Projects

DPR (Version 2) Projects

S.No Project Name Tender No Tender Date Tender Start Date Tender End Date Document
1 Engaging Technical Consultant for preparation of Feasibility Study (FS) and Detailed Project Report (DPR) on EPC mode for construction of Hunli – Metengliang - Hayuliang road (Green field alignment) to NHDL specifications from Km 20.000 to Km 143.000 (net length – 123.00 Kms) under Project Udayak in Arunachal Pradesh State CE (P)/UDK/DPR CONSULTANCY/08/2018-19 24/09/2018 24/09/2018 31/10/2018
Time 12:0Hrs
2 Consultancy Services for preparation of Feasibility Study & DPR for 3 Nos. ROBs at Km.205.320 on NH-95(05), Km.412.00 on NH-07 and Km.0.800 on NH-15(54) 85/EE/CWD/FZR 24/09/2018 22/09/2018 03/10/2018
Time 12:0Hrs
-
3 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from 2-lane/4-lane to 4-lane from km. 0.00 to 16.00 (Herbertpur to Kalsi) on NH-123(New No. 507) 4783/13yata-NH-10/2018 20/09/2018 20/09/2018 01/11/2018
Time 15:0Hrs
4 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 200.00 to 235.00 (Diwalikhal to Karanprayag) on NH-87Ext(New No. 109) 4783/13yata-NH-10/2018 20/09/2018 18/09/2018 01/11/2018
Time 15:0Hrs
5 ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHDL SPECIFICATIONS OF ROAD BASOLI – BANI –BHADERWAH FROM KM 102.00 TO KM 128.00 UNDER PROJECT BEACON IN JAMMU & KASHMIR STATE CE (P)/BCN/DPR CONSULTANCY/03/2018-19 18/09/2018 18/09/2018 24/10/2018
Time 12:0Hrs
6 ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR WIDENING/IMPROVEMENT OF EXISTING ROAD TO NHDL SPECIFICATIONS OF ROAD CHANGWINTI – WALONG – NAMTI FROM KM 0.000 TO KM 54.450 AND HAYULIANG - CHANGWINTI BETWEEN KM 45.05 TO KM 50.820 (NET LENGTH 60.220 KM) UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE CE (P)/UDK/DPR CONSULTANCY/06/2018-19 18/09/2018 18/09/2018 25/10/2018
Time 12:0Hrs
7 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing Pre-Construction Services for upgradation to 2 lane with paved shoulder from (i) Km 44.50 to Km 142.00 of Chattroo Village & (ii) Km 235.00 (Vailoo Village) to Km 269.00 (Khanabal) of Khellani – Kishtwar – Chattroo - Khanabal Section of NH 244 NHIDCL/J&K/NH-244/Khellani-Khanabal/DPR/2018-19 12/09/2018 12/09/2018 11/10/2018
Time 11:0Hrs
8 Preparation of Feasibility study and Detailed Project Report for Improvement to Two Lane with Paved Shoulder of Km 28 (Near Gangta) to 40 (Near Laxmipur) of NH-333 in the state of Bihra. 05/2018-19 11/09/2018 11/09/2018 01/10/2018
Time 17:0Hrs
9 CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON SINGTHAM-DIKCHU ROAD AND FROM KM 0.00 TO KM 7.360 ON DIKCHU-RANGRANG ROAD (NET LENGTH 30.06 KM) IN SIKKIM STATE UNDER 764 BRTF AREA UNDER PROJECT SWASTIK (THIRD CALL) CE (P) SWTK/34/ 2018-19 05/09/2018 07/09/2018 28/09/2018
Time 12:0Hrs
10 Consultancy service for Authority Engineer for supervision of Widening to two lane with paved shoulders from km.24.60 to km.70.063 of Mudigere Kadur section of NH-173 in the state of karnataka through EPC mode NHD/MNG/173/AE/NIT04/18-19/871 07/09/2018 07/09/2018 10/10/2018
Time 17:0Hrs
11 Consultancy Services for preparation of DPR for “Rehabilitation and upgradation of Chittoor - Kurnool Road NH -18 from 2 lane to 4- Lane from Km 4/0 to 18/2 (Murkumbattu Junction to Rangampet cross) in the State of Andhra Pradesh SE R and NIT NO.09/2018-2019 06/09/2018 06/09/2018 27/09/2018
Time 15:0Hrs
12 CONSULTANCY SERVICE FOR AUTHORITYs ENGINEER FOR SUPERVISION OF RECONSTRUCTION TO TWO LANE WITH PAVED SHOULDERS FROM DS. CH. 442.180 EX. KM 448.00 TO DS.CH.485.240 EX. KM 494.00 OF HULIYAR TO KB CROSS SECTION. AND FROM DS.CH. 532.100 EX.KM 533.150 TO DS.CH.539.100 EX.KM 540.175 FROM KB CROSS TO NELLIGERE SECTION OF NH150A IN THE STATE OF KARNATAKA. ON EPC MODE EE/NHD/Tmk/NiIT-04/2018-19 04/09/2018 04/09/2018 18/10/2018
Time 16:0Hrs
13 Consultancy Services for the preparation of DPR for Six lane Flyover at Kalladka town for a length of 2.1 Km including approaches (i.e. from Design Km.311.570 to Km.313.670) for the project of Four laning of Addahole (Near Gundya) (Existing Chainage Km.263.000, Design Chainage Km.255.703 to Bantwal Cross (Existing Km.328.000, Design Chainage Km.318.755) Section of NH-75 (old NH48) under NHDP Phase-IV on EPC mode in the State of Karnataka NIT No.22/NHAI/RO-BNG/23017/Tender/2018 dated 03.09.2018 19/09/2018 03/09/2018 24/09/2018
Time 15:0Hrs
14 Consultancy service for Feasibility Study and Detailed Project Report for the road section from Talwandi Sabo-Raman Road to Junction with Bathinda-Dabwali Road of NH-254 from KM 132.300 to 155.300 in the State of Punjab CW-2/BTI/05 03/09/2018 31/08/2018 20/09/2018
Time 15:0Hrs
15 consultancy services for preparation of detailed project report (DPR) for construction of Srinagar bypass from Panch- Pepal to Sweet bridge in 2-lane with paved shoulders on NH-58 in the State of Uttarakhand 4486/13Yata-NH-10/2018 dated 28.08.18 30/08/2018 30/08/2018 16/10/2018
Time 15:0Hrs
16 Consultancy Services for preparation of DPR for development of stretches for improving direct connectivity in Indian cities (Lot-8/Package-1) NHAI/Bharatmala/DPR/Lot-8/2018/Package-1 11/09/2018 24/08/2018 08/10/2018
Time 11:0Hrs
17 Consultancy Services for preparation of DPR for development of stretches for improving direct connectivity in Indian cities (Lot-8/Package-2) NHAI/Bharatmala/DPR/Lot-8/2018/Package-2 11/09/2018 24/08/2018 08/10/2018
Time 11:0Hrs
18 Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab for improvement of existing road, geometric design , safety measures and other related works for the road NH-154A From KM 0.00 to 39.36 Upto Himachal Pradesh Boundary. 14/2018 23/08/2018 23/08/2018 13/09/2018
Time 15:0Hrs
19 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for improvement of Ghat section from Km 35/0 to 65/0 Km of NH 326-A in the State of Odisha. (Bid Ref No-06 CE-NH-18-19) 06 CENH-2018-19 17/08/2018 17/08/2018 17/09/2018
Time 17:0Hrs
20 Consultancy Services for carrying out Feasibility Study and Detailed Project report for reconstruction of 11 bridges on NH 154A NH21A and NH 72 in the State of HP 4894-4993 20/08/2018 13/08/2018 11/09/2018
Time 15:0Hrs
21 Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab for improvement of existing road, geometric design , safety measures and other related works for the road NH-154A From KM 0.00 to 39.36 Upto Himachal Pradesh Boundary. 13 10/08/2018 10/08/2018 30/08/2018
Time 15:0Hrs
22 Consultancy Services for preparation of Feasibility Study & DPR for 3 Nos. ROBs at Km.205.320 on NH-95(05), Km.412.00 on NH-07 and Km.0.800 on NH-15(54) 82/EE/CWD/FZR 16/08/2018 10/08/2018 31/08/2018
Time 12:0Hrs
-
23 DPR Paonta Saheb Ballupur NHAI/Tech/UKD/03/2018 28/08/2018 02/08/2018 30/08/2018
Time 15:0Hrs
24 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In-Principle” declared NH in the Car Nicobar Island under the Union Territory of Andaman & Nicobar Island. NHIDCL/DPR/Car Nicobar/A&N/2018 02/08/2018 02/08/2018 11/09/2018
Time 11:0Hrs
25 Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Pariyojana (Lot-2) - Package-I (Re-invitation) NHIDCL/Bharatmala/DPR/Phase-I/Lot-2/Package-I/2018 30/07/2018 30/07/2018 11/09/2018
Time 11:0Hrs
26 Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram under Bharatmala Pariyojana (Lot-2) - Package-II (Re-invitation) NHIDCL/Bharatmala/DPR/Phase-I/Lot-2/Package-II/2018 30/07/2018 30/07/2018 11/09/2018
Time 11:0Hrs
27 Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/09/2nd Call NHAI/PC/BM/SM/2018/09/2nd Call 29/08/2018 26/07/2018 19/09/2018
Time 11:0Hrs
28 Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/13/2nd Call NHAI/PC/BM/SM/2018/13/2nd Call 29/08/2018 26/07/2018 19/09/2018
Time 11:0Hrs
29 Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/10 NHAI/PC/BM/SM/2018/10 06/08/2018 26/07/2018 19/09/2018
Time 11:0Hrs
30 Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/11 NHAI/PC/BM/SM/2018/11 06/08/2018 26/07/2018 19/09/2018
Time 11:0Hrs
31 Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/12 NHAI/PC/BM/SM/2018/12 06/08/2018 26/07/2018 19/09/2018
Time 11:0Hrs
32 Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/14 NHAI/PC/BM/SM/2018/14 06/08/2018 26/07/2018 19/09/2018
Time 11:0Hrs
33 Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/15 NHAI/PC/BM/SM/2018/15 06/08/2018 26/07/2018 19/09/2018
Time 11:0Hrs
34 Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4/6 lane NH connectivity under Sagarmala Scheme/Bharatmala Pariyojana Phase – I /NHAI/PC/SM/16 NHAI/PC/BM/SM/2018/16 06/08/2018 26/07/2018 19/09/2018
Time 11:0Hrs
35 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing pre construction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH- 48(4) at KonPhata - Rasayani - Turade - Apta and terminating at Kharpada on NH-66 (17)In Principal declared National Highway in the State of Maharashtra- Package No. CE/DPR/17-18/15 ( IInd Call ) CE/DPR/17-18/15 (IInd Call) 12/07/2018 12/07/2018 08/08/2018
Time 17:0Hrs
36 Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab for improvement of existing road, geometric design , safety measures and other related works for the road NH-154A From KM 0.00 to 39.36 Upto Himachal Pradesh Boundary. 12/2018-19 10/07/2018 10/07/2018 06/08/2018
Time 15:0Hrs
37 Consultancy Services for carrying out Feasibility Study and Detailed Project report for reconstruction of 11 bridges on NH 154A NH21A and NH 72 in the State of HP 3319-3418 06/08/2018 09/07/2018 18/08/2018
Time 15:0Hrs
38 Consultancy Services for preparation of DPR for Pune - Shirur (Km 10.6 – Km 64) section of NH-753-F (Part of Pune Aurangabad Economic corridor) to improve the efficiency of freight movement under “Bharatmala Pariyojana”. NHAI/RO/Mumbai/PS/DPR/ RFP/2018/9 09/08/2018 05/07/2018 14/08/2018
Time 11:0Hrs
39 Consultancy Services for preparation of Detailed Project Report for Pune - Shirur (Km 10.6 – Km 64) section of NH-753F (Part of Pune Aurangabad Economic corridor) to improve the efficiency of freight movement under Bharatmala Pariyojana NHAI/RO/Mumbai/PS/DPR/ RFP/2018/9 06/08/2018 05/07/2018 07/08/2018
Time 11:0Hrs
40 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu and Kashmir PACKAGE I i 2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch District PACKAGE II ii a 2 lane with Paved Shoulder of NH configuration for Baramulla-Gulmarg Road and b 2 Lane Bypass from Donipawa to Ashajipora connecting NH244 and NH44 NHIDCL/DPR/J and K/Mughal Road/Bara -Gul/Pkg-II/2018-19 27/06/2018 27/06/2018 04/09/2018
Time 11:0Hrs
41 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu and Kashmir PACKAGE-I i 2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch District PACKAGE II ii a) 2-lane with Paved Shoulder of NH configuration for Baramulla-Gulmarg Road and b) 2 Lane Bypass from Donipawa to Ashajipora connecting NH-244 and NH-44 NHIDCL/DPR/J and K/Mughal Road/Bara -Gul/Pkg-I/2018-19 27/06/2018 27/06/2018 04/09/2018
Time 11:0Hrs
42 Consultancy Services for preparation of Feasibility Report cum Detailed Project Report (DPR) for construction of Flyover on NH-7 at ROB of LC-14 for access from NH-7 to proposed Devanahalli Business Park (DBP) adjacent to the northern boundary of Kempegowda International Airport, Being Developed by KSIIDC between Chainage 533.100 to Chainage 535.200 totalling length of 2.10 Kms, in the State of Karnataka (Second call) NIT No.12/NHAI/RO-BNG/12017/Tender/2018 dated 25.06.2018 10/07/2018 25/06/2018 23/07/2018
Time 15:0Hrs
43 ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FS AND DPR ON EPC MODE FOR CONSTRUCTION OF HURI TALIHA ROAD TO NHDL SPECIFICATIONS FROM KM 0 PT 00 TO KM 155 PT 00 IN 756 BRTF AREA UNDER PROJECT ARUNANK IN ARUNACHAL PRADESH STATE CE(P)/ANK/DPR CONSULTANCY/01/2018-19 22/06/2018 22/06/2018 26/07/2018
Time 12:0Hrs
44 Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Lachung La, Tanglang La and Shinkun La in the Ladakh region of the state of Jammu & Kashmir JK-D3/2018 22/06/2018 22/06/2018 25/10/2018
Time 11:0Hrs
45 CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 4 lane RUB and its approaches in lieu of existing level crossing No 41 at KM 365.110 Railway CH 73 2 3 on NH 234 at Gowribidanur section in the state of Karnataka on EPC Mode. 03/2018-19 22/06/2018 22/06/2018 28/07/2018
Time 16:0Hrs
46 CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 2 lane ROB and its approaches in lieu of existing level crossing No 130 at KM 48.300 on NH-207 Near koralur village Sarjapura Dobbasapete section in the state of karnataka 02/2018-19 20/06/2018 20/06/2018 28/07/2018
Time 13:0Hrs
47 Consultancy Service for preparation of Feasibility Report cum Detailed Project Report (DPR) for Four Lane Bypass to Tumakuru City on the Southern Side of NH-48 (Old NH-4), take of at existing Km.56.500 for a length of approximately 42 Kms (Near Chikkahalli Village) and crossing Four lane of Tumakuru to Shivamogga Section of NH-206 at design Km.12.300 (Near Mallasandra Village) and terminating at existing Km.86.500 of NH-48 (Near Vasanthanarasapura Village) in the State of Karnataka NIT No.10/NHAI/RO-BNG/24016/Tender/2018 dated 18/06/2018 18/06/2018 18/06/2018 30/07/2018
Time 15:0Hrs
48 Consultancy Services for Feasibility study, Detailed project report, Including conducting site investigation, subsoil exploration and testing preparation of plans, designs, Land plan schedules, preparation of GAD for the bypass roads to Kuppam, Bireddypalli in Chittoor District and Jammalamadugu, Mydukuru in Kadapa District in the State of Andhra Pradesh( 2nd call) SE R and NIT NO.05/2018-19 08/06/2018 12/06/2018 16/07/2018
Time 15:0Hrs
49 RFP for Consultancy services for Preparation of DPR for the Construction of Bridge at Km 186/10 of Madanapalli Naidupeta Road NH 71 (4th Call) SE R and NIT NO.06/2018-19 08/06/2018 12/06/2018 23/07/2018
Time 15:0Hrs
50 SURVEY INVESTIGATION PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD TATO-MENCHUKA FROM KM 0.00 TO KM 50.00 TO NHDL STANDARD THROUGH CONSULTANCY IN ARUNACHAL PRADESH UNDER PROJECT BRAHMANK CE(P) BRAHMANK 01 OF 2018-19 21/05/2018 21/05/2018 14/06/2018
Time 10:0Hrs
51 Consultancy Services for preparation of Feasibility Report cum Detailed Project Report (DPR) for construction of Flyover on NH-7 at ROB of LC-14 for access from NH-7 to proposed Devanahalli Business Park (DBP) adjacent to the northern boundary of Kempegouda International Airport, Being Developed by KSIIDC between Chainage 533.100 to Chainage 535.200 totalling length of 2.10 Kms, in the State of Karnataka 02/NHAI/RO-BNG/12017/Tender/2018 dated 14/05/2018 23/05/2018 14/05/2018 13/06/2018
Time 15:0Hrs
52 ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR UPGRADATION OF MAIN ROAD BUDHAL-MAHORE-GUL TO NHDL SPECIFICATIONS FROM KM 0.00 TO KM 114.875 AND AN ARTERY FROM MAHORE AT KM 57.00 TO KM 68.00 ON RAOD REASI-ARNAS-MAHORE (NET LENGTH 125.875 KM) IN 31 BRTF AREA UNDER PROJECT SAMPARK IN J&K STATE CE (P) SPK/03/2018-19 12/05/2018 12/05/2018 08/06/2018
Time 12:0Hrs
53 CONSULTANCY SERVICES FOR PREPARATION OF DPR ON EPC MODE FOR IMPMT OF ROAD TLL FM KM 57PT00 TO KM 70PT00 FM NEW TO CL9 E SPCN AND MAHWERE-SAPI RD FROM KM 30PT00 TO KM 42PT00 FM EXTG CL5 TO CL9 E SPECN UNDER PROJECT PUSHPAK IN MIZORAM STATE FOURTH CALL CE (P) PSK-12 OF 2017-18 12/05/2018 12/05/2018 22/06/2018
Time 10:0Hrs
54 CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR USING LIDAR TECHNOLOGY FOR CONSTRUCTION OF ROAD CHUSUL-DUNGTI-FUKCHE-DEMCHOK TO NHSL SPECIFICATION FROM KM 0.00 TO KM 134.790 (NET LENGTH 134.790 KM) IN SECTOR OF 753 BRTF UNDER PROJECT HIMANK IN LEH-LADAKH REGION OF J&K STATE CE (P) HIMANK/30/2018-19 10/05/2018 11/05/2018 08/06/2018
Time 10:0Hrs
55 Consultancy services for preparation of DPR in the State of Meghalaya (Total Length – 102.00 Km) a) Consultancy Services for preparation of DPR of 2-laning including paved shoulder of Dkhiah- Sutnga-Saipung- Moulsei (Length – 84.00 Km) in the State of Meghalaya. b) Consultancy Services for preparation of DPR of 2-Laning including paved shoulder of Assam/Meghalaya border – Bhoirymbong on Shillong bypass (Length – 18.00 Km) in the state of Meghalaya PW/CE/NH/11/2017 10/05/2018 10/05/2018 18/06/2018
Time 15:15Hrs
56 Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Haridwar Ring Road 11012/NHAI/Tech/UKD/HAR RING Road/2017 28/05/2018 09/05/2018 11/06/2018
Time 11:0Hrs
57 Consultancy Services for Prpn of feasibility study and DPR for Construction of Elevated corridor Anishabad (Patna)-Phulwari-AIIMS (7.00KM) 03/NH-AURANGABAD/2018-19 05/06/2018 08/05/2018 09/07/2018
Time 17:0Hrs
58 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/28 as per Annexure I) 296-SESHA-2018 03/05/2018 08/05/2018 29/05/2018
Time 15:0Hrs
59 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for construction of new 2-lane Road Bridge across River Brahmaputra in Jogighopa in the State of Assam NHIDCL/DPR/Brahmaputra Bridge/Jogighopa/2018 08/05/2018 08/05/2018 19/06/2018
Time 11:0Hrs
60 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. NHIDCL/DPR/Guwahati-Jorabat bypass/Assam /2018 08/05/2018 08/05/2018 26/06/2018
Time 11:0Hrs
61 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam and Meghalaya. NHIDCL/DPR/Paikan-Tura/Assam /2018 08/05/2018 08/05/2018 26/06/2018
Time 11:0Hrs
62 DPR for Elevated corridor Anishabad Phulawari AIIMS 03/NH-AURANGABAD/2018-19 08/05/2018 08/05/2018 31/05/2018
Time 17:0Hrs
63 Capacity Augmentation to 2 lanes with paved shoulders configuration From Kayamkulam (NH47) to Junction near 01/CENH/KLA/DPR/2018-19 05/05/2018 05/05/2018 24/05/2018
Time 15:0Hrs
64 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of In-principle declared National Highways in the State (Nageshri - Khamba - Chalala - Amreli) 2 of 2018-19 (Rajkot) 10/05/2018 02/05/2018 25/06/2018
Time 15:0Hrs
65 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Kawardha to Rajnandgaon NH/CE/PWD/09/317589 01/05/2018 02/05/2018 15/05/2018
Time 17:0Hrs
66 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Dudhawa-Kanker (28.00 Km.) & Sambalpur-Silpat (21.00 Km.) NH/CE/PWD/23&24/317594 01/05/2018 02/05/2018 15/05/2018
Time 17:0Hrs
67 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Kutmakatchar-CG/Jharkhand Border-Kunkuri NH/CE/PWD/25/317599 01/05/2018 02/05/2018 15/05/2018
Time 17:0Hrs
68 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Gidhauri to Sarangarh NH/CE/PWD/26/317602 01/05/2018 02/05/2018 15/05/2018
Time 17:0Hrs
69 Consultancy Services for feasibility study and preparation of detailed project report for improvement and up-gradation to 4 lane paved shoulder from Km.456.00 to Km.482.00 (Champaknagar-Agartala ISBT) in Churaibari-Agartala Section of NH-8 (Old NH-44) in the state of Tripura. PNIT No.01/SE/NH Circle/PWD (NH)/2018-19 26/04/2018 27/04/2018 15/06/2018
Time 12:0Hrs
70 Consultancy Services for preparation of Project Report comprising, Detailed Survey/Investigation Alignment Option, Preparation of General Arrangement Drawing and Engineering Report for (1) ROB at Level Xing No.A-47A and (2) ROB at Level Xing No.A-51A 11/cwd/pwd/abh dated 05/02/2018 26/04/2018 26/04/2018 30/04/2018
Time 15:0Hrs
71 Consultancy services for carrying out Feasibility Study and preparation of DPR for construction/improvement of existing road from Cl-9 specifications to NHDL specifications on EPC mode from Km 38.00 to Km 87.00 on road Rishi-Rongli-Kupup (Net length 49.00 Km) under 764 BRTF area under project Swastik in Sikkim state (retender) CE (P) SWTK/08/ 2018-19 23/04/2018 24/04/2018 28/05/2018
Time 12:0Hrs
72 CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 71.00 TO KM 92.60 ON DAMDIM-ALGARAH-RISHI ROAD (NET LENGTH 21.60 KM) UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN WEST BENGAL STATE CE (P) SWTK/09/2018-19 24/04/2018 24/04/2018 28/05/2018
Time 12:0Hrs
73 CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON SINGTHAM-DIKCHU ROAD AND FROM KM 0.00 TO KM 7.360 ON DIKCHU-RANGRANG ROAD (NET LENGTH 30.06 KM) UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN SIKKIM STATE CE (P) SWTK/09/ 2018-19 24/04/2018 24/04/2018 28/05/2018
Time 12:0Hrs
74 Consultancy Services for preparation of Detailed Project Report from Araku (Bhalluguda) to Bowdara section of NH 516E for Upgradation to Two/Four lane with paved shoulder configuration in the state of Andhra Pradesh(Tentative Length 42.40km) 2nd call S ER and BNHVJA Tender 01 2018-19 Dt 03.04.2018 26/04/2018 20/04/2018 11/05/2018
Time 17:0Hrs
75 PREPARATION OF DPR THROUGH CONSULTANCY SERVICES AS SPECIFIED BY MORT&H AND PROVISIONS OF IRC-SP-19 FOR IMPROVEMENT/DEVELOPMENT OF ROAD KURKUTI-GHAMSALI-NITI FROM KM 0.00 TO KM 20.00 (20.00 KMS) FROM CL-9 TO NHDL SPECIFICATIONS AND GELDUNG –NITI PASS KM 0.00 TO KM 16.53 (16.53 KMS) FROM OP TRACK TO NHDL SPECIFICATIONS IN 21 BRTF AREA UNDER PROJECT SHIVALIK UTTARAKHAND STATE 80260/Consultancy/KGN/ 04 /E8 20/04/2018 20/04/2018 21/05/2018
Time 15:0Hrs
76 4-lane Elevated Section at Begusarai at Chainage 221.910 to 224.935 on NH-31, Length 3.025 Km (ii) 4-lane Elevated section of Shivala – Bihta section of Patna – Koilwar on NH-30 at design Chainage 16.050 to 29.500 of proposed alignment of NH-30, Length 13.450 Km (iii) 4-lane Elevated section at Gopalganj Chainage 384.483 to 386.362 on NH-28, Length 1.879 Km. (2 nd Call) NHAI/BH/Elevated/DPR/2017/Proc 02/05/2018 19/04/2018 21/05/2018
Time 11:0Hrs
77 Feasibility study and preparation of DPR for Bairabi By-pass on NH-154 in Mizoram (7.00 km) RE-NIT No.1/RFP/CE-HW/2017-2018 20/04/2018 18/04/2018 07/06/2018
Time 14:0Hrs
78 Feasibility study and preparation of DPR for Aizawl By-pass on NH-54 in Mizoram (35.00km) RE-NIT No.1/RFP/CE-HW/2017-2018 19/04/2018 18/04/2018 07/06/2018
Time 14:0Hrs
79 Consultancy Services for preparation of Feasibility Study & Detailed Project Report in the State of Punjab on BOTI EPCI Hybrid Annuity Mode for the road Stretch from Taran taran - Goindwal Sahib - Kapurthala- Length 50 km. 06 of 2018-19 17/04/2018 18/04/2018 30/04/2018
Time 14:0Hrs
80 CONSULTANCY SERVICES FOR PREPARATION OF DPR ON EPC MODE FOR IMPMT OF ROAD TLL FM KM 57PT00 TO KM 70PT00 FM NEW TO CL9 E SPCN AND MAHWERE-SAPI RD FROM KM 30PT00 TO KM 42PT00 FM EXTG CL5 TO CL9 E SPECN UNDER PROJECT PUSHPAK IN MIZORAM STATE THIRD CALL CE (P) PSK-12 OF 2017-18 17/04/2018 17/04/2018 07/05/2018
Time 10:0Hrs
81 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7) NHAI/Bharatmala/Phase-II/Lot-7/Package-5/RFP/2018 11/05/2018 16/04/2018 05/06/2018
Time 11:0Hrs
82 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7) NHAI/Bharatmala/Phase-II/Lot-7/Package-6/RFP/2018 11/05/2018 16/04/2018 05/06/2018
Time 11:0Hrs
83 CONSULTANCY SERVICES FROM MORTH EMPANELLED FIRM FOR FEASIBILITY STUDY (FS), PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PRECONSTRUCTION SERVICES FOR IMPROVEMENT OF ROAD DHAR-UDHAMPUR FROM NHDL SPECIFICATION TO NHFL SPECIFICATIONS FROM KM 125.00 TO KM 130.00 IN 52 RCC UNDER 35 BRTF PROJECT BEACON IN THE STATE OF JAMMU AND KASHMIR (2nd CALL) CE (P) BCN/11/2017-18 13/04/2018 14/04/2018 23/05/2018
Time 12:0Hrs
84 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/R34Sml 84-183,3.4.2018 10/04/2018 11/04/2018 05/05/2018
Time 15:0Hrs
85 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for Two/ Four laning with paved shoulder configuration Ramgarh-Sonhat-Baikunthpur-Junction of NH-43 (65.00 Km.) Harchoka-Bharatpur (20.00 Km.) & Kotadol-Ramgarh (45.00 Km.) & Jaisingh-Nagar to MP/CG Border (32.00 Km.) NH/CE/PWD/03,14,21 & 22/317585 06/04/2018 07/04/2018 15/05/2018
Time 17:0Hrs
86 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana Lot-). NHAI/Bharatmala/Phase-II/Lot-7/Package-1/RFP/2018 09/04/2018 06/04/2018 05/06/2018
Time 11:0Hrs
87 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7). NHAI/Bharatmala/Phase-II/Lot-7/Package-2/RFP/2018 11/05/2018 06/04/2018 05/06/2018
Time 11:0Hrs
88 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7) NHAI/Bharatmala/Phase-II/Lot-7/Package-3/RFP/2018 11/05/2018 06/04/2018 05/06/2018
Time 11:0Hrs
89 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors, Feeder Routes and Border Roads to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-7) NHAI/Bharatmala/Phase-II/Lot-7/Package-4/RFP/2018 11/05/2018 06/04/2018 05/06/2018
Time 11:0Hrs
90 Consultancy Services for Project Management including preparation of Detailed Project Report from AP/TS Border to Piduguralla-Narasasraopet-Vodarevu road of NH 167A in the state of A P for Upgradation to Two/Four lane with paved shoulder configuration. SE RandB NHVJA Tender 17 2017-18 dt 28 03 2018 16/04/2018 04/04/2018 04/05/2018
Time 16:30Hrs
91 CS for project management including preparation of D PR of selected stretches of N H/State Roads (approved “In Principle” for Declaration as N H in the state of A P for Up Gradation to 2 4 lane with PS configuration from Jn with NH 216 near Narsapuram - Sakhinetipalli-Malkipuram upto jn with NH 216 near Razole along with construction of new bridge between Narsapuram and Sakhinetipalli (380m accross Vasista river TL 23km 3rd call SE RandB NHVJA Tender 16 2017-18 dt 23 03 2018 13/04/2018 02/04/2018 23/04/2018
Time 17:0Hrs
92 Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode for the road Gurdaspur-Mukerian-Talwara-Mubarikpur (Approx Length 83.00 km) 10 31/03/2018 02/04/2018 23/04/2018
Time 14:0Hrs
93 Consultancy Services for Preparation of DPR for Thanjavur - Thirvaiyaru - Perambalur - Krishnapuram - Athoor road (NH136) from Km 72/2-77/4 (Km 0/0-5/2 of Perambalur By-pass) and Km 125/0 -127/0 (Km 2/0 -0/0 of Athur - Perambalur road SH157) for up-gradation to Two lanes with Paved shoulder / Four lane configuration and Review and updation of existing DPR from Km 77/4 -125/0 of NH136 (Km 49/6 -2/0 of SH157 Athur peramblur road) to NH standards including merging and compiling of DPR TN .No. 46/2017/DO Dt. 05.03.2018 02/04/2018 02/04/2018 04/05/2018
Time 15:0Hrs
94 Consultancy Services for preparation of Feasibility Study & Detailed Project Report in the State of Punjab on BOTI EPCI Hybrid Annuity Mode for the road Stretch from Taran taran - Goindwal Sahib - Kapurthala- Length 50 km. 05 of 2017-18 29/03/2018 30/03/2018 17/04/2018
Time 14:0Hrs
95 Technical Consultancy Services for preparation of Feasibility Study and Detailed Project Report for the road Stretch from NH-344A Nawanshahar-Rahon-Machiwara-Samrala-Khanna road and connecting to NH-1 (NEW-44) in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode. Tender Notice No . 3 of 2017-2018 27/03/2018 30/03/2018 10/04/2018
Time 15:0Hrs
96 CONSULTANCY SERVICES FROM MoRT&H EMPANELLED FIRM FOR FEASIBILITY STUDY (FS), PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PRECONSTRUCTION SERVICES FOR IMPROVEMENT OF ROAD RAFIABAD – KUPWARA – CHOWKIBAL – TANGDHAR – CHAMKOT (NH-701) FOR FURTHER DEVELOPMENT AS NHDL SPECIFICATION WITH PAVED SHOULDER AS WELL AS DISTRICT CONNECTIVITY ROAD IN 109 RCC UNDER 32 BRTF PROJECT BEACON IN THE STATE OF JAMMU & KASHMIR (RETENDER- SIXTH CALL) CE (P) BCN/19/2016-17 29/03/2018 29/03/2018 31/03/2018
Time 12:0Hrs
97 Consultancy Services for preparation of Feasibility Study and Detailed Project Report in the State of Punjab on BOT/EPC/ Hybrid Annuity Mode for the road Stretch from NH-5 near Prem Nagar- Morinda- Chamkaur Sahib- Bela- Paniyali and connecting to NH – 344 A. 17 of 2017-18 28/03/2018 28/03/2018 09/04/2018
Time 15:0Hrs
98 CONSULTANCY SERVICE FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of proposed 4 lane RUB and its approaches in lieu of existing level crossing No 41 at KM 365.110 Railway CH 73 2 3 on NH 234 at Gowribidanur section in the state of Karnataka on EPC Mode NIT14retender 28/03/2018 28/03/2018 17/04/2018
Time 15:0Hrs
99 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Powari to Kalpa Road on NH -505A 16619-11718, 21-03-2018 24/03/2018 27/03/2018 23/04/2018
Time 15:0Hrs
100 Consultancy services for preparation of FS and DPR for fly over between km 7.30 to Km 8.05 on Srinagar Baramulla Uri road under Project Beacon in Jammu and Kashmir State CE (P) BCN/02/2016-17 24/03/2018 26/03/2018 28/04/2018
Time 12:0Hrs
101 Consultancy Services for carrying out Feasibility Study and Detailed Engineering for reconstruction of new bridges in replacement of existing old and narrow bridges on National Highways in the State of Himachal Pradesh. 10753-10853 dated 01/03/2018 23/03/2018 23/03/2018 07/04/2018
Time 15:0Hrs
102 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir. NHIDCL/ JandK /DPR/Thathri-Chachool/2017-18 22/03/2018 22/03/2018 09/05/2018
Time 15:0Hrs
103 SURVEY INVESTIGATION PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD TATO-MENCHUKA FROM KM 0.00 TO KM 50.00 TO NHDL STANDARD THROUGH CONSULTANCY IN ARUNACHAL PRADESH UNDER PROJECT BRAHMANK CE(P)BRAHMANK/22 OF 2017-18 RETENDER 2nd time 19/03/2018 19/03/2018 31/03/2018
Time 11:0Hrs
104 Review and Updating of Detailed Project Report (DPR) for Four laning and Strengthening of the Highway starting from its junction with NH-44 near Thoppur connecting Mecheri, Mettur, Ammapettai, Nerinchipettai, Chittar, Bhavani and terminating near Erode Km 0/0 to 85/0 of NH-544H in the State of Tamil Nadu Tender Notice No.46/HDO/NH/2017-18/dated.20.02.2018 19/03/2018 19/03/2018 17/04/2018
Time 15:0Hrs
105 Review and Updating of detailed Project Report (DPR) for four Laning and Strengthening of the Salem - Uthangarai - Thirupathur - Vaniyambadi road for the stretch, Starting from Harur and Terminating @ Vaniyambadi Km.49/0-129/0 of NH -179A in the State of Tamil Nadu Tender Notice No.47/HDO/NH/2017-18/dated.21.02.2018 19/03/2018 19/03/2018 17/04/2018
Time 15:0Hrs
106 CONSULTANCY SERVICES FROM MORTH / INFRACON EMPANELLED FIRM FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR IMPROVEMENT OF ROAD SRINAGAR – BARAMULLA – URI (NH-1) FROM KM 14.200 TO KM 47.200 TO NH FOUR LANE SPECIFICATIONS, FROM KM 47.200 TO KM 57.800 TO NH FOUR LANE SPEFCIFICATIONS (BARAMULLA BYE PASS) AND FROM KM 57.800 TO KM 101.00 TO NH DOUBLE LANE SPECIFICATION WITH PAVED SHOULDER (10 MTR CARRIAGE WAY) IN THE AOR OF 53 RCC UNDER 760 BRTF (P) BEACON IN JAMMU AND KASHMIR STATE (2ND CALL) CE (P) BCN/07/2017-18 17/03/2018 18/03/2018 09/04/2018
Time 12:0Hrs
107 RE-TENDER CONSULTANCY SERVICE FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD BAKASAR-MAVASARI FROM KM 0.000 TO KM 32.49 (NET LENGTH 32.49 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION IN 45 BRTF AREA UNDER PROJECT CHETAK IN RAJASTHAN STATE CE (P) CTK/23/2017-18 15/03/2018 17/03/2018 26/04/2018
Time 11:30Hrs
108 Consultancy Services for preparation of Detailed Project Report for Replacement/ Reconstruction of Superstructure of 2 lane Old Narmada Bridge (Constructed in 1977) across Narmada River on NH-8 Section from Km. 192.00 to Km. 198.00 of NH-8 passing through District Bharuch in between Vadodara-Surat Section of NH-8 in the state of Gujarat on EPC Mode NHAI/PIU Surat (Expressway)/71/2018 22/03/2018 09/03/2018 09/04/2018
Time 11:0Hrs
109 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for strengthening in/c paved shoulder of NH-8 in Churaibari – Agartala Section from KM 422.00 to KM 456.00 ( Mungiakami to Champaknagar) in the state of Tripura (Phase-I). PNIT No.09/SE/NH Circle/PWD (NH)/2017-18 08/03/2018 09/03/2018 26/04/2018
Time 15:0Hrs
110 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of in principle declared National Highway from Kamalpur to Santirbazar (on NH-8) via Ambassa (on NH-8), Gandacherra, Amarpur (on NH-208) and Santirbazar to Belonia in the state of Tripura. PNIT NO.10/SE/NH Circle/PWD (NH)/2017-18 08/03/2018 09/03/2018 25/04/2018
Time 15:0Hrs
111 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of in principle declared National Highway from -(i) Champaknagar (Jirania) on NH-8 to Udaipur on NH-8 via Jampuijala, (ii) Amarpur on NH-208 to Udaipur on NH-8 in the state of Tripura. PNIT No.11/SE/NH Circle/ PWD (NH)/2017-18 08/03/2018 09/03/2018 25/04/2018
Time 15:0Hrs
112 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration Highway starting at Junction of NH-65(9) Umarga – KasarShirshi – Nilanga – LamjanaPhata – Samudrawani and terminating at Osmanabad In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/01 16/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
113 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway starting at Osmanabad Barshi Vairag and terminating at Junction of NH 65 Near Solapur In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/02 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
114 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation Upgradation of existing roads to 2 lane 4 lane with paved shoulders configuration of Highway Starting at Ambejogai and connecting to Pokhari Murud Samudrawani Patoda Lohara and terminating at junction of NH65 near Ashtamode In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/03 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
115 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation Upgradation of existing roads to 2 lane 4 lane with paved shoulders configuration of Highway Starting at Junction of NH753A near Karmad and connecting to Lad Sangavi Chauka Harsul Sangavi Naigaonganuri Yesgaon Bazar Savangi and terminating at Junction of NH 52 near Kannad In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/04 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
116 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane 4 lane with paved shoulders configuration of Highway Starting at Junction of NH 52 near Georai and connecting to Shevgaon Umapur Bhenda Factory and terminating at Nevasa In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/05 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
117 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Nevasa -Shrirampur - Bhabhaleshwar-Loni - Sanagmner and terminating at Akole In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/06 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
118 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Akole - Rajur - Shendi and terminating at Junction of NH 848 at Shahapur In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/07 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
119 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH-52 (211) near Padalsinghi-Pachegaon-PimpalnerTadsona-Wadvani-Chinchavan-Dharur-Adas-Lokhandi-Sawargaon-Yusuf Wadgaon and terminating at Kalamb In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/08 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
120 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Kalamb - Washi - Saramkundi (NH-211)- Bhoom - Paranda and terminating at Karmala In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/09 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
121 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Karmala - Rashin - Siddhtek and terminating at Daund In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/10 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
122 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH-161 at Hingoli - Aundha Nagnath - Javla Bazar - Hatta - Purna and terminating at Junction of NH-361 at Nanded In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/11 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
123 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH- 848 at Nashik - Dindori and terminating at Junction of NH-953 at Vani In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/12 20/03/2018 08/03/2018 10/05/2018
Time 17:0Hrs
124 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH- 60(3) at Umrane - Deola - Kalvan - Borgaon - Surgana - Bardipada and terminating at Maharashtra Gujarat State Border near Wajada In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/13 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
125 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Dondaicha - Sindhakheda - Betawad - Amalner - Dharangaon and terminating at - Junction of NH-53(6) near Erondol In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/14 20/03/2018 08/03/2018 10/05/2018
Time 17:0Hrs
126 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Junction of NH- 48(4) at Kon Phata - Rasayani - Turade - Apta and terminating at Kharpada on NH-66 (17) In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/15 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
127 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Mhasavad and terminating at Toranmal Hill Station In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/16 20/03/2018 08/03/2018 10/05/2018
Time 17:0Hrs
128 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Hinganghat - Nandori - Kora - Khedsvngi - Chimur -Neri-Pendheri - Nawargaon - Sindewahi – Mul & Chimur - Shankarpur and terminating at Kanpa In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/17 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
129 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Jintur - Yeldari and terminating at Sengaon In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/18 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
130 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Paithan - Pachod - Ambad - Ghansawangi and terminating at Ashti (Package I) In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/19 20/03/2018 08/03/2018 10/05/2018
Time 17:0Hrs
131 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Ashti - Pathari - Pokharni and terminating at Purna In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/20 20/03/2018 08/03/2018 10/05/2018
Time 17:0Hrs
132 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Ganeshpur (on Jalana Mantha Road) - Kotha - Vazarhandi - Loni - Risod and terminating at Mehekar In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/21 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
133 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Parli Vaijnath - Khodwa Savargaon - Daithana - Antarweli - Pimpaldari - Rani Sawargaon - Palam - Tadkalas and terminating at Purna In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/22 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
134 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Neera and terminating at Baramati In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/23 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
135 Consultancy Services for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/ Upgradation of existing roads to 2 lane/ 4 lane with paved shoulders configuration of Highway Starting at Trimbakshwar -Amboli - Harsul - Ozarhked - Vavar - Chalawade - Khanel and terminating at MH/Gujarat Border In Principal declared National Highways in the State of Maharashtra CE/DPR/17-18/24 20/03/2018 08/03/2018 28/05/2018
Time 17:0Hrs
136 Consultancy services from MORTH empanelled firm for FS, prep of DPR and preconstr services for impro of road Dhar Udhampur from NHDL spec to NHFL spec from Km 125 to 130.00 in 52 RCC under 35 BRTF Project Beacon in the state of Jammu Kashmir CE (P) BCN/11/2017-18 06/03/2018 07/03/2018 30/03/2018
Time 12:0Hrs
137 Consultancy Services for Feasibility study/DetailedEngineering report for construction of two lane with paved shoulder for newly in principle approved national highway From Suratgarh-Baropal-18SPD- Jhanaranwali-Bherusari-Rawatsar ) Length 57.00 Km 11/2017-18 19/04/2018 07/03/2018 23/04/2018
Time 11:0Hrs
138 Consultancy Services for Authority’s Engineer (AE) for the work of “Widening and Strengthening from (i) 2-lane to 2-lane with paved shoulder from km 0/550-1/100, 5/700-21/070, 21/500-34/200 & 34/870-38/000 and (ii) Strengthening of existing 4-lane from km 0/000-0/550, 1/100-1/780, 2/420-5/700, 21/070-21/500, 34/200-34/870 and 2-lane from km 1/780- 2/420 (Dindigul- Natham section) of NH383 in the State of Tamil Nadu “ EPC mode TN No. 44/2017/DO/NH/ dated 27.02.2018 07/03/2018 02/03/2018 20/04/2018
Time 15:0Hrs
139 Consultancy Services for preparation of Detailed Project Report from Araku (Bhalluguda) to Bowdara section of NH 516E for Upgradation to Two/Four lane with paved shoulder configuration in the state of A P (Tentative length 42.40 km) NIT NoSE Rand B NHVJA Tender 13 2017 18 dt 23 3 2018 14/03/2018 28/02/2018 02/04/2018
Time 15:0Hrs
140 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R30SML 10228-10327,21-02-2018 25/02/2018 26/02/2018 27/03/2018
Time 15:0Hrs
141 Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka 12/2016-17 23/02/2018 23/02/2018 05/03/2018
Time 16:0Hrs
-
142 Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka EE/NHD/MNG/AE2/Road Safety Audit/NIT-12/5th Call/2017-18 23/02/2018 23/02/2018 05/03/2018
Time 16:0Hrs
-
143 Consultancy Services for preparation of DPR for Rehabilitation and Upgradation From Km 0 .0 to 43.097 of Mydukur to singarakonda road via porumamilla seetaramapuram C.S puram and Kandukuru Two or Four lane with paved shoulder configuration in the State of Andhra Pradesh SE R and B NH ATP NIt NO 61/2017-18 22/02/2018 22/02/2018 09/04/2018
Time 15:0Hrs
144 CONSULTANCY SERVICES FROM MoRT&H EMPANELLED FIRM FOR FEASIBILITY STUDY (FS), PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PRECONSTRUCTION SERVICES FOR IMPROVEMENT OF ROAD RAFIABAD KUPWARA CHOWKIBAL TANGDHAR CHAMKOT (NH-701) FOR FURTHER DEVELOPMENT AS NHDL SPECIFICATION WITH PAVED SHOULDER AS WELL AS DISTRICT CONNECTIVITY ROAD IN 109 RCC UNDER 32 BRTF PROJECT BEACON IN THE STATE OF JAMMU & KASHMIR (RETENDER SIXTH CALL) CE (P) BCN/19/2016-17 19/02/2018 20/02/2018 21/03/2018
Time 12:0Hrs
145 RETENDER FOR CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD SANSARI-KILLER-THIROT-TANDI FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS FROM KM 40.000 TO KM 70.000 AND KM 96.000 TO KM 125.000 (NET LENGTH 59.00 KM) UNDER 94 RCC/ 38 BRTF PROJECT DEEPAK IN LAHAUL SPITI DISTT IN THE STATE OF HIMACHAL PRADESH CE (P) Deepak-14 of 2017-18 30/01/2018 17/02/2018 05/03/2018
Time 17:0Hrs
146 Consultancy Services for preparation of Detailed Project Report for Signature Rail-cum-Road Bridge (on the downstream side of existing Rail cum Road Bridge) including its approaches across River Ganga on Old GT Road near Kashi Railway Station, Varanasi in the State of Uttar Pradesh NHAI/DPR/Signature Bridge/2018/Bharatmala Division 16/02/2018 13/02/2018 01/05/2018
Time 11:0Hrs
147 Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Pariyojana (Lot-2) (Package-I) NHIDCL/Bharatmala/ DPR/Phase-I/ Package-I/ Lot-2/2018 12/02/2018 13/02/2018 17/04/2018
Time 11:0Hrs
148 Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram under Bharatmala Pariyojana (Lot-2) (Package-II) NHIDCL/Bharatmala/ DPR/Phase-I/ Package-II/ Lot-2/2018 12/02/2018 13/02/2018 17/04/2018
Time 11:0Hrs
149 Consultancy Services for Feasibility study Detailed project report Including conducting site investigation subsoil exploration and testing preparation of plans designs Land plan schedules preparation of GAD for the bypass roads to Kuppam Bireddypalli in Chittoor District and Jammalamadugu, Mydukuru in Kadapa District in the State of Andhra Pradesh Consultancy Services for Feasibility study Detailed project report Including conducting site investigation subsoil exploration and testing preparation of plans designs Land plan schedules preparation of GAD for the bypass roads to Kuppam Bireddypalli in Chittoor District and Jammalamadugu, Mydukuru in Kadapa District in the State of Andhra Pradesh 12/02/2018 12/02/2018 27/03/2018
Time 15:0Hrs
150 Consultancy Services for carrying out feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh.(Package No. HP/Shahpur/R-1/25 as per Annexure I) 293-SESHA-2017 07/02/2018 12/02/2018 05/03/2018
Time 15:0Hrs
151 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh (Package No. HP/Shahpur/R-1/22 as per Annexure I) 294-SESHA-2017 07/02/2018 12/02/2018 05/03/2018
Time 15:0Hrs
152 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R31SML 9577-9676, 07-02-2018 09/02/2018 09/02/2018 10/03/2018
Time 15:0Hrs
153 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R32SML 9577-9676, 07-02-2018 09/02/2018 09/02/2018 10/03/2018
Time 15:0Hrs
154 Consultancy Services for Up Gradation to Two Four lane with paved shoulder configuration of the stretch from Junction with NH 216 near Narsapuram Sakhinetipalli Malkipuram upto junction with NH 216 near Razole along with construction of new bridge between Narsapuram and Sakhinetipalli 380m long across Vasistha Godavari River Tentative Length 23.00km in the state of Andhra Pradesh 2nd Call S E Rand B NH VJA Tender 12 2017 18 dt 07 02 2018 17/02/2018 09/02/2018 05/03/2018
Time 17:0Hrs
155 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R26SML 9449-9548,06-02-2018 08/02/2018 08/02/2018 06/03/2018
Time 15:0Hrs
156 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R33SML 9449-9548,06-02-2018 08/02/2018 08/02/2018 06/03/2018
Time 15:0Hrs
157 CONSULTANCY SERVICE FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD BAKASAR-MAVASARI FROM KM 0.000 TO KM 32.49 (NET LENGTH 32.49 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION IN 45 BRTF AREA UNDER PROJECT CHETAK IN RAJASTHAN STATE CE (P) CTK/22/2017-18 06/02/2018 07/02/2018 07/03/2018
Time 11:30Hrs
158 Consultancy services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane with paved shoulders and/or it’s strengthening in the State of Himachal Pradesh “Powari to Kalpa road on NH-505A”. 9242-9342,02-02-2018 06/02/2018 06/02/2018 15/03/2018
Time 15:0Hrs
159 SURVEY INVESTIGATION PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD TATO-MENCHUKA FROM KM 0.00 TO KM 50.00 TO NHDL STANDARD THROUGH CONSULTANCY IN ARUNACHAL PRADESH UNDER PROJECT BRAHMANK CE(P)BRAHMANK/22 OF 2017-18 RETENDER 02/02/2018 03/02/2018 26/02/2018
Time 11:0Hrs
160 Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa- Galkund- Samghan- Saputara- Maharashtra Border Section) in the State of Gujarat for up-gradation to Two/Four Lanes with paved shoulder configuration 22of2017-18-5 03/02/2018 03/02/2018 16/02/2018
Time 18:0Hrs
161 for improvement and up-gradation from 2 Lane to 4 Lane of Ghazipur-Jamaniaya-Saiyad Raja road of NH-97 in the State of Uttar Pradesh NHAI/Tech/GJS/NH-97/DPR/2018/112360 03/02/2018 02/02/2018 05/02/2018
Time 11:0Hrs
-
162 improvement and up-gradation from 2 Lane to 4 Lane of Ghazipur-Jamaniaya-Saiyad Raja road of NH-97 in the State of Uttar Pradesh NHAI/Tech/GJS/NH-97/DPR/2018/112360 03/02/2018 02/02/2018 05/03/2018
Time 11:0Hrs
163 Consultancy service for Feasibility Study, Detailed Project report, Survey and preparation of land plan for widening to two lane with paved shoulders Pavagada Kalyanadurga-Veparalla Andra Border Road in the state of Karnataka. 20/2017-18 31/01/2018 31/01/2018 06/04/2018
Time 16:0Hrs
164 CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to Two lane with paved shoulder from KM 194.900 to 243.200 Banavar Huliyar section in the state of Karnataka on EPC Mode 15/2017-18 05/02/2018 30/01/2018 01/03/2018
Time 15:0Hrs
165 CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 4 lane RUB and its approaches in lieu of existing level crossing No 41 at KM 365.110 Railway CH 73 2 3 on NH 234 at Gowribidanur section in the state of Karnataka on EPC Mode. 14/2017-18 05/02/2018 30/01/2018 01/03/2018
Time 15:0Hrs
166 CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of proposed 2 lane ROB and its approaches in lieu of existing level crossing No 130 at KM 48.300 on NH-207 Near koralur village Sarjapura Dobbasapete section in the state of karnataka 13/2017-18 05/02/2018 30/01/2018 01/03/2018
Time 15:0Hrs
167 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for C/O flyover in Una town on NH-503 (Extn.) in the State of Himachal Pradesh (Package No. HP/Shahpur/R/21 as per Annexure I). 291-SESHA-2017 24/01/2018 30/01/2018 21/02/2018
Time 15:0Hrs
168 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. (Package No. HP/Shahpur/R-1/19 as per Annexure I). 292-SESHA-2017 24/01/2018 30/01/2018 21/02/2018
Time 15:0Hrs
169 CONSULTANCY SERVICE FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to Two Lane With Paved Shoulders from, Km 544 200 to Km 594 000 Hosamanecross to Pandvapura section of NH-150A in Karnataka state through an Engineering Procurement and Construction EPC Contract. 21/2017-18 06/02/2018 30/01/2018 02/03/2018
Time 16:0Hrs
170 CONSULTANCY SERVICES FOR PREPARATION OF DPR ON EPC MODE FOR IMPMT OF ROAD TLL FM KM 57PT00 TO KM 70PT00 FM NEW TO CL9 E SPCN AND MAHWERE-SAPI RD FROM KM 30PT00 TO KM 42PT00 FM EXTG CL5 TO CL9 E SPECN UNDER PROJECT PUSHPAK IN MIZORAM STATE SECOND CALL CE (P) PSK-12 OF 2017-18 29/01/2018 29/01/2018 05/04/2018
Time 10:0Hrs
171 Consultancy Services for Feasibility Study/ Detailed Project Report for the project of UP-gradation and 4-laning of Paonta Saheb – Ballupur (Dehradun) Section of NH 72 (km 104.00 to km 149.00) In the State of Uttarakhand NHAI/Tech/UKD/DPR/03/2018 31/01/2018 29/01/2018 21/05/2018
Time 11:0Hrs
172 Consultancy Services for Feasibility Study/ Detailed Project Report for the project of UP-gradation and 4-laning of Paonta Saheb – Ballupur (Dehradun) Section of NH 72 (km 104.00 to km 149.00) In the State of Uttarakhand NHAI/Tech/UKD/DPR/03/2018 31/01/2018 29/01/2018 27/02/2018
Time 15:0Hrs
173 Consultancy Services for Feasibility Study/ Detailed Project Report NHAI/Tech/UKD/DPR/03/2018 31/01/2018 29/01/2018 27/02/2018
Time 15:0Hrs
-
174 CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON ROAD SINGTHAM-DIKCHU AND FROM KM 0.00 TO KM 7.360 ON ROAD DIKCHU-RANGRANG (NET LENGTH 30.06 KM) UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN SIKKIM STATE CE (P) SWTK/39/ 2017-18 24/01/2018 25/01/2018 23/02/2018
Time 12:0Hrs
175 ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD DAMDIM-ALGARAH-RISHI FROM KM 71.00 TO KM 92.60 (NET LENGTH 21.60 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN WEST BENGAL STATE (RETENDER) CE (P) SWTK/40/ 2017-18 23/01/2018 24/01/2018 21/02/2018
Time 12:0Hrs
176 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1)(Package-III)(Reinvitation) NHIDCL/Bharatmala/DPR/Phase I/Lot-1/Package-III/2018 22/01/2018 23/01/2018 13/02/2018
Time 11:0Hrs
177 Consultancy Services for preparation of Detailed Project Reports for Construction of a Road Tunnel with its approaches including junction with Dwarka Expressway for western connectivity to IGI Airport from Dwarka expressway in the State of Delhi-4th Call NHAI/ PIU DWARKA/ IGIA Tunnel/ RFP 22/01/2018 19/01/2018 12/02/2018
Time 11:0Hrs
178 CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR USING LIDAR TECHNOLOGY FOR CONSTRUCTION OF ROAD CHUSUL-DUNGTI-FUKCHE-DEMCHOK TO NHSL SPECIFICATION FROM KM 0.00 TO KM 134.790 (NET LENGTH 134.790 KM) IN 753 BRTF UNDER PROJECT HIMANK IN LEH-LADAKH REGION OF J K STATE CE (P) HIMANK/26/2017-18 16/01/2018 17/01/2018 07/02/2018
Time 10:0Hrs
179 Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Soyala Osian Tiwari Balesar 126 KmDistt Jodhpur CE (NH) PWD Raj Jaipur NIT No 07 of 2017-18 15/01/2018 15/01/2018 19/02/2018
Time 18:0Hrs
180 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R30SML 8531-8631,10-01-2018 12/01/2018 15/01/2018 12/02/2018
Time 15:0Hrs
181 Consultancy Services for Project Management in-charge preparation of Feasibility Study/Detailed Project Report for two laning with paved shoulders of Longleng (Junction with NH No. 702) to Tuensang (Junction with NH-202) on NH No. 702B [NH(O)] CE/NH/etender/2017-18/10/01 12/01/2018 13/01/2018 20/03/2018
Time 12:0Hrs
182 Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Athibung-Khelma (Phase-B of SARDP-NE) and Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders from NH-29 to NH-29 (New NH Nos.) Dimapur Bypass. (II Call) CE/NH/etender/2017-18/10/02 12/01/2018 13/01/2018 20/03/2018
Time 12:0Hrs
183 Consultancy Services for carrying out feasibility study, Detailed Survey/Investigation, Preparation of General Arrangement Drawing, Detail Project Report for Construction of proposed ROB Six-lane configuration and its approaches in replacement of temporary LC at Km.363.625 on NH-8A New NH- 141 08 of 2017-18 (5th Attempt) 12/01/2018 12/01/2018 29/01/2018
Time 18:0Hrs
184 Consultancy Services for Preparation of DPR for improvement of newly declared NHs 8/2017-2018/2017-2018 of SE, NH Circle No. II 10/01/2018 11/01/2018 14/02/2018
Time 14:0Hrs
185 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh. (Package No. HP/Shahpur/R-1/22 as per Annexure I). 288-SESHA-2018 30/12/2017 09/01/2018 02/02/2018
Time 15:0Hrs
186 Consultancy Services for carrying out feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh. Package No. HP/Shahpur/R-1/25 as per Annexure I. 289-SESHA-2018 30/12/2017 09/01/2018 02/02/2018
Time 15:0Hrs
187 RFP for Consultancy services for Preparation of DPR for the Construction of Bridge at Km 186/10 of Madanapalli Naidupeta Road NH 71(3rd Call) NIT no 50/2017-18 09/01/2018 09/01/2018 22/02/2018
Time 15:0Hrs
188 Package for Consultancy services for Authoritys Engineer for supervision of Civil Construction work for proposed 4lane ROBs and its approaches in existing Level Crossing lieu of 23SPL Class at Km 3.600 and 18ASPL class at Km 7.800 on NH-18 in the State of Andhra Pradesh under EPC Mode 2nd call NIT no 51/2017-18 09/01/2018 09/01/2018 08/02/2018
Time 15:0Hrs
189 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1)(Package-1A) NHIDCL/Bharatmala/DPR/Phase-I/Package-1A/Lot-1/2018 09/01/2018 09/01/2018 30/01/2018
Time 11:0Hrs
190 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-1)(Package-1B). NHIDCL/Bharatmala/DPR/Phase-I/ Package-1B /Lot-1/2018 09/01/2018 09/01/2018 30/01/2018
Time 11:0Hrs
191 Engaging Technical Consultant for preparation of Feasibility Study (FS), Detailed Project Report (DPR) on EPC mode for upgradation of road Budhal-Mahore-Gul to NHDL specifications from Km 0.00 to Km 114.875 (Net length 114.875 Kms) in 31 BRTF area under Project Sampark in J&K State CE (P) SPK/25/2017-18 10/01/2018 08/01/2018 05/02/2018
Time 12:0Hrs
192 4-lane Elevated Section at Begusarai at Chainage 221.910 to 224.935 on NH-31, Length 3.025 Km (ii) 4-lane Elevated section of Shivala – Bihta section of Patna – Koilwar on NH-30 at design Chainage 16.050 to 29.500 of proposed alignment of NH-30, Length 13.450 Km (iii) 4-lane Elevated section at Gopalganj Chainage 384.483 to 386.362 on NH-28, Length 1.879 Km. NHAI/BH/Elevated/DPR/2017/Proc 06/01/2018 06/01/2018 24/01/2018
Time 11:0Hrs
193 Consultancy Services for Feasibility/DPR of 4-laning of Khagaria to Purnea Section of NH-31 from km 270.00 to km 410.00 in the State of Bihar NHAI/BH/DPR/Kha-Pur/4L/2017-18 06/01/2018 06/01/2018 09/02/2018
Time 11:0Hrs
194 Consultancy Services for Feasibility/DPR of 4-laning of Mokama – Munger Section of NH-80 from Km 1.430 to Km 70.00 including link to NH-31 in the State of Bihar NHAI/BH/DPR/Mok-Mung/4L/2017-18 06/01/2018 06/01/2018 09/02/2018
Time 11:0Hrs
195 Consultancy Services for Preparation of Detailed Project report of 4/6 lane Access Controlled Green Field Expressway Connecting New Capital City Amaravathi to Ananthapuramu with Connectivity to Kurnool and Kadapa in the State of Andhra Pradesh through BOT /EPC Basis – Approximate length 560 KM. SE NH ATP NIT No 44 10/01/2018 05/01/2018 20/02/2018
Time 15:0Hrs
196 Consultancy Services for preparation of Detailed Project Report for alternate direct connectivity between Delhi and Vadodara under National Corridor Efficiency Improvement under Bharatmala Pariyojna NHAI/Bharatmala/Delhi-Vadodra/RFP/2017 01/01/2018 29/12/2017 29/01/2018
Time 11:0Hrs
197 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Mehsana (on NH-68) to Visnagar-Vadnagar-Idar (on NH-58)-Shamlaji (on NH-48) road as new National Highway in State of Gujarat. (Job No. Inprinciple/GJ/2017-18/594) 10 of 2017-18 (3rd Attempt) 29/12/2017 29/12/2017 16/01/2018
Time 12:0Hrs
-
198 ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD GANGTOK-CHUNGTHANG FROM KM 30.00 TO KM 46.00 AND KM 58.00 TO KM 66.00 (NET LENGTH 24.00 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION UNDER 758 BRTF AREA UNDER PROJECT SWASTIK IN SIKKIM STATE CE (P) SWTK/37/2017-18 27/12/2017 28/12/2017 27/01/2018
Time 12:0Hrs
199 CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR ON USING LiDAR TECHNOLOGY FOR CONSTRUCTION / IMPROVEMENT OF EXISTING ROAD KARU-TANGTSE TO NHDL SPECIFICATION FROM KM 20.00 TO KM 81.600 (NET LENGTH 61.600 KM) IN 753 BRTF UNDER PROJECT HIMANK IN LEH-LADAKH REGION OF J&K STATE CE(P)HMK/27/2017-18 23/12/2017 27/12/2017 17/01/2018
Time 10:0Hrs
200 Consultancy Services for Project Management including preparation of Detailed Project Report from AP/TS Border to Piduguralla-Narasasraopet-Vodarevu road of NH 167A in the state of A P for Upgradation to Two/Four lane with paved shoulder configuration. S ERBNHVJA Tender 07 2017-18 DT 19 12 2017 10/01/2018 26/12/2017 25/01/2018
Time 16:0Hrs
201 A Consultancy service for review and updating of available FS and DPR Prepared by KSHIP and submission of DPR 1Tumkur Koratagere Madhugiri Pavagada Section B Consultancy service for preparation of FS and DPR including all necessary survey and investigations for widening to two lane with paved shoulders 1 Pavagada Kalyanadurga Veparalla Andra Border Road NIT12 retender 23/12/2017 23/12/2017 06/01/2018
Time 11:0Hrs
202 A Consultancy service for review and updating of available FS and DPR Prepared by KSHIP and submission of DPR 1Tumkur Koratagere Madhugiri Pavagada Section B Consultancy service for preparation of FS and DPR including all necessary survey and investigations for widening to two lane with paved shoulders 1 Pavagada Kalyanadurga Veparalla Andra Border Road NIT12 retender 23/12/2017 23/12/2017 06/01/2018
Time 11:0Hrs
203 Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa- Galkund- Samghan- Saputara- Maharashtra Border Section) in the State of Gujarat for up-gradation to Two/Four Lanes with paved shoulder configuration 19of2017-18-1-1 22/12/2017 22/12/2017 27/12/2017
Time 18:0Hrs
204 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R29SML. 7640-7739,13-12-2017 15/12/2017 19/12/2017 13/01/2018
Time 15:0Hrs
205 Consultancy Services for preparation of Detailed Project Report for the Improvement of Road safetyat the following location on NH-15 under Road Safety Annual Plan 2017-18 under Rangia NH Division in the State of Assam- 1) Improvement of Road safety in km 5 to km 6 of NH-15 near Bezera from bus-bays, drain-cum-footpath, road signs/markings, improvement of junction etc . 2) Improvement of Road safety in km 50 to km 52 through improvement of junction, bus-bays, pedestrian facilities, road signs/mar CE PWD NH (RS) 1 16/12/2017 16/12/2017 25/12/2017
Time 16:0Hrs
206 Consultancy services for preparation of DPR on EPC mode for impmt of Rd TLL from Km 57pt00 to Km 70pt00 from new to Cl9 Specn and Mahwere sapi rd from Km 30pt00 to Km 42 CE(P)PSK-12 OF 2017-18 23/12/2017 13/12/2017 04/01/2018
Time 10:0Hrs
207 ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD DAMDIM-ALGARAH-RISHI FROM KM 71.00 TO KM 92.60 (NET LENGTH 21.60 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN WEST BENGAL STATE CE(P) SWTK/34/2017-2018 12/12/2017 12/12/2017 10/01/2018
Time 15:0Hrs
208 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh Package No. HP/Shahpur/R/2. 287-SESHA-2017 11/12/2017 12/12/2017 02/01/2018
Time 15:0Hrs
209 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R-1/9) 287-SESHA-2017 11/12/2017 12/12/2017 02/01/2018
Time 15:0Hrs
210 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/27) 287-SESHA-2017 11/12/2017 12/12/2017 02/01/2018
Time 15:0Hrs
211 Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for construction of Road Nampong-Vijaynagar from Km 30.000 To Km 213.000 (Appx length 183 Km) to NHDL specifications under 752 BRTF of PROJECT UDAYAK in Arunachal Pradesh State CE(P) UDAYAK/20/2017-18 01/12/2017 12/12/2017 14/02/2018
Time 12:0Hrs
212 A Consultancy service for Proof checking of available FS and DPR with KSHIP and submission of Feasibility study DPR Survey for widening to two lane with paved shoulders a Tumkur Koratagere Madhugiri Pavagada B Consultancy service for Proof checking Feasibility study DPR Survey and Preparation of Land plan by adopting LIDAR or similar technology for widening to two lane with paved shoulders b Pavagada Kalyanadurga Veparalla Andra Border Road EE NHD TMK NIT12 2017 18 12/12/2017 11/12/2017 22/12/2017
Time 11:0Hrs
213 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of part of road stretch Dungargarh-Sardarshahr-Taranagar-Rajgarh-Bahal-Ovara-Kairu-Lohani which falls in the State of Haryana. PWD/HR/PKL/21 09/12/2017 09/12/2017 05/02/2018
Time 11:0Hrs
214 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of part of road stretch Jurhera-Palwal which falls in the State of Haryana. PWD/HR/PKL/22 09/12/2017 09/12/2017 05/02/2018
Time 11:0Hrs
215 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of part of road stretch Nathusari-Bhadara-Sindhmukh-Malsisar-Jhunjhunu-Gudha-Udaipurwati which falls in the State of Haryana. PWD/HR/PKL/23 09/12/2017 09/12/2017 05/02/2018
Time 11:0Hrs
216 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of Rajasthan/Haryana Border-Hisar in the State of Haryana. PWD/HR/PKL/24 09/12/2017 09/12/2017 05/02/2018
Time 11:0Hrs
217 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh Package No. HP/Shimla/R26SML. 7293-7392,02-12-2017 09/12/2017 09/12/2017 30/12/2017
Time 15:0Hrs
218 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R30SML. 7293-7392,02-12-2017 09/12/2017 09/12/2017 30/12/2017
Time 15:0Hrs
219 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and up-gradation to 2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shimla/R33SML. 7293-7392,02-12-2017 09/12/2017 09/12/2017 30/12/2017
Time 15:0Hrs
220 Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-64 between Km. 127/740 to 386/020 (Mahisagar River - Dabha Circle - Jambusar - Amod - Bharuch - Ankleshwar - Hasot - Vadoli – Sandhier - Surat - Navsari - Dandi Section) in the State of Gujarat for up gradation to Two/Four lane with paved shoulder configuration 19of2017-18-2 08/12/2017 08/12/2017 27/12/2017
Time 18:0Hrs
221 Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highway-953 between Km. 62/400 to 105/00 (Ahwa- Galkund- Samghan- Saputara- Maharashtra Border Section) in the State of Gujarat for up-gradation to Two/Four Lanes with paved shoulder configuration 19of2017-18-1 08/12/2017 08/12/2017 20/12/2017
Time 18:0Hrs
222 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the road stretches from Sohela-Bijepur-Barpali-Naikenpali-Binka-Sardhanpali-Sonepur (Declared as New National Highways) in the State of Odisha 10 CE-NH-17-18 05/12/2017 05/12/2017 26/12/2017
Time 17:0Hrs
223 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for construction of roads of NH standard(2-Lane) with major bridges over river Brahmaputra, Subansiri,Khabalu&Lohit along the alignment from Sivasagar-Desangmukh-Tekeliphuta-Dhakuakhana-North Lakhimpur-Majuli-Jorhat in the state of Assam. CE PWD NH 5 01/12/2017 03/12/2017 11/02/2018
Time 11:0Hrs
224 Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for construction of Road Nimmu-Chilling-Niraq-Padam-Shinkunla sub sector of road Nimmu-Padam-Darcha from km 0.00 (Nimmu) to km 259.00 (Shinkunla) to NHDL specification except between km 0.00 to km 45.00 and km 124.70 to km 176.70 (total length 162 km) under 762 BRTF of Project Vijayak in Leh Ladakh Region of Jammu and Kashmir State CE(P)VIJAYAK/21/2017-18 24/11/2017 02/12/2017 01/01/2018
Time 14:0Hrs
225 Consultancy services for preparation of Detailed Project Report for Srivilliputhoor – Sivakasi – Virudhunagar – Aruppukottai – Thiruchuli – Parthibanoor (Package No. NH-TVL/1, Category-II) for upgradation to to Two lane with paved shoulder/ Four lane configuration TN No. 16/2017-18/ DO/ dated 28.11.2017 05/12/2017 01/12/2017 18/12/2017
Time 11:0Hrs
226 CONSULTANCY SERVICE FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD BARMER-CHOHTAN-KELNOR FROM KM 8.150 TO KM 91.000 (NET LENGTH 82.85 KM) FROM EXISTING IW/CL-9 SPECIFICATION TO NHDL SPECIFICATION IN 45 BRTF AREA UNDER PROJECT CHETAK IN RAJASTHAN STATE CE (P) CTK/16/2017-18 30/11/2017 30/11/2017 02/01/2018
Time 11:30Hrs
227 CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT FOR GREEN FIELD ALIGNMENT, STRETCH FROM MARA TO YANGPHO (I.E., BET KM 41.00 TO KM 95.00 OF SEPPA-SARLI ROAD) IN STATE OF ARUNACHAL PRADESH UNDER PROJECT ARUNANK. ANK/NIT-10/2017-18 (RE-TENDER) 28/11/2017 30/11/2017 10/01/2018
Time 17:0Hrs
228 ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS), DETAILED PROJECT REPORT (DPR) ON EPC MODE FOR IMPROVEMENT OF ROAD RISHI-RONGLI-KUPUP FROM KM 38.00 TO KM 87.00 (NET LENGTH 49.00 KM) FROM EXISTING CL-9 SPECIFICATION TO NHDL SPECIFICATION UNDER 764 BRTF AREA UNDER PROJECT SWASTIK IN SIKKIM STATE CE(P)/SWTK/33/2017-18 29/11/2017 30/11/2017 29/12/2017
Time 12:0Hrs
229 Consultancy Services for preparation of DPR CE(P) DPK/09/2017-18 29/11/2017 30/11/2017 13/01/2018
Time 17:0Hrs
230 Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam NHAI/11012/ Guwahati Bypass/ DPR /NE/2017 30/11/2017 29/11/2017 28/12/2017
Time 15:0Hrs
231 CONSULTANCY SERVICES FROM MORT&H / INFRACON EMPANELLED FIRM FOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR IMPROVEMENT OF ROAD SRINAGAR – BARAMULLA – URI (NH-1) FROM KM 14.200 TO KM 47.200 TO NH FOUR LANE SPECIFICATIONS, FROM KM 47.200 TO KM 57.800 TO NH FOUR LANE SPEFCIFICATIONS (BARAMULLA BYE PASS) AND FROM KM 57.800 TO KM 101.00 TO NH DOUBLE LANE SPECIFICATION WITH PAVED SHOULDER (10 MTR CARRIAGE WAY) IN THE AOR OF 53 RCC UNDER 760 BRTF (P) BEACON IN JAMMU & KASHMIR STATE CE (P) BCN/07/2017-18 28/11/2017 29/11/2017 31/01/2018
Time 12:0Hrs
232 Preparation of Detailed Project Report for Palani – Dharapuram road TN .No. 36/2017/DO Dt. 22.11.2017 27/11/2017 27/11/2017 08/01/2018
Time 15:0Hrs
233 CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR USING LiDAR TECHNOLOGY FOR CONSTRUCTION IMPROVEMENT OF EXISTING ROAD MAHECHUSUL TO NHDL SPECIFICATIONS FROM KM 0.00 TO KM 77.625 NET LENGTH KM 77.625 IN THE STATE OF LEH LADAKH REGION OF JAMMU AND KASHMIR CE (P) HIMANK/25/2017-18 22/11/2017 24/11/2017 02/01/2018
Time 10:0Hrs
234 CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR ON USING LiDAR TECHNOLOGY FOR CONSTRUCTION / IMPROVEMENT OF EXISTING ROAD KARU-TANGTSE TO NHDL SPECIFICATION FROM KM 20.00 TO KM 81.600 (NET LENGTH 61.600 KM) IN 753 BRTF UNDER PROJECT HIMANK IN LEH-LADAKH REGION OF J&K STATE CE(P)HMK/24/2017-18 20/11/2017 21/11/2017 15/12/2017
Time 10:0Hrs
235 Consultancy Services for Preparation of Detailed Project Report for Construction of Four Laning of Rajauli- Bakhtiyarpur section from Km 47.723 to Km 154.500 of NH-31 in the State of Bihar NHAI/BH/Rajauli-Bakh/DPR/2017 21/11/2017 17/11/2017 08/12/2017
Time 15:0Hrs
-
236 SURVEY, INVESTIGATION AND PREPARATION OF DETAILED PROJECT REPORT FOR IMPROVEMENT OF ROAD TATO MENCHUKA FROM KM 0.00 TO KM 50.00 TO NH DOUBLE LANE SPECIFICATIONS THROGH CONSULTANCY IN WEST SIANG DISTT OF ARUNACHAL PRADESH UNDER PROJECT BRAHMANK CE (P) BRAHMANK/22/2017-18 15/11/2017 17/11/2017 30/01/2018
Time 11:0Hrs
237 TECHNICAL CONSULTANT FOR PREPARATION OF DETAILED PROJECT REPORT INCLUDING PRE-CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF A ROAD TUNNEL WITH ITS APPROACHES INCLUDING JUNCTION WITH DWARKA EXPRESSWAY FOR WESTERN CONNECTIVITY TO IGI AIRPORT FROM DWARKA EXPRESSWAY IN THE STATE OF DELHI. NHAI/ PIU DWARKA/ IGIA Tunnel/ RFP 17/11/2017 17/11/2017 11/12/2017
Time 11:0Hrs
238 Consultancy Services for Preparation of Feasibility Study and DPR for 4-lane Elevated Section at Ch. 221.910 to 224.935 on NH-31, 4-lane Elevated section of Shivala – Bihta section at Ch. 16.050 to 29.500 of NH-30 and 4-lane Elevated section at Gopalganj Ch. 384.483 to 386.362 on NH-28. NHAI/BH/Elevated/DPR/2017/Proc 23/11/2017 15/11/2017 06/12/2017
Time 11:0Hrs
239 SURVEY, INVESTIGATIN AND PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION IMPROVEMENT OF ROAD ALONG YINKION FROM KM 65.00 TO KM 118.800 TO NHDL SPECIFICATION UNDER PROJECT BRAHMANK IN ARUNACHAL PRADESH CE (P) BRAHMANK/21/2017-18 11/11/2017 13/11/2017 30/12/2017
Time 11:0Hrs
240 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri & b). Widening to Two lane with Paved Shoulders for Cherkala – Kalladaka in the State of Karnataka EE/NHD/MNG/AE2/Consultancy/NIT 01/3rd Call/2017-18/ 13/11/2017 13/11/2017 17/11/2017
Time 16:0Hrs
-
241 Consultancy services for preparation of FS and DPR for fly over between km 7.30 to Km 8.05 on Srinagar Baramulla Uri road under Project Beacon in Jammu and Kashmir State CE (P)BCN/02/2016-17 10/11/2017 10/11/2017 11/12/2017
Time 12:0Hrs
242 Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities (1) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zojila Tunnel between (between Baltal and Minamarg) from km 82.00 to km 95.00 on Srinagar-Leh road (NH-1) and (2) For making the NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu and Kashmir NHIDCL/JandK/ Zojila-Approach Road/DPR/NH-1/2017 09/11/2017 09/11/2017 06/02/2018
Time 17:0Hrs
243 SURVEY INVESTIGATION PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF ROAD DITTE-DIMME-MIGGING FROM KM 0.00 TO KM 191.00 TO NHDL STANDARD THROUGH CONSULTANCY IN ARUNACHAL PRADESH UNDER PROJECT BRAHMANK CE(P)BRAHMANK/20 OF 2017-18 06/11/2017 09/11/2017 11/12/2017
Time 10:0Hrs
244 Feasibility Study/Preparation of Detail Engineering report for Construction of two lane with paved Shoulder for in-principle approved National Highway Stretch from (i) Mathura – Goverdhan Deeg – Nagar Length = 31.00 Km (ii) Agra – Jagner Masalpur Length = 33.00 Km (iii) Jurhara – Palwal Length = 3.00 Km and (iv) Kalwar to Jaipur Ring Road Length = 14.00 Km (Total Length = 81.00 Km) for Package No. 6 NIT 03/2017-18 Ce (NH) PWD Rajasthan, Jaipur Package 6 08/11/2017 08/11/2017 28/11/2017
Time 11:0Hrs
245 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from 2-lane/4-lane to 4-lane from km. 0.00 to 16.00 (Herbertpur to Kalsi) on NH-123(New No. 507) 3678/13yata-NH-10/2017 dated 02.11.17 08/11/2017 08/11/2017 20/12/2017
Time 15:0Hrs
246 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 200.00 to 235.00 (Diwalikhal to Karanprayag) on NH-87Ext(New No. 109) 3678/13yata-NH-10/2017 dated 02.11.17 08/11/2017 08/11/2017 20/12/2017
Time 15:0Hrs
247 Consultancy Services for preparation of GAD including preparation of DPR for (Construction & Widening) of ROB (Existing Railway Portion & approach) at Km 76 of NH-116 (Swaimadhopur) including detailed engineering survey and all geotechnical investigation Topography survey of area & working drawings, design, Estimating and BOQ & preparation of working drawings ad per scope of work governed by the ToR of the MoRTH and proof checking from MNIT & approval from Railway & IAHE NIT 01/2017-18 SE PWD NH Circle, Jaipur Sr No. 2 08/11/2017 08/11/2017 30/11/2017
Time 11:0Hrs
248 Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for Shahpura-Alwar-Ramgarh-Nuh Road (NH-248A) From Km 86/800 to 127/700 (Length-49.90 km) (Distt. Jaipur, Alwar) NIT 01/2017-18 SE PWD NH Circle, Jaipur 07/11/2017 07/11/2017 30/11/2017
Time 11:0Hrs
249 Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Mizoram & Nagaland under Bharatmala Pariyojana (Lot-2) NHIDCL/Bharatmala/DPR/Phase-I/Lot-2/2017 01/11/2017 01/11/2017 23/11/2017
Time 11:0Hrs
250 Consultancy Services for Feasibility Study, Detailed Project Report, including conducting site investigation, subsoil exploration, testing, preparation of plans, designs, Land plans, GAD and EPC Schedules for proposed Bypass on NH86-Ext Bhopal Sanchi Sagar Road due to submergence of the road from km 135/35 to km 137/4 by the Bina Complex Irrigation multipurpose project in the state of Madhya Pradesh 22/SAC/2017-18 07/11/2017 30/10/2017 21/11/2017
Time 17:30Hrs
251 KOTA RAWATBHAT, LAKHERI ITAWA UNIYARA INDRAGARH PWDNHCENITNO03 30/10/2017 30/10/2017 28/11/2017
Time 11:0Hrs
252 BARAN MANGROL SHEOPUR MP RAJASTHAN BORDER PARON FATEHGARH GUNAAND TIKAMGARH GULGANJ FROM JUNCTION OF NH 752 NEAR KAWAL CONNECTING CHHABRA AND TERMINATING AT NH 46 NEAR SAD COLONY CEPWDNITNO03 30/10/2017 30/10/2017 28/11/2017
Time 11:0Hrs
253 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package I NHIDCL/Bharatmala/DPR/Lot-1/Package-I/2017 30/10/2017 30/10/2017 28/11/2017
Time 11:0Hrs
254 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package II NHIDCL/Bharatmala/DPR/Lot-1/Package-II/2017 30/10/2017 30/10/2017 28/11/2017
Time 11:0Hrs
255 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package III NHIDCL/Bharatmala/DPR/Lot-1/Package-III/2017 30/10/2017 30/10/2017 28/11/2017
Time 11:0Hrs
256 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package IV NHIDCL/Bharatmala/DPR/Lot-1/Package-IV/2017 30/10/2017 30/10/2017 28/11/2017
Time 11:0Hrs
257 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for upgradation of National Highways in North Eastern Region (NER) under Bharatmala Pariyojna. Package V NHIDCL/Bharatmala/DPR/Lot-1/Package-V/2017 30/10/2017 30/10/2017 28/11/2017
Time 11:0Hrs
258 Consultancy Services for project management including preparation of Detailed Project Report of selected stretches of National Highways/State Roads (approved “In Principle” for Declaration as National Highways) in the state of Andhra Pradesh for Up Gradation to Two/Four lane with paved shoulder configuration from Junction with NH 216 near Narsapuram - Sakhinetipalli-Malkipuram upto junction with NH 216 near Razole along with construction of new bridge between Narsapuram and Sakhinetipalli (380 NIT No. S E(R&B)/NH/VJA/Tender/06/ 2017-18, Dt. 25.10.2017 01/12/2017 30/10/2017 08/12/2017
Time 17:0Hrs
259 Consultancy Services for project management including preparation of Detailed Project Report of selected stretches of National Highways/State Roads (approved “In Principle” for Declaration as National Highways) in the state of Andhra Pradesh for Up Gradation to Two/Four lane with paved shoulder configuration from Junction with NH 216 near Narsapuram - Sakhinetipalli-Malkipuram upto junction with NH 216 near Razole along with construction of new bridge between Narsapuram and Sakhinetipalli (380 SE/R&B/NH VJA NIT No.06/2017-18, dt 25.10.2017 27/11/2017 30/10/2017 30/11/2017
Time 17:0Hrs
260 Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Stretch From Dungargarh-Sardarshar - Taranagar-Rajgarh-Bahal-Ovara-Kairu-Lohani (Length-180 Km). SE(NH)INIT/2016-2017/421D-1310 22/11/2017 28/10/2017 28/11/2017
Time 11:0Hrs
261 Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Stretch From Nathusari-Bhadara-Sidhmukh -Sadulpur-Malsisar-Jhunjhunu-Gudha-Udaipurwati (Length- 200 Km). SE(NH)INIT/2016-2017/421D-1310 22/11/2017 28/10/2017 28/11/2017
Time 11:0Hrs
262 Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for newly in principal approved National Highway Nachna-Ramdevra-Falsund-Baytu length 210 Km. NIT No.3/2017-18 CE NH PWD Rajasthan Jaipur Sr. No.7 08/11/2017 26/10/2017 28/11/2017
Time 11:0Hrs
263 Consultancy Services for Feasibility study/Detailed Engineering report for construction of two lane with paved shoulder for newly proposed national highway From Mandsaur connecting Pratapgarh, Dhariyawad, Salumber and terminating at Junction of NH-927A near Dungarpur in In Km 108/0 to 160/0 (including Aspur, Punjpur, Punali and Other Bypasses ) Length 52.00 Km NIT 03/2017-18 Package-01 25/11/2017 26/10/2017 28/11/2017
Time 11:0Hrs
264 Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway (i) Marwar Junction Kamlighat (Length 50 Km) (ii) Sanderao Bali Sadri (Length 43 Km) (iii) Charbhuja Gomati Choraha (Length 9 Km) Total Length 102 Km CE (NH) PWD Raj Jaipur NIT No 03 of 2017-18 29/10/2017 26/10/2017 27/11/2017
Time 11:0Hrs
265 Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Sojat Siriyari Desuri Km 93 Distt Pali CE (NH) PWD Raj Jaipur NIT No 03 of 2017-18 29/10/2017 26/10/2017 28/11/2017
Time 11:0Hrs
266 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of In-principle declared National Highways in the State of Gujarat (2nd Try) 12 of 2017-18 (2nd Try) 08/11/2017 25/10/2017 16/11/2017
Time 18:0Hrs
267 Package for Consultancy services for Authoritys Engineer for supervision of Civil Construction work for proposed 4lane ROB and its approaches in existing Level Crossing lieu of 23 SPL Class at Km 3 18ASPL class at Km 7 on NH18 in the State of Andhra Pradesh under EPC Mode SE R and B NIT NO 31 23/10/2017 23/10/2017 04/12/2017
Time 15:0Hrs
268 Package for Consultancy services for Authoritys Engineer supervision of Civil Construction work for proposed 4lane ROBs and its approaches in existing Level Crossing 1 lieu of 95SPL3E at Km 272 lieu of 102E at Km 281 on NH205 in the State of Andhra Pradesh under EPC Mode. SE R and B NIT NO 33 23/10/2017 23/10/2017 19/12/2017
Time 15:0Hrs
269 Package for Consultancy services for Authority’s Engineer supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossing (i)in lieu of 67at Km 133/200 (ii) in lieu of 75 at Km 145/200 (iii)in lieu No 95 at Km 183/600 on NH-205 in the State of Andhra Pradesh under EPC Mode SE NH ATP NIT No 32 26/10/2017 23/10/2017 19/12/2017
Time 15:0Hrs
270 Package for Consultancy services for Authoritys Engineer supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossing (i) lieu of 124E/SPL3 at Km 1/8 & (ii) 30/E at Km 64/800on NH-205 in the State of Andhra Pradesh under EPC Mode SE NH ATP NIT No 34 26/10/2017 23/10/2017 19/12/2017
Time 15:0Hrs
271 Package for Consultancy services for Authority’s Engineer supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossing (i) in lieu of 45 C- Class at Km 93.400 & (ii) in lieu of 48E/C at Km 96.800 on NH-205 in the State of Andhra Pradesh under EPC Mode SE NH ATP NIT No 35 26/10/2017 23/10/2017 19/12/2017
Time 15:0Hrs
272 Consultancy services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Mokokchung to Zunheboto and from Chazuba to Meluri via Thevopheshu. (NH 702A) (2nd Call) CE/NH/etender/2017-18/08/01 20/10/2017 20/10/2017 24/11/2017
Time 12:0Hrs
273 Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Showuba-Guzunyu-Pughoboto-Zunheboto-Aghunato-Noklak-Pangsha- 2nd Call CE/NH/etender/2017-18/08/02 20/10/2017 20/10/2017 24/11/2017
Time 12:0Hrs
274 Consultancy Services for Feasibility Study and Detailed Project Report for two laning with paved shoulders of Trans Eastern Highway from Mon-Longwa-Pangsha-Kiphire-Avangkhu- 2nd Call. CE/NH/etender/2017-18/08/03 20/10/2017 20/10/2017 24/11/2017
Time 12:0Hrs
275 Consultancy services for engagement of consultant for preparation of DPR for construction of road Tangmarg Badrakut Penjanpatri Basamgali Jamaigali under 760 BRTF CE (P)/ BCN/20/2016-17 18/10/2017 18/10/2017 02/11/2017
Time 12:30Hrs
276 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of in principle declared National Highway from Kamalpur to Santirbazar (on NH-8) via Ambassa (on NH-8), Gandacherra, Amarpur (on NH-208) and Santirbazar to Belonia in the state of Tripura. PNIT No.07/SE/NH Circle/PWD(NH)/2017-18 16/10/2017 16/10/2017 06/12/2017
Time 15:0Hrs
277 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of in principle declared National Highway from -(i) Champaknagar (Jirania) on NH-8 to Udaipur on NH-8 via Jampuijala, (ii) Amarpur on NH-208 to Udaipur on NH-8 in the state of Tripura.. 08/SE/NH Circle/PWD(NH)/2017-18 17/10/2017 16/10/2017 19/12/2017
Time 15:0Hrs
278 Consultancy services for engagement of consultant for preparation of DPR for construction of road Tangmarg Badrakut Penjanpatri Basamgali Jamaigali under 760 BRTF CE (P)/ BCN/20/2016-17 12/10/2017 12/10/2017 12/10/2017
Time 14:0Hrs
279 Consultancy Services for Appointment of Technical Consultant for Carrying out Feasibility Study and Preparation of DPR for Augmentation of Tambaram (km.28/000)-Tindivanam (Km.121/000) Section of NH-45 in the State of Tamil Nadu under NHDP Phase-V (3rd call). NHAI/11012/DPR/TT/RFP/2017 21/10/2017 11/10/2017 27/11/2017
Time 11:0Hrs
280 DPR for construction of Bypass (Bagalur town) in NH 207 (New NH 648) TNNo.9/17-2018/NH/DO/dt 05.10.2017 11/10/2017 11/10/2017 24/10/2017
Time 15:0Hrs
281 Consultancy Services for Feasibility study Detailed project report including conducting site investigation subsoil exploration and testing preparation of plans designs land plan schedules and preparation of GAD for the Bypass Roads for the four towns of V Kota and Chittoor in Chittoor District Badvel in Kadapa District and Adoni in Kurnool District 4th call Consultancy Services for Feasibility study Detailed project report including conducting site investigation subsoil exploration and testing preparation of plans designs land plan schedules and preparation of GAD for the Bypass Roads for the four towns of V Kota and Chittoor in Chittoor District Badvel in Kadapa District and Adoni in Kurnool District 4th call 06/10/2017 09/10/2017 27/11/2017
Time 15:0Hrs
282 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed Two lane road from Junction of NH-627 near Baithalangso-Bichitur-Ulukunchi- Umpanai-Assam/Meghalaya Border under Nagaon NH Division in the State of Assam. CE PWD NH 2 (R2) 07/10/2017 07/10/2017 13/12/2017
Time 16:0Hrs
283 a).Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg Panathur Bagamandala Madikeri EE/NHD/MNG/AE2/Consultancy/NIT 01/3rd Call/2017-18 27/10/2017 07/10/2017 07/11/2017
Time 16:0Hrs
-
284 Consultancy services for flyover bet Km 7.3 to Km 8.05 on Srinagar-Baramulla-Uri rd CE (P)BCN/02/2016-17 06/10/2017 06/10/2017 16/10/2017
Time 12:30Hrs
285 Consultancy services for feasibility study, preparation of DPR & preconstruction services for newly declared NH 701 on Rd Rafiabad-Kupwara-Chowkibal-Tangdhar-Chamkot CE (P) BCN/19/2016-17 06/10/2017 06/10/2017 16/10/2017
Time 12:0Hrs
286 Engaging Technical Consultant for preparation of FS DPR on EPC mode for impvt of road Rajouri Thanamandi Surankot from Km 3.900 to Km 56.915 from existing Cl 9 specification to NHDL specification under 31 BRTF area under Project Sampark in J and K State CE (P) SPK/15/2017-18 06/10/2017 06/10/2017 31/10/2017
Time 12:0Hrs
287 Consultancy Services for preparation of Detailed Project Report of improvement to Blackspot at Km 218/0 to 220/0 of NH 67 TN.No.14/ DO/ 2017-18/ Dt.03.10.2017 06/10/2017 06/10/2017 23/10/2017
Time 15:0Hrs
288 CONSULTANCY SERVICE FOR CARRYING OUT FEASIBILITY STUDY, PREPARATION OF DETAILED PROJECT REPORT FOR GREEN FIELD ALIGNMENT STRETCH FROM MARA TO YANGPHO (i.e., BET KM 41 TO 95 OF SEPA -SARLI ROAD) IN STATE OF ARUNACHAL PRADESH UNDER PROJECT ARUNANK ANK/TENDER -10/2017-18 05/10/2017 05/10/2017 10/11/2017
Time 17:0Hrs
289 CONSULTANCY SERVICES FOR REVISION OF MINISTRY’S SPECIFICATIONS (FIFTH REVISION, 2013), POCKETBOOK FOR HIGHWAY ENGINEERS (2ND REVISION, 2002) AND POCKETBOOK FOR BRIDGE ENGINEERS (1ST REVISION, 2000) RW/NH-35076/02/2017-S&R (R) 29/09/2017 29/09/2017 09/11/2017
Time 10:30Hrs
290 Consultancy Services for Soil Stability on Kaladan Multi Modal Transit Transport Project on NH-502A in Mizoram (99.83 km) RE-NIT No.2/RFP/CE-HW/2017-2018 03/10/2017 29/09/2017 13/10/2017
Time 15:0Hrs
291 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh (Package No. HP/Shahpur/R/22) 283-SESHA-2017 26/09/2017 29/09/2017 13/11/2017
Time 15:0Hrs
292 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh (Package No. HP/Shahpur/R/23) 283-SESHA-2017 27/09/2017 29/09/2017 13/11/2017
Time 15:0Hrs
293 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh (Package No. HP/Shahpur/R/24) 283-SESHA-2017 27/09/2017 29/09/2017 13/11/2017
Time 15:0Hrs
294 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh (Package No. HP/Shahpur/R/25) 284-SESHA-2017 27/09/2017 29/09/2017 13/11/2017
Time 15:0Hrs
295 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh (Package No. HP/Shahpur/R/26) 284-SESHA-2017 27/09/2017 29/09/2017 13/11/2017
Time 15:0Hrs
296 Consultancy Services for preparation of DPR for bypass/ring roads around Gorakhpur, Bareilly, Moradabad,Kanpur and Ayodhya in the State of Uttar Pradesh under NHDP Phase-VII Ring Roads Bypassess/UP/NHDP/Ph-VII 28/09/2017 28/09/2017 23/11/2017
Time 11:0Hrs
297 Consultancy Services for Feasibility Study cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or similar technology for Widening to two lane with Paved Shoulders A) From Chinthamani NH-69 Chelur Rayachervu Tanakal AP NH 42 B) From Kuppam on NH 42 AP Kolar on NH 75 Karnataka length in AP 25kms and Karnataka 40 Kms C) From Madakasira Rolla AP Karnataka border Sire in the state of Karnataka Total length 67 Kms, AP 38 Kms Karnataka 29 Kms D) Mulabagalu Tayalur from Km 0.00 to 24.00 2 04/2017-18 DT 25-09-2917 27/09/2017 27/09/2017 31/10/2017
Time 16:0Hrs
298 Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of new 6-lane Flyover at Ainthapalli Junction on NH-6 in Sambalpur NHAI/11013/13/RO/OD/2017 26/09/2017 21/09/2017 23/10/2017
Time 11:0Hrs
-
299 SURVEY, INVESTIGATION AND PREPARATION OF DETAILED PROJECT REPORT FOR IMPROVEMENT OF ROAD TATO-MENCHUKA FROM KM 0.00 TO 50.00 TO NH DOUBLE LANE SPECIFICATIONS IN WEST SIANG DISTT OF ARUNACHAL PRADESH UNDER 1443 BBC/44 BRTF/ PROJECT BRAHAMNK CE (P) Brahmank/19/2016-17 20/09/2017 21/09/2017 11/10/2017
Time 10:0Hrs
300 Consultancy Services for preparation of Detailed Project Report for Construction of 1600 mtr span Double Lane Bridge with footpaths on both sides including approaches on both sides of approx. length 2.6 km over River Chenab at Sajwal Paragwal Indrapattian at Jourian in Distt Jammu J&K under CRF e-NIT No. 114 of 2017-18 Dated 16 .09.2017 27/09/2017 18/09/2017 09/10/2017
Time 16:0Hrs
301 Consultancy servrces tor, feasibility study. detailed project report, survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH- 150A near Molkahnur-Rayadurga-Anthapura Junction at NIH -44 road EE/NHD/CTA/AE/CS/NIT//2017-18/ 861 18/09/2017 18/09/2017 03/10/2017
Time 11:0Hrs
302 Preparation of Detailed Project Report for Construction of flyover at Km. 599/0-601/0 (Kaliyakavilai) of NH 47 07/2017-18/ DO/ dated 11.09.2017 18/09/2017 18/09/2017 03/10/2017
Time 11:0Hrs
303 Consultancy work for preparation of Detailed Project Report for construction of 1600 mtr span Double Lane Bridge with footpaths on both sides including approaches on both sides of approx. length 2.6 km. over River Chenab at Sajwal (Paragwal - Indrapattian) at Jourian in Distt. Jammu, J and K under CRF e-NIT No. 114 of 2017-18 Dated 16 .09.2017 11/10/2017 18/09/2017 16/10/2017
Time 16:0Hrs
304 HQ CE (P) BRAHMANK CE P BRAHMANK 19 2017 2018 15/09/2017 17/09/2017 09/10/2017
Time 9:0Hrs
305 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/R29sml HP/Shimla/R29Sml 16/09/2017 16/09/2017 10/10/2017
Time 15:0Hrs
306 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/R30sml HP/Shimla/R30Sml 16/09/2017 16/09/2017 10/10/2017
Time 15:0Hrs
307 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No.HP/Shimla/R31sml HP/Shimla/R31Sml 16/09/2017 16/09/2017 10/10/2017
Time 15:0Hrs
308 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No.HP/Shimla/R32sml HP/Shimla/R32Sml 16/09/2017 16/09/2017 10/10/2017
Time 15:0Hrs
309 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No.HP/Shimla/R33sml HP/Shimla/R33Sml 16/09/2017 16/09/2017 10/10/2017
Time 15:0Hrs
310 Consultancy Services For Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two Lane with Paved Shoulders For Manipal to Karkala and from Ramasmudra to Punjalkatte and from Belthangadi - Shiradi Via Dharmasthala, Periyashanthi and Gundya to Subramanya in the state of Karnataka EE/NHD/MNG/JE/Consultancy/NIT 21/3rd call/2017-18 15/09/2017 15/09/2017 22/09/2017
Time 16:0Hrs
-
311 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Shringeri – Agalagundi – Jayapur – Balehonnur – Hyrambi – Aldur - NadipurandKarkala – Moodabidri – Bc Road (Including Overlapping Stretch Of 19 Kms Of Existing NH-169 for a total length of 26.00 Kms)in the State of Karnataka EE/NHD/MNG/AE2/Consultancy/NIT 17/3rdCall/2017-18 15/09/2017 15/09/2017 22/09/2017
Time 16:0Hrs
-
312 ConsultancyServicesforPreparation of Detailed Project Report for Construction of Four Laning of Rajauli- Bakhtiyarpur section from Km 47.723 to Km 154.500 of NH-31 in the State of Bihar NHAI/BH/Rajauli- Bakh/DPR/2016 15/09/2017 14/09/2017 31/10/2017
Time 11:0Hrs
313 Consultancy Services for preparation of feasibility study and Detailed Project Report for 2- lanning with paved shoulder from Shangshak to Tengnoupal on NH-39 (102A – Extn) under NH(O) in the State of Manipur ACE-I/NH/Consultancy/2017-18/307 13/09/2017 13/09/2017 17/10/2017
Time 15:0Hrs
314 Consultancy Services for preparation of feasibility study and Detailed Project Report for 2-laning with paved shoulder from Imphal to Kakching Lamkhai on NH-137 A under NH(O) in the state of Manipur ACE-I/NH/Consultancy/2017-18/303 13/09/2017 13/09/2017 17/10/2017
Time 15:0Hrs
315 Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of (i) Margherita-Changlang in the state of Assam and Arunachal Pradesh (ii) Daporijo (Upper Subansiri) to Dollungmukh (Lower Subansiri) via Dumporijo in the state of Arunachal Pradesh (iii) Tezu-Chapakhowa Via Sunpura section in the state of Arunachal Pradesh and Assam under SARDP-NE on Engineering, NHIDCL/DPR/ MC-DD-TC/ Arunachal Pradesh /2017 18/09/2017 12/09/2017 15/12/2017
Time 16:30Hrs
316 Consultancy Services for Preparation of DPR for Additional Cross Drainage structures across water tank areas i.e Bridges, Culverts etc on the basis of Order of NGT & Revised MoEF Clearance for the section of Kerala / Tamil Nadu border to Villukkuri section from km 43/0 to km 70/250 of NH-47 and Villukuri to Kanyakumari from Km. 70.250 to Km. 96.714 section of NH-47 & Nagercoil to Kavalkinaru from Km. 0.000 to Km. 16.376 section of NH-47B under NHDP Phase-III in the State of Tamil Nadu on EPCmode NHAI/11012/DPR/Addl. Works/NH-47&47B/08/2017 (2nd Call) 25/09/2017 12/09/2017 10/10/2017
Time 11:0Hrs
-
317 Consultancy services for feasibility study, Planning and Preparation of Detailed Project for reducing traffic congestion on NH 5 from Junction 38 RD No 4 03 Rotary near The Tribune to UT Boundary RD No 8 30 by providing signal free corridor which may include elevated highway construction of grade separated intersection at Junction 38 and other appropriate remedial measures for smooth flow of traffic along NH 5 CP1/2017/DPR 1 11/09/2017 11/09/2017 05/10/2017
Time 15:0Hrs
318 Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the States of Madhya Pradesh for up gradation to Two/Four lane with paved shoulder configuration under Package-I 10066./MPRDC/NNH/DPR/2004/02/2017 09/10/2017 09/09/2017 08/11/2017
Time 17:30Hrs
319 Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the States of Madhya Pradesh for up gradation to Two/Four lane with paved shoulder configuration under Package-II 10067./MPRDC/NNH/DPR/2004/02/2017 11/10/2017 09/09/2017 08/11/2017
Time 17:30Hrs
320 Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the States of Madhya Pradesh for up gradation to Two/Four lane with paved shoulder configuration under Package-III 10068./MPRDC/NNH/DPR/2004/02/2017 11/10/2017 09/09/2017 08/11/2017
Time 17:30Hrs
321 Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the States of Madhya Pradesh for up gradation to Two/Four lane with paved shoulder configuration under Package-IV 10069./MPRDC/NNH/DPR/2004/02/2017 11/10/2017 09/09/2017 08/11/2017
Time 17:30Hrs
322 Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam NHAI/11012/ Guwahati Bypass/ DPR /NE/2017 08/09/2017 07/09/2017 10/10/2017
Time 11:0Hrs
323 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-6) NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-6 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
324 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-1) NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-1 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
325 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-2) NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-2 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
326 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-3) NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-3 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
327 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-4) NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-4 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
328 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-5) NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-5 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
329 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-6) NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-6 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
330 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-7) NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-7 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
331 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4/Pkg-8) NHAI/BM/DPR/Ph-II/Lot-4/2017/Pkg-8 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
332 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-1) NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-1 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
333 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-2) NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-2 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
334 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-3) NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-3 07/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
335 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-4) NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-4 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
336 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-5) NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-5 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
337 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-6) NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-6 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
338 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Pkg-7) NHAI/BM/DPR/Ph-II/Lot-5/2017/Pkg-7 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
339 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-1) NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-1 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
340 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-2) NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-2 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
341 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-3) NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-3 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
342 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-4) NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-4 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
343 Consultancy Services for preparation of DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Pkg-5) NHAI/BM/DPR/Ph-II/Lot-6/2017/Pkg-5 08/09/2017 06/09/2017 06/11/2017
Time 11:0Hrs
344 CONSULTING SERVICES FOR Preparation of DPR for Construction of Bridge at Km 186 of Madanapalli Naidupeta Road NH 71 2 Call SE R&B NIt NO 17 05/09/2017 05/09/2017 11/09/2017
Time 17:0Hrs
345 Preparation of Detailed Project Report for Palani – Dharapuram road TN .No. 25/2017/DO Dt. 24.08.2017 05/09/2017 05/09/2017 14/11/2017
Time 15:0Hrs
346 Preparation of Detailed Project Report for Construction of Theni Bypass road of NH49 Extn TN .No. 25/2017/DO Dt. 24.08.2017 05/09/2017 05/09/2017 20/10/2017
Time 15:0Hrs
347 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/19) 281-SESHA-2017 30/08/2017 05/09/2017 26/09/2017
Time 15:0Hrs
348 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/20) 281-SESHA-2017 30/08/2017 05/09/2017 26/09/2017
Time 15:0Hrs
349 Consultancy Services for preparation of DPR for improvement and widening to 2 lane with paved shoulder including geometric improvement of Churaibari - Agartala Section from Km 318.00 to Km 422.00 of NH-44 in Tripura / Portion from Km 343.00 to Km 397.00 for 54 Km. 05/CE/PWD (NH)/BID/2017-18 04/09/2017 04/09/2017 03/01/2018
Time 15:0Hrs
350 “Consultancy Services for preparation of DPR of “2-Laning including paved shoulder of Assam/Meghalaya border – Bhoirymbong on Shillong bypass (Length – 18.00 Km) in the state of Meghalaya” PW/CE/NH/4/2017 06/09/2017 04/09/2017 18/12/2017
Time 15:15Hrs
351 Preparation of Detailed Project Report for Construction of flyover at Km. 599/0-601/0 (Kaliyakavilai) of NH 47 03/2017-18/ DO/ dated 13.07.2017 05/09/2017 01/09/2017 07/09/2017
Time 11:0Hrs
352 Preparation of Detailed Project Report for providing pedestrian subway at Km 628/10 of NH47 (Sunkan Kadai) 03/2017-18/ DO/ dated 13.07.2017 05/09/2017 01/09/2017 07/09/2017
Time 11:0Hrs
353 Independent Engineer Services during Operation and Maintenance of Jodhpur – Pali Section of NH-65 from Km. 308.000 to Km.366.000 and including Bypass to Pali starting from Km. 366.000 of NH-65, Connecting NH - 14 at Km. 114.000 in the state of Rajasthan through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the DBFOT) Basis stage of selected road stretches under BOT projects in the State of Rajasthan NIT No 04 of 2017-18 SE NH PWD Jodhpur 21/09/2017 28/08/2017 09/10/2017
Time 11:0Hrs
354 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from 2-lane/ 4-lane to 4-lane from km. 0.00 to 16.00 (Herbertpur to Kalsi) on NH-123 in the State of Uttarakhand 2834/13 Yata-NH-10/2017 dated 21-08-2017 12/09/2017 25/08/2017 03/10/2017
Time 15:0Hrs
355 Consultancy Services for Preparation of Detailed Project Report for construction of flyover between km 7.30 to km 8.050 on road Srinagar – Baramulla – Uri in 53 RCC sector under 760 BRTF / Project Beacon in JK State (fourth call) CE (P) BCN/02/2016-17 24/08/2017 25/08/2017 26/09/2017
Time 12:0Hrs
356 CONSULTANCY SERVICES FROM MoRTH EMPANELLED FIRM FOR FEASIBILITY STUDY (FS), PREPARATION OF DETAILED PROJECT REPORT (DPR) AND PRECONSTRUCTION SERVICES FOR NEWLY DECLARED NH-701 RAFIABAD – KUPWARA – CHOWKIBAL – TANGDHAR – CHAMKOT ROAD IN 109 RCC UNDER 32 BRTF PROJECT BEACON IN THE STATE OF JAMMU KASHMIR (RETENDER- FIFTH CALL) CE (P) BCN/19/2016-17 25/08/2017 25/08/2017 26/09/2017
Time 12:0Hrs
357 Consultancy Services for preparation of Feasibility Detailed Study / Detailed Project report for construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur Section from km. 165.40 to km. 190.587 on NH-54 of package AS-21 (Bal.) through New Alignment in the state of Assam on EPC mode NHAI/11015/AS-21 (Bal)/2011/NE 08/09/2017 25/08/2017 05/10/2017
Time 11:0Hrs
358 Consultancy for preparation of Detailed Project Report for Srivilliputhoor – Sivakasi – Virudhunagar – Aruppukottai – Thiruchuli – Parthibanoor (Package No. NH-TVL/1, Category-II) to Two lane with paved shoulder/ Four lane configuration TN NO. 05/2017-18/ DO/ dated 22.08.2017 24/08/2017 24/08/2017 19/09/2017
Time 11:0Hrs
359 Proposal for carrying out feasibility study and detailed project report survey preparation of land plan for widening to two lane with paved shoulders of Basohli Bhaderwah Doda including Tunnel at Chattergala eNIT No. 38 of 2017 Dated 21.08.2017 11/09/2017 24/08/2017 23/10/2017
Time 15:0Hrs
360 Consultancy Services for DPR Survey and Preparation of Land Plan for upgradation of SH 57 into NH with Widening to two lane with paved shoulders from KM 432 to 584 connecting Chikkamagaluru Belur Hassan Holena rasipura Krishnarajnagar and Bilikere including 3 link roads NH in the State of Karnataka. No/EE/NHD/MNG/AE1/Consultancy/NIT05/2017-18 23/08/2017 23/08/2017 05/09/2017
Time 16:0Hrs
-
361 Consultancy Services for Preparation of Detailed Project Report for Up gradation to Two lane Four lane with Paved Shoulders configuration of part of the newly declared NH 516E from the junction on NH 16 near Rajahmundry to Bhupathipalem Road (Connecting SH38 near Rampachodavaram) in the state of Andhra Pradesh S ERBNHVJA Tender 04 2017 18 Dt 16 08 2017 11/09/2017 22/08/2017 21/09/2017
Time 15:0Hrs
362 Consultancy Services for preparation of Detailed Project Report including Pre-Construction activities for Construction of a Road Tunnel with its approaches including junction with Dwarka Expressway for western connectivity to IGI Airport from Dwarka expressway in the State of Delhi NHAI/ PIU DWARKA/ IGIA Tunnel/ RFP 22/08/2017 21/08/2017 13/09/2017
Time 11:0Hrs
363 Consultancy Services for preparation of Detailed Project Report of improvement to Blackspot at Km 218/0 to 220/0 of NH 67 TN.No.12/ DO/ 2017-18/ Dt.17.08.2017 19/08/2017 19/08/2017 04/09/2017
Time 15:0Hrs
364 Preparation of DPR for “ in Principle” declared state Highways road as New National Highway for Kollegala – Hanur – MM Hills – Palar road Tamilnadu border (30 Km length in Tamilnadu) extended upto Mettur in Tamilnadu TN.No.14/HDO/NH/2017-2018/ Dated 10.08.2017 19/08/2017 19/08/2017 29/08/2017
Time 15:0Hrs
365 Consultancy Services for preparation of feasibility report cum Detailed Project Report (DPR) of 4/6 lane (A) Belgaum Bypass (Western) tentatively from Km 9.500 (NH 4A) To Km 515.000 (NH 4) (22 Km) and (B) Belgaum Bypass (Eastern) from Km 515.000 (NH 4) to Km 492.000 (NH 4) (New NH 48) (33 Km) in the State of Karnataka (Second Call) 09/NHAI/RO-BNG/14021/Tender/2017 dated 18.08.2017 21/08/2017 18/08/2017 11/09/2017
Time 15:0Hrs
366 Consultancy Services for Preparation of Detailed Project Report for Proposed Route of New National Highway starting from Matigara More (on NH-31) to Teesta Bazar near NH-10 via, Garidhara-Mirik-Simana-Basti-Ghum-Peshok with a minimum of 2-Lane with Paved Shoulder Configuration in the District of Darjeeling , Kalimpong, West Bengal NIeQ NO. 01 OF 2017-18 OF SE, NHPDC 18/08/2017 18/08/2017 23/10/2017
Time 18:0Hrs
367 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Kundapur-Koteswar-Halady-Someshwara (On NH-169A) in the State of Karnataka EE/NHD/MNG/AE2/Consultancy/NIT 20/3rd Call/2017-18 21/08/2017 11/08/2017 28/08/2017
Time 16:0Hrs
-
368 Consultancy Services for preparation of Feasibility Report of construction of 4 Lane Inner Ring Road in and around Allahabad City in the state of Uttar Pradesh NHAI/Tech/IRR (Ald.)/DPR/2017/104091 17/08/2017 09/08/2017 30/08/2017
Time 11:0Hrs
-
369 Consultancy Services for preparation of DPR for bypass/ring roads around Gorakhpur, Bareilly, Moradabad, Kanpur and Ayodhya in the State of Uttar Pradesh under NHDP Phase-VII. Ring Roads/Bypasses/Uttar Pradesh/NHDP/Phase-VII 09/08/2017 09/08/2017 22/09/2017
Time 11:0Hrs
370 Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Agra-Mumbai Corridor) NHAI/BM/Corridor Improvement/RFP/2017/A-M 09/08/2017 09/08/2017 03/10/2017
Time 11:0Hrs
371 Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Pune-Vijayawada Corridor) NHAI/BM/Corridor Improvement/RFP/2017/P-V 09/08/2017 09/08/2017 03/10/2017
Time 11:0Hrs
372 Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Mumbai-Kolkata Corridor) NHAI/BM/Corridor Improvement/RFP/2017/M-K 09/08/2017 09/08/2017 03/10/2017
Time 11:0Hrs
373 Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Bangalore-Kanyakumari Corridor) NHAI/BM/Corridor Improvement/RFP/2017/B-K 09/08/2017 09/08/2017 03/10/2017
Time 11:0Hrs
374 Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of In Principle NHs i Benibad Katra Aurai Runisaidpur Belsand Parsauni ii Turki to Motipur via Saraiya iii Kalyanpur Dholi Muzaffarpur Deoria iv Motihari Dhaka Belwaghat Sheohar Road in Bihar on EPC Mode. Package No DPR BIHAR NH Div MUZ 01 2017 MoRTH 231024 1 09/08/2017 08/08/2017 19/09/2017
Time 15:0Hrs
375 Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of In Principle NH i Manjhi Ekma MaharajganjAfradmore Barauli ii Manjhi Darauli Guthani Mairwa Siwan Barharia Sarfara upto iii Mairwa Nautan Kuchaikot iv Mirganj Bhagipatti Samour Road upto UP Border in Bihar on EPC Mode. Package No.DPR BIHAR NH Div MUZ 02 2017MoRTH2310701 09/08/2017 08/08/2017 19/09/2017
Time 15:0Hrs
376 Consultancy Services for preparation of Detailed Project Report of selected stretch Nellvoy Pallikonda Road Sreepuram Golden Temple road in the State of Tamilnadu for upgradation to Two lane with paved shoulder or Four lane configuration Package No NH CH 2 2017 18 TN 02 HDO NH NELVOY ROAD 08/08/2017 08/08/2017 15/09/2017
Time 11:0Hrs
377 Consultancy Services for preparation of DPR of 2-Laning including paved shoulder of Assam/Meghalaya border – Bhoirymbong on Shillong bypass (Length – 18.00 Km) in the state of Meghalaya No.PW/CE/NH/4/2017 08/08/2017 08/08/2017 29/08/2017
Time 16:15Hrs
378 Consultancy Services for preparation of DPR of 2-laning including paved shoulder of Dkhiah- Sutnga-Saipung- Moulsei (Length – 84.00 Km) in the State of Meghalaya. No.PW/CE/NH/11/2017 08/08/2017 08/08/2017 31/08/2017
Time 16:20Hrs
379 Consultancy Services for preparation of DPR of 2-laning including paved shoulder of Nongstoin-Maweit- Nongjri (Length – 75.00 Km) in the State of Meghalaya. No.PW/CE/NH/10/2017 08/08/2017 08/08/2017 31/08/2017
Time 16:25Hrs
380 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh (Package No. HP/Shahpur/R/25). 278-SESHA-2017 09/08/2017 07/08/2017 14/09/2017
Time 15:0Hrs
381 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for By-Passes under National Highway Division HPPWD, Hamirpur in the State of Himachal Pradesh (Package No. HP/Shahpur/R/26). 278-SESHA-2017 09/08/2017 07/08/2017 14/09/2017
Time 15:0Hrs
382 (i) Consultancy services for feasibility study Detailed Project Report Survey and preparation of land plan for widening to 2 lane with paved shoulders from Bheja (from proposed new bridge over river koshi Junction of NH. 327(E) near Nunupatti-Baniari-Laukha-Tarawae-Singheshwar (on NH.-131)-Rani Patti-Khurda-Chakmaka) up to Junction with NH. 107 (ii) Consultancy services for feasibility study Detailed Project Report Survey and preparation of land plan for widening to 2 lane with paved shoulders 02/2017 Package No. II 20/09/2017 07/08/2017 10/10/2017
Time 15:0Hrs
383 Package III (i) Consultancy services for feasibility study Detailed Project Report Survey and preparation of land plan for widening to 2 lane with paved shoulders from NH.-106/NH.-131 New Birpur to Bathnaha (NH.-57A/NH.-527 New) Via Balua. (ii) Consultancy services for feasibility study Detailed Project Report Survey and preparation of land plan for widening to 2 lane with paved shoulders from Udakishunganj (NH. 131)-Bihariganj-Murliganj-Mirganj-Jadia-Bhimpur on NH.-57 (NH-27 New)-Balua-Birpur NIT 02/2017 Package III 20/09/2017 07/08/2017 10/10/2017
Time 15:0Hrs
384 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. (Package No. HP/Shahpur/ R/2) 280-SESHA-2017 05/08/2017 05/08/2017 11/09/2017
Time 15:0Hrs
385 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. (Package No. HP/Shahpur/ R/5) 280-SESHA-2017 05/08/2017 05/08/2017 11/09/2017
Time 15:0Hrs
386 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. (Package No. HP/Shahpur/ R-1/6) 280-SESHA-2017 05/08/2017 05/08/2017 11/09/2017
Time 15:0Hrs
387 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R/8) 280-SESHA-2017 05/08/2017 05/08/2017 11/09/2017
Time 15:0Hrs
388 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R-1/9) 280-SESHA-2017 05/08/2017 05/08/2017 11/09/2017
Time 15:0Hrs
389 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R/11) 280-SESHA-2017 05/08/2017 05/08/2017 11/09/2017
Time 15:0Hrs
390 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R/17) 280-SESHA-2017 05/08/2017 05/08/2017 11/09/2017
Time 15:0Hrs
391 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh.(Package No. HP/Shahpur/ R/27) 280-SESHA-2017 05/08/2017 05/08/2017 11/09/2017
Time 15:0Hrs
392 CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT INCLUDING PRE- CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF A ROAD TUNNEL WITH ITS APPROACHES INCLUDING JUNCTION WITH DWARKA EXPRESSWAY FOR WESTERN CONNECTIVITY TO IGI AIRPORT FROM DWARKA EXPRESSWAY IN THE STATE OF DELHI NHAI/PIU DWARKA/IGIA TUNNEL/RFP 07/07/2017 04/08/2017 17/08/2017
Time 11:0Hrs
393 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh. (Package No. HP/Shahpur/R/22). 279-SESHA-2017 01/08/2017 03/08/2017 07/09/2017
Time 15:0Hrs
394 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh) (Package No. HP/Shahpur/R/23). 279-SESHA-2017 01/08/2017 03/08/2017 07/09/2017
Time 15:0Hrs
395 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for bridges under National Highway Division HPPWD, Chamba in the State of Himachal Pradesh) (Package No. HP/Shahpur/R/24). 279-SESHA-2017 01/08/2017 03/08/2017 07/09/2017
Time 15:0Hrs
396 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/8 HP/Shimla/8 03/08/2017 03/08/2017 04/09/2017
Time 15:0Hrs
397 Consultancy Services for preparation of Detailed Project Report of Preparation of flyover at Km. 619/2-620/2 of NH 47 (Thuckalay) 04/2017-18/ DO/ dated 24.07.2017 16/08/2017 02/08/2017 19/09/2017
Time 11:0Hrs
398 Consultancy Services for preparation of Detailed Project Report of selected stretch – Arcot –Tindivanam road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration TN 02 HDO NH Arcot Road 01/08/2017 01/08/2017 15/09/2017
Time 11:0Hrs
399 ConsultancyServicesfor Appointment of Technical Consultant to Carry out the Detailed Project Report for Upgradation/ Widening of Channrayapattana& Hassan Bypasses, 8 Grade separated Structures, Service Road and other Road Safety Measures essentialin Devihalli(Km.110.00) to Hassan(km.189.500) section of NH 75, on EPC basis. 05/ NHAI/RO-BNG/23019/Tender/2017 31/07/2017 31/07/2017 23/08/2017
Time 15:0Hrs
400 CONSULTANCY SERVICES FROM MORTH EMPANNELLED FIRM FOR FEASIBILITY STUDY PREPARATION OF DETAILED PROJECT REPORT AND PRECONSTRUCTION SERVICES FOR NEWLY DECLARED NH 701 RAFIABAD KUPWARA CHOWKIBAL TANGDHAR CHAMKOT ROAD IN 109 RCC UNDER 32 BRTF PROJECT BEACON IN THE STATE OF JAMMU KASHMIR CE (P) BCN/19/2016-17 31/07/2017 31/07/2017 17/08/2017
Time 12:0Hrs
401 CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY REPORT CUM DETAILS PROJECT REPORT (DPR) OF 4/6 LANE (A) BELGAUM BYPASS (EAST) TENTATIVELY FROM KM 9.500 (NH 4A) TO KM 515.000 (NH 4) (22 KM) AND (B) BELGAUM BYPASS (WEST) FROM KM 515.000 (NH 4) TO KM 492.000 (NH 4) (NEW NH 48) (33 KM) IN THE STATE OF KARNATAKA 03/ NHAI/RO-BNG/14021/Tender/2017 31/07/2017 31/07/2017 16/08/2017
Time 17:0Hrs
402 Consultancy Services for Feasibility Study and preparation of Detailed Project Report of selected stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as National Highways ) (Junction of NH-5(GQ)(New NH No-16) near Jankia-Chandanpur (40Kms) on NH-316 in the State of Odisha.) for up gradation to Two/Four lane configuration 6 CE NH 17-18 31/07/2017 29/07/2017 18/08/2017
Time 17:0Hrs
403 Consultancy Services for Soil Stability on Kaladan Multi Modal Transit Transport Project on NH-502A in Mizoram NIT No.2/RFP/CE-HW/2017-2018 02/08/2017 29/07/2017 18/09/2017
Time 15:0Hrs
404 Feasibility study and preparation of DPR for Bairabi bypass on NH-154 in Mizoram NIT No.1/RFP/CE-HW/2017-2018 31/07/2017 28/07/2017 04/09/2017
Time 15:0Hrs
405 Feasibility study and preparation of DPR for Restoration of Continuous Landslide at Km 176/50 and Sinking Area at Km 179/50 on NH-54 in Mizoram NIT No.1/RFP/CE-HW/2017-2018 01/08/2017 28/07/2017 04/09/2017
Time 15:0Hrs
406 Feasibility study and preparation of DPR for 2-Laning with paved shoulder on NH-102B in Mizoram NIT No.1/RFP/CE-HW/2017-2018 01/08/2017 28/07/2017 04/09/2017
Time 15:0Hrs
407 Feasibility study and preparation of DPR for 2-Laning with paved shoulder on NH-306A in Mizoram NIT No.1/RFP/CE-HW/2017-2018 01/08/2017 28/07/2017 04/09/2017
Time 15:0Hrs
408 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up gradation of In-principle declaration of Narayan Sarovar on NH 41 Lakhpat road as new National Highway in the State of Gujarat 11 of 2016-17 Third Attempt 28/07/2017 28/07/2017 21/08/2017
Time 17:0Hrs
409 Feasibility study and preparation of DPR for Aizawl By-Pass on NH-54 in Mizoram NIT No.1/RFP/CE-HW/2017-2018 31/07/2017 28/07/2017 04/09/2017
Time 15:0Hrs
410 Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam. NHAI/11012/ Guwahati Bypass/ DPR /NE/2017 04/08/2017 27/07/2017 28/08/2017
Time 11:0Hrs
411 Consultancy Services for,Feasibility Study,Detailedproject Report,survey and Preparation of Land Plan by adopting LiDAR or similar technology for UPGRADATION OF STATE HIGHWAY ENH/VJP/PB/AE2/TND/2017-18/1116 26/07/2017 26/07/2017 19/08/2017
Time 16:0Hrs
412 Consultancy Services for feasibility study/detailed Engineering and detailed project preparation for C/O flyover in Una town on NH-503 (Extn.) in the State of Himachal Pradesh (Package No. HP/Shahpur/R/21). 277-SESHA-2017 27/07/2017 26/07/2017 07/09/2017
Time 15:0Hrs
413 1. Consultancy Services for of Preparation of Detailed Project Report of Improvement to Two lane with paved shoulder NH-57 (NH-27 New) Sakri to Madhubani- Rajnagar-Babubarhi- Khutauna-Phulparash road in Bihar on EPC Mode. 2.Consultancy Services for of Preparation of Feasibility Study and Detailed Project Report for Improvement to Two lane with paved shoulder NH-57 (NH-27 New) Bhutaha Chowk to Nirmali Via Mangasihaul – Marauna-Madhepur dist Madhubani (45km) Road in Bihar on EPC Mode. DPR/BIHAR/NH Div. Jainagar-03/2017-18 26/07/2017 25/07/2017 22/09/2017
Time 10:30Hrs
414 Consultancy Services for Preparation of Detailed Project Report (DPR) Construction of new 6-lane Flyover at Ainthapalli Junction on NH-6 in Sambalpur NHAI/11013/13/RO/OD/2017 01/08/2017 25/07/2017 18/09/2017
Time 11:0Hrs
-
415 Preparation of Detailed Project Report for Dindigul - Natham - Singampunari - Thirupathur - Devakottai - Rastha Road TN .No. 23/2017/DO Dt.24.07.2017 24/07/2017 24/07/2017 08/08/2017
Time 15:0Hrs
416 Preparation of Detailed Project Report for Construction of flyover at Km. 599/0-601/0 (Kaliyakavilai) of NH 47 03/2017-18/ DO/ dated 13.07.2017 24/07/2017 24/07/2017 01/09/2017
Time 11:0Hrs
417 Preparation of Detailed Project Report for providing pedestrian subway at Km 628/10 of NH47 (Sunkan Kadai) 03/2017-18/ DO/ dated 13.07.2017 24/07/2017 24/07/2017 01/09/2017
Time 11:0Hrs
418 Balance work of construction of 4-laning road from Km. 165.400 to Km 190.587 of Jatinga Junction to harangajao section of NH-54 in the state of Assam under East West Corridor Project (Contract package no EW-II AS-21 (Bal)) NHAI/11015/AS-21 (Bal)/2011/NE 16/08/2017 24/07/2017 21/08/2017
Time 11:0Hrs
419 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 16.00 to 111.35 (Kalsi to Barkot Bend) with realignment of km. 44.00 to 59.00 (due to submergence in Lakhwar-Vyasi Dam project) on NH-123(New No. 507) 1775/13Yata-NH-10/2017 dated 30.05.2017 11/09/2017 24/07/2017 31/10/2017
Time 15:0Hrs
420 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from from single/intermediate lane to 2-lane with paved shoulder from km. 0.00 to 84.200 (Chamoli to Kund) on NH-107A 1775/13yata-NH-10/2017dated 31.05.2017 12/09/2017 24/07/2017 31/10/2017
Time 15:0Hrs
421 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 0.00 to 84.00 (Tuini to Near Chakrata) on NH-707A 1775/13yata-NH-10/2017dated 31.05.2017 12/09/2017 24/07/2017 31/10/2017
Time 15:0Hrs
422 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 84.00 to 160.00 (Near Chakrata to Mussoorie) on NH-707A 1775/13yata-NH-10/2017dated 31.05.2017 12/09/2017 24/07/2017 31/10/2017
Time 15:0Hrs
423 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from from single/intermediate lane to 2-lane with paved shoulder from km. 189.00 to 264.00 (Salondhar to Buakhal) on NH-121(New No. 309) 1775/13yata-NH-10/2017dated 31.05.2017 12/09/2017 24/07/2017 31/10/2017
Time 15:0Hrs
424 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from widening from single/intermediate lane to 2-lane with paved shoulder from km. 200.00 to 235.00 (Diwalikhal to Karanprayag) on NH-87Ext(New No. 109 2040/13yata-NH-10/2017dated 29.06.2017 12/09/2017 24/07/2017 31/10/2017
Time 15:0Hrs
425 Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for construction of Road Nimmu-Chilling-Niraq-Padam-Darcha from Km 45.000 To Km 90.000 to NHDL specifications under 762 BRTF of Project Vijayak in Leh Ladakh Region of Jammu & Kashmir State CE (P) VIJAYAK/14/2017-18 22/07/2017 22/07/2017 23/08/2017
Time 14:0Hrs
426 Consultancy Services for carrying out feasibility study, Detailed Survey/Investigation, Preparation of General Arrangement Drawing, Detail Project Report for Construction of proposed ROB Six-lane configuration and its approaches in replacement of temporary LC at Km.363.625 on NH-8A New NH- 141 08 of 2016-17 4th attempt 21/07/2017 21/07/2017 09/08/2017
Time 17:0Hrs
427 Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for Construction of Elevated corridor- (i) At Sarojini Nagar and Banthara (Km. 14.300 & Km. 23.000) on Lucknow Kanpur Section of NH-25- (Length 4 Kms). (ii) From Shaheed Path to PGI (Km. 12.700 to Km.16.000) on Lucknow Raebareli Section of NH-24B (length 3.300Kms). (iii) From near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms). NHAI/PIU-LKO/Tender/Elevated DPR/08 20/07/2017 21/07/2017 19/08/2017
Time 11:0Hrs
428 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri and Cherkala – Kalladaka in the State of Karnataka EE/NHD/MNG/AE2/Consultancy/NIT 01/2nd Call/2017-18 20/07/2017 20/07/2017 31/07/2017
Time 16:0Hrs
-
429 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri and Cherkala – Kalladaka in the State of Karnataka EE/NHD/MNG/AE2/Consultancy/NIT 01/2nd Call/2017-18 20/07/2017 20/07/2017 31/07/2017
Time 16:0Hrs
-
430 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri and Cherkala – Kalladaka in the State of Karnataka EE/NHD/MNG/AE2/Consultancy/NIT 01/2nd Call/2017-18 20/07/2017 20/07/2017 31/07/2017
Time 16:0Hrs
-
431 Consultancy Services for Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh. NHAI/Tech/Agra Bypass(N)/DPR/2017/103113 25/07/2017 20/07/2017 10/08/2017
Time 15:0Hrs
-
432 Consultancy Services for Preparation of DPR for Additional Cross Drainage structures across water tank areas i.e Bridges, Culverts etc on the basis of Order of NGT & Revised MoEF Clearance for NH-47&47B in the State of Tamil Nadu. NHAI/11012/DPR/Addl/08/2017 20/07/2017 19/07/2017 23/08/2017
Time 11:0Hrs
433 Consultancy Services for carrying out Road Safety Audit of existing road from Km 5/2 -19/0 & Km 96/0 -119/0 of NH 49 Extn (New NH 85) TN .No. 22/2017/DO Dt.14.07.2017 18/07/2017 18/07/2017 21/08/2017
Time 15:0Hrs
434 Preparation of Detailed Project Report for Construction of Theni Bypass road of NH49 Extn TN .No. 22/2017/DO Dt.14.07.2017 18/07/2017 18/07/2017 21/08/2017
Time 15:0Hrs
435 Consultancy Services for preparation of feasibility study and Detailed Project Report for 2-lanning with paved shoulder from Imphal-Kakching Lamkhai on NH-137 A under NH(O) in the state of Manipur 01/ACE-I/NH/ Consultancy/2017-18/147 21/07/2017 17/07/2017 15/08/2017
Time 11:0Hrs
436 Consultancy Services for preparation of feasibility study and Detailed Project Report for 2-lanning with paved shoulder from Shankshak to Tengnoupal on NH-39 (102A – Extn) under NH(O) in the state of Manipur 02/ACE-I/NH/ Consultancy/2017-18/148 21/07/2017 17/07/2017 15/08/2017
Time 11:0Hrs
437 Consultancy Services for Appointment of Technical Consultant for Carrying out Feasibility Study and Preparation of DPR for Augmentation of Tambaram (km.28/000)-Tindivanam (Km.121/000) Section of NH-45 in the State of Tamil Nadu under NHDP Phase-V (2nd call). NHAI/11012/DPR/TT/RFP/2017/ 17/07/2017 14/07/2017 10/08/2017
Time 11:0Hrs
-
438 Consultancy Services for preparation of Detailed Project Report of selected stretch Avinashi– Mettupalayam road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration. TN.No.09/HDO/NH/2017-18/Dt.27.06.2017 11/07/2017 11/07/2017 29/08/2017
Time 15:0Hrs
439 Consultancy Services for preparation of Detailed Project Report of selected stretch Bhavani –Karur road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration. TN.No.10/HDO/NH/2017-18/Dt.27.06.2017 11/07/2017 11/07/2017 29/08/2017
Time 15:0Hrs
440 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in North Eastern Region (NER)- Package I NHIDCL/DPR/NER/01/2017 11/07/2017 11/07/2017 04/09/2017
Time 15:0Hrs
441 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in North Eastern Region (NER) - Package II NHIDCL/DPR/NER/02/2017 11/07/2017 11/07/2017 04/09/2017
Time 15:0Hrs
442 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the UT of Andaman & Nicobar Islands NHIDCL/DPR/A&N/2017 11/07/2017 11/07/2017 04/09/2017
Time 15:0Hrs
443 Consultancy Services for preparation of Detailed Project Report of selected stretch Mettupalayam-Bhavani road in the State of Tamilnadu for up-gradation to Two lane with paved shoulder/ Four lane configuration. TN.No.08/HDO/NH/2017-18/Dt.27.06.2017 10/07/2017 10/07/2017 29/08/2017
Time 15:0Hrs
444 Consultancy Services for preparation of Feasibility study / Detailed Project Report for Construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur section from Km 165.400 to Km 190.587 on NH-54 of Package AS-21 (Balance) broadly along the existing DPR alignment in the State of Assam. NHAI/11015/AS-21 (Bal)/DPR (Existing)/2017/NE 10/07/2017 10/07/2017 29/08/2017
Time 11:0Hrs
445 Preparation of Detailed Project Report for Palani – Dharapuram road TN .No. 19/2017/DO Dt.04.07.2017 10/07/2017 07/07/2017 18/08/2017
Time 11:0Hrs
446 Preparation of Detailed Project Report for Trichy – Nammakkal road TN .No. 19/2017/DO Dt.04.07.2017 10/07/2017 07/07/2017 18/08/2017
Time 11:0Hrs
447 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam.(Package I) (Reinvitation) NHIDCL/DPR/Assam/01/2017 05/07/2017 06/07/2017 01/09/2017
Time 15:0Hrs
448 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam ( Package II) (Reinvitation) NHIDCL/DPR/Assam/02/2017 05/07/2017 06/07/2017 01/09/2017
Time 15:0Hrs
449 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam (Package III) (Reinvitation) NHIDCL/DPR/Assam/03/2017 05/07/2017 06/07/2017 01/09/2017
Time 15:0Hrs
450 TEST PROJECT DO NOT APPLY TEST PROJECT DO NOT APPLY 06/07/2017 06/07/2017 06/07/2017
Time 23:0Hrs
451 Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Baran – Khanpur – Jhalawar 82 Kms (District Baran , Jhalawar) CE NIT NO. 1 04/07/2017 04/07/2017 12/07/2017
Time 16:0Hrs
452 Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway MP/Rajasthan border-Paron-Fatehgarh-Guna Length 22 Kms (District Baran) CE NIT NO. 1 04/07/2017 04/07/2017 12/07/2017
Time 16:0Hrs
453 Consultancy Services for Feasibility Study/ Detailed Engineering report for Construction of Two lane with Paved Shoulder from Junction of NH-752 near Kawai connecting Chhabra and terminating at NH-46 near Sada Colony Length-48 km. Consultancy Services for Feasibility Study/ Detailed Engineering report for Construction of Two lane with Paved Shoulder from Junction of NH-752 near Kawai connecting Chhabra and terminating at NH-46 near Sada Colony Length-48 km. 04/07/2017 04/07/2017 12/07/2017
Time 16:0Hrs
454 Package for Consultancy Services for project Management including preparation of Detailed Project Report of selected stretches / Corridors of NHs / SH Roads (approved In Principle for declaration as NHs) in the State of Andhra Pradesh for upgradation to two/four lane with paved shoulders configuration for (1.) Gooty connecting Pathikonda, Adoni, Madire, Hanaval, Konthanahai, Upparahal, Kowthalam, Urokonda, Halvi, Kumbalanuru, Manvi in the State of Karnataka – 135 Kms. and (2.)Junction with NH- Nit No 16/SE/AEE2/2017-18, Date 02.06.2017 12/07/2017 04/07/2017 17/08/2017
Time 17:0Hrs
455 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of Bhiwani bypass from Bhiwani-Jind road (NH 709A) to Bhiwani Loharu road (NH- 709-E) crossing Bhiwani-Hansi road (NH-148B) in the State of Haryana. PWD/HR/PKL/20 19/04/2017 04/07/2017 29/09/2017
Time 15:0Hrs
456 Consultancy Services for FeasibilityStudy and preparatio of Detailed Project Report for Construction of proposed Badarpur Bypas and Karimganj Bypass CE PWD NH 1(R) 03/07/2017 03/07/2017 30/07/2017
Time 17:0Hrs
457 Consultancy Services for Detailed Design and Drawing for Construction of High Level Bridge across Mahi River at Sangmeshwar on Chikhli-Anandpuri Road Distt. Dungarpur under CRF (Job No. CRF-885/RJ/2016-17) which include Topographic Survey, Hydrological Investigations, Geo-Technical Investigations and Preparation of General Arrangement Drawing 03/2017-2018 SE PWD Circle Dungarpur Rajasthan 29/06/2017 30/06/2017 21/07/2017
Time 18:0Hrs
458 Conusltancy Services for Appointment of Technical Consultant to Carry out the Detailed Project Report for Upgradation or Widening of Channrayapattana and Hassan bypasses 8 Grade separated Structures, Service Road and other Road Safety Measures essential in Devihalli (Km. 110.00) to Hassan (km. 189.500) section of NH 75 in the State of Karnataka. 05/NHAI/RO-BNG/23019 06/07/2017 29/06/2017 31/07/2017
Time 15:0Hrs
459 Consultancy Services for detail Road Safety Audit of existing roads (i) from ch. 12.370km ( Bhalumunda) to ch. 68.260 km( Belgaon) of NH-59 (ii) from ch. 0.00km (Champua) to ch. 14.000 km( Remuli) of NH-20 and (iii) from ch. 119.000km (Bhanjnagar) to ch. 159.000 km(Aska) of NH-157. in the state of Odisha 04 CE-NH-2017-18 29/06/2017 29/06/2017 19/07/2017
Time 17:0Hrs
460 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for strengthening in/c paved shoulder of NH-8 in Churaibari – Agartala Section from KM 422.00 to KM 456.00 (Mungiakami to Champaknagar) in the state of Tripura (Phase-I). 04/CE/PWD (NH)/BID/2017-18 25/05/2017 29/06/2017 16/08/2017
Time 15:0Hrs
461 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/16) 272-SESHA-2017 24/06/2017 28/06/2017 02/08/2017
Time 15:0Hrs
462 Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for construction of Road Nimmu-Chilling-Niraq-Padam-Darcha from Km 45.000 to Km 90.000 to NHDL specifications under 762 BRTF of Project Vijayak in Leh Ladakh Region of Jammu & Kashmir State CE (P) VIJAYAK/12/2017-18 19/06/2017 25/06/2017 06/07/2017
Time 14:0Hrs
463 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Daringibadi Ghat portion from Km 231/00 to Km 256/880 of NH-59 in the State of Odisha. (Bid Ref No-03 CE-NH-17-18) 03 CE-NH-17-18 27/06/2017 24/06/2017 14/07/2017
Time 17:0Hrs
464 Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for Construction of Elevated corridor (i) At Sarojini Nagar and Banthara (Km. 14.300 & Km.23.000) on Lucknow Kanpur Sect ion of NH-25- (Length 4 Kms) . (ii) From Shaheed Path to PGI ( Km. 12.700 to Km.16.000) on Lucknow Raebareli Sect ion of NH-24B (length 3.300Kms) . (iii) From near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms). NHAI/PIU/LKO/DPR/2017/07 23/06/2017 24/06/2017 10/07/2017
Time 11:0Hrs
465 Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for Construction of Elevated corridor (i) At Sarojini Nagar and Banthara (Km. 14.300 & Km.23.000) on Lucknow Kanpur Sect ion of NH-25- (Length 4 Kms) . (ii) From Shaheed Path to PGI ( Km. 12.700 to Km.16.000) on Lucknow Raebareli Sect ion of NH-24B (length 3.300Kms) . (iii) From near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms). NHAI/PIU/LKO/DPR/2017/07 23/06/2017 24/06/2017 10/07/2017
Time 11:0Hrs
466 Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Mathura-Govardhan-Deeg-Nagar (Length-31 km) Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 5 29/06/2017 23/06/2017 11/07/2017
Time 16:0Hrs
467 Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Lalsot (On NH-23)-Swai Madhopur (On NH-148D) Length-65 km (Distt. Dausa, Sawai Madhopur) Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 8 29/06/2017 23/06/2017 11/07/2017
Time 16:0Hrs
468 Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Mathura-Bharatpur-Bayana-Hindaun (Length-101 km) Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 12 29/06/2017 23/06/2017 11/07/2017
Time 16:0Hrs
469 Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for (I) in-principle approved NH Stretch from Gangapur-Bhadoti (40Km) (II) Sawai Madhopur-Palighat-Shivpuri (34Km) (NH-552Extn.) Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 13 29/06/2017 23/06/2017 11/07/2017
Time 16:0Hrs
470 Consultancy Services for Feasibility Study/Detail Engineering report for construction of two lane with paved Shoulder for Shahpura-Alwar-Ramgarh-Nuhu Road (NH-248A) From Km 86/800 to 127/700 (Length-49.90 km) (Distt. Jaipur, Alwar) Short Term NIT 01/2017-18 CE (NH) PWD Rajasthan Jaipur Sr No. 14 29/06/2017 23/06/2017 11/07/2017
Time 16:0Hrs
471 of Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Pokharan-Sankda-Bhainsda-Fatehgarh Length 80 Km CE(NH) Raj. NIT 1/2017-18 28/06/2017 23/06/2017 11/07/2017
Time 16:0Hrs
-
472 of Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Stretch from Rohat (on NH-62) – Ahore (on NH-325) Length 82 Km CE(NH) Raj. NIT 1/2017-18 28/06/2017 23/06/2017 11/07/2017
Time 16:0Hrs
-
473 FEASINILITY STUDY AND PREPARATION OF KOTA RAWATBHATA RAJESTHAN BORDER TOWARD SINGOLI LENGTH -68 KM DISTRICT KOTA CHITTORGARH CENITNO1-2017-18 23/06/2017 23/06/2017 12/07/2017
Time 18:0Hrs
474 BARAN MANGROL SHEOPUR LENGTH -43 KM ( DISTRICT BARAN) CENIT1 23/06/2017 23/06/2017 12/07/2017
Time 18:0Hrs
475 Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Desuri (NH-162) – Sadri-Lunawa-Bera- Kagdara- Pindwara Length- 90 Km (District Pali, Sirohi) CE(NH) Raj. NIT 1/2017-18 05/07/2017 23/06/2017 11/07/2017
Time 15:0Hrs
476 Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Kharia (on NH-25)- Ransi- Borunda – Gotan and extended upto Junction with NH-58 near Run Length- 125.00 Km (District Jodhpur, Nagaur) CE(NH) Raj. NIT 1/2017-18 05/07/2017 23/06/2017 11/07/2017
Time 15:0Hrs
477 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 4 lane paved shoulder from Km.456.00 to Km. 482.00 (Champaknagar-Agartala ISBT) in Churaibari-Agartala Section of NH-8 (Old NH-44) in the state of Tripura. 03/CE/PWD (NH)/BID/2017-18 30/05/2017 23/06/2017 17/08/2017
Time 15:0Hrs
478 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of “in principle” declared National Highway from Kamalpur to Santirbazar (on NH-8) via Ambassa (on NH-8), Gandacherra, Amarpur (on NH-208) and Santirbazar to Belonia in the state of Tripura. 02/CE/PWD (NH)/BID/2017-18 24/05/2017 22/06/2017 11/08/2017
Time 15:0Hrs
479 Consultancy Services for feasibility study and preparation of detailed project report and providing pre-construction services for improvement and up-gradation to 2 lane with paved shoulder of “in principle” declared National Highway from -(i) Champaknagar (Jirania) on NH-8 to Udaipur on NH-8 via Jampuijala, (ii) Amarpur on NH-208 to Udaipur on NH-8 in the state of Tripura. 01/CE/PWD (NH)/DNIT/2017-18 17/05/2017 21/06/2017 10/08/2017
Time 15:0Hrs
480 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of Rewari Bypass from Rohtak-Jhajjar-Rewari Road (NH-71) to Gurgaon- Jaipur Road (NH-8) crossing Rewari-Narnaul Road (NH-11) in the State of Haryana. PWD/HR/PKL/19 17/04/2017 21/06/2017 03/08/2017
Time 15:0Hrs
481 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed Two lane road from Junction of NH-627 near Baithalangso-Bichitur- Ulukunchi-Umpanai-Assam/Meghalaya Border under Nagaon NH Division in the State of Assam. CE PWD NH 2 (R) 20/06/2017 20/06/2017 03/08/2017
Time 16:0Hrs
482 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Consultancy Services for Feasibility study and preparation of Detailed Project Report(DPR) for the proposed 2-lane road from Barpeta Manas road on NH-31 to Manas (Bhutan Border) under Rangia NH Division in the State of Assam. CE PWD NH 3 (R) 20/06/2017 20/06/2017 03/08/2017
Time 16:0Hrs
483 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Two lane road from Lanka(on NH-27)- Kheroni(on NH- 627) under Nagaon NH Division in the State of Assam CE PWD NH 4 (R) 20/06/2017 20/06/2017 03/08/2017
Time 16:0Hrs
484 Invitation of proposal for consultancy services for preparation of detailed project report (DPR) for widening from single/intermediate lane to 2-lane with paved shoulder from km. 16.00 to 111.35 (Kalsi to Barkot Bend) with realignment of km. 44.00 to 59.00 (due to submergence in Lakhwar-Vyasi Dam project) on NH-123(New No. 507) 1775/13yata-nh-10/2017dated 31.05.2017 24/07/2017 20/06/2017 05/08/2017
Time 15:0Hrs
485 Consultancy services for prepparation of feasibility report from DPR of 4/6 lane of Belgaum Bypass tentative alignment from Km 498 (NH4) to Km 9.5 (NH4A) to Km 515 NH4 03/ NHAI/RO -BNG/14021/Tender/2017 28/06/2017 17/06/2017 20/07/2017
Time 15:0Hrs
486 Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh NHAI/Tech/Agra Bypass(N)/DPR/2017/101440 21/06/2017 16/06/2017 13/07/2017
Time 11:0Hrs
-
487 Consultancy Services for t,easihility Stud},, Detailed I)roject Report, Sur-vev and l)reparation of Land Plan for Widening to Two lane with laved Shouiders lbr I.losdr-rrg * Panathur lSagamandaia - Madikeri and Cherkala - Kalladaka in the Sta-te of Karnataka EE/NHD/MNG/AE2/Consultancy/NIT 01/2017-18 16/06/2017 16/06/2017 27/06/2017
Time 16:0Hrs
-
488 Consultancy services for Authority Engineer for supervision of civil construction works Rehabilitation and upgradation of NH75 Old NH234 from Km 506 to Km 508 700 and Km 518 to Km 534 Design Ch Km 506 to 508 and 518 to 534 Mangalore to Thiruvannamalai Road to two lane with paved shoulders on EPC Basis in the State of Andhra Pradesh 2nd call SER&B NIT NO 14 16/06/2017 16/06/2017 02/08/2017
Time 15:0Hrs
489 Consultancy Services for Feasibility study Detailed project report including conducting site investigation, subsoil exploration and testing preparation of plans designs land plan schedules and preparation of GAD for the Bypass Roads for the four towns of V Kota and Chittoor in Chittoor District Badvel in Kadapa District and Adoni in Kurnool District 3rd call SE R AND B NIT NO 15 16/06/2017 16/06/2017 02/08/2017
Time 15:0Hrs
490 Consultancy for preparation of GAD including preparation of detailed project report for construction (Construction & Widening) of ROB (Existing Railway Portion & approach) at NH-116 Km 76 of NH-116 (Swaimadhopur) including detailed engineering survey, survey and investigation of soil / all geotechnical investigation Topography survey of area & working drawings, design, Estimating and BOQ & preparation of working drawings ad per scope of work governed by the Terms of reference of the MoRTH Short Term NIT 03/2017-18 EE PWD NH Dn.-I, Jaipur Sr No. 1 16/06/2017 16/06/2017 04/07/2017
Time 11:0Hrs
491 Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka NHD/MNG/JE/Road Safety Audit/NIT-12/4th Call/2017-18 15/06/2017 15/06/2017 28/06/2017
Time 16:0Hrs
-
492 Consultancy services for feasibility study and preparation of detailed project report for 4 laning of Basukinath - Deoghar section of NH-114A under NHDP Phase-IV in the state of Jharkhand (Third Call) NHAI/11012/NHDP-IV/JH/Basukinath-Deoghar/ 2017 03/07/2017 13/06/2017 16/08/2017
Time 11:0Hrs
493 Consultancy Services for carrying out feasibility study Detailed Survey Investigation Preparation of General Arrangement Drawing, Detail Project Report for Construction of proposed ROB Six lane configuration and its approaches in replacement of temporary LC at Km.363.625 on NH 8A New NH 141 08 OF 2016-17 Third Attempt 12/06/2017 13/06/2017 04/07/2017
Time 17:0Hrs
494 Consultancy Services for preparation of Detailed Project Report for Construction of proposed Mandvi bypass road starting from Km. 97.200 and ending on Km.104.200 of NH 8A Extn. in the State of Gujarat 09 of 2016-17 Third Attempt 12/06/2017 13/06/2017 04/07/2017
Time 17:0Hrs
495 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up gradation of In principle declaration of Chitrod on NH 27 Rapar Dholavira Upto Balasar road as new National Highway in the State of Gujarat 10 of 2016-17 Third Attempt 12/06/2017 13/06/2017 28/06/2017
Time 17:0Hrs
496 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of In-principle declaration of Lakhpat Gaduli Hajipir Khavda Dholavira Mauvana Santalpur road as new National Highway in the State of Gujarat 11 of 2016-17 T 12/06/2017 13/06/2017 04/07/2017
Time 17:0Hrs
497 CONSULTANCY SERVICES FOR PROOF CHECKING OF STANDARD DESIGNS AND PLANS FOR VARIOUS TYPES OF BRIDGE SUPERSTRUCTURES BASED ON LIMIT STATE METHOD R//NH-34049/3/2008-S&R(B) 28/06/2017 12/06/2017 14/09/2017
Time 11:0Hrs
498 Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two lane with paved shoulder Darbhanga – Kusheshwar Asthan – Khagaria Road in Bihar on EPC Mode. RCD/NH Div. Jainagar/01/2017-18 29/06/2017 12/06/2017 03/08/2017
Time 15:0Hrs
499 Consultancy Services for Proof Checking of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method (Package 2) RW/NH-34049/3/2008-S and R B Package 2 16/08/2017 12/06/2017 14/09/2017
Time 11:0Hrs
500 Consultancy Services for Proof Checking of Standard Designs and Plans for various types of Bridge Superstructures based on Limit State Method package 3 RW/NH-34049/3/2008-S and R B Package 3 16/08/2017 12/06/2017 14/09/2017
Time 11:0Hrs
501 Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Four Lane of the road Darbhanga Jaynagar NH 105 in Bihar on EPC Mode RCD NH Div Jainagar 02 2017 18 30/06/2017 09/06/2017 03/08/2017
Time 15:0Hrs
502 Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 Lane Inner Ring Road in and around Allahabad City in the state of Uttar Pradesh. NHAI/Tech/IRR(Ald)/DPR/2017/100963 15/06/2017 08/06/2017 20/07/2017
Time 11:0Hrs
-
503 DPR for construction of Bypass (Bagalur town) in NH 207 (New NH 648) TN .No. 6/HDO/ NH /2017-2018/ Dated 23.05.2017 08/06/2017 08/06/2017 24/07/2017
Time 15:0Hrs
504 Preparation of DPR for in Principle declared state Highways road as New National Highway for Kollegala – Hanur – MM Hills – Palar road Tamilnadu border (30 Km length in Tamilnadu) extended upto Mettur in Tamilnadu TN .No. 7/HDO/ NH /2017-2018/ Dated 24.05.2017 08/06/2017 08/06/2017 17/07/2017
Time 11:0Hrs
505 Preparation of Detailed Project Report for Construction of flyover at Km. 599/0-601/0 (Kaliyakavilai) of NH 47 TN No. 02/2017-18/ DO/ dated 19.05.2017 08/06/2017 08/06/2017 11/07/2017
Time 11:0Hrs
506 Preparation of Detailed Project Report for providing pedestrian subway at Km 628/10 of NH47 (Sunkan Kadai) TN No. 02/2017-18/ DO/ dated 19.05.2017 08/06/2017 08/06/2017 11/07/2017
Time 11:0Hrs
507 Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tuivai road section (length- 162Km ) on NH-102B in the State of Manipur (ii) 2 laning with paved shoulder of Imphal-Jiribam section of NH-37 (NH-53) (length- 220 Km) in the State of Manipur (iii) 2 laning with paved shoulder from Tamenglong in Manipur to Peren in Nagaland via Longdi Pabram ( NHIDCL/DPR/CT-IJ-TP/ Manipur/2017 07/06/2017 06/06/2017 31/07/2017
Time 15:0Hrs
508 Preparation of Detailed Project Report for Construction of Theni Bypass road of NH49 Extn TN.No. 18/2017/ DO/ dated 19.05.2017 05/06/2017 05/06/2017 11/07/2017
Time 11:0Hrs
509 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/10 HP/Shimla/10 03/06/2017 03/06/2017 29/06/2017
Time 15:0Hrs
510 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Ramgarh-Sonhat-Baikunthpur (65.00 Km.) and Harchoka-Bharatpur (20.00 Km.) NH/CE/PWD/03 and 14/208875 14/06/2017 01/06/2017 25/07/2017
Time 17:0Hrs
511 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Keonchi-Ratanpur of NH 45 NH/CE/PWD/18/208890 14/06/2017 01/06/2017 25/07/2017
Time 17:0Hrs
512 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Balod-Gunderdehi-Durg- Dhamdha-Gandai-Salhetekari Road-CG-MP border (including 28.00 km b/w Dhamdha-Gandai) NH/CE/PWD/19/208901 14/06/2017 01/06/2017 25/07/2017
Time 17:0Hrs
513 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Pithora-Bagbahra-Komakhan-Chhura-Gariyaband Marg NH/CE/PWD/20/208953 14/06/2017 01/06/2017 25/07/2017
Time 17:0Hrs
514 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Kondagaon-Narayanpur (48.70 Km.) and Geedam-Dantewada (12.00 Km.) and Narayanpur-Kutul-Farasbeda-MH border (50.00 km.) NH/CE/PWD/16,17, 11/208980 14/06/2017 01/06/2017 25/07/2017
Time 17:0Hrs
515 Consultancy services for feasibility study, Prepration of DPR and providing pre construction services in respect of 2 laning of (i) DMP section on NH-129A (ii) PC section of NH-102C and (iii) SN on NH-102A (BMP) on EPC in the state of Manipur 2nd Call NHIDCL/DPR/SN-DMP-PC/Manipur/2017 05/06/2017 30/05/2017 13/07/2017
Time 17:0Hrs
516 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/25Sml HP/Shimla/25Sml 30/05/2017 29/05/2017 22/06/2017
Time 15:0Hrs
517 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/26Sml HP/Shimla/26Sml 30/05/2017 29/05/2017 22/06/2017
Time 15:0Hrs
518 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/28Sml HP/Shimla/28Sml 30/05/2017 29/05/2017 22/06/2017
Time 15:0Hrs
519 Consultancy Services for feasibility study and preparation of Detailed Project Report for Construction of R.O.B. in lieu of existing Railway crossing at Km. 363.625 on NH-8A K.F.T.Z. – Kandla road in the State of Gujarat 08 of 2016-17 Second Attempt 26/05/2017 27/05/2017 09/06/2017
Time 17:0Hrs
520 Consultancy Services for preparation of Detailed Project Report for Construction of proposed Mandvi bypass road starting from Km. 97/200 & ending on Km.104/200 of NH 8A Extn. in the State of Gujarat 09 of 2016-17 Second Attempt 27/05/2017 27/05/2017 09/06/2017
Time 17:0Hrs
521 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Chitrod on NH 27 – Rapar – Dholavira Upto Balasar road as new National Highway in the State of Gujarat 10 of 2016-17 second attempt 27/05/2017 27/05/2017 09/06/2017
Time 15:0Hrs
522 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Lakhpat-Gaduli-Hajipir-Khavda-Dholavira-Mauvana-Santalpur road as new National Highway in the State of Gujarat 11 OF 2016-17 Second Attempt 27/05/2017 27/05/2017 09/06/2017
Time 17:0Hrs
523 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Daringibadi Ghat portion from Km 231/00 to Km 256/880 of NH-59 in the State of Odisha. 2 CE-NH-17-18 27/05/2017 26/05/2017 19/06/2017
Time 17:0Hrs
524 Consultancy Services for carrying out Road Safety Audit of existing road from Km 5/2 -19/0 & Km 96/0 -119/0 of NH 49 Extn (New NH 85) TN.No. 17/2017/ DO/ dated 18.05.2017 24/05/2017 24/05/2017 06/07/2017
Time 11:0Hrs
525 Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for Construction of Elevated corridor (i) At Sarojini Nagar and Banthara (Km. 14.300 & Km. 23.000) on Lucknow Kanpur Section of NH-25(Length 4 Kms). (ii) From Shaheed Path to PGI (Km. 12.700 to Km.16.000) on Lucknow Raebareli Section of NH-24B (length 3.300Kms). (iii) From near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms). NHAI/PIU./LKO/DPR/2017/06 14/06/2017 24/05/2017 18/06/2017
Time 11:0Hrs
526 CONSULTANCY SERVICES FOR ENGAGEMENT OF CONSULTANT FOR PREPARATION OF DPR USING LiDAR TECHNOLOGY FOR CONSTRUCTION/IMPROVEMENT OF EXISTING ROAD MANALI-SARCHU-LEH FROM CL-9 SPECIFICATIONS TO NHDL SPECIFICATIONS FROM KM 13.0 TO KM 31.0, KM 185.00 TO KM 195.00 AND KM 224.89 TO KM 304.39 ( KM 0 RECKONED AT MANALI ) NET LENGTH KM 107.50 IN THE STATE OF HIMANCHAL PRADESH AND LEH LADAKH REGION OF JAMMU & KASHMIR CE (P) HIMANK/01/2017-18 19/05/2017 22/05/2017 19/06/2017
Time 12:0Hrs
527 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Hosdurg – Panathur – Bagamandala – Madikeri and Cherkala – Kalladaka in the State of Karnataka EE/NHD/MNG/AE2/Consultancy/NIT 01/2017-18 Date 07.04.2017 20/05/2017 20/05/2017 22/05/2017
Time 16:0Hrs
528 Consultancy Services for Road Safety Audit from km. 0.00 to 52.00 (Mani to Puttur) and from km. 82.00 to 138.00 (Sulya to Kushalnagar) of NH-275 in the State of Karnataka NHD/MNG/JE/Road Safety Audit/NIT-12/3rd Call/2017-18 Date 09-05-2017 19/05/2017 19/05/2017 24/05/2017
Time 16:0Hrs
529 Consultancy Services for preparation of Feasibility study /Detailed Project Report for construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur Section from km. 165.40 to km. 190.587 on NH - 54 of package AS-21(Bal) through New Alignment in the State of Assam on EPC mode. NHAI/11015/AS-21(BAL)/2011/NE 19/05/2017 18/05/2017 17/07/2017
Time 11:0Hrs
530 Consultancy Services for preparation of GAD including preparation of detailed project report for construction (Construction & Widening) of ROB (Existing Railway Portion & approach) at NH-116 Km 76 of NH-116 (Swaimadhopur) including detailed engineering survey, survey and investigation of soil/all geotechnical investigation Topography survey of area & working drawings, design, Estimating and BOQ & preparation of working drawings ad per scope of work governed by the Terms of reference of the MoRTH Short Term NIT 02/2017-18 EE PWD NH Dn-I, Jaipur 26/05/2017 18/05/2017 30/05/2017
Time 11:0Hrs
531 Consultancy Services for Preparation of DPR for improvement of newly declared NHs 3 of SE, N. H. Circle No. II of 2017-18 - 3rd Cal 16/05/2017 17/05/2017 16/06/2017
Time 17:0Hrs
532 Consultancy Services for preparation of Detailed Project Report of stretches from Ankaleshwar (Km.0.000) to Netrang (Km.45.000) & Taloda (Km.143.000) to Burhanpur (Km.543.000) of National Highways for up gradation to 4- lane in the State of Maharashtra NHAI/RO-NAG/2017-18/03 13/05/2017 13/05/2017 27/06/2017
Time 11:30Hrs
533 4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh NHAI/Tech/Agra Bypass(N)/DPR/2017/99552 15/05/2017 12/05/2017 13/06/2017
Time 11:0Hrs
534 Package CENH/DPR/01/2017 DPR for 2 lane with Paved Shoulders/From Kayamkulam (NH47) to Junction near Thiruvalla (NH183) 05/CENH/KLA/DPR/2017-18 05/06/2017 11/05/2017 14/06/2017
Time 15:0Hrs
535 Package CENH/DPR/02/2017-DPR for 2 lane with Paved Shoulders/From Bharanikkavu near Adur in NH183A up to Titanium, Chavara at NH47 (new NH66)/Connecting NH183A at Elavunkal near Laha with Pampa 05/CENH/KLA/DPR/2017-18 05/06/2017 11/05/2017 14/06/2017
Time 15:0Hrs
536 Package CENH/DPR/03/2017/Makaraparambu bypass between km 53/000 and 63/000 (4 lane bypass)/Road connecting Vadakkenchery – Pollachi (stretch in Kerala) 05/CENH/KLA/DPR/2017-18 05/06/2017 11/05/2017 14/06/2017
Time 15:0Hrs
537 Package CENH/DPR/04/2017 DPR for 2 lane with Paved Shoulders Road connecting International Sea Port, Vizhinjam with Karamana- Kaliakkavila stretch of NH-47 and NH Bypass 47 (New NH 66). (starts from Balaramapuram passes through Mukkola - Vizhinjam International Sea Port (Mulloor) - Pulluvila- Kanjiramkulam and meets the NH-47 at Neyyattinkara/Road connecting Thiruvananthapuram – Thenmala 05/CENH/KLA/DPR/2017-18 05/06/2017 11/05/2017 14/06/2017
Time 15:0Hrs
538 Package CENH/DPR/04/2017 DPR for 2 lane with Paved Shoulders Road connecting International Sea Port, Vizhinjam with Karamana- Kaliakkavila stretch of NH-47 and NH Bypass 47 (New NH 66). (starts from Balaramapuram passes through Mukkola - Vizhinjam International Sea Port (Mulloor) - Pulluvila- Kanjiramkulam and meets the NH-47 at Neyyattinkara/Road connecting Thiruvananthapuram – Thenmala 05/CENH/KLA/DPR/2017-18 05/06/2017 11/05/2017 14/06/2017
Time 15:0Hrs
539 Package CENH/DPR/05/2017 DPR for 2 lane with Paved Shoulders Road connecting Hosdurg – Panathur – Bhagamandala – Madikeri – in Karnataka State (stretch in Kerala)/Road connecting Cherkala – Kalladka (stretch in Kerala) 05/CENH/KLA/DPR/2017-18 05/06/2017 11/05/2017 14/06/2017
Time 15:0Hrs
540 Prepration of DPR for Nimmu -Padam- Darcha road in Jammu and Kashmir CE (P) VJK/03/2017-18 04/05/2017 09/05/2017 15/06/2017
Time 12:0Hrs
541 Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for the Construction of a Road Tunnel and its approaches Enabling All Weather Connectivity along the Mughal Road in the State of Jammu and Kashmir. NHIDCL/DPR/J&K/Mughal Road/ (Pir Ki Gali-Tunnel)/2017 30/03/2017 09/05/2017 15/01/2018
Time 17:0Hrs
542 Consultancy Services for following tunnel on NH244 1-Sudhmahadev-Dranga Tunnel length 4.5Km and its approaches on Chenani-Sudhmahadev-Goha road portion 2-Vailoo Tunnel length 10.00Km under Sinthan Pass and its approach roads onGoha-Khellani-Khanabal NHIDCL/DPR/J&K/C-K(Tunnels)/2017 23/03/2017 08/05/2017 10/07/2017
Time 17:0Hrs
543 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/29Sml HP/Shimla/29Sml 29/04/2017 29/04/2017 23/05/2017
Time 15:0Hrs
544 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/31Sml HP/Shimla/31Sml 29/04/2017 29/04/2017 23/05/2017
Time 15:0Hrs
545 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/30Sml HP/Shimla/30Sml 29/04/2017 29/04/2017 23/05/2017
Time 15:0Hrs
546 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/32Sml as per annexure I HP/Shimla/32sml 29/04/2017 29/04/2017 23/05/2017
Time 15:0Hrs
547 Technical Consultant for preparation of Feasibility study (FS), Detailed Project Report (DPR) and providing Pre-Construction Services for improvement of existing road from Km 28.30 (Akhnoor) to Km 108.54 (Tain Br) under 13 TF and from Km 108.54 to Km 236.78 (Poonch) under 31 TF on NH-144A for 4-lane/2-lane with Paved Shoulder from existing double lane specification in the State of J&K CE (P) SPK/01/2017-18 20/04/2017 21/04/2017 29/05/2017
Time 12:0Hrs
548 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declared (A) Khambhaliya – Advana – Porbandar road, (B) Khambhaliya – Bhanwad – Ranavav (up to junction of N.H.8B) road, (C) Porbandar – Bhanvad – Jamjodhpur - Kalavad road as new National Highway in the State of Gujarat 14/3 of 2016-17 20/04/2017 17/04/2017 13/05/2017
Time 15:0Hrs
549 Consultancy Services for detail Road Safety Audit of existing road from ch. 294.280km (Navrangpur) to ch. 434.787 km( Sunki ghat) of NH-26 in the state of Odisha. 01 CE-NH-2017-18 -Package-I 20/04/2017 17/04/2017 08/05/2017
Time 17:0Hrs
550 Consultancy Services for detail Road Safety Audit of existing road from ch. 413.700km (Malkanagiri) to ch. 513.700 km(Motu) of NH-326 in the state of Odisha 01 CE-NH-2017-18 Package-II 20/04/2017 17/04/2017 08/05/2017
Time 17:0Hrs
551 Consultancy Services for detail Road Safety Audit of existing roads (i) from ch. 12.370km ( Bhalumunda) to ch. 68.260 km( Belgaon) of NH-59 (ii) from ch. 0.00km (Champua) to ch. 14.000 km( Remuli) of NH-20 and (iii) from ch. 119.000km (Bhanjnagar) to ch. 159.000 km(Aska) of NH-157. in the state of Odisha 01 CE-NH-2017-18 Package-III 20/04/2017 17/04/2017 08/05/2017
Time 17:0Hrs
552 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declared Nageshri - Khambha - Chalala – Amreli road as new National Highway in the State of Gujarat 14/2 of 2016-17 20/04/2017 11/04/2017 06/05/2017
Time 17:0Hrs
553 Consultancy Services for Preparation of Detailed Project Report for Up gradation to Two lane / Four lane with Paved Shoulders configuration of newly declared NH 516D from Devarapalli at NH -16 to Jeelugumilli near AP/TS Border in the state of Andhra Pradesh SE(R&B)/NH/VJA/Short Tender/01/2017-18 Dated 03/04/2017 16/05/2017 11/04/2017 05/06/2017
Time 16:0Hrs
554 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declared National Highways in the State of Gujarat 14/1 of 2016-17 17/04/2017 11/04/2017 06/05/2017
Time 18:0Hrs
555 Consultancy Services for Feasibility Study/ Detailed Engineering report for Construction of Two lane with Paved Shoulder from Junction of NH-752 near Kawai connecting Chhabra and terminating at NH-46 near Sada Colony Length-48 km CE NH NIT NO. 20 10/04/2017 10/04/2017 11/05/2017
Time 11:0Hrs
556 Dindigul - Natham - Singampunari - Thirupathur - Devakottai - Rastha Road (Package No.NH-MDU/1, TN .No. 14/2017/DO Dt. 28.03.2017 10/04/2017 10/04/2017 13/04/2017
Time 14:0Hrs
557 Thanjavur - Pattukottai -Karaikudi Road (Package No.NH-MDU/2 TN .No. 14/2017/DO Dt. 28.03.2017 10/04/2017 10/04/2017 13/04/2017
Time 14:0Hrs
558 Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Mathura-Bharatpur-Bayana-Hindaun (Length-101 km) NIT 20 / 2016-17 CE (NH) PWD Rajasthan Jaipur Sr. No. 04 08/05/2017 10/04/2017 10/05/2017
Time 18:0Hrs
559 Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder for in-principle approved NH Stretch from Gangapur-Sawai Madhopur (Length-75 km) NIT 20 / 2016-17 CE (NH) PWD Rajasthan Jaipur Sr. No. 05 08/05/2017 10/04/2017 10/05/2017
Time 18:0Hrs
560 Consultancy Services for Feasibility Study/Detail Engineering report for construction of tow lane with paved Shoulder Sawai Madhopur-Palighati-Shivpuri (NH-552 Extn) (Length-34 km) NIT 20/2016-17 CE(NH) PWD Rajasthan Jaipur Sr No 06 08/05/2017 10/04/2017 10/05/2017
Time 18:0Hrs
561 Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Ghazipur Ballia- UP/Bihar section from Km. 0.00 to 128.00 of NH-19 and Construction of 2/4 laning Fly over at Ballia (from Chandra Shekhar Mod to Satish Chandra College) in the state of Uttar Pradesh NHAI/Tech/NH-19/Pkg-I/ DPR /2016 12/04/2017 07/04/2017 05/05/2017
Time 11:0Hrs
-
562 Consultancy services for Feasibility Study and Preparation of DPR for Total Length 312.48 Km for Upgradation of Paramakudi to Ramanathapuram section of NH-49 (39 Km) to Four lane, Upgradation of Ramanathapuram to Rameshwaram section of NH-49 (63 Km) to Four lane and Four Laning of Dindigul Coimbatore Sathyamangalam and 2 laning with or without Paved shoulder from Sathyamanglam to TN Karnataka Border section of NH-209 (210.48 Km) NHAI/11012/DPR/PR-DKB/07/2017 20/04/2017 07/04/2017 16/05/2017
Time 11:0Hrs
563 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Junction of NH-5(GQ)(New NH No-16) near Jankia-Chandanpur (40Kms) on NH-316 in the State of Odisha 46 CE-NH-16-17 Package-I 05/04/2017 03/04/2017 01/05/2017
Time 17:0Hrs
564 Consultancy Services for Feasibility Study Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Bhubaneswar-Athgarh-Samarpur (Sankarpur) -Mahidharpur Road in the State of Odisha. 46 CE-NH-16-17 Package-II 05/04/2017 03/04/2017 01/05/2017
Time 17:0Hrs
565 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Jharsuguda(on NH-49)-Karamdihi- Subdega- Balishankara- up to junction with NH-43 near Ludang (Pathalgaon) (on NH-43) up to Odisha border in the State of Odisha. 46 CE-NH-16-17 Package-III 05/04/2017 03/04/2017 01/05/2017
Time 17:0Hrs
566 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Sonepur on NH-57, for proposed By pass at Nayagarh on NH-57 & proposed By pass at Reamal on NH-53 in the State of Odisha. 46 CE-NH-16-17 Package-IV 05/04/2017 03/04/2017 01/05/2017
Time 17:0Hrs
567 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/29Sml HP/Shimla/29Sml 19/04/2017 30/03/2017 21/04/2017
Time 15:0Hrs
568 Consultancy Services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of “In-principle” declaration of Mehsana-Visnagar-Vadnagar-Kheralu-Idar-Bhiloda-Shamlaji road as new National Highway in State of Gujarat. 18 of 2016-17 2nd-Attempt 30/03/2017 30/03/2017 17/04/2017
Time 18:10Hrs
-
569 Consultancy Services for Road Safety Audit of existing road Ch. 85.000 km. (Near Dharoi) to Ch. 135.000 km. (Near Pilucha) of NH-58 in State of Gujarat. 19 of 2016-2017 (2nd Attempt) 30/03/2017 30/03/2017 17/04/2017
Time 18:10Hrs
-
570 Sample DPR Version 2 Project Sample DPR Version 2 Project 28/03/2017 28/03/2017 28/04/2017
Time 15:0Hrs
571 Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH 48 near Davanagere and terminating at its junction with NH 369 near Chennagiri.(3rd Call) EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1985 25/03/2017 25/03/2017 17/04/2017
Time 16:59Hrs
572 Consultancy Services for Preparation of Detailed Project Report for Proposed Route of New National 20/2016-17(2nd Call) of SE NHC - II 25/03/2017 23/03/2017 10/05/2017
Time 14:0Hrs
573 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed Two lane road from Junction of NH-627 near Baithalangso-Bichitur-Ulukunchi-Umpanai-Assam/Meghalaya Border under Nagaon NH Division in the State of Assam. CE PWD NH 2 23/03/2017 23/03/2017 11/05/2017
Time 14:0Hrs
574 Consultancy Services for Feasibility study and preparation of Detailed Project Report(DPR) for the proposed 2-lane road from Barpeta Manas road on NH-31 to Manas (Bhutan Border) under Rangia NH Division in the State of Assam. CE PWD NH 3 23/03/2017 23/03/2017 11/05/2017
Time 14:0Hrs
575 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for the proposed Two lane road from Lanka (on NH-27)- Kheroni (on NH-627) under Nagaon NH Division in the State of Assam CE PWD NH 4 23/03/2017 23/03/2017 11/05/2017
Time 14:0Hrs
576 Consultancy services for feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulders from Junction of NH 48 near Davanagere and terminating at its junction with NH 369 near Chennagiri.(3rd Call) .EE/NHD/CTA/AE1/NEW NH/CS/NIT/2016 17/1985 23/03/2017 23/03/2017 07/04/2017
Time 16:59Hrs
577 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/15 as per Annexure I) 254-SESHA-2017 28/03/2017 22/03/2017 24/04/2017
Time 15:0Hrs
578 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/16 as per Annexure I) 254-SESHA-2017 28/03/2017 22/03/2017 24/04/2017
Time 15:0Hrs
579 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/17 as per Annexure I) 254-SESHA-2017 28/03/2017 22/03/2017 24/04/2017
Time 15:0Hrs
580 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration-Ramgarh-Sonhat-Baikunthpur(65.00 Km.)andHarchoka-Bharatpur(20.00 Km.) NH/CE/PWD/03and14/30250 04/03/2017 22/03/2017 02/05/2017
Time 17:0Hrs
581 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Keonchi-Ratanpur NH 45 NH/CE/PWD/18/30251 31/03/2017 22/03/2017 02/05/2017
Time 17:0Hrs
582 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Balod-Gunderdehi-Durg- Dhamdha-Gandai-Salhetekari Road-CG-MP border (including 28.00 km b/w Dhamdha-Gandai) NH/CE/PWD/19/30252 31/03/2017 22/03/2017 02/05/2017
Time 17:0Hrs
583 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Pithora-Bagbahra-Komakhan-Chhura-Gariyaband Marg NH/CE/PWD/20/30253 31/03/2017 22/03/2017 02/05/2017
Time 17:0Hrs
584 Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to Two/Four lane with paved shoulder configuration Kondagaon-Narayanpur (48.70 Km.) and Geedam-Dantewada (12.00 Km.) and Narayanpur-Kutul-Farasbeda-MH border (50.00 km.) NH/CE/PWD/16,17and11/30483 31/03/2017 22/03/2017 02/05/2017
Time 17:0Hrs
585 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/18 as per Annexure I) 255-SESHA-2017 28/03/2017 22/03/2017 24/04/2017
Time 15:0Hrs
586 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/19 as per Annexure I) 255-SESHA-2017 28/03/2017 22/03/2017 24/04/2017
Time 15:0Hrs
587 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/20 as per Annexure I) 255-SESHA-2017 28/03/2017 22/03/2017 24/04/2017
Time 15:0Hrs
588 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Badarpur Bypass, Karimganj Bypass and Geotechnical Investigation for the Highway Construction for the stretch between Lowaripoua to Churaibari CE PWD NH 1 21/03/2017 21/03/2017 16/05/2017
Time 11:0Hrs
589 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam. NHIDCL/DPR/Assam/01/2017 15/03/2017 17/03/2017 11/05/2017
Time 15:0Hrs
590 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam NHIDCL/DPR/Assam/02/2017 16/03/2017 17/03/2017 11/05/2017
Time 15:0Hrs
591 Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways in the state of Assam. NHIDCL/DPR/Assam/03/2017 17/03/2017 17/03/2017 11/05/2017
Time 15:0Hrs
592 Consultancy Services for preparation of Feasibility study /Detailed Project Report for construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur Section from km. 165.40 to km. 190.587 on NH - 54 of package AS-21(Bal) through New Alignment in the State of Assam on EPC mode. NHAI/11015/AS-21(BAL)/2011/NE 28/03/2017 17/03/2017 28/04/2017
Time 11:0Hrs
-
593 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Digapahandi (at NH-326)-Haridakhandi (on NH-59) in the State of Odisha. (NH declaration Approved “In Principle”) 45 CE-NH-16-17 16/03/2017 15/03/2017 05/04/2017
Time 17:0Hrs
594 Consultancy Services for Feasibility study/Detailed Engineering report for construction of two lane with paved shoulder for newly proposed national highway From Mandsaur connecting Pratapgarh, Dhariyawad, Salumber and terminating at Junction of NH-927A near Dungarpur in Km 0/0 (M.P. Border) to 54/0 (including Pratapgarh Bypass) Length 54.00 Km NIT 06/2016-17 SE PWD NH Circle Jaipur Sr No. 1 11/04/2017 14/03/2017 24/04/2017
Time 18:0Hrs
595 Consultancy Services for Feasibility study/Detailed Engineering report for construction of two lane with paved shoulder for newly proposed national highway From Mandsaur connecting Pratapgarh, Dhariyawad, Salumber and terminating at Junction of NH-927A near Dungarpur in Km 54/0 to 108/0 (including Dhariyawad Bypass) Length 54.00 Km NIT 06/2016-17 SE PWD NH Circle Jaipur Sr No. 2 11/04/2017 14/03/2017 24/04/2017
Time 18:0Hrs
596 Consultancy Services for Feasibility study/Detailed Engineering report for construction of two lane with paved shoulder for newly proposed national highway From Mandsaur connecting Pratapgarh, Dhariyawad, Salumber and terminating at Junction of NH-927A near Dungarpur in In Km 108/0 to 160/0 (including Aspur, Punjpur, Punali and Other Bypasses ) Length 52.00 Km NIT 06/2016-17 SE PWD NH Circle Jaipur Sr No. 3 11/04/2017 14/03/2017 24/04/2017
Time 18:0Hrs
597 Consultancy services for, feasibility study, detailed project report, survey and preparation of land plan for Upgradation of State Highway to National Highway by Adopting LiDAR or equivalent technology for the road from Vengurla-Math- Amboli- Chandgarh-Belgaon in the State of Karnataka on EPC Mode 2nd Call. ENH/NHD/HBL/PB-3/2016-17/537 Dated 09.03.2017 10/03/2017 11/03/2017 07/04/2017
Time 17:0Hrs
598 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Up gradation of State road to National Highway by adopting LiDAR or equivalent technology, for the road Gangavathi-Tavaragera-Mudgal in the State of Karnataka on EPC mode.2nd call NIT No.ENH/NHD/HBL/PB-3/2016-17/537 Dated 09.03.2017 11/03/2017 11/03/2017 07/04/2017
Time 17:0Hrs
599 Consultancy Services for Preparation of Feasibility Study/ Detailed Project Report for the construction of Flyovers and ROB on various NH stretches in the State of Assam NHAI/11015/Flyovers/ROB/EW-Corridor/2017 28/03/2017 10/03/2017 19/04/2017
Time 11:0Hrs
-
600 Consultancy Services for Preparation of Detailed Project Report for Construction of 2-Lane Bridge for Connectivity of Port Blair - Chatham Island and Bambooflat with 400 M Navigational span in the Union Territory region of Andaman Nicobar Islands NHIDCL/Port Blair-Chatham-Bamboo Flat/DPR/2017 20/03/2017 09/03/2017 01/08/2017
Time 15:0Hrs
601 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/8 as per Annexure I) 246-SESHA-2017 12/03/2017 09/03/2017 12/04/2017
Time 15:0Hrs
602 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and / or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/9) as per annexure I 246-SESHA-2017 12/03/2017 09/03/2017 12/04/2017
Time 15:0Hrs
603 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/10 as per Annexure I) 246-SESHA-2017 12/03/2017 09/03/2017 12/04/2017
Time 15:0Hrs
604 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/11 as per Annexure I) 246-SESHA-2017 12/03/2017 09/03/2017 12/04/2017
Time 15:0Hrs
605 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and / or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/12 as per Annexure I) 246-SESHA-2017 13/03/2017 09/03/2017 12/04/2017
Time 15:0Hrs
606 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/13 as per Annexure I) 246-SESHA-2017 13/03/2017 09/03/2017 12/04/2017
Time 15:0Hrs
607 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/14 as per Annexure I) 246-SESHA-2017 13/03/2017 09/03/2017 12/04/2017
Time 15:0Hrs
608 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/3 as per Annexure I) 245-SESHA-2017 12/03/2017 08/03/2017 12/04/2017
Time 15:0Hrs
609 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/4 as per Annexure I) 245-SESHA-2017 12/03/2017 08/03/2017 12/04/2017
Time 15:0Hrs
610 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/5 as per Annexure I) 245-SESHA-2017 12/03/2017 08/03/2017 12/04/2017
Time 15:0Hrs
611 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/6 as per Annexure I) 245-SESHA-2017 12/03/2017 08/03/2017 12/04/2017
Time 15:0Hrs
612 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/7 as per Annexure I) 245-SESHA-2017 12/03/2017 08/03/2017 12/04/2017
Time 15:0Hrs
613 Consultancy Services to Carry out the Feasibility Study and Preparation of Detailed Project Report for Value addition works on Four lane Lakhanpur-Vijaypur section from Km 16.35 to Km 80.00 of NH-44 (old NH 1A) in the State of Jammu and Kashmir (2nd Call) NHAI/J&K/DPR/2016/2ndCall 08/03/2017 08/03/2017 06/04/2017
Time 11:0Hrs
614 Consultancy services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/1 as per Annexure I). 245-SESHA-2017 09/03/2017 08/03/2017 12/04/2017
Time 15:0Hrs
615 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders and/or its strengthening in the State of Himachal Pradesh (Package No. HP/Shahpur/R/2 as per Annexure I) 245-SESHA-2017 09/03/2017 08/03/2017 12/04/2017
Time 15:0Hrs
616 Consultancy Services for Feasibility Study and preparation of Detailed Project Report for proposed By pass at Sonepur on NH-57, for proposed By pass at Nayagarh on NH-57 & proposed By pass at Reamal on NH-53 in the State of Odisha. 44 CE-NH-16-17 01/03/2017 01/03/2017 22/03/2017
Time 17:0Hrs
617 Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Kota-Rawatbhata-Rajasthan Border (toward Singoli) Length 68 Km (District Kota, Chittorgarh) CE PWD RAJASTRHAN JAIPUR NIT NO 19 08/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
618 Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Kota-Kaithoon-Sangod –Bapawar-Kawai Length 103.70 Kms (District Kota) CE PWD NH JAIPUR NIT NO. 19 08/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
619 Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Baran – Mangrol – Sheopur Length 43 Kms (District Baran) CE PWD RAJASTRHAN JAIPUR NIT NO 19 08/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
620 Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway Baran – Khanpur – Jhalawar 82 Kms (District Baran , Jhalawar) CE PWD RAJASTRHAN JAIPUR NIT NO 19 08/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
621 Consultancy Services for Feasibility Study/ Preparation of Detailed Engineering report for Construction of Two lane with Paved Shoulder for Newly In- Principle approved National Highway MP/Rajasthan border-Paron-Fatehgarh-Guna Length 22 Kms (District Baran) CE PWD RAJASTRHAN JAIPUR NIT NO 19 08/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
622 Consultancy Services for Feasibility Study/prepration of Detailed Engineering Report for Construction of two lane with paved shoulder for newly in prenciple approved National Highways Dausa-Lawan-Chaksu-Phagi-Dudu Length-137 Km (District Dausa, Jaipur) NIT No. 19/2016-17 CE (NH) PWD Rajasthan, Jaipur Sr No. 5 10/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
623 Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Desuri (NH-162) – Sadri-Lunawa-Bera- Kagdara- Pindwara Length- 90 Km (District Pali, Sirohi) CE PWD RAJASTRHAN JAIPUR NIT NO 19 10/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
624 Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Kharia (on NH-25)- Ransi- Borunda – Gotan and extended upto Junction with NH-58 near Run Length- 105.00 Km (District Jodhpur, Nagaur) CE PWD RAJASTRHAN JAIPUR NIT NO 19 10/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
625 Feasibility study/ preparation of Detailed Engineering report from construction of two lane with paved shoulder for newly in principle approved National Highway Deoli (on NH-52) to Nasirabad (on NH-48)via Kekari Sarwar Length 96.60 Km. (distt Tonk, Ajmer) CE PWD RAJASTRHAN JAIPUR NIT NO 19 10/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
626 Consultancy Services for Feasibility Study/prepration of Detailed Engineering report for Construction of two lane with paved shoulder for newly in prenciple approved National Highways Mathura-Govardhan-Deeg-Nagar Length 31.00 Km (Distt. Bharatpur) NIT No. 19/2016-17 CE (NH) PWD Rajasthan, Jaipur Sr No. 7 11/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
627 Consultancy Services for Feasibility Study/prepration of Detailed Engineering report for Construction of two lane with paved shoulder for newly in prenciple approved National Highways Lalsot (on NH-23) - Sawai madhopur (on NH-148D) Length 65.00 Km (Distt. Dausa, Sawai Madhopur) NIT No. 19/2016-17 CE (NH) PWD Rajasthan, Jaipur Sr No. 11 11/04/2017 22/02/2017 17/04/2017
Time 18:0Hrs
628 Consultancy Services for Preparation of Detailed Project Report for Proposed Route of New National Highway starting from (A) Dumka NH (114A)-Masalia Kundhit Nala - Mahesmunda Ghat (Jharkhand) - Asansol (B) Junction with NH 19 near Kulti in the state of West Bengal connecting Chittaranjan, Jamtara and terminating at Gobindpur in the State of Jharkhand, with a minimum of 2 Lane with Paved Shoulder Configuration in the District of Burdwan, in West Bengal 18/2016-17 of SE NHC - II 09/03/2017 21/02/2017 21/03/2017
Time 14:0Hrs
629 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Channarayapattana Holenarssipur Arkalgud Kodlipet Madikeri Virajpet Makutta and connecting Kannur (In Kerala) in the State of Karnataka. EE/NHD/MNG/AE3/Consultancy/NIT 19/2nd call/2016-17 22/03/2017 15/02/2017 04/04/2017
Time 16:0Hrs
630 Consultancy Services for Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two lane with Paved Shoulders for Kundapur Koteswar Halady Someshwara (On NH169A) in the State of Karnataka EE/NHD/MNG/AE3/Consultancy/NIT 20/2nd Call/2016-17 22/03/2017 15/02/2017 04/04/2017
Time 16:0Hrs
631 Consultancy Services For Feasibility Study, Detailed Project Report, Survey and Preparation of Land Plan for Widening to Two Lane with Paved Shoulders For Manipal to Karkala and from Ramasmudra to Punjalkatte and from Beltangadi Shiradi Via Dharmasthala, Periyashanthi and Gundya to Subramanya in the state of Karnataka EE/NHD/MNG/JE/Consultancy/NIT 21/2nd call/2016-17 23/03/2017 15/02/2017 04/04/2017
Time 16:0Hrs
632 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up- gradation, Redesigning, Rehabilitation and Upgradation including 2/4/6 laning of Ambala-Shazadpur-Naraingarh-KalaAmb Road (NH72) in the State of Haryana PWD/HR/PKL/15 28/02/2017 24/01/2017 07/04/2017
Time 15:0Hrs
633 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up- gradation, Redesigning, Rehabilitation and Upgradation including 2/4/6 laning of Bhiwani bypass from Bhiwani-Jind road (NH 709A) to Bhiwani Loharu road (NH- 709-E) crossing Bhiwani-Hansi road (NH-148B) in the State of Haryana PWD/HR/PKL/16 28/02/2017 24/01/2017 07/04/2017
Time 15:0Hrs
634 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up- gradation, Redesigning, Rehabilitation and Upgradation including 2/4/6 laning of Rajasthan Haryana Border-Narnaul-Ateli-Rewari Road (NH-11) in the State of Haryana PWD/HR/PKL/17 28/02/2017 24/01/2017 07/04/2017
Time 15:0Hrs
635 Consultancy Services for carrying out feasibility study and detailed project preparation for Improvement, Up-gradation, Redesigning, Rehabilitation and Up-gradation including 2/4/6 laning of part of Sirsa- Nohar- Taranagar- Churu road section which falls in the State of Haryana. PWD/HR/PKL/18 28/02/2017 24/01/2017 09/05/2017
Time 15:0Hrs
©2014 | All right Reserved