S.No |
Project Name |
Tender No |
Tender Date |
Tender Start Date |
Tender End Date |
Document |
1 |
Consultancy services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Zunheboto and from Chazuba to Meluri via Thevopheshu. (NH 702A) |
CE/NH/ DPR/2020-21/702A |
21/01/2021 |
21/01/2021
|
19/02/2021
Time
13:0Hrs
|
|
2 |
Preparation of Detailed Project Report for Widening of existing single/ intermediate lane to 2-lane with paved shoulders from Km. 189.00 to 263.115 (Salondhar to Buakhal) on NH-309(Old No. 121) in the State of Uttarakhand (total length 74.115 km) |
256/13yata-NH-10/2020 dated 19.01.2021 |
21/01/2021 |
21/01/2021
|
22/02/2021
Time
11:0Hrs
|
|
3 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Nagaland gate (NH 702D) |
CE/NH/ DPR/2020-21/702D |
21/01/2021 |
21/01/2021
|
19/02/2021
Time
13:0Hrs
|
|
4 |
Detailed Project Report of Feasibility Study and Preparation of DPR for Construction of HL Bridge over Chir River in Km 199 of NH-333A (Bihar/ Jharkhand Border) in the District Banka, Bihar. |
NIT no. 23/NH-Bhagalpur/2020-21 |
22/12/2020 |
22/12/2020
|
25/01/2021
Time
17:0Hrs
|
|
5 |
Consultancy Services for Preparation of Detailed Project Report for 2 lane road from Tetwal (Kashmir) to Drass (Ladakh) in the UT of Jammu & Kashmir and Ladakh |
2020-NHIDC-604411-1 |
19/12/2020 |
19/12/2020
|
27/01/2021
Time
11:0Hrs
|
-
|
6 |
Consultancy Services for preparation of Detailed Project Report for NH 326 Chintoor to Motu from Km.1/200 to 9/600 under (R&B), NH division Visakhapatnam in the State of Andhra Pradesh |
SENHVJA 24 2020 21, dt.08.12.2020 |
18/12/2020 |
14/12/2020
|
28/01/2021
Time
17:0Hrs
|
|
7 |
Consultancy Services for Feasibility Study and preparation of DPR for Bypass of Km 28(Near Gangta) to Km 40(Near Laxmipur) of NH-333 lying in Bhimbandh Wildlife sanctuary Area in the State of Bihar to the Specification of 2 Lane with Paved Shoulder |
NIT NO. 13/NH-LAKHISARAI/2020-21 |
05/12/2020 |
10/12/2020
|
18/01/2021
Time
17:0Hrs
|
|
8 |
Consultancy services for feasibility study and detailed Engineering for rehabilitation and up-gradation of NH- 154A from Km 84 to 93 and 130 to 172 in the state of Himachal Pradesh. |
516-SESHA-2020 |
03/12/2020 |
04/12/2020
|
06/01/2021
Time
15:0Hrs
|
|
9 |
Consultancy Services for feasibility study and detailed Engineering Gagret Bye-pass Kms. 59/0 to 66/50 Mubarikpur Bye-pass Kms (71/0 of NH-70) & (90/0 of NH-20A) & Amb Bye-pass Kms 74/0 to 78/0 in the state of Himachal Pradesh. |
517-SESHA-2020 |
03/12/2020 |
04/12/2020
|
06/01/2021
Time
15:0Hrs
|
|
10 |
Consultancy Services for Preparation of Feasibility Report and Detailed Project Report DPR for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana |
2020-NHIDC-599747-1 |
11/12/2020 |
27/11/2020
|
21/12/2020
Time
11:0Hrs
|
|
11 |
Consultancy Services for Detailed Project Report Preparation for rehabilitation and up-gradation to 2 lane 2 lane with paved shoulder from Km. 89.00 to 123.00 (Kathgodam to Nainital) of NH-87 (New NH-109) in the State of Uttarakhand. |
4388/12M-NH/2019-20 |
12/11/2020 |
13/11/2020
|
14/12/2020
Time
15:0Hrs
|
|
12 |
Consultancy services for Rehabilitation and Upgradation to two lane with paved shoulder configuration of Araku (Bhalluguda) to Bowdara section of NH-516E in the State of Andhra Pradesh |
RO/VJA/GNHCP Dt 02-10-2020 |
13/11/2020 |
13/11/2020
|
16/11/2020
Time
11:0Hrs
|
|
13 |
CS for Preparation of Detailed Project Report and Detailed Engineering for Up gradation to 2 lane with paved shoulders of the stretch from Km 0 to 36.4 of NH 167BG from Seetharampuam to Duttalur in the state of Andhra Pradesh |
Tender Notice No.SENHVJA/20/2020-21,dt.03.11.2020 |
07/11/2020 |
06/11/2020
|
07/12/2020
Time
17:0Hrs
|
|
14 |
RFP for Consultancy Services for Preparation of Detailed Project Report for 2-laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh (Package 5 Khanabal- Baltal) |
2020-NHIDC-594998-1 |
04/11/2020 |
04/11/2020
|
14/12/2020
Time
11:0Hrs
|
|
15 |
RFP for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh (Package 4 Lamayuru-Leh) |
2020-NHIDC-594948-1 |
04/11/2020 |
04/11/2020
|
14/12/2020
Time
11:0Hrs
|
|
16 |
RFP for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh (Package 3 Kargil-Lamayuru) |
2020-NHIDC-594941-1 |
04/11/2020 |
04/11/2020
|
14/12/2020
Time
11:0Hrs
|
|
17 |
RFP for Consultancy Sniervices for Preparation of Detailed Project Report for 2 lang with paved shoulder in the UT of Jammu & Kashmir and Ladakh (Package 2 Minamarg-Kargil) |
2020-NHIDC-594935-1 |
04/11/2020 |
04/11/2020
|
14/12/2020
Time
11:0Hrs
|
|
18 |
RFP for Consultancy Services for Preparation of Detailed Project Report for 2 laning with paved shoulder in the UT of Jammu & Kashmir and Ladakh. (Package 1 Srinagar-Minamarg) |
2020-NHIDC-594887-1 |
04/11/2020 |
04/11/2020
|
14/12/2020
Time
11:0Hrs
|
|
19 |
Preparation of DPR for Elephant Corridor from km 389/0 - 391/4 of NH-67 (Nagapattinam-Gudalur-Mysore road) |
Preparation of DPR for Elephant Corridor from km 389/0 - 391/4 of NH-67 (Nagapattinam-Gudalur-Mysore road) |
19/11/2020 |
28/10/2020
|
14/12/2020
Time
15:0Hrs
|
|
20 |
Consultancy Services for feasibility study and detailed engineering including preparation of Detailed Project Report for reconstruction of major bridge across Beas River at Dehra at RD 59/375 including approaches and realignment in the state of Himachal Pradesh. |
515-SESHA-2020 |
15/10/2020 |
24/10/2020
|
23/11/2020
Time
15:0Hrs
|
|
21 |
Consultancy Services for feasibility study and detailed engineering for widening to two lane and geometric improvements of NH-907A from Km 0/0 to 78/0 (Nahan to Kumarhatti Stretch) in the state of Himachal Pradesh. |
3235-39-SENHCS-2020 |
09/10/2020 |
09/10/2020
|
03/11/2020
Time
17:0Hrs
|
|
22 |
Consultancy services for preparation of DPR for widening of existing Single/Intermediate lane to 2- lane with paved shoulder from km 160.00 to km 175.00 (Mussoorie to Bataghat) of NH-707A and km 133.150 to 173.600 (Fediz to Sanail) of NH-707 (Old NH-72B) in the State of Uttarakhand |
3128/13yata-NH-10/2020 dated 24.09.2020 |
25/09/2020 |
25/09/2020
|
26/10/2020
Time
11:0Hrs
|
|
23 |
Consultancy Services for Preparation of Detailed Project Report for the work of approx. 17 Km long spur from Bharauli (near Buxar) to Haidaria connecting Purvanchal Expressway |
104/RO-PATNA/NHAI/2020-21 |
23/09/2020 |
23/09/2020
|
02/11/2020
Time
11:0Hrs
|
|
24 |
Consultancy Services for Preparation of Detailed Project Report for the work of 4 laning of Mokama - Munger Section of NH -80 (Total Length - 70 Km). |
105/RO-PATNA/NHAI/2020-21 |
23/09/2020 |
23/09/2020
|
02/11/2020
Time
11:0Hrs
|
|
25 |
Consultancy Services for Preparation of Detailed Project Report for the work of 4 (Four) laning of Buxar-Varanasi Road. (Total Length – 108 Km) |
103/RO-PATNA/NHAI/2020-21 |
23/09/2020 |
22/09/2020
|
02/11/2020
Time
11:0Hrs
|
|
26 |
Consultancy services for feasibility study and detailed Engineering for rehabilitation and up-gradation of NH- 154A from Km 84 to 93 and 130 to 172 in the state of Himachal Pradesh. |
514-SESHA-2020 |
17/09/2020 |
18/09/2020
|
09/10/2020
Time
15:0Hrs
|
|
27 |
Consultancy Services for feasibility study and detailed Engineering Gagret Bye-pass Kms. 59/0 to 66/50 Mubarikpur Bye-pass Kms (71/0 of NH-70) and (90/0 of NH-20A) and Amb Bye-pass Kms 74/0 to 78/0 in the state of Himachal Pradesh. |
513-SESHA-2020 |
15/09/2020 |
18/09/2020
|
09/10/2020
Time
15:0Hrs
|
|
28 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for 2-lane widening with Paved shoulders from existing km 53.425 to 55.335 NH 109 (New NH-107) including landslide treatment /Bypass of Khat Village in the State of Uttarakhand |
2882/13yata-NH-10/2020 dated 15.09.2020 |
19/09/2020 |
16/09/2020
|
19/10/2020
Time
11:0Hrs
|
|
29 |
Consultancy Services for Preparation of Detailed Project Report (DPR)for Construction of double lane Highway from Langrh CO HQ of KurungKumey District to Chayang Tajo ADC HQ, East Kameng District Via Sangram SDO HQ, Nyapin ADC HQ and Phassang Circle HQ (L=136.00 Km) in the State of Arunachal Pradesh |
Ar.P/VIP/Langrh-Chayangtajo |
18/09/2020 |
15/09/2020
|
15/10/2020
Time
11:0Hrs
|
|
30 |
Preparation of DPR for NH-458 (Raipur-Jassakhera Section) in the State of Rajasthan |
02/2020-2021 |
22/09/2020 |
07/09/2020
|
07/01/2021
Time
16:0Hrs
|
|
31 |
Consultancy Services for Preparation of DPR of New NH-311 (Singhana-Khetri Nagar-Jasrapur-Nagli Saledi Singh- Bhatiwar-Chhawsari-Titanwar) |
04/2020-21 |
16/09/2020 |
27/08/2020
|
12/10/2020
Time
11:0Hrs
|
|
32 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Widening from single/ intermediate lane to 2-lane with paved shoulder from km 175.00 to 311.00 (Bhataghat-Dhanolti-Chamba-New Tehri-Maletha) on NH-707A in the State of Uttarakhand |
2380/13yata-NH-10/2020 dated 14.08.2020 |
24/08/2020 |
24/08/2020
|
24/09/2020
Time
11:0Hrs
|
|
33 |
Consultancy services for preparation of DPR for widening of existing Single/Intermediate lane to 2- lane with paved shoulder from km 160.00 to km 175.00 (Mussoorie to Bataghat) of NH-707A and km 134.150 to 173.600 (Fediz to Sanail) of NH-707 (Old NH-72B) in the State of Uttarakhand |
2380/13yata-NH-10/2020 dated 14.08.2020 |
26/08/2020 |
24/08/2020
|
24/09/2020
Time
10:7Hrs
|
|
34 |
Consultancy services for feasibility study (FS) and preparation of detailed project report and providing pre construction services for construction and upgradation of road Gangotri- Dharasu (NH-34) to National Highway Double lane/IW specification under Chardham Pariyojna in the State of Uttarakhand in 36 BRTF Sector of Project Shivalik |
Shivalik/EPC/03/2020-21 |
18/07/2020 |
24/08/2020
|
16/09/2020
Time
11:0Hrs
|
|
35 |
Consultancy services for preparation of DPR for two laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 5 - Mechuka - Tato – Monigong and Tato to Bile) |
DPR/FH/Ar. P/ 2020/05 |
23/08/2020 |
23/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
36 |
Consultancy services for preparation of DPR for two laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 6 - Migging – Tuting – Zido and Singa - Anelye – Hunli) |
DPR/FH/Ar. P/ 2020/06 |
23/08/2020 |
23/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
37 |
Consultancy services for preparation of DPR for two laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 7 - Hunli to Hayuliang) |
DPR/FH/Ar. P/ 2020/07 |
23/08/2020 |
23/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
38 |
Consultancy services for preparation of DPR for two laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 8 -Hayuliang - Changwinti – Hawai - Miao (Changlang)) |
DPR/FH/Ar. P/ 2020/08 |
23/08/2020 |
23/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
39 |
Consultancy services for preparation of DPR for two laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 9 - Miao (Changlang) – Gandhigramm - Vijaynagar) |
DPR/FH/Ar. P/ 2020/09 |
23/08/2020 |
23/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
40 |
Consultancy services for preparation of DPR for two laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 1- Nafra – Dibrick – Sachung – Lada |
DPR/FH/Ar. P/ 2020/01 |
21/08/2020 |
21/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
41 |
Consultancy services for preparation of DPR for two laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 2 - Lada to Sarli) |
DPR/FH/Ar. P/ 2020/02 |
21/08/2020 |
21/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
42 |
Consultancy services for preparation of DPR for two laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 3 - Sarli– Huri – Parsi Parlo – Tali) |
DPR/FH/Ar. P/ 2020/03 |
21/08/2020 |
21/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
43 |
Consultancy Services for Preparation of Detailed Project Report for 2 lanes/2 lane with paved shoulder configuration of stretch of total length 313 Km package II in the state of Madhya Pradesh |
2020-MoRTH-558070-1 |
21/08/2020 |
21/08/2020
|
28/08/2020
Time
18:0Hrs
|
|
44 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 4 - Tali - Taliha - Siyum – Mechuka) |
DPR/FH/Ar. P/ 2020/04 |
23/08/2020 |
21/08/2020
|
06/10/2020
Time
11:0Hrs
|
|
45 |
Consultancy Services for preparation of DPR for elevated corridor throughout the Imphal City (length 25 km) in the State of Manipur |
NH-12013/03/2020/Tender/MN/Z-V |
18/08/2020 |
19/08/2020
|
09/11/2020
Time
11:0Hrs
|
|
46 |
Consultancy Services for preparation of DPR for Widening of existing Single/intermediate lane to 2-lane from Km. 55.550 to 235.00 (Quarab to Karanparyag) on NH 87Ext. (New no.109) in the State of Uttarakhand. |
2513/12M-NH/2019-20 dt 18.08.2020 |
19/08/2020 |
19/08/2020
|
18/09/2020
Time
15:0Hrs
|
|
47 |
Consultancy Services for preparation of DPR-Feasibility Report for Six laning of Chandikhole-Paradip (Km. 0.00 to km. 77.00) of NH-5A in the State of Odisha |
55446 |
19/08/2020 |
18/08/2020
|
27/10/2020
Time
11:0Hrs
|
|
48 |
Consultancy Services for Preparation of Detailed Project Report for 2 lane with paved shoulder configuration of stretch of Damoh UP Border NH 12A Ext and Sirmour Dabhora NH 135B total length 259 Km package I in the state of Madhya Pradesh |
2020-MoRTH-557883-1 |
28/08/2020 |
07/08/2020
|
28/08/2020
Time
18:0Hrs
|
|
49 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Balance Work of Taliha-Tato Road from Km 0.00 to Km 30.00 to NHDL Specifications on EPC Mode under Phase-A of SARDP-NE in the State of Arunachal Pradesh |
NH-12013/01/2020/T-T/SARDP-NE/Zone-V |
22/08/2020 |
05/08/2020
|
15/09/2020
Time
11:0Hrs
|
|
50 |
Consultancy Services for Preparation of DPR for Balance Work of Bile Migging road from Km 0.00 to 15.00 (Bile end) and Km 0.00 to 38.00 (Migging end) to NHDL specifications on EPC Mode under Phase A of SARDP NE in the State of Arunachal Pradesh. |
NH-12013/01/2020/T-T/SARDP-NE/Zone-V |
23/08/2020 |
05/08/2020
|
15/09/2020
Time
11:0Hrs
|
|
51 |
Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95.00 to km 101.00 of NH-51 on EPC mode in the State of Meghalaya |
2020-NHIDC-571984-1 |
04/08/2020 |
04/08/2020
|
08/09/2020
Time
15:30Hrs
|
|
52 |
Consultancy Services for Detailed Project Report Preparation for rehabilitation and up-gradation to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 80.00 Ghat to Berinag of NH-309A in the State of Uttarakhand. |
2187/12M-NH/2019-20 dt 28.07.2020 |
28/07/2020 |
28/07/2020
|
29/08/2020
Time
15:0Hrs
|
|
53 |
Consultancy Services for Preparation of Detailed Project Report For Two Lanes/Two lane with paved shoulder Configuration of Stretch Mandla-Nainpur-Lamta-Balaghat NH-543 Total 134 Km in State of Madhya Pradesh |
2020-MoRTH-573750-1 |
10/08/2020 |
27/07/2020
|
17/08/2020
Time
17:30Hrs
|
|
54 |
Consultancy Services for Preparation of Detailed Project Report For Two Lanes/Two lane with paved shoulder Configuration of Stretch Mandla-Nainpur-Lamta-Balaghat NH-543 Total 134 Km in State of Madhya Pradesh |
2020-MoRTH-573750-1 |
21/08/2020 |
27/07/2020
|
24/08/2020
Time
18:0Hrs
|
|
55 |
Preparation of DPR for Elephant Corridor from km 389/0 - 391/4 of NH-67 (Nagapattinam-Gudalur-Mysore road) |
TN.No.6/HDO/NH/2020-21/Dt.24.07.2020 |
10/08/2020 |
24/07/2020
|
08/09/2020
Time
15:0Hrs
|
|
56 |
Consultancy Services for Detailed Project Report and Providing Pre-Construction activities for Construction of Highway 2- Lane Tunnel including approaches across the Mussoorie Hills. Design Chainage 0.700 of Cart-Maccanzi Road to Chainage 156.700 of Tyuni-Chakrata-Mussoorie-Dhanolty-New Tehri Road of NH-707A region in the State of Uttarakhand |
1866/13Yata-NH-10/2020 dated 21.07.2020 |
23/07/2020 |
21/07/2020
|
29/09/2020
Time
15:0Hrs
|
|
57 |
RETENDER FOR CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION OF VIADUCT BETWEEN KM 5.20 TO KM 8.70 ON ROAD MANALI-SARCHU IN 70 RCC SECTOR UNDER 38 BRTF / PROJECT DEEPAK IN HIMACHAL PRADESH STATE |
CE (P) DPK 04 of 2020-21 |
17/07/2020 |
17/07/2020
|
04/08/2020
Time
15:0Hrs
|
|
58 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Widening from single/ intermediate lane to 2-lane with paved shoulder from km 175.00 to 233.00 (Bhataghat-Dhanolti-Chamba-New Tehri) on NH-707A in the State of Uttarakhand |
1796/13Yata-NH-10/2020 dated 13.07.2020 |
23/07/2020 |
13/07/2020
|
17/08/2020
Time
11:0Hrs
|
|
59 |
Consultancy Services for preparation of DPR for green field Chambal Expressway in the State of MP/UP/Rajasthan |
NHAI/HQ/MP/Chambal Expressway/2020 |
20/07/2020 |
09/07/2020
|
27/08/2020
Time
11:0Hrs
|
|
60 |
Consultancy Services for preparation of Detailed Project Report for Construction of Alternative approach road for Boarder area RE park in Kachchh District in the State of Gujarat. (Proposed alignment starts from NH-341 at Ch. 147. and ends on Dharmshala-Vighkot road Approx. length 18.150 Kms. |
06AE of 2020-21 |
13/07/2020 |
04/07/2020
|
27/07/2020
Time
17:0Hrs
|
|
61 |
Consultancy Services for Preparation of Detailed Project Report for 2 laning of Aizawl Bypass including Tunnel (Connecting Sairang on NH-306 to NH-02) in the State of Mizoram under Bharatmala Pariyojna |
2020-NHIDC-569046-1 |
05/07/2020 |
04/07/2020
|
17/09/2020
Time
11:0Hrs
|
|
62 |
Consultancy Services for Detailed Project Report Preparation for rehabilitation and up-gradation to 4- Lane from Km. 0.00 to 28.00( Kashipur to Ramnagar) of NH-121 (New NH-309) in the State of Uttarakhand. |
1721/12M-NH/2019-20 dt 26.06.2020 |
26/06/2020 |
27/06/2020
|
28/07/2020
Time
15:0Hrs
|
|
63 |
Consultancy Services for Detailed Project Report Preparation for rehabilitation and up-gradation to 2 lane 2 lane with paved shoulder from Km. 89.00 to 123.00 (Kathgodam to Nainital) of NH-87 New NH-109 in the State of Uttarakhand. |
1657/12M-NH/2019-20 |
22/06/2020 |
22/06/2020
|
23/07/2020
Time
17:0Hrs
|
|
64 |
Consultancy services for feasibility study (FS) and preparation of detailed project report and providing pre construction services for construction and upgradation of road Bhaironghati -Nelong-Naga-Angar-PDA-Medikay to National Highway Double lane specification under Bharatmala pariyojna in the State of Uttarakhand in 36 BRTF Sector of Project Shivalik |
Shivalik/EPC/01/2020-21 |
20/05/2020 |
16/06/2020
|
31/07/2020
Time
15:0Hrs
|
|
65 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Ojree (Dabarkot) Design Chainage Km 77.025 to Km 78.550 ON Dharasu to Yamunotri road of NH 134(Old No 94) region of the state of Uttarakhand |
1683/13yata-Nh-10/2020 dated 02.06.2020 |
15/06/2020 |
15/06/2020
|
16/07/2020
Time
12:0Hrs
|
|
66 |
Consultancy Services for preparation of DPR/ Feasibility Report for Construction of Ring Road for Jabalpur city. |
NHAI/HQ/MP/DPR/Jabalpur Ring Road/2020 |
12/06/2020 |
12/06/2020
|
27/07/2020
Time
11:0Hrs
|
|
67 |
Consultancy Services to study the existing DPR/ contract provisions for 4 laning of Ramban Banihal Section (Km 151 to Km 187) under implementation and prepare revised DPR for critical locations to provide realignments /alternate solutions to the extent required in the form of tunnels / viaducts etc to make such locations all weather traffic worthy and safe for operations |
2020/NHAI/50523/1 |
20/06/2020 |
12/06/2020
|
16/07/2020
Time
11:0Hrs
|
|
68 |
Consultancy Services for preparation of Detailed Project Report including Pre-Construction activities for Construction of a Road Tunnel for NH-148AE with its approach and connection to NH-248BB and existing Delhi internal roads in the State of Delhi |
PIU/DWE/20/03 |
05/06/2020 |
05/06/2020
|
19/08/2020
Time
11:0Hrs
|
|
69 |
Consultancy Services for preparation of DPR of Four laning of proposed Shimla Bypass from Kaithlighat to Dhalli Section on NH-22 |
2020/NHAI/49323/1 |
15/06/2020 |
29/05/2020
|
29/06/2020
Time
11:0Hrs
|
|
70 |
Consultancy services for preparation of detailed project report for 4 laning of NH 60 New NH 14 from 115.000 Kharagpur to Km 422.450 Moregram in the State of West Bengal. |
01 of 2020-21 of SE NHPDC |
19/05/2020 |
19/05/2020
|
18/08/2020
Time
11:0Hrs
|
|
71 |
CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION OF VIADUCT BETWEEN KM 5.20 TO KM 8.70 ON ROAD MANALI-SARCHU IN 70 RCC SECTOR UNDER 38 BRTF / PROJECT DEEPAK IN HIMACHAL PRADESH STATE |
CE (P) DPK 02 of 2020-21 |
08/05/2020 |
16/05/2020
|
23/06/2020
Time
10:0Hrs
|
|
72 |
test |
12 |
07/05/2020 |
07/05/2020
|
07/05/2020
Time
15:0Hrs
|
-
|
73 |
Consultancy Services for Preparation of Detailed Project Report for 2 lane with paved shoulder configuration of stretch of Damoh UP Border NH 12A Ext and Sirmour Dabhora NH 135B total length 259 Km package I in the state of Madhya Pradesh |
2020-MoRTH-557883-1 |
06/07/2020 |
07/05/2020
|
29/07/2020
Time
17:30Hrs
|
|
74 |
Consultancy Services for Preparation of Detailed Project Report for 2 lanes/2 lane with paved shoulder configuration of stretch of total length 313 Km package II in the state of Madhya Pradesh |
2020-MoRTH-558070-1 |
06/07/2020 |
07/05/2020
|
29/07/2020
Time
17:30Hrs
|
|
75 |
Consultancy Services for Preparation of Detailed Project Report for 2 lane with paved shoulder configuration of stretch of Damoh UP Border NH 12A Ext and Sirmour Dabhora NH 135B total length 259 Km package I in the state of Madhya Pradesh |
2020-MoRTH-557883-1 |
04/08/2020 |
07/05/2020
|
20/08/2020
Time
17:30Hrs
|
|
76 |
Consultancy Services for Preparation of Detailed Project Report for 2 lanes/2 lane with paved shoulder configuration of stretch of total length 313 Km package II in the state of Madhya Pradesh |
2020-MoRTH-558070-1 |
04/08/2020 |
07/05/2020
|
20/08/2020
Time
17:30Hrs
|
|
77 |
Consultancy Services for Preparation of Detailed Project Report for 2 lane with paved shoulder configuration of stretch of Damoh UP Border NH 12A Ext and Sirmour Dabhora NH 135B total length 259 Km package I in the state of Madhya Pradesh |
2020-MoRTH-557883-1 |
27/08/2020 |
07/05/2020
|
27/08/2020
Time
17:30Hrs
|
|
78 |
Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95.00 to km 101.00 of NH-51 on EPC mode in the State of Meghalaya |
2020-NHIDC-557834-1 |
09/05/2020 |
05/05/2020
|
09/06/2020
Time
14:30Hrs
|
|
79 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Construction of VUP in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode Near Bibi Wala Chowk for the T-Junction with Bypass/Ring Road on the road section of NH-07, Bathinda. |
CW-2/BTI/05 |
23/03/2020 |
18/03/2020
|
20/07/2020
Time
15:0Hrs
|
|
80 |
Feasibility study and preparation of DPR for 2-Laning with paved shoulder on NH-306A in Mizoram |
RE-NIT No.1/RFP/CE-HW/PWD/2017-18 |
18/03/2020 |
17/03/2020
|
11/05/2020
Time
11:0Hrs
|
|
81 |
Feasibility study and preparation of DPR for 2-Laning with paved shoulder on NH-306A in Mizoram (100.00 km). |
RE-NIT No.1/RFP/CE-HW/2017-2018 Dt.17.03.2020 |
27/05/2020 |
17/03/2020
|
20/06/2020
Time
11:0Hrs
|
|
82 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territory of Ladakh. |
2020-NHIDC-548777-1 |
12/04/2020 |
28/02/2020
|
18/05/2020
Time
15:0Hrs
|
|
83 |
CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT PREPARATION FOR GEOMETRIC IMPROVEMENT, RECONSTRUCTION OF EXISTING STRUCTURES AND UPGRADATION OF EXISTING ROAD AS PER TRAFFIC REQUIREMENT TO FROM KM 330/700 TO KM 426/500 OF NH68, IN THE STATE OF GUJARAT |
RW/GNR/DPR GENERAL/TENDER/NH-68 |
06/01/2020 |
24/02/2020
|
03/07/2020
Time
17:0Hrs
|
|
84 |
CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT PREPARATION FOR UPGRADATION OF EXISTING ROAD TO 2L PSS WITH GEPMETRIC IMPROVEMENT AND RECONSTRUCTION OF EXISTING STRUCTURE FROM KM 62/400 TO KM 105/00 OF NH953, IN THE STATE OF GUJARAT |
RW/GNR/DPR GENERAL/TENDER/NH-953 |
06/01/2020 |
24/02/2020
|
03/07/2020
Time
17:0Hrs
|
|
85 |
CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT PREPARATION FOR UPGRADATION OF EXISTING 4L ROAD TO 6L FROM KM 0/00 TO KM 12/00 OF NH147, IN THE STATE OF GUJARAT |
RW/GNR/DPR GENERAL/TENDER/NH-147 |
07/01/2020 |
24/02/2020
|
03/07/2020
Time
17:0Hrs
|
|
86 |
CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT PREPARATION FOR reconstruction of EXISTING TWO LANE ROB FROM KM 66/500 TO KM 67/250 OF NH64 IN THE STATE OF GUJARAT |
RW/GNR/DPR GENERAL/TENDER/NH-64 |
07/01/2020 |
24/02/2020
|
03/07/2020
Time
17:0Hrs
|
|
87 |
CONSULTANCY SERVICES FOR DETAILED PROJECT REPORT PREPARATION FOR UPGRADATION OF EXISTING ROAD TO 2L PSS/4L FROM KM 56/0 TO KM 160/20 OF NH58 INCL VADGAM BYPASS, VADALI BYPASS, CHANOL BYPASS IN THE STATE OF GUJARAT |
RW/GNR/DPR GENERAL/TENDER/NH-58 |
31/12/2019 |
21/02/2020
|
03/07/2020
Time
17:0Hrs
|
|
88 |
Consultancy Services for Carrying out Feasibility Study and Detailed ProjectReport of Jalori Pass Tunnel 4.200 Km including approaches on Sainj0.00 Luhri Aut 97.00 Road NH 305 from Km. 46.080 to Km. 57.00 in theState of Himachal Pradesh. |
2020-MoRTH-545297-1 |
17/02/2020 |
17/02/2020
|
10/06/2020
Time
11:0Hrs
|
|
89 |
Consultancy Services for Preparation of Detailed Project Report for Slope Protection work of section of Km. 25.60 to Km 26.1 Bagrakot -Kafer of NH 717A in the state of West Bengal |
NHIDCL/Bagrakot-Kafer/Slope Protection/NH-717A/West Bengal |
20/02/2020 |
11/02/2020
|
03/03/2020
Time
15:0Hrs
|
|
90 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Widening from single/ intermediate lane to 2-lane with paved shoulder from km 0.00 to 84.00 (Tuini to Chakrata) on NH-707A in the State of Uttarakhand |
675/13Yata-NH-10/2020 dated 10.02.2020 |
22/02/2020 |
10/02/2020
|
18/03/2020
Time
15:0Hrs
|
|
91 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Widening from single/ intermediate lane to 2-lane with paved shoulder from km 84.00 to 160.00 (Chakrata to Mussoorie) on NH-707A in the State of Uttarakhand |
675/13Yata-NH-10/2020 dated 10.02.2020 |
22/02/2020 |
10/02/2020
|
18/03/2020
Time
15:0Hrs
|
|
92 |
consultancy services for preparation of detailed project report (DPR) for construction of Srinagar bypass from Panch- Pepal to Sweet bridge in 2-lane with paved shoulders on NH-58 in the State of Uttarakhand |
520/13Yata-NH-10/2020 |
06/02/2020 |
01/02/2020
|
11/03/2020
Time
15:0Hrs
|
|
93 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Ojree (Dabarkot) Design Chainage Km 77.025 to Km 78.550 ON Dharasu to Yamunotri road of NH 134(Old No 94) region of the state of Uttarakhand |
520/13Yata-NH-10/2020 dated 31.01.2020 |
11/02/2020 |
01/02/2020
|
11/03/2020
Time
15:0Hrs
|
|
94 |
Consultancy services for preparation of DPR including LA and other clearances for construction of Elevated road in Singheshwar Bazar on NH-106(Old)NH-131(New) in the state of Bihar |
08/NH-MADHEPURA/2019-20 |
22/01/2020 |
21/01/2020
|
12/03/2020
Time
17:0Hrs
|
|
95 |
Consultancy services for feasibility study and preparation of Detailed Project Report for Construction of R.O.B. in lieu of existing Railway crossing at Km 20.690 on NH-503A (near Una Town) in the State of Himachal Pradesh |
2020-MoRTH-536652-1 |
17/01/2020 |
16/01/2020
|
19/02/2020
Time
11:0Hrs
|
|
96 |
Consultancy Services for preparation of DPR for Rehabilitation and upgradation from 2- Lane to 2 lane with paved shoulders of Mulakalacheru to Madanapalli section of NH 42 from Km 202/050 to 244/ 930 in the State of Andhra Pradesh |
SE R and NIT NO.01/2019-20,dt. 05.11.2019 |
22/11/2019 |
31/12/2019
|
21/01/2020
Time
15:0Hrs
|
|
97 |
Consultancy Services for Feasibility Study Detailed Project Report Survey and Preparation of Land Acquisition for Construction for Bypass to Hubballi Dharwad Cities From Tadas Cross to Tegur cross NH4 AH47 Bengaluru Pune Section in the State of Karnataka. |
2120 Dated24-12-2019 |
26/12/2019 |
26/12/2019
|
24/02/2020
Time
17:0Hrs
|
|
98 |
Consultancy Services for Carrying out Feasibility Study and Detailed Project Report of Jalori Pass Tunnel (4.200 Km.) including approaches on Sainj (0.00)-Luhri- Aut (97.00) Road NH-305 from Km. 46.080 to Km. (57.00) in the State of Himachal Pradesh. |
2019-MoRTH-529553-1 |
23/12/2019 |
23/12/2019
|
10/02/2020
Time
11:0Hrs
|
|
99 |
Consultancy Services for Balance works of Land acquisition Plan ,Forest clearance Proposals and other pre construction activities in respect of Detailed Project Report (DPR) for Sainj-Luhari-Jalori-Banjar-Aut Road excluding Jalori Pass Tunnel, of NH- |
2019-MoRTH-529393-1 |
23/12/2019 |
23/12/2019
|
10/02/2020
Time
11:0Hrs
|
|
100 |
Consultancy services for construction of missing link from Birhu to Lathiani from Km 36/0 to 42/0 on NH-503A including Lathiani Bridge on back water of Govindsagar and its approaches in Himachal Pradesh |
2019-MoRTH-526487-1 |
11/12/2019 |
11/12/2019
|
20/01/2020
Time
11:0Hrs
|
|
101 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Widening from single/ intermediate lane to 2-lane with paved shoulder from km 0.00 to 84.00 (Tuini to Chakrata) on NH-707A in the State of Uttarakhand |
3901/13yata-NH-10/2019 |
26/11/2019 |
26/11/2019
|
14/01/2020
Time
10:44Hrs
|
|
102 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Widening from single/ intermediate lane to 2-lane with paved shoulder from km 84.00 to 160.00 (Chakrata to Mussoorie) on NH-707A in the State of Uttarakhand |
3901/13yata-NH-10/2019 dated 25.11.19 |
26/11/2019 |
26/11/2019
|
14/01/2020
Time
10:42Hrs
|
|
103 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR WIDENING TO 2-LANE WITH PAVED SHOULDER FROM EXISTING KM 200.300 TO KM 202.400 (DESIGN CHAINAGE KM 76.400 TO KM 78.400) INCLUDING LANDSLIDE MITIGATION NEAR BY OJAREE ON DHARASU TO YAMUNOTRI ROAD OF NH-134(OLD NO. 94) IN THE STATE OF UTTARAKHAND |
3902/13Yata-NH-10/2019 dated 25.11.2019 |
26/11/2019 |
25/11/2019
|
14/01/2020
Time
10:45Hrs
|
|
104 |
Consultancy Services for preparation of Detailed Project Report for Slope Protection work of section of Km. 25.60 to Km 26.1 (Bagrakot -Kafer) of NH-717A in the state of West Bengal |
NHIDCL/Bagrakot-Kafer/Slope Protection/NH-717A/West Bengal |
26/11/2019 |
25/11/2019
|
26/12/2019
Time
15:0Hrs
|
|
105 |
Preparation of Detailed Project Report/ Detailed Engineering for the Stretch Kavali- Udayagiri – Seetarampuram from km 0.000 to 104.000 of NH 167BG in the state of Andhra Pradesh |
Tender Notice No.SENHVJA/03/2019-20, dt.30.10.2019 |
09/12/2019 |
22/11/2019
|
06/01/2020
Time
17:0Hrs
|
|
106 |
Consultancy Services for preparation of DPR for Improvements to hair pin bends on Hyderabad - Srisailam - Dornala - Tokapalli road from KM 191/0 to 268/700 of NH 765 in the state of AP |
SE NH ATP NIT No 02 2019-20 |
21/11/2019 |
21/11/2019
|
21/01/2020
Time
15:0Hrs
|
|
107 |
Preparing of DPR for bypasses of Karamadai Town, Coonoor Town and Ooty Town (Hilly terrian) of NH-67 |
TN.No.05/HDO/NH/2019-20/Dt.24.10.2019 |
15/11/2019 |
15/11/2019
|
31/12/2019
Time
15:0Hrs
|
|
108 |
Preparing of DPR for Elephant Corridor from km 389/0-391/4 of NH-67 |
TN.No.06/HDO/NH/2019-20/Dt.25.10.2019 |
15/11/2019 |
15/11/2019
|
31/12/2019
Time
15:0Hrs
|
|
109 |
Preparation of DPR for construction of Srinagar bypass from Panch- Pepal to Sweet bridge in 2-lane with paved shoulders on NH-58 in the State of Uttarakhand |
3672/13yata-NH-10/2019 dated 08.11.2019 |
18/11/2019 |
13/11/2019
|
10/01/2020
Time
12:35Hrs
|
|
110 |
Preparation of Feasibility study and Detailed Project Report for Improvement to Two Lane with Paved Shoulder of Km 28 (Near Gangta) to 40 (Near Laxmipur) of NH-333 in the state of Bihar |
NIT NO. 13 R.C.D. NH. DIVISION, LAKHISARAI AT MNUNGER 2019-20 |
22/10/2019 |
25/10/2019
|
15/11/2019
Time
17:0Hrs
|
|
111 |
CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF RAIL CUM HIGHWAY UNDER WATER TUNNEL INCLUDING APPROACH ROAD ACROSS MIGHTY RIVER BRAHMAPUTRA, APPROXIMATELY IN BETWEEN PACHIGAON (JAMUGURI) AND KALIABOR TEA ESTATE (SILGHAT) THROUGH EPC MODE UNDER PROJECT VARTAK IN ASSAM STATE |
CE (P)/VTK/DPR CONSULTANCY/02/2019-20 |
15/10/2019 |
17/10/2019
|
05/02/2020
Time
14:0Hrs
|
|
112 |
Preparation of Feasibility Study and Detailed Proect Report for Improvement to Two Lane with Paved shoulder of KM 28 (Near Gangta) to KM (Near Laxmipur) of NH-333. (Total 13 KM) in Bihar on EPC Mode. |
EE NH DIVISION LAKHISARA AT MUNGER 08/2019-20 |
19/09/2019 |
19/09/2019
|
19/10/2019
Time
17:0Hrs
|
|
113 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) OF ROAD KALCHAW-PHURA-TONGKLONG FROM KM 45.00 TO KM 66.690 (NET LENGTH 21.69 KM) AND ROAD THIGSAI-BUALPUI-SAISIH-PANGKHUA-SANGAU FROM KM 7.800 TO KM 29.180 (NET LENGTH 21.38 KMS) FOR COMPREHENSIVE PLANNING OF FORMATION, PERMANENT,SURFACING AND SLOPE STABILISATION WORKS ALONGWITH SAFETY MEASURES TO NHDL SPECIFICATION (10 M WIDTH HAVING SINGLE LANE PAVED)UNDER 24 BRTF AREA UNDER PROJECT PUSHPAK IN MIZORAM STATE (NET LENGTH 43.07 |
CE(P)PSK/07/2019-20 |
02/09/2019 |
31/08/2019
|
25/10/2019
Time
10:0Hrs
|
|
114 |
Consultancy Services for Feasibility study and Preparation of Detailed Project Report for Reconstruction of Existing R.O.B.at L.C No-274-A on Ahmedabad Dandi NH-64 Between Km. 66/500 to 67/250 Passing through Nadiad City in the State of Gujarat. (Job No-064-GJ-2018-19-618) |
DPR / 01 of 2019-20 NH / AB / DPR / 826 / 2019 |
07/08/2019 |
07/08/2019
|
26/08/2019
Time
11:0Hrs
|
-
|
115 |
Consultancy Services for the preparation of DPR for the stretch of 14.57 Km from Design Chainage Km.255.703 to Km.270.270 passing through reserve forest stretch of Four laning of Addahole (Near Gundya) (Existing Chainage Km.263.000, Design Chainage Km.255.703) to Bantwal Cross (Existing Km.328.000, Design Chainage Km.318.755) Section of NH-75 (old NH-48) under NHDP Phase-IV on EPC mode in the State of Karnataka |
NIT No.03/ NHAI/RO-BNG/23017/Tender/2019 Dated 25.07.2019 |
02/08/2019 |
25/07/2019
|
05/09/2019
Time
15:0Hrs
|
|
116 |
Consultancy services for carrying out Road Safety Audit Sainj- Luhri- Anni -Jalori- Aut Road NH 305 (Starting chainage 53/0, ending chainage 94/0) |
501-SESHA-2019 |
17/07/2019 |
22/07/2019
|
06/09/2019
Time
15:0Hrs
|
|
117 |
Consultancy services for carrying out Road Safety Audit Chakki-Banikhet-Chamba-Bharmour road NH 154A (Starting chainage 106/0, ending chainage 172/0) |
502-SESHA-2019 |
18/07/2019 |
22/07/2019
|
06/09/2019
Time
15:0Hrs
|
|
118 |
Consultancy services for carrying out Road Safety Audit from Km 46/0 to 106/0 of NH 72 B (New NH 707) in the State of Himachal Pradesh. |
4661-4664 dated 04-07-2019 |
16/07/2019 |
18/07/2019
|
23/08/2019
Time
15:0Hrs
|
|
119 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode for the road section from Talwandi Sabo-Raman Road to Junction with Bathinda-Dabwali Road of NH-254 from KM 132.300 to 155.300 (Approx Length 23.00 km) |
CW-2/BTI/03 |
20/07/2019 |
15/07/2019
|
02/09/2019
Time
15:0Hrs
|
-
|
120 |
Authority Engineer for Construction of 1640 m span (Double Lane) bridge with footpath on both side including approaches on both side of approx. length 3.6 km. over river Chenab at Sajwal (Paragwal-Inderpattian) at Jourian in distt. Jammu. |
E. NIT No 23 /2019-20 dated 1.07.2019 |
02/07/2019 |
02/07/2019
|
25/07/2019
Time
16:0Hrs
|
|
121 |
Consultancy Services for preparation of Detailed Project Report for Balance work of construction of 4-laning road from Km. 140.700 to Km 165.08 (Narimbanglo to Jatinga section), Km 165.220 to Km 190.587 (Jatinga Junction to Harangajo Section) of NH-54 in the state of Assam under Phase II program of NHDP on EPC mode |
NHAI/N-H(21 22)/NE/2019 |
03/07/2019 |
02/07/2019
|
26/08/2019
Time
11:0Hrs
|
|
122 |
Consultancy Services for preparation of Detailed Project Report for construction of New Bridge near Old Bridge across Sharavathi River at Honnavara on NH-66 in the State of Karnataka |
NHAI /KNT/DPR/Sharavathi Bridge/NH-66/2019(Newly uploaded) |
09/08/2019 |
26/06/2019
|
05/09/2019
Time
11:0Hrs
|
|
123 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of new 6-lane Capital Region Ring Road from Palatotapada (NH-16) to Kuspangi ( NH-42) |
NHAI/13011/133/RO-OD |
25/06/2019 |
22/06/2019
|
19/08/2019
Time
11:0Hrs
|
|
124 |
CONSTRUCTION OF 1640 M SPAN DOUBLE LANE BRIDGE WITH FOOTPATH ON BOTH SIDE INCLUDING APPROACHES ON BOTH SIDE OF APPROX. LENGTH 3.6 KM OVER RIVER CHENAB AT SAJWAL PARAGWAL INDERPATTIAN AT JOURIAN IN DISTT JAMMU |
Fresh E NIT No 19. 2019.20 Dated 18.06.2019 |
21/06/2019 |
20/06/2019
|
28/06/2019
Time
16:0Hrs
|
|
125 |
Consultancy Services for Preparation of DPR for construction of Bypass on Western side of Gwalior city in the State of Madhya Pradesh |
NHAI/MP/DPR/Gwalior city (Western side)/ Bypass/2019 |
07/06/2019 |
07/06/2019
|
20/08/2019
Time
11:0Hrs
|
|
126 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD CHAKPIKRONG-SAJIK-TAMPAK-AIGONG-KHONGTAL TO NHSL SPECIFICATION (42 Km), CONSTRUCTION OF ROAD KHEMDO–PHAISANJANG (GREEN FIELD ALIGNMENT) TO NHSL SPECIFICATION (25.9 Km) & CHAKPIKRONG - JOUPI (GREEN FIELD ALIGNMENT) TO NHSL SPECIFICATIONS (28 Km) UNDER PROJECT SEWAK IN MANIPUR STATE (TOTAL LENGTH 95.90 KM). |
CE (P)/SWK/DPR CONSULTANCY/01/2019-20 |
04/06/2019 |
06/06/2019
|
10/07/2019
Time
12:0Hrs
|
|
127 |
Consultancy Services for preparation & approval of Detailed Design & Drawing of Various Standard Spans of ROB with Standard Deck Configuration of 4/6-Lane Divided Carriageway “including Proof checking from Indian Institute of Technology (IIT)/ National Institute of Technology (NITs) and Approval from Research Design & Standard Organization (RDSO, Lucknow)” |
NHAI/ROB /DPR/ 2019 |
29/05/2019 |
28/05/2019
|
08/07/2019
Time
11:0Hrs
|
|
128 |
Consultancy Services for preparation of DPR/ Feasibility report for Construction of Ring Road for Jabalpur city. |
NHAI/MP/HQ/Jabalpur Ring Road/2019 |
30/05/2019 |
27/05/2019
|
20/08/2019
Time
11:0Hrs
|
|
129 |
Consultancy Services for preparation of DPR of 2-laning including paved shoulder of Nongstoin-Maweit- Nongjri (Length – 75.00 Km) in the State of Meghalaya |
PW/CE/NH/10/2017 |
24/05/2019 |
24/05/2019
|
28/06/2019
Time
16:20Hrs
|
|
130 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) CONSTRUCTION OF HIGH LEVEL RCC MAJOR BRIDGE AT KM. 89 (AKLERA) ON PARWAN ALONG WITH APPROACHES AND OTHER STRUCTURE ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN. (II) CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS RIVER LAHASI IN KM. 63 INCLUDING APPROACHES ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN ON EPC MODE |
NITNO-10-2018-19 |
02/06/2019 |
08/05/2019
|
11/06/2019
Time
11:0Hrs
|
|
131 |
PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF APPROACH ROAD OF APPROXIMATE ROAD LENGTH 6.9 KM OF NHSL SPECIFICATIONS TO MOUNTAIN RADAR SITE TIBBA TOP AT 1 AFSB MUSSORIE NEAR SUWAKHOLI BETWEEN MUSSOORIE- SUWAKHOLI- CHAMBA ROAD IN 36 BRTF AREA UNDER PROJECT SHIVALIK IN UTTARAKHAND STATE |
80260/Consultancy/Radar site/2019-20/05/E8 |
04/04/2019 |
04/04/2019
|
13/05/2019
Time
14:0Hrs
|
|
132 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD NAMTI–KIBITHU BETWEEN KM 0.0 TO 20.31 TO NHDL SPECIFICATIONS, CONSTRUCTION OF ROAD KIBITHU-THOCHU-WACHA BETWEEN KM 0.0 TO KM 9.75 (GREEN FIELD ALIGNMENT) TO NHDL SPECIFICATIONS AND CONSTRUCTION OF CHANGLOHAGAM–ROCHAM ROAD BETWEEN KM 16.50 TO KM 29.25 (GREEN FIELD ALIGNMENT) TO NHSL SPECIFICATIONS UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE (TOTAL LENGTH 42.810 KMS) |
CE (P)/UDK/DPR CONSULTANCY/16/2018-19 |
27/03/2019 |
29/03/2019
|
13/05/2019
Time
12:0Hrs
|
|
133 |
Consultancy Services for preparation & approval of Detailed Design & Drawing of Various Standard Spans of ROB with Standard Deck Configuration of 4/6-Lane Divided Carriageway “including Proof checking from IIT/ NITs and Approval from Research Design & Standard Organization (RDSO, Lucknow)” |
NHAI/ROB /DPR/ 2019 |
08/03/2019 |
08/03/2019
|
08/04/2019
Time
11:0Hrs
|
|
134 |
Consultancy Services for Preparation of Detailed Project Report for 2 lanes/2 lane with paved shoulder Total length 579 Km. in the state of Madhya Pradesh. |
NH/DPR-I/01//2019 |
05/03/2019 |
02/03/2019
|
28/05/2019
Time
17:30Hrs
|
|
135 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF KAYING - TATO ROAD FROM KM 11.350 TO KM 19.950 AND KM 28.600 TO KM 86.600 (TOTAL LENGTH 66.600 KM) FROM EXISTING ROAD TO NHDL SPECIFICATIONS UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE |
CE (P)/BMK/DPR CONSULTANCY/14/2018-19 |
27/02/2019 |
01/03/2019
|
04/04/2019
Time
12:0Hrs
|
|
136 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR IMPMT OF NORTH SOUTH ROAD FROM KM 48 PT610 TO KM 60PT385 NET LENGTH 11 PT 775 KM FROM NEW TO CL 9 SPECIFICATION UNDER 46 BRITF PROJECT PUSHPAK IN GREAT NICOBAR ISLAND A and NI UT Second Call |
CE (P) PSK-09 OF 2018-19 |
28/02/2019 |
01/03/2019
|
28/03/2019
Time
10:30Hrs
|
|
137 |
Consultancy services for carrying out feasibility study/detailed Engineering and detailed project preparation including L.A. for C/O bridges on NH-154A under National Highway HPPWD. Division Chamba in the State of Himachal Pradesh.(Package No. HP/Shahpur/R-2/21) |
312-SESHA-2019 |
25/02/2019 |
26/02/2019
|
19/03/2019
Time
15:0Hrs
|
|
138 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed (i) Two lane road from Junction of NH-627 near Baithalangso-Bichitur-Ulukunchi-Umpanai-Assam/Meghalaya Border & (ii) Two lane road from Lanka(on NH-27)- Kheroni(on NH-627) under Nagaon NH Division in the State of Assam. |
CE PWD NH 2018-19 01 |
25/02/2019 |
25/02/2019
|
26/04/2019
Time
16:0Hrs
|
|
139 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Ojree (Dabarkot) Design Chainage Km 77.025 to Km 78.550 ON Dharasu to Yamunotri road of NH 134(Old No 94) region of the state of Uttarakhand |
604/13yata-NH-10/2019 dated 14.02.2019 |
15/03/2019 |
14/02/2019
|
03/04/2019
Time
11:3Hrs
|
|
140 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR CONSTRUCTION OF DONG - JACHEP ROAD (GREEN FIELD ALIGNMENT) TO NHSL SPECIFICATIONS FROM KM 0.000 TO KM 78.000 (NET LENGTH 78.000 KM) UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P)/UDK/DPR CONSULTANCY/13/2018-19 |
12/02/2019 |
14/02/2019
|
02/04/2019
Time
12:0Hrs
|
|
141 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) CONSTRUCTION OF HIGH LEVEL RCC MAJOR BRIDGE AT KM. 89 (AKLERA) ON PARWAN ALONG WITH APPROACHES AND OTHER STRUCTURE ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN. (II) CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS RIVER LAHASI IN KM. 63 INCLUDING APPROACHES ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN ON EPC MODE |
NITNO-10-2018-19 |
16/02/2019 |
11/02/2019
|
28/03/2019
Time
11:0Hrs
|
|
142 |
efdsfdf |
test |
01/02/2019 |
01/02/2019
|
02/02/2019
Time
15:0Hrs
|
-
|
143 |
Consultancy Services for Authority’s Engineer (AE) for the work of “Widening & Strengthening from (i) 2-lane to 2lane with paved shoulder from km 0/550-1/100, 5/700-21/070, 21/500-34/200 & 34/870-38/000 and (ii) Strengthening of existing 4lane from Km 0/000-0/550, 1/100-1/780, 2/420-5/700, 21/070-21/500, 34/200-34/870 & 2 lane from km 1/780- 2/420 (Dindigul- Natham section) of NH383 in the State of Tamil Nadu” EPC mode |
TN No. 21/2018/DO/NH/ dated 01.02.2019 |
05/02/2019 |
01/02/2019
|
15/02/2019
Time
15:0Hrs
|
|
144 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for construction of Srinagar bypass from Panch- Pepal to Sweet bridge in 2-lane with paved shoulders on NH-58 in the State of Uttarakhand |
3530/13yata-NH-10/2018 |
29/01/2019 |
29/01/2019
|
03/04/2019
Time
11:5Hrs
|
|
145 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from 2-lane/4-lane to 4-lane from km. 0.00 to 16.00 (Herbertpur to Kalsi) on NH-123(New No. 507) |
3530/13yata-NH-10/2018 |
29/01/2019 |
29/01/2019
|
15/03/2019
Time
15:0Hrs
|
|
146 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 1 Nafra – Dibrick – Sachung – Lada) |
2019-MoRTH-436060-1 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
147 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 2 Lada to Sarli) |
2019-MoRTH-436060-2 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
148 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 3 Sarli - Huri - Parsi Parlo - Tali) |
2019-MoRTH-436060-3 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
149 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 4 Tali - Taliha - Siyum – Mechuka) |
2019-MoRTH-436060-4 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
150 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 5 Mechuka - Tato – Monigong and Tato to Bile) |
2019-MoRTH-436060-5 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
151 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 6 Migging – Tuting – Zido and Singa - Anelye – Hunli) |
2019-MoRTH-436060-6 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
152 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 7 Hunli to Hayuliang) |
2019-MoRTH-436060-7 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
153 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 8 Hayuliang - Changwinti – Hawai - Miao (Changlang)) |
2019-MoRTH-436060-8 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
154 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages (Package 9 Miao (Changlang) – Gandhigramm - Vijaynagar) |
2019-MoRTH-436060-9 |
29/01/2019 |
29/01/2019
|
25/03/2019
Time
11:0Hrs
|
|
155 |
Consultancy Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 0.00 to 84.00 (Tuini to Near Chakrata) on NH-707A, km. 84.00 to 160.00 (Near Chakrata to Mussoorie) on NH-707A, km. 0.00 to 84.200 (Chamoli to Kund) on NH-107A and km. 189.00 to 264.00 (Salondhar to Buakhal) on NH-121(New No. 309) in the State of Uttarakhand (For Project km 0.00 to 84.200 on NH 107A |
3530/13yata-NH-10/2018 |
17/01/2019 |
16/01/2019
|
15/03/2019
Time
15:0Hrs
|
|
156 |
Consultancy Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 0.00 to 84.00 (Tuini to Near Chakrata) on NH-707A, km. 84.00 to 160.00 (Near Chakrata to Mussoorie) on NH-707A, km. 0.00 to 84.200 (Chamoli to Kund) on NH-107A and km. 189.00 to 264.00 (Salondhar to Buakhal) on NH-121(New No. 309) in the State of Uttarakhand (For Project km 0.00 to 84.00 on NH 707A) |
3530/13yata-NH-10/2018 |
18/02/2019 |
16/01/2019
|
15/03/2019
Time
15:0Hrs
|
|
157 |
Consultancy Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 0.00 to 84.00 (Tuini to Near Chakrata) on NH-707A, km. 84.00 to 160.00 (Near Chakrata to Mussoorie) on NH-707A, km. 0.00 to 84.200 (Chamoli to Kund) on NH-107A and km. 189.00 to 264.00 (Salondhar to Buakhal) on NH-121(New No. 309) in the State of Uttarakhand (For Project km 84.00 to 160.00 on NH 707A) |
3530/13yata-NH-10/2018 |
18/02/2019 |
16/01/2019
|
15/03/2019
Time
15:0Hrs
|
|
158 |
Consultancy Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 0.00 to 84.00 (Tuini to Near Chakrata) on NH-707A, km. 84.00 to 160.00 (Near Chakrata to Mussoorie) on NH-707A, km. 0.00 to 84.200 (Chamoli to Kund) on NH-107A and km. 189.00 to 264.00 (Salondhar to Buakhal) on NH-121(New No. 309) in the State of Uttarakhand (For Project km 189.00 to 264.00 on NH 121) |
3530/13yata-NH-10/2018 |
18/02/2019 |
16/01/2019
|
15/03/2019
Time
15:0Hrs
|
|
159 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report For Construction of Ring Roads around major cities like Chandigarh or Mohali, Ludhiana, Jalandhar, Patiala, Sangrur and Bathinda in the State of Punjab. |
02 |
03/01/2019 |
04/01/2019
|
28/01/2019
Time
15:0Hrs
|
|
160 |
Engaging Technical Consultant for preparation of FS and DPR on EPC mode for widening/ impvt of existing rd from Km 0.00 to Km 15.00 to NHDL Specifications and from Km 15.00 to Km 135.00 to intermediate carriageway of Road Mahadev-Toloi-Pfutsero in Manipur and Nagaland State under Project Sewak |
CE (P/ SWK/DPR CONSULTANCY/12/2018-19 |
21/12/2018 |
23/12/2018
|
28/01/2019
Time
12:0Hrs
|
|
161 |
Consultancy Services for preparation & approval of Detailed Design & Drawing of Various Standard Spans of ROB with Standard Deck Configuration of 4/6-Lane Divided Carriageway “including Proof checking from IIT/ NITs and Approval from Research Design & Standard Organization (RDSO, Lucknow)” |
NHAI/ROB /DPR/ 2018 |
21/12/2018 |
20/12/2018
|
04/02/2019
Time
11:0Hrs
|
|
162 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) CONSTRUCTION OF HIGH LEVEL RCC MAJOR BRIDGE AT KM. 89 (AKLERA) ON PARWAN ALONG WITH APPROACHES AND OTHER STRUCTURE ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN. (II) CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS RIVER LAHASI IN KM. 63 INCLUDING APPROACHES ON NH-752 BARAN-AKLERA ROAD IN THE STATE OF RAJASTHAN ON EPC MODE |
NIT No. 7 |
23/01/2019 |
20/12/2018
|
03/02/2019
Time
17:0Hrs
|
|
163 |
Technical Consultant for survey, investigation and preparation of detailed project report for construction of Chaglohagam Rocham road (Green Field Alignment) from km 16.500 to km 29.250 (net length 12.750 kms) to NHSL specifications under GS |
CE(P) UDK/32/2018-19 |
28/12/2018 |
19/12/2018
|
28/01/2019
Time
15:0Hrs
|
|
164 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-1 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-1 |
17/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
165 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-2 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-2 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
166 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-3 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-3 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
167 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-4 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-4 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
168 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-5 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-5 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
169 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-6 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-6 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
170 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-7 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-7 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
171 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-8 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-8 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
172 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-9 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-9 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
173 |
Consultancy Services for preparation of DPR for development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojana Phase-II (Lot-9)-NHAI/Bharatmala/DPR/Lot-9/2018/Package-10 |
NHAI/Bharatmala/DPR/Lot-9/2018/Package-10 |
18/12/2018 |
17/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
174 |
RE-TENDER FOR ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF HIGHWAY TUNNEL INCLUDING APPROACH ROAD ACROSS CHATTERGALA PASS, APPROXIMATELY IN BETWEEN KM 114.00 AND KM 151.00 ON BASOLI-BANI-BHADERWAH ROAD THROUGH EPC MODE UNDER PROJECT BEACON IN J & K STATE |
CE (P)/BEACON/DPR CONSULTANCY/07/2018-19 |
13/12/2018 |
14/12/2018
|
19/03/2019
Time
12:0Hrs
|
|
175 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHDL SPECIFICATIONS OF ROAD TALIHA – NACHO FROM KM 0.000 TO KM 48.310 AND KM 64.641 TO KM 67.310 (NET LENGTH 50.979 KM) UNDER PROJECT ARUNANK IN ARUNACHAL PRADESH STATE |
CE (P)/ANK/DPR CONSULTANCY/10/2018-19 |
11/12/2018 |
13/12/2018
|
15/01/2019
Time
12:0Hrs
|
|
176 |
RE-TENDER FOR ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF HIGHWAY TUNNEL INCLUDING APPROACH ROAD ACROSS SADHANA PASS, APPROXIMATELY IN BETWEEN KM 11.00 AND KM 39.00 ON CHOWKIBAL-TANGDHAR-CHAMKOT ROAD THROUGH EPC MODE UNDER PROJECT BEACON IN J & K STATE |
CE (P)/BEACON/DPR CONSULTANCY/05/2018-19 |
12/12/2018 |
13/12/2018
|
18/03/2019
Time
12:0Hrs
|
|
177 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHSL SPECIFICATIONS WITH PAVED SHOULDERS OF ROAD SUMDO – KAZA - GRAMPHOO FROM KM 75.000 TO KM 170.000 (NET LENGTH 95.000 KM) UNDER PROJECT DEEPAK IN HIMACHAL PRADESH STATE |
CE (P)/DPK/DPR CONSULTANCY/11/2018-19 |
10/12/2018 |
12/12/2018
|
14/01/2019
Time
12:0Hrs
|
|
178 |
Preparation of Detailed Project Report for Construction of Vettavalam bypass at Km 165/0 -167/0 and Kanniyambadi bypass at Km 75/0 of NH-234 (New NH.38) Mangalore - Villupuram Road |
TN 01 NH Kanniyambadi |
30/01/2019 |
12/12/2018
|
20/06/2019
Time
11:0Hrs
|
|
179 |
Preparation of DPR for bypasses to Karamadai Town, Coonoor Town, Ooty Town (Hilly terrain) of NH 67 (Nagapattinam-Gudalur-Mysore road) |
TN 01 NH Karamadai |
30/01/2019 |
12/12/2018
|
13/06/2019
Time
11:0Hrs
|
|
180 |
Preparation of DPR for Elephant Corridor from Km 389/0 - 391/4 of NH 67 (Nagapattinam-Gudalur-Mysore road) |
TN01NHElephant corridor |
30/01/2019 |
12/12/2018
|
06/01/2019
Time
11:0Hrs
|
|
181 |
Preparation of DPR for Elephant Corridor from Km 389/0 - 391/4 of NH 67 (Nagapattinam-Gudalur-Mysore road) |
TN 01 Elephant Corridor |
30/01/2019 |
12/12/2018
|
13/06/2019
Time
11:0Hrs
|
|
182 |
Consultancy services for preparation of DPR of 2 laningof the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 1- Nafra – Dibrick – Sachung – Lada ) |
1 of 2018-19 Pkg 1 |
11/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
183 |
Consultancy services for preparation of DPR of 2 laningof the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 2- Lada to Sarli) |
1 of 2018-19 Pkg 2 |
12/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
184 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 3- Sarli– Huri – Parsi Parlo – Tali) |
1 of 2018-19 Pkg 3 |
12/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
185 |
Consultancy services for preparation of DPR of 2 laningof the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 4- Tali - Taliha - Siyum – Mechuka) |
1 of 2018-19 Pkg 4 |
12/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
186 |
Consultancy services for preparation of DPR of 2 laningof the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 5 - Mechuka - Tato – Monigong and Tato to Bile) |
1 of 2018-19 Pkg 5 |
12/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
187 |
Consultancy services for preparation of DPR of 2 laningof the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 6 - Migging – Tuting – Zido and Singa - Anelye – Hunli) |
1 of 2018-19 Pkg 6 |
12/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
188 |
Consultancy services for preparation of DPR of 2 laningof the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 7- Hunli to Hayuliang) |
1 of 2018-19 Pkg 7 |
12/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
189 |
Consultancy service for preparation of DPR of 2 laningof the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 8- Hayuliang - Changwinti – Hawai - Miao (Changlang)) |
1 of 2018-19 Pkg 8 |
12/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
190 |
Consultancy services for preparation of DPR of 2 laning of the proposed Frontier Highway from Nafra – Dibrick – Sachung – Lada – Sarli – Huri – Parsi Parlo – Tali – Taliha – Siyum – Mechuka – Tato – Monigong – Tato – Bile – Migging – Tuting – Singa – Anelye – Hunli – Hayuliang – Changwinti – Hawai – Miao (Changlang) – Gandhigramm – Vijaynagar in the State of Arunachal Pradesh in 9 Packages(Pkg 9- Miao (Changlang) – Gandhigramm - Vijaynagar) |
1 of 2018-19 Pkg 9 |
12/12/2018 |
11/12/2018
|
31/01/2019
Time
11:0Hrs
|
|
191 |
Consultancy services Preparation of Feasibility study and Detailed Project Report for Improvement to Two Lane with Paved Shoulder of Km 28 (Near Gangta) to 40 (Near Laxmipur) of NH-333 in the state of Bihar. |
NIT No. NH Division Lakhisarai at Munger - 09/2018-19 |
06/12/2018 |
08/12/2018
|
21/01/2019
Time
17:0Hrs
|
|
192 |
Invitation of proposal for consultancy services for preparation of detailed project report DPR for Widening from Single to intermediate 2 lane from km.0.00 to 77.100 Almora to Ghat on NH 309 B in the State of Uttarakhand. |
5165/12M-NH/2018 dt 05.12.2018 |
06/12/2018 |
08/12/2018
|
08/01/2019
Time
15:0Hrs
|
|
193 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR IMPMT OF NORTH SOUTH ROAD FROM KM 48 PT610 TO KM 60PT385 NET LENGTH 11 PT 775 KM FROM NEW TO CL 9 SPECIFICATION UNDER 46 BRITF PROJECT PUSHPAK IN GREAT NICOBAR ISLAND A and NI UNION TERRITORY |
CE (P) PSK-09 OF 2018-19 |
27/11/2018 |
28/11/2018
|
21/01/2019
Time
10:30Hrs
|
|
194 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR ON EPC MODE FOR IMPMT OF ROAD TLLL FM KM 57PT00 TO KM 70PT00 FM NEW TO CL9 E SPCN AND ZMS RD FROM KM 30PT00 TO KM 42PT00 FM EXTG CL5 TO CL9 E SPECN UNDER PROJECT PUSHPAK IN MIZORAM STATE FIFTH CALL |
CE (P) PSK-12 OF 2017-18 |
22/11/2018 |
20/11/2018
|
11/01/2019
Time
10:30Hrs
|
|
195 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of new 6-lane Flyover at Ainthapalli Junction on NH-6 in Sambalpur |
NHAI/11011/16/RO/OD/DPR/2018 |
16/11/2018 |
16/11/2018
|
03/01/2019
Time
11:0Hrs
|
|
196 |
Consultancy Services for Preparation of Detailed Project Report for Up gradation to Two lane / Four lane with Paved Shoulders configuration of part of the newly declared NH 516E from the junction on NH 16 near Rajahmundry to Bhupathipalem Road (Connecting SH-38 near Rampachodavaram) in the state of Andhra Pradesh |
IT No. SE R and B NH VJA Tender 09 2017 18 |
30/11/2018 |
05/11/2018
|
05/12/2018
Time
16:0Hrs
|
|
197 |
Consultancy Services for Preparation of Detailed Project Report for Up gradation to Two lane / Four lane with Paved Shoulders configuration of part of the newly declared NH 516E from the junction on NH 16 near Rajahmundry to Bhupathipalem Road (Connecting SH-38 near Rampachodavaram) in the state of Andhra Pradesh |
IT No. SE R and B NH VJA Tender 09 2017 18 |
30/11/2018 |
05/11/2018
|
05/12/2018
Time
16:0Hrs
|
|
198 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHDL SPECIFICATIONS OF ROAD BASOLI – BANI –BHADERWAH FROM KM 102.00 TO KM 128.00 UNDER PROJECT BEACON IN JAMMU & KASHMIR STATE (2ND CALL) |
CE (P)/BCN/DPR CONSULTANCY/03/2018-19 |
29/10/2018 |
31/10/2018
|
04/12/2018
Time
12:0Hrs
|
|
199 |
Technical Consultant for survey, investigation and preparation of detailed project report for construction of Chaglohagam-Rocham road (Green Field Alignment) from km 16.500 to km 29.250 (net length 12.750 kms) to NHSL specifications under GS programme through consultancy services under the AOR of 116 RCC under 48 BRTF Project Udayak in Anjaw District of Arunachal Pradesh |
CE (P) UDAYAK/DPR CONSULTANCY/30/2018-19 |
01/11/2018 |
31/10/2018
|
07/12/2018
Time
12:0Hrs
|
|
200 |
RE-TENDER-IIIRD CALL-CONSULTANCY SERVICE FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD BAKASAR-MAVASARI FROM KM 0.000 TO KM 32.49 (NET LENGTH 32.49 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION IN 45 BRTF AREA UNDER PROJECT CHETAK IN RAJASTHAN STATE |
CE (P) CTK/24/2018-19 |
26/10/2018 |
27/10/2018
|
30/11/2018
Time
11:30Hrs
|
|
201 |
Consultancy Services for preparation of Feasibility Study, Structural Design of proposed structure, Detailed Project Report, Bid documents & preconstruction services for construction of two lane bridge over Yamuna river at village Shahjahnpur parallel to Yamuna bridge on Eastern peripheral Expressway i/c approaches connecting Chainsa Ghrora Road to Haryana/UP Border village Fatehpur Atta. |
PWD/HR/PKL/24 |
30/10/2018 |
26/10/2018
|
16/11/2018
Time
17:0Hrs
|
|
202 |
Consultancy Services for the preparation of DPR for Six lane Flyover at Kalladka town for a length of 2.1 Km including approaches (i.e. from Design Km.311.570 to Km.313.670) for the project of Four laning of addahole (Near Gundya) (Existing Chainage Km.263.000, Design Chainage Km.255.703 to Bantwal Cross (Existing Km.328.000, Design Chainage Km.318.755) Section of NH-75 (old NH-48) under NHDP Phase-IV on EPC mode in the State of Karnataka (Second Call) |
NIT No.23/NHAI/RO-BNG/23017/Tender/2018 dated 23.10.2018 |
26/10/2018 |
23/10/2018
|
19/11/2018
Time
15:0Hrs
|
|
203 |
Consultancy Services for preparation of Feasibility study and Detailed Project Report in the State of Punjab on BOT/EPC/Hybrid annunity Mode for the road strecth from Tarn Taran Goindwal Sahib Kapurthala Length 50 Km. |
07 |
18/10/2018 |
18/10/2018
|
20/11/2018
Time
13:0Hrs
|
|
204 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) FOR CONSTRUCTION OF RE-ALIGNMENT OF VARIOUS STRETCHES BETWEEN PANDRASS - PASHKYUM (NET LENGTH - 31.00 KMS) ON ROAD ZOZILA - KARGIL - LEH (NH-1) TO NHDL SPECIFICATIONS THROUGH EPC MODE UNDER PROJECT VIJAYAK IN JAMMU AND KASHMIR STATE |
CE (P)/VJK/DPR CONSULTANCY/09/2018-19 |
17/10/2018 |
18/10/2018
|
27/12/2018
Time
12:0Hrs
|
|
205 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode for the road Gurdaspur-MukerianTalwara-Mubarikpur (Approx Length 83.00 km) |
16 of 2018-19 |
17/10/2018 |
17/10/2018
|
13/11/2018
Time
15:0Hrs
|
|
206 |
CONSULTANCY SERVICE FOR AUTHORITYs ENGINEER FOR SUPERVISION OF Construction of proposed 4 lane RUB and its approaches in lieu of existing level crossing No 41 at KM 365.110 Railway CH 73 2 3 on NH 234 at Gowribidanur section in the state of Karnataka on EPC Mode. |
EE/NHD/Tmk/NIT06/2018 |
17/10/2018 |
17/10/2018
|
07/11/2018
Time
16:0Hrs
|
|
207 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 2 lane ROB and its approaches in lieu of existing level crossing No 130 at KM 48.300 on NH-207 Near koralur village Sarjapura Dobbasapete section in the state of karnataka |
EE/NHD/Tmk/NIT05/2018 |
17/10/2018 |
17/10/2018
|
07/11/2018
Time
13:0Hrs
|
|
208 |
Consultancy services Preparation of Feasibility study and Detailed Project Report for Improvement to Two Lane with Paved Shoulder of Km 28 (Near Gangta) to 40 (Near Laxmipur) of NH-333 in the state of Bihar. |
RCD/NH DIVISION LAKHISARAI AT MUNGER-08/2018-19 |
15/10/2018 |
15/10/2018
|
15/11/2018
Time
17:0Hrs
|
|
209 |
Feasibility Study, Preparation of Detailed Project Report and providing preconstruction services for Construction of 2-Lane Bridge for Connectivity of Port Blair-Chatham Island and Bambooflat with 200 mtr to 400mtr Navigational span in the Union Territory region of Andaman Nicobar Islands |
NHIDCL/Chatham-Bambooflat/Pre-feasibility/2018 |
11/10/2018 |
10/10/2018
|
31/10/2018
Time
15:0Hrs
|
|
210 |
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR WIDENING TO 2-LANE WITH PAVED SHOULDER FROM EXISTING KM 200.300 TO KM 202.400 (DESIGN CHAINAGE KM 76.400 TO KM 78.400) INCLUDING LANDSLIDE MITIGATION NEAR BY OJAREE ON DHARASU TO YAMUNOTRI ROAD OF NH-134(OLD NO. 94) IN THE STATE OF UTTARAKHAND |
5043/13yata-NH-10/2018 dated 03.10.2018 |
11/10/2018 |
05/10/2018
|
21/11/2018
Time
15:0Hrs
|
|
211 |
Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of KedimaTabufii-Besho-Karong road (66 km) in the state of Manipur and Nagaland. |
2018-NHIDC-392033-1 |
11/10/2018 |
05/10/2018
|
06/10/2018
Time
15:0Hrs
|
|
212 |
CS for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of KedimaTabufii-Besho-Karong road (66 km) in the state of Manipur and Nagaland. |
NHIDCL/DPR/Kedima-Karong /Manipur/2018 |
11/10/2018 |
05/10/2018
|
20/11/2018
Time
15:0Hrs
|
|
213 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON SINGTHAM-DIKCHU ROAD AND FROM KM 0.00 TO KM 7.360 ON DIKCHU-RANGRANG ROAD (NET LENGTH 30.06 KM) IN SIKKIM STATE UNDER 764 BRTF AREA UNDER PROJECT SWASTIK (FOURTH CALL) |
CE (P) SWTK/39/ 2018-19 |
04/10/2018 |
04/10/2018
|
20/10/2018
Time
12:0Hrs
|
|
214 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R-2/19) |
298-SESHA-2018 |
26/09/2018 |
04/10/2018
|
25/10/2018
Time
15:0Hrs
|
|
215 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for C/O bridges on NH-154A and C/O flyover/Bypass in Una town on NH-503 (Extn.) in the State of Himachal Pradesh (Package No. HP/Shahpur/R-1/21) |
299-SESHA-2018 |
26/09/2018 |
04/10/2018
|
25/10/2018
Time
15:0Hrs
|
|
216 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHDL SPECIFICATIONS WITH HARD SHOULDER HAVING 7.5M CARRIAGEWAY (PNH SPECIFICATION AS PER ROAD CLASSIFICATION IN BHUTAN) FROM KM 75.00 TO KM 100.00 OF ROAD DARRANGA –TASHIGANG AND FROM KM 53.00 TO KM 78.90 OF ROAD CONFLUENCE-HAA UNDER PROJECT DANTAK IN BHUTAN |
CE (P)/DTK/DPR CONSULTANCY/04/2018-19 |
26/09/2018 |
28/09/2018
|
26/11/2018
Time
12:0Hrs
|
|
217 |
Consultancy Services for Feasibility Study Preparation of Detailed Project Report for 2/4 lane with paved shoulder of Shillong Western Bypass starting from near Ladumsaw existing km 60.900 of NH-40 to NH-106 Old NH-44E under SARDP-NE phase A in the state of Meghalaya |
2018-NHIDC-372579-1 |
28/09/2018 |
28/09/2018
|
17/10/2018
Time
11:0Hrs
|
|
218 |
Consultancy Services for Feasibility Study Preparation of Detailed Project Report and providing pre-construction services for up-gradation of new National Highways in the State of Meghalaya 1 Garobdha (on NH 127B)-Ampati-Zigzag-Mahendraganj |
2018-NHIDC-381584-1 |
28/09/2018 |
28/09/2018
|
29/10/2018
Time
11:0Hrs
|
|
219 |
Consultancy Services for Feasibility Study Preparation of Detailed Project Report and providing pre-construction services for up-gradation of new National Highways in the State of Meghalaya 2- Mawngap (on old NH 44E)-Mawphlang-Laitmusiang-Mawkyrwat-Rangthong-Nongnah-Dirang-Khadphra |
2018-NHIDC-381591-1 |
28/09/2018 |
28/09/2018
|
29/10/2018
Time
11:0Hrs
|
|
220 |
Consultancy Services for preparation of Detailed Project Report of Ramgarh-Sonhat-Baikunthpur-Junction of NH-43 (65.00 Km.) Harchoka-Bharatpur (20.00 Km.) & Kotadol-Ramgarh (45.00 Km.) & Jaisingh-Nagar to MP/CG Border (32.00 Km.) for Two/ Four laning with paved shoulder configuration |
2018-MoRTH-389258-1 |
23/10/2018 |
28/09/2018
|
14/12/2018
Time
17:0Hrs
|
|
221 |
Consultancy Services for preparation of Detailed Project Report of Dudhawa-Kanker (28.00 Km.) & Sambalpur-Silpat (21.00 Km.) for Two/ Four laning with paved shoulder configuration |
2018-MoRTH-389259-1 |
23/10/2018 |
28/09/2018
|
14/12/2018
Time
17:0Hrs
|
|
222 |
Consultancy Services for preparation of Detailed Project Report of Kutmakatchar-CG/Jharkhand Border-Kunkuri for Two/ Four laning with paved shoulder configuration |
2018-MoRTH-389261-1 |
23/10/2018 |
28/09/2018
|
14/12/2018
Time
17:0Hrs
|
|
223 |
Consultancy Services for preparation of Detailed Project Report of Gidhauri to Sarangarh for Two/ Four laning with paved shoulder configuration |
2018-MoRTH-389264-1 |
23/10/2018 |
28/09/2018
|
14/12/2018
Time
17:0Hrs
|
|
224 |
Construction of 1640 m span (Double Lane) bridge with footpath on both side including approaches on both side of approx. length 3.6 km. over river Chenab at Sajwal (Paragwal-Inderpattian) at Jourian in distt. Jammu |
e.Nit No. 70 of 2018-19 Dated 27-09-2018 |
29/09/2018 |
27/09/2018
|
30/11/2018
Time
16:0Hrs
|
|
225 |
Engaging Technical Consultant for preparation of Feasibility Study (FS) and Detailed Project Report (DPR) on EPC mode for construction of Hunli – Metengliang - Hayuliang road (Green field alignment) to NHDL specifications from Km 20.000 to Km 143.000 (net length – 123.00 Kms) under Project Udayak in Arunachal Pradesh State |
CE (P)/UDK/DPR CONSULTANCY/08/2018-19 |
24/09/2018 |
26/09/2018
|
31/10/2018
Time
12:0Hrs
|
|
226 |
Consultancy Services for Preparation of Feasibility study and Detailed Project Report for Construction of Elevated road in Singheshwar Bazar (1.2 Km) under Madhepura District on Birpur –Bihpur Road, NH-106 (New NH-131) in the state of Bihar. |
02/2018-19 |
20/10/2018 |
24/09/2018
|
02/11/2018
Time
17:0Hrs
|
|
227 |
Consultancy Services for preparation of Feasibility Study & DPR for 3 Nos. ROBs at Km.205.320 on NH-95(05), Km.412.00 on NH-07 and Km.0.800 on NH-15(54) |
85/EE/CWD/FZR |
24/09/2018 |
22/09/2018
|
03/10/2018
Time
12:0Hrs
|
-
|
228 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from 2-lane/4-lane to 4-lane from km. 0.00 to 16.00 (Herbertpur to Kalsi) on NH-123(New No. 507) |
4783/13yata-NH-10/2018 |
20/09/2018 |
20/09/2018
|
01/11/2018
Time
15:0Hrs
|
|
229 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 200.00 to 235.00 (Diwalikhal to Karanprayag) on NH-87Ext(New No. 109) |
4783/13yata-NH-10/2018 |
20/09/2018 |
18/09/2018
|
01/11/2018
Time
15:0Hrs
|
|
230 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHDL SPECIFICATIONS OF ROAD BASOLI – BANI –BHADERWAH FROM KM 102.00 TO KM 128.00 UNDER PROJECT BEACON IN JAMMU & KASHMIR STATE |
CE (P)/BCN/DPR CONSULTANCY/03/2018-19 |
18/09/2018 |
18/09/2018
|
24/10/2018
Time
12:0Hrs
|
|
231 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHDL SPECIFICATIONS OF ROAD CHANGWINTI – WALONG – NAMTI FROM KM 0.000 TO KM 54.450 AND HAYULIANG - CHANGWINTI BETWEEN KM 45.05 TO KM 50.820 (NET LENGTH 60.220 KM) UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE |
CE (P)/UDK/DPR CONSULTANCY/06/2018-19 |
18/09/2018 |
18/09/2018
|
25/10/2018
Time
12:0Hrs
|
|
232 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing Pre-Construction Services for upgradation to 2 lane with paved shoulder from (i) Km 44.50 to Km 142.00 of Chattroo Village & (ii) Km 235.00 (Vailoo Village) to Km 269.00 (Khanabal) of Khellani – Kishtwar – Chattroo - Khanabal Section of NH 244 |
NHIDCL/J&K/NH-244/Khellani-Khanabal/DPR/2018-19 |
12/09/2018 |
12/09/2018
|
17/10/2018
Time
11:0Hrs
|
|
233 |
Preparation of Feasibility study and Detailed Project Report for Improvement to Two Lane with Paved Shoulder of Km 28 (Near Gangta) to 40 (Near Laxmipur) of NH-333 in the state of Bihra. |
05/2018-19 |
11/09/2018 |
11/09/2018
|
01/10/2018
Time
17:0Hrs
|
|
234 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON SINGTHAM-DIKCHU ROAD AND FROM KM 0.00 TO KM 7.360 ON DIKCHU-RANGRANG ROAD (NET LENGTH 30.06 KM) IN SIKKIM STATE UNDER 764 BRTF AREA UNDER PROJECT SWASTIK (THIRD CALL) |
CE (P) SWTK/34/ 2018-19 |
05/09/2018 |
07/09/2018
|
28/09/2018
Time
12:0Hrs
|
|
235 |
Consultancy service for Authority Engineer for supervision of Widening to two lane with paved shoulders from km.24.60 to km.70.063 of Mudigere Kadur section of NH-173 in the state of karnataka through EPC mode |
NHD/MNG/173/AE/NIT04/18-19/871 |
07/09/2018 |
07/09/2018
|
10/10/2018
Time
17:0Hrs
|
|
236 |
Consultancy Services for preparation of DPR for “Rehabilitation and upgradation of Chittoor - Kurnool Road NH -18 from 2 lane to 4- Lane from Km 4/0 to 18/2 (Murkumbattu Junction to Rangampet cross) in the State of Andhra Pradesh |
SE R and NIT NO.09/2018-2019 |
06/09/2018 |
06/09/2018
|
10/10/2018
Time
15:0Hrs
|
|
237 |
CONSULTANCY SERVICE FOR AUTHORITYs ENGINEER FOR SUPERVISION OF RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM DS. CH. 442.180 EX. KM 448.00 TO DS.CH.485.240 EX. KM 494.00 OF HULIYAR TO KB CROSS SECTION. AND FROM DS.CH. 532.100 EX.KM 533.150 TO DS.CH.539.100 EX.KM 540.175 FROM KB CROSS TO NELLIGERE SECTION OF NH150A IN THE STATE OF KARNATAKA. ON EPC MODE |
EE/NHD/Tmk/NiIT-04/2018-19 |
04/09/2018 |
04/09/2018
|
30/10/2018
Time
16:0Hrs
|
|
238 |
Consultancy Services for the preparation of DPR for Six lane Flyover at Kalladka town for a length of 2.1 Km including approaches (i.e. from Design Km.311.570 to Km.313.670) for the project of Four laning of Addahole (Near Gundya) (Existing Chainage Km.263.000, Design Chainage Km.255.703 to Bantwal Cross (Existing Km.328.000, Design Chainage Km.318.755) Section of NH-75 (old NH48) under NHDP Phase-IV on EPC mode in the State of Karnataka |
NIT No.22/NHAI/RO-BNG/23017/Tender/2018 dated 03.09.2018 |
19/09/2018 |
03/09/2018
|
24/09/2018
Time
15:0Hrs
|
|
239 |
Consultancy service for Feasibility Study and Detailed Project Report for the road section from Talwandi Sabo-Raman Road to Junction with Bathinda-Dabwali Road of NH-254 from KM 132.300 to 155.300 in the State of Punjab |
CW-2/BTI/05 |
03/09/2018 |
31/08/2018
|
20/09/2018
Time
15:0Hrs
|
|
240 |
consultancy services for preparation of detailed project report (DPR) for construction of Srinagar bypass from Panch- Pepal to Sweet bridge in 2-lane with paved shoulders on NH-58 in the State of Uttarakhand |
4486/13Yata-NH-10/2018 dated 28.08.18 |
30/08/2018 |
30/08/2018
|
16/10/2018
Time
15:0Hrs
|
|
241 |
Consultancy Services for preparation of DPR for development of stretches for improving direct connectivity in Indian cities (Lot-8/Package-1) |
NHAI/Bharatmala/DPR/Lot-8/2018/Package-1 |
11/09/2018 |
24/08/2018
|
15/10/2018
Time
11:0Hrs
|
|
242 |
Consultancy Services for preparation of DPR for development of stretches for improving direct connectivity in Indian cities (Lot-8/Package-2) |
NHAI/Bharatmala/DPR/Lot-8/2018/Package-2 |
11/09/2018 |
24/08/2018
|
15/10/2018
Time
11:0Hrs
|
|
243 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab for improvement of existing road, geometric design , safety measures and other related works for the road NH-154A From KM 0.00 to 39.36 Upto Himachal Pradesh Boundary. |
14/2018 |
23/08/2018 |
23/08/2018
|
13/09/2018
Time
15:0Hrs
|
|
244 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for improvement of Ghat section from Km 35/0 to 65/0 Km of NH 326-A in the State of Odisha. (Bid Ref No-06 CE-NH-18-19) |
06 CENH-2018-19 |
17/08/2018 |
17/08/2018
|
17/09/2018
Time
17:0Hrs
|
|
245 |
Consultancy Services for carrying out Feasibility Study and Detailed Project report for reconstruction of 11 bridges on NH 154A NH21A and NH 72 in the State of HP |
4894-4993 |
20/08/2018 |
13/08/2018
|
11/09/2018
Time
15:0Hrs
|
|
246 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab for improvement of existing road, geometric design , safety measures and other related works for the road NH-154A From KM 0.00 to 39.36 Upto Himachal Pradesh Boundary. |
13 |
10/08/2018 |
10/08/2018
|
30/08/2018
Time
15:0Hrs
|
|
247 |
Consultancy Services for preparation of Feasibility Study & DPR for 3 Nos. ROBs at Km.205.320 on NH-95(05), Km.412.00 on NH-07 and Km.0.800 on NH-15(54) |
82/EE/CWD/FZR |
16/08/2018 |
10/08/2018
|
31/08/2018
Time
12:0Hrs
|
-
|
248 |
DPR Paonta Saheb Ballupur |
NHAI/Tech/UKD/03/2018 |
28/08/2018 |
02/08/2018
|
30/08/2018
Time
15:0Hrs
|
|
249 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In-Principle” declared NH in the Car Nicobar Island under the Union Territory of Andaman & Nicobar Island. |
NHIDCL/DPR/Car Nicobar/A&N/2018 |
02/08/2018 |
02/08/2018
|
11/09/2018
Time
11:0Hrs
|
|
250 |
Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Pariyojana (Lot-2) - Package-I (Re-invitation) |
NHIDCL/Bharatmala/DPR/Phase-I/Lot-2/Package-I/2018 |
30/07/2018 |
30/07/2018
|
11/09/2018
Time
11:0Hrs
|
|
251 |
Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram under Bharatmala Pariyojana (Lot-2) - Package-II (Re-invitation) |
NHIDCL/Bharatmala/DPR/Phase-I/Lot-2/Package-II/2018 |
30/07/2018 |
30/07/2018
|
11/09/2018
Time
11:0Hrs
|
|
252 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/09/2nd Call |
NHAI/PC/BM/SM/2018/09/2nd Call |
29/08/2018 |
26/07/2018
|
19/09/2018
Time
11:0Hrs
|
|
253 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/13/2nd Call |
NHAI/PC/BM/SM/2018/13/2nd Call |
29/08/2018 |
26/07/2018
|
19/09/2018
Time
11:0Hrs
|
|
254 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/10 |
NHAI/PC/BM/SM/2018/10 |
06/08/2018 |
26/07/2018
|
19/09/2018
Time
11:0Hrs
|
|
255 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/11 |
NHAI/PC/BM/SM/2018/11 |
06/08/2018 |
26/07/2018
|
19/09/2018
Time
11:0Hrs
|
|
256 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/12 |
NHAI/PC/BM/SM/2018/12 |
06/08/2018 |
26/07/2018
|
19/09/2018
Time
11:0Hrs
|
|
257 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/14 |
NHAI/PC/BM/SM/2018/14 |
06/08/2018 |
26/07/2018
|
19/09/2018
Time
11:0Hrs
|
|
258 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/15 |
NHAI/PC/BM/SM/2018/15 |
06/08/2018 |
26/07/2018
|
19/09/2018
Time
11:0Hrs
|
|
259 |
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/16 |
NHAI/PC/BM/SM/2018/16 |
06/08/2018 |
26/07/2018
|
19/09/2018
Time
11:0Hrs
|
|
260 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing pre construction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH- 48(4) at KonPhata - Rasayani - Turade - Apta and terminating at Kharpada on NH-66 (17)In Principal declared National Highway in the State of Maharashtra- Package No. CE/DPR/17-18/15 ( IInd Call ) |
CE/DPR/17-18/15 (IInd Call) |
12/07/2018 |
12/07/2018
|
08/08/2018
Time
17:0Hrs
|
|
261 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab for improvement of existing road, geometric design , safety measures and other related works for the road NH-154A From KM 0.00 to 39.36 Upto Himachal Pradesh Boundary. |
12/2018-19 |
10/07/2018 |
10/07/2018
|
06/08/2018
Time
15:0Hrs
|
|
262 |
Consultancy Services for carrying out Feasibility Study and Detailed Project report for reconstruction of 11 bridges on NH 154A NH21A and NH 72 in the State of HP |
3319-3418 |
06/08/2018 |
09/07/2018
|
18/08/2018
Time
15:0Hrs
|
|
263 |
Consultancy Services for preparation of DPR for Pune - Shirur (Km 10.6 – Km 64) section of NH-753-F (Part of Pune Aurangabad Economic corridor) to improve the efficiency of freight movement under “Bharatmala Pariyojana”. |
NHAI/RO/Mumbai/PS/DPR/ RFP/2018/9 |
09/08/2018 |
05/07/2018
|
14/08/2018
Time
11:0Hrs
|
|
264 |
Consultancy Services for preparation of Detailed Project Report for Pune - Shirur (Km 10.6 – Km 64) section of NH-753F (Part of Pune Aurangabad Economic corridor) to improve the efficiency of freight movement under Bharatmala Pariyojana |
NHAI/RO/Mumbai/PS/DPR/ RFP/2018/9 |
06/08/2018 |
05/07/2018
|
07/08/2018
Time
11:0Hrs
|
|
265 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu and Kashmir PACKAGE I i 2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch District PACKAGE II ii a 2 lane with Paved Shoulder of NH configuration for Baramulla-Gulmarg Road and b 2 Lane Bypass from Donipawa to Ashajipora connecting NH244 and NH44 |
NHIDCL/DPR/J and K/Mughal Road/Bara -Gul/Pkg-II/2018-19 |
27/06/2018 |
27/06/2018
|
04/09/2018
Time
11:0Hrs
|
|
266 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu and Kashmir PACKAGE-I i 2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch District PACKAGE II ii a) 2-lane with Paved Shoulder of NH configuration for Baramulla-Gulmarg Road and b) 2 Lane Bypass from Donipawa to Ashajipora connecting NH-244 and NH-44 |
NHIDCL/DPR/J and K/Mughal Road/Bara -Gul/Pkg-I/2018-19 |
27/06/2018 |
27/06/2018
|
04/09/2018
Time
11:0Hrs
|
|
267 |
Consultancy Services for preparation of Feasibility Report cum Detailed Project Report (DPR) for construction of Flyover on NH-7 at ROB of LC-14 for access from NH-7 to proposed Devanahalli Business Park (DBP) adjacent to the northern boundary of Kempegowda International Airport, Being Developed by KSIIDC between Chainage 533.100 to Chainage 535.200 totalling length of 2.10 Kms, in the State of Karnataka (Second call) |
NIT No.12/NHAI/RO-BNG/12017/Tender/2018 dated 25.06.2018 |
10/07/2018 |
25/06/2018
|
23/07/2018
Time
15:0Hrs
|
|
268 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR ON EPC MODE FOR CONSTRUCTION OF HURI TALIHA ROAD TO NHDL SPECIFICATIONS FROM KM 0 PT 00 TO KM 155 PT 00 IN 756 BRTF AREA UNDER PROJECT ARUNANK IN ARUNACHAL PRADESH STATE |
CE(P)/ANK/DPR CONSULTANCY/01/2018-19 |
22/06/2018 |
22/06/2018
|
26/07/2018
Time
12:0Hrs
|
|
269 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Lachung La, Tanglang La and Shinkun La in the Ladakh region of the state of Jammu & Kashmir |
JK-D3/2018 |
22/06/2018 |
22/06/2018
|
29/05/2019
Time
11:0Hrs
|
|
270 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 4 lane RUB and its approaches in lieu of existing level crossing No 41 at KM 365.110 Railway CH 73 2 3 on NH 234 at Gowribidanur section in the state of Karnataka on EPC Mode. |
03/2018-19 |
22/06/2018 |
22/06/2018
|
28/07/2018
Time
16:0Hrs
|
|
271 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 2 lane ROB and its approaches in lieu of existing level crossing No 130 at KM 48.300 on NH-207 Near koralur village Sarjapura Dobbasapete section in the state of karnataka |
02/2018-19 |
20/06/2018 |
20/06/2018
|
28/07/2018
Time
13:0Hrs
|
|
272 |
Consultancy Service for preparation of Feasibility Report cum Detailed Project Report (DPR) for Four Lane Bypass to Tumakuru City on the Southern Side of NH-48 (Old NH-4), take of at existing Km.56.500 for a length of approximately 42 Kms (Near Chikkahalli Village) and crossing Four lane of Tumakuru to Shivamogga Section of NH-206 at design Km.12.300 (Near Mallasandra Village) and terminating at existing Km.86.500 of NH-48 (Near Vasanthanarasapura Village) in the State of Karnataka |
NIT No.10/NHAI/RO-BNG/24016/Tender/2018 dated 18/06/2018 |
18/06/2018 |
18/06/2018
|
30/07/2018
Time
15:0Hrs
|
|
273 |
Consultancy Services for Feasibility study, Detailed project report, Including conducting site investigation, subsoil exploration and testing preparation of plans, designs, Land plan schedules, preparation of GAD for the bypass roads to Kuppam, Bireddypalli in Chittoor District and Jammalamadugu, Mydukuru in Kadapa District in the State of Andhra Pradesh( 2nd call) |
SE R and NIT NO.05/2018-19 |
08/06/2018 |
12/06/2018
|
16/07/2018
Time
15:0Hrs
|
|
274 |
RFP for Consultancy services for Preparation of DPR for the Construction of Bridge at Km 186/10 of Madanapalli Naidupeta Road NH 71 (4th Call) |
SE R and NIT NO.06/2018-19 |
08/06/2018 |
12/06/2018
|
23/07/2018
Time
15:0Hrs
|
|
275 |
SURVEY INVESTIGATION PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD TATO-MENCHUKA FROM KM 0.00 TO KM 50.00 TO NHDL STANDARD THROUGH CONSULTANCY IN ARUNACHAL PRADESH UNDER PROJECT BRAHMANK |
CE(P) BRAHMANK 01 OF 2018-19 |
21/05/2018 |
21/05/2018
|
14/06/2018
Time
10:0Hrs
|
|
276 |
Consultancy Services for preparation of Feasibility Report cum Detailed Project Report (DPR) for construction of Flyover on NH-7 at ROB of LC-14 for access from NH-7 to proposed Devanahalli Business Park (DBP) adjacent to the northern boundary of Kempegouda International Airport, Being Developed by KSIIDC between Chainage 533.100 to Chainage 535.200 totalling length of 2.10 Kms, in the State of Karnataka |
02/NHAI/RO-BNG/12017/Tender/2018 dated 14/05/2018 |
23/05/2018 |
14/05/2018
|
13/06/2018
Time
15:0Hrs
|
|
277 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR UPGRADATION OF MAIN ROAD BUDHAL-MAHORE-GUL TO NHDL SPECIFICATIONS FROM KM 0.00 TO KM 114.875 AND AN ARTERY FROM MAHORE AT KM 57.00 TO KM 68.00 ON RAOD REASI-ARNAS-MAHORE (NET LENGTH 125.875 KM) IN 31 BRTF AREA UNDER PROJECT SAMPARK IN J&K STATE |
CE (P) SPK/03/2018-19 |
12/05/2018 |
12/05/2018
|
08/06/2018
Time
12:0Hrs
|
|
278 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR ON EPC MODE FOR IMPMT OF ROAD TLL FM KM 57PT00 TO KM 70PT00 FM NEW TO CL9 E SPCN AND MAHWERE-SAPI RD FROM KM 30PT00 TO KM 42PT00 FM EXTG CL5 TO CL9 E SPECN UNDER PROJECT PUSHPAK IN MIZORAM STATE FOURTH CALL |
CE (P) PSK-12 OF 2017-18 |
12/05/2018 |
12/05/2018
|
22/06/2018
Time
10:0Hrs
|
|
279 |
CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR USING LIDAR TECHNOLOGY FOR CONSTRUCTION OF ROAD CHUSUL-DUNGTI-FUKCHE-DEMCHOK TO NHSL SPECIFICATION FROM KM 0.00 TO KM 134.790 (NET LENGTH 134.790 KM) IN SECTOR OF 753 BRTF UNDER PROJECT HIMANK IN LEH-LADAKH REGION OF J&K STATE |
CE (P) HIMANK/30/2018-19 |
10/05/2018 |
11/05/2018
|
08/06/2018
Time
10:0Hrs
|
|
280 |
Consultancy services for preparation of DPR in the State of Meghalaya (Total Length – 102.00 Km) a) Consultancy Services for preparation of DPR of 2-laning including paved shoulder of Dkhiah- Sutnga-Saipung- Moulsei (Length – 84.00 Km) in the State of Meghalaya. b) Consultancy Services for preparation of DPR of 2-Laning including paved shoulder of Assam/Meghalaya border – Bhoirymbong on Shillong bypass (Length – 18.00 Km) in the state of Meghalaya |
PW/CE/NH/11/2017 |
10/05/2018 |
10/05/2018
|
18/06/2018
Time
15:15Hrs
|
|
281 |
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Haridwar Ring Road |
11012/NHAI/Tech/UKD/HAR RING Road/2017 |
28/05/2018 |
09/05/2018
|
11/06/2018
Time
11:0Hrs
|
|
282 |
Consultancy Services for Prpn of feasibility study and DPR for Construction of Elevated corridor Anishabad (Patna)-Phulwari-AIIMS (7.00KM) |
03/NH-AURANGABAD/2018-19 |
05/06/2018 |
08/05/2018
|
09/07/2018
Time
17:0Hrs
|
|
283 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/28 as per Annexure I) |
296-SESHA-2018 |
03/05/2018 |
08/05/2018
|
29/05/2018
Time
15:0Hrs
|
|
284 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for construction of new 2-lane Road Bridge across River Brahmaputra in Jogighopa in the State of Assam |
NHIDCL/DPR/Brahmaputra Bridge/Jogighopa/2018 |
08/05/2018 |
08/05/2018
|
19/06/2018
Time
11:0Hrs
|
|
285 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. |
NHIDCL/DPR/Guwahati-Jorabat bypass/Assam /2018 |
08/05/2018 |
08/05/2018
|
26/06/2018
Time
11:0Hrs
|
|
286 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam and Meghalaya. |
NHIDCL/DPR/Paikan-Tura/Assam /2018 |
08/05/2018 |
08/05/2018
|
26/06/2018
Time
11:0Hrs
|
|
287 |
DPR for Elevated corridor Anishabad Phulawari AIIMS |
03/NH-AURANGABAD/2018-19 |
08/05/2018 |
08/05/2018
|
31/05/2018
Time
17:0Hrs
|
|
288 |
Capacity Augmentation to 2 lanes with paved shoulders configuration From Kayamkulam (NH47) to Junction near |
01/CENH/KLA/DPR/2018-19 |
05/05/2018 |
05/05/2018
|
24/05/2018
Time
15:0Hrs
|
|
289 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of In-principle declared National Highways in the State (Nageshri - Khamba - Chalala - Amreli) |
2 of 2018-19 (Rajkot) |
10/05/2018 |
02/05/2018
|
25/06/2018
Time
15:0Hrs
|
|
290 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Kawardha to Rajnandgaon |
NH/CE/PWD/09/317589 |
01/05/2018 |
02/05/2018
|
15/05/2018
Time
17:0Hrs
|
|
291 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Dudhawa-Kanker (28.00 Km.) & Sambalpur-Silpat (21.00 Km.) |
NH/CE/PWD/23&24/317594 |
01/05/2018 |
02/05/2018
|
15/05/2018
Time
17:0Hrs
|
|
292 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Kutmakatchar-CG/Jharkhand Border-Kunkuri |
NH/CE/PWD/25/317599 |
01/05/2018 |
02/05/2018
|
15/05/2018
Time
17:0Hrs
|
|
293 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Gidhauri to Sarangarh |
NH/CE/PWD/26/317602 |
01/05/2018 |
02/05/2018
|
15/05/2018
Time
17:0Hrs
|
|
294 |
Consultancy Services for feasibility study and preparation of detailed project report for improvement and up-gradation to 4 lane paved shoulder from Km.456.00 to Km.482.00 (Champaknagar-Agartala ISBT) in Churaibari-Agartala Section of NH-8 (Old NH-44) in the state of Tripura. |
PNIT No.01/SE/NH Circle/PWD (NH)/2018-19 |
26/04/2018 |
27/04/2018
|
15/06/2018
Time
12:0Hrs
|
|
295 |
Consultancy Services for preparation of Project Report comprising, Detailed Survey/Investigation Alignment Option, Preparation of General Arrangement Drawing and Engineering Report for (1) ROB at Level Xing No.A-47A and (2) ROB at Level Xing No.A-51A |
11/cwd/pwd/abh dated 05/02/2018 |
26/04/2018 |
26/04/2018
|
30/04/2018
Time
15:0Hrs
|
|
296 |
Consultancy services for carrying out Feasibility Study and preparation of DPR for construction/improvement of existing road from Cl-9 specifications to NHDL specifications on EPC mode from Km 38.00 to Km 87.00 on road Rishi-Rongli-Kupup (Net length 49.00 Km) under 764 BRTF area under project Swastik in Sikkim state (retender) |
CE (P) SWTK/08/ 2018-19 |
23/04/2018 |
24/04/2018
|
28/05/2018
Time
12:0Hrs
|
|
297 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 71.00 TO KM 92.60 ON DAMDIM-ALGARAH-RISHI ROAD (NET LENGTH 21.60 KM) UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN WEST BENGAL STATE |
CE (P) SWTK/09/2018-19 |
24/04/2018 |
24/04/2018
|
28/05/2018
Time
12:0Hrs
|
|
298 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON SINGTHAM-DIKCHU ROAD AND FROM KM 0.00 TO KM 7.360 ON DIKCHU-RANGRANG ROAD (NET LENGTH 30.06 KM) UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN SIKKIM STATE |
CE (P) SWTK/09/ 2018-19 |
24/04/2018 |
24/04/2018
|
28/05/2018
Time
12:0Hrs
|
|
299 |
Consultancy Services for preparation of Detailed Project Report from Araku (Bhalluguda) to Bowdara section of NH 516E for Upgradation to Two/Four lane with paved shoulder configuration in the state of Andhra Pradesh(Tentative Length 42.40km) 2nd call |
S ER and BNHVJA Tender 01 2018-19 Dt 03.04.2018 |
26/04/2018 |
20/04/2018
|
11/05/2018
Time
17:0Hrs
|
|
300 |
PREPARATION OF DPR THROUGH CONSULTANCY SERVICES AS SPECIFIED BY MORT&H AND PROVISIONS OF IRC-SP-19 FOR IMPROVEMENT/DEVELOPMENT OF ROAD KURKUTI-GHAMSALI-NITI FROM KM 0.00 TO KM 20.00 (20.00 KMS) FROM CL-9 TO NHDL SPECIFICATIONS AND GELDUNG –NITI PASS KM 0.00 TO KM 16.53 (16.53 KMS) FROM OP TRACK TO NHDL SPECIFICATIONS IN 21 BRTF AREA UNDER PROJECT SHIVALIK UTTARAKHAND STATE |
80260/Consultancy/KGN/ 04 /E8 |
20/04/2018 |
20/04/2018
|
21/05/2018
Time
15:0Hrs
|
|
301 |
4-lane Elevated Section at Begusarai at Chainage 221.910 to 224.935 on NH-31, Length 3.025 Km (ii) 4-lane Elevated section of Shivala – Bihta section of Patna – Koilwar on NH-30 at design Chainage 16.050 to 29.500 of proposed alignment of NH-30, Length 13.450 Km (iii) 4-lane Elevated section at Gopalganj Chainage 384.483 to 386.362 on NH-28, Length 1.879 Km. (2 nd Call) |
NHAI/BH/Elevated/DPR/2017/Proc |
02/05/2018 |
19/04/2018
|
21/05/2018
Time
11:0Hrs
|
|
302 |
Feasibility study and preparation of DPR for Bairabi By-pass on NH-154 in Mizoram (7.00 km) |
RE-NIT No.1/RFP/CE-HW/2017-2018 |
20/04/2018 |
18/04/2018
|
07/06/2018
Time
14:0Hrs
|
|
303 |
Feasibility study and preparation of DPR for Aizawl By-pass on NH-54 in Mizoram (35.00km) |
RE-NIT No.1/RFP/CE-HW/2017-2018 |
19/04/2018 |
18/04/2018
|
07/06/2018
Time
14:0Hrs
|
|
304 |
Consultancy Services for preparation of Feasibility Study & Detailed Project Report in the State of Punjab on BOTI EPCI Hybrid Annuity Mode for the road Stretch from Taran taran - Goindwal Sahib - Kapurthala- Length 50 km. |
06 of 2018-19 |
17/04/2018 |
18/04/2018
|
30/04/2018
Time
14:0Hrs
|
|
305 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR ON EPC MODE FOR IMPMT OF ROAD TLL FM KM 57PT00 TO KM 70PT00 FM NEW TO CL9 E SPCN AND MAHWERE-SAPI RD FROM KM 30PT00 TO KM 42PT00 FM EXTG CL5 TO CL9 E SPECN UNDER PROJECT PUSHPAK IN MIZORAM STATE THIRD CALL |
CE (P) PSK-12 OF 2017-18 |
17/04/2018 |
17/04/2018
|
07/05/2018
Time
10:0Hrs
|
|
306 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7) |
NHAI/Bharatmala/Phase-II/Lot-7/Package-5/RFP/2018 |
11/05/2018 |
16/04/2018
|
05/06/2018
Time
11:0Hrs
|
|
307 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7) |
NHAI/Bharatmala/Phase-II/Lot-7/Package-6/RFP/2018 |
11/05/2018 |
16/04/2018
|
05/06/2018
Time
11:0Hrs
|
|
308 |
CONSULTANCY SERVICES FROM MORTH EMPANELLED FIRM FOR FEASIBILITY STUDY (FS), PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PRECONSTRUCTION SERVICES FOR IMPROVEMENT OF ROAD DHAR-UDHAMPUR FROM NHDL SPECIFICATION TO NHFL SPECIFICATIONS FROM KM 125.00 TO KM 130.00 IN 52 RCC UNDER 35 BRTF PROJECT BEACON IN THE STATE OF JAMMU AND KASHMIR (2nd CALL) |
CE (P) BCN/11/2017-18 |
13/04/2018 |
14/04/2018
|
23/05/2018
Time
12:0Hrs
|
|
309 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/R34Sml |
84-183,3.4.2018 |
10/04/2018 |
11/04/2018
|
05/05/2018
Time
15:0Hrs
|
|
310 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Ramgarh-Sonhat-Baikunthpur-Junction of NH-43 (65.00 Km.) Harchoka-Bharatpur (20.00 Km.) & Kotadol-Ramgarh (45.00 Km.) & Jaisingh-Nagar to MP/CG Border (32.00 Km.) |
NH/CE/PWD/03,14,21 & 22/317585 |
06/04/2018 |
07/04/2018
|
15/05/2018
Time
17:0Hrs
|
|
311 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana Lot-). |
NHAI/Bharatmala/Phase-II/Lot-7/Package-1/RFP/2018 |
09/04/2018 |
06/04/2018
|
05/06/2018
Time
11:0Hrs
|
|
312 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7). |
NHAI/Bharatmala/Phase-II/Lot-7/Package-2/RFP/2018 |
11/05/2018 |
06/04/2018
|
05/06/2018
Time
11:0Hrs
|
|
313 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7) |
NHAI/Bharatmala/Phase-II/Lot-7/Package-3/RFP/2018 |
11/05/2018 |
06/04/2018
|
05/06/2018
Time
11:0Hrs
|
|
314 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7) |
NHAI/Bharatmala/Phase-II/Lot-7/Package-4/RFP/2018 |
11/05/2018 |
06/04/2018
|
05/06/2018
Time
11:0Hrs
|
|
315 |
Consultancy Services for Project Management including preparation of Detailed Project Report from AP/TS Border to Piduguralla-Narasasraopet-Vodarevu road of NH 167A in the state of A P for Upgradation to Two/Four lane with paved shoulder configuration. |
SE RandB NHVJA Tender 17 2017-18 dt 28 03 2018 |
16/04/2018 |
04/04/2018
|
04/05/2018
Time
16:30Hrs
|
|
316 |
CS for project management including preparation of D PR of selected stretches of N H/State Roads (approved “In Principle” for Declaration as N H in the state of A P for Up Gradation to 2 4 lane with PS configuration from Jn with NH 216 near Narsapuram - Sakhinetipalli-Malkipuram upto jn with NH 216 near Razole along with construction of new bridge between Narsapuram and Sakhinetipalli (380m accross Vasista river TL 23km 3rd call |
SE RandB NHVJA Tender 16 2017-18 dt 23 03 2018 |
13/04/2018 |
02/04/2018
|
23/04/2018
Time
17:0Hrs
|
|
317 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode for the road Gurdaspur-Mukerian-Talwara-Mubarikpur (Approx Length 83.00 km) |
10 |
31/03/2018 |
02/04/2018
|
23/04/2018
Time
14:0Hrs
|
|
318 |
Consultancy Services for Preparation of DPR for Thanjavur - Thirvaiyaru - Perambalur - Krishnapuram - Athoor road (NH136) from Km 72/2-77/4 (Km 0/0-5/2 of Perambalur By-pass) and Km 125/0 -127/0 (Km 2/0 -0/0 of Athur - Perambalur road SH157) for up-gradation to Two lanes with Paved shoulder / Four lane configuration and Review and updation of existing DPR from Km 77/4 -125/0 of NH136 (Km 49/6 -2/0 of SH157 Athur peramblur road) to NH standards including merging and compiling of DPR |
TN .No. 46/2017/DO Dt. 05.03.2018 |
02/04/2018 |
02/04/2018
|
04/05/2018
Time
15:0Hrs
|
|
319 |
Consultancy Services for preparation of Feasibility Study & Detailed Project Report in the State of Punjab on BOTI EPCI Hybrid Annuity Mode for the road Stretch from Taran taran - Goindwal Sahib - Kapurthala- Length 50 km. |
05 of 2017-18 |
29/03/2018 |
30/03/2018
|
17/04/2018
Time
14:0Hrs
|
|
320 |
Technical Consultancy Services for preparation of Feasibility Study and Detailed Project Report for the road Stretch from NH-344A Nawanshahar-Rahon-Machiwara-Samrala-Khanna road and connecting to NH-1 (NEW-44) in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode. |
Tender Notice No . 3 of 2017-2018 |
27/03/2018 |
30/03/2018
|
10/04/2018
Time
15:0Hrs
|
|
321 |
CONSULTANCY SERVICES FROM MoRT&H EMPANELLED FIRM FOR FEASIBILITY STUDY (FS), PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PRECONSTRUCTION SERVICES FOR IMPROVEMENT OF ROAD RAFIABAD – KUPWARA – CHOWKIBAL – TANGDHAR – CHAMKOT (NH-701) FOR FURTHER DEVELOPMENT AS NHDL SPECIFICATION WITH PAVED SHOULDER AS WELL AS DISTRICT CONNECTIVITY ROAD IN 109 RCC UNDER 32 BRTF PROJECT BEACON IN THE STATE OF JAMMU & KASHMIR (RETENDER- SIXTH CALL) |
CE (P) BCN/19/2016-17 |
29/03/2018 |
29/03/2018
|
31/03/2018
Time
12:0Hrs
|
|
322 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode for the road Stretch from NH-5 near Prem Nagar- Morinda- Chamkaur Sahib- Bela- Paniyali and connecting to NH – 344 A. |
17 of 2017-18 |
28/03/2018 |
28/03/2018
|
09/04/2018
Time
15:0Hrs
|
|
323 |
CONSULTANCY SERVICE FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of proposed 4 lane RUB and its approaches in lieu of existing level crossing No 41 at KM 365.110 Railway CH 73 2 3 on NH 234 at Gowribidanur section in the state of Karnataka on EPC Mode |
NIT14retender |
28/03/2018 |
28/03/2018
|
17/04/2018
Time
15:0Hrs
|
|
324 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Powari to Kalpa Road on NH -505A |
16619-11718, 21-03-2018 |
24/03/2018 |
27/03/2018
|
23/04/2018
Time
15:0Hrs
|
|
325 |
Consultancy services for preparation of FS and DPR for fly over between km 7.30 to Km 8.05 on Srinagar Baramulla Uri road under Project Beacon in Jammu and Kashmir State |
CE (P) BCN/02/2016-17 |
24/03/2018 |
26/03/2018
|
28/04/2018
Time
12:0Hrs
|
|
326 |
Consultancy Services for carrying out Feasibility Study and Detailed Engineering for reconstruction of new bridges in replacement of existing old and narrow bridges on National Highways in the State of Himachal Pradesh. |
10753-10853 dated 01/03/2018 |
23/03/2018 |
23/03/2018
|
07/04/2018
Time
15:0Hrs
|
|
327 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir. |
NHIDCL/ JandK /DPR/Thathri-Chachool/2017-18 |
22/03/2018 |
22/03/2018
|
09/05/2018
Time
15:0Hrs
|
|
328 |
SURVEY INVESTIGATION PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD TATO-MENCHUKA FROM KM 0.00 TO KM 50.00 TO NHDL STANDARD THROUGH CONSULTANCY IN ARUNACHAL PRADESH UNDER PROJECT BRAHMANK |
CE(P)BRAHMANK/22 OF 2017-18 RETENDER 2nd time |
19/03/2018 |
19/03/2018
|
31/03/2018
Time
11:0Hrs
|
|
329 |
Review and Updating of Detailed Project Report (DPR) for Four laning and Strengthening of the Highway starting from its junction with NH-44 near Thoppur connecting Mecheri, Mettur, Ammapettai, Nerinchipettai, Chittar, Bhavani and terminating near Erode Km 0/0 to 85/0 of NH-544H in the State of Tamil Nadu |
Tender Notice No.46/HDO/NH/2017-18/dated.20.02.2018 |
19/03/2018 |
19/03/2018
|
17/04/2018
Time
15:0Hrs
|
|
330 |
Review and Updating of detailed Project Report (DPR) for four Laning and Strengthening of the Salem - Uthangarai - Thirupathur - Vaniyambadi road for the stretch, Starting from Harur and Terminating @ Vaniyambadi Km.49/0-129/0 of NH -179A in the State of Tamil Nadu |
Tender Notice No.47/HDO/NH/2017-18/dated.21.02.2018 |
19/03/2018 |
19/03/2018
|
17/04/2018
Time
15:0Hrs
|
|
331 |
CONSULTANCY SERVICES FROM MORTH / INFRACON EMPANELLED FIRM FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR IMPROVEMENT OF ROAD SRINAGAR – BARAMULLA – URI (NH-1) FROM KM 14.200 TO KM 47.200 TO NH FOUR LANE SPECIFICATIONS, FROM KM 47.200 TO KM 57.800 TO NH FOUR LANE SPEFCIFICATIONS (BARAMULLA BYE PASS) AND FROM KM 57.800 TO KM 101.00 TO NH DOUBLE LANE SPECIFICATION WITH PAVED SHOULDER (10 MTR CARRIAGE WAY) IN THE AOR OF 53 RCC UNDER 760 BRTF (P) BEACON IN JAMMU AND KASHMIR STATE (2ND CALL) |
CE (P) BCN/07/2017-18 |
17/03/2018 |
18/03/2018
|
09/04/2018
Time
12:0Hrs
|
|
332 |
RE-TENDER CONSULTANCY SERVICE FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD BAKASAR-MAVASARI FROM KM 0.000 TO KM 32.49 (NET LENGTH 32.49 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION IN 45 BRTF AREA UNDER PROJECT CHETAK IN RAJASTHAN STATE |
CE (P) CTK/23/2017-18 |
15/03/2018 |
17/03/2018
|
26/04/2018
Time
11:30Hrs
|
|
333 |
Consultancy Services for preparation of Detailed Project Report for Replacement/ Reconstruction of Superstructure of 2 lane Old Narmada Bridge (Constructed in 1977) across Narmada River on NH-8 Section from Km. 192.00 to Km. 198.00 of NH-8 passing through District Bharuch in between Vadodara-Surat Section of NH-8 in the state of Gujarat on EPC Mode |
NHAI/PIU Surat (Expressway)/71/2018 |
22/03/2018 |
09/03/2018
|
09/04/2018
Time
11:0Hrs
|
|
334 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for strengthening in/c paved shoulder of NH-8 in Churaibari – Agartala Section from KM 422.00 to KM 456.00 ( Mungiakami to Champaknagar) in the state of Tripura (Phase-I). |
PNIT No.09/SE/NH Circle/PWD (NH)/2017-18 |
08/03/2018 |
09/03/2018
|
26/04/2018
Time
15:0Hrs
|
|
335 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of in principle declared National Highway from Kamalpur to Santirbazar (on NH-8) via Ambassa (on NH-8), Gandacherra, Amarpur (on NH-208) and Santirbazar to Belonia in the state of Tripura. |
PNIT NO.10/SE/NH Circle/PWD (NH)/2017-18 |
08/03/2018 |
09/03/2018
|
25/04/2018
Time
15:0Hrs
|
|
336 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of in principle declared National Highway from -(i) Champaknagar (Jirania) on NH-8 to Udaipur on NH-8 via Jampuijala, (ii) Amarpur on NH-208 to Udaipur on NH-8 in the state of Tripura. |
PNIT No.11/SE/NH Circle/ PWD (NH)/2017-18 |
08/03/2018 |
09/03/2018
|
25/04/2018
Time
15:0Hrs
|
|
337 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration Highway starting at Junction of NH-65(9) Umarga – KasarShirshi – Nilanga – LamjanaPhata – Samudrawani and terminating at Osmanabad In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/01 |
16/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
338 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway starting at Osmanabad Barshi Vairag and terminating at Junction of NH 65 Near Solapur In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/02 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
339 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation Upgradation of existing roads to 2 lane 4 lane with paved shoulders configuration of Highway Starting at Ambejogai and connecting to Pokhari Murud Samudrawani Patoda Lohara and terminating at junction of NH65 near Ashtamode In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/03 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
340 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation Upgradation of existing roads to 2 lane 4 lane with paved shoulders configuration of Highway Starting at Junction of NH753A near Karmad and connecting to Lad Sangavi Chauka Harsul Sangavi Naigaonganuri Yesgaon Bazar Savangi and terminating at Junction of NH 52 near Kannad In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/04 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
341 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane 4 lane with paved shoulders configuration of Highway Starting at Junction of NH 52 near Georai and connecting to Shevgaon Umapur Bhenda Factory and terminating at Nevasa In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/05 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
342 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Nevasa -Shrirampur - Bhabhaleshwar-Loni - Sanagmner and terminating at Akole In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/06 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
343 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Akole - Rajur - Shendi and terminating at Junction of NH 848 at Shahapur In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/07 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
344 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH-52 (211) near Padalsinghi-Pachegaon-PimpalnerTadsona-Wadvani-Chinchavan-Dharur-Adas-Lokhandi-Sawargaon-Yusuf Wadgaon and terminating at Kalamb In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/08 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
345 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Kalamb - Washi - Saramkundi (NH-211)- Bhoom - Paranda and terminating at Karmala In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/09 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
346 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Karmala - Rashin - Siddhtek and terminating at Daund In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/10 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
347 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH-161 at Hingoli - Aundha Nagnath - Javla Bazar - Hatta - Purna and terminating at Junction of NH-361 at Nanded In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/11 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
348 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH- 848 at Nashik - Dindori and terminating at Junction of NH-953 at Vani In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/12 |
20/03/2018 |
08/03/2018
|
10/05/2018
Time
17:0Hrs
|
|
349 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH- 60(3) at Umrane - Deola - Kalvan - Borgaon - Surgana - Bardipada and terminating at Maharashtra Gujarat State Border near Wajada In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/13 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
350 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Dondaicha - Sindhakheda - Betawad - Amalner - Dharangaon and terminating at - Junction of NH-53(6) near Erondol In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/14 |
20/03/2018 |
08/03/2018
|
10/05/2018
Time
17:0Hrs
|
|
351 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH- 48(4) at Kon Phata - Rasayani - Turade - Apta and terminating at Kharpada on NH-66 (17) In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/15 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
352 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Mhasavad and terminating at Toranmal Hill Station In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/16 |
20/03/2018 |
08/03/2018
|
10/05/2018
Time
17:0Hrs
|
|
353 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Hinganghat - Nandori - Kora - Khedsvngi - Chimur -Neri-Pendheri - Nawargaon - Sindewahi – Mul & Chimur - Shankarpur and terminating at Kanpa In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/17 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
354 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Jintur - Yeldari and terminating at Sengaon In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/18 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
355 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Paithan - Pachod - Ambad - Ghansawangi and terminating at Ashti (Package I) In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/19 |
20/03/2018 |
08/03/2018
|
10/05/2018
Time
17:0Hrs
|
|
356 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Ashti - Pathari - Pokharni and terminating at Purna In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/20 |
20/03/2018 |
08/03/2018
|
10/05/2018
Time
17:0Hrs
|
|
357 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Ganeshpur (on Jalana Mantha Road) - Kotha - Vazarhandi - Loni - Risod and terminating at Mehekar In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/21 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
358 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Parli Vaijnath - Khodwa Savargaon - Daithana - Antarweli - Pimpaldari - Rani Sawargaon - Palam - Tadkalas and terminating at Purna In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/22 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
359 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Neera and terminating at Baramati In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/23 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
360 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Trimbakshwar -Amboli - Harsul - Ozarhked - Vavar - Chalawade - Khanel and terminating at MH/Gujarat Border In Principal declared National Highways in the State of Maharashtra |
CE/DPR/17-18/24 |
20/03/2018 |
08/03/2018
|
28/05/2018
Time
17:0Hrs
|
|
361 |
Consultancy services from MORTH empanelled firm for FS, prep of DPR and preconstr services for impro of road Dhar Udhampur from NHDL spec to NHFL spec from Km 125 to 130.00 in 52 RCC under 35 BRTF Project Beacon in the state of Jammu Kashmir |
CE (P) BCN/11/2017-18 |
06/03/2018 |
07/03/2018
|
30/03/2018
Time
12:0Hrs
|
|
362 |
Consultancy Services for Feasibility study/DetailedEngineering report for construction of two lane with paved shoulder for newly in principle approved national highway From Suratgarh-Baropal-18SPD- Jhanaranwali-Bherusari-Rawatsar ) Length 57.00 Km |
11/2017-18 |
19/04/2018 |
07/03/2018
|
23/04/2018
Time
11:0Hrs
|
|
363 |
Consultancy Services for Authority’s Engineer (AE) for the work of “Widening and Strengthening from (i) 2-lane to 2-lane with paved shoulder from km 0/550-1/100, 5/700-21/070, 21/500-34/200 & 34/870-38/000 and (ii) Strengthening of existing 4-lane from km 0/000-0/550, 1/100-1/780, 2/420-5/700, 21/070-21/500, 34/200-34/870 and 2-lane from km 1/780- 2/420 (Dindigul- Natham section) of NH383 in the State of Tamil Nadu “ EPC mode |
TN No. 44/2017/DO/NH/ dated 27.02.2018 |
07/03/2018 |
02/03/2018
|
20/04/2018
Time
15:0Hrs
|
|
364 |
Consultancy Services for preparation of Detailed Project Report from Araku (Bhalluguda) to Bowdara section of NH 516E for Upgradation to Two/Four lane with paved shoulder configuration in the state of A P (Tentative length 42.40 km) |
NIT NoSE Rand B NHVJA Tender 13 2017 18 dt 23 3 2018 |
14/03/2018 |
28/02/2018
|
02/04/2018
Time
15:0Hrs
|
|
365 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R30SML |
10228-10327,21-02-2018 |
25/02/2018 |
26/02/2018
|
27/03/2018
Time
15:0Hrs
|
|
366 |
Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka |
12/2016-17 |
23/02/2018 |
23/02/2018
|
05/03/2018
Time
16:0Hrs
|
-
|
367 |
Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka |
EE/NHD/MNG/AE2/Road Safety Audit/NIT-12/5th Call/2017-18 |
23/02/2018 |
23/02/2018
|
05/03/2018
Time
16:0Hrs
|
-
|
368 |
Consultancy Services for preparation of DPR for Rehabilitation and Upgradation From Km 0 .0 to 43.097 of Mydukur to singarakonda road via porumamilla seetaramapuram C.S puram and Kandukuru Two or Four lane with paved shoulder configuration in the State of Andhra Pradesh |
SE R and B NH ATP NIt NO 61/2017-18 |
22/02/2018 |
22/02/2018
|
09/04/2018
Time
15:0Hrs
|
|
369 |
CONSULTANCY SERVICES FROM MoRT&H EMPANELLED FIRM FOR FEASIBILITY STUDY (FS), PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PRECONSTRUCTION SERVICES FOR IMPROVEMENT OF ROAD RAFIABAD KUPWARA CHOWKIBAL TANGDHAR CHAMKOT (NH-701) FOR FURTHER DEVELOPMENT AS NHDL SPECIFICATION WITH PAVED SHOULDER AS WELL AS DISTRICT CONNECTIVITY ROAD IN 109 RCC UNDER 32 BRTF PROJECT BEACON IN THE STATE OF JAMMU & KASHMIR (RETENDER SIXTH CALL) |
CE (P) BCN/19/2016-17 |
19/02/2018 |
20/02/2018
|
21/03/2018
Time
12:0Hrs
|
|
370 |
RETENDER FOR CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD SANSARI-KILLER-THIROT-TANDI FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS FROM KM 40.000 TO KM 70.000 AND KM 96.000 TO KM 125.000 (NET LENGTH 59.00 KM) UNDER 94 RCC/ 38 BRTF PROJECT DEEPAK IN LAHAUL SPITI DISTT IN THE STATE OF HIMACHAL PRADESH |
CE (P) Deepak-14 of 2017-18 |
30/01/2018 |
17/02/2018
|
05/03/2018
Time
17:0Hrs
|
|
371 |
Consultancy Services for preparation of Detailed Project Report for Signature Rail-cum-Road Bridge (on the downstream side of existing Rail cum Road Bridge) including its approaches across River Ganga on Old GT Road near Kashi Railway Station, Varanasi in the State of Uttar Pradesh |
NHAI/DPR/Signature Bridge/2018/Bharatmala Division |
16/02/2018 |
13/02/2018
|
01/05/2018
Time
11:0Hrs
|
|
372 |
Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Pariyojana (Lot-2) (Package-I) |
NHIDCL/Bharatmala/ DPR/Phase-I/ Package-I/ Lot-2/2018 |
12/02/2018 |
13/02/2018
|
17/04/2018
Time
11:0Hrs
|
|
373 |
Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram under Bharatmala Pariyojana (Lot-2) (Package-II) |
NHIDCL/Bharatmala/ DPR/Phase-I/ Package-II/ Lot-2/2018 |
12/02/2018 |
13/02/2018
|
17/04/2018
Time
11:0Hrs
|
|
374 |
Consultancy Services for Feasibility study Detailed project report Including conducting site investigation subsoil exploration and testing preparation of plans designs Land plan schedules preparation of GAD for the bypass roads to Kuppam Bireddypalli in Chittoor District and Jammalamadugu, Mydukuru in Kadapa District in the State of Andhra Pradesh |
Consultancy Services for Feasibility study Detailed project report Including conducting site investigation subsoil exploration and testing preparation of plans designs Land plan schedules preparation of GAD for the bypass roads to Kuppam Bireddypalli in Chittoor District and Jammalamadugu, Mydukuru in Kadapa District in the State of Andhra Pradesh |
12/02/2018 |
12/02/2018
|
27/03/2018
Time
15:0Hrs
|
|
375 |
Consultancy Services for carrying out feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh.(Package No. HP/Shahpur/R-1/25 as per Annexure I) |
293-SESHA-2017 |
07/02/2018 |
12/02/2018
|
05/03/2018
Time
15:0Hrs
|
|
376 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh (Package No. HP/Shahpur/R-1/22 as per Annexure I) |
294-SESHA-2017 |
07/02/2018 |
12/02/2018
|
05/03/2018
Time
15:0Hrs
|
|
377 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R31SML |
9577-9676, 07-02-2018 |
09/02/2018 |
09/02/2018
|
10/03/2018
Time
15:0Hrs
|
|
378 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R32SML |
9577-9676, 07-02-2018 |
09/02/2018 |
09/02/2018
|
10/03/2018
Time
15:0Hrs
|
|
379 |
Consultancy Services for Up Gradation to Two Four lane with paved shoulder configuration of the stretch from Junction with NH 216 near Narsapuram Sakhinetipalli Malkipuram upto junction with NH 216 near Razole along with construction of new bridge between Narsapuram and Sakhinetipalli 380m long across Vasistha Godavari River Tentative Length 23.00km in the state of Andhra Pradesh 2nd Call |
S E Rand B NH VJA Tender 12 2017 18 dt 07 02 2018 |
17/02/2018 |
09/02/2018
|
05/03/2018
Time
17:0Hrs
|
|
380 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R26SML |
9449-9548,06-02-2018 |
08/02/2018 |
08/02/2018
|
06/03/2018
Time
15:0Hrs
|
|
381 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R33SML |
9449-9548,06-02-2018 |
08/02/2018 |
08/02/2018
|
06/03/2018
Time
15:0Hrs
|
|
382 |
CONSULTANCY SERVICE FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD BAKASAR-MAVASARI FROM KM 0.000 TO KM 32.49 (NET LENGTH 32.49 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION IN 45 BRTF AREA UNDER PROJECT CHETAK IN RAJASTHAN STATE |
CE (P) CTK/22/2017-18 |
06/02/2018 |
07/02/2018
|
07/03/2018
Time
11:30Hrs
|
|
383 |
Consultancy services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane with paved shoulders and/or it’s strengthening in the State of Himachal Pradesh “Powari to Kalpa road on NH-505A”. |
9242-9342,02-02-2018 |
06/02/2018 |
06/02/2018
|
15/03/2018
Time
15:0Hrs
|
|
384 |
SURVEY INVESTIGATION PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD TATO-MENCHUKA FROM KM 0.00 TO KM 50.00 TO NHDL STANDARD THROUGH CONSULTANCY IN ARUNACHAL PRADESH UNDER PROJECT BRAHMANK |
CE(P)BRAHMANK/22 OF 2017-18 RETENDER |
02/02/2018 |
03/02/2018
|
26/02/2018
Time
11:0Hrs
|
|
385 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa- Galkund- Samghan- Saputara- Maharashtra Border Section) in the State of Gujarat for up-gradation to Two/Four Lanes with paved shoulder configuration |
22of2017-18-5 |
03/02/2018 |
03/02/2018
|
16/02/2018
Time
18:0Hrs
|
|
386 |
for improvement and up-gradation from 2 Lane to 4 Lane of Ghazipur-Jamaniaya-Saiyad Raja road of NH-97 in the State of Uttar Pradesh |
NHAI/Tech/GJS/NH-97/DPR/2018/112360 |
03/02/2018 |
02/02/2018
|
05/02/2018
Time
11:0Hrs
|
-
|
387 |
improvement and up-gradation from 2 Lane to 4 Lane of Ghazipur-Jamaniaya-Saiyad Raja road of NH-97 in the State of Uttar Pradesh |
NHAI/Tech/GJS/NH-97/DPR/2018/112360 |
03/02/2018 |
02/02/2018
|
05/03/2018
Time
11:0Hrs
|
|
388 |
Consultancy service for Feasibility Study, Detailed Project report, Survey and preparation of land plan for widening to two lane with paved shoulders Pavagada Kalyanadurga-Veparalla Andra Border Road in the state of Karnataka. |
20/2017-18 |
31/01/2018 |
31/01/2018
|
06/04/2018
Time
16:0Hrs
|
|
389 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to Two lane with paved shoulder from KM 194.900 to 243.200 Banavar Huliyar section in the state of Karnataka on EPC Mode |
15/2017-18 |
05/02/2018 |
30/01/2018
|
01/03/2018
Time
15:0Hrs
|
|
390 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 4 lane RUB and its approaches in lieu of existing level crossing No 41 at KM 365.110 Railway CH 73 2 3 on NH 234 at Gowribidanur section in the state of Karnataka on EPC Mode. |
14/2017-18 |
05/02/2018 |
30/01/2018
|
01/03/2018
Time
15:0Hrs
|
|
391 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 2 lane ROB and its approaches in lieu of existing level crossing No 130 at KM 48.300 on NH-207 Near koralur village Sarjapura Dobbasapete section in the state of karnataka |
13/2017-18 |
05/02/2018 |
30/01/2018
|
01/03/2018
Time
15:0Hrs
|
|
392 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for C/O flyover in Una town on NH-503 (Extn.) in the State of Himachal Pradesh (Package No. HP/Shahpur/R/21 as per Annexure I). |
291-SESHA-2017 |
24/01/2018 |
30/01/2018
|
21/02/2018
Time
15:0Hrs
|
|
393 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. (Package No. HP/Shahpur/R-1/19 as per Annexure I). |
292-SESHA-2017 |
24/01/2018 |
30/01/2018
|
21/02/2018
Time
15:0Hrs
|
|
394 |
CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to Two Lane With Paved Shoulders from, Km 544 200 to Km 594 000 Hosamanecross to Pandvapura section of NH-150A in Karnataka state through an Engineering Procurement and Construction EPC Contract. |
21/2017-18 |
06/02/2018 |
30/01/2018
|
02/03/2018
Time
16:0Hrs
|
|
395 |
CONSULTANCY SERVICES FOR PREPARATION OF DPR ON EPC MODE FOR IMPMT OF ROAD TLL FM KM 57PT00 TO KM 70PT00 FM NEW TO CL9 E SPCN AND MAHWERE-SAPI RD FROM KM 30PT00 TO KM 42PT00 FM EXTG CL5 TO CL9 E SPECN UNDER PROJECT PUSHPAK IN MIZORAM STATE SECOND CALL |
CE (P) PSK-12 OF 2017-18 |
29/01/2018 |
29/01/2018
|
05/04/2018
Time
10:0Hrs
|
|
396 |
Consultancy Services for Feasibility Study/ Detailed Project Report for the project of UP-gradation and 4-laning of Paonta Saheb – Ballupur (Dehradun) Section of NH 72 (km 104.00 to km 149.00) In the State of Uttarakhand |
NHAI/Tech/UKD/DPR/03/2018 |
31/01/2018 |
29/01/2018
|
21/05/2018
Time
11:0Hrs
|
|
397 |
Consultancy Services for Feasibility Study/ Detailed Project Report for the project of UP-gradation and 4-laning of Paonta Saheb – Ballupur (Dehradun) Section of NH 72 (km 104.00 to km 149.00) In the State of Uttarakhand |
NHAI/Tech/UKD/DPR/03/2018 |
31/01/2018 |
29/01/2018
|
27/02/2018
Time
15:0Hrs
|
|
398 |
Consultancy Services for Feasibility Study/ Detailed Project Report |
NHAI/Tech/UKD/DPR/03/2018 |
31/01/2018 |
29/01/2018
|
27/02/2018
Time
15:0Hrs
|
-
|
399 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON ROAD SINGTHAM-DIKCHU AND FROM KM 0.00 TO KM 7.360 ON ROAD DIKCHU-RANGRANG (NET LENGTH 30.06 KM) UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN SIKKIM STATE |
CE (P) SWTK/39/ 2017-18 |
24/01/2018 |
25/01/2018
|
23/02/2018
Time
12:0Hrs
|
|
400 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD DAMDIM-ALGARAH-RISHI FROM KM 71.00 TO KM 92.60 (NET LENGTH 21.60 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN WEST BENGAL STATE (RETENDER) |
CE (P) SWTK/40/ 2017-18 |
23/01/2018 |
24/01/2018
|
21/02/2018
Time
12:0Hrs
|
|
401 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1)(Package-III)(Reinvitation) |
NHIDCL/Bharatmala/DPR/Phase I/Lot-1/Package-III/2018 |
22/01/2018 |
23/01/2018
|
13/02/2018
Time
11:0Hrs
|
|
402 |
Consultancy Services for preparation of Detailed Project Reports for Construction of a Road Tunnel with its approaches including junction with Dwarka Expressway for western connectivity to IGI Airport from Dwarka expressway in the State of Delhi-4th Call |
NHAI/ PIU DWARKA/ IGIA Tunnel/ RFP |
22/01/2018 |
19/01/2018
|
12/02/2018
Time
11:0Hrs
|
|
403 |
CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR USING LIDAR TECHNOLOGY FOR CONSTRUCTION OF ROAD CHUSUL-DUNGTI-FUKCHE-DEMCHOK TO NHSL SPECIFICATION FROM KM 0.00 TO KM 134.790 (NET LENGTH 134.790 KM) IN 753 BRTF UNDER PROJECT HIMANK IN LEH-LADAKH REGION OF J K STATE |
CE (P) HIMANK/26/2017-18 |
16/01/2018 |
17/01/2018
|
07/02/2018
Time
10:0Hrs
|
|
404 |
Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Soyala Osian Tiwari Balesar 126 KmDistt Jodhpur |
CE (NH) PWD Raj Jaipur NIT No 07 of 2017-18 |
15/01/2018 |
15/01/2018
|
19/02/2018
Time
18:0Hrs
|
|
405 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R30SML |
8531-8631,10-01-2018 |
12/01/2018 |
15/01/2018
|
12/02/2018
Time
15:0Hrs
|
|
406 |
Consultancy Services for Project Management in-charge preparation of Feasibility Study/Detailed Project Report for two laning with paved shoulders of Longleng (Junction with NH No. 702) to Tuensang (Junction with NH-202) on NH No. 702B [NH(O)] |
CE/NH/etender/2017-18/10/01 |
12/01/2018 |
13/01/2018
|
20/03/2018
Time
12:0Hrs
|
|
407 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Athibung-Khelma (Phase-B of SARDP-NE) and Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders from NH-29 to NH-29 (New NH Nos.) Dimapur Bypass. (II Call) |
CE/NH/etender/2017-18/10/02 |
12/01/2018 |
13/01/2018
|
20/03/2018
Time
12:0Hrs
|
|
408 |
Consultancy Services for carrying out feasibility study, Detailed Survey/Investigation, Preparation of General Arrangement Drawing, Detail Project Report for Construction of proposed ROB Six-lane configuration and its approaches in replacement of temporary LC at Km.363.625 on NH-8A New NH- 141 |
08 of 2017-18 (5th Attempt) |
12/01/2018 |
12/01/2018
|
29/01/2018
Time
18:0Hrs
|
|
409 |
Consultancy Services for Preparation of DPR for improvement of newly declared NHs |
8/2017-2018/2017-2018 of SE, NH Circle No. II |
10/01/2018 |
11/01/2018
|
14/02/2018
Time
14:0Hrs
|
|
410 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh. (Package No. HP/Shahpur/R-1/22 as per Annexure I). |
288-SESHA-2018 |
30/12/2017 |
09/01/2018
|
02/02/2018
Time
15:0Hrs
|
|
411 |
Consultancy Services for carrying out feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh. Package No. HP/Shahpur/R-1/25 as per Annexure I. |
289-SESHA-2018 |
30/12/2017 |
09/01/2018
|
02/02/2018
Time
15:0Hrs
|
|
412 |
RFP for Consultancy services for Preparation of DPR for the Construction of Bridge at Km 186/10 of Madanapalli Naidupeta Road NH 71(3rd Call) |
NIT no 50/2017-18 |
09/01/2018 |
09/01/2018
|
22/02/2018
Time
15:0Hrs
|
|
413 |
Package for Consultancy services for Authoritys Engineer for supervision of Civil Construction work for proposed 4lane ROBs and its approaches in existing Level Crossing lieu of 23SPL Class at Km 3.600 and 18ASPL class at Km 7.800 on NH-18 in the State of Andhra Pradesh under EPC Mode 2nd call |
NIT no 51/2017-18 |
09/01/2018 |
09/01/2018
|
08/02/2018
Time
15:0Hrs
|
|
414 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1)(Package-1A) |
NHIDCL/Bharatmala/DPR/Phase-I/Package-1A/Lot-1/2018 |
09/01/2018 |
09/01/2018
|
30/01/2018
Time
11:0Hrs
|
|
415 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1)(Package-1B). |
NHIDCL/Bharatmala/DPR/Phase-I/ Package-1B /Lot-1/2018 |
09/01/2018 |
09/01/2018
|
30/01/2018
Time
11:0Hrs
|
|
416 |
Engaging Technical Consultant for preparation of Feasibility Study (FS), Detailed Project Report (DPR) on EPC mode for upgradation of road Budhal-Mahore-Gul to NHDL specifications from Km 0.00 to Km 114.875 (Net length 114.875 Kms) in 31 BRTF area under Project Sampark in J&K State |
CE (P) SPK/25/2017-18 |
10/01/2018 |
08/01/2018
|
05/02/2018
Time
12:0Hrs
|
|
417 |
4-lane Elevated Section at Begusarai at Chainage 221.910 to 224.935 on NH-31, Length 3.025 Km (ii) 4-lane Elevated section of Shivala – Bihta section of Patna – Koilwar on NH-30 at design Chainage 16.050 to 29.500 of proposed alignment of NH-30, Length 13.450 Km (iii) 4-lane Elevated section at Gopalganj Chainage 384.483 to 386.362 on NH-28, Length 1.879 Km. |
NHAI/BH/Elevated/DPR/2017/Proc |
06/01/2018 |
06/01/2018
|
24/01/2018
Time
11:0Hrs
|
|
418 |
Consultancy Services for Feasibility/DPR of 4-laning of Khagaria to Purnea Section of NH-31 from km 270.00 to km 410.00 in the State of Bihar |
NHAI/BH/DPR/Kha-Pur/4L/2017-18 |
06/01/2018 |
06/01/2018
|
09/02/2018
Time
11:0Hrs
|
|
419 |
Consultancy Services for Feasibility/DPR of 4-laning of Mokama – Munger Section of NH-80 from Km 1.430 to Km 70.00 including link to NH-31 in the State of Bihar |
NHAI/BH/DPR/Mok-Mung/4L/2017-18 |
06/01/2018 |
06/01/2018
|
09/02/2018
Time
11:0Hrs
|
|
420 |
Consultancy Services for Preparation of Detailed Project report of 4/6 lane Access Controlled Green Field Expressway Connecting New Capital City Amaravathi to Ananthapuramu with Connectivity to Kurnool and Kadapa in the State of Andhra Pradesh through BOT /EPC Basis – Approximate length 560 KM. |
SE NH ATP NIT No 44 |
10/01/2018 |
05/01/2018
|
20/02/2018
Time
15:0Hrs
|
|
421 |
Consultancy Services for preparation of Detailed Project Report for alternate direct connectivity between Delhi and Vadodara under National Corridor Efficiency Improvement under Bharatmala Pariyojna |
NHAI/Bharatmala/Delhi-Vadodra/RFP/2017 |
01/01/2018 |
29/12/2017
|
29/01/2018
Time
11:0Hrs
|
|
422 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Mehsana (on NH-68) to Visnagar-Vadnagar-Idar (on NH-58)-Shamlaji (on NH-48) road as new National Highway in State of Gujarat. (Job No. Inprinciple/GJ/2017-18/594) |
10 of 2017-18 (3rd Attempt) |
29/12/2017 |
29/12/2017
|
16/01/2018
Time
12:0Hrs
|
-
|
423 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD GANGTOK-CHUNGTHANG FROM KM 30.00 TO KM 46.00 AND KM 58.00 TO KM 66.00 (NET LENGTH 24.00 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION UNDER 758 BRTF AREA UNDER PROJECT SWASTIK IN SIKKIM STATE |
CE (P) SWTK/37/2017-18 |
27/12/2017 |
28/12/2017
|
27/01/2018
Time
12:0Hrs
|
|
424 |
CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR ON USING LiDAR TECHNOLOGY FOR CONSTRUCTION / IMPROVEMENT OF EXISTING ROAD KARU-TANGTSE TO NHDL SPECIFICATION FROM KM 20.00 TO KM 81.600 (NET LENGTH 61.600 KM) IN 753 BRTF UNDER PROJECT HIMANK IN LEH-LADAKH REGION OF J&K STATE |
CE(P)HMK/27/2017-18 |
23/12/2017 |
27/12/2017
|
17/01/2018
Time
10:0Hrs
|
|
425 |
Consultancy Services for Project Management including preparation of Detailed Project Report from AP/TS Border to Piduguralla-Narasasraopet-Vodarevu road of NH 167A in the state of A P for Upgradation to Two/Four lane with paved shoulder configuration. |
S ERBNHVJA Tender 07 2017-18 DT 19 12 2017 |
10/01/2018 |
26/12/2017
|
25/01/2018
Time
16:0Hrs
|
|
426 |
A Consultancy service for review and updating of available FS and DPR Prepared by KSHIP and submission of DPR 1Tumkur Koratagere Madhugiri Pavagada Section B Consultancy service for preparation of FS and DPR including all necessary survey and investigations for widening to two lane with paved shoulders 1 Pavagada Kalyanadurga Veparalla Andra Border Road |
NIT12 retender |
23/12/2017 |
23/12/2017
|
06/01/2018
Time
11:0Hrs
|
|
427 |
A Consultancy service for review and updating of available FS and DPR Prepared by KSHIP and submission of DPR 1Tumkur Koratagere Madhugiri Pavagada Section B Consultancy service for preparation of FS and DPR including all necessary survey and investigations for widening to two lane with paved shoulders 1 Pavagada Kalyanadurga Veparalla Andra Border Road |
NIT12 retender |
23/12/2017 |
23/12/2017
|
06/01/2018
Time
11:0Hrs
|
|
428 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa- Galkund- Samghan- Saputara- Maharashtra Border Section) in the State of Gujarat for up-gradation to Two/Four Lanes with paved shoulder configuration |
19of2017-18-1-1 |
22/12/2017 |
22/12/2017
|
27/12/2017
Time
18:0Hrs
|
|
429 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R29SML. |
7640-7739,13-12-2017 |
15/12/2017 |
19/12/2017
|
13/01/2018
Time
15:0Hrs
|
|
430 |
Consultancy Services for preparation of Detailed Project Report for the Improvement of Road safetyat the following location on NH-15 under Road Safety Annual Plan 2017-18 under Rangia NH Division in the State of Assam- 1) Improvement of Road safety in km 5 to km 6 of NH-15 near Bezera from bus-bays, drain-cum-footpath, road signs/markings, improvement of junction etc . 2) Improvement of Road safety in km 50 to km 52 through improvement of junction, bus-bays, pedestrian facilities, road signs/mar |
CE PWD NH (RS) 1 |
16/12/2017 |
16/12/2017
|
25/12/2017
Time
16:0Hrs
|
|
431 |
Consultancy services for preparation of DPR on EPC mode for impmt of Rd TLL from Km 57pt00 to Km 70pt00 from new to Cl9 Specn and Mahwere sapi rd from Km 30pt00 to Km 42 |
CE(P)PSK-12 OF 2017-18 |
23/12/2017 |
13/12/2017
|
04/01/2018
Time
10:0Hrs
|
|
432 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD DAMDIM-ALGARAH-RISHI FROM KM 71.00 TO KM 92.60 (NET LENGTH 21.60 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN WEST BENGAL STATE |
CE(P) SWTK/34/2017-2018 |
12/12/2017 |
12/12/2017
|
10/01/2018
Time
15:0Hrs
|
|
433 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh Package No. HP/Shahpur/R/2. |
287-SESHA-2017 |
11/12/2017 |
12/12/2017
|
02/01/2018
Time
15:0Hrs
|
|
434 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R-1/9) |
287-SESHA-2017 |
11/12/2017 |
12/12/2017
|
02/01/2018
Time
15:0Hrs
|
|
435 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/27) |
287-SESHA-2017 |
11/12/2017 |
12/12/2017
|
02/01/2018
Time
15:0Hrs
|
|
436 |
Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for construction of Road Nampong-Vijaynagar from Km 30.000 To Km 213.000 (Appx length 183 Km) to NHDL specifications under 752 BRTF of PROJECT UDAYAK in Arunachal Pradesh State |
CE(P) UDAYAK/20/2017-18 |
01/12/2017 |
12/12/2017
|
14/02/2018
Time
12:0Hrs
|
|
437 |
A Consultancy service for Proof checking of available FS and DPR with KSHIP and submission of Feasibility study DPR Survey for widening to two lane with paved shoulders a Tumkur Koratagere Madhugiri Pavagada B Consultancy service for Proof checking Feasibility study DPR Survey and Preparation of Land plan by adopting LIDAR or similar technology for widening to two lane with paved shoulders b Pavagada Kalyanadurga Veparalla Andra Border Road |
EE NHD TMK NIT12 2017 18 |
12/12/2017 |
11/12/2017
|
22/12/2017
Time
11:0Hrs
|
|
438 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of part of road stretch Dungargarh-Sardarshahr-Taranagar-Rajgarh-Bahal-Ovara-Kairu-Lohani which falls in the State of Haryana. |
PWD/HR/PKL/21 |
09/12/2017 |
09/12/2017
|
05/02/2018
Time
11:0Hrs
|
|
439 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of part of road stretch Jurhera-Palwal which falls in the State of Haryana. |
PWD/HR/PKL/22 |
09/12/2017 |
09/12/2017
|
05/02/2018
Time
11:0Hrs
|
|
440 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of part of road stretch Nathusari-Bhadara-Sindhmukh-Malsisar-Jhunjhunu-Gudha-Udaipurwati which falls in the State of Haryana. |
PWD/HR/PKL/23 |
09/12/2017 |
09/12/2017
|
05/02/2018
Time
11:0Hrs
|
|
441 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of Rajasthan/Haryana Border-Hisar in the State of Haryana. |
PWD/HR/PKL/24 |
09/12/2017 |
09/12/2017
|
05/02/2018
Time
11:0Hrs
|
|
442 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh Package No. HP/Shimla/R26SML. |
7293-7392,02-12-2017 |
09/12/2017 |
09/12/2017
|
30/12/2017
Time
15:0Hrs
|
|
443 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R30SML. |
7293-7392,02-12-2017 |
09/12/2017 |
09/12/2017
|
30/12/2017
Time
15:0Hrs
|
|
444 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R33SML. |
7293-7392,02-12-2017 |
09/12/2017 |
09/12/2017
|
30/12/2017
Time
15:0Hrs
|
|
445 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-64 between Km. 127/740 to 386/020 (Mahisagar River - Dabha Circle - Jambusar - Amod - Bharuch - Ankleshwar - Hasot - Vadoli – Sandhier - Surat - Navsari - Dandi Section) in the State of Gujarat for up gradation to Two/Four lane with paved shoulder configuration |
19of2017-18-2 |
08/12/2017 |
08/12/2017
|
27/12/2017
Time
18:0Hrs
|
|
446 |
Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa- Galkund- Samghan- Saputara- Maharashtra Border Section) in the State of Gujarat for up-gradation to Two/Four Lanes with paved shoulder configuration |
19of2017-18-1 |
08/12/2017 |
08/12/2017
|
20/12/2017
Time
18:0Hrs
|
|
447 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the road stretches from Sohela-Bijepur-Barpali-Naikenpali-Binka-Sardhanpali-Sonepur (Declared as New National Highways) in the State of Odisha |
10 CE-NH-17-18 |
05/12/2017 |
05/12/2017
|
26/12/2017
Time
17:0Hrs
|
|
448 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for construction of roads of NH standard(2-Lane) with major bridges over river Brahmaputra, Subansiri,Khabalu&Lohit along the alignment from Sivasagar-Desangmukh-Tekeliphuta-Dhakuakhana-North Lakhimpur-Majuli-Jorhat in the state of Assam. |
CE PWD NH 5 |
01/12/2017 |
03/12/2017
|
11/02/2018
Time
11:0Hrs
|
|
449 |
Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for construction of Road Nimmu-Chilling-Niraq-Padam-Shinkunla sub sector of road Nimmu-Padam-Darcha from km 0.00 (Nimmu) to km 259.00 (Shinkunla) to NHDL specification except between km 0.00 to km 45.00 and km 124.70 to km 176.70 (total length 162 km) under 762 BRTF of Project Vijayak in Leh Ladakh Region of Jammu and Kashmir State |
CE(P)VIJAYAK/21/2017-18 |
24/11/2017 |
02/12/2017
|
01/01/2018
Time
14:0Hrs
|
|
450 |
Consultancy services for preparation of Detailed Project Report for Srivilliputhoor – Sivakasi – Virudhunagar – Aruppukottai – Thiruchuli – Parthibanoor (Package No. NH-TVL/1, Category-II) for upgradation to to Two lane with paved shoulder/ Four lane configuration |
TN No. 16/2017-18/ DO/ dated 28.11.2017 |
05/12/2017 |
01/12/2017
|
18/12/2017
Time
11:0Hrs
|
|
451 |
CONSULTANCY SERVICE FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD BARMER-CHOHTAN-KELNOR FROM KM 8.150 TO KM 91.000 (NET LENGTH 82.85 KM) FROM EXISTING IW/CL-9 SPECIFICATION TO NHDL SPECIFICATION IN 45 BRTF AREA UNDER PROJECT CHETAK IN RAJASTHAN STATE |
CE (P) CTK/16/2017-18 |
30/11/2017 |
30/11/2017
|
02/01/2018
Time
11:30Hrs
|
|
452 |
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT FOR GREEN FIELD ALIGNMENT, STRETCH FROM MARA TO YANGPHO (I.E., BET KM 41.00 TO KM 95.00 OF SEPPA-SARLI ROAD) IN STATE OF ARUNACHAL PRADESH UNDER PROJECT ARUNANK. |
ANK/NIT-10/2017-18 (RE-TENDER) |
28/11/2017 |
30/11/2017
|
10/01/2018
Time
17:0Hrs
|
|
453 |
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD RISHI-RONGLI-KUPUP FROM KM 38.00 TO KM 87.00 (NET LENGTH 49.00 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN SIKKIM STATE |
CE(P)/SWTK/33/2017-18 |
29/11/2017 |
30/11/2017
|
29/12/2017
Time
12:0Hrs
|
|
454 |
Consultancy Services for preparation of DPR |
CE(P) DPK/09/2017-18 |
29/11/2017 |
30/11/2017
|
13/01/2018
Time
17:0Hrs
|
|
455 |
Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam |
NHAI/11012/ Guwahati Bypass/ DPR /NE/2017 |
30/11/2017 |
29/11/2017
|
28/12/2017
Time
15:0Hrs
|
|
456 |
CONSULTANCY SERVICES FROM MORT&H / INFRACON EMPANELLED FIRM FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR IMPROVEMENT OF ROAD SRINAGAR – BARAMULLA – URI (NH-1) FROM KM 14.200 TO KM 47.200 TO NH FOUR LANE SPECIFICATIONS, FROM KM 47.200 TO KM 57.800 TO NH FOUR LANE SPEFCIFICATIONS (BARAMULLA BYE PASS) AND FROM KM 57.800 TO KM 101.00 TO NH DOUBLE LANE SPECIFICATION WITH PAVED SHOULDER (10 MTR CARRIAGE WAY) IN THE AOR OF 53 RCC UNDER 760 BRTF (P) BEACON IN JAMMU & KASHMIR STATE |
CE (P) BCN/07/2017-18 |
28/11/2017 |
29/11/2017
|
31/01/2018
Time
12:0Hrs
|
|
457 |
Preparation of Detailed Project Report for Palani – Dharapuram road |
TN .No. 36/2017/DO Dt. 22.11.2017 |
27/11/2017 |
27/11/2017
|
08/01/2018
Time
15:0Hrs
|
|
458 |
CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR USING LiDAR TECHNOLOGY FOR CONSTRUCTION IMPROVEMENT OF EXISTING ROAD MAHECHUSUL TO NHDL SPECIFICATIONS FROM KM 0.00 TO KM 77.625 NET LENGTH KM 77.625 IN THE STATE OF LEH LADAKH REGION OF JAMMU AND KASHMIR |
CE (P) HIMANK/25/2017-18 |
22/11/2017 |
24/11/2017
|
02/01/2018
Time
10:0Hrs
|
|
459 |
CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR ON USING LiDAR TECHNOLOGY FOR CONSTRUCTION / IMPROVEMENT OF EXISTING ROAD KARU-TANGTSE TO NHDL SPECIFICATION FROM KM 20.00 TO KM 81.600 (NET LENGTH 61.600 KM) IN 753 BRTF UNDER PROJECT HIMANK IN LEH-LADAKH REGION OF J&K STATE |
CE(P)HMK/24/2017-18 |
20/11/2017 |
21/11/2017
|
15/12/2017
Time
10:0Hrs
|
|
460 |
Consultancy Services for Preparation of Detailed Project Report for Construction of Four Laning of Rajauli- Bakhtiyarpur section from Km 47.723 to Km 154.500 of NH-31 in the State of Bihar |
NHAI/BH/Rajauli-Bakh/DPR/2017 |
21/11/2017 |
17/11/2017
|
08/12/2017
Time
15:0Hrs
|
-
|
461 |
SURVEY, INVESTIGATION AND PREPARATION OF DETAILED PROJECT REPORT FOR IMPROVEMENT OF ROAD TATO MENCHUKA FROM KM 0.00 TO KM 50.00 TO NH DOUBLE LANE SPECIFICATIONS THROGH CONSULTANCY IN WEST SIANG DISTT OF ARUNACHAL PRADESH UNDER PROJECT BRAHMANK |
CE (P) BRAHMANK/22/2017-18 |
15/11/2017 |
17/11/2017
|
30/01/2018
Time
11:0Hrs
|
|
462 |
TECHNICAL CONSULTANT FOR PREPARATION OF DETAILED PROJECT REPORT INCLUDING PRE-CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF A ROAD TUNNEL WITH ITS APPROACHES INCLUDING JUNCTION WITH DWARKA EXPRESSWAY FOR WESTERN CONNECTIVITY TO IGI AIRPORT FROM DWARKA EXPRESSWAY IN THE STATE OF DELHI. |
NHAI/ PIU DWARKA/ IGIA Tunnel/ RFP |
17/11/2017 |
17/11/2017
|
11/12/2017
Time
11:0Hrs
|
|
463 |
Consultancy Services for Preparation of Feasibility Study and DPR for 4-lane Elevated Section at Ch. 221.910 to 224.935 on NH-31, 4-lane Elevated section of Shivala – Bihta section at Ch. 16.050 to 29.500 of NH-30 and 4-lane Elevated section at Gopalganj Ch. 384.483 to 386.362 on NH-28. |
NHAI/BH/Elevated/DPR/2017/Proc |
23/11/2017 |
15/11/2017
|
06/12/2017
Time
11:0Hrs
|
|
464 |
SURVEY, INVESTIGATIN AND PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION IMPROVEMENT OF ROAD ALONG YINKION FROM KM 65.00 TO KM 118.800 TO NHDL SPECIFICATION UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH |
CE (P) BRAHMANK/21/2017-18 |
11/11/2017 |
13/11/2017
|
30/12/2017
Time
11:0Hrs
|
|
465 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri & b). Widening to Two lane with Paved Shoulders for Cherkala – Kalladaka in the State of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 01/3rd Call/2017-18/ |
13/11/2017 |
13/11/2017
|
17/11/2017
Time
16:0Hrs
|
-
|
466 |
Consultancy services for preparation of FS and DPR for fly over between km 7.30 to Km 8.05 on Srinagar Baramulla Uri road under Project Beacon in Jammu and Kashmir State |
CE (P)BCN/02/2016-17 |
10/11/2017 |
10/11/2017
|
11/12/2017
Time
12:0Hrs
|
|
467 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities (1) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zojila Tunnel between (between Baltal and Minamarg) from km 82.00 to km 95.00 on Srinagar-Leh road (NH-1) and (2) For making the NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu and Kashmir |
NHIDCL/JandK/ Zojila-Approach Road/DPR/NH-1/2017 |
09/11/2017 |
09/11/2017
|
06/02/2018
Time
17:0Hrs
|
|
468 |
SURVEY INVESTIGATION PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD DITTE-DIMME-MIGGING FROM KM 0.00 TO KM 191.00 TO NHDL STANDARD THROUGH CONSULTANCY IN ARUNACHAL PRADESH UNDER PROJECT BRAHMANK |
CE(P)BRAHMANK/20 OF 2017-18 |
06/11/2017 |
09/11/2017
|
11/12/2017
Time
10:0Hrs
|
|
469 |
Feasibility Study/Preparation of Detail Engineering report for Construction of two lane with paved Shoulder for in-principle approved National Highway Stretch from (i) Mathura – Goverdhan Deeg – Nagar Length = 31.00 Km (ii) Agra – Jagner Masalpur Length = 33.00 Km (iii) Jurhara – Palwal Length = 3.00 Km and (iv) Kalwar to Jaipur Ring Road Length = 14.00 Km (Total Length = 81.00 Km) for Package No. 6 |
NIT 03/2017-18 Ce (NH) PWD Rajasthan, Jaipur Package 6 |
08/11/2017 |
08/11/2017
|
28/11/2017
Time
11:0Hrs
|
|
470 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from 2-lane/4-lane to 4-lane from km. 0.00 to 16.00 (Herbertpur to Kalsi) on NH-123(New No. 507) |
3678/13yata-NH-10/2017 dated 02.11.17 |
08/11/2017 |
08/11/2017
|
20/12/2017
Time
15:0Hrs
|
|
471 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 200.00 to 235.00 (Diwalikhal to Karanprayag) on NH-87Ext(New No. 109) |
3678/13yata-NH-10/2017 dated 02.11.17 |
08/11/2017 |
08/11/2017
|
20/12/2017
Time
15:0Hrs
|
|
472 |
Consultancy Services for preparation of GAD including preparation of DPR for (Construction & Widening) of ROB (Existing Railway Portion & approach) at Km 76 of NH-116 (Swaimadhopur) including detailed engineering survey and all geotechnical investigation Topography survey of area & working drawings, design, Estimating and BOQ & preparation of working drawings ad per scope of work governed by the ToR of the MoRTH and proof checking from MNIT & approval from Railway & IAHE |
NIT 01/2017-18 SE PWD NH Circle, Jaipur Sr No. 2 |
08/11/2017 |
08/11/2017
|
30/11/2017
Time
11:0Hrs
|
|
473 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for Shahpura-Alwar-Ramgarh-Nuh Road (NH-248A) From Km 86/800 to 127/700 (Length-49.90 km) (Distt. Jaipur, Alwar) |
NIT 01/2017-18 SE PWD NH Circle, Jaipur |
07/11/2017 |
07/11/2017
|
30/11/2017
Time
11:0Hrs
|
|
474 |
Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram & Nagaland under Bharatmala Pariyojana (Lot-2) |
NHIDCL/Bharatmala/DPR/Phase-I/Lot-2/2017 |
01/11/2017 |
01/11/2017
|
23/11/2017
Time
11:0Hrs
|
|
475 |
Consultancy Services for Feasibility Study, Detailed Project Report, including conducting site investigation, subsoil exploration, testing, preparation of plans, designs, Land plans, GAD and EPC Schedules for proposed Bypass on NH86-Ext Bhopal Sanchi Sagar Road due to submergence of the road from km 135/35 to km 137/4 by the Bina Complex Irrigation multipurpose project in the state of Madhya Pradesh |
22/SAC/2017-18 |
07/11/2017 |
30/10/2017
|
21/11/2017
Time
17:30Hrs
|
|
476 |
KOTA RAWATBHAT, LAKHERI ITAWA UNIYARA INDRAGARH |
PWDNHCENITNO03 |
30/10/2017 |
30/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
477 |
BARAN MANGROL SHEOPUR MP RAJASTHAN BORDER PARON FATEHGARH GUNAAND TIKAMGARH GULGANJ FROM JUNCTION OF NH 752 NEAR KAWAL CONNECTING CHHABRA AND TERMINATING AT NH 46 NEAR SAD COLONY |
CEPWDNITNO03 |
30/10/2017 |
30/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
478 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package I |
NHIDCL/Bharatmala/DPR/Lot-1/Package-I/2017 |
30/10/2017 |
30/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
479 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package II |
NHIDCL/Bharatmala/DPR/Lot-1/Package-II/2017 |
30/10/2017 |
30/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
480 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package III |
NHIDCL/Bharatmala/DPR/Lot-1/Package-III/2017 |
30/10/2017 |
30/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
481 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package IV |
NHIDCL/Bharatmala/DPR/Lot-1/Package-IV/2017 |
30/10/2017 |
30/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
482 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package V |
NHIDCL/Bharatmala/DPR/Lot-1/Package-V/2017 |
30/10/2017 |
30/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
483 |
Consultancy Services for project management including preparation of Detailed Project Report of selected stretches of National Highways/State Roads (approved “In Principle” for Declaration as National Highways) in the state of Andhra Pradesh for Up Gradation to Two/Four lane with paved shoulder configuration from Junction with NH 216 near Narsapuram - Sakhinetipalli-Malkipuram upto junction with NH 216 near Razole along with construction of new bridge between Narsapuram and Sakhinetipalli (380 |
NIT No. S E(R&B)/NH/VJA/Tender/06/ 2017-18, Dt. 25.10.2017 |
01/12/2017 |
30/10/2017
|
08/12/2017
Time
17:0Hrs
|
|
484 |
Consultancy Services for project management including preparation of Detailed Project Report of selected stretches of National Highways/State Roads (approved “In Principle” for Declaration as National Highways) in the state of Andhra Pradesh for Up Gradation to Two/Four lane with paved shoulder configuration from Junction with NH 216 near Narsapuram - Sakhinetipalli-Malkipuram upto junction with NH 216 near Razole along with construction of new bridge between Narsapuram and Sakhinetipalli (380 |
SE/R&B/NH VJA NIT No.06/2017-18, dt 25.10.2017 |
27/11/2017 |
30/10/2017
|
30/11/2017
Time
17:0Hrs
|
|
485 |
Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Stretch From Dungargarh-Sardarshar - Taranagar-Rajgarh-Bahal-Ovara-Kairu-Lohani (Length-180 Km). |
SE(NH)INIT/2016-2017/421D-1310 |
22/11/2017 |
28/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
486 |
Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Stretch From Nathusari-Bhadara-Sidhmukh -Sadulpur-Malsisar-Jhunjhunu-Gudha-Udaipurwati (Length- 200 Km). |
SE(NH)INIT/2016-2017/421D-1310 |
22/11/2017 |
28/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
487 |
Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for newly in principal approved National Highway Nachna-Ramdevra-Falsund-Baytu length 210 Km. |
NIT No.3/2017-18 CE NH PWD Rajasthan Jaipur Sr. No.7 |
08/11/2017 |
26/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
488 |
Consultancy Services for Feasibility study/Detailed Engineering report for construction of two lane with paved shoulder for newly proposed national highway From Mandsaur connecting Pratapgarh, Dhariyawad, Salumber and terminating at Junction of NH-927A near Dungarpur in In Km 108/0 to 160/0 (including Aspur, Punjpur, Punali and Other Bypasses ) Length 52.00 Km |
NIT 03/2017-18 Package-01 |
25/11/2017 |
26/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
489 |
Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway (i) Marwar Junction Kamlighat (Length 50 Km) (ii) Sanderao Bali Sadri (Length 43 Km) (iii) Charbhuja Gomati Choraha (Length 9 Km) Total Length 102 Km |
CE (NH) PWD Raj Jaipur NIT No 03 of 2017-18 |
29/10/2017 |
26/10/2017
|
27/11/2017
Time
11:0Hrs
|
|
490 |
Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Sojat Siriyari Desuri Km 93 Distt Pali |
CE (NH) PWD Raj Jaipur NIT No 03 of 2017-18 |
29/10/2017 |
26/10/2017
|
28/11/2017
Time
11:0Hrs
|
|
491 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of In-principle declared National Highways in the State of Gujarat (2nd Try) |
12 of 2017-18 (2nd Try) |
08/11/2017 |
25/10/2017
|
16/11/2017
Time
18:0Hrs
|
|
492 |
Package for Consultancy services for Authoritys Engineer for supervision of Civil Construction work for proposed 4lane ROB and its approaches in existing Level Crossing lieu of 23 SPL Class at Km 3 18ASPL class at Km 7 on NH18 in the State of Andhra Pradesh under EPC Mode |
SE R and B NIT NO 31 |
23/10/2017 |
23/10/2017
|
04/12/2017
Time
15:0Hrs
|
|
493 |
Package for Consultancy services for Authoritys Engineer supervision of Civil Construction work for proposed 4lane ROBs and its approaches in existing Level Crossing 1 lieu of 95SPL3E at Km 272 lieu of 102E at Km 281 on NH205 in the State of Andhra Pradesh under EPC Mode. |
SE R and B NIT NO 33 |
23/10/2017 |
23/10/2017
|
19/12/2017
Time
15:0Hrs
|
|
494 |
Package for Consultancy services for Authority’s Engineer supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossing (i)in lieu of 67at Km 133/200 (ii) in lieu of 75 at Km 145/200 (iii)in lieu No 95 at Km 183/600 on NH-205 in the State of Andhra Pradesh under EPC Mode |
SE NH ATP NIT No 32 |
26/10/2017 |
23/10/2017
|
19/12/2017
Time
15:0Hrs
|
|
495 |
Package for Consultancy services for Authoritys Engineer supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossing (i) lieu of 124E/SPL3 at Km 1/8 & (ii) 30/E at Km 64/800on NH-205 in the State of Andhra Pradesh under EPC Mode |
SE NH ATP NIT No 34 |
26/10/2017 |
23/10/2017
|
19/12/2017
Time
15:0Hrs
|
|
496 |
Package for Consultancy services for Authority’s Engineer supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossing (i) in lieu of 45 C- Class at Km 93.400 & (ii) in lieu of 48E/C at Km 96.800 on NH-205 in the State of Andhra Pradesh under EPC Mode |
SE NH ATP NIT No 35 |
26/10/2017 |
23/10/2017
|
19/12/2017
Time
15:0Hrs
|
|
497 |
Consultancy services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Zunheboto and from Chazuba to Meluri via Thevopheshu. (NH 702A) (2nd Call) |
CE/NH/etender/2017-18/08/01 |
20/10/2017 |
20/10/2017
|
24/11/2017
Time
12:0Hrs
|
|
498 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Showuba-Guzunyu-Pughoboto-Zunheboto-Aghunato-Noklak-Pangsha- 2nd Call |
CE/NH/etender/2017-18/08/02 |
20/10/2017 |
20/10/2017
|
24/11/2017
Time
12:0Hrs
|
|
499 |
Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Trans Eastern Highway from Mon-Longwa-Pangsha-Kiphire-Avangkhu- 2nd Call. |
CE/NH/etender/2017-18/08/03 |
20/10/2017 |
20/10/2017
|
24/11/2017
Time
12:0Hrs
|
|
500 |
Consultancy services for engagement of consultant for preparation of DPR for construction of road Tangmarg Badrakut Penjanpatri Basamgali Jamaigali under 760 BRTF |
CE (P)/ BCN/20/2016-17 |
18/10/2017 |
18/10/2017
|
02/11/2017
Time
12:30Hrs
|
|
501 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of in principle declared National Highway from Kamalpur to Santirbazar (on NH-8) via Ambassa (on NH-8), Gandacherra, Amarpur (on NH-208) and Santirbazar to Belonia in the state of Tripura. |
PNIT No.07/SE/NH Circle/PWD(NH)/2017-18 |
16/10/2017 |
16/10/2017
|
06/12/2017
Time
15:0Hrs
|
|
502 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of in principle declared National Highway from -(i) Champaknagar (Jirania) on NH-8 to Udaipur on NH-8 via Jampuijala, (ii) Amarpur on NH-208 to Udaipur on NH-8 in the state of Tripura.. |
08/SE/NH Circle/PWD(NH)/2017-18 |
17/10/2017 |
16/10/2017
|
19/12/2017
Time
15:0Hrs
|
|
503 |
Consultancy services for engagement of consultant for preparation of DPR for construction of road Tangmarg Badrakut Penjanpatri Basamgali Jamaigali under 760 BRTF |
CE (P)/ BCN/20/2016-17 |
12/10/2017 |
12/10/2017
|
12/10/2017
Time
14:0Hrs
|
|
504 |
Consultancy Services for Appointment of Technical Consultant for Carrying out Feasibility Study and Preparation of DPR for Augmentation of Tambaram (km.28/000)-Tindivanam (Km.121/000) Section of NH-45 in the State of Tamil Nadu under NHDP Phase-V (3rd call). |
NHAI/11012/DPR/TT/RFP/2017 |
21/10/2017 |
11/10/2017
|
27/11/2017
Time
11:0Hrs
|
|
505 |
DPR for construction of Bypass (Bagalur town) in NH 207 (New NH 648) |
TNNo.9/17-2018/NH/DO/dt 05.10.2017 |
11/10/2017 |
11/10/2017
|
24/10/2017
Time
15:0Hrs
|
|
506 |
Consultancy Services for Feasibility study Detailed project report including conducting site investigation subsoil exploration and testing preparation of plans designs land plan schedules and preparation of GAD for the Bypass Roads for the four towns of V Kota and Chittoor in Chittoor District Badvel in Kadapa District and Adoni in Kurnool District 4th call |
Consultancy Services for Feasibility study Detailed project report including conducting site investigation subsoil exploration and testing preparation of plans designs land plan schedules and preparation of GAD for the Bypass Roads for the four towns of V Kota and Chittoor in Chittoor District Badvel in Kadapa District and Adoni in Kurnool District 4th call |
06/10/2017 |
09/10/2017
|
27/11/2017
Time
15:0Hrs
|
|
507 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed Two lane road from Junction of NH-627 near Baithalangso-Bichitur-Ulukunchi- Umpanai-Assam/Meghalaya Border under Nagaon NH Division in the State of Assam. |
CE PWD NH 2 (R2) |
07/10/2017 |
07/10/2017
|
13/12/2017
Time
16:0Hrs
|
|
508 |
a).Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg Panathur Bagamandala Madikeri |
EE/NHD/MNG/AE2/Consultancy/NIT 01/3rd Call/2017-18 |
27/10/2017 |
07/10/2017
|
07/11/2017
Time
16:0Hrs
|
-
|
509 |
Consultancy services for flyover bet Km 7.3 to Km 8.05 on Srinagar-Baramulla-Uri rd |
CE (P)BCN/02/2016-17 |
06/10/2017 |
06/10/2017
|
16/10/2017
Time
12:30Hrs
|
|
510 |
Consultancy services for feasibility study, preparation of DPR & preconstruction services for newly declared NH 701 on Rd Rafiabad-Kupwara-Chowkibal-Tangdhar-Chamkot |
CE (P) BCN/19/2016-17 |
06/10/2017 |
06/10/2017
|
16/10/2017
Time
12:0Hrs
|
|
511 |
Engaging Technical Consultant for preparation of FS DPR on EPC mode for impvt of road Rajouri Thanamandi Surankot from Km 3.900 to Km 56.915 from existing Cl 9 specification to NHDL specification under 31 BRTF area under Project Sampark in J and K State |
CE (P) SPK/15/2017-18 |
06/10/2017 |
06/10/2017
|
31/10/2017
Time
12:0Hrs
|
|
512 |
Consultancy Services for preparation of Detailed Project Report of improvement to Blackspot at Km 218/0 to 220/0 of NH 67 |
TN.No.14/ DO/ 2017-18/ Dt.03.10.2017 |
06/10/2017 |
06/10/2017
|
23/10/2017
Time
15:0Hrs
|
|
513 |
CONSULTANCY SERVICE FOR CARRYING OUT FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT FOR GREEN FIELD ALIGNMENT STRETCH FROM MARA TO YANGPHO (i.e., BET KM 41 TO 95 OF SEPA -SARLI ROAD) IN STATE OF ARUNACHAL PRADESH UNDER PROJECT ARUNANK |
ANK/TENDER -10/2017-18 |
05/10/2017 |
05/10/2017
|
10/11/2017
Time
17:0Hrs
|
|
514 |
CONSULTANCY SERVICES FOR REVISION OF MINISTRY’S SPECIFICATIONS (FIFTH REVISION, 2013), POCKETBOOK FOR HIGHWAY ENGINEERS (2ND REVISION, 2002) AND POCKETBOOK FOR BRIDGE ENGINEERS (1ST REVISION, 2000) |
RW/NH-35076/02/2017-S&R (R) |
29/09/2017 |
29/09/2017
|
09/11/2017
Time
10:30Hrs
|
|
515 |
Consultancy Services for Soil Stability on Kaladan Multi Modal Transit Transport Project on NH-502A in Mizoram (99.83 km) |
RE-NIT No.2/RFP/CE-HW/2017-2018 |
03/10/2017 |
29/09/2017
|
13/10/2017
Time
15:0Hrs
|
|
516 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh (Package No. HP/Shahpur/R/22) |
283-SESHA-2017 |
26/09/2017 |
29/09/2017
|
13/11/2017
Time
15:0Hrs
|
|
517 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh (Package No. HP/Shahpur/R/23) |
283-SESHA-2017 |
27/09/2017 |
29/09/2017
|
13/11/2017
Time
15:0Hrs
|
|
518 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh (Package No. HP/Shahpur/R/24) |
283-SESHA-2017 |
27/09/2017 |
29/09/2017
|
13/11/2017
Time
15:0Hrs
|
|
519 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh (Package No. HP/Shahpur/R/25) |
284-SESHA-2017 |
27/09/2017 |
29/09/2017
|
13/11/2017
Time
15:0Hrs
|
|
520 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh (Package No. HP/Shahpur/R/26) |
284-SESHA-2017 |
27/09/2017 |
29/09/2017
|
13/11/2017
Time
15:0Hrs
|
|
521 |
Consultancy Services for preparation of DPR for bypass/ring roads around Gorakhpur, Bareilly, Moradabad,Kanpur and Ayodhya in the State of Uttar Pradesh under NHDP Phase-VII |
Ring Roads Bypassess/UP/NHDP/Ph-VII |
28/09/2017 |
28/09/2017
|
23/11/2017
Time
11:0Hrs
|
|
522 |
Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lane with Paved Shoulders A) From Chinthamani NH-69 Chelur Rayachervu Tanakal AP NH 42 B) From Kuppam on NH 42 AP Kolar on NH 75 Karnataka length in AP 25kms and Karnataka 40 Kms C) From Madakasira Rolla AP Karnataka border Sire in the state of Karnataka Total length 67 Kms, AP 38 Kms Karnataka 29 Kms D) Mulabagalu Tayalur from Km 0.00 to 24.00 2 |
04/2017-18 DT 25-09-2917 |
27/09/2017 |
27/09/2017
|
31/10/2017
Time
16:0Hrs
|
|
523 |
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of new 6-lane Flyover at Ainthapalli Junction on NH-6 in Sambalpur |
NHAI/11013/13/RO/OD/2017 |
26/09/2017 |
21/09/2017
|
23/10/2017
Time
11:0Hrs
|
-
|
524 |
SURVEY, INVESTIGATION AND PREPARATION OF DETAILED PROJECT REPORT FOR IMPROVEMENT OF ROAD TATO-MENCHUKA FROM KM 0.00 TO 50.00 TO NH DOUBLE LANE SPECIFICATIONS IN WEST SIANG DISTT OF ARUNACHAL PRADESH UNDER 1443 BBC/44 BRTF/ PROJECT BRAHAMNK |
CE (P) Brahmank/19/2016-17 |
20/09/2017 |
21/09/2017
|
11/10/2017
Time
10:0Hrs
|
|
525 |
Consultancy Services for preparation of Detailed Project Report for Construction of 1600 mtr span Double Lane Bridge with footpaths on both sides including approaches on both sides of approx. length 2.6 km over River Chenab at Sajwal Paragwal Indrapattian at Jourian in Distt Jammu J&K under CRF |
e-NIT No. 114 of 2017-18 Dated 16 .09.2017 |
27/09/2017 |
18/09/2017
|
09/10/2017
Time
16:0Hrs
|
|
526 |
Consultancy servrces tor, feasibility study. detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH- 150A near Molkahnur-Rayadurga-Anthapura Junction at NIH -44 road |
EE/NHD/CTA/AE/CS/NIT//2017-18/ 861 |
18/09/2017 |
18/09/2017
|
03/10/2017
Time
11:0Hrs
|
|
527 |
Preparation of Detailed Project Report for Construction of flyover at Km. 599/0-601/0 (Kaliyakavilai) of NH 47 |
07/2017-18/ DO/ dated 11.09.2017 |
18/09/2017 |
18/09/2017
|
03/10/2017
Time
11:0Hrs
|
|
528 |
Consultancy work for preparation of Detailed Project Report for construction of 1600 mtr span Double Lane Bridge with footpaths on both sides including approaches on both sides of approx. length 2.6 km. over River Chenab at Sajwal (Paragwal - Indrapattian) at Jourian in Distt. Jammu, J and K under CRF |
e-NIT No. 114 of 2017-18 Dated 16 .09.2017 |
11/10/2017 |
18/09/2017
|
16/10/2017
Time
16:0Hrs
|
|
529 |
HQ CE (P) BRAHMANK |
CE P BRAHMANK 19 2017 2018 |
15/09/2017 |
17/09/2017
|
09/10/2017
Time
9:0Hrs
|
|
530 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/R29sml |
HP/Shimla/R29Sml |
16/09/2017 |
16/09/2017
|
10/10/2017
Time
15:0Hrs
|
|
531 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/R30sml |
HP/Shimla/R30Sml |
16/09/2017 |
16/09/2017
|
10/10/2017
Time
15:0Hrs
|
|
532 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No.HP/Shimla/R31sml |
HP/Shimla/R31Sml |
16/09/2017 |
16/09/2017
|
10/10/2017
Time
15:0Hrs
|
|
533 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No.HP/Shimla/R32sml |
HP/Shimla/R32Sml |
16/09/2017 |
16/09/2017
|
10/10/2017
Time
15:0Hrs
|
|
534 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No.HP/Shimla/R33sml |
HP/Shimla/R33Sml |
16/09/2017 |
16/09/2017
|
10/10/2017
Time
15:0Hrs
|
|
535 |
Consultancy Services For Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two Lane with Paved Shoulders For Manipal to Karkala and from Ramasmudra to Punjalkatte and from Belthangadi - Shiradi Via Dharmasthala, Periyashanthi and Gundya to Subramanya in the state of Karnataka |
EE/NHD/MNG/JE/Consultancy/NIT 21/3rd call/2017-18 |
15/09/2017 |
15/09/2017
|
22/09/2017
Time
16:0Hrs
|
-
|
536 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Shringeri – Agalagundi – Jayapur – Balehonnur – Hyrambi – Aldur - NadipurandKarkala – Moodabidri – Bc Road (Including Overlapping Stretch Of 19 Kms Of Existing NH-169 for a total length of 26.00 Kms)in the State of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 17/3rdCall/2017-18 |
15/09/2017 |
15/09/2017
|
22/09/2017
Time
16:0Hrs
|
-
|
537 |
ConsultancyServicesforPreparation of Detailed Project Report for Construction of Four Laning of Rajauli- Bakhtiyarpur section from Km 47.723 to Km 154.500 of NH-31 in the State of Bihar |
NHAI/BH/Rajauli- Bakh/DPR/2016 |
15/09/2017 |
14/09/2017
|
31/10/2017
Time
11:0Hrs
|
|
538 |
Consultancy Services for preparation of feasibility study and Detailed Project Report for 2- lanning with paved shoulder from Shangshak to Tengnoupal on NH-39 (102A – Extn) under NH(O) in the State of Manipur |
ACE-I/NH/Consultancy/2017-18/307 |
13/09/2017 |
13/09/2017
|
17/10/2017
Time
15:0Hrs
|
|
539 |
Consultancy Services for preparation of feasibility study and Detailed Project Report for 2-laning with paved shoulder from Imphal to Kakching Lamkhai on NH-137 A under NH(O) in the state of Manipur |
ACE-I/NH/Consultancy/2017-18/303 |
13/09/2017 |
13/09/2017
|
17/10/2017
Time
15:0Hrs
|
|
540 |
Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of (i) Margherita-Changlang in the state of Assam and Arunachal Pradesh (ii) Daporijo (Upper Subansiri) to Dollungmukh (Lower Subansiri) via Dumporijo in the state of Arunachal Pradesh (iii) Tezu-Chapakhowa Via Sunpura section in the state of Arunachal Pradesh and Assam under SARDP-NE on Engineering, |
NHIDCL/DPR/ MC-DD-TC/ Arunachal Pradesh /2017 |
18/09/2017 |
12/09/2017
|
15/12/2017
Time
16:30Hrs
|
|
541 |
Consultancy Services for Preparation of DPR for Additional Cross Drainage structures across water tank areas i.e Bridges, Culverts etc on the basis of Order of NGT & Revised MoEF Clearance for the section of Kerala / Tamil Nadu border to Villukkuri section from km 43/0 to km 70/250 of NH-47 and Villukuri to Kanyakumari from Km. 70.250 to Km. 96.714 section of NH-47 & Nagercoil to Kavalkinaru from Km. 0.000 to Km. 16.376 section of NH-47B under NHDP Phase-III in the State of Tamil Nadu on EPCmode |
NHAI/11012/DPR/Addl. Works/NH-47&47B/08/2017 (2nd Call) |
25/09/2017 |
12/09/2017
|
10/10/2017
Time
11:0Hrs
|
-
|
542 |
Consultancy services for feasibility study, Planning and Preparation of Detailed Project for reducing traffic congestion on NH 5 from Junction 38 RD No 4 03 Rotary near The Tribune to UT Boundary RD No 8 30 by providing signal free corridor which may include elevated highway construction of grade separated intersection at Junction 38 and other appropriate remedial measures for smooth flow of traffic along NH 5 |
CP1/2017/DPR 1 |
11/09/2017 |
11/09/2017
|
05/10/2017
Time
15:0Hrs
|
|
543 |
Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the States of Madhya Pradesh for up gradation to Two/Four lane with paved shoulder configuration under Package-I |
10066./MPRDC/NNH/DPR/2004/02/2017 |
09/10/2017 |
09/09/2017
|
08/11/2017
Time
17:30Hrs
|
|
544 |
Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the States of Madhya Pradesh for up gradation to Two/Four lane with paved shoulder configuration under Package-II |
10067./MPRDC/NNH/DPR/2004/02/2017 |
11/10/2017 |
09/09/2017
|
08/11/2017
Time
17:30Hrs
|
|
545 |
Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the States of Madhya Pradesh for up gradation to Two/Four lane with paved shoulder configuration under Package-III |
10068./MPRDC/NNH/DPR/2004/02/2017 |
11/10/2017 |
09/09/2017
|
08/11/2017
Time
17:30Hrs
|
|
546 |
Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the States of Madhya Pradesh for up gradation to Two/Four lane with paved shoulder configuration under Package-IV |
10069./MPRDC/NNH/DPR/2004/02/2017 |
11/10/2017 |
09/09/2017
|
08/11/2017
Time
17:30Hrs
|
|
547 |
Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam |
NHAI/11012/ Guwahati Bypass/ DPR /NE/2017 |
08/09/2017 |
07/09/2017
|
10/10/2017
Time
11:0Hrs
|
|
548 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-6) |
NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-6 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
549 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-1) |
NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-1 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
550 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-2) |
NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-2 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
551 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-3) |
NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-3 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
552 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-4) |
NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-4 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
553 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-5) |
NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-5 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
554 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-6) |
NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-6 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
555 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-7) |
NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-7 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
556 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-8) |
NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-8 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
557 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-1) |
NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-1 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
558 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-2) |
NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-2 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
559 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-3) |
NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-3 |
07/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
560 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-4) |
NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-4 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
561 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-5) |
NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-5 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
562 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-6) |
NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-6 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
563 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-7) |
NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-7 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
564 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-1) |
NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-1 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
565 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-2) |
NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-2 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
566 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-3) |
NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-3 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
567 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-4) |
NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-4 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
568 |
Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-5) |
NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-5 |
08/09/2017 |
06/09/2017
|
06/11/2017
Time
11:0Hrs
|
|
569 |
CONSULTING SERVICES FOR Preparation of DPR for Construction of Bridge at Km 186 of Madanapalli Naidupeta Road NH 71 2 Call |
SE R&B NIt NO 17 |
05/09/2017 |
05/09/2017
|
11/09/2017
Time
17:0Hrs
|
|
570 |
Preparation of Detailed Project Report for Palani – Dharapuram road |
TN .No. 25/2017/DO Dt. 24.08.2017 |
05/09/2017 |
05/09/2017
|
14/11/2017
Time
15:0Hrs
|
|
571 |
Preparation of Detailed Project Report for Construction of Theni Bypass road of NH49 Extn |
TN .No. 25/2017/DO Dt. 24.08.2017 |
05/09/2017 |
05/09/2017
|
20/10/2017
Time
15:0Hrs
|
|
572 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/19) |
281-SESHA-2017 |
30/08/2017 |
05/09/2017
|
26/09/2017
Time
15:0Hrs
|
|
573 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/20) |
281-SESHA-2017 |
30/08/2017 |
05/09/2017
|
26/09/2017
Time
15:0Hrs
|
|
574 |
Consultancy Services for preparation of DPR for improvement and widening to 2 lane with paved shoulder including geometric improvement of Churaibari - Agartala Section from Km 318.00 to Km 422.00 of NH-44 in Tripura / Portion from Km 343.00 to Km 397.00 for 54 Km. |
05/CE/PWD (NH)/BID/2017-18 |
04/09/2017 |
04/09/2017
|
03/01/2018
Time
15:0Hrs
|
|
575 |
“Consultancy Services for preparation of DPR of “2-Laning including paved shoulder of Assam/Meghalaya border – Bhoirymbong on Shillong bypass (Length – 18.00 Km) in the state of Meghalaya” |
PW/CE/NH/4/2017 |
06/09/2017 |
04/09/2017
|
18/12/2017
Time
15:15Hrs
|
|
576 |
Preparation of Detailed Project Report for Construction of flyover at Km. 599/0-601/0 (Kaliyakavilai) of NH 47 |
03/2017-18/ DO/ dated 13.07.2017 |
05/09/2017 |
01/09/2017
|
07/09/2017
Time
11:0Hrs
|
|
577 |
Preparation of Detailed Project Report for providing pedestrian subway at Km 628/10 of NH47 (Sunkan Kadai) |
03/2017-18/ DO/ dated 13.07.2017 |
05/09/2017 |
01/09/2017
|
07/09/2017
Time
11:0Hrs
|
|
578 |
Independent Engineer Services during Operation and Maintenance of Jodhpur – Pali Section of NH-65 from Km. 308.000 to Km.366.000 and including Bypass to Pali starting from Km. 366.000 of NH-65, Connecting NH - 14 at Km. 114.000 in the state of Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the DBFOT) Basis stage of selected road stretches under BOT projects in the State of Rajasthan |
NIT No 04 of 2017-18 SE NH PWD Jodhpur |
21/09/2017 |
28/08/2017
|
09/10/2017
Time
11:0Hrs
|
|
579 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from 2-lane/ 4-lane to 4-lane from km. 0.00 to 16.00 (Herbertpur to Kalsi) on NH-123 in the State of Uttarakhand |
2834/13 Yata-NH-10/2017 dated 21-08-2017 |
12/09/2017 |
25/08/2017
|
03/10/2017
Time
15:0Hrs
|
|
580 |
Consultancy Services for Preparation of Detailed Project Report for construction of flyover between km 7.30 to km 8.050 on road Srinagar – Baramulla – Uri in 53 RCC sector under 760 BRTF / Project Beacon in JK State (fourth call) |
CE (P) BCN/02/2016-17 |
24/08/2017 |
25/08/2017
|
26/09/2017
Time
12:0Hrs
|
|
581 |
CONSULTANCY SERVICES FROM MoRTH EMPANELLED FIRM FOR FEASIBILITY STUDY (FS), PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PRECONSTRUCTION SERVICES FOR NEWLY DECLARED NH-701 RAFIABAD – KUPWARA – CHOWKIBAL – TANGDHAR – CHAMKOT ROAD IN 109 RCC UNDER 32 BRTF PROJECT BEACON IN THE STATE OF JAMMU KASHMIR (RETENDER- FIFTH CALL) |
CE (P) BCN/19/2016-17 |
25/08/2017 |
25/08/2017
|
26/09/2017
Time
12:0Hrs
|
|
582 |
Consultancy Services for preparation of Feasibility Detailed Study / Detailed Project report for construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur Section from km. 165.40 to km. 190.587 on NH-54 of package AS-21 (Bal.) through New Alignment in the state of Assam on EPC mode |
NHAI/11015/AS-21 (Bal)/2011/NE |
08/09/2017 |
25/08/2017
|
05/10/2017
Time
11:0Hrs
|
|
583 |
Consultancy for preparation of Detailed Project Report for Srivilliputhoor – Sivakasi – Virudhunagar – Aruppukottai – Thiruchuli – Parthibanoor (Package No. NH-TVL/1, Category-II) to Two lane with paved shoulder/ Four lane configuration |
TN NO. 05/2017-18/ DO/ dated 22.08.2017 |
24/08/2017 |
24/08/2017
|
19/09/2017
Time
11:0Hrs
|
|
584 |
Proposal for carrying out feasibility study and detailed project report survey preparation of land plan for widening to two lane with paved shoulders of Basohli Bhaderwah Doda including Tunnel at Chattergala |
eNIT No. 38 of 2017 Dated 21.08.2017 |
11/09/2017 |
24/08/2017
|
23/10/2017
Time
15:0Hrs
|
|
585 |
Consultancy Services for DPR Survey and Preparation of Land Plan for upgradation of SH 57 into NH with Widening to two lane with paved shoulders from KM 432 to 584 connecting Chikkamagaluru Belur Hassan Holena rasipura Krishnarajnagar and Bilikere including 3 link roads NH in the State of Karnataka. |
No/EE/NHD/MNG/AE1/Consultancy/NIT05/2017-18 |
23/08/2017 |
23/08/2017
|
05/09/2017
Time
16:0Hrs
|
-
|
586 |
Consultancy Services for Preparation of Detailed Project Report for Up gradation to Two lane Four lane with Paved Shoulders configuration of part of the newly declared NH 516E from the junction on NH 16 near Rajahmundry to Bhupathipalem Road (Connecting SH38 near Rampachodavaram) in the state of Andhra Pradesh |
S ERBNHVJA Tender 04 2017 18 Dt 16 08 2017 |
11/09/2017 |
22/08/2017
|
21/09/2017
Time
15:0Hrs
|
|
587 |
Consultancy Services for preparation of Detailed Project Report including Pre-Construction activities for Construction of a Road Tunnel with its approaches including junction with Dwarka Expressway for western connectivity to IGI Airport from Dwarka expressway in the State of Delhi |
NHAI/ PIU DWARKA/ IGIA Tunnel/ RFP |
22/08/2017 |
21/08/2017
|
13/09/2017
Time
11:0Hrs
|
|
588 |
Consultancy Services for preparation of Detailed Project Report of improvement to Blackspot at Km 218/0 to 220/0 of NH 67 |
TN.No.12/ DO/ 2017-18/ Dt.17.08.2017 |
19/08/2017 |
19/08/2017
|
04/09/2017
Time
15:0Hrs
|
|
589 |
Preparation of DPR for “ in Principle” declared state Highways road as New National Highway for Kollegala – Hanur – MM Hills – Palar road Tamilnadu border (30 Km length in Tamilnadu) extended upto Mettur in Tamilnadu |
TN.No.14/HDO/NH/2017-2018/ Dated 10.08.2017 |
19/08/2017 |
19/08/2017
|
29/08/2017
Time
15:0Hrs
|
|
590 |
Consultancy Services for preparation of feasibility report cum Detailed Project Report (DPR) of 4/6 lane (A) Belgaum Bypass (Western) tentatively from Km 9.500 (NH 4A) To Km 515.000 (NH 4) (22 Km) and (B) Belgaum Bypass (Eastern) from Km 515.000 (NH 4) to Km 492.000 (NH 4) (New NH 48) (33 Km) in the State of Karnataka (Second Call) |
09/NHAI/RO-BNG/14021/Tender/2017 dated 18.08.2017 |
21/08/2017 |
18/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
591 |
Consultancy Services for Preparation of Detailed Project Report for Proposed Route of New National Highway starting from Matigara More (on NH-31) to Teesta Bazar near NH-10 via, Garidhara-Mirik-Simana-Basti-Ghum-Peshok with a minimum of 2-Lane with Paved Shoulder Configuration in the District of Darjeeling , Kalimpong, West Bengal |
NIeQ NO. 01 OF 2017-18 OF SE, NHPDC |
18/08/2017 |
18/08/2017
|
23/10/2017
Time
18:0Hrs
|
|
592 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Kundapur-Koteswar-Halady-Someshwara (On NH-169A) in the State of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 20/3rd Call/2017-18 |
21/08/2017 |
11/08/2017
|
28/08/2017
Time
16:0Hrs
|
-
|
593 |
Consultancy Services for preparation of Feasibility Report of construction of 4 Lane Inner Ring Road in and around Allahabad City in the state of Uttar Pradesh |
NHAI/Tech/IRR (Ald.)/DPR/2017/104091 |
17/08/2017 |
09/08/2017
|
30/08/2017
Time
11:0Hrs
|
-
|
594 |
Consultancy Services for preparation of DPR for bypass/ring roads around Gorakhpur, Bareilly, Moradabad, Kanpur and Ayodhya in the State of Uttar Pradesh under NHDP Phase-VII. |
Ring Roads/Bypasses/Uttar Pradesh/NHDP/Phase-VII |
09/08/2017 |
09/08/2017
|
22/09/2017
Time
11:0Hrs
|
|
595 |
Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Agra-Mumbai Corridor) |
NHAI/BM/Corridor Improvement/RFP/2017/A-M |
09/08/2017 |
09/08/2017
|
03/10/2017
Time
11:0Hrs
|
|
596 |
Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Pune-Vijayawada Corridor) |
NHAI/BM/Corridor Improvement/RFP/2017/P-V |
09/08/2017 |
09/08/2017
|
03/10/2017
Time
11:0Hrs
|
|
597 |
Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Mumbai-Kolkata Corridor) |
NHAI/BM/Corridor Improvement/RFP/2017/M-K |
09/08/2017 |
09/08/2017
|
03/10/2017
Time
11:0Hrs
|
|
598 |
Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Bangalore-Kanyakumari Corridor) |
NHAI/BM/Corridor Improvement/RFP/2017/B-K |
09/08/2017 |
09/08/2017
|
03/10/2017
Time
11:0Hrs
|
|
599 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of In Principle NHs i Benibad Katra Aurai Runisaidpur Belsand Parsauni ii Turki to Motipur via Saraiya iii Kalyanpur Dholi Muzaffarpur Deoria iv Motihari Dhaka Belwaghat Sheohar Road in Bihar on EPC Mode. Package No DPR BIHAR NH Div MUZ 01 |
2017 MoRTH 231024 1 |
09/08/2017 |
08/08/2017
|
19/09/2017
Time
15:0Hrs
|
|
600 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of In Principle NH i Manjhi Ekma MaharajganjAfradmore Barauli ii Manjhi Darauli Guthani Mairwa Siwan Barharia Sarfara upto iii Mairwa Nautan Kuchaikot iv Mirganj Bhagipatti Samour Road upto UP Border in Bihar on EPC Mode. Package No.DPR BIHAR NH Div MUZ 02 |
2017MoRTH2310701 |
09/08/2017 |
08/08/2017
|
19/09/2017
Time
15:0Hrs
|
|
601 |
Consultancy Services for preparation of Detailed Project Report of selected stretch Nellvoy Pallikonda Road Sreepuram Golden Temple road in the State of Tamilnadu for upgradation to Two lane with paved shoulder or Four lane configuration Package No NH CH 2 2017 18 |
TN 02 HDO NH NELVOY ROAD |
08/08/2017 |
08/08/2017
|
15/09/2017
Time
11:0Hrs
|
|
602 |
Consultancy Services for preparation of DPR of 2-Laning including paved shoulder of Assam/Meghalaya border – Bhoirymbong on Shillong bypass (Length – 18.00 Km) in the state of Meghalaya |
No.PW/CE/NH/4/2017 |
08/08/2017 |
08/08/2017
|
29/08/2017
Time
16:15Hrs
|
|
603 |
Consultancy Services for preparation of DPR of 2-laning including paved shoulder of Dkhiah- Sutnga-Saipung- Moulsei (Length – 84.00 Km) in the State of Meghalaya. |
No.PW/CE/NH/11/2017 |
08/08/2017 |
08/08/2017
|
31/08/2017
Time
16:20Hrs
|
|
604 |
Consultancy Services for preparation of DPR of 2-laning including paved shoulder of Nongstoin-Maweit- Nongjri (Length – 75.00 Km) in the State of Meghalaya. |
No.PW/CE/NH/10/2017 |
08/08/2017 |
08/08/2017
|
31/08/2017
Time
16:25Hrs
|
|
605 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh (Package No. HP/Shahpur/R/25). |
278-SESHA-2017 |
09/08/2017 |
07/08/2017
|
14/09/2017
Time
15:0Hrs
|
|
606 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh (Package No. HP/Shahpur/R/26). |
278-SESHA-2017 |
09/08/2017 |
07/08/2017
|
14/09/2017
Time
15:0Hrs
|
|
607 |
(i) Consultancy services for feasibility study Detailed Project Report Survey and preparation of land plan for widening to 2 lane with paved shoulders from Bheja (from proposed new bridge over river koshi Junction of NH. 327(E) near Nunupatti-Baniari-Laukha-Tarawae-Singheshwar (on NH.-131)-Rani Patti-Khurda-Chakmaka) up to Junction with NH. 107 (ii) Consultancy services for feasibility study Detailed Project Report Survey and preparation of land plan for widening to 2 lane with paved shoulders |
02/2017 Package No. II |
20/09/2017 |
07/08/2017
|
10/10/2017
Time
15:0Hrs
|
|
608 |
Package III (i) Consultancy services for feasibility study Detailed Project Report Survey and preparation of land plan for widening to 2 lane with paved shoulders from NH.-106/NH.-131 New Birpur to Bathnaha (NH.-57A/NH.-527 New) Via Balua. (ii) Consultancy services for feasibility study Detailed Project Report Survey and preparation of land plan for widening to 2 lane with paved shoulders from Udakishunganj (NH. 131)-Bihariganj-Murliganj-Mirganj-Jadia-Bhimpur on NH.-57 (NH-27 New)-Balua-Birpur |
NIT 02/2017 Package III |
20/09/2017 |
07/08/2017
|
10/10/2017
Time
15:0Hrs
|
|
609 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. (Package No. HP/Shahpur/ R/2) |
280-SESHA-2017 |
05/08/2017 |
05/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
610 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. (Package No. HP/Shahpur/ R/5) |
280-SESHA-2017 |
05/08/2017 |
05/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
611 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. (Package No. HP/Shahpur/ R-1/6) |
280-SESHA-2017 |
05/08/2017 |
05/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
612 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R/8) |
280-SESHA-2017 |
05/08/2017 |
05/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
613 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R-1/9) |
280-SESHA-2017 |
05/08/2017 |
05/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
614 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R/11) |
280-SESHA-2017 |
05/08/2017 |
05/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
615 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R/17) |
280-SESHA-2017 |
05/08/2017 |
05/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
616 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R/27) |
280-SESHA-2017 |
05/08/2017 |
05/08/2017
|
11/09/2017
Time
15:0Hrs
|
|
617 |
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT INCLUDING PRE- CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF A ROAD TUNNEL WITH ITS APPROACHES INCLUDING JUNCTION WITH DWARKA EXPRESSWAY FOR WESTERN CONNECTIVITY TO IGI AIRPORT FROM DWARKA EXPRESSWAY IN THE STATE OF DELHI |
NHAI/PIU DWARKA/IGIA TUNNEL/RFP |
07/07/2017 |
04/08/2017
|
17/08/2017
Time
11:0Hrs
|
|
618 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh. (Package No. HP/Shahpur/R/22). |
279-SESHA-2017 |
01/08/2017 |
03/08/2017
|
07/09/2017
Time
15:0Hrs
|
|
619 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh) (Package No. HP/Shahpur/R/23). |
279-SESHA-2017 |
01/08/2017 |
03/08/2017
|
07/09/2017
Time
15:0Hrs
|
|
620 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh) (Package No. HP/Shahpur/R/24). |
279-SESHA-2017 |
01/08/2017 |
03/08/2017
|
07/09/2017
Time
15:0Hrs
|
|
621 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/8 |
HP/Shimla/8 |
03/08/2017 |
03/08/2017
|
04/09/2017
Time
15:0Hrs
|
|
622 |
Consultancy Services for preparation of Detailed Project Report of Preparation of flyover at Km. 619/2-620/2 of NH 47 (Thuckalay) |
04/2017-18/ DO/ dated 24.07.2017 |
16/08/2017 |
02/08/2017
|
19/09/2017
Time
11:0Hrs
|
|
623 |
Consultancy Services for preparation of Detailed Project Report of selected stretch – Arcot –Tindivanam road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration |
TN 02 HDO NH Arcot Road |
01/08/2017 |
01/08/2017
|
15/09/2017
Time
11:0Hrs
|
|
624 |
ConsultancyServicesfor Appointment of Technical Consultant to Carry out the Detailed Project Report for Upgradation/ Widening of Channrayapattana& Hassan Bypasses, 8 Grade separated Structures, Service Road and other Road Safety Measures essentialin Devihalli(Km.110.00) to Hassan(km.189.500) section of NH 75, on EPC basis. |
05/ NHAI/RO-BNG/23019/Tender/2017 |
31/07/2017 |
31/07/2017
|
23/08/2017
Time
15:0Hrs
|
|
625 |
CONSULTANCY SERVICES FROM MORTH EMPANNELLED FIRM FOR FEASIBILITY STUDY PREPARATION OF DETAILED PROJECT REPORT AND PRECONSTRUCTION SERVICES FOR NEWLY DECLARED NH 701 RAFIABAD KUPWARA CHOWKIBAL TANGDHAR CHAMKOT ROAD IN 109 RCC UNDER 32 BRTF PROJECT BEACON IN THE STATE OF JAMMU KASHMIR |
CE (P) BCN/19/2016-17 |
31/07/2017 |
31/07/2017
|
17/08/2017
Time
12:0Hrs
|
|
626 |
CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY REPORT CUM DETAILS PROJECT REPORT (DPR) OF 4/6 LANE (A) BELGAUM BYPASS (EAST) TENTATIVELY FROM KM 9.500 (NH 4A) TO KM 515.000 (NH 4) (22 KM) AND (B) BELGAUM BYPASS (WEST) FROM KM 515.000 (NH 4) TO KM 492.000 (NH 4) (NEW NH 48) (33 KM) IN THE STATE OF KARNATAKA |
03/ NHAI/RO-BNG/14021/Tender/2017 |
31/07/2017 |
31/07/2017
|
16/08/2017
Time
17:0Hrs
|
|
627 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report of selected stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as National Highways ) (Junction of NH-5(GQ)(New NH No-16) near Jankia-Chandanpur (40Kms) on NH-316 in the State of Odisha.) for up gradation to Two/Four lane configuration |
6 CE NH 17-18 |
31/07/2017 |
29/07/2017
|
18/08/2017
Time
17:0Hrs
|
|
628 |
Consultancy Services for Soil Stability on Kaladan Multi Modal Transit Transport Project on NH-502A in Mizoram |
NIT No.2/RFP/CE-HW/2017-2018 |
02/08/2017 |
29/07/2017
|
18/09/2017
Time
15:0Hrs
|
|
629 |
Feasibility study and preparation of DPR for Bairabi bypass on NH-154 in Mizoram |
NIT No.1/RFP/CE-HW/2017-2018 |
31/07/2017 |
28/07/2017
|
04/09/2017
Time
15:0Hrs
|
|
630 |
Feasibility study and preparation of DPR for Restoration of Continuous Landslide at Km 176/50 and Sinking Area at Km 179/50 on NH-54 in Mizoram |
NIT No.1/RFP/CE-HW/2017-2018 |
01/08/2017 |
28/07/2017
|
04/09/2017
Time
15:0Hrs
|
|
631 |
Feasibility study and preparation of DPR for 2-Laning with paved shoulder on NH-102B in Mizoram |
NIT No.1/RFP/CE-HW/2017-2018 |
01/08/2017 |
28/07/2017
|
04/09/2017
Time
15:0Hrs
|
|
632 |
Feasibility study and preparation of DPR for 2-Laning with paved shoulder on NH-306A in Mizoram |
NIT No.1/RFP/CE-HW/2017-2018 |
01/08/2017 |
28/07/2017
|
04/09/2017
Time
15:0Hrs
|
|
633 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up gradation of In-principle declaration of Narayan Sarovar on NH 41 Lakhpat road as new National Highway in the State of Gujarat |
11 of 2016-17 Third Attempt |
28/07/2017 |
28/07/2017
|
21/08/2017
Time
17:0Hrs
|
|
634 |
Feasibility study and preparation of DPR for Aizawl By-Pass on NH-54 in Mizoram |
NIT No.1/RFP/CE-HW/2017-2018 |
31/07/2017 |
28/07/2017
|
04/09/2017
Time
15:0Hrs
|
|
635 |
Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam. |
NHAI/11012/ Guwahati Bypass/ DPR /NE/2017 |
04/08/2017 |
27/07/2017
|
28/08/2017
Time
11:0Hrs
|
|
636 |
Consultancy Services for,Feasibility Study,Detailedproject Report,survey and Preparation of Land Plan by adopting LiDAR or similar technology for UPGRADATION OF STATE HIGHWAY |
ENH/VJP/PB/AE2/TND/2017-18/1116 |
26/07/2017 |
26/07/2017
|
19/08/2017
Time
16:0Hrs
|
|
637 |
Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for C/O flyover in Una town on NH-503 (Extn.) in the State of Himachal Pradesh (Package No. HP/Shahpur/R/21). |
277-SESHA-2017 |
27/07/2017 |
26/07/2017
|
07/09/2017
Time
15:0Hrs
|
|
638 |
1. Consultancy Services for of Preparation of Detailed Project Report of Improvement to Two lane with paved shoulder NH-57 (NH-27 New) Sakri to Madhubani- Rajnagar-Babubarhi- Khutauna-Phulparash road in Bihar on EPC Mode. 2.Consultancy Services for of Preparation of Feasibility Study and Detailed Project Report for Improvement to Two lane with paved shoulder NH-57 (NH-27 New) Bhutaha Chowk to Nirmali Via Mangasihaul – Marauna-Madhepur dist Madhubani (45km) Road in Bihar on EPC Mode. |
DPR/BIHAR/NH Div. Jainagar-03/2017-18 |
26/07/2017 |
25/07/2017
|
22/09/2017
Time
10:30Hrs
|
|
639 |
Consultancy Services for Preparation of Detailed Project Report (DPR) Construction of new 6-lane Flyover at Ainthapalli Junction on NH-6 in Sambalpur |
NHAI/11013/13/RO/OD/2017 |
01/08/2017 |
25/07/2017
|
18/09/2017
Time
11:0Hrs
|
-
|
640 |
Preparation of Detailed Project Report for Dindigul - Natham - Singampunari - Thirupathur - Devakottai - Rastha Road |
TN .No. 23/2017/DO Dt.24.07.2017 |
24/07/2017 |
24/07/2017
|
08/08/2017
Time
15:0Hrs
|
|
641 |
Preparation of Detailed Project Report for Construction of flyover at Km. 599/0-601/0 (Kaliyakavilai) of NH 47 |
03/2017-18/ DO/ dated 13.07.2017 |
24/07/2017 |
24/07/2017
|
01/09/2017
Time
11:0Hrs
|
|
642 |
Preparation of Detailed Project Report for providing pedestrian subway at Km 628/10 of NH47 (Sunkan Kadai) |
03/2017-18/ DO/ dated 13.07.2017 |
24/07/2017 |
24/07/2017
|
01/09/2017
Time
11:0Hrs
|
|
643 |
Balance work of construction of 4-laning road from Km. 165.400 to Km 190.587 of Jatinga Junction to harangajao section of NH-54 in the state of Assam under East West Corridor Project (Contract package no EW-II AS-21 (Bal)) |
NHAI/11015/AS-21 (Bal)/2011/NE |
16/08/2017 |
24/07/2017
|
21/08/2017
Time
11:0Hrs
|
|
644 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 16.00 to 111.35 (Kalsi to Barkot Bend) with realignment of km. 44.00 to 59.00 (due to submergence in Lakhwar-Vyasi Dam project) on NH-123(New No. 507) |
1775/13Yata-NH-10/2017 dated 30.05.2017 |
11/09/2017 |
24/07/2017
|
31/10/2017
Time
15:0Hrs
|
|
645 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from from single/intermediate lane to 2-lane with paved shoulder from km. 0.00 to 84.200 (Chamoli to Kund) on NH-107A |
1775/13yata-NH-10/2017dated 31.05.2017 |
12/09/2017 |
24/07/2017
|
31/10/2017
Time
15:0Hrs
|
|
646 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 0.00 to 84.00 (Tuini to Near Chakrata) on NH-707A |
1775/13yata-NH-10/2017dated 31.05.2017 |
12/09/2017 |
24/07/2017
|
31/10/2017
Time
15:0Hrs
|
|
647 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 84.00 to 160.00 (Near Chakrata to Mussoorie) on NH-707A |
1775/13yata-NH-10/2017dated 31.05.2017 |
12/09/2017 |
24/07/2017
|
31/10/2017
Time
15:0Hrs
|
|
648 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from from single/intermediate lane to 2-lane with paved shoulder from km. 189.00 to 264.00 (Salondhar to Buakhal) on NH-121(New No. 309) |
1775/13yata-NH-10/2017dated 31.05.2017 |
12/09/2017 |
24/07/2017
|
31/10/2017
Time
15:0Hrs
|
|
649 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from widening from single/intermediate lane to 2-lane with paved shoulder from km. 200.00 to 235.00 (Diwalikhal to Karanprayag) on NH-87Ext(New No. 109 |
2040/13yata-NH-10/2017dated 29.06.2017 |
12/09/2017 |
24/07/2017
|
31/10/2017
Time
15:0Hrs
|
|
650 |
Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for construction of Road Nimmu-Chilling-Niraq-Padam-Darcha from Km 45.000 To Km 90.000 to NHDL specifications under 762 BRTF of Project Vijayak in Leh Ladakh Region of Jammu & Kashmir State |
CE (P) VIJAYAK/14/2017-18 |
22/07/2017 |
22/07/2017
|
23/08/2017
Time
14:0Hrs
|
|
651 |
Consultancy Services for carrying out feasibility study, Detailed Survey/Investigation, Preparation of General Arrangement Drawing, Detail Project Report for Construction of proposed ROB Six-lane configuration and its approaches in replacement of temporary LC at Km.363.625 on NH-8A New NH- 141 |
08 of 2016-17 4th attempt |
21/07/2017 |
21/07/2017
|
09/08/2017
Time
17:0Hrs
|
|
652 |
Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for Construction of Elevated corridor- (i) At Sarojini Nagar and Banthara (Km. 14.300 & Km. 23.000) on Lucknow Kanpur Section of NH-25- (Length 4 Kms). (ii) From Shaheed Path to PGI (Km. 12.700 to Km.16.000) on Lucknow Raebareli Section of NH-24B (length 3.300Kms). (iii) From near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms). |
NHAI/PIU-LKO/Tender/Elevated DPR/08 |
20/07/2017 |
21/07/2017
|
19/08/2017
Time
11:0Hrs
|
|
653 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri and Cherkala – Kalladaka in the State of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 01/2nd Call/2017-18 |
20/07/2017 |
20/07/2017
|
31/07/2017
Time
16:0Hrs
|
-
|
654 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri and Cherkala – Kalladaka in the State of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 01/2nd Call/2017-18 |
20/07/2017 |
20/07/2017
|
31/07/2017
Time
16:0Hrs
|
-
|
655 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri and Cherkala – Kalladaka in the State of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 01/2nd Call/2017-18 |
20/07/2017 |
20/07/2017
|
31/07/2017
Time
16:0Hrs
|
-
|
656 |
Consultancy Services for Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh. |
NHAI/Tech/Agra Bypass(N)/DPR/2017/103113 |
25/07/2017 |
20/07/2017
|
10/08/2017
Time
15:0Hrs
|
-
|
657 |
Consultancy Services for Preparation of DPR for Additional Cross Drainage structures across water tank areas i.e Bridges, Culverts etc on the basis of Order of NGT & Revised MoEF Clearance for NH-47&47B in the State of Tamil Nadu. |
NHAI/11012/DPR/Addl/08/2017 |
20/07/2017 |
19/07/2017
|
23/08/2017
Time
11:0Hrs
|
|
658 |
Consultancy Services for carrying out Road Safety Audit of existing road from Km 5/2 -19/0 & Km 96/0 -119/0 of NH 49 Extn (New NH 85) |
TN .No. 22/2017/DO Dt.14.07.2017 |
18/07/2017 |
18/07/2017
|
21/08/2017
Time
15:0Hrs
|
|
659 |
Preparation of Detailed Project Report for Construction of Theni Bypass road of NH49 Extn |
TN .No. 22/2017/DO Dt.14.07.2017 |
18/07/2017 |
18/07/2017
|
21/08/2017
Time
15:0Hrs
|
|
660 |
Consultancy Services for preparation of feasibility study and Detailed Project Report for 2-lanning with paved shoulder from Imphal-Kakching Lamkhai on NH-137 A under NH(O) in the state of Manipur |
01/ACE-I/NH/ Consultancy/2017-18/147 |
21/07/2017 |
17/07/2017
|
15/08/2017
Time
11:0Hrs
|
|
661 |
Consultancy Services for preparation of feasibility study and Detailed Project Report for 2-lanning with paved shoulder from Shankshak to Tengnoupal on NH-39 (102A – Extn) under NH(O) in the state of Manipur |
02/ACE-I/NH/ Consultancy/2017-18/148 |
21/07/2017 |
17/07/2017
|
15/08/2017
Time
11:0Hrs
|
|
662 |
Consultancy Services for Appointment of Technical Consultant for Carrying out Feasibility Study and Preparation of DPR for Augmentation of Tambaram (km.28/000)-Tindivanam (Km.121/000) Section of NH-45 in the State of Tamil Nadu under NHDP Phase-V (2nd call). |
NHAI/11012/DPR/TT/RFP/2017/ |
17/07/2017 |
14/07/2017
|
10/08/2017
Time
11:0Hrs
|
-
|
663 |
Consultancy Services for preparation of Detailed Project Report of selected stretch Avinashi– Mettupalayam road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration. |
TN.No.09/HDO/NH/2017-18/Dt.27.06.2017 |
11/07/2017 |
11/07/2017
|
29/08/2017
Time
15:0Hrs
|
|
664 |
Consultancy Services for preparation of Detailed Project Report of selected stretch Bhavani –Karur road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration. |
TN.No.10/HDO/NH/2017-18/Dt.27.06.2017 |
11/07/2017 |
11/07/2017
|
29/08/2017
Time
15:0Hrs
|
|
665 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in North Eastern Region (NER)- Package I |
NHIDCL/DPR/NER/01/2017 |
11/07/2017 |
11/07/2017
|
04/09/2017
Time
15:0Hrs
|
|
666 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in North Eastern Region (NER) - Package II |
NHIDCL/DPR/NER/02/2017 |
11/07/2017 |
11/07/2017
|
04/09/2017
Time
15:0Hrs
|
|
667 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the UT of Andaman & Nicobar Islands |
NHIDCL/DPR/A&N/2017 |
11/07/2017 |
11/07/2017
|
04/09/2017
Time
15:0Hrs
|
|
668 |
Consultancy Services for preparation of Detailed Project Report of selected stretch Mettupalayam-Bhavani road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration. |
TN.No.08/HDO/NH/2017-18/Dt.27.06.2017 |
10/07/2017 |
10/07/2017
|
29/08/2017
Time
15:0Hrs
|
|
669 |
Consultancy Services for preparation of Feasibility study / Detailed Project Report for Construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur section from Km 165.400 to Km 190.587 on NH-54 of Package AS-21 (Balance) broadly along the existing DPR alignment in the State of Assam. |
NHAI/11015/AS-21 (Bal)/DPR (Existing)/2017/NE |
10/07/2017 |
10/07/2017
|
29/08/2017
Time
11:0Hrs
|
|
670 |
Preparation of Detailed Project Report for Palani – Dharapuram road |
TN .No. 19/2017/DO Dt.04.07.2017 |
10/07/2017 |
07/07/2017
|
18/08/2017
Time
11:0Hrs
|
|
671 |
Preparation of Detailed Project Report for Trichy – Nammakkal road |
TN .No. 19/2017/DO Dt.04.07.2017 |
10/07/2017 |
07/07/2017
|
18/08/2017
Time
11:0Hrs
|
|
672 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam.(Package I) (Reinvitation) |
NHIDCL/DPR/Assam/01/2017 |
05/07/2017 |
06/07/2017
|
01/09/2017
Time
15:0Hrs
|
|
673 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam ( Package II) (Reinvitation) |
NHIDCL/DPR/Assam/02/2017 |
05/07/2017 |
06/07/2017
|
01/09/2017
Time
15:0Hrs
|
|
674 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam (Package III) (Reinvitation) |
NHIDCL/DPR/Assam/03/2017 |
05/07/2017 |
06/07/2017
|
01/09/2017
Time
15:0Hrs
|
|
675 |
TEST PROJECT DO NOT APPLY |
TEST PROJECT DO NOT APPLY |
06/07/2017 |
06/07/2017
|
06/07/2017
Time
23:0Hrs
|
|
676 |
Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Baran – Khanpur – Jhalawar 82 Kms (District Baran , Jhalawar) |
CE NIT NO. 1 |
04/07/2017 |
04/07/2017
|
12/07/2017
Time
16:0Hrs
|
|
677 |
Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway MP/Rajasthan border-Paron-Fatehgarh-Guna Length 22 Kms (District Baran) |
CE NIT NO. 1 |
04/07/2017 |
04/07/2017
|
12/07/2017
Time
16:0Hrs
|
|
678 |
Consultancy Services for Feasibility Study/ Detailed Engineering report for Construction of Two lane with Paved Shoulder from Junction of NH-752 near Kawai connecting Chhabra and terminating at NH-46 near Sada Colony Length-48 km. |
Consultancy Services for Feasibility Study/ Detailed Engineering report for Construction of Two lane with Paved Shoulder from Junction of NH-752 near Kawai connecting Chhabra and terminating at NH-46 near Sada Colony Length-48 km. |
04/07/2017 |
04/07/2017
|
12/07/2017
Time
16:0Hrs
|
|
679 |
Package for Consultancy Services for project Management including preparation of Detailed Project Report of selected stretches / Corridors of NHs / SH Roads (approved In Principle for declaration as NHs) in the State of Andhra Pradesh for upgradation to two/four lane with paved shoulders configuration for (1.) Gooty connecting Pathikonda, Adoni, Madire, Hanaval, Konthanahai, Upparahal, Kowthalam, Urokonda, Halvi, Kumbalanuru, Manvi in the State of Karnataka – 135 Kms. and (2.)Junction with NH- |
Nit No 16/SE/AEE2/2017-18, Date 02.06.2017 |
12/07/2017 |
04/07/2017
|
17/08/2017
Time
17:0Hrs
|
|
680 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of Bhiwani bypass from Bhiwani-Jind road (NH 709A) to Bhiwani Loharu road (NH- 709-E) crossing Bhiwani-Hansi road (NH-148B) in the State of Haryana. |
PWD/HR/PKL/20 |
19/04/2017 |
04/07/2017
|
29/09/2017
Time
15:0Hrs
|
|
681 |
Consultancy Services for FeasibilityStudy and preparatio of Detailed Project Report for Construction of proposed Badarpur Bypas and Karimganj Bypass |
CE PWD NH 1(R) |
03/07/2017 |
03/07/2017
|
30/07/2017
Time
17:0Hrs
|
|
682 |
Consultancy Services for Detailed Design and Drawing for Construction of High Level Bridge across Mahi River at Sangmeshwar on Chikhli-Anandpuri Road Distt. Dungarpur under CRF (Job No. CRF-885/RJ/2016-17) which include Topographic Survey, Hydrological Investigations, Geo-Technical Investigations and Preparation of General Arrangement Drawing |
03/2017-2018 SE PWD Circle Dungarpur Rajasthan |
29/06/2017 |
30/06/2017
|
21/07/2017
Time
18:0Hrs
|
|
683 |
Conusltancy Services for Appointment of Technical Consultant to Carry out the Detailed Project Report for Upgradation or Widening of Channrayapattana and Hassan bypasses 8 Grade separated Structures, Service Road and other Road Safety Measures essential in Devihalli (Km. 110.00) to Hassan (km. 189.500) section of NH 75 in the State of Karnataka. |
05/NHAI/RO-BNG/23019 |
06/07/2017 |
29/06/2017
|
31/07/2017
Time
15:0Hrs
|
|
684 |
Consultancy Services for detail Road Safety Audit of existing roads (i) from ch. 12.370km ( Bhalumunda) to ch. 68.260 km( Belgaon) of NH-59 (ii) from ch. 0.00km (Champua) to ch. 14.000 km( Remuli) of NH-20 and (iii) from ch. 119.000km (Bhanjnagar) to ch. 159.000 km(Aska) of NH-157. in the state of Odisha |
04 CE-NH-2017-18 |
29/06/2017 |
29/06/2017
|
19/07/2017
Time
17:0Hrs
|
|
685 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for strengthening in/c paved shoulder of NH-8 in Churaibari – Agartala Section from KM 422.00 to KM 456.00 (Mungiakami to Champaknagar) in the state of Tripura (Phase-I). |
04/CE/PWD (NH)/BID/2017-18 |
25/05/2017 |
29/06/2017
|
16/08/2017
Time
15:0Hrs
|
|
686 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/16) |
272-SESHA-2017 |
24/06/2017 |
28/06/2017
|
02/08/2017
Time
15:0Hrs
|
|
687 |
Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for construction of Road Nimmu-Chilling-Niraq-Padam-Darcha from Km 45.000 to Km 90.000 to NHDL specifications under 762 BRTF of Project Vijayak in Leh Ladakh Region of Jammu & Kashmir State |
CE (P) VIJAYAK/12/2017-18 |
19/06/2017 |
25/06/2017
|
06/07/2017
Time
14:0Hrs
|
|
688 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Daringibadi Ghat portion from Km 231/00 to Km 256/880 of NH-59 in the State of Odisha. (Bid Ref No-03 CE-NH-17-18) |
03 CE-NH-17-18 |
27/06/2017 |
24/06/2017
|
14/07/2017
Time
17:0Hrs
|
|
689 |
Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for Construction of Elevated corridor (i) At Sarojini Nagar and Banthara (Km. 14.300 & Km.23.000) on Lucknow Kanpur Sect ion of NH-25- (Length 4 Kms) . (ii) From Shaheed Path to PGI ( Km. 12.700 to Km.16.000) on Lucknow Raebareli Sect ion of NH-24B (length 3.300Kms) . (iii) From near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms). |
NHAI/PIU/LKO/DPR/2017/07 |
23/06/2017 |
24/06/2017
|
10/07/2017
Time
11:0Hrs
|
|
690 |
Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for Construction of Elevated corridor (i) At Sarojini Nagar and Banthara (Km. 14.300 & Km.23.000) on Lucknow Kanpur Sect ion of NH-25- (Length 4 Kms) . (ii) From Shaheed Path to PGI ( Km. 12.700 to Km.16.000) on Lucknow Raebareli Sect ion of NH-24B (length 3.300Kms) . (iii) From near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms). |
NHAI/PIU/LKO/DPR/2017/07 |
23/06/2017 |
24/06/2017
|
10/07/2017
Time
11:0Hrs
|
|
691 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Mathura-Govardhan-Deeg-Nagar (Length-31 km) |
Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 5 |
29/06/2017 |
23/06/2017
|
11/07/2017
Time
16:0Hrs
|
|
692 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Lalsot (On NH-23)-Swai Madhopur (On NH-148D) Length-65 km (Distt. Dausa, Sawai Madhopur) |
Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 8 |
29/06/2017 |
23/06/2017
|
11/07/2017
Time
16:0Hrs
|
|
693 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Mathura-Bharatpur-Bayana-Hindaun (Length-101 km) |
Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 12 |
29/06/2017 |
23/06/2017
|
11/07/2017
Time
16:0Hrs
|
|
694 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for (I) in-principle approved NH Stretch from Gangapur-Bhadoti (40Km) (II) Sawai Madhopur-Palighat-Shivpuri (34Km) (NH-552Extn.) |
Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 13 |
29/06/2017 |
23/06/2017
|
11/07/2017
Time
16:0Hrs
|
|
695 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of two lane with paved Shoulder for Shahpura-Alwar-Ramgarh-Nuhu Road (NH-248A) From Km 86/800 to 127/700 (Length-49.90 km) (Distt. Jaipur, Alwar) |
Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 14 |
29/06/2017 |
23/06/2017
|
11/07/2017
Time
16:0Hrs
|
|
696 |
of Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Pokharan-Sankda-Bhainsda-Fatehgarh Length 80 Km |
CE(NH) Raj. NIT 1/2017-18 |
28/06/2017 |
23/06/2017
|
11/07/2017
Time
16:0Hrs
|
-
|
697 |
of Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Stretch from Rohat (on NH-62) – Ahore (on NH-325) Length 82 Km |
CE(NH) Raj. NIT 1/2017-18 |
28/06/2017 |
23/06/2017
|
11/07/2017
Time
16:0Hrs
|
-
|
698 |
FEASINILITY STUDY AND PREPARATION OF KOTA RAWATBHATA RAJESTHAN BORDER TOWARD SINGOLI LENGTH -68 KM DISTRICT KOTA CHITTORGARH |
CENITNO1-2017-18 |
23/06/2017 |
23/06/2017
|
12/07/2017
Time
18:0Hrs
|
|
699 |
BARAN MANGROL SHEOPUR LENGTH -43 KM ( DISTRICT BARAN) |
CENIT1 |
23/06/2017 |
23/06/2017
|
12/07/2017
Time
18:0Hrs
|
|
700 |
Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Desuri (NH-162) – Sadri-Lunawa-Bera- Kagdara- Pindwara Length- 90 Km (District Pali, Sirohi) |
CE(NH) Raj. NIT 1/2017-18 |
05/07/2017 |
23/06/2017
|
11/07/2017
Time
15:0Hrs
|
|
701 |
Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Kharia (on NH-25)- Ransi- Borunda – Gotan and extended upto Junction with NH-58 near Run Length- 125.00 Km (District Jodhpur, Nagaur) |
CE(NH) Raj. NIT 1/2017-18 |
05/07/2017 |
23/06/2017
|
11/07/2017
Time
15:0Hrs
|
|
702 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 4 lane paved shoulder from Km.456.00 to Km. 482.00 (Champaknagar-Agartala ISBT) in Churaibari-Agartala Section of NH-8 (Old NH-44) in the state of Tripura. |
03/CE/PWD (NH)/BID/2017-18 |
30/05/2017 |
23/06/2017
|
17/08/2017
Time
15:0Hrs
|
|
703 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of “in principle” declared National Highway from Kamalpur to Santirbazar (on NH-8) via Ambassa (on NH-8), Gandacherra, Amarpur (on NH-208) and Santirbazar to Belonia in the state of Tripura. |
02/CE/PWD (NH)/BID/2017-18 |
24/05/2017 |
22/06/2017
|
11/08/2017
Time
15:0Hrs
|
|
704 |
Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of “in principle” declared National Highway from -(i) Champaknagar (Jirania) on NH-8 to Udaipur on NH-8 via Jampuijala, (ii) Amarpur on NH-208 to Udaipur on NH-8 in the state of Tripura. |
01/CE/PWD (NH)/DNIT/2017-18 |
17/05/2017 |
21/06/2017
|
10/08/2017
Time
15:0Hrs
|
|
705 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of Rewari Bypass from Rohtak-Jhajjar-Rewari Road (NH-71) to Gurgaon- Jaipur Road (NH-8) crossing Rewari-Narnaul Road (NH-11) in the State of Haryana. |
PWD/HR/PKL/19 |
17/04/2017 |
21/06/2017
|
03/08/2017
Time
15:0Hrs
|
|
706 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed Two lane road from Junction of NH-627 near Baithalangso-Bichitur- Ulukunchi-Umpanai-Assam/Meghalaya Border under Nagaon NH Division in the State of Assam. |
CE PWD NH 2 (R) |
20/06/2017 |
20/06/2017
|
03/08/2017
Time
16:0Hrs
|
|
707 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Consultancy Services for Feasibility study and preparation of Detailed Project Report(DPR) for the proposed 2-lane road from Barpeta Manas road on NH-31 to Manas (Bhutan Border) under Rangia NH Division in the State of Assam. |
CE PWD NH 3 (R) |
20/06/2017 |
20/06/2017
|
03/08/2017
Time
16:0Hrs
|
|
708 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Two lane road from Lanka(on NH-27)- Kheroni(on NH- 627) under Nagaon NH Division in the State of Assam |
CE PWD NH 4 (R) |
20/06/2017 |
20/06/2017
|
03/08/2017
Time
16:0Hrs
|
|
709 |
Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 16.00 to 111.35 (Kalsi to Barkot Bend) with realignment of km. 44.00 to 59.00 (due to submergence in Lakhwar-Vyasi Dam project) on NH-123(New No. 507) |
1775/13yata-nh-10/2017dated 31.05.2017 |
24/07/2017 |
20/06/2017
|
05/08/2017
Time
15:0Hrs
|
|
710 |
Consultancy services for prepparation of feasibility report from DPR of 4/6 lane of Belgaum Bypass tentative alignment from Km 498 (NH4) to Km 9.5 (NH4A) to Km 515 NH4 |
03/ NHAI/RO -BNG/14021/Tender/2017 |
28/06/2017 |
17/06/2017
|
20/07/2017
Time
15:0Hrs
|
|
711 |
Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh |
NHAI/Tech/Agra Bypass(N)/DPR/2017/101440 |
21/06/2017 |
16/06/2017
|
13/07/2017
Time
11:0Hrs
|
-
|
712 |
Consultancy Services for t,easihility Stud},, Detailed I)roject Report, Sur-vev and l)reparation of Land Plan for Widening to Two lane with laved Shouiders lbr I.losdr-rrg * Panathur lSagamandaia - Madikeri and Cherkala - Kalladaka in the Sta-te of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 01/2017-18 |
16/06/2017 |
16/06/2017
|
27/06/2017
Time
16:0Hrs
|
-
|
713 |
Consultancy services for Authority Engineer for supervision of civil construction works Rehabilitation and upgradation of NH75 Old NH234 from Km 506 to Km 508 700 and Km 518 to Km 534 Design Ch Km 506 to 508 and 518 to 534 Mangalore to Thiruvannamalai Road to two lane with paved shoulders on EPC Basis in the State of Andhra Pradesh 2nd call |
SER&B NIT NO 14 |
16/06/2017 |
16/06/2017
|
02/08/2017
Time
15:0Hrs
|
|
714 |
Consultancy Services for Feasibility study Detailed project report including conducting site investigation, subsoil exploration and testing preparation of plans designs land plan schedules and preparation of GAD for the Bypass Roads for the four towns of V Kota and Chittoor in Chittoor District Badvel in Kadapa District and Adoni in Kurnool District 3rd call |
SE R AND B NIT NO 15 |
16/06/2017 |
16/06/2017
|
02/08/2017
Time
15:0Hrs
|
|
715 |
Consultancy for preparation of GAD including preparation of detailed project report for construction (Construction & Widening) of ROB (Existing Railway Portion & approach) at NH-116 Km 76 of NH-116 (Swaimadhopur) including detailed engineering survey, survey and investigation of soil / all geotechnical investigation Topography survey of area & working drawings, design, Estimating and BOQ & preparation of working drawings ad per scope of work governed by the Terms of reference of the MoRTH |
Short Term NIT 03/2017-18 EE PWD NH Dn.-I, Jaipur Sr No. 1 |
16/06/2017 |
16/06/2017
|
04/07/2017
Time
11:0Hrs
|
|
716 |
Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka |
NHD/MNG/JE/Road Safety Audit/NIT-12/4th Call/2017-18 |
15/06/2017 |
15/06/2017
|
28/06/2017
Time
16:0Hrs
|
-
|
717 |
Consultancy services for feasibility study and preparation of detailed project report for 4 laning of Basukinath - Deoghar section of NH-114A under NHDP Phase-IV in the state of Jharkhand (Third Call) |
NHAI/11012/NHDP-IV/JH/Basukinath-Deoghar/ 2017 |
03/07/2017 |
13/06/2017
|
16/08/2017
Time
11:0Hrs
|
|
718 |
Consultancy Services for carrying out feasibility study Detailed Survey Investigation Preparation of General Arrangement Drawing, Detail Project Report for Construction of proposed ROB Six lane configuration and its approaches in replacement of temporary LC at Km.363.625 on NH 8A New NH 141 |
08 OF 2016-17 Third Attempt |
12/06/2017 |
13/06/2017
|
04/07/2017
Time
17:0Hrs
|
|
719 |
Consultancy Services for preparation of Detailed Project Report for Construction of proposed Mandvi bypass road starting from Km. 97.200 and ending on Km.104.200 of NH 8A Extn. in the State of Gujarat |
09 of 2016-17 Third Attempt |
12/06/2017 |
13/06/2017
|
04/07/2017
Time
17:0Hrs
|
|
720 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up gradation of In principle declaration of Chitrod on NH 27 Rapar Dholavira Upto Balasar road as new National Highway in the State of Gujarat |
10 of 2016-17 Third Attempt |
12/06/2017 |
13/06/2017
|
28/06/2017
Time
17:0Hrs
|
|
721 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of In-principle declaration of Lakhpat Gaduli Hajipir Khavda Dholavira Mauvana Santalpur road as new National Highway in the State of Gujarat |
11 of 2016-17 T |
12/06/2017 |
13/06/2017
|
04/07/2017
Time
17:0Hrs
|
|
722 |
CONSULTANCY SERVICES FOR PROOF CHECKING OF STANDARD DESIGNS AND PLANS FOR VARIOUS TYPES OF BRIDGE SUPERSTRUCTURES BASED ON LIMIT STATE METHOD |
R//NH-34049/3/2008-S&R(B) |
28/06/2017 |
12/06/2017
|
14/09/2017
Time
11:0Hrs
|
|
723 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two lane with paved shoulder Darbhanga – Kusheshwar Asthan – Khagaria Road in Bihar on EPC Mode. |
RCD/NH Div. Jainagar/01/2017-18 |
29/06/2017 |
12/06/2017
|
03/08/2017
Time
15:0Hrs
|
|
724 |
Consultancy Services for Proof Checking of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method (Package 2) |
RW/NH-34049/3/2008-S and R B Package 2 |
16/08/2017 |
12/06/2017
|
14/09/2017
Time
11:0Hrs
|
|
725 |
Consultancy Services for Proof Checking of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method package 3 |
RW/NH-34049/3/2008-S and R B Package 3 |
16/08/2017 |
12/06/2017
|
14/09/2017
Time
11:0Hrs
|
|
726 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Four Lane of the road Darbhanga Jaynagar NH 105 in Bihar on EPC Mode |
RCD NH Div Jainagar 02 2017 18 |
30/06/2017 |
09/06/2017
|
03/08/2017
Time
15:0Hrs
|
|
727 |
Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 Lane Inner Ring Road in and around Allahabad City in the state of Uttar Pradesh. |
NHAI/Tech/IRR(Ald)/DPR/2017/100963 |
15/06/2017 |
08/06/2017
|
20/07/2017
Time
11:0Hrs
|
-
|
728 |
DPR for construction of Bypass (Bagalur town) in NH 207 (New NH 648) |
TN .No. 6/HDO/ NH /2017-2018/ Dated 23.05.2017 |
08/06/2017 |
08/06/2017
|
24/07/2017
Time
15:0Hrs
|
|
729 |
Preparation of DPR for in Principle declared state Highways road as New National Highway for Kollegala – Hanur – MM Hills – Palar road Tamilnadu border (30 Km length in Tamilnadu) extended upto Mettur in Tamilnadu |
TN .No. 7/HDO/ NH /2017-2018/ Dated 24.05.2017 |
08/06/2017 |
08/06/2017
|
17/07/2017
Time
11:0Hrs
|
|
730 |
Preparation of Detailed Project Report for Construction of flyover at Km. 599/0-601/0 (Kaliyakavilai) of NH 47 |
TN No. 02/2017-18/ DO/ dated 19.05.2017 |
08/06/2017 |
08/06/2017
|
11/07/2017
Time
11:0Hrs
|
|
731 |
Preparation of Detailed Project Report for providing pedestrian subway at Km 628/10 of NH47 (Sunkan Kadai) |
TN No. 02/2017-18/ DO/ dated 19.05.2017 |
08/06/2017 |
08/06/2017
|
11/07/2017
Time
11:0Hrs
|
|
732 |
Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tuivai road section (length- 162Km ) on NH-102B in the State of Manipur (ii) 2 laning with paved shoulder of Imphal-Jiribam section of NH-37 (NH-53) (length- 220 Km) in the State of Manipur (iii) 2 laning with paved shoulder from Tamenglong in Manipur to Peren in Nagaland via Longdi Pabram ( |
NHIDCL/DPR/CT-IJ-TP/ Manipur/2017 |
07/06/2017 |
06/06/2017
|
31/07/2017
Time
15:0Hrs
|
|
733 |
Preparation of Detailed Project Report for Construction of Theni Bypass road of NH49 Extn |
TN.No. 18/2017/ DO/ dated 19.05.2017 |
05/06/2017 |
05/06/2017
|
11/07/2017
Time
11:0Hrs
|
|
734 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/10 |
HP/Shimla/10 |
03/06/2017 |
03/06/2017
|
29/06/2017
Time
15:0Hrs
|
|
735 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Ramgarh-Sonhat-Baikunthpur (65.00 Km.) and Harchoka-Bharatpur (20.00 Km.) |
NH/CE/PWD/03 and 14/208875 |
14/06/2017 |
01/06/2017
|
25/07/2017
Time
17:0Hrs
|
|
736 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Keonchi-Ratanpur of NH 45 |
NH/CE/PWD/18/208890 |
14/06/2017 |
01/06/2017
|
25/07/2017
Time
17:0Hrs
|
|
737 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Balod-Gunderdehi-Durg- Dhamdha-Gandai-Salhetekari Road-CG-MP border (including 28.00 km b/w Dhamdha-Gandai) |
NH/CE/PWD/19/208901 |
14/06/2017 |
01/06/2017
|
25/07/2017
Time
17:0Hrs
|
|
738 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Pithora-Bagbahra-Komakhan-Chhura-Gariyaband Marg |
NH/CE/PWD/20/208953 |
14/06/2017 |
01/06/2017
|
25/07/2017
Time
17:0Hrs
|
|
739 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Kondagaon-Narayanpur (48.70 Km.) and Geedam-Dantewada (12.00 Km.) and Narayanpur-Kutul-Farasbeda-MH border (50.00 km.) |
NH/CE/PWD/16,17, 11/208980 |
14/06/2017 |
01/06/2017
|
25/07/2017
Time
17:0Hrs
|
|
740 |
Consultancy services for feasibility study, Prepration of DPR and providing pre construction services in respect of 2 laning of (i) DMP section on NH-129A (ii) PC section of NH-102C and (iii) SN on NH-102A (BMP) on EPC in the state of Manipur 2nd Call |
NHIDCL/DPR/SN-DMP-PC/Manipur/2017 |
05/06/2017 |
30/05/2017
|
13/07/2017
Time
17:0Hrs
|
|
741 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/25Sml |
HP/Shimla/25Sml |
30/05/2017 |
29/05/2017
|
22/06/2017
Time
15:0Hrs
|
|
742 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/26Sml |
HP/Shimla/26Sml |
30/05/2017 |
29/05/2017
|
22/06/2017
Time
15:0Hrs
|
|
743 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/28Sml |
HP/Shimla/28Sml |
30/05/2017 |
29/05/2017
|
22/06/2017
Time
15:0Hrs
|
|
744 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for Construction of R.O.B. in lieu of existing Railway crossing at Km. 363.625 on NH-8A K.F.T.Z. – Kandla road in the State of Gujarat |
08 of 2016-17 Second Attempt |
26/05/2017 |
27/05/2017
|
09/06/2017
Time
17:0Hrs
|
|
745 |
Consultancy Services for preparation of Detailed Project Report for Construction of proposed Mandvi bypass road starting from Km. 97/200 & ending on Km.104/200 of NH 8A Extn. in the State of Gujarat |
09 of 2016-17 Second Attempt |
27/05/2017 |
27/05/2017
|
09/06/2017
Time
17:0Hrs
|
|
746 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Chitrod on NH 27 – Rapar – Dholavira Upto Balasar road as new National Highway in the State of Gujarat |
10 of 2016-17 second attempt |
27/05/2017 |
27/05/2017
|
09/06/2017
Time
15:0Hrs
|
|
747 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Lakhpat-Gaduli-Hajipir-Khavda-Dholavira-Mauvana-Santalpur road as new National Highway in the State of Gujarat |
11 OF 2016-17 Second Attempt |
27/05/2017 |
27/05/2017
|
09/06/2017
Time
17:0Hrs
|
|
748 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Daringibadi Ghat portion from Km 231/00 to Km 256/880 of NH-59 in the State of Odisha. |
2 CE-NH-17-18 |
27/05/2017 |
26/05/2017
|
19/06/2017
Time
17:0Hrs
|
|
749 |
Consultancy Services for carrying out Road Safety Audit of existing road from Km 5/2 -19/0 & Km 96/0 -119/0 of NH 49 Extn (New NH 85) |
TN.No. 17/2017/ DO/ dated 18.05.2017 |
24/05/2017 |
24/05/2017
|
06/07/2017
Time
11:0Hrs
|
|
750 |
Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for Construction of Elevated corridor (i) At Sarojini Nagar and Banthara (Km. 14.300 & Km. 23.000) on Lucknow Kanpur Section of NH-25(Length 4 Kms). (ii) From Shaheed Path to PGI (Km. 12.700 to Km.16.000) on Lucknow Raebareli Section of NH-24B (length 3.300Kms). (iii) From near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms). |
NHAI/PIU./LKO/DPR/2017/06 |
14/06/2017 |
24/05/2017
|
18/06/2017
Time
11:0Hrs
|
|
751 |
CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR USING LiDAR TECHNOLOGY FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD MANALI-SARCHU-LEH FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS FROM KM 13.0 TO KM 31.0, KM 185.00 TO KM 195.00 AND KM 224.89 TO KM 304.39 ( KM 0 RECKONED AT MANALI ) NET LENGTH KM 107.50 IN THE STATE OF HIMANCHAL PRADESH AND LEH LADAKH REGION OF JAMMU & KASHMIR |
CE (P) HIMANK/01/2017-18 |
19/05/2017 |
22/05/2017
|
19/06/2017
Time
12:0Hrs
|
|
752 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri and Cherkala – Kalladaka in the State of Karnataka |
EE/NHD/MNG/AE2/Consultancy/NIT 01/2017-18 Date 07.04.2017 |
20/05/2017 |
20/05/2017
|
22/05/2017
Time
16:0Hrs
|
|
753 |
Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka |
NHD/MNG/JE/Road Safety Audit/NIT-12/3rd Call/2017-18 Date 09-05-2017 |
19/05/2017 |
19/05/2017
|
24/05/2017
Time
16:0Hrs
|
|
754 |
Consultancy Services for preparation of Feasibility study /Detailed Project Report for construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur Section from km. 165.40 to km. 190.587 on NH - 54 of package AS-21(Bal) through New Alignment in the State of Assam on EPC mode. |
NHAI/11015/AS-21(BAL)/2011/NE |
19/05/2017 |
18/05/2017
|
17/07/2017
Time
11:0Hrs
|
|
755 |
Consultancy Services for preparation of GAD including preparation of detailed project report for construction (Construction & Widening) of ROB (Existing Railway Portion & approach) at NH-116 Km 76 of NH-116 (Swaimadhopur) including detailed engineering survey, survey and investigation of soil/all geotechnical investigation Topography survey of area & working drawings, design, Estimating and BOQ & preparation of working drawings ad per scope of work governed by the Terms of reference of the MoRTH |
Short Term NIT 02/2017-18 EE PWD NH Dn-I, Jaipur |
26/05/2017 |
18/05/2017
|
30/05/2017
Time
11:0Hrs
|
|
756 |
Consultancy Services for Preparation of DPR for improvement of newly declared NHs |
3 of SE, N. H. Circle No. II of 2017-18 - 3rd Cal |
16/05/2017 |
17/05/2017
|
16/06/2017
Time
17:0Hrs
|
|
757 |
Consultancy Services for preparation of Detailed Project Report of stretches from Ankaleshwar (Km.0.000) to Netrang (Km.45.000) & Taloda (Km.143.000) to Burhanpur (Km.543.000) of National Highways for up gradation to 4- lane in the State of Maharashtra |
NHAI/RO-NAG/2017-18/03 |
13/05/2017 |
13/05/2017
|
27/06/2017
Time
11:30Hrs
|
|
758 |
4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh |
NHAI/Tech/Agra Bypass(N)/DPR/2017/99552 |
15/05/2017 |
12/05/2017
|
13/06/2017
Time
11:0Hrs
|
|
759 |
Package CENH/DPR/01/2017 DPR for 2 lane with Paved Shoulders/From Kayamkulam (NH47) to Junction near Thiruvalla (NH183) |
05/CENH/KLA/DPR/2017-18 |
05/06/2017 |
11/05/2017
|
14/06/2017
Time
15:0Hrs
|
|
760 |
Package CENH/DPR/02/2017-DPR for 2 lane with Paved Shoulders/From Bharanikkavu near Adur in NH183A up to Titanium, Chavara at NH47 (new NH66)/Connecting NH183A at Elavunkal near Laha with Pampa |
05/CENH/KLA/DPR/2017-18 |
05/06/2017 |
11/05/2017
|
14/06/2017
Time
15:0Hrs
|
|
761 |
Package CENH/DPR/03/2017/Makaraparambu bypass between km 53/000 and 63/000 (4 lane bypass)/Road connecting Vadakkenchery – Pollachi (stretch in Kerala) |
05/CENH/KLA/DPR/2017-18 |
05/06/2017 |
11/05/2017
|
14/06/2017
Time
15:0Hrs
|
|
762 |
Package CENH/DPR/04/2017 DPR for 2 lane with Paved Shoulders Road connecting International Sea Port, Vizhinjam with Karamana- Kaliakkavila stretch of NH-47 and NH Bypass 47 (New NH 66). (starts from Balaramapuram passes through Mukkola - Vizhinjam International Sea Port (Mulloor) - Pulluvila- Kanjiramkulam and meets the NH-47 at Neyyattinkara/Road connecting Thiruvananthapuram – Thenmala |
05/CENH/KLA/DPR/2017-18 |
05/06/2017 |
11/05/2017
|
14/06/2017
Time
15:0Hrs
|
|
763 |
Package CENH/DPR/04/2017 DPR for 2 lane with Paved Shoulders Road connecting International Sea Port, Vizhinjam with Karamana- Kaliakkavila stretch of NH-47 and NH Bypass 47 (New NH 66). (starts from Balaramapuram passes through Mukkola - Vizhinjam International Sea Port (Mulloor) - Pulluvila- Kanjiramkulam and meets the NH-47 at Neyyattinkara/Road connecting Thiruvananthapuram – Thenmala |
05/CENH/KLA/DPR/2017-18 |
05/06/2017 |
11/05/2017
|
14/06/2017
Time
15:0Hrs
|
|
764 |
Package CENH/DPR/05/2017 DPR for 2 lane with Paved Shoulders Road connecting Hosdurg – Panathur – Bhagamandala – Madikeri – in Karnataka State (stretch in Kerala)/Road connecting Cherkala – Kalladka (stretch in Kerala) |
05/CENH/KLA/DPR/2017-18 |
05/06/2017 |
11/05/2017
|
14/06/2017
Time
15:0Hrs
|
|
765 |
Prepration of DPR for Nimmu -Padam- Darcha road in Jammu and Kashmir |
CE (P) VJK/03/2017-18 |
04/05/2017 |
09/05/2017
|
15/06/2017
Time
12:0Hrs
|
|
766 |
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for the Construction of a Road Tunnel and its approaches Enabling All Weather Connectivity along the Mughal Road in the State of Jammu and Kashmir. |
NHIDCL/DPR/J&K/Mughal Road/ (Pir Ki Gali-Tunnel)/2017 |
30/03/2017 |
09/05/2017
|
15/01/2018
Time
17:0Hrs
|
|
767 |
Consultancy Services for following tunnel on NH244 1-Sudhmahadev-Dranga Tunnel length 4.5Km and its approaches on Chenani-Sudhmahadev-Goha road portion 2-Vailoo Tunnel length 10.00Km under Sinthan Pass and its approach roads onGoha-Khellani-Khanabal |
NHIDCL/DPR/J&K/C-K(Tunnels)/2017 |
23/03/2017 |
08/05/2017
|
10/07/2017
Time
17:0Hrs
|
|
768 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/29Sml |
HP/Shimla/29Sml |
29/04/2017 |
29/04/2017
|
23/05/2017
Time
15:0Hrs
|
|
769 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/31Sml |
HP/Shimla/31Sml |
29/04/2017 |
29/04/2017
|
23/05/2017
Time
15:0Hrs
|
|
770 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/30Sml |
HP/Shimla/30Sml |
29/04/2017 |
29/04/2017
|
23/05/2017
Time
15:0Hrs
|
|
771 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/32Sml as per annexure I |
HP/Shimla/32sml |
29/04/2017 |
29/04/2017
|
23/05/2017
Time
15:0Hrs
|
|
772 |
Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for improvement of existing road from Km 28.30 (Akhnoor) to Km 108.54 (Tain Br) under 13 TF and from Km 108.54 to Km 236.78 (Poonch) under 31 TF on NH-144A for 4-lane/2-lane with Paved Shoulder from existing double lane specification in the State of J&K |
CE (P) SPK/01/2017-18 |
20/04/2017 |
21/04/2017
|
29/05/2017
Time
12:0Hrs
|
|
773 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declared (A) Khambhaliya – Advana – Porbandar road, (B) Khambhaliya – Bhanwad – Ranavav (up to junction of N.H.8B) road, (C) Porbandar – Bhanvad – Jamjodhpur - Kalavad road as new National Highway in the State of Gujarat |
14/3 of 2016-17 |
20/04/2017 |
17/04/2017
|
13/05/2017
Time
15:0Hrs
|
|
774 |
Consultancy Services for detail Road Safety Audit of existing road from ch. 294.280km (Navrangpur) to ch. 434.787 km( Sunki ghat) of NH-26 in the state of Odisha. |
01 CE-NH-2017-18 -Package-I |
20/04/2017 |
17/04/2017
|
08/05/2017
Time
17:0Hrs
|
|
775 |
Consultancy Services for detail Road Safety Audit of existing road from ch. 413.700km (Malkanagiri) to ch. 513.700 km(Motu) of NH-326 in the state of Odisha |
01 CE-NH-2017-18 Package-II |
20/04/2017 |
17/04/2017
|
08/05/2017
Time
17:0Hrs
|
|
776 |
Consultancy Services for detail Road Safety Audit of existing roads (i) from ch. 12.370km ( Bhalumunda) to ch. 68.260 km( Belgaon) of NH-59 (ii) from ch. 0.00km (Champua) to ch. 14.000 km( Remuli) of NH-20 and (iii) from ch. 119.000km (Bhanjnagar) to ch. 159.000 km(Aska) of NH-157. in the state of Odisha |
01 CE-NH-2017-18 Package-III |
20/04/2017 |
17/04/2017
|
08/05/2017
Time
17:0Hrs
|
|
777 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declared Nageshri - Khambha - Chalala – Amreli road as new National Highway in the State of Gujarat |
14/2 of 2016-17 |
20/04/2017 |
11/04/2017
|
06/05/2017
Time
17:0Hrs
|
|
778 |
Consultancy Services for Preparation of Detailed Project Report for Up gradation to Two lane / Four lane with Paved Shoulders configuration of newly declared NH 516D from Devarapalli at NH -16 to Jeelugumilli near AP/TS Border in the state of Andhra Pradesh |
SE(R&B)/NH/VJA/Short Tender/01/2017-18 Dated 03/04/2017 |
16/05/2017 |
11/04/2017
|
05/06/2017
Time
16:0Hrs
|
|
779 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declared National Highways in the State of Gujarat |
14/1 of 2016-17 |
17/04/2017 |
11/04/2017
|
06/05/2017
Time
18:0Hrs
|
|
780 |
Consultancy Services for Feasibility Study/ Detailed Engineering report for Construction of Two lane with Paved Shoulder from Junction of NH-752 near Kawai connecting Chhabra and terminating at NH-46 near Sada Colony Length-48 km |
CE NH NIT NO. 20 |
10/04/2017 |
10/04/2017
|
11/05/2017
Time
11:0Hrs
|
|
781 |
Dindigul - Natham - Singampunari - Thirupathur - Devakottai - Rastha Road (Package No.NH-MDU/1, |
TN .No. 14/2017/DO Dt. 28.03.2017 |
10/04/2017 |
10/04/2017
|
13/04/2017
Time
14:0Hrs
|
|
782 |
Thanjavur - Pattukottai -Karaikudi Road (Package No.NH-MDU/2 |
TN .No. 14/2017/DO Dt. 28.03.2017 |
10/04/2017 |
10/04/2017
|
13/04/2017
Time
14:0Hrs
|
|
783 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Mathura-Bharatpur-Bayana-Hindaun (Length-101 km) |
NIT 20 / 2016-17 CE (NH) PWD Rajasthan Jaipur Sr. No. 04 |
08/05/2017 |
10/04/2017
|
10/05/2017
Time
18:0Hrs
|
|
784 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Gangapur-Sawai Madhopur (Length-75 km) |
NIT 20 / 2016-17 CE (NH) PWD Rajasthan Jaipur Sr. No. 05 |
08/05/2017 |
10/04/2017
|
10/05/2017
Time
18:0Hrs
|
|
785 |
Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder Sawai Madhopur-Palighati-Shivpuri (NH-552 Extn) (Length-34 km) |
NIT 20/2016-17 CE(NH) PWD Rajasthan Jaipur Sr No 06 |
08/05/2017 |
10/04/2017
|
10/05/2017
Time
18:0Hrs
|
|
786 |
Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Ghazipur Ballia- UP/Bihar section from Km. 0.00 to 128.00 of NH-19 and Construction of 2/4 laning Fly over at Ballia (from Chandra Shekhar Mod to Satish Chandra College) in the state of Uttar Pradesh |
NHAI/Tech/NH-19/Pkg-I/ DPR /2016 |
12/04/2017 |
07/04/2017
|
05/05/2017
Time
11:0Hrs
|
-
|
787 |
Consultancy services for Feasibility Study and Preparation of DPR for Total Length 312.48 Km for Upgradation of Paramakudi to Ramanathapuram section of NH-49 (39 Km) to Four lane, Upgradation of Ramanathapuram to Rameshwaram section of NH-49 (63 Km) to Four lane and Four Laning of Dindigul Coimbatore Sathyamangalam and 2 laning with or without Paved shoulder from Sathyamanglam to TN Karnataka Border section of NH-209 (210.48 Km) |
NHAI/11012/DPR/PR-DKB/07/2017 |
20/04/2017 |
07/04/2017
|
16/05/2017
Time
11:0Hrs
|
|
788 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Junction of NH-5(GQ)(New NH No-16) near Jankia-Chandanpur (40Kms) on NH-316 in the State of Odisha |
46 CE-NH-16-17 Package-I |
05/04/2017 |
03/04/2017
|
01/05/2017
Time
17:0Hrs
|
|
789 |
Consultancy Services for Feasibility Study Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Bhubaneswar-Athgarh-Samarpur (Sankarpur) -Mahidharpur Road in the State of Odisha. |
46 CE-NH-16-17 Package-II |
05/04/2017 |
03/04/2017
|
01/05/2017
Time
17:0Hrs
|
|
790 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Jharsuguda(on NH-49)-Karamdihi- Subdega- Balishankara- up to junction with NH-43 near Ludang (Pathalgaon) (on NH-43) up to Odisha border in the State of Odisha. |
46 CE-NH-16-17 Package-III |
05/04/2017 |
03/04/2017
|
01/05/2017
Time
17:0Hrs
|
|
791 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Sonepur on NH-57, for proposed By pass at Nayagarh on NH-57 & proposed By pass at Reamal on NH-53 in the State of Odisha. |
46 CE-NH-16-17 Package-IV |
05/04/2017 |
03/04/2017
|
01/05/2017
Time
17:0Hrs
|
|
792 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/29Sml |
HP/Shimla/29Sml |
19/04/2017 |
30/03/2017
|
21/04/2017
Time
15:0Hrs
|
|
793 |
Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Mehsana-Visnagar-Vadnagar-Kheralu-Idar-Bhiloda-Shamlaji road as new National Highway in State of Gujarat. |
18 of 2016-17 2nd-Attempt |
30/03/2017 |
30/03/2017
|
17/04/2017
Time
18:10Hrs
|
-
|
794 |
Consultancy Services for Road Safety Audit of existing road Ch. 85.000 km. (Near Dharoi) to Ch. 135.000 km. (Near Pilucha) of NH-58 in State of Gujarat. |
19 of 2016-2017 (2nd Attempt) |
30/03/2017 |
30/03/2017
|
17/04/2017
Time
18:10Hrs
|
-
|
795 |
Sample DPR Version 2 Project |
Sample DPR Version 2 Project |
28/03/2017 |
28/03/2017
|
28/04/2017
Time
15:0Hrs
|
|
796 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH 48 near Davanagere and terminating at its junction with NH 369 near Chennagiri.(3rd Call) |
EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1985 |
25/03/2017 |
25/03/2017
|
17/04/2017
Time
16:59Hrs
|
|
797 |
Consultancy Services for Preparation of Detailed Project Report for Proposed Route of New National |
20/2016-17(2nd Call) of SE NHC - II |
25/03/2017 |
23/03/2017
|
10/05/2017
Time
14:0Hrs
|
|
798 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed Two lane road from Junction of NH-627 near Baithalangso-Bichitur-Ulukunchi-Umpanai-Assam/Meghalaya Border under Nagaon NH Division in the State of Assam. |
CE PWD NH 2 |
23/03/2017 |
23/03/2017
|
11/05/2017
Time
14:0Hrs
|
|
799 |
Consultancy Services for Feasibility study and preparation of Detailed Project Report(DPR) for the proposed 2-lane road from Barpeta Manas road on NH-31 to Manas (Bhutan Border) under Rangia NH Division in the State of Assam. |
CE PWD NH 3 |
23/03/2017 |
23/03/2017
|
11/05/2017
Time
14:0Hrs
|
|
800 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed Two lane road from Lanka (on NH-27)- Kheroni (on NH-627) under Nagaon NH Division in the State of Assam |
CE PWD NH 4 |
23/03/2017 |
23/03/2017
|
11/05/2017
Time
14:0Hrs
|
|
801 |
Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH 48 near Davanagere and terminating at its junction with NH 369 near Chennagiri.(3rd Call) |
.EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1985 |
23/03/2017 |
23/03/2017
|
07/04/2017
Time
16:59Hrs
|
|
802 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/15 as per Annexure I) |
254-SESHA-2017 |
28/03/2017 |
22/03/2017
|
24/04/2017
Time
15:0Hrs
|
|
803 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/16 as per Annexure I) |
254-SESHA-2017 |
28/03/2017 |
22/03/2017
|
24/04/2017
Time
15:0Hrs
|
|
804 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/17 as per Annexure I) |
254-SESHA-2017 |
28/03/2017 |
22/03/2017
|
24/04/2017
Time
15:0Hrs
|
|
805 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration-Ramgarh-Sonhat-Baikunthpur(65.00 Km.)andHarchoka-Bharatpur(20.00 Km.) |
NH/CE/PWD/03and14/30250 |
04/03/2017 |
22/03/2017
|
02/05/2017
Time
17:0Hrs
|
|
806 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Keonchi-Ratanpur NH 45 |
NH/CE/PWD/18/30251 |
31/03/2017 |
22/03/2017
|
02/05/2017
Time
17:0Hrs
|
|
807 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Balod-Gunderdehi-Durg- Dhamdha-Gandai-Salhetekari Road-CG-MP border (including 28.00 km b/w Dhamdha-Gandai) |
NH/CE/PWD/19/30252 |
31/03/2017 |
22/03/2017
|
02/05/2017
Time
17:0Hrs
|
|
808 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Pithora-Bagbahra-Komakhan-Chhura-Gariyaband Marg |
NH/CE/PWD/20/30253 |
31/03/2017 |
22/03/2017
|
02/05/2017
Time
17:0Hrs
|
|
809 |
Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Kondagaon-Narayanpur (48.70 Km.) and Geedam-Dantewada (12.00 Km.) and Narayanpur-Kutul-Farasbeda-MH border (50.00 km.) |
NH/CE/PWD/16,17and11/30483 |
31/03/2017 |
22/03/2017
|
02/05/2017
Time
17:0Hrs
|
|
810 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/18 as per Annexure I) |
255-SESHA-2017 |
28/03/2017 |
22/03/2017
|
24/04/2017
Time
15:0Hrs
|
|
811 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/19 as per Annexure I) |
255-SESHA-2017 |
28/03/2017 |
22/03/2017
|
24/04/2017
Time
15:0Hrs
|
|
812 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/20 as per Annexure I) |
255-SESHA-2017 |
28/03/2017 |
22/03/2017
|
24/04/2017
Time
15:0Hrs
|
|
813 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Badarpur Bypass, Karimganj Bypass and Geotechnical Investigation for the Highway Construction for the stretch between Lowaripoua to Churaibari |
CE PWD NH 1 |
21/03/2017 |
21/03/2017
|
16/05/2017
Time
11:0Hrs
|
|
814 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam. |
NHIDCL/DPR/Assam/01/2017 |
15/03/2017 |
17/03/2017
|
11/05/2017
Time
15:0Hrs
|
|
815 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam |
NHIDCL/DPR/Assam/02/2017 |
16/03/2017 |
17/03/2017
|
11/05/2017
Time
15:0Hrs
|
|
816 |
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam. |
NHIDCL/DPR/Assam/03/2017 |
17/03/2017 |
17/03/2017
|
11/05/2017
Time
15:0Hrs
|
|
817 |
Consultancy Services for preparation of Feasibility study /Detailed Project Report for construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur Section from km. 165.40 to km. 190.587 on NH - 54 of package AS-21(Bal) through New Alignment in the State of Assam on EPC mode. |
NHAI/11015/AS-21(BAL)/2011/NE |
28/03/2017 |
17/03/2017
|
28/04/2017
Time
11:0Hrs
|
-
|
818 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Digapahandi (at NH-326)-Haridakhandi (on NH-59) in the State of Odisha. (NH declaration Approved “In Principle”) |
45 CE-NH-16-17 |
16/03/2017 |
15/03/2017
|
05/04/2017
Time
17:0Hrs
|
|
819 |
Consultancy Services for Feasibility study/Detailed Engineering report for construction of two lane with paved shoulder for newly proposed national highway From Mandsaur connecting Pratapgarh, Dhariyawad, Salumber and terminating at Junction of NH-927A near Dungarpur in Km 0/0 (M.P. Border) to 54/0 (including Pratapgarh Bypass) Length 54.00 Km |
NIT 06/2016-17 SE PWD NH Circle Jaipur Sr No. 1 |
11/04/2017 |
14/03/2017
|
24/04/2017
Time
18:0Hrs
|
|
820 |
Consultancy Services for Feasibility study/Detailed Engineering report for construction of two lane with paved shoulder for newly proposed national highway From Mandsaur connecting Pratapgarh, Dhariyawad, Salumber and terminating at Junction of NH-927A near Dungarpur in Km 54/0 to 108/0 (including Dhariyawad Bypass) Length 54.00 Km |
NIT 06/2016-17 SE PWD NH Circle Jaipur Sr No. 2 |
11/04/2017 |
14/03/2017
|
24/04/2017
Time
18:0Hrs
|
|
821 |
Consultancy Services for Feasibility study/Detailed Engineering report for construction of two lane with paved shoulder for newly proposed national highway From Mandsaur connecting Pratapgarh, Dhariyawad, Salumber and terminating at Junction of NH-927A near Dungarpur in In Km 108/0 to 160/0 (including Aspur, Punjpur, Punali and Other Bypasses ) Length 52.00 Km |
NIT 06/2016-17 SE PWD NH Circle Jaipur Sr No. 3 |
11/04/2017 |
14/03/2017
|
24/04/2017
Time
18:0Hrs
|
|
822 |
Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for Upgradation of State Highway to National Highway by Adopting LiDAR or equivalent technology for the road from Vengurla-Math- Amboli- Chandgarh-Belgaon in the State of Karnataka on EPC Mode 2nd Call. |
ENH/NHD/HBL/PB-3/2016-17/537 Dated 09.03.2017 |
10/03/2017 |
11/03/2017
|
07/04/2017
Time
17:0Hrs
|
|
823 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Up gradation of State road to National Highway by adopting LiDAR or equivalent technology, for the road Gangavathi-Tavaragera-Mudgal in the State of Karnataka on EPC mode.2nd call |
NIT No.ENH/NHD/HBL/PB-3/2016-17/537 Dated 09.03.2017 |
11/03/2017 |
11/03/2017
|
07/04/2017
Time
17:0Hrs
|
|
824 |
Consultancy Services for Preparation of Feasibility Study/ Detailed Project Report for the construction of Flyovers and ROB on various NH stretches in the State of Assam |
NHAI/11015/Flyovers/ROB/EW-Corridor/2017 |
28/03/2017 |
10/03/2017
|
19/04/2017
Time
11:0Hrs
|
-
|
825 |
Consultancy Services for Preparation of Detailed Project Report for Construction of 2-Lane Bridge for Connectivity of Port Blair - Chatham Island and Bambooflat with 400 M Navigational span in the Union Territory region of Andaman Nicobar Islands |
NHIDCL/Port Blair-Chatham-Bamboo Flat/DPR/2017 |
20/03/2017 |
09/03/2017
|
01/08/2017
Time
15:0Hrs
|
|
826 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/8 as per Annexure I) |
246-SESHA-2017 |
12/03/2017 |
09/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
827 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and / or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/9) as per annexure I |
246-SESHA-2017 |
12/03/2017 |
09/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
828 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/10 as per Annexure I) |
246-SESHA-2017 |
12/03/2017 |
09/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
829 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/11 as per Annexure I) |
246-SESHA-2017 |
12/03/2017 |
09/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
830 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and / or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/12 as per Annexure I) |
246-SESHA-2017 |
13/03/2017 |
09/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
831 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/13 as per Annexure I) |
246-SESHA-2017 |
13/03/2017 |
09/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
832 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/14 as per Annexure I) |
246-SESHA-2017 |
13/03/2017 |
09/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
833 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/3 as per Annexure I) |
245-SESHA-2017 |
12/03/2017 |
08/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
834 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/4 as per Annexure I) |
245-SESHA-2017 |
12/03/2017 |
08/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
835 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/5 as per Annexure I) |
245-SESHA-2017 |
12/03/2017 |
08/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
836 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/6 as per Annexure I) |
245-SESHA-2017 |
12/03/2017 |
08/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
837 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/7 as per Annexure I) |
245-SESHA-2017 |
12/03/2017 |
08/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
838 |
Consultancy Services to Carry out the Feasibility Study and Preparation of Detailed Project Report for Value addition works on Four lane Lakhanpur-Vijaypur section from Km 16.35 to Km 80.00 of NH-44 (old NH 1A) in the State of Jammu and Kashmir (2nd Call) |
NHAI/J&K/DPR/2016/2ndCall |
08/03/2017 |
08/03/2017
|
06/04/2017
Time
11:0Hrs
|
|
839 |
Consultancy services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/1 as per Annexure I). |
245-SESHA-2017 |
09/03/2017 |
08/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
840 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/2 as per Annexure I) |
245-SESHA-2017 |
09/03/2017 |
08/03/2017
|
12/04/2017
Time
15:0Hrs
|
|
841 |
Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Sonepur on NH-57, for proposed By pass at Nayagarh on NH-57 & proposed By pass at Reamal on NH-53 in the State of Odisha. |
44 CE-NH-16-17 |
01/03/2017 |
01/03/2017
|
22/03/2017
Time
17:0Hrs
|
|
842 |
Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Kota-Rawatbhata-Rajasthan Border (toward Singoli) Length 68 Km (District Kota, Chittorgarh) |
CE PWD RAJASTRHAN JAIPUR NIT NO 19 |
08/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
843 |
Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Kota-Kaithoon-Sangod –Bapawar-Kawai Length 103.70 Kms (District Kota) |
CE PWD NH JAIPUR NIT NO. 19 |
08/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
844 |
Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Baran – Mangrol – Sheopur Length 43 Kms (District Baran) |
CE PWD RAJASTRHAN JAIPUR NIT NO 19 |
08/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
845 |
Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Baran – Khanpur – Jhalawar 82 Kms (District Baran , Jhalawar) |
CE PWD RAJASTRHAN JAIPUR NIT NO 19 |
08/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
846 |
Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway MP/Rajasthan border-Paron-Fatehgarh-Guna Length 22 Kms (District Baran) |
CE PWD RAJASTRHAN JAIPUR NIT NO 19 |
08/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
847 |
Consultancy Services for Feasibility Study/prepration of Detailed Engineering Report for Construction of two lane with paved shoulder for newly in prenciple approved National Highways Dausa-Lawan-Chaksu-Phagi-Dudu Length-137 Km (District Dausa, Jaipur) |
NIT No. 19/2016-17 CE (NH) PWD Rajasthan, Jaipur Sr No. 5 |
10/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
848 |
Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Desuri (NH-162) – Sadri-Lunawa-Bera- Kagdara- Pindwara Length- 90 Km (District Pali, Sirohi) |
CE PWD RAJASTRHAN JAIPUR NIT NO 19 |
10/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
849 |
Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Kharia (on NH-25)- Ransi- Borunda – Gotan and extended upto Junction with NH-58 near Run Length- 105.00 Km (District Jodhpur, Nagaur) |
CE PWD RAJASTRHAN JAIPUR NIT NO 19 |
10/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
850 |
Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Deoli (on NH-52) to Nasirabad (on NH-48)via Kekari Sarwar Length 96.60 Km. (distt Tonk, Ajmer) |
CE PWD RAJASTRHAN JAIPUR NIT NO 19 |
10/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
851 |
Consultancy Services for Feasibility Study/prepration of Detailed Engineering report for Construction of two lane with paved shoulder for newly in prenciple approved National Highways Mathura-Govardhan-Deeg-Nagar Length 31.00 Km (Distt. Bharatpur) |
NIT No. 19/2016-17 CE (NH) PWD Rajasthan, Jaipur Sr No. 7 |
11/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
852 |
Consultancy Services for Feasibility Study/prepration of Detailed Engineering report for Construction of two lane with paved shoulder for newly in prenciple approved National Highways Lalsot (on NH-23) - Sawai madhopur (on NH-148D) Length 65.00 Km (Distt. Dausa, Sawai Madhopur) |
NIT No. 19/2016-17 CE (NH) PWD Rajasthan, Jaipur Sr No. 11 |
11/04/2017 |
22/02/2017
|
17/04/2017
Time
18:0Hrs
|
|
853 |
Consultancy Services for Preparation of Detailed Project Report for Proposed Route of New National Highway starting from (A) Dumka NH (114A)-Masalia Kundhit Nala - Mahesmunda Ghat (Jharkhand) - Asansol (B) Junction with NH 19 near Kulti in the state of West Bengal connecting Chittaranjan, Jamtara and terminating at Gobindpur in the State of Jharkhand, with a minimum of 2 Lane with Paved Shoulder Configuration in the District of Burdwan, in West Bengal |
18/2016-17 of SE NHC - II |
09/03/2017 |
21/02/2017
|
21/03/2017
Time
14:0Hrs
|
|
854 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Channarayapattana Holenarssipur Arkalgud Kodlipet Madikeri Virajpet Makutta and connecting Kannur (In Kerala) in the State of Karnataka. |
EE/NHD/MNG/AE3/Consultancy/NIT 19/2nd call/2016-17 |
22/03/2017 |
15/02/2017
|
04/04/2017
Time
16:0Hrs
|
|
855 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Kundapur Koteswar Halady Someshwara (On NH169A) in the State of Karnataka |
EE/NHD/MNG/AE3/Consultancy/NIT 20/2nd Call/2016-17 |
22/03/2017 |
15/02/2017
|
04/04/2017
Time
16:0Hrs
|
|
856 |
Consultancy Services For Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two Lane with Paved Shoulders For Manipal to Karkala and from Ramasmudra to Punjalkatte and from Beltangadi Shiradi Via Dharmasthala, Periyashanthi and Gundya to Subramanya in the state of Karnataka |
EE/NHD/MNG/JE/Consultancy/NIT 21/2nd call/2016-17 |
23/03/2017 |
15/02/2017
|
04/04/2017
Time
16:0Hrs
|
|
857 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up- gradation, Redesigning, Rehabilitation and Upgradation including 2/4/6 laning of Ambala-Shazadpur-Naraingarh-KalaAmb Road (NH72) in the State of Haryana |
PWD/HR/PKL/15 |
28/02/2017 |
24/01/2017
|
07/04/2017
Time
15:0Hrs
|
|
858 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up- gradation, Redesigning, Rehabilitation and Upgradation including 2/4/6 laning of Bhiwani bypass from Bhiwani-Jind road (NH 709A) to Bhiwani Loharu road (NH- 709-E) crossing Bhiwani-Hansi road (NH-148B) in the State of Haryana |
PWD/HR/PKL/16 |
28/02/2017 |
24/01/2017
|
07/04/2017
Time
15:0Hrs
|
|
859 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up- gradation, Redesigning, Rehabilitation and Upgradation including 2/4/6 laning of Rajasthan Haryana Border-Narnaul-Ateli-Rewari Road (NH-11) in the State of Haryana |
PWD/HR/PKL/17 |
28/02/2017 |
24/01/2017
|
07/04/2017
Time
15:0Hrs
|
|
860 |
Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of part of Sirsa- Nohar- Taranagar- Churu road section which falls in the State of Haryana. |
PWD/HR/PKL/18 |
28/02/2017 |
24/01/2017
|
09/05/2017
Time
15:0Hrs
|
|