUCTION WORK FOR REHABILITATION AND UPGRADATION OF KARNATAKA/A.P BORDER – GOOTY SECTION FROM KM 368+920 to KM 424+225 OF NH-63( New NH-67 ) TO FOUR LANE WITH PAVED SHOULDERS IN THE STATE OF ANDHRAPRADESH UNDER NHDP-IV THROUGH (EPC) BASIS |
NIT.No:53/EPC/SE/2015-16 , Dt 14-03-2016 |
18/03/2016 |
18/03/2016 |
23/05/2016
Time
17:1Hrs
|
|
991 |
TEST |
TEST TENDER 1 |
16/03/2016 |
16/03/2016 |
22/03/2017
Time
15:50Hrs
|
-
|
992 |
Consultancy Services for Improvement/Upgradation/Redesigning/Rehabilitation including 2/4/6 laning of Gurgaon-Pataudi-Rewari Road in the State of Haryana |
PWD/CHD/NH-PKL/7157 |
14/03/2016 |
14/03/2016 |
27/04/2016
Time
15:0Hrs
|
|
993 |
Consultancy Services for Improvement/Upgradation/Redesigning/Rehabilitation including 2/4/6 laning of Gurgaon-Pataudi-Rewari Road in the State of Haryana |
PWD/CHD/NHPKL/ 7157 |
14/03/2016 |
14/03/2016 |
01/06/2016
Time
15:0Hrs
|
|
994 |
Consultancy Services for Improvement/Upgradation/Redesigning/Rehabilitation including 2/4/6 laning of Jind-SafidonPanipat in the State of Haryana |
PWD/CHD/NHPKL/ 7157 |
14/03/2016 |
14/03/2016 |
01/06/2016
Time
15:0Hrs
|
|
995 |
Consultancy Services for Improvement/Upgradation/Redesigning/Rehabilitation including 2/4/6 laning of Titram MorKaithal-JindHansi in the State of Haryana |
PWD/CHD/NHPKL/ 7157 |
14/03/2016 |
14/03/2016 |
01/06/2016
Time
15:0Hrs
|
|
996 |
Consultancy Services for Improvement/Upgradation/Redesigning/Rehabilitation including 2/4/6 laning of Hisar-ToshamBadhdha-SatnaliMahendergarhRewari in the State of Haryana |
PWD/CHD/NHPKL/7157 |
14/03/2016 |
14/03/2016 |
01/06/2016
Time
15:0Hrs
|
|
997 |
Consultancy services for Improvement /Upgradation/Redesigning /Rehabilitation including 2/4/6 laning of Fatehabad-Ratia-Budhlada Mandi in the State of Haryana |
PWD/CHD/NHPKL/7157 |
14/03/2016 |
14/03/2016 |
01/06/2016
Time
15:0Hrs
|
|
998 |
Consultancy Services for Improvement/Upgradation/Redesigning/Rehabilitation including 2/4/6 laning of Ambala-Shazadpur-Naraingarh-Kala Amb |
PWD/CHD/NH-PKL/7157 |
14/03/2016 |
14/03/2016 |
01/06/2016
Time
15:0Hrs
|
|
999 |
Consultancy services for Authority’ Engineer for Supervision of project of Two Laning With Paved Shoulders Of Kullu - Manali Section Of NH-21 (Now Nh-3) From Km 272.00 To Km 309.345 (Designed Chainage) On EPC Mode In The State Of Himachal Pradesh Under NHDP Phase - IV B |
NHAI/11012/EPC/K-M/AE/HP/2016 |
11/03/2016 |
11/03/2016 |
11/04/2016
Time
11:0Hrs
|
|
1000 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of NH-78 (New NH 43) from Km 468.600 to Km 531.250 (Pathalgaon to Kunkuri section) to two lane with paved shoulder in the State of Chhattisgarh under NHDP –IV through Engineering, Procurement & Construction (EPC) Basis Contract. |
853/CE/NH/TC/44-41/2015/NHDP-IV/26802 |
09/03/2016 |
09/03/2016 |
28/04/2016
Time
17:0Hrs
|
|
1001 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of NH-200 (New NH-49) from Km 241.553 to Km 312.600 (Masania Kala village – Rengapali village/Odisha Border Section) to two lane with paved shoulder in the State of Chhattisgarh under NHDP –IV on EPC basis contract basis. |
854/CE/NH/TC/44-42/2015/NHDP-IV/26803 |
09/03/2016 |
09/03/2016 |
28/04/2016
Time
17:0Hrs
|
|
1002 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Jaisingh Nagar(CG/MPBorder)-Kotadol, Ramgarh-Semaria Road |
NH/CE/PWD/01 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1003 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Semaria-Wadrafnagar-Krishna Nagar-Ramanujganj Road |
NH/CE/PWD/02 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1004 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Baikunthpur-Sonhat-Ramgarh Road |
NH/CE/PWD/03 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1005 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration :Dhamdha-Gandai (28/2) Road |
NH/CE/PWD/04 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1006 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Bardula-Sankra-Nagari-Sihava-Dudhawa-Kanker |
NH/CE/PWD/05 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1007 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Kanker-Bhanupratappur-Sambalpur, Silpat-Junction of NH-930 |
NH/CE/PWD/06 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1008 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Kewchi-Pendra-Kotmi-Pasan-Khadgawan-Chirmiri Road |
NH/CE/PWD/08 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1009 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Kawardha-Rajnandgaon |
NH/CE/PWD/09 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1010 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration : Kachche-Narayanpur |
NH/CE/PWD/10 |
08/03/2016 |
09/03/2016 |
11/05/2016
Time
17:0Hrs
|
|
1011 |
Consultancy Services for project preparation, feasibility study, preparation of Detailed Project Report and comparative Study of different alternatives for widening of 4-lane to 6-lane/provision of elevated corridor/ construction of new expressway of Raipur-Durg section in Km. 281.000 to 307.600 = 26.60 Km. Of NH 006 (New N.H. 53) in the State of Chhattisgarh. |
852/CE/NH/TC/44-20/2015/II/26780 |
08/03/2016 |
09/03/2016 |
06/05/2016
Time
17:0Hrs
|
|
1012 |
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR PROJECT OF (i) 2 Laning of Akajan-Likabali-Bame road from Km 12.00 to Km 33.00 (State Road) and (ii) 2 Laning of Akajan-Likabali-Bame road from Km 33.00 to Km 65.00 ( State Road )in state of Arunachal Pradesh under SARDP on EPC basis |
NHIDCL/AE/AKLK- BDM/2016 |
07/03/2016 |
07/03/2016 |
19/04/2016
Time
11:0Hrs
|
|
1013 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders/4-lane configuration (or possibility of twin two lane with interconnectivity at suitable intervals) and/or its strengthening in the State of Himachal Pradesh.Package No. HP/Shahpur/1 |
168-SESHA-2015 |
04/03/2016 |
07/03/2016 |
02/05/2016
Time
15:0Hrs
|
|
1014 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders/4-lane configuration (or possibility of twin two lane with interconnectivity at suitable intervals) and/or its strengthening in the State of Himachal Pradesh. Package no. HP/Shahpur/2 |
168-SESHA-2016 |
04/03/2016 |
07/03/2016 |
02/05/2016
Time
15:0Hrs
|
|
1015 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders/4-lane configuration (or possibility of twin two lane with interconnectivity at suitable intervals) and/or its strengthening in the State of Himachal Pradesh. Package No. HP/Shahpur/1 |
168-SESHA-2016 |
04/03/2016 |
07/03/2016 |
02/05/2016
Time
15:0Hrs
|
|
1016 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders/4-lane configuration (or possibility of twin two lane with interconnectivity at suitable intervals) and/or its strengthening in the State of Himachal Pradesh. Package no. HP/Shahpur/3 |
168-SESHA-2016 |
04/03/2016 |
07/03/2016 |
02/05/2016
Time
15:0Hrs
|
|
1017 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders/4-lane configuration (or possibility of twin two lane with interconnectivity at suitable intervals) and/or its strengthening in the State of Himachal Pradesh. Package No. HP/Shahpur/4 |
168-SESHA-2016 |
04/03/2016 |
07/03/2016 |
02/05/2016
Time
15:0Hrs
|
|
1018 |
Independent Engineer Services during O&M Period for the project of “Rehabilitation and Up-gradation to 2-lane with paved shoulders and maintenance of Multai-Chhindwara-Seoni Section of NH-69A and Narsinghpur-Chhindwara-Saoner Section of NH-26B in Madhya Pradesh and Maharashtra including construction and maintenance of Ring Road and Connection Roads in Chhindwara Town”. |
NHAI/RO-MP/NIT/2016 |
04/03/2016 |
04/03/2016 |
05/04/2016
Time
11:0Hrs
|
|
1019 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Four laning /Two Lane with Paved shoulder of NH-101 of Chhapra – Mohammadpur section including Chhapra Bypass connecting NH-85 & 19 (Chhapra – Manjhi ghat section) in Bihar on EPC / PPP Mode |
DPR/BIHAR/RO-PAT/02 |
04/03/2016 |
04/03/2016 |
26/04/2016
Time
15:0Hrs
|
|
1020 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Fourlaning /Two Lane with Paved shoulder of NH-219 of Mohania - Bhabhua - Chainpur - UP borderin Bihar on EPC Mode |
DPR/BIHAR/RO-PAT/04 |
04/03/2016 |
04/03/2016 |
26/04/2016
Time
15:0Hrs
|
|
1021 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Four laning /Two Lane with Paved shoulder of NH-103 including a flyover at Paswan Chowk on NH-19 in Bihar on EPC Mode. |
DPR/BIHAR/RO-PAT/01 |
04/03/2016 |
04/03/2016 |
26/04/2016
Time
15:0Hrs
|
|
1022 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR PROJECT OF 2 laning of (i) 2 Laning with paved shoulders from Pasighat to Bomjur Section of NH- 52 from Km 583.450 to Km 595.000 and (ii) 2 Laning from Singer River to Sijon River Section of NH-513 from Km 19.880 to Km 43.257 in State of Arunachal Pradesh Under SARDP on EPC basis |
NHIDCL/AE/P- B & S-S/2016 |
02/03/2016 |
02/03/2016 |
21/04/2016
Time
17:0Hrs
|
|
1023 |
CONSULTANCY SERVICES FOR PROJECT MANAGEMENT PHASE-I INCLUDING PREPARATION OF DETAILED PROJECT REPORT OF SELECTED STRETCHES/ CORRIDORS OF NATIONAL HIGHWAYS/ STATE ROADS (APPROVED IN PRINCIPLE FOR DECLARATION AS NATIONAL HIGHWAYS) IN THE STATE OF TELANGANA FOR UP GRADATION TO TWO/ FOUR LANE WITH PAVED SHOULDER CONFIGURATION. |
SE(R&B)NH⁄HYD⁄75-81⁄2015-16, Dated: 17.02.2016 |
17/02/2016 |
02/03/2016 |
12/04/2016
Time
15:0Hrs
|
|
1024 |
Rehabilitation and up-gradation of Gurajanapalli village – Polekuru village section(from km. 41/161 to 59/800) and Komagiri –Pasarlapudi section (km. 70/400 to 105/170) of NH-214 (new NH-216) to two lane with paved shoulder in the state of Andhra Pradesh under EPC basis |
RW/NH-37018/05/2016-NHDP-IVA |
02/03/2016 |
02/03/2016 |
18/04/2016
Time
17:0Hrs
|
|
1025 |
(I) Rehabilitation and up-gradation of Dindi – Digamarru section from Km. 126/510 to Km. 135/740 of NH-214(New NH-216) & Digamarru – Losari section from Km. 0/000 to Km. 34/230 of NH-214A(New NH-216) to two lane with paved shoulder in the state of Andhra Pradesh under EPC basis & (II) Construction of Razole bypass to two lanes with paved shoulder from Km. 105.170 to Km. 127.500 in the state of Andhra Pradesh on EPC basis |
RW/NH-37018/04/2016-NHDP-IVA |
02/03/2016 |
02/03/2016 |
18/04/2016
Time
17:0Hrs
|
|
1026 |
Independent Engineer services during Operation & Maintenance Period of 4-lane divided carriageway of Tambaram to Tindivanam Section of NH-45 from Km 28/000 to Km 121/000 under BOT (Annuity) and Tindivanam to Ulundurpet Section of NH-45 from Km 121/000 to Km 192/250 in the State of Tamil Nadu executed under BOT (Toll) under NHDP Phase-III. |
RO-Chennai/IE/O&M/2016/1/ Package-I |
25/02/2016 |
25/02/2016 |
18/04/2016
Time
17:0Hrs
|
|
1027 |
Independent Engineer services during Operation & Maintenance Period of 4-lane divided carriageway of Tambaram to Tindivanam Section of NH-45 from Km 28/000 to Km 121/000 under BOT (Annuity) and Tindivanam to Ulundurpet Section of NH-45 from Km 121/000 to Km 192/250 in the State of Tamil Nadu executed under BOT (Toll) under NHDP Phase-III. |
RO-Chennai/IE/O&M/2016/1/ Package-I |
25/02/2016 |
25/02/2016 |
11/04/2016
Time
15:0Hrs
|
|
1028 |
Independent Engineer services during Operation & Maintenance Period of 4-lane divided carriageway facility of Ulundurpet – Padalur Section of NH-45 from Km 192/250 to Km 285/000 and Padalur – Trichy section of NH-45 from Km 285/000 to 325/000 in the State of Tamil Nadu to be executed under BOT (Toll) under NHDP Phase-III |
IE/O&M/2016/Package-II |
25/02/2016 |
25/02/2016 |
18/04/2016
Time
17:0Hrs
|
|
1029 |
Independent Engineer services during Operation & Maintenance Period of 4-lane divided carriageway facility of Karur to Dindigul Section of NH-7 from Km 292/600 to Km 373+725 and Dindigul to Samayanallur section of NH-7 (TN-05) from Km 373/725 to 426/775 in the State of Tamil Nadu to be executed under BOT (Toll) under NHDP Phase-III |
IE/O&M/2016/Package-III |
25/02/2016 |
25/02/2016 |
18/04/2016
Time
17:0Hrs
|
|
1030 |
Independent Engineer services during Operation & Maintenance Period of 4-lane divided carriageway facility of Madurai – Aruppukottai-Thoothukudi Section of NH-45B from Km 138/800 to Km 266/865 in the State of Tamil Nadu to be executed under BOT (Toll) under NHDP Phase-IIIA |
IE/O&M/2016/Package-IV |
25/02/2016 |
25/02/2016 |
18/04/2016
Time
17:0Hrs
|
|
1031 |
Consultancy Services for Project Management including preparation of Detailed Project Report of selected stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for upgradation to Two/Four lane with paved shoulder configuration |
SE(R&B)/NH/VJA/30/2015-16 |
23/02/2016 |
24/02/2016 |
30/03/2016
Time
0:0Hrs
|
|
1032 |
Test Project |
123456 |
24/02/2016 |
24/02/2016 |
23/03/2016
Time
0:0Hrs
|
-
|
1033 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR CONSTRUCTION OF APPROACHES IN CH 522/615 TO CH 530/850 FOR BRIDGE ACROSS RIVER ZUARI ON NH-17/NH-66 ON PANJIM-MANGALORE SECTION IN THE STATE OF GOA-(PACKAGE I) ON EPC MODE |
12014/17/2015-GOA |
23/02/2016 |
23/02/2016 |
25/04/2016
Time
17:0Hrs
|
|
1034 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION OF APPROACHES IN CH 531/934 TO CH 536/250 FOR BRIDGE ACROSS RIVER ZUARI ON NH-17/NH-66 ON PANJIM-MANGALORE SECTION IN THE STATE OF GOA-PACKAGE III ON EPC MODE |
12014/16/2015-GOA(P-6) |
23/02/2016 |
23/02/2016 |
25/04/2016
Time
17:0Hrs
|
|
1035 |
Consultancy Services for Finalisation of Alignment; Finalisation of Aesthetic Design of Krishna River Bridges and preparation of Feasibility Study Report-cum-Preliminary Design Reports for each Sub-Project for Construction ofOuter Ring Road around Vijayawada-Guntur-Tenali Urban Agglomeration in the State of Andhra Pradesh on Green Field Alignment under NHDP Phase-VII. |
. DPR/Outer Ring Road/Vijayawada/AP/ |
22/02/2016 |
22/02/2016 |
17/03/2016
Time
0:0Hrs
|
|
1036 |
Consultancy Services for Finalisation of Alignment; Finalisation of AestheticDesign of Krishna River Bridges and preparation of Feasibility Study Report-cum-Preliminary Design Reports for each Sub-Projectfor Construction ofOuter Ring Road around Vijayawada-Guntur-Tenali Urban Agglomeration in the State of Andhra Pradeshon Green Field Alignment under NHDP Phase-VII |
DPR/Outer Ring Road/Vijayawada/AP |
22/02/2016 |
22/02/2016 |
17/03/2016
Time
11:0Hrs
|
|
1037 |
Consultancy services for Authority Engineer for Supervision of 1. 4_laning of Varanasi Gorakhpur section of NH_29 from km 88.000 (design chainage 84.160) to km 148.000 (design chainage 149.540) [Pkg_III from Village Birnon to Village Amilla] in the state of UP under NHDP Phase_IV 2. 4-laning of Varanasi Gorakhpur section of NH_29 from km 148.000 (design chainage 149.540) to km 208.300 [Pkg_IV from Village Amilla to Gorakhpur] in the state of UP under NHDP Phase-IV on EPC. |
NHAI/AE/Varanasi-Gorakhpur(Pkg-III and IV)/NH-29/UP(Tech Div)/2016 |
17/02/2016 |
17/02/2016 |
18/04/2016
Time
11:0Hrs
|
|
1038 |
Consultancy services for Authority’s Engineer for Supervision of Jabalpur-Bhopalsection of NH-12 from Km. 10.400 to Km. 130.00under NHDP - IIIon EPC mode in the State of Madhya Pradesh |
17464 |
15/02/2016 |
15/02/2016 |
10/04/2016
Time
17:30Hrs
|
|
1039 |
Consultancy services for Authority’s Engineer for Supervision of Jabalpur-Bhopalsection of NH-12 from Km. 130.00 to Km. 301.200 under NHDP - IIIon EPC mode in the State of Madhya Pradesh |
17464dated12022016 |
15/02/2016 |
15/02/2016 |
10/04/2016
Time
17:30Hrs
|
|
1040 |
Consultancy services for Authority’s Engineer for Supervision of 4-laning of Varanasi Gorakhpur section of NH-29 from km 12.000 (design chainage 12.010) to km 88.000 (design chainage 84.160) [package-II from Sandah to Birnon] in the state of Uttar Pradesh under NHDP Phase-IV on EPC Basis. |
NHAI/AE/ Varanasi-Gorakhpur(Pkg-II)/NH-29/UP(Tech Div)/2016 |
12/02/2016 |
12/02/2016 |
12/04/2016
Time
11:0Hrs
|
|
1041 |
RFP FOR CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR CONSTRUCTION OF BRIDGE INCLUDING APPROACHES ACROSS RIVER ZUARI ON NH-17/NH-66 ON PANJIM-MANGALORE SECTION IN THE STATE OF GOA-(PACKAGE II : CH 530/850 TO CH 531/934) ON EPC MODE. |
NH-12014/13/2015/GOA/(P-6) |
11/02/2016 |
11/02/2016 |
27/04/2016
Time
17:0Hrs
|
|
1042 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of Ambikapur-Pathalgaon section of NH-78 from Km 373+505 (existing chainage 373+505) to Km 469+300 (existing chainage 468+800) to 2-lane with paved shoulders in the state of Chhattisgarh under NHDP–IV through Engineering, Procurement & Construction (EPC) basis |
837/NH/TC/CE/44-38/2015/26534 |
09/02/2016 |
09/02/2016 |
27/03/2016
Time
0:0Hrs
|
|
1043 |
Consultancy Services for Authority’s Engineer for Supervision of Construction of Four laning of Nagina-Kashipur Section of NH-74 from km. 71.610 (existing km. 73.000) to km. 170.403 (existing km. 175.000) in the State of Uttarakhand and Uttar Pradesh on EPC Mode under NHDP Phase-IV |
NHAI/N-K/NH-74/EPC/AE/UKD/(Tech-Div)/2015 |
03/02/2016 |
03/02/2016 |
11/04/2016
Time
11:0Hrs
|
|
1044 |
Consultancy Services for project preparation of Feasibility Study Detailed Project Report of selected road stretches for NH connectivity to Backward Religious Tourist places and Border areas under Bharat Mala scheme(Package-B/1) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1045 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package-T/27 ) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1046 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package-R/5 ) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1047 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package- 4T/16) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1048 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package-B/17 ) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1049 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package-B2T/18 ) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1050 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package-R/20) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1051 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package-R/21 ) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1052 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package-R/25 ) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1053 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package- BM/11) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1054 |
Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected road stretches for NH connectivity to Backward/Religious/Tourist places and Border areas under Bharat Mala scheme(Package-2TR/26 ) |
NHAI/BRT/Proc/02/DPR/2016 |
02/02/2016 |
02/02/2016 |
15/03/2016
Time
15:0Hrs
|
|
1055 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section Panipat (Junction with NH-44)-Shamli - Muzaffarnagar-Bijnor - Nagina road in the state of Uttar Pradesh & Haryana for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/47 |
01/02/2016 |
01/02/2016 |
09/03/2016
Time
15:0Hrs
|
|
1056 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section Allahabad–Jaunpur– Gorakhpur road in the state of Uttar Pradesh for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/48 |
01/02/2016 |
01/02/2016 |
09/03/2016
Time
15:0Hrs
|
|
1057 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section Nuh-Mandkola-Palwal-Jewar-Bulandshahar road in the state of Uttar Pradesh & Haryana for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/50 |
01/02/2016 |
01/02/2016 |
09/03/2016
Time
15:0Hrs
|
|
1058 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Rameshwar-Gangolihat-Berinag-Chaukori-Kanda-Bagheshwar-Takula-Almora in the state of Uttrakhand for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/54 |
01/02/2016 |
01/02/2016 |
09/03/2016
Time
15:0Hrs
|
|
1059 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Hodal-Bhirukhi-Hasanpur-Kashipur-Barauli- Ghori-Mohna-Arwa-Chandpur-Manjahawali in the state of Haryana for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/55 |
01/02/2016 |
01/02/2016 |
09/03/2016
Time
15:0Hrs
|
|
1060 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR CONSTRUCTION OF NORTHERN KOTA BYPASS FROM (I) DESIGN CH. 0.000 (KM 391/100 OF NH- 76) TO DESIGN CH. 10/300 (RANGPUR ROAD) AND (II) DESIGN CH. 10/300 (RANGPUR ROAD) TO DESIGN CH. 14.200 (KM 11/700 OF SH-33) WITH LINK ROAD OF 452M LENGTH WITH SH-33 IN THE STATE OF RAJASTHAN ON EPC BASIS |
RW/NH-37018/09/2015/NHDP-IVA |
29/01/2016 |
29/01/2016 |
19/02/2016
Time
0:0Hrs
|
|
1061 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of NH-200 (New NH-49) From Km 178.944 To Km 241.553 (Banari Village To Masania Kala Village Section) To Two Lane with Paved Shoulder in the State of Chhattisgarh Under NHDP –IV through Engineering, Procurement & Construction (EPC) Basis |
828/CE/NH/TC/44-35/2015/NHDP-IV/26394 |
28/01/2016 |
28/01/2016 |
14/03/2016
Time
0:0Hrs
|
|
1062 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section Dubiakhand-Betla-Garu-Mahuadanr-KUsumi-Rajpur in the state of Jharkhand for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/31 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1063 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Godda-Sunderpahari-Pakur in the state of Jharkhand for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/33 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1064 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Hatgamahria-Jagannathpur-Baraiburu-Saddle-Manoharpur-Anandpur-Bano-Kolebira in the state of Jharkhand for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/36 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1065 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Highway starting from its junction with NH-33 near Bar Bigha connecting Shekhpura, Sikandra, Jamui, Jha-Jha, Banka in the State of Bihar and terminating at its junction with NH-133 near Godda in the State of Jharkhand for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/37 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1066 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Parsora-Kendujhargarh-Panikholi-Kuakhia-Jaipur-Aradi-Chandbali-Raj Kanika and terminating at Satabhaya in the state of Odisha for up gradation to Two/Four lane with paved shoulder configuration. |
NH/IAHE/38 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1067 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Balangir-Patnagarh-Harishankar-Nrushinghnath-Paikamal-Nuaparha in the state of Odisha for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/41 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1068 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Naranpur (Keonjhor)-Kaliahata-Kankadahada-Kamakhyanagar in the state of Odisha for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/42 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1069 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Junction with NG-5 A (new NH-53) near Kendrapara – Chandbali – Dharma – Junction of NH-5 (GQ) (new NH-16) near Bhadrak in the state of Odisha for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/43 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1070 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Andhra Pradesh/Odisha Border-Parlakhemundi-Ramanagundam-Bissamcuttack-Maniguda-Bhabanipatna in the state of Odisha for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/45 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1071 |
Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of section of Bhabanipatna- Kharial-Bangomunda-Patnagarh- Odisha/Chattisgarh Border in the state of Odisha for up gradation to Two/Four lane with paved shoulder configuration |
NH/IAHE/46 |
27/01/2016 |
27/01/2016 |
29/03/2016
Time
15:0Hrs
|
|
1072 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF FOUR LANING OF HARIDWAR NAGINA SECTION OF NH-74 FROM KM 0.000 (DESIGN CHAINAGE KM 0.000) TO KM 73.000 (DESIGN CHAINAGE KM 71.614) IN THE STATES OF UTTARAKHAND AND UTTAR PRADESH UNDER NHDP PHASE-IV ON EPC MODE |
NHAI/Haridwar-Nagina/NH-74/EPC/AE/UKD(Tech-Div.)/2015 |
25/01/2016 |
25/01/2016 |
06/04/2016
Time
11:0Hrs
|
|
1073 |
4567 |
345 |
25/01/2016 |
24/01/2016 |
30/01/2016
Time
0:0Hrs
|
-
|
1074 |
Consultancy Services for Finalisation of Alignment; Finalisation of Aesthetic Design of Krishna River Bridges and preparation of Feasibility Study Report-cum-Preliminary Design Reports for each Sub-Project for Construction of Outer Ring Road around Vijayawada-Guntur-Tenali Urban Agglomeration in the State of Andhra Pradesh on Green Field Alignment under NHDP Phase-VII |
FS/Outer Ring Road/ Vijayawada/AP |
18/01/2016 |
18/01/2016 |
17/02/2016
Time
0:0Hrs
|
|
1075 |
RFP for Appointment of Technical Consultant for preparation of feasibility- report of Delhi-Ludhiana-Amritsar-Katra Expressway with connectivity to Chandigarh |
NHAI/RFP/DL/2016 |
18/01/2016 |
18/01/2016 |
07/03/2016
Time
0:0Hrs
|
|
1076 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of Raebareli to Allahabad section of NH-24B in the State of Utter Pradesh |
DPR/Raebareli-Allahabad/NH-24B/UP(Tech Div)/2016 |
15/01/2016 |
15/01/2016 |
15/02/2016
Time
0:0Hrs
|
|
1077 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of NH-43 from Km 130.000 to Km 180.000 (Kanker to Bedma Section)to two lane with paved shoulder in the State of Chhattisgarh under NHDP –IV on Engineering, Procurement & Construction (EPC) Basis. |
26182 |
07/01/2016 |
07/01/2016 |
22/02/2016
Time
0:0Hrs
|
|
1078 |
Consultancy services for Authority’s Engineer for Supervision of project of Four Laning of Mahulia-Baharagora-JH/WB section of NH-33 (from km 277+500 to km 333+500) and NH-06 (from km 199+200 to km183+587) (Total length 71.61 kms) in the state of Jharkhand under NHDP Phase-III on EPC mode. |
NHAI/JH/MBC/AE/ 2015 |
06/01/2016 |
06/01/2016 |
08/02/2016
Time
0:0Hrs
|
|
1079 |
abcd |
12345 |
05/01/2016 |
05/01/2016 |
30/01/2016
Time
0:0Hrs
|
|
1080 |
AE for supervision of Construction of 4 lane Flyover on NH-6 integrated with ROBs & river bridge including approach ramps, service roads, footpath over RCC utility duct from PardiOctroi Naka to Itwari (Ch. 544/665 to 548/065) &Inner Ring Road from Manewada to Kalamna (Ch. 20/760 to 23/190), & from Rani Prajapati Square to Vaishno Devi Square (Ch. 00/000 to 00/596) including RUB on L.C. No.71,72 & connecting inner ring road junction to APMC Kalamana market gate no. 1 & 2, Nagpur, MH on EPC mode |
NHAI/Tech/MH/Nag/Pardi/AE/2015 |
05/01/2016 |
05/01/2016 |
17/02/2016
Time
0:0Hrs
|
|
1081 |
AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF TWO LANING WITH PAVED SHOULDERS OF CHHAPRA GOPALGANJ SECTION OF NH-85 FROM KM 0.00TO KM 93.500 (EXISTING CHAINAGE) AND KM 0.00 TO KM 94.258 (DESIGN CHAINAGE) [TOTAL DESIGN LENGTH: 94.258 KMS] IN THE STATE OF BIHAR ON EPC MODE |
Chhapra-Gopalganj/AE/2015 |
28/11/2015 |
04/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1082 |
Four laning of Vengalam-Edapally from km 230.000 to km 438.000 of NH-17 (Package-II) and from Cherthalai-Thiruvananthapuram from km 379.100 to 551.900 of NH-47 (Package-III) under NHDP Phase-III in the State of Kerala |
NHAI/HQ/Kerala/NH-17&NH-47/15-16 |
04/01/2016 |
04/01/2016 |
04/02/2016
Time
0:0Hrs
|
|
1083 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF FOUR LANING OF KOILWAR TO BHOJPUR OF NH-30 & 84 FROM EXISTING CHAINAGE KM 137.375 OF NH-30 TO KM 27.370 OF NH-84 (DESIGN CHAINAGE KM 33.250 TO KM 77.100) (DESIGN LENGTH-43.850 KM) IN THE STATE OF BIHAR UNDER NHDP PHASE-III ON EPC MODE. |
Koilwar – Bhojpur /AE/2015 |
27/11/2015 |
02/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1084 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF FOUR LANING OF BHOJPUR TO BUXAR SECTION FROM KM 27.370 TO KM 75.000 OF NH-84 (DESIGN CHAINAGE KM 77.100 TO KM 125.000) (DESIGN LENGTH-47.900 KM) IN THE STATE OF BIHAR UNDER NHDP PHASE-III ON EPC MODE. |
Bhojpur –Buxar/AE/2015 |
27/11/2015 |
02/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1085 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF FOUR-LANING OF FORBESGANJ TO JOGBANI SECTION FROM KM. 0.00 TO KM. 9.260 (ICP AT JOGBANI) OF NH-57A IN THE STATE OF BIHAR ON EPC MODE |
FOR-JOG/AE/2015 |
28/11/2015 |
02/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1086 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF TWO LANING WITH PAVED SHOULDERS OF BIHARSHARIF-BARBIGHA-MOKAMA SECTION OF NH-82 FROM DESIGN CHAINAGE KM 94.478 (EXISTING CHAINAGE KM 119.320 OF NH-31) TO KM 149.053 (EXITING CHAINAGE KM 149.020 OF NH-82) [TOTAL DESIGN LENGTH – 54.575 KM] IN THE STATE OF BIHAR ON EPC MODE |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF TWO LANING WITH PAVED SHOULDERS OF BIHARSHARIF-BARBIGHA-MOKAMA SECTION OF NH-82 FROM DESIGN CHAINAGE KM 94.478 (EXISTING CHAINAGE KM 119.320 OF NH-31) TO KM 149.053 (EXITING CHAINAGE KM 149.020 OF NH-82) [TOTAL DESIGN LENGTH – 54.575 KM] IN THE STATE OF BIHAR ON EPC MODE |
28/11/2015 |
02/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1087 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF TWO-LANE WITH PAVED SHOULDER FROM KM 1.300 TO KM 74.349 (EXISTING CHAINAGE FROM KM. 1.300 TO KM. 74.200) OF CHHAPRA - REWAGHAT-MUZAFFARPUR OF NH-102 IN THE STATE OF BIHAR UNDER NHDP PHASE IV ON EPC MODE |
CRM/AE/2015 |
28/11/2015 |
02/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1088 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF FOUR LANING OF BAKHTIYARPUR – MOKAMA SECTION OF NH-31 FROM KM. 153.300 TO KM. 197.900 (DESIGN CHAINAGE) AND (EXISTING CHAINAGE KM 153.300 TO KM 204.741 OF NH – 31) IN THE STATE OF BIHAR ON EPC MODE. |
NHAI/BH/Bakhtiyarpur-Mokama /AE/2015 |
03/12/2015 |
02/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1089 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF FOUR LANING OF SIMARIA – KHAGARIA SECTION OF NH -31 FROM KM 206.050 TO KM 266.282 (DESIGN CHAINAGE) AND (EXISTING CHAINAGE KM 209.945 TO KM 270.000 OF NH – 31) IN THE STATE OF BIHAR ON EPC MODE . |
NHAI/BH/Simaria-Khgaria /AE/2015 |
03/12/2015 |
02/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1090 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF FOUR LANING OF PATNA TO KOILWAR SECTION OF NH-30 FROM EXISTING CHAINAGE KM 181.300 TO KM 137.375 (DESIGN CHAINAGE KM 0.000 TO KM 33.250) (DESIGN LENGTH-33.250 KM) IN THE STATE OF BIHAR UNDER NHDP PHASE-III ON EPC MODE |
Patna –Koilwar/AE/2015 |
28/11/2015 |
02/01/2016 |
25/01/2016
Time
0:0Hrs
|
|
1091 |
test123 |
123 |
16/12/2015 |
17/12/2015 |
27/01/2016
Time
0:0Hrs
|
-
|
1092 |
tset 05 |
abc |
16/12/2015 |
17/12/2015 |
30/01/2016
Time
0:0Hrs
|
-
|
1093 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation & Upgradation of NH-111(New NH-130) from Km. 82.500 to Km 163.400 (katghora to Shivnagar Section) in the State of Chhattisgarh to two lanes with paved shoulder under NHDP-IV on EPC basis. |
25965 |
17/12/2015 |
17/12/2015 |
08/02/2016
Time
0:0Hrs
|
|
1094 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation & Upgradation of NH-111 from Km. 163.400 to Km 215.800 (Shivnagar to Ambikapur Section) in the State of Chhattisgarh to two lanes with paved shoulder under NHDP-IV on EPC basis. |
25966 |
17/12/2015 |
17/12/2015 |
08/02/2016
Time
0:0Hrs
|
|
1095 |
Independent Engineer services during Operation & Maintenance Period for Six-Lane Badarpur Elevated Highway from Km. 16.100 to Km. 20.500 on Delhi-Agra Section of NH-2 in the States of Delhi and Haryana on BOT (TOLL) Basis |
NHAI/GM (N-1)/BADARPUR FLYOVER/GEN/04 |
15/12/2015 |
15/12/2015 |
15/01/2016
Time
0:0Hrs
|
|
1096 |
Consultancy services for Authority’s Engineer for Supervision of Rehabilitation & Upgradation of NH-12A(New NH-30) from design chainage Km. 191.400 to 242.300 (Chilpi to Kawardha Section Package-I) in the State of Chhattisgarh to two lanes with paved shoulder under NHDP-IV on EPC basis. |
25861 |
07/12/2015 |
07/12/2015 |
27/01/2016
Time
0:0Hrs
|
|
1097 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of (i) Tato – Taliha road from Km. 30.00 to Km. 109.3 (Taliha end) (ii) Bile – Migging Road from Km. 15.00 to Km 51.56 (Bile end) under SARDP-NE on Engineering, Procurement and Construction mode in the state of Arunachal Pradesh. |
NHIDCL/AR.PR/Bile-Migging/2015 |
03/12/2015 |
03/12/2015 |
17/02/2016
Time
0:0Hrs
|
|
1098 |
TEST |
32 |
11/12/2015 |
02/12/2015 |
15/12/2015
Time
0:0Hrs
|
-
|
1099 |
xyz |
test A |
01/12/2015 |
01/12/2015 |
22/03/2017
Time
16:2Hrs
|
|
1100 |
testB |
testB |
01/12/2015 |
01/12/2015 |
22/03/2017
Time
15:34Hrs
|
-
|
1101 |
sssss |
00000 |
01/12/2015 |
01/12/2015 |
07/12/2015
Time
0:0Hrs
|
-
|
1102 |
Consultancy Services for Project Management Phase-I including preparation of Detailed Project Report of Raebareli to Allahabad section of NH-24B for up gradation to Four lane configuration. |
DPR/Raebareli-Allahabad/NH-24B/UP(Tech Div)/2015 |
27/11/2015 |
30/11/2015 |
14/01/2016
Time
0:0Hrs
|
|
1103 |
Consultancy services for Feasibility Studies and preparation of Detailed Project Report |
NH-102A /NHIDCL/Manipur/Restoration-Civil Work |
25/11/2015 |
25/11/2015 |
30/11/2015
Time
0:0Hrs
|
-
|
1104 |
dfr |
abce |
23/11/2015 |
24/11/2015 |
30/12/2016
Time
0:0Hrs
|
-
|
1105 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR (I) REHABILITATION AND UPGRADATION OF KATHIPUDI TO START OF KAKINADA BYPASSFROM KM. 0.000 TO 27.500 OF NH-214 (NEW NH-216) TO FOUR LANE WITH PAVED SHOULDER & (II) CONSTRUCTION OF KAKINADA BYPASS TO TWO LANES WITH PAVED SHOULDER FROM KM. 27.500 TO KM. 42.00 IN THE STATE OF ANDHRAPRADESH ON EPC BASIS |
RW/NH-37018/12/2015/NHDP-IVA |
17/11/2015 |
17/11/2015 |
14/01/2016
Time
0:0Hrs
|
|
1106 |
Consultancy Services for preparation of Detailed Project Report for the construction of new 6-lane Bridge parallel to existing 2-lane Bridge at Phaphamau near Allahabad in the State of Uttar Pradesh. |
RO/LKO/DPR/Phaphamau River Bridge/2015-16 |
16/11/2015 |
16/11/2015 |
05/02/2016
Time
0:0Hrs
|
|
1107 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridors under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country and ADB Funded Projects in the State of Tripura |
NHIDCL/BM-BRT/06/2015 |
13/09/2015 |
21/09/2015 |
09/03/2016
Time
15:0Hrs
|
|
1108 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridors under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country and ADB Funded Projects in the State of Uttrakhand |
NHIDCL/BM-BRT/07/2015 |
13/09/2015 |
21/09/2015 |
17/03/2016
Time
15:0Hrs
|
|
1109 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridors under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country and ADB Funded Projects in the State of Sikkim |
NHIDCL/BM-BRT/05/2015 |
13/09/2015 |
18/09/2015 |
22/03/2016
Time
15:0Hrs
|
|
1110 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridors under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country and ADB Funded Projects in the State of Jammu & kashmir |
NHIDCL/BM-BRT/03/2015 |
13/09/2015 |
17/09/2015 |
29/03/2016
Time
15:0Hrs
|
|
1111 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridors under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country and ADB Funded Projects in the State of Manipur |
NHIDCL/BM-BRT/04/2015 |
13/09/2015 |
17/09/2015 |
10/05/2016
Time
15:0Hrs
|
|
1112 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridors under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country and ADB Funded Projects in the State of Himachal Pradesh |
NHIDCL/BM-BRT/02/2015 |
13/09/2015 |
16/09/2015 |
17/03/2016
Time
15:0Hrs
|
|
1113 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of up-gradation to Two Lane with paved shoulder NH configuration of corridors under BHARATMALA Project, National Highway connectivity to backward areas/religious/tourist places of the country and ADB Funded Projects in the State of Assam & West Bengal |
NHIDCL/BM-BRT/01/2015 |
13/09/2015 |
15/09/2015 |
04/03/2016
Time
15:0Hrs
|
|