Projects

AE Projects

S.No Project Name Tender No Tender Date Tender Start Date Tender End Date Document
1 Supervision Consultancy Services for Operation & Maintenance of the section from Jarwal to Bahraich Bypass (Pkg-2) (Km.42.546 to Km.93.037) and Bahraich Bypass to Rupadiha Section (Pkg-3) (Km.99.000 to Km.152.847) on NH-28C (New NH- 927) with 2-lane paved shoulders in the State of Uttar Pradesh 10/RO-UP (East),VNS/SC/NH28C/NHAI/2018-19 20/09/2018 20/09/2018 27/10/2018
Time 12:30Hrs
-
2 Consultancy services for Authoritys Engineer for Supervision of Construction, Operation and Maintenance of 2-Lane bi-directional Zojila Tunnel with Parallel Escape (Egress) Tunnel excluding approaches on Srinagar Leh Section connecting NH 1 at km 95 and at km 118 in the State of Jammu and Kashmir on EPC Basis 2018 NHIDC 385433 18/09/2018 18/09/2018 15/10/2018
Time 11:0Hrs
3 Construction Supervision for Strengthening / Strengthening and Widening of State Highways and district roads of Southern Highway Circle Southern Circle (PWD) under South 24 Parganas District and Howrah District Govt of West Bengal for some selected road sections 19 of 2018-19 of SE/SHC 24/08/2018 14/09/2018 28/09/2018
Time 15:0Hrs
4 Consultancy services for Authority Engineer for supervision of construction of emergency Landing facility on the stretch from Km.1274.000 to 1277.600 on Chilakaluripet- Nellore section of Nh-16 in the state of Andhra Pradesh on EPC mode. nhai/11011/11/2016/elf/chilakaluripet-nellore(1274-1277.600)AE 12/09/2018 10/09/2018 25/10/2018
Time 11:0Hrs
5 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of highways facilities (Emergency landing Strip) between existing km.171.800 to km 176.500 (near Datrana & Juvanpur Villages) of NH-151A in the State of Gujarat on EPC mode NHAI/11001/11/2018-Datrana-Juvanpur/AE 12/09/2018 10/09/2018 25/10/2018
Time 15:0Hrs
6 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF FOUR LANING OF NH – 709B FROM EPE CROSSING (EXISTING CHAINAGE 30.790, DESIGN CHAINAGE 0.000) TO START OF SHAMLI BYPASS (EXISTING CHAINAGE 92.200, DESIGN CHAINAGE 61.409) IN THE STATE OF UTTAR PRADESH UNDER BHARATMALA PARIYOJANA ON EPC MODE 2018-NHAI-13990-1 14/09/2018 10/09/2018 25/09/2018
Time 11:0Hrs
7 Independent Engineer Services during Operation and Maintenance stage of Six lanned section of Km 108.700 to Km 192.000 Vadodara to Bharuch section of NH 48 on BOT basis in the state of Gujarat NHAI/PIU Surat (Expressway)/10-E/2018 07/09/2018 07/09/2018 27/09/2018
Time 11:0Hrs
8 Independent Engineer Services during Operation Maintenance stage of Six/ Four lanning of Km 198.00 to Km 263.00, Bharuch - Surat section of NH-48 in the State of Gujarat NHAI/PIU Surat (Expressway)/10-F/2018 07/09/2018 07/09/2018 27/09/2018
Time 11:0Hrs
9 Consultancy Services for Authority’s Engineer for Construction of six lane elevated structure at Gondal Chowkdi at Ch Km 175 on existing 4 lane Jetpur-Gondal-Rajkot Section from km 117 to 185 on NH-27 old NH-8B in the state of Gujarat NHAI/Gujarat/Gondal Chowkdi/EPC/AE/2018 07/09/2018 06/09/2018 22/10/2018
Time 11:0Hrs
10 Consultancy Service for AE for (i)Construction/upgradation of existing road to 2L with PS including geometric improvement from Ranipool to Pakyong from Km 0.0 to 16.167 of NH-717-A on EPC under SARDP-NE Phase Á (ii)Improvement & Rehabilitation(I&R) of existing Indira By-Pass from Km 0.0 to 10.117 on NH-10 (iii) I & R of Kapur more at Km 70.0 on NH-10 (iv)Special Repair work between Ranipool to Zero point from km 80.0 to 93.0 of NH-10 in Sikkim (v) PR for Rangpo-Gangtok section for Km 52.0 to 8 NHIDCL/AE/Sikkim/2018 05/09/2018 06/09/2018 19/10/2018
Time 15:0Hrs
11 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of Emergency Landing Facility on Pondicherry to Tindivanam section from Km. 13.900 to 18.900 of NH-66 in the State of Tamil Nadu on EPC Mode NHAI/11001/11/2018-Pondicherry-TindivanamDatrana-/AE 13/09/2018 06/09/2018 22/10/2018
Time 15:0Hrs
12 Supervision Consultancy Services for O and M stage of Bheem Parasoli Gulabpura section of NH 148D (including Bheem Parasoli bypass) and Lambia Raipur section of NH 458 for total length 124.03 km. on EPC mode under NHDP Phase IV NHAI/12012/03/2018-ROJ/SC/28 05/09/2018 05/09/2018 09/10/2018
Time 11:0Hrs
13 Consultancy Services for Authority’s Engineer for Supervision of “Construction of (i) 2 laning of existing Hunli-Anini road on EPC basis from design km 21.50 to km 37.50 (ii) 2 laning of existing Hunli-Anini road on EPC basis from design km 37.50 to km 53.50 and (iii) 2 laning of existing Hunli-Anini road on EPC basis from design km 53.50 to km 92.500 in the state of Arunachal Pradesh under SARDP-NE” NHIDCL/Ar. Pr./Hunli-Anini(21.5 to 92.50)/AE/2018 07/09/2018 04/09/2018 04/10/2018
Time 15:0Hrs
14 Consultancy Services as Independent Engineer during Operation and Maintenance for the project of Design, Engineering, Finance, Construction, Operation and Maintenance of access controlled highway project of Bangalore-Nelamangala section of NH-4 from Km. 10.000 to Km. 29.500 in the State of Karnataka on Build, Operate & Transfer (BOT) basis NIT No.21/ NHAI/RO-BNG/11018/Tender/2018 Dated 31.08.2018 07/09/2018 31/08/2018 11/10/2018
Time 15:0Hrs
15 Consultancy services for Authority Engineer for construction of a 4 lane elevated corridor in Deesa Town between km 565.850 to km 569.600 (Length 3.750km) on East West Corridor of NH27 Old NH-14 in Gujarat on EPC Mode NHAI/Guj/Deesa Flyover/EPC/Authority Engineer/2018 29/08/2018 29/08/2018 15/10/2018
Time 11:0Hrs
16 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Jalgaon Jamod- Nandura (Design Ch. Km. 0/000 to Km. 24/998) of (NH-161G) in the State of Maharashtra on EPC mode NH/MAH/PWD/Akola/AE/Pkg-1-2nd call 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
17 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Kharwandi - Rajuri [Design ch. Km 0/000 to 36/500] of NH-361F in the State of Maharashtra on EPC mode. NH/MAH/PWD/Aur-7/AE/Pkg-32 (Second Call) 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
18 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Naldurg - Akkalkot of NH-652 in the State of Maharashtra on EPC mode in the state of Maharashtra NH/MAH/PWD/Pune-7/AE/Pkg-29-2nd call 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
19 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Manglurpir - Mahan (Design Ch. Km. 75/000 to 107/500) (Ch. Km. 97/074 to 64/574) of NH-161A in the State of Maharashtra on EPC mode. NH/MAH/PWD/Akola/AE/Pkg-2-2nd call 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
20 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Rahuri - Sonai – Shani Shinganapur (Design Ch. Km. 0/000 to 26/143) of NH-160 C in the State of Maharashtra on EPC mode. EPC mode NH/MAH/PWD/Pune-8/AE/Pkg-30 (Second Call) 30/08/2018 27/08/2018 05/10/2018
Time 17:30Hrs
21 Independent Engineer Services for Four-Laning of Puducherry – Poondiyankuppam section of NH 45A (New NH 32) from Km 29.000 to Km 67.000 (Design Chainage) under Bharatmala Pariyojana Phase I (Residual NHDP IV works) on HAM in the State of Tamil Nadu and Union Territory of Puducherry (2nd Call). NHAI/Tech/TN/NH-32/Pudu-Poond/IE/2018 10/09/2018 27/08/2018 25/09/2018
Time 11:0Hrs
22 Consultancy services for Authority Engineer forsupervision of package no RSHIP-ADB-Tranche-II/EPC/01-04 6/2018-19 28/08/2018 27/08/2018 10/09/2018
Time 17:0Hrs
-
23 Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance contract of Dalkhola-Islampur- Ghoshpukur section from km 447.000 to km 551.000 (excluding km 498.780 to km 507.000) of NH-31 and Salsalabari to West Bengal Assam Border from km 228.000 to km 254.500 section of NH-31C in the State of West Bengal 01/O and M/2018-19 23/08/2018 23/08/2018 20/09/2018
Time 17:0Hrs
24 Independent Engineer for supervision of widening of Pipli–Bhavnagar- Section Package 1 from km 136/025 to 169/328 (Design Chainage km 136/000 to km 169/308) Near Adhelai Village to Nari Junction to four laning from existing 10-Meter-wide in the State of Gujarat on Hybrid Annuity Mode NHAI/Guj/IE/NariPipli/2018 23/08/2018 23/08/2018 24/09/2018
Time 11:0Hrs
25 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitaion/Maintenance of newly entrusted Churachandpur-Singhat-Sinzawl Tuivai road section from Km 103.1 to Km 161.48 on NH-102B and Churachandpur-Tipaimukh road from km 185.00 to Km 262.00 (Package-II) on EPC basis in the state of Manipur. NHIDCL/AE/Manipur/C-T/2018/2 17/08/2018 16/08/2018 04/10/2018
Time 15:0Hrs
26 Independent Engineer services for Four/Six Laning of Aunta-Simaria (Ganga Bridge with approach roads) section of NH-31 from Km 197.900 to Km 206.050 (Design Chainage) (Existing Chainage Km 204.741 to Km 209.945) [Total Design Length 8.15 Km] in the State of Bihar on Hybrid Annuity Mode. NHAI/BH/Aunta-Simaria/HAM/IE/2017/Proc/ 10/08/2018 08/08/2018 05/09/2018
Time 11:0Hrs
27 Consultancy Services for Independent Engineer services for construction of new link (NH-133B) from Km 0.000 (Km 200.87 of Sahibganj Bypass) in Jharkhand to Km 15.885 (Junction of NH-133B and 131A on Manihari Bypass) and construction of Manihari Bypass from Km 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to Km 6.000 near Narenpur of NH-131A in Bihar including Ganga Bridge to 4 lane standard on Hybrid Annuity Mode NHAI/JH/IE/Sahibganj Bridge/2017 05/09/2018 03/08/2018 04/10/2018
Time 11:0Hrs
28 Consultancy services for Authority Engineer for supervision of construction of 4-laning from Itanagar to Banderdewa (Package A from 29.500 km to 40.40 km) in the state of Arunachal Pradesh on EPC mode. CEAP(HW)/W-24/IB/AE/2018-19 31/07/2018 03/08/2018 29/08/2018
Time 14:0Hrs
29 Consultancy Service for Authority’s Engineer for i Construction of alternative highway PackageIVA from 0.00 to 13.00 of Bagrakot Kafer section of NH-717A on EPC mode in state of West Bengal ii Construction of alternative highway Package IVB from 13.00 to 25.60 of Bagrakot Kafer section of NH717A on EPC mode in state of West Bengal iii Construction of alternative highway Package IVD from 26.10 to 40.00 of Bagrakot Kafer section of NH-717A on EPC mode in state of West Bengal iv Constructio NHIDCL/AE/West Bengal /2018 31/07/2018 02/08/2018 17/09/2018
Time 15:0Hrs
30 Supervision Consultant (SC) Services for Operation and Maintenance of i) Swaroopganj-Pindwara Section (Km.248.700 to Km. 264.000) of NH-14 and Pindwara-Udaipur Section (Km 0.000 to Km. 104.724) of NH-76 in the state of Rajasthan ii) Debari to Udaipur Section (Km. 118.500 to Km. 113.830) of NH-76, 11.20 Kms two lane existing Udaipur Bypass from Pratapnagar to Balicha and Udaipur to Kaya Section (Km. 278.000 to Km. 287.400) of NH-8 NHAI/2018/12022/3/25 03/08/2018 01/08/2018 12/09/2018
Time 11:0Hrs
31 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway from shiv Murti Intersection at km 20 of NH 8 till Rail under Bridge (RuB) near Dwarka Sector 21, from km -0.800 to 5.300-Package-I in Delhi ” ON EPC mode. NHAI/Tech/DE/Package-I/ AE/2018 03/08/2018 01/08/2018 24/09/2018
Time 11:0Hrs
32 Appointment of Independent Engineer IE during O M period of 4 Lanning of Rohtak Panipat Section NH 71A from Km. 0 000 Km. 63 300 of NH 10 to Km. 80 858 Km 83 500 of NH 1 in the State of Haryana under NHDP Phase III on DBFOT basis NHAI RO CHD 11011 PD RTK RTK Pani O M IE RFP 09/08/2018 31/07/2018 13/09/2018
Time 11:0Hrs
33 Supervision Consultancy Services for construction supervision of the balance work of Rehabilitation and upgradation to four lanes from km 16.000 to km 96.127 of Gwalior – Jhansi Section of NH-75 in the State of UP and MP under North-South Corridor (NHDP Phase-II) on EPC Mode (Item Rate Basis). NHAI/MP/G-J/EPC-Item Rate/ SC/01/17 01/08/2018 30/07/2018 05/09/2018
Time 11:0Hrs
34 Consultancy Services for Authoritys Engineer Supervision Under package V for Rehabilitation and Up-gradation Amanganj Pawai section and Chandiaghat Katni section of NH 43 Ext Two lane with paved shoulder in the state of MP on EPC Mode. 1116/NNH/AE/pkg-V/EPC/2017-18 20/08/2018 27/07/2018 30/08/2018
Time 17:30Hrs
35 Consultancy Services for Authoritys Engineer Supervision for Balance work of Rehabilitation and Up- gradation Bameetha Satna section of NH 75 Two lane with paved shoulder in the state of MP on EPC Mode 115/B-SATNA/AE/EPC/2017-18 20/08/2018 27/07/2018 30/08/2018
Time 17:30Hrs
36 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF GRADE SEPARATOR FROM H 7 AREA TO PORT CONNECTIVITY ROAD BY PASSING CONVENT JUNCTION IN THE STATE OF ANDHRA PRADESH ON EPC MODE 2ND CALL 11011/1/2018/VPRCL/Convent Junction/AE/2nd Call 27/07/2018 25/07/2018 27/08/2018
Time 11:0Hrs
37 STRENGTHENING WITH PAVED SHOULDERS FROM KM 30/0 TO KM 46/0, KM 54/0 TO KM 61/0, KM 69/0 TO KM 80/0, KM 80/0 TO KM 96/0 OF NH 39 INCLUDING TOLL PLAZA UNDER GOLAGHAT NH DIVISION UNDER EPC MODE IN THE STATE OF ASSAM 2/AE/APWD 25/07/2018 25/07/2018 01/09/2018
Time 15:0Hrs
38 Appointment of Safety Consultants for Four Laning of Gundugolanu – Devarapalli – Kovvuru Section of NH-16 from Km. 15.320 (Existing Km. 15.700) to Km. 85.204 (Existing Km. 81.400) (Design Length=69.884 Kms.) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/RO-VJA/12004/SC-EGK/1725 25/07/2018 25/07/2018 24/08/2018
Time 11:0Hrs
39 Appointment of Safety Consultants for Four lane connectivity to Visakhapatnam Port Road from Km 0.000 to Km 12.700 (Design Length = 12.70 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/RO-VJA/11009/SC-VPR/1723 25/07/2018 25/07/2018 24/08/2018
Time 11:0Hrs
40 Appointment of Safety Consultants for Six laning of Anandapuram – Pendurthi – Anakapalli Section of NH-5 (new NH-16) from Km 681.000 (Existing Km 681.000) to Km 731.780 (Existing Km 742.400) (Design Length = 50.78 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/RO-VJA/11009/SC-APA/1724 25/07/2018 25/07/2018 24/08/2018
Time 11:0Hrs
41 Consultancy services for posting of AE for Rehabilitation and up gradation of 2 lane/ 2 lane with paved shoulder from existing km. 172.900 to km. 194.150 (Design Chainage km. 49.300 to Km. 70.300) on Dharasu to Yamunotri Road of NH- 134 (old NH-94) in the state of Uttarakhand through an Engineering, Procurement and Construction (EPC) Contract. 3076/13yata-NH-10/2018 dated 23.07.18 25/07/2018 25/07/2018 08/10/2018
Time 15:0Hrs
42 Consultancy services for posting of Authority Engineer for Construction of Kund Bypass from Existing Km 33.130 to Km 41.260 (existing length 8.130 km) design chainage km 35.130 to km 47.700(design length 12.570 km) on NH-109 (New No. 107) in the State of Uttarakhand under EPC Mode under improvement to NH Connectivity to Chardham 3076/ 13 yata - Nh-10/2018 25/07/2018 25/07/2018 08/10/2018
Time 15:0Hrs
43 Appointment of Safety Consultants for Six laning of Narasannapeta - Ranasthalam section of NH-16 from design Km 580.671 (Existing Km 580.700) to design Km 632.861 (Existing Km 634.000) (Design Length – 54.19 Km) in the State of Andhra Pradesh under NHDP Phase V on Hybrid Annuity Mode NHAI/RO-VJA/11050/8/SC-NR/2nd Call 24/07/2018 24/07/2018 23/08/2018
Time 11:0Hrs
44 Consultancy Services as Independent Engineer during Operation & Maintenance of 4-laning of Devihalli – Hassan Section from Km. 110.000 to Km. 189.500 of NH-48 (New NH No. 75) including a new 2-lane with Paved Shoulder Bypass for Channarayapatna Town and widening of existing Hassan Bypass to 2-lane with Paved Shoulders on DBFOT Basis in the State of Karnataka NIT No.13/NHAI/RO-BNG/23019/Tender/2018 dt. 24.07.2018 27/07/2018 24/07/2018 06/09/2018
Time 15:0Hrs
45 Independent Engineer services during Operation and Maintenance Period for Talegaon - Amravati section of NH-6 (New NH-53) from Km 100.000 to Km 166.725 in the State of Maharashtra under NHDP Phase-III on Build, Operate and Transfer (BOT) basis NHAI/RO-NAG/2018-19/10 23/07/2018 23/07/2018 17/09/2018
Time 11:0Hrs
46 Consultancy services for Authority’s Engineer for Supervision of (i) Rehabilitation and Up-gradation from 2 lane to 4 lane on NH Stretch under NHDP-IVB for Varanasi-Dagamagpur (Pkg-1) Section of NH-7 and Design Chainage Km 15.100 to Km. 49.100. Length 34 Km. (Package- 1) (ii) Rehabilitation and Up-gradation from 2 lane to 4 lane on NH Stretch under NHDP-IVB for Dagamagpur-Lalganj Section of NH-7 (Pkg-2) and Design Chainage Km 49.100 to Km. 96.800. Length 47.7Km. (Package-2) (iii) Rehabilitation NHAI/NHDP-IV/Varanasi-Hanumanha/EPC/AE/RFP/2018 24/07/2018 23/07/2018 29/08/2018
Time 11:0Hrs
-
47 Independent Engineer for Operation and Maintenance of Agra Gwalior section from Km 8.0 to Km 103.0 of NH 3 Length 95.00 Km and Operation of Toll Plaza at Km 32.607 Km 00.00 to Km 42.033 of Gwalior Bypass in the State of Uttar Pradesh, Rajasthan and Madhya Pradesh on Operate, Maintain and Transfer OMT Basis Pkg 22 NS and Authority Engineer for Construction of 4 lane Flyover at Km. 80.742 from Km. 79.780 to 81.200 Length 1.420 Km of NH-3 at Morena Town in the State of Madhya Pradesh on EPC mode NHAI/RO-MP/Gwl/IE/AE/2018 dated 19.07.2018 26/07/2018 19/07/2018 04/09/2018
Time 11:0Hrs
48 CONSULTANCY SERVICE FOR SUPERVISION OF REHABILITATION AND UPGRADATION OF EXISTING HIGHWAY OF 2 LANE WITH PAVED SHOULDER OF DAHEGAON KUHI UMRED SECTION OF NH 247 IN THE STATE OF MAHARASHTRA EENH/TENDER/AE/2018-19/2756 27/07/2018 16/07/2018 30/07/2018
Time 17:0Hrs
49 Consultancy Services for Supervision of Short Term Improvement and routine maintenance contract of Kotwa-Mehsi-Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH-28 in the State of Bihar (3rd Call). 33/RO-PATNA/NHAI/2017-18 17/07/2018 13/07/2018 11/09/2018
Time 12:30Hrs
50 Consultancy Services of Authority s Engineer for Supervision of Const. of two-lane with paved shoulder Bahraich bypass from Km.92.547toKm.99.000 of NH-28C in the State of UttarPradesh on EPC mode under NHDP IV. Job no.28C-UP-NHDPIV-2017-18-01. 3001/162-Yata- NH Circle/2018 Dated 05.07.2018 12/07/2018 12/07/2018 26/07/2018
Time 17:0Hrs
51 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF construction of Emergency Landing Facility on the stretch from km.1210.000 to km.1215.000 on Chilakaluripet-Nellore section of NH-16 in the State of Andhra Pradesh on EPC mode – under BHARATMALA PARIYOJANA PHASE I. nhai/11011/11/2016/2018/elf/ae/chilakuripet-nellore 20/07/2018 12/07/2018 06/09/2018
Time 11:0Hrs
-
52 Independent Engineer services for Operation and Maintenance Four laning of End of Durg Bypss-Chhattisgarh/Maharashtra Border section from Km. 322.000 to Km. 405.000 of NH-6 (New NH-53) in the State of Chhattisgarh executed as BOT (Toll) on DBFOT pattern under NHDP Phase-III 11052/RO-Raipur/Tender/09 20/07/2018 11/07/2018 25/09/2018
Time 14:30Hrs
53 Authority Engineer for Rehabilitation and Up-gradation from KM. 133.520 to 158.040 of NH 76 and NH-86 (5.360 Km.) (Kulpahar-Mahoba Section) to two lane with paved shoulder on EPC Mode in the state of Uttar Pradesh. 1311M/13M-NHCK/18 06/07/2018 09/07/2018 30/07/2018
Time 17:0Hrs
54 Appointment Safety Consultants for Rehabilitation and Upgradation of Giddalur – Vinukonda section of NH-544D from Design km.212.983 (existing km.213.000) to Design km.322.800 (existing km.322.840) (Design length 112.797km) in the State of Andhra Pradesh under NH(O) on Hybrid Annuity Mode NHAI/RO-VJA/GV/18-19/1601 24/07/2018 06/07/2018 06/08/2018
Time 11:0Hrs
55 for supervision for O&M and Periodic Renewal works (PR-I & PR-II) of 6-Laned Pimpalgaon-Nashik-Gonde (Km 380 to Km 440), Section of NH-3 in the State of Maharashtra NHAI/RO/MUM/NSK/PNG/SC/2017-18/8 09/07/2018 05/07/2018 02/08/2018
Time 11:0Hrs
56 Consultancy services for Authority Engineer for Supervision of Four-lane divided highway from Melur (Design Km 0.000/Existing Km 99.920 of NH-38) to Karaikudi (Design Km 45.860/Existing Km 12.900 of NH-383 Ext.) (Design Length = 45.860 Km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC Mode NHAI/11012/Mel-Kar/EPC/AE/03/2018 13/07/2018 03/07/2018 08/10/2018
Time 11:0Hrs
57 Consultancy services for Authority Engineer for Supervision of Six Lanning of Sriperumbudur to Karaipettai from km 37.000 to 71.015(34.015 km) of NH-4 (New NH-48) in the state of Tamil Nadu under residual NHDP (Phase-V) under Bharatmala Pariyojana on EPC Mode NHAI /11012/Sri-Kar/EPC/AE/01/2018 NHAI /11012/Sri-Kar/EPC/AE/01/2018 12/07/2018 02/07/2018 04/10/2018
Time 11:0Hrs
58 Consultancy services for Authority Engineer for Supervision of Six Lanning of Karaipettai to Walajapet from Km 71.015 to 107.091 (36.076 km) of NH-4 (New NH-48) in the state of Tamil Nadu under residual NHDP (Phase-V) under Bharatmala Pariyojana on EPC Mode NHAI /11012/Kar-Wal/EPC/AE/02/2018 12/07/2018 02/07/2018 04/10/2018
Time 11:0Hrs
59 Consultancy Services For Authority’s Engineer For Supervision of Four Lane divided carriageway from Vadipatti (Design Chainage 0) to Chittampatti (Design Chainage 29 960) Stretch of Madurai Ring Road Section of NH 744A on EPC mode under Bharatmala Pariyojana Phase I in the state of Tamil Nadu NHAI/11012/MRR/EPC/AE/14/2018 05/07/2018 02/07/2018 10/10/2018
Time 11:0Hrs
-
60 Independent Engineer services for Operation and Maintenance of Four Laning of Durg bypass from km.308.600 to km.323.600 of NH-6 (New-53) and Raipur-Aurang from km. 239.00 to km. 282.000 of NH-6 (New-53) in the State of Chhattisgarh executed as BOT (Toll) on DBFOT pattern under NHDP Phase-IV 11052/RO-Raipur/Tender/08 20/07/2018 30/06/2018 01/08/2018
Time 14:30Hrs
61 Independent Engineer services for Four Laning of Chengala to Neleshwaram town (Pallikara Railway Gate) section of NH-17 (New NH-66) from km 57.200 (Design km 56.200) to km 95.650 (Design km 93.468) (total length 37.268 km) in the State of Kerala under NHDP Phase-III on Hybrid Annuity Mode NHAI/Tech/KL/Chengala-Neleshwaram/NH-17/IE/2017-18 09/08/2018 27/06/2018 01/11/2018
Time 11:0Hrs
62 Consultancy Services For Authoritys Engineer for Supervision of Balance work of Four-laning of Raiganj-Dalkhola section of NH-34 from km 398.00 to km 452.750 (Package-V) under NHDP Phase-III in the State of West Bengal on EPC NHAI/EPC/ WB/NH34/2018/PK05/419/AE 10/07/2018 26/06/2018 23/08/2018
Time 11:0Hrs
63 Consultancy Services for Authority s Engineer for Up gradation of newly declared NH-341 to two-lane with Paved shoulder configuration between Km. 65.478 to Km 162.209 Bhuj Airport Jn - Khavda - India Bridge to Dharmshala section in the State of Gujarat 8 of 2017-18 2nd Attempt 22/06/2018 22/06/2018 16/07/2018
Time 15:0Hrs
64 Consultancy Services for Authoritys Engineer for Construction of proposed 4-Lane R.O.B and its approaches in replacement of existing old and narrow ROB LC No. 149A at Ch 39.885 on NH 168A near Dhanera EPC Mode Upgradation of new N. H. No. 168 to two lane with paved side shoulder configuration between Km 0/0 to 41/300 and Km 43.250 to 68.174 Dhanera Panthawada section 2 lane PSS in the State of Gujarat. Project Length 66.224 Km 1.120 Km On EPC Mode 09 of 2017-18 3rd Attempt 22/06/2018 22/06/2018 07/07/2018
Time 15:0Hrs
65 (i) Consultancy Services for Authority’s Engineer for Supervision of Construction of 2nd Flyover (LCW) in Kishanganj Town starting from km 472.300 to km 475.480 of NH-31(Total Length - 3.180 km) in the State of Bihar on EPC Mode. (ii) Consultancy Services for Supervision Consultant for O & M of Km 410.70 to Km 447.00 (Purnea – Dalkhola Section) of NH-31(iii) Supervision Consultancy Services for supervision of restoration work in Km 410.7to Km 447.000 of NH-31 NHAI/BH/Kishanganj/NH-31/AE/2018(2nd Call) 22/06/2018 22/06/2018 31/07/2018
Time 11:0Hrs
66 Independent Engineer services for O and M of Four laning of Orissa Border Aurang section from Km 88 to Km 239 of NH 6 in the State of Chhattisgarh executed as BOT Toll on DBFOT pattern under NHDP Phase IV 11052/RO-Raipur/Tender/07 06/07/2018 21/06/2018 23/07/2018
Time 14:30Hrs
67 Independent Engineer Services for supervision of Six Laning of Shamlaji to Motachiloda from km 401.200 to km 494.410 (Length 93.210 km) section of NH-8 in the state of Gujarat under NHDP phase-V (Package-VI) on HAM NHAI/Guj/Shamlaji-Motachiloda/IE/2018 02/07/2018 20/06/2018 23/08/2018
Time 11:0Hrs
68 4-laning of Aligarh-Kanpur section from Km 229/000 (Design chainage 240/897) to Km 289/000 (Design chainage 302/108) (Package-III form Kalyanpur- Naviganj) of NH-91 in the state of Uttar Pradesh on HAM Mode under Bhartamala Pariyojana- Appointment of Independent Engineer. NHAI/UP/11017/1/2009/NHDP-IV/AK91/PKG-III/IE 18/06/2018 18/06/2018 07/08/2018
Time 11:0Hrs
69 Six Laning of Hapur bypass to Moradabad Section including Hapur bypass from km 50.000 (design chainage 50.000) to km 148.277 (design chainage 149.867) of NH-24 (New NH 9) in the State of Uttar Pradesh-Appointment of Independent Engineer. 11011/5/2017-HM-I/UP/IE 18/06/2018 18/06/2018 09/08/2018
Time 11:0Hrs
70 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF FOLLOWING PROJECTS “(i) Construction of Proposed 4 lane ROB and its approaches in lieu of existing level crossing No. 328A at Km 0.500 on Barmer-Gadra-Munabao Railway line of NH-25E in District Barmer” “(ii) Construction of proposed 2 lane ROB and its approaches in lieu of existing level crossing No. C-293 & A-292 at Km 233/038 & 233/435 on NH-112 on Jodhpur to Barmer Road at Balotra” & “(iii) Up-gradation to two lane with paved s 02/2018-19 (SE NH Corcle Jodhpur) 28/06/2018 17/06/2018 16/07/2018
Time 18:0Hrs
71 Independent Engineer Services for Supervision of Redesigning, Rehabilitation and Upgradation to Four Lane configuration & Strengthening of UP/Haryana Border to Rohna Section from km 0.000 to km. 44.800 of NH-334B in the State of Haryana on HAM Mode (Package-I) NHAI/Tech/Haryana/NH-334B/UP/HR Border-Rohna/IE/2018 18/06/2018 15/06/2018 27/09/2018
Time 11:0Hrs
72 Consultancy services for posting of Authority Engineer for Construction of 2-lane with paved shoulders configuration & strengthening of NH-58 from km 338.00 to 350.00 and 350.00 to 368.00 on NH-58 in the State of Uttarakhand on EPC Mode 1959/13yata-NH-10/2018 dated 02.06.2018 15/06/2018 15/06/2018 19/07/2018
Time 17:0Hrs
73 Consultancy service for Authority’s Engineer for supervision of Construction of 4-lane ROB and its approaches in lieu of existing Level Crossing No.48/E at km.66.900 on NH-50(Railway Chainage 96/6-7) Near Naubad in the state of Karnataka on EPC Mode (Job No.NH-50-KNT(14)/17-S&R(B)-013 EE/NHD/KLB/NH-50/Job-013/PB-2/NIT/2018-19/250 15/06/2018 15/06/2018 30/07/2018
Time 17:0Hrs
74 Consultancy service for Authority Engineer for supervision of Strengthening of existing two lane pavement including paved shoulders on NH-39 (new NH-02) Mao- Imphal Section (SH - Mao-Senapati and R– Koubru leikha section from km 212.325 to km 260.000 and km 260.000 to km 287.000 respectively) on EPC mode (4th Call) RW/GHT/MN/DP(O)/2016-17/18-19/AE 13/06/2018 15/06/2018 24/07/2018
Time 11:0Hrs
75 Supervision Consultant (SC) Services for Operation and Maintenance of i) Swaroopganj-Pindwara Section (Km.248.700 to Km. 264.000) of NH-14 and Pindwara-Udaipur Section (Km 0.000 to Km. 104.724) of NH-76 in the state of Rajasthan ii) Debari to Udaipur Section (Km. 118.500 to Km. 113.830) of NH-76, 11.20 Kms two lane existing Udaipur Bypass from Pratapnagar to Balicha and Udaipur to Kaya Section (Km. 278.000 to Km. 287.400) of NH-8 NHAI/2018/12022/3/24 13/06/2018 14/06/2018 23/07/2018
Time 11:0Hrs
76 test project do not apply test project do not apply 14/06/2018 14/06/2018 15/06/2018
Time 15:0Hrs
77 test project do not apply2 test project do not apply2 14/06/2018 14/06/2018 15/06/2018
Time 15:0Hrs
78 Consultancy Services for Supervision Consultant (SC) for Operation and Maintenance of km 1065 to 1119 of Nalbari to Ghy section of NH-31 and km 146.172 to 163.895 of ghy Bypass of NH 37 in the state of Assam 2nd Call SC/OM/02 14/06/2018 13/06/2018 03/07/2018
Time 11:0Hrs
-
79 Consultancy service for Authority’s Engineer for supervision of Strengthening and Widening to two lane with paved shoulder of NH-61 from km 40.00 to km 72.40 (Package-I) and from km 168.00 to km 183.00 (Package-II) in the State of Nagaland under EPC mode RW/GHT/NG/DP(O)/2016-17/NH-61/AE 08/06/2018 11/06/2018 24/07/2018
Time 11:0Hrs
80 Consultancy Services for Authority’s Engineer for –Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu-Yamunotri section between Ch. 25.4 km and Ch. 51.0 km falling along NH-134 (old NH-94) in the State of Uttarakhand” on Engineering, Procurement and Construction (EPC) Mode. NHIDCL/Silkyara Tunnel/AE/2018 08/06/2018 08/06/2018 05/09/2018
Time 15:0Hrs
81 Independent Engineer services for 4-laning of NH-80 section of Mirza Chauki to Farkka from km. 215.00 to km. 260.00 in the State of Jharkhand (Package-I) on Hybrid Annuity Mode. NHAI/11012/JH/IE/NH-80/Pkg-I/2018 08/06/2018 08/06/2018 03/10/2018
Time 11:0Hrs
82 Independent Engineer services for Construction of Churhat bypass including Tunnel on Rewa Sidhi section of NH 75E from chainage 33.200 to chainage 55.400 (design length 15.350 km.) in the state of MP on “hybrid annuity mode”. NHAI/HQ/MP/Churhat Bypass/IE/2016 11/06/2018 08/06/2018 02/08/2018
Time 11:0Hrs
83 Independent Engineer Services during Operation and Maintenance Period for Four laned Jammu-Udhampur section from km 15.00 Jammu Bypass to km 67.00 on BOT Annuity in Jammu and Kashmir under NHDP-Phase II NHAI/2015/OM/11074/IE/01 07/06/2018 08/06/2018 30/07/2018
Time 11:0Hrs
84 (i) 4 Lanning of Aligarh-Kanpur Section from km. 140/200 (Design Chainage 140/200) to km 186/000 (Design Chainage 195/733) [Package-I from Aligarh-Bhadwas] of NH-91 in the state of Uttar Pradesh on Hybrid Annuity Mode under Economic Corridor of Bhartamala Pariyojana. (ii) 4-laning of Aligarh-Kanpur section from Km 186/000 (Design chainage 195/733) to Km 229/000 (Design chainage 240/897) (Package-II from Bhadwas - Kalyanpur) of NH-91 in the State of Uttar Pradesh on Hybrid Annuity Mode under Econ NHAI/UP/11017/1/2009/NHDP-IV/AK91/IE 08/06/2018 08/06/2018 07/08/2018
Time 11:0Hrs
-
85 Consultancy Services of Authoritys Engineer for supervision of Four lane widening and strengthening of NH29E from Km. 81.420 (Jungle Kaudiya) to Km. 98.945 Mohaddipur Chowk Road)Design Km. 81.420 to Km.98.935 in the State of Uttar Pradesh. 1609 /357Yata-NH Circle/18 Dated 08.05.2018 07/06/2018 07/06/2018 03/07/2018
Time 12:0Hrs
86 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000 (Existing Km 25.760 to Km 52.370)” in the state of Nagaland under SARDP-NE on EPC Mode. NHIDCL/Nagaland/ Chakabama-Zunheboto (0 to 50.000)/AE/2018 13/06/2018 06/06/2018 23/07/2018
Time 16:30Hrs
87 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (ii) Design Km 75.000 to Km 95.000 (Existing Km 79.040 to Km 100.345) (iii) Design Km 95.000 to Km 115.534 (Existing Km 100.345 to Km 122.250)” in the state of Nagaland under SARDP-NE on EPC Mode. NHIDCL/Nagaland/ Chakabama-Zunheboto (50.00 to 115.534)/AE/2018 13/06/2018 06/06/2018 23/07/2018
Time 16:30Hrs
88 Appointment of Independent Engineer (IE) during O M period of widening 6 laning from 86 Km to 96 Km covering Panipat City on NH-1 in Haryana including elevated structure covering Gohana Road, Sanulai Road, Assandh Road crossing, City Bus stand and Skylark Tourist Complex, peripheral lane and service road etc 11011/PD-AMB/ Panipat Elevated/O&M/RFP 06/06/2018 06/06/2018 18/07/2018
Time 11:0Hrs
89 Consultancy Services for Authority’s Engineer and Engineer In- Charge as Applicable for Km 0.00 To Km 330.70 of Andaman Trunk Road in the Union Territory of Andaman & Nicobar Islands for EPC Contracts Packages (Total Length= 90 Km) and Item Rates Contracts (Total Length= 64.40 Km) respectively. NHIDCL/AE/A&N/Middle/Pkg III-VI/2018 06/06/2018 05/06/2018 21/08/2018
Time 15:0Hrs
90 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway from shiv Murti Intersection at km 20 of NH 8 till Rail under Bridge (RuB) near Dwarka Sector 21, from km -0.800 to 5.300 –Package-I in Delhi ” ON EPC mode. NHAI/Tech/DE/Package-I/AE/2018 04/06/2018 04/06/2018 11/07/2018
Time 11:0Hrs
91 Consultancy services for Authority’s Engineer for Supervision of Four Laning of (a) Medshi to Washim Section (Package- II) from Km 47/700 to Km 92/200 (Design Chainage) (b) Washim to Pangare Section (Package- III) from Km 92/200 to Km 134/500 (Design Chainage) of NH-161 in the State of Maharashtra on EPC mode(2nd Call) NHAI/Tech/MH/AE/Med –Wash - Pang/2018-2nd 12/06/2018 01/06/2018 02/07/2018
Time 11:0Hrs
92 Independent Engineer services for six laning &strengthening of NH248A from existing km 2.740 (Rajiv chowk) to km 11.682 in Gurugram under NHDP Phase IV on Hybrid Annuity Mode in the State of Haryana PackageI NHAI/Tech/Gur/IE/PkgI/2018 06/06/2018 31/05/2018 02/07/2018
Time 11:0Hrs
93 Independent Engineer services for six laning &strengthening of new NH 248A from existing km 11.682 to km 24.400 (design ch. 9.282 to km 22.000) under NHDP Phase IV on Hybrid Annuity Mode in the State of Haryana PackageII NHAI/Tech/Gur/IE/PkgII/2018 06/06/2018 31/05/2018 02/07/2018
Time 11:0Hrs
94 Consultancy Service for Authority s Engineer for supervision of Pkg I Construction of 4 lane Flyover at Amberpet X road Hyderabad and Pkg II Constn of Uppal Six lane Elevated Corridor from Km 7.95 to Km 14.20 of NH 163 of Hyd BP sec in Telangana RW/NH-12014/06/2017-TS/P7Dated 24.05.18 31/05/2018 31/05/2018 16/08/2018
Time 15:0Hrs
95 Consultancy services of Authority’s Engineer for supervision of Widening the existing lane to 2 lane with paved shoulder from Km.239/900 to 294/300 km (Nayagarh to Khurda) excluding Khurda bypass of NH-57 on EPC mode in the state of Odisha 05 CE NH 2018-19 28/05/2018 29/05/2018 19/07/2018
Time 17:0Hrs
96 Independent Engineer services for Six Laning of Chakeri to Allahabad Section of NH-2 from km 483.687 to km 628.753 (Design Length – 145.066 km) on Hybrid Annuity mode under Bharatmala Pariyojana in the State of Uttar Pradesh Chakeri-Allahabad/ NH-2/HAM/IE/2018 28/05/2018 24/05/2018 09/07/2018
Time 11:0Hrs
97 Package for Consultancy services for Authority Engineer supervision of Civil Construction work for proposed 4lane ROBs and its approaches in existing Level Crossings (i) in lieu of LC No.67at Km 133.200 of NH 205 (ii) in lieu of LC No.75 at Km 145.200 of NH 205 (iii) in lieu of LC No 88 at Km.56/100 of NH340 (iv) in lieu of 17 at Km 563/200 of NH67 & (v) Widening and Strengthening of 2 lane with paved shoulders road to 4 Lane road from Km 563/0 to Km 572/0 of (Proddutur Bye Pass Road) Hubli SE R and B NIt no.64/2018-18 23/05/2018 24/05/2018 09/07/2018
Time 15:0Hrs
98 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF 1) WORK OF CONSTRUCTION OF FLYOVER AND UNDERPASS WITH SERVICE ROADS AT ATUL KATARIA CHOWK ON OLD DELHI-JAIPUR ROAD IN GURUGRAM (HARYANA) & 2) WORK OF CONSTRUCTION OF ARTERIAL ROAD FROM UMANG BHARDWAJ ROAD TO NPR IN GURUGRAM (HARYANA) ON Engineering, Procurement & Construction (EPC) Mode 84420 22/05/2018 22/05/2018 02/07/2018
Time 15:0Hrs
99 Independent Engineer Services for 4-Laning of Sangli-Solapur (Package I- Sangli-Borgaon) section of NH-166 from existing km 182.195 (Design Chainage km 182.556) to existing km 219.956 (Design Chainage km 224.000) (length=41.444 km) under NH (O) in the state of Maharashtra on Hybrid Annuity mode NHAI/GM(T)/IE/San-Bor/Mah/2018 23/05/2018 22/05/2018 21/06/2018
Time 11:0Hrs
100 Independent Engineer Services for 4-Laning of Sangli-Solapur (Package II- Borgaon-Watambare) section of NH-166 from existing km 219.956 (Design Chainage km 224.000) to existing km 272.394 (Design Chainage km 276.000) (length=52.000 km) under NH (O) in the state of Maharashtra on Hybrid Annuity mode NHAI/GM(T)/IE/Bor-Wat/Mah/2018 23/05/2018 22/05/2018 21/06/2018
Time 11:0Hrs
101 Independent Engineer Services for 4-Laning of Sangli-Solapur (Package III- Watambare to Mangalwedha) section of NH-166 from existing km 272.394 (Design Chainage km 276.000) to existing km 314.396 (Design Chainage km 321.600) (length=45.600 km) under NH(O) in the state of Maharashtra on Hybrid Annuity mode. NHAI/GM(T)/IE/Wat-Man/Mah/2018 23/05/2018 22/05/2018 21/06/2018
Time 11:0Hrs
102 Independent Engineer Services for 4-Laning of Sangli-Solapur (Package IV- Mangalwedha to Solapur) section of NH-166 from existing km 314.969 (Design Chainage km 321.600) to existing km 370.452 (Design Chainage km 378.100) (length=56.500 km) under NH(O) in the state of Maharashtra on Hybrid Annuity mode. NHAI/GM(T)/IE/Man-Sol/Mah/2018 23/05/2018 22/05/2018 21/06/2018
Time 11:0Hrs
103 Appointment of Independent Engineer Services during O&M period for “4 Laning of Kurali – Kiratpur Section of NH-21 (New NH-205) from Km 28.600 to Km 71.500 in the state of Punjab on DBFOT Basis under NHDP- Phase-III”- RFP NHAI/RO/CHD//11011/PD-MHL/KUR-KIR/NH-205/O&M//IE/RFP 21/05/2018 21/05/2018 12/07/2018
Time 11:0Hrs
104 Independent Engineer Services for Development and Operation /Maintenance of Sikar-Bikaner section of NH-11 from Km. 340.188 of NH-11 to Km. 557.775 of NH-11 via Sikar Bypass and Bikaner Bypass from Km.553.869 of NH-11 to Km. 267.325 of NH-89 by 2 laning with paved shoulder in the State of Rajasthan through Public Private Partnership (“PPP”) on Design, Build, Finance, Operation and Transfer “DBFOT” basis. 01/2018-19 21/05/2018 21/05/2018 16/07/2018
Time 11:0Hrs
105 Consultancy Services for Authority’s Engineer for Supervision of Construction of new 4-lane Elevated Highway (2x10.50m wide twin two lane structures) including approaches & service roads connecting Kazhakuttam Junction & Technopark Junction of NH-47 (New NH-66) from Km. 547.080 to Km. 549.801 in the State of Kerala under NHDP Phase-III on EPC mode NHAI/Tech/KL/Kazha. Jn.-Technopark Jn./NH-17/AE/2017-18 04/06/2018 21/05/2018 09/07/2018
Time 11:0Hrs
106 Consultancy Services for Authority’s Engineer for Supervision of construction of Four-Lane ROB in the section of National Highway 17 (new NH-66) from Km 93.468 (Existing km 95.650) to km 94.248 (Existing Km 96.450) as per approved GAD and its approaches & allied works on approaches of ROB near Neleshwaram town (Pallikara Railway Gate) Kasargad district in the State of Kerala under NHDP phase III on EPC mode. 3rd Call NHAI/Tech/KL/Nileshwar ROB/NH-17/AE /2017-18 28/05/2018 18/05/2018 02/07/2018
Time 11:0Hrs
107 Independent Engineer Services for 4-Laning of Akkalkot-Solapur section of NH-150E with paved shoulders from design Chainage km 99.400 to km 138.352/ existing chainage from km. 102.819 to km. 141.800 (design length=38.952 km) including Akkalkot bypass (design length 7.350 km.) in the state of Maharashtra on Hybrid Annuity mode. NHAI/GM(T)/IE/Akk-Sol/Mah/2018 18/05/2018 18/05/2018 18/06/2018
Time 11:0Hrs
108 Independent Engineer Services for Construction of 6/8 laning of existing 4 lane Vadape to Thane from km 539.202 to km 563.000 section of NH-3 (new NH-848) under Bharatmala Pariyojna in the State of Maharashtra to be executed on Hybrid Annuity Mode NHAI/GM(T)/IE/Vad-Tha/Mah/2018 18/05/2018 18/05/2018 02/07/2018
Time 11:0Hrs
109 Appointment of Independent Engineer Services during Operation & Maintenance stage of four laning of Zirakpur-Parwanoo Section of NH-5 (Old NH-22) RFP NHAI/RO/CHD/11011/PD-CHD/ZKP-PAR/IE/RFP 21/05/2018 18/05/2018 13/07/2018
Time 11:0Hrs
110 Authority’s Engineer for Supervision OF Rehabilitation and Up-gradation of Allahabad Bypass Road Junction to Allahabad City section of NH-96 from existing km 135/230 to km 153/000 [Design Ch. 135.500 to Ch. 153.330](excluding existing Ch. 148.600 to Ch. 149.400) to Four Lane with paved shoulders under EPC mode in the state of Uttar Pradesh. 843/107comB-18/18 28/05/2018 16/05/2018 17/05/2018
Time 17:0Hrs
-
111 Authority’s Engineer for Supervision OF Rehabilitation and Up-gradation of Allahabad Bypass Road Junction to Allahabad City section of NH-96 from existing km 135/230 to km 153/000 [Design Ch. 135.500 to Ch. 153.330](excluding existing Ch. 148.600 to Ch. 149.400) to Four Lane with paved shoulders under EPC mode in the state of Uttar Pradesh. 843/107 comB - 18/18 28/05/2018 16/05/2018 11/07/2018
Time 17:0Hrs
-
112 IE O & M for kagal satara works NHAI/RO/MUM/KLP/IE/K-S/2018-19/05 15/05/2018 15/05/2018 14/06/2018
Time 11:0Hrs
113 Authoritys Engineer for Supervision of Reh. and upgrad. of existing pavement to 2 lane with paved shoulder from ch. 323.745tokm 351.000(Balrampur to Tulsipur sec.) in the state of UP on EPC mode 1281/162/Yata NH Circle/18 Dated12.04.2018 15/05/2018 15/05/2018 29/05/2018
Time 17:0Hrs
114 Consultancy Services for Authority Engineer for Supervision of Rehabilitation And Upgradation to 2 lane with Paved Shoulders of Punjab Haryana Border to Moonak Jakhal Budhlada Bhikhi from km 236600 to 239400 and km. 244750 to km 287710 section of nh148b falling in the State of Punjab on Engineering Procurement and Construction EPC mode 03 dated 14.05.2018 18/05/2018 15/05/2018 28/05/2018
Time 16:0Hrs
115 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway from Rail under Bridge (RuB) near Sector 21 Dwarka to Delhi Haryana Border (Km 5.300 to Km 9.500) –Package 2 in state of Delhi” ON EPC NHAI/Tech/DE/Pkg II/AE/2018 15/05/2018 14/05/2018 13/06/2018
Time 11:0Hrs
116 Independent Engineer Services during Operation and Maintenance stage of 4 laning of Thrissur to Edapally section from Km 270/000 to Km 342/000 of NH-544 design length 64.94 kms in the State of Kerala under NHDP Phase II executed on BOT(Toll) on DBFOT basis PIUPKDKL-01IE2018-1901 11/05/2018 11/05/2018 12/06/2018
Time 17:0Hrs
117 Consultancy services for Authority Engineers for supervision of the work construction of bridge over river Bidya connecting Godkhali to Gosaba bazar in the district of South 24Paragans under South 24Paragans Hwy Division under WB WBPWRD/RFP-03/SE/SHC/2017-18 02/07/2018 10/05/2018 17/08/2018
Time 14:0Hrs
118 Consultancy Services for Independent Engineer for Supervision of 4-lane with paved shoulder configuration of Bilaspur-Pathrapali (Km. 0.000 to Km. 53.300) section of NH-111 (New NH-130) in the State of Chhattisgarh under BharatMala on Hybrid Annuity Mode NHAI/11012/CG/Bilaspur Pathrapali/IE/2018 31/05/2018 09/05/2018 25/06/2018
Time 11:0Hrs
119 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 468.000 of Lameri to Paini (Excluding Km 420.250 to 420.500, Km 423.300 to Km 423.650, Km 437.625 to Km 437.775 and 464.425 to Km 464.525) of NH-07 under Chardham Pariyojna on EPC basis in the State of Uttarakhand. NHIDCL/AE/ R-J/2018 09/05/2018 09/05/2018 05/07/2018
Time 15:0Hrs
120 Rehabilitation and Upgradation of Rishikesh–Dharasu road with 2-lane paved shoulder from design Chainage from km 74.733 to 107.347(32.614km) including construction of Kamand re-alignment(length 2513m) and land slide treatment work bet design chainage Km 73.8 to Km 74 AND From design Chainage km 58.603 to 58.853 and Km 61.63 to 63.95 and construction of 2-lane with paved shoulder Chamba Bypass of design length 2.035 Km including 440m long tunnel(Design length–4.605 Km) on EPC Mode in Uttarakhand 85007/Auth Engg/Km 76-110 & Chamba Bypass 08/05/2018 08/05/2018 02/07/2018
Time 15:0Hrs
121 Package for Consultancy services for Authoritys Engineer supervision of Civil Construction work for proposed 4-lane ROBs and its approaches in existing Level Crossings (i) lieu of 124E/SPL3 at Km 1.8 (ii) 30/E at Km 64.800 (iii) lieu of 45 C- Class at Km 93.400 (ii) lieu of 48E/C at Km 96.800 on NH-205 in the State of Andhra Pradesh (under EPC Mode) SE NH ATP NIT No 65 10/05/2018 07/05/2018 21/06/2018
Time 15:0Hrs
122 Independent Engineer Services during Operation & Maintenance stage of Four Laning of Hyderabad-Yadgiri Section of NH-163 (Old NH No.202) from Km.18.600 to Km.54.000 in the State of Telangana under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis Package No.NHDP-III/BOT/AP-04 (2nd call). 10423 08/05/2018 07/05/2018 13/06/2018
Time 11:0Hrs
123 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OFUP-GRADATION OF CHANDRAPUR- BALLARPUR - KOTHARI- GONDPIPRI- AASTI ROAD TO 2 LANE WITH PAVED SHOULDER CONFIGURATIONIN THE STATE OF MAHARASHTRA PACKAG 2 FROM KM 242-150 TO KM 284-400 IN THE STATE OF MAHARASHTRA ( PKG NO PWD/2 ) ON EPC MODE (SECOND CALL) 02/2018-19 04/06/2018 04/05/2018 06/06/2018
Time 17:30Hrs
124 Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 (existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028) and land slide treatment at existing km 138.500 (Design chainage km 134.970) of NH -94 on EPC mode (Design Length = 26.553 Km) AND (ii) Chinyalisour bypass from existing chainage Km 133.020 to Km 137.330 of NH-94 (old) on EPC mode in Uttarakhand 85008/Auth Engg/Km 110-142 and Chinyalisour Bypass 21/05/2018 04/05/2018 05/07/2018
Time 15:0Hrs
125 Independent Engineer services for Four Lanning from km 253/600 to km 308/550 of Bellary to Byrapura Section of NH-150(A) on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Karnataka NHAI/KNT-NH-150(A)/Pkg-1/ Bellary-Byrapura/ IE/2018/117177 04/05/2018 04/05/2018 04/07/2018
Time 11:0Hrs
126 Independent Engineer services for Four laning from km 308/550 to km 358/500 Byrapura to Challakere section of NH-150 A on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka NHAI/KNT-NH-150(A)/Pkg-2/ IE/2018/117178 04/05/2018 04/05/2018 04/07/2018
Time 11:0Hrs
127 Independent Engineer Services for Four laning from km 358/500 to km 414/205 challakere to hariyur section of NH-150 A on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka NHAI/KNT/NH-150(A)/Pck-3/ Challak-Harriyur/ IE/2018 /117179 04/05/2018 04/05/2018 04/07/2018
Time 11:0Hrs
128 Construction of 4 Nos. Grade Separator between km. 281.000 to Km. 307.600. of NH 53 (Old NH-06) Raipur-Durg 4- lane in the State of Chhattisgarh in EPC Mode under NH(O) Annual Plan 17-18 1.Km. 286.400 Kumhari length 600m 2.Km. 299.000 Transport Nagar length 580m 3.Km. 302.000 Power House length 1210m 4.Km. 304.000 Chandra-Mourya Chowk to Km. 305.000 Supela length 1569m 01/AE/RO/2018/330845 03/05/2018 04/05/2018 02/07/2018
Time 17:0Hrs
129 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OFUP-GRADATION OF CHANDRAPUR- BALLARPUR - KOTHARI- GONDPIPRI- AASTI ROAD TO 2 LANE WITH PAVED SHOULDER CONFIGURATIONIN THE STATE OF MAHARASHTRA PACKAG 2 FROM KM 242-150 TO KM 284-400 IN THE STATE OF MAHARASHTRA ( PKG NO PWD/2 ) ON EPC MODE (SECOND CALL) 279339/2 04/05/2018 04/05/2018 02/06/2018
Time 17:30Hrs
130 Consultancy services for authority engineer for supervision of the work Rehabilitation and upgradation of NH75 (Old NH234) from Km 506 to Km 508 and Km 518 to Km 534 (Design Ch Km 506 to 508 and 518 to 534) Mangalore to Thiruvannamalai Road to two lane with paved shoulders on EPC Basis in the State of Andhra Pradesh (3 rd call) SE R and B NH ATP NIt NO 04/2018-19 01/05/2018 02/05/2018 14/06/2018
Time 15:0Hrs
131 Consultancy Services for Authoritys Engineer (AE) for the work of Widening existing 2 lane to 2-lane with 1.5m paved shoulders from km 0/000-23/100 and 29/250-47/400 and Strengthening existing carriageway from km 23/100-29/250 (Gudiyatham bypass) and from km 47/400-56/00 (Vellore bypass) of NH234 in Tamil Nadu TN 02 HDO NH NH234 AE 27/04/2018 27/04/2018 12/06/2018
Time 11:0Hrs
132 Consultancy services for Authority’s Engineer for supervision of Rehabilitation and upgradation of NH-340C from Atmakur (Design Km 65.800/Existing Km 72.980) to Dornala (Design Km 124.150/Existing Km 131.230) to Two lane with paved shoulders (Design Length = 58.350 Km) in the State of Andhra Pradesh under NH (O) on EPC Mode NHAI/Tech/AP/NH-340C/Atm-Dor/AE/2017-18 27/04/2018 27/04/2018 10/10/2018
Time 11:0Hrs
133 Consultancy Services for Authority Engineer for Supervision of Rehabilitation and Up gradation to 2 Lane with paved Shoulders of Abohar- Sito Gunno -Dabwali Road from Km.0.00 to Km.50.885 of NH-354E including construction of one High Level Major Steel Bridge on EPC Mode in the State of Punjab 1/EE/CWD/PWD/ABOHAR 27/04/2018 27/04/2018 29/05/2018
Time 15:0Hrs
134 Independent Engineer services for Operation Maintenance of Allahabad Bypass (including Ganga Bridge Pkg. ABP- 1) from Km. 158.00 to Km. 242.708 section of NH-2 in the State of U.P under OMT Pkg. 32 11015/NHAI/PIU/ALD/OMT/21350 27/04/2018 27/04/2018 28/05/2018
Time 11:0Hrs
135 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR THE BALANCE WORK OF FOUR –LANING OF DHALKOLA BYPASS(LENGTH 5.5 KM ) INCLUDING ROB ON NH-34 ON EPC MODE IN THE STATE OF WEST BENGAL NHAI/NH34/Balwork/Dkhl.Bypass/2018/AE 04/05/2018 26/04/2018 11/06/2018
Time 15:0Hrs
136 Consultancy services for Authority’s Engineer for supervision of the work of Upgradation of NH-81 with a minimum of 2-Lane with paved shoulder configuration starting from km 19.205 to km 46.550 in the District of Malda, on EPC mode in the State of West Bengal under Annual Plan 2017-2018 .(Job No. 081-WB-2017-18/421)-2nd Call 2/2018-19 of SE, National Highway Circle No. II 24/04/2018 25/04/2018 28/05/2018
Time 14:0Hrs
137 Consultancy Services for Authoritys Engineer for Construction of proposed 4-Lane R.O.B and its approaches in replacement of existing old and narrow ROB LC No. 149A at Ch 39.885 on NH 168A near Dhanera EPC Mode Upgradation of new N. H. No. 168 to two lane with paved side shoulder configuration between Km 0/0 to 41/300 and Km 43.250 to 68.174 Dhanera Panthawada section 2 lane PSS in the State of Gujarat. Project Length 66.224 Km 1.120 Km On EPC Mode 09 of 2017-18 2nd Attempt Gandhidham 25/04/2018 25/04/2018 19/05/2018
Time 18:10Hrs
138 Consultancy services for Authority’s Engineer for supervision of the work of Upgradation for NH-512 with a minimum of 2-Lane with paved shoulder configuration starting from Ch 82.4 km to 99.5 km and minimum of 4-Lane configuration from Ch 104.2 km to Ch 106.607 km on EPC mode in the State of West Bengal under Annual Plan 2017-2018, Job No. 51-WB-2017-18/422.-2nd Call. 3/2018-19 of SE National Highway Circle No.-II 26/04/2018 25/04/2018 28/05/2018
Time 14:0Hrs
139 ConsultancyServicesofAuthorityEngineer 12/NH-GAYA/2017-18 21/04/2018 23/04/2018 17/05/2018
Time 17:0Hrs
140 Independent Engineer Services during Operation & Maintenance stage of Four laning of Jorabat Shillong (Barapani) section of NH-40 from 0.000 to km 61.800 in the state of Assam and Meghalaya on DBFOT pattern under SRDP-NE in BOT (Annuity) project in the State of Meghalaya NHAI/PIU/SHL/TENDER/JB/IE/2018 19/04/2018 20/04/2018 28/05/2018
Time 11:0Hrs
141 Independent Engineer Services during Operation & Maintenance stage of 2-lane Shillong Bypass connecting NH-40 &NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44, in the State of Meghalaya under SARDP –NE on BOT(Annuity) basis – project NHAI/PIU/SHL/TENDER/SB/IE/2018 19/04/2018 20/04/2018 28/05/2018
Time 11:0Hrs
142 Independent Engineer Services for 4- Laning of Chakur – Loha Section of NH-361 from km 114.600 to km 187.800 (design length 73.345 km) under Bharatmala Pariyojna in the State of Maharashtra on Hybrid Annuity Mode. NHAI/GM(T)/IE/Cha-Loh/Mah/2018 01/05/2018 20/04/2018 28/05/2018
Time 11:0Hrs
143 Independent Engineer services for 4-Laning of Loha- Waranga section of NH-361 from km 187.800 to km 244.369 (design length 56.569km) under Bharatmala Pariyojna in the state of Maharashtra on Hybrid Annuity Mode. NHAI/GM(T)/IE/Loh-War/Mah/2018 01/05/2018 20/04/2018 28/05/2018
Time 11:0Hrs
144 CONSULTANCY SERVICES FOR AUTHORITYs ENGINEER FOR Rehabilitation and up gradation of NH 326A from km 0/0 to 41/979 (excluding km 2/255 to 3/372 and km 36/820 to 38/275) to two lane with paved Shoulders including the ROBs at km 2/100 & 33/100 along with approaches in the state of Andhra Pradesh under NH(O) on EPC Mode S.E/R&B/NH VJA NIT No 02/SE/TO/EPC/2018-19 01/05/2018 20/04/2018 04/06/2018
Time 17:0Hrs
145 Independent Engineer Services for 4-Laning of Ausa – Chakur Section of NH-361 from km 55.835 to km 114.345(design length 58.510km) under Bharatmala Pariyojna in the state of Maharashtra on Hybrid Annuity Mode NHAI/GM(T)/IE/Aus-Cha/Mah/2018 01/05/2018 20/04/2018 28/05/2018
Time 11:0Hrs
146 Independent Engineer Services for Supervision of Redesigning, Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Rohna/Hassangarh to Jhajjar Section from Km 44.800 to km 80.250 (Design Chainage) (Length 35.450km) of NH-334B in the State of Haryana on HAM basis under NH (O) (Package-2) NHAI/Tech/Haryana/NH-334B/Rohna-Jhajjar/IE/2018 15/05/2018 19/04/2018 21/05/2018
Time 11:0Hrs
147 Consultancy services for Independent Engineer for supervision of Rehabilitation and Upgradation of Giddalur – Vinukonda section of NH-544D from Design km 212.983 (existing km 213.000) to Design km 322.800 (existing km 322.840) (Design length 112.797 km) in the State of Andhra Pradesh to two lane with paved shoulder under NH(O) on Hybrid Annuity Mode NHAI/Tech/AP/NH-544D/Gid-Vinu/IE/2017-18 27/04/2018 18/04/2018 05/06/2018
Time 11:0Hrs
148 Consultancy Services For Authority’s Engineer For Rehabilitation and upgradation of existing road to 2-lane with paved shoulders configuration in Purulia (Jhr Border)-Chandil (Junction with NH-33) section of NH-32[from Km 70.524 (Jhr/WB Border) to Km 84.000 (near Sainik School, Purulia) and from Km 94.300 (near Simulia Junction, Purulia) to Km 153.705 (near Chandil, Junction with NH-33 in the State of Jharkhand) in the States of West Bengal and Jharkhand under NHDP Phase-IVB on EPC Mode NHAI/EPC/PHIVB/NH32/2018/AE 04/05/2018 18/04/2018 18/06/2018
Time 11:0Hrs
149 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Rehabilitation and Upgradation of two lanes with paved shoulder from Moga-Makhu-Harike-Khalra including construction of 2 nos ROB (Project Length=75.167 kms) of NH-703- B in the state of Punjab on EPC Mode and Rehabilitation and Upgradation of Makhu to Arifke including construction of 2 nos ROB to two lane with paved shoulders of NH 703 A (Project Length = 24.600 km) in the state of Punjab on EPC Mode 75/EE/CWD/FZR dated 18-04-2018 24/04/2018 18/04/2018 13/06/2018
Time 16:0Hrs
150 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR REHABILITATION AND UP GRADATION TO FOUR LANING OF NH-31D FROM KM 113.200 TO KM 154.854 (PACKAGE-II A) GHOSHPUKURSALSALABARI SECTION IN THE STATE OF WEST BENGAL ON EPC MODE NHAI/WB/NH-31D(pckg-2A)/2018/440(C)/AE 24/04/2018 17/04/2018 18/06/2018
Time 11:0Hrs
151 Consultancy Services for Authority’s Engineer for the work of Development of Four-lane Islampur Bypass of 10.31 Km length from Km.0.00 (Ex.Ch. 498.500) to Km. 10.310 (Ex. Ch. 506.950) of NH-31 in the State of West Bengal under NHDP Phase II on Engineering, Procurement and Construction (EPC) Mode. NHAI/11015/WB-7/8/2018/AE/105(C) 19/04/2018 17/04/2018 18/06/2018
Time 11:0Hrs
152 Supervision Consultancy Services for O and M stage of Bheem Parasoli Gulabpura section of NH 148D (including Bheem Parasoli bypass) and Lambia Raipur section of NH 458 for total length 124.03 km. on EPC mode under NHDP Phase IV NHAI/12012/03/2018-ROJ/SC/20 07/05/2018 17/04/2018 25/05/2018
Time 11:0Hrs
153 Consultancy Services as Independent Engineer during Operation, Maintenance and Fee collection of 4- lane divided carriageway facility of Nelamangala – Tumkur section from Km. 29.5 to Km. 62.00 (32.5 Kms) on (BOT) basis through Concessionaire and Six lane of Tumkur bypass from Km. 62.00 to Km. 75.00 (13 Kms) on EPC through O&M Contractor of NH-4 (New NH-48) in the state of Karnataka (Second Call) 01/NHAI/RO-BNG/13020/Tender/2018 dated 16/04/2018 24/04/2018 16/04/2018 30/05/2018
Time 15:0Hrs
154 Consultancy services for Supervision Consultant for Short Term Improvement and Routine Maintenance of Two laning with paved shoulders of Jhalawar – Rajasthan/ M.P. Border section of NH-12 (New NH-52) from Km. 346.540 to Km. 408.700 in the state of Rajasthan NHAI/2018/3/SC/Tender/17 26/04/2018 16/04/2018 29/05/2018
Time 11:0Hrs
155 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of Flyover in (a) Sakoli town (b) Lakhani town and (c) Construction of ROB and PUP including Slip Road Median RCC Drain footpath etc from km 441/970 to km 443/560 at Saundad on NH-53 (Old NH - 6) in the State of Maharashtra on EPC Mode NHAI/MH/Tech/AE/Lakhani Sakoli/2018 19/04/2018 16/04/2018 15/05/2018
Time 11:0Hrs
156 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Four Laning of (a) Medshi to Washim Section (Package- II) from Km 47.700 to Km 92.200 (Design Chainage) (b) Washim to Pangare Section (Package- III) from Km 92.200 to Km 134.500 (Design Chainage) of NH-161 in the State of Maharashtra on EPC mode NHAI/Tech/MH/AE/Med –Wash - Pang/2018 19/04/2018 16/04/2018 15/05/2018
Time 11:0Hrs
157 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Construction of NH-24, 4-lane bypass starting from km 479.500 of NH 24 and terminating at km 17.600 of MDR-77C (bypass chainage from km 64.900/64.380 to km 79.516/79.000 length 14.618 km Pkg. – 3A (ii) Construction of NH-24 Extension 4-lane bypass starting from Behta Road and terminating at Sitapur Road Chainage 479.500 (Bypass chainage from km 32.000 / 31.490 to km 64.900 / 64.380 average length 32.895 km) -Package – 2 and (ii NHAI/NHDP-VII/Lucknow Bypass/EPC/AE/RFP/2018 17/04/2018 16/04/2018 23/05/2018
Time 11:0Hrs
158 Consultancy services for Authority’s Engineer for supervision of Development of NH 31 to 4 lane configuration from km 551.36 to km 563.260 Ghoshpukur to Bihar More Bagdogra in Darjeeling District West Bengal under EPC Mode ( Project length 11.90 Km.) under Annual Plan 2017-18 e-RFP No. 01 OF 2018-19 OF SUPERINTEDING ENGINEER, PIU-II, SILIGURI 17/04/2018 15/04/2018 21/05/2018
Time 14:0Hrs
159 TEST 12 12/04/2018 13/04/2018 14/04/2018
Time 15:0Hrs
-
160 Consultancy services for Auth Engr supervision of Civil Construction of 4 Lane Signature Bridge (900m long central cable stayed Module) connecting missing link between Okha and Beyt Dwarka on EPC Mode including Construction of Approaches on New NH-51 01 of 2018-19 (Rajkot) 19/04/2018 13/04/2018 07/06/2018
Time 17:0Hrs
161 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF FOUR LANING OF MADURAI CHETTIKULAM SECTION OF NH 785 FROM MADURAI (KM 0.000) TO CHETTIKULAM (7.300) UNDER BHARATMALA PARIYOJNA PHASE I IN THE STATE OF TAMIL NADU ON EPC MODE NHAI/11012/MC/EPC/AE/9/2018 12/04/2018 12/04/2018 14/05/2018
Time 11:0Hrs
162 Independent Engineer Services for Four laning of Sattanathapuram to Nagapattinam (Design Ch Km 123.800 to Km 179.555) section of NH 45A (New NH 332) in the State of Tamil Nadu under NHDP Phase IV on Hybrid Annuity Mode NHAI/11012/SN/HAM/IE/10/2018 12/04/2018 12/04/2018 14/05/2018
Time 11:0Hrs
163 Consultancy Service for Authority s Engineer for Supervision km 159 0 165 4 AND 186 0 215 0 of NH 163 from km 25 0 59 2 Mahadevpur Bhupalapalli) of NH-353C old NH 363 km 121.000 to 154.000 of Nakrekal - Mallampalli section of NH365 In TS NIT No. SE (R&B) NH/KMNR/41/2017-18 17-03-2018 12/04/2018 11/04/2018 11/05/2018
Time 15:0Hrs
164 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WORKS Rehabilitation and Upgradation Morena Porsa and Porsa Bhind section of NH 552 Ext Two lane with paved shoulder through Engineering Procurement and Construction in the state of MP MPRDC/NNH/AE /pkg VII/01/2018/672 03/05/2018 11/04/2018 11/05/2018
Time 17:30Hrs
165 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of NH-730 from Km. 484.000 to Km. 505.120 (Ramnagar to Siswa Babu) to two lane with paved Shoulders (Rural Area) & Two Lane Paved Shoulders with Service Road (Urban Area) under EPC Mode in the State of Uttar Pradesh. 967/357Yata-NH Circle/18 Dated 17-03-2018 11/04/2018 11/04/2018 21/05/2018
Time 17:0Hrs
166 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of NH-730 from Km. 537.000 to Km. 564.750 (Kaptanganj to Radrauna) to two lane with paved Shoulders (Rural Area) & Four Lane Divided Carriageway with Service Road (Urban Area) under EPC Mode in the State of Uttar Pradesh. 967/357Yata NH Circle/18 Dated 17-03-2018 11/04/2018 11/04/2018 21/05/2018
Time 17:0Hrs
167 Consultancy Services for Supervision Consultant (SC) for Supervision of Two - laning with paved shoulder of Bhilwara - Ladpura section of NH-758 from km. 87.250 to km. 155.000 [length 67.750 km] in the state of Rajasthan on EPC mode under NHDP Phase-IV. NHAI/12013/03/2018-ROJ/AE/20 08/05/2018 10/04/2018 25/05/2018
Time 11:0Hrs
168 consultancy services for authority engineer for supervision of construction of six laning of dedicated port road to krishnapatnam port (package-i) km 0.000 to km18.000 on epc mode in the state of andhra pradesh under bharatmala pariyojana phase I NHAI/PC/Sagarmala/2018/PC 01 /Pkg I/AE 10/04/2018 09/04/2018 23/05/2018
Time 11:0Hrs
-
169 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF UPGRADATION TO TWO LANE WITH PAVED SHOULDERS OF BELAKERI PORT TO KUMTA –SIRSI ROAD FROM KM. 0.000 TO KM. 4.265 OF BELEKERI PORT LINK ROAD AND FROM KM. 4.965 TO KM. 60.000 OF SH-69 (EXCLUDING STRETCH OF NH-66) IN KARNATAKA STATE ON EPC MODE (PACKAGE - I) UNDER BHARATMALA PARIYOJANA PHASE I. NHAI/PC/Sagarmala/2018/SM 04/Pkg I/AE 10/04/2018 09/04/2018 23/05/2018
Time 11:0Hrs
170 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Rehabilitation and upgradation to 2 lane with paved shoulders of Mudki to Jawahar Singh Wala section of NH-254 from km 0.00 to 38.00 in the State of Punjab on EPC Mode. CW-2/BTI/02 dated 06.04.2018 06/04/2018 07/04/2018 07/05/2018
Time 17:0Hrs
171 Package for Consultancy services for Authority Engineer for supervision of Civil Construction works for proposed 4 lane ROBs and its approaches in existing Level Crossings in lieu of 23SPL Class at Km 3.600 on NH 18 and in lieu of 18ASPL class at Km 7.800 on NH-18 and in lieu of 95SPL3E at Km 272.600 on NH -205 and lieu of 102 E at Km 281.200 on NH-205 in the State of Andhra Pradesh SE R and B NIt no.63 07/04/2018 07/04/2018 17/05/2018
Time 15:0Hrs
172 Independent Engineer services for development and construction of selected road stretches on Hybrid Annuity Mode (HAM) projects under Bharatmala Pariyojna in Rajasthan-KHAJUWALA-POOGAL-BAP NHAI/11012/Raj/Poogal-Bap/BM/IE 01/05/2018 05/04/2018 07/05/2018
Time 11:0Hrs
173 Independent Engineer services for development and construction of selected road stretches on Hybrid Annuity Mode (HAM) projects under Bharatmala Pariyojna in Rajasthan-Munabao-Tanot NHAI/11012/Raj/Poogal-Bap/BM/IE-II 02/05/2018 05/04/2018 07/05/2018
Time 11:0Hrs
174 Independent Engineer services for Construction of Eight lane Vadodara Kim Expressway from km. 355.000 to km. 378.740 (Package I i.e. Padra to Vadodara section), from km. 323.000 to km. 355.000 (Package II i.e. Sanpa to Padra section) & from km. 292.000 to km. 323.000 (Package III i.e. Manubar to Sanpa section) in the State of Gujarat under Bharatmala Pariyojna on Hybrid Annuity Mode NHAI/VME Phase IA/IE-I 26/04/2018 05/04/2018 07/05/2018
Time 11:0Hrs
175 Independent Engineer services for Construction of Eight lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Package IV i.e. Ankleshwar to Manubar Section) & from Km 254.430 to Km 279.00 (Package V i.e. Kim to Ankleshwar Section) in the State of Gujarat under Bharatmala Pariyojna on Hybrid Annuity Mode NHAI/VME Phase IA/IE-II 26/04/2018 05/04/2018 07/05/2018
Time 11:0Hrs
176 Consultancy Services For Authority Engineer For Supervision of Four Laning of Chettikulam to Natham Section of NH 785 from Chettikulam (Km 7.300) to Natham (Km.36.690) on EPC Mode under Bharatmala Pariyojna Phase I in the State of Tamil Nadu NHAI/11012/CN/EPC/AE/8/2018 10/04/2018 04/04/2018 03/05/2018
Time 11:0Hrs
177 Consultancy Services for Independent Engineer services for Six Lanning of Bangalore – Nidigatta Section Km 18/000 to Km 74/200 of NH-275 in state of Karnataka to be executed on Hybrid Annuity Mode NHAI/ KNT/ NH-275/Bng-Nid/IE/2018/115615 dated 3.04.2018 03/04/2018 03/04/2018 29/05/2018
Time 11:0Hrs
-
178 Consultancy Services for Independent Engineer for Six Laning of Nidagatta-Mysore Section, km 74/20 to km 135/304 of NH-275 in the State of Karnataka to be executed on Hybrid Annuity Mode NHAI/ KNT/ NH-275/NID-MSY/IE/2018/115616 dated 3/04/2018 03/04/2018 03/04/2018 29/05/2018
Time 11:0Hrs
179 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR CONSTRUCTION OF, (i) CONSTRUCTION OF PROPOSED 4-LANE ROB AND ITES APPROACHES IN LIUE OF EXISTING LEVEL CROSSING NO. 328A AT KM. 0.500 ON BARMER – GADRA – MUNBAO RAILWAY LINE OF NH-25E IN DISTRICT BARMER (ii) CONSTRUCTION OF PROPOSED 2-LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING NO. C-293 & A-292 AT KM 233/038 & 233/435 ON NH-112. ON JODHPUR TO BARMER ROAD AT BALOTRA IN THE STATE OF RAJASTHAN. 14/2017-18 13/05/2018 02/04/2018 23/05/2018
Time 18:0Hrs
180 . Construction of proposed 4 Lane R.O.B and its approaches in replacement of existing old and narrow ROB LC No. 149A at Ch 39.885 on NH 168A near Dhanera on EPC Mode 09 of 2017-18 Gandhidham 02/04/2018 31/03/2018 23/04/2018
Time 15:0Hrs
181 Consultancy services of Authority’s Engineer for supervision of Widening and strengthening Two lane to Two lane with paved shoulder from Km.173/370 to 229/400 km of NH-59(Baliguda-Daringbadi section) on EPC mode in the state of Odisha. 15 CENH 2017-18 31/03/2018 29/03/2018 02/06/2018
Time 17:0Hrs
182 Consultancy services of Authority’s Engineer for supervision of Widening and strengthening Two lane to Two lane with paved shoulder from Km.269/300 to 328/200 km of NH-49(Jharsuguda to Bhojpur) on EPC mode in the state of Odisha. (Bid Ref No-16 CENH of 2017-18) 16 CE NH 2017-18 31/03/2018 29/03/2018 02/06/2018
Time 17:0Hrs
183 Consultancy services for Independent Engineer for supervision of four laning of NH-161 from Ramsanpalle (Design Km 39.980/Existing Km 44.757) to Mangloor (Design Km 86.788/Existing Km 91.350) (Design Length =46.808 Km) in the State of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/NH-161/San-Nan/Pkg-II/IE/17-18/ 29/03/2018 28/03/2018 10/05/2018
Time 11:0Hrs
184 Consultancy services for Independent Engineer for supervision of four laning of NH-161 from Mangloor (Design Km 86.788/Existing Km 91.350) to Telangana/Maharashtra Border (Design Km 135.751/Existing Km 140.873) (Design Length =48.963 Km) in the State of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/NH-161/San-Nan/Pkg-III/IE/17-18/ 29/03/2018 28/03/2018 10/05/2018
Time 11:0Hrs
185 Consultancy services for Independent Engineer for supervision of Six laning of NH-140 from Chittor (Design Km 0.000/Existing Km 158.000 of NH-4) to Mallavaram (Design Km 61.128/Existing Km 41.800 of NH-140) (Design Length = 61.128 Km) in the State of Andhra Pradesh under Bharatmala Pariyojna on Hybrid Annuity Mode NHAI/Tech/AP/NH-140/Cht-Mal/IE/2017-18/ 29/03/2018 28/03/2018 10/05/2018
Time 11:0Hrs
186 Consultancy services for Independent Engineer for supervision of Six laning of Anandapuram–Pendurthi-Anakapalli section of NH-5 (new NH-16) from Km.681.000 (Existing Km.681.000) to Km.731.780 (Existing Km.742.400) (Design Length=50.78 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/APA/IE/2017-18 27/04/2018 28/03/2018 14/05/2018
Time 11:0Hrs
187 Consultancy services for Independent Engineer for Supervision of Four lane connectivity to Visakhapatnam Port Road from Km.0.000 to Km.12.700 (Design Length=12.70 Km) in Andhra Pradesh under Port Connectivity under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/Vizag Port Connectivity/IE/2017-18 27/04/2018 28/03/2018 14/05/2018
Time 11:0Hrs
188 Consultancy services for Independent Engineer for Supervision of Four laning of Gundugolanu-Devarapalli-Kovvuru section of NH-16 from Km 15.320 (Existing Km 15.700) to Km 85.204 (existing Km 81.400) (Design Length=69.884 Km) in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity mode NHAI/AP/NH-16/GDK/IE/2017-18 27/04/2018 28/03/2018 14/05/2018
Time 11:0Hrs
189 Consultancy Services for Authority’s Engineer for Supervision of Jhajjar-Loharu Section from km 130.770 to km 228.630 (Design Chainage km 0.000 to km 97.864) of NH-334B in the State of Haryana on EPC basis under NH (O)-Part-1 as 2-lane with paved shoulder NHAI/Tech/Haryana/NH-334B/Jhajjar-Loharu/AE/2017-18 17/04/2018 27/03/2018 26/04/2018
Time 11:0Hrs
-
190 Consultancy Services for Authority’s Engineer for Supervision of 2-lane with paved shoulder from Jind-Gohana Road from Design Chainage km 0.000 to km 50.505 (Length-50.505 km) of NH-352A on EPC mode under NH (O) in the State of Haryana NHAI/Tech/Haryana/NH-352A/Jind-Gohana/AE/2017-18 17/04/2018 27/03/2018 26/04/2018
Time 11:0Hrs
-
191 Consultancy Services for Authority’s Engineer for Supervision of 2-Lane with Paved Shoulder for Bhiwani-Mundal-Jind road from design chainage Km 6.875 to Km 68.857 (Length-61.982 Km) of NH-709A in The State of Haryana Under NH (O) on EPC Mode (Package-I) NHAI/Tech/Haryana/NH-709A/Bhiwani-Mundal-Jind/AE/17-18 17/04/2018 27/03/2018 26/04/2018
Time 11:0Hrs
-
192 Consultancy Services for Authority’s Engineer for Supervision of 2-lane with paved shoulder for Jind-Karnal Section from existing km 68.660 (Design km 68.857) i.e. Junction with Narwana road (NH-352) at Subhash Chowk and ends at km 153.700 (Design km 154.219) at ITI Chowk which is intersection with NH-1 of NH-709 A in the State of Haryana under NH (O) on EPC mode (Package-II) NHAI/Tech/Haryana/NH-709A/Jind-Karnal/AE/17-18 17/04/2018 27/03/2018 26/04/2018
Time 11:0Hrs
-
193 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF REHABILITATION AND UP GRADATION TO 2 LANE WITH PAVED SHOULDERS OF PUNJAB HARYANA BORDER TO MOONAK JAKHAL BUDHLADA BHIKHI FROM KM 236.600 TO 239.400 AND KM 244.750 TO KM 287.710 SECTION OF NH 148B FALLING IN THE STATE OF PUNJAB ON ENGINEERING PROCUREMENT AND CONSTRUCTION EPC MODE 14 29/03/2018 27/03/2018 08/05/2018
Time 17:0Hrs
194 Independent Engineer Services for Four laning of Tiruchirappalli (Km.000) to Kallagam (Km.38.700) Section of NH-227on Hybrid Annuity Mode under Bharatmala Pariyojana (Residual Projects under NHDP) in the State of Tamil Nadu. NHAI/11013/NHDP-IV/TN/TK/IE/2018 13/04/2018 26/03/2018 26/04/2018
Time 11:0Hrs
195 Independent Engineer Services for Two laning with Paved Shoulder of Meensurutti (Km. 98.433) to Chidambarm (Km.129.965.) Section of NH-227 on Hybrid Annuity Mode under Bharatmala Pariyojna Phase-I (Residual Projects under NHDP) in the State of Tamil Nadu. NHAI/11014/NHDP-IV/TN/MC/IE/2018 13/04/2018 26/03/2018 26/04/2018
Time 11:0Hrs
196 Independent Engineer Services for Four laning of Kallagam to Karuppur from km. 38.700 to km. 50.382 and two laning with paved shoulders from Karuppur to Meensurutti from km 50.382 to km 98.433 of NH-227 under Bharatmal Pariyojana (Residual Projects under NHDP Phase-IV) in the State of Tamil Nadu on Hybrid Annuity Mode NHAI/11015/NHDP-IV/TN/KM/IE/2018 13/04/2018 26/03/2018 26/04/2018
Time 11:0Hrs
197 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REHABILITATION AND UP GRADATION OF NH 544E FROM KM 0 00 TO KM 59 100 DESIGN CH 0 00 TO 56 803 KODIKONDA JUNCTION TO MADAKASIRA SECTION TO TWO LANE WITH PS ON EPC MODE IN THE STATE OF AP RO VJA NH O 2017 18 668 Corr Dt 23 03 2018 22/03/2018 23/03/2018 07/05/2018
Time 15:0Hrs
198 Independent Engineer services for 4 Laning of Belgaum – Khanapur Section (Km 0/000 – Km 30/800) (Design Chainage Km 0/000 to Km 30/000) of NH-4A in the State of Karnataka on Hybrid Annuity Mode NHAI/NHDP-III/IE/NH-4A/Bel-Khanapur/2018 / 115015 23/03/2018 23/03/2018 07/05/2018
Time 11:0Hrs
199 Independent Engineer Services for Four laning of Villupuram Km 0.000 to Puducherry Km 29.000 Section of NH 45A (New NH 332) in the State of Tamil Nadu under NHDP Phase IV on Hybrid Annuity Mode NHAI/GM(T)/IE/ Villu Pudu/TN/2018 09/04/2018 23/03/2018 03/05/2018
Time 11:0Hrs
-
200 Independent Engineer Services for Four laning of Puducherry Km 29.000 to Poondiyankuppam Km 67.000 section of NH45A (New NH332) in the State of Tamil Nadu under NHDP Phase IV on Hybrid Annuity Mode. NHAI/ Tech /TN/NH 332/ Pudu Poond/IE/2018 09/04/2018 23/03/2018 24/04/2018
Time 11:0Hrs
201 Independent Engineer services for Four laning of Poondiankuppam to Sattanathapuram (Design Ch Km 67.000 to Km 123.800) section of NH 45A in the State of Tamil Nadu on HAM Project under NHDP Phase IV NHAI/11012/PS/HAM/IE/6/2018 09/04/2018 23/03/2018 24/04/2018
Time 11:0Hrs
202 (i) Consultancy Services for Authority’s Engineer for Supervision of Construction of 2nd Flyover (LCW) in Kishanganj Town starting from km 472.300 to km 475.480 of NH-31 (Existing NH) (Total Length - 3.180 km) in the State of Bihar on EPC Mode. (ii) Consultancy Services for Supervision Consultant for Operation & Maintenance of Km 410.700 to Km 447.000 (EW-04 & EW-12 package) (Purnea – Dalkhola Section) of NH-31 in the State of Bihar. (iii) Supervision Consultancy Serv NHAI/BH/Kishanganj/NH-31/AE/2018 23/03/2018 22/03/2018 26/04/2018
Time 11:0Hrs
203 Appointment of Safety Consultants for the stretches under NHAI, PIU, Karaikudi NHAI/RO Madurai/RSA/2018/06 22/03/2018 22/03/2018 12/04/2018
Time 15:0Hrs
204 Appointment of Safety Consultants for the stretches under NHAI, PIU, Nagercoil and Dindigul NHAI/RO Madurai/RSA/2018/07 22/03/2018 22/03/2018 12/04/2018
Time 15:0Hrs
205 Supervision Consultant services for Four Lane NH Connectivity to ICTT Vallarpadam from Kalamassery Ch Km 0/000 to Vallarpadam Ch Km 17/121 Section on NH 966A Old NH 47 C in the State of Kerala (2nd call) RO Kerala/PIU-CHN/ICTT/SC/2017-18/05 20/04/2018 21/03/2018 04/05/2018
Time 17:0Hrs
206 Independent Engineer Services during Operation and Maintenance stage of 4 Laning of Walayar – Vadakkancherry from existing KM 182/250 to KM 240/000 (Design Length 54 Km) in the State of Kerala under NHDP-Phase-III executed on BOT (Toll) on DBFOT Basis(2nd call) RO KeralaPIU PKDKL-02IE2017-1802 20/04/2018 21/03/2018 04/05/2018
Time 17:0Hrs
207 Independent Engineer Services for O and M Period for two lane with paved shoulder of Khagaria-Purnea section from km 270.00 to km 410 of NH-31 in the State of Bihar constructed under NHDP-III on DBFOT (Annuity) 29/RO-PATNA/NHAI/2017-18 01/05/2018 19/03/2018 17/05/2018
Time 11:0Hrs
208 Consultancy Services for Authority s Engineer for Up gradation of newly declared NH-341 to two-lane with Paved shoulder configuration between Km. 65.478 to Km 162.209 Bhuj Airport Jn - Khavda - India Bridge to Dharmshala section in the State of Gujarat 08 of 2017-18 Gandhidham 28/03/2018 16/03/2018 30/04/2018
Time 15:0Hrs
209 Consultancy Services for Authoritys Engineer for Supervision of (i) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length (ii) Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis. (iii) Widening and Up-gradation to 2 lane with pave 2018/NHIDC/318569/1 15/03/2018 16/03/2018 01/05/2018
Time 15:0Hrs
210 Appointment of Safety Consultants for the stretches under NHAI, PIU, Madurai NHAI/RO Madurai/RSA/2018/01 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
211 Appointment of Safety Consultants for the stretches under NHAI, PIU, Madurai and Nagercoil NHAI/RO Madurai/RSA/2018/02 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
212 Appointment of Safety Consultants for the stretches under NHAI, PIU, Thanjavur NHAI/RO Madurai/RSA/2018/03 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
213 Appointment of Safety Consultants for the stretches under NHAI, PIU, Thanjavur and Trichy NHAI/RO Madurai/RSA/2018/04 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
214 Appointment of Safety Consultants for the stretches under NHAI, PIU, Trichy NHAI/RO Madurai/RSA/2018/05 16/03/2018 16/03/2018 03/04/2018
Time 15:0Hrs
215 Consultancy Services for Authority’s Engineer for supervision of the work “Six laning of Km 9.900 to Km 19.948 (Aramgarh section) of Hyderabad section of NH 44 under NH(O) in the state of Telangana SE(R&B)NH/Hyd/43/2017-18,dt26-02-2018 16/03/2018 16/03/2018 25/04/2018
Time 15:0Hrs
216 Consultancy services for Authority s Engineer for supervision of a Rehabilitation and Up gradation of the stretch from Ch From Km 113.900 to 154.479 b 157.707 to 187.723 C 187.723 to 234.434 of NH-167 in the state of Telangana SE(R&B)NH/Hyd/44/2017-18,dt26-02-2018 16/03/2018 16/03/2018 25/04/2018
Time 15:0Hrs
217 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of 8 Lane Dwarka expressway from Delhi-Haryana Border to Start of Rail Over Bridge, Gurugram (Chainage from km. 9.500 to km. 19.700) in the state of Haryana (NH-248 BB) – Package III” ON EPC mode. NHAI/Tech/DE/Package-III/AE/2018 19/03/2018 15/03/2018 15/05/2018
Time 11:0Hrs
218 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway (NH-248 BB) Package – IV from Rail Over Bridge (ROB) Till end point km 40 NH-8-SPR Intersection near kherki Dula of 8.76 km length, from km 19.700 to km 28.460 in the State of Haryana” ON EPC mode. NHAI/Tech/DE/Package-IV/AE/2018 21/03/2018 15/03/2018 15/05/2018
Time 11:0Hrs
219 Independent Engineer Services during Operation & Maintenance Period of Two lane with Paved Shoulder with Provision of Capacity Augmentation of Rajasthan Border – Fatehpur-Salasar Section of NH-65 in the State of Rajasthan on BOT basis under NHDP Phase-IV NHAI/12019/03/2018-ROJ/Tech./19 23/04/2018 15/03/2018 02/04/2018
Time 11:0Hrs
-
220 Independent Engineer Services during Operationn and Maintenance Period of Two lane with Paved Shoulder with Provision of Capacity Augmentation of Rajasthan Border Fatehpur-Salasar Sect ion of NH 65 in the State of Rajasthan on BOT basis under NHDP Phase IV NHAI/12019/03/ 2018-ROJ/Tech./ 25/04/2018 15/03/2018 17/05/2018
Time 11:0Hrs
221 Consultancy Services for Authoritys Engineer for Supervision of works for Rehabilitation and Upgradation Mihona to Daboh section and Daboh to U.P. Border section of NH 552 Ext. Two lane with paved shoulder in the state of Madhya Pradesh on EPC Mode 22047/MPRDC/NNH/AE/Pkg-IV/EPC/2017-18 22/03/2018 14/03/2018 09/04/2018
Time 17:30Hrs
222 Rehabilitation and upgradation to 2 lane with paved shoulder from existing km 195.175 to km. 220.00 (Design Chainage km. 71.300 to km. 95.947) excluding existing chainage 199.800 to km 201.900 (design chainage 76.400 to km 78.400) on Dharasu toYamunotri Road of NH-134 (old NH – 94) in the State of Uttarakhand on EPC Mode under improvement to NH Connectivity to Chardham in the State of Uttarakhand 12014/5/2017/Chardham/AE 10/04/2018 14/03/2018 04/06/2018
Time 17:0Hrs
223 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) Construction of 4 Lane NH-56 bypass connecting NH-2 (Rakhauna Village km 782.546 of NH-2) with NH-56 (Vajidpur Village km 271.300 of NH-56) as part of Varanasi Ring Road, Design Chainage km 0.000 to km 16.400 (total length 16.980 km including Interchange loop at NH-2) under NHDP Phase – VII, on EPC Mode (Phase II Package 1) & (ii) Construction of 4 Lane NH-29 Bypass, Phase-II connecting NH-29 (near Sandaha Village km 11.70 of N NHAI/Tech/VRR/ Package-1and2/AE/UP(T)/2018 19/03/2018 14/03/2018 01/05/2018
Time 11:0Hrs
224 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Balance work of Rehabiltation and Up-gradation Bametha-Satna section of NH-75 from KM 57/160 to Km.15/00(Design Length 97.840 Km. )to Two lane with paved shoulders in the state of Madhya Pradesh 21889/B-Satna/AE/EPC/2017-18 06/04/2018 12/03/2018 11/04/2018
Time 17:30Hrs
225 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WORKS Rehabilitation and Upgradation Rewa to Simour section of NH 135B and Pawai to Nagod of NH 943Ext. Total Length of 87.59 Km in the state of Madhya Pradesh on EPC Mode 21790/MPRDC/NNH/AE/Pkg-VI 22/03/2018 10/03/2018 05/04/2018
Time 17:30Hrs
226 Rehabilitation and Up-gradation Amanganj - Pawai section of NH-43 Ext. and Chandiaghat - Katni section of NH-43 Ext to Two lane with paved shoulder in the state of Madhya Pradesh on EPC Mode 21789/MPRDC/NNH/AE/Pkg-V/EPC/2017-18 12/03/2018 10/03/2018 05/04/2018
Time 17:30Hrs
227 (1) Strengthening & Widening to 2 lane with paved shoulder from Km 142.05 to 167.465 of NH-120 (Goh to Doudnagar) in the State of Bihar on EPC mode Under NH Division Gaya (2) Strengthening & Widening to 2 lane with paved shoulder from Km 0.000 to 10.800 of NH-219(Mohania-Bhabhua)intheStateofBiharonEPCmodeUnderNHDivisionAurgangabad&(3)ConstructionofRCCMinorBridgeinReplacementofExistingNarrowandOldDamagedBridgeinKm02/Km14/Km40&Km43ofNH-333intheStateofBiharonEPCModeUnderNHDivisionLakhisaraiAtMunger 11/NH-GAYA/2017-18 10/03/2018 09/03/2018 17/04/2018
Time 17:0Hrs
228 Independent Engineer Services for O&M Period for two lane with paved shoulder of Mokama-Munger section from km 1.430 to km 70.00 (length) approx. 68.570 km) of NH-80 in the State of Bihar constructed under NHDP-III on BOT (Annuity) 28/RO-PATNA/NHAI/2017-18 03/05/2018 07/03/2018 15/05/2018
Time 11:0Hrs
229 Independent Engineer for supervision of upgradation to 4 lane with paved shoulder of Bhimasar Junction of NH-41 to Anjar- Bhuj up to Airport Junction from km 0.000 to km 65.478 of NH-341 to be executed on Hybrid Annuity Mode in the state of Gujarat NHAI/Guj/Anjar-Bhuj/IE/2018 07/03/2018 06/03/2018 19/04/2018
Time 11:0Hrs
230 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND AUGMENTATION OF NEW NH-354 (OLD-SH-25) OF SECTION RAMDAS TO GURDASPUR FROM DESIGN CHAINAGE KM 140.000 (EXISTING KM 46.320 OF SH) TO DESIGN CHAINAGE KM 187.492 (EXISTING KM 3.185 OF SH) FOR LENGTH OF 47.492 KM INTO TWO WITH PAVED SHOULDER /FOUR-LANE UNDER BHARATMALA SCHEME IN THE STATE OF PUNJAB ON EPC MODE (PACKAGE-V) NHAI/31044/1/ 2018/PB/ PKG-V 16/03/2018 05/03/2018 04/04/2018
Time 11:0Hrs
231 Independent Engineer (IE) during Operation & Maintenance period on the basis of National Competitive Bidding for 4-Laning of Kagal - Satara Section of NH-48 (old NH-4) from Km 592.240 to Km 725.000 in the State of Maharashtra under NHDP Phase-I on BOT basis NHAI/RO/MUM/KLP/IE/K-S/2017-18/03-2 05/03/2018 05/03/2018 06/03/2018
Time 11:0Hrs
232 Consultancy Services for Authority’s Engineer for (i) Protection works at Nalupani Landslide Zone (Ex.km 123.080 to km. 123.480, km 123.665 to km 123.740 and km 123.770 to km 123.970) Section of NH-34 in the State of Uttarakhand on EPC basis. (ii) Construction of Road, Bridge and Slope Protection works of Landslide at Bareti (Ex. Km. 100.300 to km 101.600 of Section NH-34 in the State of Uttarakhand on EPC basis. NHIDCL/AE/Nalupani-Bareti/UK/2017 06/03/2018 05/03/2018 27/03/2018
Time 15:0Hrs
233 IE SERVICES DURING O AND M PERIOD FOR PALANPUR TO SWAROOPGANJ SECTION (KM. 340.00 TO KM. 264.00) OF NH-14 CONSTRUCTED ON BOT (ANNUITY) MODE UNDER NHDP PHASE-III IN THE STATE OF GUJARAT AND RAJASTHAN FOR 36 MONTHS 03/2018 01/03/2018 03/03/2018 12/03/2018
Time 17:0Hrs
234 Consultancy Services as Independent Engineer during Operation & Maintenance Period for the project Design, Construction, Development, Finance, Operation and Maintenance of Km. 463.600 (AP/Karnataka Border) to Km. 524.000 (Avathi Village) Covering 60.40 Kms. and improvement, Operation and Maintenance of Km. 524.000 (Avathi Village) to Km.534.72 (Devanahalli Village) on NH-7 in the State of Karnataka under North Corridor (NHDP Phase-II) on BOT (Annuity) basis (NS-2/BOT/KNT-1) 26/NHAI/RO-BNG/12016/TENDER/2018 DATED 02/03/2018 13/03/2018 02/03/2018 12/04/2018
Time 15:0Hrs
235 4/2 lane with Paved Shoulder from Tanot-Ramgarh-Bhadasar-Jaisalmer and NH from Bhadasar (Mokal)-Sarkaritala up to Pakistan Border under Phase-I of Bharatmala Pariyojana NHAI/19038/BM-5, 6(P-II) & 8/EPC/AE/2018/1/ 28/02/2018 01/03/2018 17/04/2018
Time 11:0Hrs
-
236 2-lane with Paved Shoulder of NH from Raisinghnagar- Pugal under Phase-I of Bharatmala Pariyojana (Package-2). NHAI/19038/BM-5, 6(P-II) & 8/EPC/AE/2018/1/RP/ 28/02/2018 01/03/2018 17/04/2018
Time 11:0Hrs
-
237 4/2-lane with Paved Shoulder from Gagaria-Baori Kalan-Serwa-Bakhasar section of NH-925 and Sata-Gandhav Section of NH 925A under Bharatmala Pariyojna NHAI/19038/BM-5, 6(P-II) & 8/EPC/AE/2018/1/GB 28/02/2018 01/03/2018 17/04/2018
Time 11:0Hrs
-
238 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and augmentation of New NH-354 (old-SH-21) of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 (existing km 65.477 of SH) to Design Chainage km 71.496 (existing km 16.351 of SH) for Length of 48.823 km into Two lane with paved shoulder /Four-Laning under Bharatmala scheme in the State of Punjab on EPC mode (Package-II) NHAI/31044/1/2018/PB/PKG-II 15/03/2018 01/03/2018 03/04/2018
Time 11:0Hrs
239 Independent Engineer services for Rehabilitation & Upgration of four lane to Six Laning of Chandikhole – Bhadrak (km. 62.000 to Km. 136.500) Section of NH-5 in the State of Odisha to be executed on Hybrid (Annuity) Mode. NHAI/NHDP-V/Tech/OR/2017/ChB/IE/113580 23/03/2018 28/02/2018 02/04/2018
Time 11:0Hrs
-
240 Independent Engineer services for Rehabilitation and Up-gradation of Six-laning of Bhadrak – Baleshwar section of NH-5 (New NH-16) from km. 136.500 to km. 199.141 in the State of Odisha to be executed on Hybrid Annuity Mode (HAM) Project under NHDP-Phase-V NHAI/NHDP-V/Tech/OR/2017/BB/IE/113587 26/03/2018 28/02/2018 02/04/2018
Time 11:0Hrs
241 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of Four/Six laning of NH 5 (New NH 16) from Puintola to Tangi (km. 284.000 to km. 355.000) (Pkg II) In the state of Odisha on EPC mode. NHAI/Odisha/EPC/PT/Pkg-II/AE/2018/113578 12/03/2018 28/02/2018 12/04/2018
Time 11:0Hrs
242 Consultancy service for Authoritys Engineer for supervision of Construction of Major Bridge at Km 180.865 across river Krishnaon NH 167 Hagari to Jadcherla section i the state of Karnataka on EPC mode EE/NHD/CTA/NH167/NIT/2017 18/1936 27/02/2018 27/02/2018 05/03/2018
Time 16:0Hrs
243 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of Six laning of Tangi to Bhubaneswar (km 355.0-km 414.0) section of NH 5 (New NH 16) Pkg III in the state of Odisha on EPC mode NHAI/Odisha/EPC/TB/Pkg-III/AE/2018/113430 12/03/2018 26/02/2018 10/04/2018
Time 11:0Hrs
244 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Construction of Dwarka expressway from Rail under Bridge (RuB) near Sector 21 Dwarka to Delhi Haryana Border (Km 5.300 to Km 9.500) –Package 2 in state of Delhi” ON EPC mode. NHAI/Tech/DE/Package- II/AE/2018 08/03/2018 26/02/2018 02/04/2018
Time 11:0Hrs
245 Consultancy Services for Authoritys Engineer for Supervision of Up-gradation of NH-130A from (design chainage 0.000 to 18.700 Km. And 25.900 to 38.000) (Bilaspur-Takhatpur-Mungeli-Pandariya-Pondi Package-I Section) to two lane with paved shoulders in the State of Chhattisgarh under Corridor Approach through Engineering Procurement & Construction (EPC) mode contract 15/CE/NH/TC/44-08/2017/287784 24/02/2018 25/02/2018 19/04/2018
Time 17:0Hrs
246 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation/Maintenance of newly entrusted Churachandpur-Singhat-Sinzawl Tuivai road section from (i) Km 0.00 to km 34.5 (ii) Km 34.5 to Km 103.1 and (iii) Km 103.1 to Km 161.48 on NH-102B and Churachandpur-Tipaimukh road from km 185.00 to Km 262.00 (Package-II) on EPC basis in the state of Manipur NHIDCL/AE/Manipur/C-T/2018 21/02/2018 21/02/2018 09/05/2018
Time 15:0Hrs
247 Consultancy Services for Authoritys Engineer for Supervision of 2 Laning with Paved Shoulder from Km 30/800 to Km 70/800 and 2 Laning without Paved Shoulder from Km 70/800 to Karnataka/Goa Border (km 84/120) of NH-4A in the State of Karnataka on EPC Mode NHAI/NHDP-III/AE/NH-4A/Bel-Khanapur/2018 20/02/2018 20/02/2018 26/02/2018
Time 11:0Hrs
-
248 Consultancy services for Authority’s Engineer for supervision of the work of Upgradation of NH-81 with a minimum of 2-Lane with paved shoulder configuration starting from km 19.205 to km 46.550 in the District of Malda, on EPC mode in the State of West Bengal under Annual Plan 2017-2018.(Job No. 081-WB-2017-18/421). 11/2017-18 of SE, National Highway Circle No. Ii 20/02/2018 20/02/2018 09/04/2018
Time 14:0Hrs
249 Consultancy Services for Authority’s Engineer for the work of Upgradation for NH-512 with a minimum of 2-Lane with paved shoulder configuration starting from Ch 82.4 km to 99.5 km and minimum of 4-Lane configuration from Ch 104.2 km to Ch 106.607 km on EPC mode in the State of West Bengal under Annual Plan 2017-2018, Job No. 51-WB-2017-18/422 12/2017-18 of SE, National Highway Circle No. II 20/02/2018 20/02/2018 09/04/2018
Time 14:0Hrs
250 Consultancy Services for Supervision of Short Term Improvement and routine maintenance contract of Kotwa-Mehsi-Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH-28 in the State of Bihar (2nd Call) 26/RO-PATNA/NHAI/2017-18 03/05/2018 20/02/2018 21/05/2018
Time 11:0Hrs
251 Independent Engineer Services during Operation & Maintenance stage of Four Lane divided carriageway facility constructed on BOT (Annuity) of Panagarh – Palsit – Dankuni section from Km.517.000 to Km.645.600 on NH-2 in the state of West Bengal 04/O&M/2017-18 (2nd Call) 16/02/2018 19/02/2018 20/03/2018
Time 15:0Hrs
252 CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION OF VIADUCT AND ITS APPROACHES TO ROB AT KM 426 OF NH-91 IN KANPUR CITY ON EPC MOD IN THE STATE OF UTTAR PRADSEH. 229M/13M-NHCK/17 dt. 13.02.2018 17/02/2018 17/02/2018 27/03/2018
Time 13:0Hrs
253 Consultancy Services of Supervision Consultant (SC) for Operation & Maintenance including Overlaying of NH – 5 (New No.NH-16) from Km 11/000 to Km 21/400 for a period of 12 Months in the State of Tamil Nadu NHAI/RO Chennai/SC/2018/01 – 2nd Call 17/02/2018 17/02/2018 01/03/2018
Time 15:0Hrs
254 CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION FROM KM 89.600 TO KM 133.520 (HARPALPUR-SUGIRA SECTION), ON EPC MODE IN THE STATE OF UTTAR PRADESH 230M/13M-NHCK/17 15/02/2018 17/02/2018 27/03/2018
Time 17:0Hrs
255 CONSULTANCY SERVICES OF AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION FROM KM. 133.520 TO KM 158.040 (KULPAHAR-MAHOBA SECTION), OF NH-76 & NH-86 (5.360 KM.) TO TWO LANE WITH PAVED SHOULDER ON EPC MODE IN THE STATE OF UTTAR PRADESH 230M / 13M-NHCK / 17 15/02/2018 17/02/2018 27/03/2018
Time 17:0Hrs
256 Consultancy services for Authority’s Engineer for supervision of the work of Upgradation of NH-81 with a minimum of 2-Lane with paved shoulder configuration starting from km 19.205 to km 46.550 in the District of Malda, on EPC mode in the State of West Bengal under Annual Plan 2017-2018, (Job No. 081-WB-2017-18/421) 11/2017-18 of SE, NHC II 15/02/2018 16/02/2018 19/02/2018
Time 14:0Hrs
257 Consultancy service for Authority’s Engineer for Development of NH - 147 (Old NH-8C) NH No 147) including 6-lanning with service road on either side in 4 packages (I) Km. 0.00 to 16.350 Package (II) km. 16.350 to 31.300 Package (III) Km. 31.300 to 35.480 Package (IV) Km. 35.480 to 44.040 in the state of Gujarat on EPC Mode. (Package No. I to IV) 01 of 2017-2018 16/02/2018 16/02/2018 20/03/2018
Time 15:0Hrs
258 Consultancy Services for Authoritys Engineer (AE) for the work of Providing paved shoulders including improvements to existing carriageway from km 0/0-56/0 of NH234 (New NH 75) (Mangalore-Villupuram road) on EPC mode in the State of Tamil Nadu India TN 13 HDO 0-56 NH234 16/02/2018 16/02/2018 09/04/2018
Time 11:0Hrs
259 Consultancy services for Authoritys engineer for supervision of civil construction works reconstruction with geometric improvement of single lane to 2 lane with paved shoulder configuration from existing km 163.000 to km 194.800 of NH -125 in the State of Uttarakhand on EPC Mode 581-12M-NH-2018 dt 12-02-2018 14/02/2018 14/02/2018 28/02/2018
Time 15:0Hrs
260 IE SERVICES DURING O AND M PERIOD FOR PALANPUR TO SWAROOPGANJ SECTION (KM. 340.00 TO KM. 264.00) OF NH-14 CONSTRUCTED ON BOT (ANNUITY) MODE UNDER NHDP PHASE-III IN THE STATE OF GUJARAT AND RAJASTHAN FOR 36 MONTHS 2018/NHAI/6508/1 12/02/2018 12/02/2018 27/02/2018
Time 15:0Hrs
261 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR UP GRADATION TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FOR THE SECTION (I) SHAHPUR -PATGAON SECTION I [DESIGN CH. KM 0.000-20.130] AND SECTION (II) SHAHPUR - PATGAON SECTION II DESIGN CH. KM 20.130- 48 783] OF NH-548A (PART SHAHAPUR-MURBAD-KARJAT-KHOPOLI) IN THE STATE OF MAHARASHTRA ON EPC MODE AE-2018/Mum/01 05/04/2018 12/02/2018 23/04/2018
Time 17:0Hrs
262 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR UP GRADATION TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FOR THE SECTION (I) PATGAON – KHOPOLI SECTION I DESIGN CH. KM 48.783 to 69.508 AND SECTION (II) PATGAON – KHOPOLI SECTION II DESIGN CH. KM 69.508 to 91.139 OF NH-548A (PART SHAHAPUR-MURBAD-KARJAT-KHOPOLI) IN THE STATE OF MAHARASHTRA ON EPC MODE AE-2018/Mum/02 05/04/2018 12/02/2018 23/04/2018
Time 17:0Hrs
263 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR UP GRADATION TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FOR THE SECTION OF PUNE/ RAIGAD DISTRICT BORDER TO MANGAON (Dist. Raigad) DESIGN CH. 69.000 TO 103.775 OF NH-753F (PART PUNE-PAUD-MULASHI-TAMHINI GHATMANGAON) IN THE STATE OF MAHARASHTRA ON EPC MODE AE-2018/Mum/03 05/04/2018 12/02/2018 23/04/2018
Time 17:0Hrs
264 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR UP GRADATION TO TWO LANE WITH PAVED SHOULDERS CONFIGURATION FOR THE SECTION OF RENAPUR TO ASTAMODE (Dist. Latur) DESIGN CH. 0.000 TO 24.030 OF NH-63 (PART OF RENAPUR -ASHTAMODE -UDGIR -DEGLUR-AADAMPUR PHATA KHATGAON -SGAROLI -BODHAN-NIZAMABAD) IN THE STATE OF MAHARASHTRA ON EPC MODE AE-2018/Abad/04 05/04/2018 12/02/2018 23/04/2018
Time 17:0Hrs
265 Consultancy service for Authoritys Engineer for the work ““Rehabilitation and up-gradation of Hyderabad outer ring road to Medak section of NH-765 D from existing Km 15.970 (Design Km. 0.0) to existing Km 78.700 (Design Km. 62.92) to Two Lane with paved shoulders / Four Lane in the state of Telangana on EPC basis contract RW/NH-12014/06/2017-TS/P7Dated 09.02.2018 10/02/2018 10/02/2018 02/04/2018
Time 15:0Hrs
266 Rehabilitation and up-gradation of NH-565 from existing km 361/330 (Dornala T Junction) to km 420/800 (Penchalakona Junction) to two lane with paved shoulder on EPC mode in the State of Andhra Pradesh RO/VJA/NHDPIV/2017-18/661/Corr 19/02/2018 08/02/2018 02/04/2018
Time 15:0Hrs
267 Consultancy services for Authoritys Engineer for Supervision of Four/Six Laning of Aurangabad (km.290.200) to Karodi Village End (km 320.104) road section of NH-211 (new NH No. 52) (Existing Length 29.904 km Design Length 30.215 km) in the state of Maharashtra under NHDP Phase IV-B on EPC Mode NHAI/Tech/MH/AE/Aur-Kar/2018 08/02/2018 08/02/2018 09/03/2018
Time 11:0Hrs
268 Consultancy services for Authoritys Engineer for Supervision of Four/Six Laning of Karodi (km 320.104) to Telwadi (km 375.000) road section of NH-211 (new NH No. 52) (Existing Length 54.896 km Design Length 55.610 km) in the state of Maharashtra under NHDP Phase IV-B on EPC Mode NHAI/Tech/MH/AE/Kar-Tel/2018 08/02/2018 08/02/2018 09/03/2018
Time 11:0Hrs
269 Independent Engineer Services during Operation and Maintenance stage of Four laned section of Km 4.200 to Km 122.420 Ahmedabad Godhra section of NH 47 Old NH 59 in the State of Gujarat on DBFOT Basis under NHDP Phase III 2018/NHAI/7294/1 13/03/2018 08/02/2018 04/04/2018
Time 11:0Hrs
270 CONSULTANCY SERVICES FOR AUTHORITY‟S ENGINEER FOR PACKAGE-1 UPGRADATION TO TWO LANE WITH PAVED SHOULDER FROM KUNDAL TO JHADOL (SECTION OF NH-58E) FROM CH. KM 0.000 TO KM 43.900 INCLUDING LEFT OUT PORTION IN THE STATE OF RAJASTHAN ON EPC MODE.PACKAGE-2 UPGRADATION TO TWO LANE WITH PAVED SHOULDER FROM JHADOL TO AMBHELLY (SECTION OF NH-58E) FROM CH. KM 43.900 TO KM 91.00 & CONSTRUCTION OF 4-LANE ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING NO.43 AT KM 13.00 ON MAVLI-CHITTORGARH ROAD OF 02/2017-18 20/02/2018 07/02/2018 10/04/2018
Time 11:0Hrs
271 Independent Engineer Services for Operation and Maintenance Stage of 4 laning of Indore Gujarat/MP Border on BOT (Toll) basis from Km. 9.500 to Km. 171.000 of NH59 on DBFOT in the State of Madhya Pradesh under NHDP Phase III NHAI/RO-MP/IND/IE/2018 12/02/2018 07/02/2018 04/04/2018
Time 15:0Hrs
272 Consultancy services for posting of AE for Rehabilitation and up gradation of 2 lane/ 2 lane with paved shoulder from existing km. 172.900 to km. 194.150 (Design Chainage km. 49.300 to Km. 70.300) on Dharasu to Yamunotri Road of NH- 134 (old NH-94) in the state of Uttarakhand through an Engineering, Procurement and Construction (EPC) Contract. 513/13yata-NH-10/2018 19/02/2018 06/02/2018 26/03/2018
Time 12:0Hrs
273 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Washim to Dastapur. (Ch.0.000 to Ch.29.074), section (ii) Dastapur to Karanja (Ch.29.074 to Ch.60.374 and Section (iii) Kherda to Nagzari (Ch.77.134 to Ch.106.374) of NH-166E in the state of Maharashtra. NH/MAH/MSRDC/AMT-1/AE/Pkg-6 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
274 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Khamgaon to Deulgaon Sakarsha (NH-548C from Existing Ch. 565.653 to Ch. 529.867) and section (ii) Deulgaon Sakarsha to Mehkar (NH-548C from Existing Ch.529.867 to Ch. 493.867) in the state of Maharashtra. NH/MAH/MSRDC/AMT-2/AE/Pkg-7 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
275 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Pune to Male Village (Shende Patilwada) NH-753F Ch.01.275 to Ch.31.400 and section (ii) Male Village (Shende Patil Wada) to Pune Raigarh District Border NH-753F Ch 31.400 to Ch.69.000 in the state of Maharashtra NH/MAH/MSRDC/MUM-1/AE/Pkg-8 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
276 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Sangola - Jath (Design Ch. Km. 0/000 to Km. 44/784) Ch. Km. 185/339 to Km. 230/123 of NH- 965G), section (ii) Karad-Vita section from (Design Ch. Km. 0/000 to Km. 47/000) of NH-166E and Section (iii) Vita - Nagaj Section (Design Ch. Km. 47/000 to Km. 94/261) of NH-166E in the state of Maharashtra. NH/MAH/PWD/PUNE-1/AE/Pkg-9 12/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
277 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Kusumba to Malegaon (Design Ch. Km 54.155 to Km. 95.500) of NH-160 H in the state of Maharashtra on EPC Mode. NH/MAH/PWD/PUNE-2/AE/Pkg-10 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
278 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Jalgaon – Pachora - Bhadgaon (Design Ch. Km 4.000 to Km. 56.200) Ch. Km 4.000 to Km. 56.200, section (ii) Bhadgaon - Chalisgaon (Design Ch. Km 56.200 to Km 103.000) Ch. Km 56.200 to Km 103.000 and Section (iii) Chalisgaon – Nandgaon (Design Ch. Km 103.00 to Km.146.000) Ch. Km 103.00 to Km.146.000 of NH-753J in the state of Maharashtra. NH/MAH/PWD/PUNE-3/AE/Pkg-11 12/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
279 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Jalgaon Jamod- Nandura NH/MAH/PWD/NGP-1/AE/Pkg-14 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
280 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane Manglurpir - Mahan (Design Ch. Km. 75/000 to 107/500) (Ch. Km. 97/074 to 64/574) section of NH-161A in the state of Maharashtra on EPC Mode. NH/MAH/PWD/NGP-2/AE/Pkg-15 12/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
281 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Malegaon to Risod (Design Ch. Km. 0/000 to 44/200) (ii) Risod to Hingoli (Design Ch. Km. 44/200 to 97/450)section of NH-461B in the state of Maharashtra on EPC Mode. NH/MAH/PWD/NGP-3/AE/Pkg-16 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
282 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Wardha - Hinganghat (Design Ch. Km 0/000 to Km. 36/850) Ch. Km.132/541 of (NH-347A) (ii) Seldoh to Pavnar (Design Ch. Km 39/200 to Km. 88/540) of NH-353I in the state of Maharashtra on EPC Mode. NH/MAH/PWD/NGP-5/AE/Pkg-18 13/02/2018 06/02/2018 18/04/2018
Time 15:0Hrs
283 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Salaikhurd - Tirora (Design Ch. Km. 44/000 to 87/000) (Ch. Km. 117/200 to 74/200) (ii) Mansar - Ramtek - Salaikhurd section of NH-753 from existing km 75.80 to 120.100 (Design Ch. From km 0.00 to 44.00) section of NH-753 in the state of Maharashtra on EPC Mode. NH/MAH/PWD/NGP-6/AE/Pkg-19 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
284 Consultancy Services For Authority’s Engineer For Up gradation to Four lane with paved shoulders configuration for the work Chikali - Takarkhed [Design Chainage - 68.900- 108.500] of NH-753A in the State of Maharashtra on EPC mode. NH/MAH/PWD/NGP-7/AE/Pkg-20 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
285 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Shivur- Yeola (Design Ch. 44/900 to 74/000) from Km. 66/900 to 96/000) (ii) Phulambri - Khultabad (Design Ch. Km. 51.700 to Km. 78.268) section of NH-752H in the state of Maharashtra on EPC Mode. NH/MAH/PWD/AUR-1/AE/Pkg-21 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
286 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Dhad - Bhokardan (Design Ch. Km. 28/000 to 67/600) of NH-753M) &Bhokardhan - Sillod (Design Ch. Km. 12/500 to 0/000) of NH-753F) and (ii) Chikali - Dhad (Design Ch. Km. 0/000 to 28/000) ofNH-753M) in the state of Maharashtra on EPC Mode. PWD/AUR-2/AE/Pkg-22 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
287 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Wadigodri - Dhangripimpri and (ii) Dhangripimpri to Jalna and Ambad Chowk to Mantha Chowk section of NH-753H in the state of Maharashtra on EPC Mode. NH/MAH/PWD/AUR-3/AE/Pkg-23 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
288 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Omerga to Ausa (Design Ch. 0/00 to 47/800) From Km. 249/200 to 201/400 of NH- 548B, section (ii) Pangaon to Dharmapuri (Design Ch. Km. 106.200 to 118.850) Ch. Km. 38/200 to 25/550 of NH- 561H and Parali to Injegaon (Design Ch. Km. 144.400 to 156.500) From Km. 95/800 to 83/700 of NH-548B and Section (iii) Latur to Pangaon (Design Ch. Km. 64/250 to 10 NH/MAH/PWD/AUR-4/AE/Pkg-24 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
289 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Parbhani to Gangkhed (Design Ch. Km. 0/000 to Km 35/885) (Km 46/620 - 82/505 of NH-752K) in the state of Maharashtra on EPC Mode. NH/MAH/PWD/AUR-5/AE/Pkg-25 13/02/2018 06/02/2018 25/04/2018
Time 17:0Hrs
290 Consultancy Services For Authority’s Engineer For Up gradation to two lane with paved shoulders configuration for the work Kothari - Dhanora Junction at NH 361 (Design Ch. Km. 90/000 to Km. 147/650) (Ch. 198/074 to 255/724 of NH- 161A ) in the State of Maharashtra on EPC mode. NH/MAH/PWD/AUR-6/AE/Pkg-26 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
291 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane (i) Mahad - Raigad Fort, Hirkaniwadi Connector & Jijaumata Samadhi Connector (a) (Design Ch Km 0/000 to Km 23/446) (b) (Design Ch Km 0/000 to Km 0/950) (c) (Design Ch Km 0/000 to Km 1/213) and (ii) Pacharal - Mandangarh with Ambadave connector (Birth place of Dr Bhimrao Ambedkar) of NH-965DD in the state of Maharashtra on EPC Mode. NH/MAH/PWD/MUM-1/AE/Pkg-27 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
292 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Chiplun - Helwak (Design Ch. Km. 26/400 to 40/000 & 53/600 to 85/000) Ch. 26/400 to 40/000 & 53/600 to 85/000) of NH-166E in the State of Maharashtra on EPC mode. NH/MAH/PWD/Pune-6/AE/Pkg-28 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
293 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Naldurg - Akkalkot of NH-652 in the State of Maharashtra on EPC mode. NH/MAH/PWD/Pune-7/AE/Pkg-29 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
294 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Rahuri - Sonai – Shani Shinganapur (Design Ch. Km. 0/000 to 26/143) of NH-160 C in the State of Maharashtra on EPC mode. NH/MAH/PWD/Pune-8/AE/Pkg-30 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
295 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Kharwandi - Rajuri [Design ch. Km 0/000 to 36/500] of NH-361F in the State of Maharashtra on EPC mode. NH/MAH/PWD/Aur-7/AE/Pkg-32 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
296 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Nanded (NH - 161) Usmannagar - Kandhar - Jam - Jalkot (Jalkot - Togari section) (Design Ch. Km. 65/952 to 110/124) of NH-50 in the State of Maharashtra on EPC mode. NH/MAH/PWD/Aur-8/AE/Pkg-33 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
297 Consultancy Services For Authority’s Engineer For Up gradation to Two lane with paved shoulders configuration for the work Pen - Khopli - Mahad (Ashtavinayaka) Road of NH-166D in the State of Maharashtra on EPC mode. NH/MAH/PWD/Mum-2/AE/Pkg-34 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
298 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Talegaon - Gonapur (Design Ch. Km. 0/000 to 60/703) (Ch. Km.0/000 to 60/703 of NH-347A), section (ii) Arvi - Talegaon (Design Ch. Km. 59/900 to 73/600) (Ch. Km. 60/703 to 74/403 of NH-347A) and Section (iii) Wardha - Arvi (Design Ch. Km 00/000 to Km 53/708) of NH-647 in the state of Maharashtra. NH/MAH/PWD/NGP-4/AE/Pkg-17 13/02/2018 06/02/2018 18/04/2018
Time 17:0Hrs
299 Consultancy services for Authoritys Engineer for supervision of the works Construction of proposed ROB at Memari and ROB at Jougram-Masagram in the district of Burdwan and Construction of proposed ROB at Simlagarh in the district of Hooghly, All in the State of West Bengal. WBPW(R)D/RFP NO-08 of SE/WHC-I/2017-2018 19/01/2018 06/02/2018 19/02/2018
Time 14:0Hrs
300 Construction of Kund Bypass from Existing Km 33.130 to Km 41.260 (existing length 8.130 km) design chainage km 35.130 to km 47.700(design length 12.570 km) on NH-109 (New No. 107) in the State of Uttarakhand under EPC Mode under improvement to NH Connectivity to Chardham 513/13yata-NH-10/2018 dated 06.02.18 28/02/2018 06/02/2018 09/04/2018
Time 17:0Hrs
301 AppointmentofIEduringOandMperiodfor4/6laningofRohtak-HisarsectionofNH-10fromKm. 87.000 toKm.170.000 includingconnectinglinkfromKm. 87.000 (NH-10) to Km. 348.000 (NH-71) in the statesofHaryana -2ndcallofRFP NHAI/RO/CHD/11011/PD-RTK-HTK-HSR/NH-10/IE/RFP 26/02/2018 02/02/2018 05/03/2018
Time 11:0Hrs
302 Consultancy services for Authority’s Engineer for supervision of the works Proposed Bridge over river Ajay, Construction, near Shibpur at Ch. 17.84 km of Muchipara-Shibpur road (district of PaschimBurdwan) connecting Jaydev-Kenduli-Khagra road at Ch. 1.05 km (district of Birbhum) under Asansol Highway Division, Public Works (Roads) Directorate, West Bengal. WBPW(R)D/RFP NO-07 of SE/WHC-I/2017-2018 19/01/2018 02/02/2018 16/02/2018
Time 14:0Hrs
303 Consultancy services for Authority’s Engineer for supervision of Rehabilitation and up-gradation of existing 2-lane to four lane standards from Talchar to End of Kamakhyanagar Bypass Section of (Km. 8.844 – Km. 15.725) of NH 23 (New NH – 149) and (Km. 301.875 – Km. 335.946) of NH 200 (New NH 53) in the State of Odisha Under NHDP Phase – III on EPC Mode (Pkg-I). NHAI/EPC/11012/TKB/2017AE/Pkg-I./112364 12/02/2018 02/02/2018 12/03/2018
Time 11:0Hrs
-
304 Consultancy services for Authority’s Engineer for supervision of Rehabilitation and Up gradation of existing 2-lane to 4-lane standards from Duburi to Chandikhole Section of NH 200 (New NH 53) from km. 388.376 to km 428.074 in the State of Odisha Under NHDP Phase - III on EPC Mode (Pkg- III). NHAI/EPC/11012/TKB/2017AE/Pkg-III/112371 12/02/2018 02/02/2018 12/03/2018
Time 11:0Hrs
305 Rehabilitation and Up gradation of existing 2-lane to 4-lane standards to End of Kamakhyanagar Bypass – Duburi Section (km 335.946 – km 388.382) of NH-200 (New NH 53) in the State of Odisha Under NHDP Phase – III on EPC Mode (Pkg-II) NHAI/EPC/11012/TKB/2017/AE/Pkg-2/112370 12/02/2018 02/02/2018 12/03/2018
Time 11:0Hrs
306 Consultancy Services for Supervision Consultant during Operation and Maintenance stage of Six lane of Km. 192.00 to Km 198.00 between Vadodara – Surat section of NH-48 (Old NH-8) including four lane Extra Dose Bridge across river Narmada (Total length 6.745 Km) and Old Narmada Bridges Constructed in the year 1977 and in the year 2000 on river Narmada in the state of Gujarat NHAI/PIU Surat (Expressway)/72/2018 02/02/2018 01/02/2018 20/03/2018
Time 11:0Hrs
307 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Development of newly declared NH-527C from Majhauli to Charout Section to 2 lane with paved shoulder National Highway Standard in the State of Bihar on Engineering Procurement & Construction (EPC) basis (Km 0.0 to Km 63.655) NHAI/BH/Majh-Char/AE/2018 06/02/2018 31/01/2018 03/04/2018
Time 11:0Hrs
308 Consultancy services for authoritys Engineer for supervision of Strengthening of existing two lane pavement including paved shoulders on NH-39 new NH02 Mao Imphal section SH - Mao Senapati and Senapati - Koubru Leikha section from Km 212/325 to Km 260/00 and 260/00 to 287/00 respectively) on EPC mode (3rd call) RW/GHT/MN/DP(O)/2016-17/18&19/AE 30/01/2018 30/01/2018 28/02/2018
Time 15:0Hrs
309 Consultancy services for Authority’s Engineer supervision of Civil Construction work for Rehabilitation and upgradation of NH42 from Km 76/0 to 102/130 (Design Chainage 76/00 to 99/971 excluding Km 77/3 to 78/350 ( Rapthadu – Bathapalli Section) to four lane in the state of Andhra Pradesh under corridor approach through EPC basis contract under NH(O) SE NH ATP NIT NO 55 31/01/2018 30/01/2018 28/03/2018
Time 15:0Hrs
310 Consultancy services for Authority’s Engineer supervision of Civil Construction work for Rehabilitation and upgradation of new NH-544DD (Old SH-30) from design Chainage Km 0.000 to 56.000 (Ex. Km 0.460 to Ex. Km 58.344) of Ananthapuramu–Kalyandurg section to two lane with paved shoulders in the State of Andhra Pradesh under NH(O) on EPC mode SE NH ATP NIT No 56 31/01/2018 30/01/2018 27/03/2018
Time 15:0Hrs
311 Consultancy services for Authority’s Engineer supervision of Civil Construction work for Rehabilitation and upgradation of new NH-544DD from design Chainage Km 56.00 to 102.20 of Kalyandurg-Molakalmuru section to two lane with paved shoulders in the State of Andhra Pradesh under NH(O) on EPC mode SE NH ATP NIT No 57 31/01/2018 30/01/2018 27/03/2018
Time 15:0Hrs
312 Consultancy services for Authority Engineer for Supervision of “Construction of Integrated Structures along with Development of other allied structures on both sides of Chandani Chowk Junction (Ch. 842.580) of NH-4 in Pune city in the state of Maharashtra on EPC mode NHAI/Chandni Chowk/AE/Mah/2017 12/02/2018 29/01/2018 26/04/2018
Time 11:0Hrs
313 Consultancy services for Authority’s Engineer for Supervision of Construction of proposed Srinagar bypass from Km 0.000 (Galander) to Km 42.100 (Crossing of Sumbel Road) in Srinagar in the State of J&K on EPC Basis NHAI/12011/Srinagar Bypass/EPC/AE/2018 23/02/2018 29/01/2018 07/03/2018
Time 11:0Hrs
314 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR WIDENING, STRENGTHENING AND RECONSTRUCTION OF SAWAI MADHOPUR TO SHEOPUR FROM KM 76/600 TO KM 112/000 SECTION OF NH-552 EXTN. IN THE STATE OF RAJASTHAN ON EPC MODE. (JOB NO. NH-552 EXT./RJ/2017-18/700) NIT NO. 07/2017-18 EE NH 25/01/2018 25/01/2018 25/02/2018
Time 18:0Hrs
315 Appointment of Independent Engineer Services during Operation & Maintenance stage of four laning of Kaithal Rajasthan Border section of NH-152/65 from KM. 33.250 (Design Km. 0.500) to km. 241.580 (Design Km 165.759) in the States of Haryana under NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate & Transfer(“DBFOT”) Toll Basis- RFP NHAI/RO/CHD/11011/PD-Hisar/KAT-RAJ-BDR/IE/RFP 25/01/2018 24/01/2018 12/03/2018
Time 11:0Hrs
316 Independent Engineer for supervision of widening of Pipli – Bhavnagar- Section Package 1 from km 136/025 to 169/328 (Design Chainage km 136/000 to km 169/308) Near Adhelai Village to Nari Junction to four laning from existing 10-Meter-wide in the State of Gujarat on Hybrid Annuity Mode NHAI/Guj/IE/Nari-Pipli/2018 05/03/2018 24/01/2018 12/03/2018
Time 11:0Hrs
317 Independent Engineer services for Operation and Maintenance for Four Laning of Orissa Border-Aurang section from Km. 88.000 to Km. 293.000 of NH-6 (New NH-53) in the State of Chhattisgarh executed as BOT (Toll) on DBFOT pattern under NHDP Phase-IV 11052/RO-Raipur/Tender/04 14/03/2018 24/01/2018 11/06/2018
Time 14:30Hrs
318 Independent Engineer services for Operation and Maintenance of Four Laning of Durg bypass from Km. 308.600 to Km. 323.600 of NH-6 New-53 in the State of Chhattisgarh executed as BOT Toll on DBFOT pattern under NHDP Phase-IV 11052/RO-Raipur/Tender/05 15/03/2018 24/01/2018 25/04/2018
Time 15:0Hrs
319 Independent Engineer services for Operation and Maintenance of Four Laning of Durg-bypass from km.308.600 to km.323.600 of NH-6 (New-53) and Aurang-Raipur from km.239.00 to km.282.00 of NH-6 (New-53) in the State of Chhattisgarh executed as BOT Toll on DBFOT pattern under NHDP Phase-IV 11052/RO-Raipur/Tender/06 15/03/2018 24/01/2018 11/06/2018
Time 14:30Hrs
320 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF THE WORK FOR Widening to Two Lane with Paved Shoulders from Km 0/970 to Km 40/410 of Jangaon – Thirumalgiri Section (erstwhile section of SH-16) of NH-365B on EPC mode under NH(O) in the State of Telangana NIT No. SE (R&B) NH/KMNR/37/2016-17 19-10-2016 23/01/2018 23/01/2018 15/02/2018
Time 15:0Hrs
321 Consultancy for Authority Engineer services Construction of 2 Lane ROB and its approaches in lies of existing level crossing (LC No. C 61) at Nagaur City (Bikaner Phatak) km 165.550 on NH 89. (Job No. NH 89/RJ (3)/16-17/003-S and R(B). and Construction of 2 Lane ROB and its approaches in lies of existing level crossing (LC No. C 64) at Nagaur City (Manasar Phatak) at Km 172/990 on NH 65(Job No. NH 65/RJ /2017 18/703) in the State of Rajasthan on EPC Mode. NIT no 04 of 2017-18 SE NH Bikaner 22/01/2018 19/01/2018 05/03/2018
Time 18:0Hrs
322 Consultancy for Authority Engineer services for the work of (i) Construction of Proposed 2- Lane ROB and its approaches in lieu of existing level crossing No. A-142 at Km 1.00 on NH-709 Extn. Near Sadulpur Railway Station in District Churu in the State of Rajasthan.(Job No. NH-709 Extn,/RJ(5)/17-S&R(B)-005) &(ii). Construction of two lane flexible pavement with paved shoulder from km 3.650 to km 58.325 of NH-709 Extn. (Rajgarh-Haryana Border) in the State of Rajasthan ON EPC under NH(O) during 04/2017-18 15/01/2018 19/01/2018 05/03/2018
Time 18:0Hrs
323 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Upgradation of Allahabad-Mirzapur section (km 450.000 to 486.775) of NH 76E/35 to two lane with paved shoulder under EPC Mode in the State of Uttar Pradesh. 2403/107COM B-18/17 DT 06/10/2017 18/01/2018 18/01/2018 05/02/2018
Time 15:0Hrs
324 Independent Engineer services for Four laning of Tumkur-Shivamogga section from (i) km 12/310 (Design km 12/300) to Km 66/540 (Design Km 65/195) from Mallasandra to Karadi village (Pkg-I) (ii) Km 66/540 (Design Ch. 65/195) (Karadi) to Km 119/790 (Design Ch. 121/900) (Banwara) (Pkg –II) (iii) Km 119/790 (Design Km 121/900) to Km 166/100 (Design Km 170/415) from Banavara town to Bettadahalli village (Pkg –III) of NH-206 on Hybrid Annuity Mode under NHDP Phase – IV in the State of Karnataka NHAI/Tumkur-Shimoga-Honnavar/KNT/2018 18/01/2018 18/01/2018 16/04/2018
Time 11:0Hrs
-
325 Independent Engineer service for Development, Operation and maintenance of Chittorgarh- Neemuch (MP Border) NH-79 Section (PWD Km. 183.000 to Km. 221.400) & Nimbahera- Partapgarh NH-113 Section (Km. 5.400 to Km. 80.000) In The State of Rajasthan Through Public Private Partnership (PPP) on Design, Built, Finance, Operate and Transfer (the “DBFOT”) Basis. SE NH PWD CIRCLE KOTA NITNO1-2017-18 17/01/2018 17/01/2018 27/01/2018
Time 11:0Hrs
326 Consultancy Services for Supervision Consultant (SC) of Operation & Maintenance of 4 laning of Madurai – Tirunelveli – Panagudi – Kanniyakumari Section from Km 0/000 to Km 243/170 of NH-7 (New NH.44) including construction of Bridge at Narikulam Tank Portion at km 230/700 to Km 231/250 and Improvement of Approach Road to ROB at Km 0/600 at Samayanallur of NH-7(New NH.44) and Operation & Maintenance of Tuticorin – Tirunelveli Section from Km 0/000 to km 47/250 of NH-7A (New NH.138) in the State RO Madurai/SC/O&M/2017/Package-I (2ND Call) 17/01/2018 13/01/2018 15/02/2018
Time 12:0Hrs
327 Consultancy services for Authoritys Engineer for Supervission of Rehabilitation and Upgradation Biaora Maksudangarh and Maksudangarh Sironjsection of NH 752B from Km3.150 to to Km.92.640 to Two lane with paved shoulder in the state of MP on EPC Mode CE-RO/BPL/NIT/09/AE/2017-18 09/02/2018 13/01/2018 05/03/2018
Time 17:30Hrs
328 Consultancy services for Authority Engineer for Supervision of Rehabilitation and Up-gradation Khilchipur Jirapur section of NH 752B, Shujalpur Ashta section of NH 752C and Pachore Shujalpur section of NH 752C length 88.21 Km to Two lane in the MP CE-RO/BPL/NIT/10/AE/2017-18 09/02/2018 13/01/2018 05/03/2018
Time 17:30Hrs
329 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of existing 2-lane to four laning of Koida (Km 206.200) to Rajamunda (Km 259.453) section of NH-215 (New NH-520) in the state of Odisha (the “Project”) through an Engineering, Procurement and Construction (the “EPC”) Contract under NHDP Phase III, Package II NHAI/NHDP-III/EPC/Odisha/KR/AE/2018/111351 23/01/2018 12/01/2018 13/02/2018
Time 11:30Hrs
-
330 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION OF CUTTACK ANGUL SECTION OF NH -42 (NEW NH 55) TO 4-LANING FROM KM. 60.200 TO KM. 112.000) IN THE STATE OF ODISHA UNDER NHDP-III ON EPC MODE (PKG -I1) NHAI/NHDP-IV/OR/2017/CA/AE/Pkg-II/111275 23/01/2018 11/01/2018 13/02/2018
Time 11:30Hrs
331 Authority Engineer services for Rehabilitation and Upgrading of Cuttack-Angul Section of NH-42 (New NH-55) to 4-Lane from km 0.400 to km. 60.200 in the State of Odisha under NDHP Phase III on EPC Mode (Pkg.-I) NHAI/NHDP-IV/OR/2017/CA/AE/Pkg-I/111237 23/01/2018 11/01/2018 13/02/2018
Time 11:30Hrs
-
332 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of existing 2-lane to 4-lane standards of Rimuli – Koida Section km 163.00 to km 206.200 of NH-215 (New NH-520) in the state of Odisha under NHDP Phase-III on EPC mode Package –I NHAI/EPC /11012/71/2017/RK-PK1/AE 23/01/2018 11/01/2018 13/02/2018
Time 11:30Hrs
333 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and up-gradation of existing 2-lane to 4-lane standards of Rimuli – Koida Section km 163.00 to km 206.200 of NH-215 (New NH-520) in the state of Odisha under NHDP Phase-III on EPC mode Package –I NHAI/EPC /11012/71/2017/RK-PK1/AE/111236 12/01/2018 11/01/2018 13/02/2018
Time 11:30Hrs
334 Consultancy Services as Independent Engineer during Operation & Maintenance for Six laning of Tumkur-Chitradurga (excluding Tumkur & Chitradurga bypasses) Section from Km.75.00 to Km.189.00 of NH-4 (114.00 Km.) in the State of Karnataka on DBFOT Pattern under NHDP Phase V 25/ NHAI/RO-BNG/13019/Tender/2018 Dated 11.01.2018 12/01/2018 11/01/2018 22/02/2018
Time 15:0Hrs
335 Appointment of Independent Engineer Services during Operation Maintenance stage of 4 laned Pathankot Amritsar Section of NH-15 from Km. 6.82 to Km. 108.502 in the State of Punjab-RFP PDJAL/NH-15/PAT ASR/IE/RFP 19/01/2018 10/01/2018 23/02/2018
Time 11:0Hrs
336 Consultancy services for Authority’s Engineer for supervision of the works Proposed Bridge over river Ajay, Construction, near Shibpur at Ch. 17.84 km of Muchipara-Shibpur road (district of PaschimBurdwan) connecting Jaydev-Kenduli-Khagra road at Ch. 1.05 km (district of Birbhum) under Asansol Highway Division, Public Works (Roads) Directorate, West Bengal. WBPW(R)D/RFP NO-05 of SE/WHC-I/2017-2018 20/12/2017 05/01/2018 15/01/2018
Time 14:0Hrs
337 Consultancy services for Authority engineer for supervision of Construction of High Level Thapra Bridge on Chordi Choraha-Kuba-Ananduri Road (MDR-83) in Km. 22 of Banswara District in the state of Rajasthan Under ISC on EPC Mode NIT 07/2017-18 PWD Dn Garhi Distt Banswara 04/01/2018 04/01/2018 22/01/2018
Time 11:0Hrs
338 Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance including the ongoing Contracts for completion of balance works on this stretch, work of Rehabilitation of Old Ganga Bridge, work of Construction of Madhya Ganga Canal on Hapur- Garhmukteshwar-Moradabad Section of NH-09 (Old NH-24) from Km 49.00 to Km 149.250 in the State of Uttar Pradesh NHAI/RO-W-UP/PIU-MBD/NH-09(24)/2017-18/02 02/01/2018 01/01/2018 15/01/2018
Time 11:0Hrs
339 Independent Engineer Services during Operation and Maintenance stage of Six lanned section of Surat-Dahisar from Km 263.000 to Km 502.000 of NH-48 (old NH-8) in the state of Gujarat and Maharashtra on Build Operate and Transfer (BOT) Toll basis on DBFO basis under NHDP Phase – V NHAI/PIU Surat (Expressway)/SDM-10/2017 25/01/2018 30/12/2017 07/02/2018
Time 11:0Hrs
340 Independent Engineer Services during Operation and Maintenance stage of Six lanned section of Km 108.700 to Km 192.000 Vadodara to Bharuch section of NH-48 (old NH-8) on BOT (Toll) basis in the state of Gujarat under Phase V NHAI/PIU Surat (Expressway)/10-E/2017 25/01/2018 30/12/2017 31/01/2018
Time 11:0Hrs
341 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 2 2017-NHAI-5582-1 12/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
342 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 3 2017-NHAI-5582-1 PKG-3 12/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
343 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 4 2017-NHAI-5582-1 PKG-4 12/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
344 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 5 2017-NHAI-5582-1PKG-5 12/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
345 Independent Engineer Services for National Highways stretches under Bundle-1 of Tolling, Operation, Maintenance & Transfer (TOT) Projects in the states of Andhra Pradesh & Gujrat-Package 1 2017-NHAI-5582-1 11/01/2018 29/12/2017 26/02/2018
Time 11:0Hrs
346 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Pfutsero- Phek Road from (i) Design km 0.000 to km 20.000 (Existing km 0.000 to km 19.900) (ii) Design km 20.000 to km 40.000 (Existing km 19.900 to km 40.090) (iii) Design km 40.000 to km 62.558 (Existing km 40.090 to km 65.300)” in the state of Nagaland under SARDP-NE on EPC Mode. NHIDCL/Nagaland/Pfutsero-Phek (0 to 62.558)/AE/2017 12/01/2018 28/12/2017 24/04/2018
Time 16:30Hrs
347 Appointment of Independent Engineer Services during operation & maintenance stage of four laned Amritsar to Wagha border section of NH-1 from km. 456.100 to km. 492.030 in the state of Punjab on BOT (Annuity) basis- RFP. NHAI/RO/CHD/11011/PD-JAL/NH-1/ASR-WSA/IE/RFP 05/01/2018 28/12/2017 19/02/2018
Time 11:0Hrs
-
348 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000 (Existing Km 25.760 to Km 52.370) (iii) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (iv) Design Km 75.000 to Km 95.000 (Existing Km 79.040 to Km 100.345) (v) Design Km 95.000 to Km 115.534 (Existing Km 100.345 to Km 122.250)” in the state of Nagaland NHIDCL/Nagaland/ Chakabama-Zunheboto (0 to 115.534)/AE/2017 12/01/2018 28/12/2017 08/05/2018
Time 16:0Hrs
349 Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Merangkong-Tamlu-Mon Road from (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (ii) Design Km 20.000 to Km 40.000 (Existing Km 20.456 to Km 41.065) (iii) Design Km 40.000 to Km 59.000 (Existing Km 41.065 to Km 60.345) (iv) Design Km 59.000 to Km 86.835 (Existing Km 60.345 to Km 98.065)” in the state of Nagaland under SARDP-NE on EPC Mode. NHIDCL/Nagaland/ Merangkong-Tamlu-Mon (0 to 86.835)/AE/2017 12/01/2018 28/12/2017 17/04/2018
Time 15:30Hrs
350 Consultancy services for Authority’s Engineer for supervision of Rehabilitation and Upgradation of NH-544D from Bugga (Existing Km 74.45/Design Km 69.00) to Kaipa (Existing Km 134.28 /Design Km 126.40) to two lane with paved shoulders (Design length = 57.40 Km) in the State of Andhra Pradesh under Bharatmala Pariyojna on EPC Mode NHAI/Tech/AP/NH-544D/Bug-Kap/Pkg-III/AE/17-18 03/01/2018 26/12/2017 23/10/2018
Time 11:0Hrs
351 Consultancy services for Authority’s Engineer for supervision of four laning of NH-161 from Kandi (Design Km 0.000) (Km 498.250 of NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757) (Design Length = 39.980 Km) in the State of Telangana under Bharatmala Pariyojna on EPC Mode NHAI/Tech/AP/NH-161/San-Nan/Pkg-I/AE/17-18 03/01/2018 26/12/2017 12/02/2018
Time 11:0Hrs
352 Consultancy services for Authority engineer for supervision of construction of 4-laning from Itnagar to Banderdewa (pkg A from 29.500km to 40.40km) in the state of Arunachal Pradesh on EPC mode. CEAP(HW)WZ/W-24/IB/AE/2017-18 26/12/2017 26/12/2017 30/01/2018
Time 15:0Hrs
353 Independent Engineer Services during Operation and Maintenance stage of Six/ Four lanning of Km 198.00 to Km 263.00 Bharuch - Surat section of NH-48 (old NH-8) in Gujarat on Build Operate and Transfer (BOT) basis Project Package II under Phase - V NHAI/PIU Surat (Expressway)/10-F/2017 25/01/2018 23/12/2017 31/01/2018
Time 11:0Hrs
354 Widening to Two Lane with Paved Shoulders from Km 40/410 to km 84/037 of Thirumalagiri to Suryapet section of NH-365B (Erstwhile SH16) in the State of Telangana on EPC mode under NH(O) Annual Plan 2016-17 SE(R&B)NH/HYD/32/2017-18, Dt. 16.12.2017(2nd Call) 21/12/2017 21/12/2017 04/01/2018
Time 15:0Hrs
355 Consultancy Services as Independent Engineer during Operation & Maintenance of Bengaluru-Hoskote-Mulbagal section from Km.237.700 to Km.318.000 of NH-4 in the State of Karnataka under NHDP Phase-IIIA on BOT basis. 19/ NHAI/RO-BNG/11019/Tender/2017 dated 20/12/2017 22/12/2017 20/12/2017 05/02/2018
Time 15:0Hrs
356 Four laning of Panikoili-Keonjhar-Rimuli section of NH-20 (old NH-215) from Km.0.000 to Km. 163.000 (Design Chainage Km 0.000 to Km166.173) BOT project under NHDP Phase-III in the State of Odisha 11012/7/RO-OD/IE/2017 27/12/2017 15/12/2017 15/02/2018
Time 11:0Hrs
-
357 Independent Engineer Services during Operation and Maintenance from Km 0 to Km 32.27 of Gorakhpur Bypass on NH-28 in the state of UP on BOT Annuity Basis NHAI/PIU-GKP/IE/2017-18/03 15/12/2017 15/12/2017 16/01/2018
Time 11:0Hrs
358 Rehabilitation and Up-gradation Thikri-Anjad section of NH-347B from Km 0/000 to Km. 34/560 (Design Length 34.560 Km) to Two lane with paved shoulder through Engineering, Procurement and Construction in the state of Madhya Pradesh on EPC Mode 16576/ThikriAnjad/AE/EPC/2017 15/12/2017 14/12/2017 09/01/2018
Time 17:30Hrs
359 Supervision Consultant (SC) services for Four Lane NH Connectivity to ICTT Vallarpadam from Kalamassery (Ch.Km 0/000) to Vallarpadam (Ch.Km 17/121) Section on NH 966A (Old NH 47 C) in the State of Kerala ROKerala/PIU-CHN/ICTT/SC/2017-18/05 14/12/2017 14/12/2017 08/02/2018
Time 11:0Hrs
360 Independent Engineer (IE) during Operation & Maintenance period on the basis of National Competitive Bidding for 4-Laning of Kagal - Satara Section of NH-48 (old NH-4) from Km 592.240 to Km 725.000 in the State of Maharashtra under NHDP Phase-I on BOT basis NHAI/RO/MUM/KLP/IE/K-S/2017-18/03 13/12/2017 13/12/2017 11/12/2018
Time 10:59Hrs
361 Consultancy Services forAE for supervision of upgradation of Chandrapur Ballarpur ashti road to 2 lane with paved shoulder in the state of Maharashtra from KM 242150 to 284400 15/2017-18 08/01/2018 13/12/2017 29/01/2018
Time 17:50Hrs
362 Independent Engineer Services during Operation and Maintenance stage of 4 Laning of Walayar – Vadakkancherry from existing KM 182/250 to KM 240/000 (Design Length 54 Km) in the State of Kerala under NHDP-Phase-III executed on BOT (Toll) on DBFOT Basis PIU PKDKL-02IE2017-1802 12/12/2017 12/12/2017 08/02/2018
Time 11:0Hrs
363 Independent Engineer services for Four/Six Laning of Aunta-Simaria (Ganga Bridge with approach roads) section of NH-31 from Km 197.900 to Km 206.050 (Design Chainage) (Existing Chainage Km 204.741 to Km 209.945) [Total Design Length 8.15 Km] in the State of Bihar on Hybrid Annuity Mode. NHAI/BH/Aunta-Simaria/HAM/IE/2017/Proc 14/12/2017 11/12/2017 05/04/2018
Time 11:0Hrs
364 Consultancy Services of Authority s ngineer for supervision of Construction of High Level Bridge across River Sone at Chanchikala including its approaches on Kone Nakatwar Ranidih road in Sonebhadra District of Uttar Pradesh under LWE scheme on EPC 2751/12 NIVIDA SON CIRCLE /16-17 02/01/2018 11/12/2017 23/01/2018
Time 17:0Hrs
365 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF ROAD FROM FARIDABAD-GREATER NOIDA VIA JASSANA-MANJHAWALI-ATTA GUJRAN INCLUDING BRIDGE OVER RIVER YAMUNA UNDER ISC SCHEME OF CRF (PHASE1 CONSTRUCTION OF MAJOR BRIDGE (630 M LONG) AND RIVER TRAINING/GUIDE BUND WORKS) IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/18 09/12/2017 09/12/2017 22/01/2018
Time 11:0Hrs
366 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF 08 NOS ROBs AND THEIR APPROACHES IN THE STATE OF HARYANA ON EPC MODE UNDER SETU BHARATAM PROGRAMME. PWD/HR/PKL/AE/19 09/12/2017 09/12/2017 29/01/2018
Time 11:0Hrs
367 Consultancy Services For Authority’s Engineer For Up gradation to two lane with paved shoulders configuration for the work from Km. 109.790to Km 163.050 of Nilajphata to Bhandara section of NH-247 in the State of Maharashtra on EPC mode.(Length 53.26 kms) NH/MAH/PWD/NGP-1/AE-17-18/Pkg-1 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
368 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of 2 lane road with paved shoulders of section (i) Arni to Naigaon Bandi (Design km. 0/000 to km. 40/000) and Poharadevi link (Design km 0/000 to 5/132) (Total Length - 45.817 Km) and section (ii) Naigaon Bandi - Mangrulpir (Design km. 40/000 to km. 75/000) (Total Length - 35 Km) section of NH -161A in the state of Maharashtra. NH/MAH/PWD/NGP-2/AE/Pkg-2 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
369 Consultancy services for Authoritys Engineer for Supervision of Upgradation to two lane with paved shoulder configurations (Ardhapur-Himayatnagar-Fulsawani-Mahur Road of NH 752I, Section (i) Ardhapur to Himyatnagar of NH 752I from Km 350.900 to Km 415.600 (Design Chainage from Km 0/000 (Ardhapur) to Km 64/700 (Himayatnagr)) (64.700Km) Section (ii) Himyatnagar to Fulsawangi of NH 752I from Km 415.600 to Km 454.613 (Design Chainage from Km 64/700(Himayatnagr) to 103/713 (Fulsawangi) ) (L-39.013Km) NH/MAH/PWD/AUG-1/AE/Pkg-3 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
370 Consultancy services for Authoritys Engineer for Supervision of Upgradation to two lane with paved shoulder configurations of Nanded- Osman Nagar- Halda- Mukhed-Wazar upto Maharashtra Border of NH 161A, Section (i) Kundral to Wazar of NH 161A from Km 472/709 to km 519.229 (Design Chainage from km 52/730 ( Kundral) to km 99.250 (Wazar)) Section (ii) Osman Nagar - Kundral section of (NH-161A) design Ch. from Km. 0.00 to Km. 52.730 in the state of Maharashtra on EPC Mode. NH/MAH/PWD/AUG-2/AE/PKG-4 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
371 Consultancy Services For Authority’s Engineer for Up- gradation of Nanded to Jalkot section of NH -50 from Km 1/900 to km 67/852 to two Lanes configuration [ Nanded- Osman Nagar- Kandhar- Jalkot- Udgir- Bider- Gulbarga- Vijayapur- Hospot, Road design chainage from km 0/000 to (Nanded) to km 65/952 (Jalkot)] in the state of Maharashtra on Engineering Procurement and Construction (EPC) mode NH/MAH/PWD/AUG-3/AE/Pkg-5 09/12/2017 08/12/2017 22/01/2018
Time 17:0Hrs
372 Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance including the ongoing Contracts for completion of balance works on this stretch, work of Rehabilitation of Old Ganga Bridge, work of Construction of Madhya Ganga Canal on Hapur- Garhmukteshwar-Moradabad Section of NH-09 (Old NH-24) from Km 49.00 to Km 149.250 in the State of Uttar Pradesh NHAI/RO-W-UP/PIU-MBD/NH-09(24)/2017-18/01 dt 08.12.2017 09/12/2017 08/12/2017 28/12/2017
Time 11:0Hrs
373 Consultancy Services for Authority Engineer for Supervision of Six laning of Aurangabad to Bihar/Jharkhand Border(Chordaha) Section from Km 180 to Km 249.525 of NH-2 in the State of Bihar under NHDP Phase V on EPC Mode NHAI/BH/Aur-Bihar Border/AE/2017/Proc 13/12/2017 08/12/2017 15/02/2018
Time 11:0Hrs
374 Supervision Consultant (SC) Services for Operation and Maintenance of km 1065.000 to 1119.000 of Nalbari to Guwahati section of NH-31 and km 146.172 to 163.895 of Guwahati bypass of NH-37 in the State of Assam SC/OM/01 19/12/2017 08/12/2017 27/02/2018
Time 11:0Hrs
375 Consultancy services for Independent Engineer for supervision of Four laning of NH-363 from Mancherial (Design Km 0.000 /Existing Km 251.900) to Repallewada (Design Km 42.000/Existing Km 288.510) (Design Length = 42.000 Km) in the State of Telangana under NHDP Phase-IV under Bharatmala Pariyojana on Hybrid Annuity Mode NHAI/Tech/AP/NH-363/Man-Rep/IE/17-18 03/01/2018 08/12/2017 23/10/2018
Time 11:0Hrs
376 Consultancy Services for Authority’s Engineer for Supervision of Construction of Grade Separator Structure at Khandagiri Chowk (Km. 412) on NH-5 (New NH-16) in the State of Odisha on EPC mode 11011/15/AE/Khandagiri/2017 11/12/2017 08/12/2017 30/01/2018
Time 11:0Hrs
-
377 Consultancy services for posting of Authority Engineer for Construction of 2-lane with paved shoulders configuration & strengthening of NH-58 from km 338.00 to 350.00 and 350.00 to 368.00 on NH-58 in the State of Uttarakhand on EPC Mode 4049/13yata-NH-10/2017 dated 04.12.17 07/12/2017 07/12/2017 29/01/2018
Time 12:0Hrs
378 Consultancy Services for Independent Engineer services for Four laning of Thalapady to Chengala section of NH-17 (New NH-66) from Km. 17.200 (Design Chainage 17.200) to Km. 57.200 (Design Chainage 56.200) (total length 39.00 Km.) in the State of Kerala under NHDP Phase-III on Hybrid Annuity Mode. NHAI/Tech/KL/Thalapady-Chengala/NH-17/IE/2017-18 11/12/2017 06/12/2017 30/10/2018
Time 11:0Hrs
379 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF 4 LANING OF EXISTING TWO LANE WITH PAVED SHOULDER ROAD FROM TALWANDI BHAI TO FEROZEPUR NH 05 (OLD NH 95) FROM KM 170.380 TO KM 194.040 IN THE STATE OF PUNJAB ON EPC MODE NHAI/23044/1/2017/PB 08/12/2017 06/12/2017 08/01/2018
Time 11:0Hrs
380 Consultancy Services as Independent Engineer during Upgradation, Operation and Maintenance of Hyderabad-Bengaluru section of NH-7 from Km.534.720 to Km.556.840 in the State of Karnataka under NHDP Phase-VII (Package No.NS-2/BOT/KNT-2) on BOT basis (Modified). 15/NHAI/RO-BNG/12017/Tender/2017 dated 05.10.2017 11/10/2017 06/12/2017 04/01/2018
Time 15:0Hrs
381 consultancy Services for Authoritys Engineer for Supervision of construction of Four-Lane ROB in the section of NH-17 (new NH-66) from Km. 93.760 to Km. 94.540 as per approved GAD and its approaches & allied works on approaches of ROB near Nileshwaram town (Pallikara Railway Gate) Kasargad district in the State of Kerala under NHDP Phase-III on EPC mode. NHAI/Tech/KL/Nileshwar ROB/NH-17/AE/2017-18 08/12/2017 05/12/2017 22/02/2018
Time 11:0Hrs
382 Consultancy Services for Authoritys Engineer For Rehabilitation and upgradation of Kashedi Ghat section of NH-17 (New NH No. 66) to four-lanes with paved shoulders from existing km 148/0 to km 161/600 (Design km 149.510 to km 158.467) including construction of twin-tube six-lane tunnel through an Engineering, Procurement and Construction (EPC ) Contract under NHDP-IV in the state of Maharashtra. RO/MUM/AE/NHDPIV-02/2017-18 09/12/2017 05/12/2017 23/02/2018
Time 17:0Hrs
383 Consultancy Services for Supervision Consultant (SC) of Operation & Maintenance of 4 laning of Madurai – Tirunelveli – Panagudi – Kanniyakumari Section from Km 0/000 to Km 243/170 of NH-7 (New NH.44) including construction of Bridge at Narikulam Tank Portion at km 230/700 to Km 231/250 and Improvement of Approach Road to ROB at Km 0/600 at Samayanallur of NH-7(New NH.44) and Operation & Maintenance of Tuticorin – Tirunelveli Section from Km 0/000 to km 47/250 of NH-7A (New NH.138) in the State RO Chennai/SC/O&M/2017/Package-I 05/12/2017 05/12/2017 02/01/2018
Time 11:0Hrs
384 Independent Engineer services for Four Laning of Solapur- Bijapur Section of NH-13 (NEW NH NO 52) (Four Lane) from km 0.000 to km 110.542 (Design Length 109.08 km) in the states of Maharashtra and Karnataka to be executed under BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) basis under NHDP Phase III. NHAI/GM(T)/IE/Sol-Bij/Mah./2017 07/12/2017 04/12/2017 01/02/2018
Time 11:0Hrs
385 Consultancy services for Authoritys engineer for supervision of civil construction works Reconstruction with geometric improvement of existing Two lane intermediate lane to 2 lane with paved shoulders configuration from existing km. 126.730 to km 135.075 and existing Km 143.750 to Km 163.000 Tanakpur – Pithoragarh Project Road of NH-125 in the State of Uttarakhand on EPC Mode 3808/12 M-NH/2017 dt 29.11.2017 21/12/2017 04/12/2017 15/01/2018
Time 15:0Hrs
386 Independent Engineer Services during Operation and Maintenance stage of Four Lane divided carriageway facility constructed on BOT (Annuity) of Panagarh Palsit Dankuni section from Km.517.000 to Km.645.600 on NH 2 in the state of West Bengal 04/O and M/2017-18 30/11/2017 30/11/2017 22/01/2018
Time 11:0Hrs
387 Independent Engineer for Operation and Maintenance for Kolaghat - Haldia including the incomplete section of ROB Cum Flyover from Km 52.080 to 53.472 at the end of NH-41 on OMT basis in the state of West Bengal 02/O and M/2017-18 29/11/2017 29/11/2017 22/01/2018
Time 11:0Hrs
388 Independent Engineer Services during Operation and Maintenance stage of 4-laning of Balasore-Kharagpur Section from Km. 0.000 to Km. 119.300 (length approx 119.300 Km) of NH-60 under NHDP-I executed as BOT (Toll) on DBFOT Pattern in the State of Odisha and West Bengal 01/O and M/2017-18 28/11/2017 28/11/2017 22/01/2018
Time 11:0Hrs
389 Independent Engineer services for Four lanning of Hoskote – Dobbaspet section of NH207 from Km 58-300 to Km 138-320 in the State of Karnataka under NHDP Ph – IV to be executed on DBFOT (Toll) basis on DBFOT Basis under NHDP-Phase NHAI/NHDP-IV/DBFO/NH-207/IE/Hosk-Dobbas/108945 dt. 23.11.2017 23/11/2017 23/11/2017 23/01/2018
Time 11:0Hrs
-
390 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and Up-gradation to 4-laning of Rajamunda-Barkote Section of NH-23 (New NH no. 143) (km. 287.200 to km. 337.185) in the State of Odisha under NHDP-IV on EPC Mode NHAI/NHDP/IV/TECH/OR/2017/AE 21/11/2017 21/11/2017 20/12/2017
Time 11:0Hrs
391 Consultancy services for INSTITUTIONAL SUPPORT CONSULTANT (ISC) of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 (Contract Package I) and Two Laning of Imphal – Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur (Contract Package II) under Engineering Procurement and Construction (EPC) Mode. NHIDCL/Manipur/Imphal-Moreh/ISC/2017 22/11/2017 21/11/2017 29/01/2018
Time 15:0Hrs
392 Consultancy services for Authority’s Engineer for Supervision of Construction of four Lanning work from Hiran River to Sindoor River from km 64.00 to km 130 .00 section of NH-12 under NHDP Phase – III in the state of MP on EPC Basis NHAI/HQ/MP/NH-12/HIR–SIN/AE/2016 19/11/2017 17/11/2017 01/01/2018
Time 11:0Hrs
-
393 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Four laning of delinked stretch of Seoni – MP/MH Border of NH-7 from km 624.480 to km 653.225 under NHDP Phase-II on EPC Mode in the state of MP ON EPC NHAI /HQ/ MP / MP-3 DELINKED / AE/ / 2017 19/11/2017 17/11/2017 01/01/2018
Time 11:0Hrs
-
394 Consultancy services for Authority’s Engineer for supervision of Four laning of NH-363 from Repallewada (Design Km 42.000 /Existing Km 288.510) to Telangana/Maharashtra Border (Design Km 94.602/Existing Km 342.000) (Design Length = 52.602 Km) in the State of Telangana on EPC mode NHAI/Tech/AP/NH-363/Rep-Border/AE/17-18 30/11/2017 15/11/2017 18/01/2018
Time 11:0Hrs
395 Authority Engineer for Construction of Rock Fall Area Bypass on Lengpui Airport Road on NH-44A Via Lengte Road during 2016-17 in the State of Mizoram. RE-RE NIT No. 3/RFP/CE-HW/2017-18/AE 15/01/2018 08/11/2017 29/01/2018
Time 11:0Hrs
396 Authority Engineer for Construction of 2-lane with paved shoulder of flexible pavement from Km 42.80 to Km 60.30 of NH-150 during 2016-17 in the State of Mizoram on EPC Mode under NH (O). RE-ReNIT No.3(2)/RFP/CE-HW/2017-18/AE 15/01/2018 08/11/2017 29/01/2018
Time 11:0Hrs
397 Independent Engineer services for Six Laning of Gorhar to Khairatunda Section of NH-2 from Km. 320.810 to Km.360.300 in the State of Jharkhand under NHDP Phase-V on Hybrid Annuity Mode. NHAI/11012/JH/IE/NH-2/Pkg-II/2017 14/12/2017 06/11/2017 17/01/2018
Time 11:0Hrs
398 Independent Engineer services for Six Laning of Khairatunda to Barwa Adda Section of NH‐2 from km. 360.300 to km. 400.132 in the State of Jharkhand under NHDP Phase‐V on Hybrid Annuity Mode. NHAI/11012/JH/IE/ NH-2/Pkg-III/2017 14/12/2017 06/11/2017 27/02/2018
Time 11:0Hrs
399 Independent Engineer Services during Operation & Maintenance period for 6 laning of Panipat - Jalandhar section of NH-1 (New NH-44) from Km.96.000 to Km.387.100 (Length 291.100 Km including balance work of about 10 Kms) in the State of Haryana & Punjab on BOT (Toll) basis on DBFOT pattern under NHDP Phase V NHAI-RO-CHD-11011-PD-AMB-NH-1 15/11/2017 02/11/2017 18/12/2017
Time 11:0Hrs
400 Construction of Patharkandi Bypass 1/AE/APWD 01/11/2017 01/11/2017 18/01/2018
Time 11:0Hrs
401 Consultancy services for Authority’s Engineer for Supervision of 4-laning section from km. 1.700 (Pirpaiti of NH-80) in the State of Bihar to km. 50.800 (Gandhigram, Godda of nh-133) in the State of Jharkhand on EPC mode. NHAI/11012/JH/AE/NH-133/Pirpainti-GandhigramI/2017 04/12/2017 30/10/2017 04/10/2018
Time 11:0Hrs
402 Consultancy services for Authority’s Engineer for Supervision of four laning of Gandhigram (Godda) to Hansdiha section of NH-133 from km 50.800 to km 95.770 in the state of Jharkhand on EPC mode. NHAI/11012/JH/AE/NH-133/ Gandhigram-Hansdiha/2017 04/12/2017 30/10/2017 04/10/2018
Time 11:0Hrs
403 Consultancy Services for AE for Supervision of Rehabilitaion Maintenance of Churachandpur-Singhat-Sinzawl- Tuivai road section from Km 0.00 to km 34.5, Km 34.5 to Km 103.1 and Km 103.1 to Km 161.48 on NH-102B in the state of Manipur on EPC basis NHIDCL/AE/Manipur/C-T/2016 27/10/2017 27/10/2017 18/12/2017
Time 15:0Hrs
404 Consultancy services for AE for 4Laning of Imphal Moreh Section of NH 39 from Km 330.000 to Km 350.000 Pkg1 and Two Laning of Imphal Moreh Section of NH 39 from Km 350.000 to Km 395.680 in the State of Manipur Pkg II under EPC Mode NHIDCL/Manipur/ Imphal-Moreh/AE/2017 27/10/2017 27/10/2017 18/12/2017
Time 15:0Hrs
405 Consultancy services for Authority’s Engineer for Supervision of Six laning of Bihar/Jharkhand Border (Chordaha) to Gorhar Section of NH-2 from km. 249.525 to km. 320.810 in the State of Jharkhand under NHDP Phase V on EPC mode NHAI/11012/JH/AE/NH-2/Pkg-I/2017 04/12/2017 26/10/2017 16/01/2018
Time 11:0Hrs
406 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF 4-LANING OF BARHI-KODERMA SECTION OF NH-31 FROM KM. 0.000 TO KM. 27.500 IN THE STATE OF JHARKHAND UNDER NHDP PHASE-IV ON EPC MODE. NHAI/11012/JH/AE/NH-31/ Bar-Kod/2017 29/11/2017 26/10/2017 11/12/2017
Time 11:0Hrs
407 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of Sultanpur-Pratapgarh Section of NH-96 from existing Km. 60/000 to km. 90/000 (Design Chainage 60.000 to 90.865) to two lane with paved shoulder under EPC mode in the State ofUttar Pradesh . 2927/ 1 YATA- NH CIRCLE /2017 DATED 22.09.2017 25/10/2017 25/10/2017 22/11/2017
Time 15:0Hrs
408 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF SIX LANING OF CHENNAI-TADA SECTION OF NH-5 FROM KM 11/0 TO KM 54/4 IN THE STATE OF TAMIL NADU TO BE EXECUTED UNDER DBFOT BASIS UNDER NHDP PHASE V –BALANCE WORK IN KM 21.400 TO KM 54.400 (LENGTH.33.000 KM) UNDER EPC MODE NHAI/11014/CT Balance/AE/2017 21/10/2017 18/10/2017 21/12/2017
Time 11:0Hrs
409 Consultancy Services for Authority’s Engineer for Construction of Mechi Bridge and Approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India under Engineering Procurement and Construction (EPC) Mode NHIDCL/AE/Mechi Bridge/2017 17/10/2017 17/10/2017 23/11/2017
Time 15:0Hrs
410 Independent Engineer services during Operation and Maintenance Period for 4/6 laning of Delhi/Haryana Border to Rohtak section of NH-10 from Km. 29.700 to Km. 87.000 design chainage from km.29.650 to km. 93.140 including Bahadurgarh and Rohtak bye-passes in the State of Haryana NHAI/RO/CHD/11011/PD-RTK/DLH-RTK/NH-10/IE/RFP 03/11/2017 17/10/2017 28/11/2017
Time 11:0Hrs
411 Consultancy services for Authority Engineer for Supervision of Construction of balance Works of Six Laning of Jaipur Ring Road (Km 0.300 to Km 46.700) between Agra Road and Ajmer Road on EPC mode in the State of Rajasthan NHAI/Tech/JRR/AE/2017 13/10/2017 13/10/2017 16/11/2017
Time 11:0Hrs
412 Consultancy services for Independent Engineer services for Four laning of Dangiawas (km 96.595 of NH-112) to Jajiwal (km 283.500 of NH 65 Nagaur road) section- Package-I (Design length 74.619 km) of Jodhpur Ring Road (In Principally declared NH) in the State of Rajasthan on Hybrid Annuity Mode under NHDP phase VII NHAI/Raj/Phase-VII/Jodhpur Ring Rd./2017/IE 13/10/2017 13/10/2017 21/11/2017
Time 11:0Hrs
413 Constancy Services for Authority’s Engineer for Supervision of balance work for four laning of Itarsi to Betul Section of NH-69 from km. 63.000 to km. 137.000 (Design length 73.955 km) in the State of Madhya Pradesh (Package-II / NH-69) on EPC mode. NHAI/MP/AE/Itarsi-Betul/2017 16/10/2017 13/10/2017 29/11/2017
Time 11:0Hrs
414 Consultancy services for Authority’s Engineer for supervision of 6-laning of existing 2-lane (i) Nandigama bypass from Km 220.700 to Km 226.600 (Design chainage from Km 220.700 to Km 227.480) and (ii) Kanchikacherla bypass from Km 238.200 to Km 245.400 (Design chainage from Km 238.200 to 245.760) on NH-65 in the state of Andhra Pradesh under NHDP Phase -IV on EPC mode NHAI/AP/NH-65/NK Bypasses/AE/17-18 24/10/2017 13/10/2017 27/11/2017
Time 11:0Hrs
415 Consultancy Services for Authoritys Engineer for Supervision Design and Construction of Delhi-Meerut Expressway (Package-IV) from Dasna to Meerut- Km. 27-740 of NH-24 to Km. 51-975 of NH-58 (Design Chainage 28-000 to 59-777) in the state of Uttar Pradesh on EPC Basis (Length 31-777 Kms) NHAI/DME/Pkg-IV/2017/AE 13/10/2017 13/10/2017 21/12/2017
Time 11:0Hrs
416 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of 4 lane ROB and its approaches in lieu of existing railway crossing LC No 92C at KM 63 at Nangal near Ajouli Mour and Construction of 4lane ROB and its approaches in lieu of existing railway crossing LC No 88C at KM 59870 and 4Lane major bridge on Satluj river at Nangal on NH503 Extn in the State of Punjab 2 12/10/2017 12/10/2017 24/11/2017
Time 16:0Hrs
417 Consultancy Services for Authoritys Engineer for supervision of Six Laning of Pimplgaon-Nashik-Gonde Section of NH-03 from Km 380.000 to Km 440.000 in the state of Maharashtra - Balance / Additional Works ON EPC Basis NHAI/MH/Tech/AE/PNG/SFC-I/2017 26/10/2017 11/10/2017 20/11/2017
Time 11:0Hrs
418 Consultancy service for Authority’s Engineer for supervision of Construction of Major Bridge at Km 180.865 across river Krishna on NH-167 Hagari to Jadcherla section in the state of Karnataka on EPC mode EE/NHD/CTA/NH-167/Job-009/NIT/2017-18/1008 17/10/2017 11/10/2017 13/11/2017
Time 16:0Hrs
419 Consultancy services for Authority s Engineer for supervision of civil construction work for Widening to 2 lane with paved shoulder from km 318 to km 339 and from km 397 to 422 on Churaibari Agartala section of NH 44 in the State of Tripura on EPC mode under NH (O) 20(1)/CE/PWD (NH)/2015/DNIT-27/2017-18/3497 Dated 10/10/2017 10/10/2017 10/10/2017 23/11/2017
Time 12:0Hrs
420 Consultancy service for Authority’s Engineer for supervision of Consultancy service for Improvement of city portion of Dimapur City (km 106.90 to Km 124.20) and Kohima City (km 177.60 to km 187.60) on NH No. 39 in the state of Nagaland under EPC mode during 2016-2017(2nd Call) CE/NH/etender/2017-18/07/01 04/10/2017 05/10/2017 31/10/2017
Time 12:0Hrs
421 Consultancy Services for Authority Engineer for Supervision of Four laning of Balachera to Harangajao section of NH-54(Ext) from km 275.000 to km 244.000 in the State of Assam on EPC mode NHIDCL/Assam/B-H/AE/2017 29/09/2017 29/09/2017 27/11/2017
Time 11:0Hrs
422 Independent Engineer Services for construction of 4-lane Road on NH-12 (New NH-52) from Km 299/000 to 346/540 (Design Chainage from km 9/860 to 58/740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on Hybrid Annuity Mode (Length 48/880 km) – Package –II NHAI/19032/Dara-Teen./Pkg.-II/IE/Raj./2017/1/ 28/09/2017 28/09/2017 30/10/2017
Time 11:0Hrs
-
423 Consultancy Services For Authoritys Engineer For Upgradation To Four Lane With Paved Shoulder Of Takarkhed Bagile To Jalna Section Of Nh-753a, Existing Km 110/375 To Km 155/110 Exlucing Deulgaon Raja Town From Km 122/600 To Km 127/00 Length Of Malkapur –Jalna Road On Epc Mode In The State Of Maharashtra RO/MUM/AE/PROC/NHO-1170/2017-18 08/10/2017 28/09/2017 22/11/2017
Time 17:0Hrs
424 Consultancy Services For Authority’s Engineer For Upgradation Of Sakoli –Lakhander –Wadsa –Armori-Gadchiroli-Ashti-Aallapalli Sironcha Road Nh-353c (Sections Gadchiroli To Ashti ) From Km 113/650 To Km 182/350 Length -68.70 Km On Epc Mode In The State Of Maharashtra RO/MUM/AE/PROC/NHO-1174/2017-18 08/10/2017 28/09/2017 22/11/2017
Time 17:0Hrs
425 Consultancy Services for Authority Engineer for Supervision of Balance work of Rehabilitation and Up-gradation Satna–Bela section of NH-75 from Km. 155.000 to Km. 202.040 (Design length 47.040 Km) to four lane with paved shoulders in the state of Madhya Pradesh on Engineering, Procurement and Construction (EPC) Mode Satna-Bela-Mangwa/AE/EPC/2017-18 03/11/2017 28/09/2017 20/12/2017
Time 17:30Hrs
426 Consultancy Services for Authority’s Engineer for Supervision of Construction of six/eight lane Vadodara Kim Expressway in the state of Gujarat under NHDP Phase - VI on EPC mode - Package I from km. 355.000 to km. 378.740 (Padra to Vadodara section), Package II from km. 323.000 to km. 355.000 (Sanpa to Padra section), Package III from km. 292.000 to km. 323.000 (Manubar to Sanpa section) of Vadodara Mumbai Expressway NHAI/VME Phase IA/ AE-1 31/10/2017 26/09/2017 20/11/2017
Time 11:30Hrs
427 Consultancy Services for Authority’s Engineer for Supervision of Construction of six/eight lane Vadodara Kim Expressway in the state of Gujarat under NHDP Phase - VI on EPC mode - Package I from km. 355.000 to km. 378.740 (Padra to Vadodara section), Package II from km. 323.000 to km. 355.000 (Sanpa to Padra section), Package III from km. 292.000 to km. 323.000 (Manubar to Sanpa section) of Vadodara Mumbai Expressway NHAI/VME Phase IA/AE-1 09/10/2017 26/09/2017 31/10/2017
Time 11:0Hrs
428 Consultancy Services for Authority’s Engineer for Supervision of Construction of six/eight lane Vadodara Kim Expressway in the state of Gujarat under NHDP Phase - VI on EPC mode - Package IV from Km 279.00 to Km 292.00 (Ankleshwar to Manubar Section), Package V from Km 254.430 to Km 279.000 (Kim to Ankleshwar Section) of Vadodara Mumbai Expressway NHAI/VME Phase IA/AE-2 09/10/2017 26/09/2017 21/11/2017
Time 11:0Hrs
429 Independent Engineer Services for Operation and Maintenance of Lalitpur-Sagar-Lakhnadon section on NH-26 on OMT Basis in the State of Madhya Pradesh 3182 02/11/2017 23/09/2017 13/12/2017
Time 17:0Hrs
430 Authority Engineer for Construction of Rock Fall Area Bypass on Lengpui Airport Road on NH-44A Via Lengte Road during 2016-17 in the State of Mizoram RE-NIT No. 3/RFP/CE-HW/2017-18/AE 13/10/2017 22/09/2017 30/10/2017
Time 11:0Hrs
431 Authority Engineer for Construction of 2-lane with paved shoulder of flexible pavement from Km 42.80 to Km 60.30 of NH-150 during 2016-17 in the State of Mizoram on EPC Mode under NH (O). RE-NIT No. 3(2)/RFP/CE-HW/2017-18/AE 13/10/2017 22/09/2017 30/10/2017
Time 11:0Hrs
432 Consultancy Services For Authority’s Engineer For Supervision ofrehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Dahegaon - Kuhi - Umred section of NH-247 (Length - 41.54 km)in the State of Maharashtra under EPC Mode 3331 06/10/2017 20/09/2017 11/10/2017
Time 17:0Hrs
433 Consultancy services for Authority’s Engineer for supervision of the works Construction proposed Bridge over River Ajoy at 22nd Km on Panagarh-Illambazar Road (SH-14) adjacent to the existing bridge under Birbhum Highway Division No.-II in the district of Birbhum, West Bengal (2ND CALL) WBPW(R)D/RFP NO-03 of SE/WHC-I/2017-2018 18/09/2017 15/09/2017 13/10/2017
Time 14:0Hrs
434 Consultancy Services for Authority’s Engineer for (i) Protection works at Nalupani Landslide Zone (Ex.km 123.080 to km. 123.480, km 123.665 to km 123.740 and km 123.770 to km 123.970) Section of NH-34 in the State of Uttarakhand on EPC basis. (ii) Construction of Road, Bridge and Slope Protection works of Landslide at Bareti (Ex. Km. 100.300 to km 101.600 of Section NH-34 in the State of Uttarakhand on EPC basis. NHIDCL/AE/NalupaniBareti/UK/2017 14/09/2017 14/09/2017 07/11/2017
Time 15:0Hrs
435 CS FOR AE 2nd Call FOR Construction of 1.Steel Bridge River B-M on Jiribam- Barak road on NH-37 Pkg I 2. Imphal-Jiribam Road from Km 3 to Km 220 NH-53 New NH-3 Pkg II 3.Tamenglong Khonsang Road Km 0 to Km39.50 in the State of Manipur Pkg III NHIDCL/2017/AE/Manipur/B-M Bridge 2nd call 15/09/2017 14/09/2017 01/11/2017
Time 15:0Hrs
436 AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF GRADE SEPARATOR FROM H-7 AREA TO PORT CONNECTIVITY ROAD BY PASSING CONVENT JUNCTION IN THE STATE OF ANDHRA PRADESH ON EPC MODE 11011/1/2017/VPRCL/Convent Junction/AE 12/09/2017 12/09/2017 11/10/2017
Time 11:0Hrs
437 Consultancy Services as Independent Engineer during Operation, Maintenance and Fee collection of 4- lane divided carriageway facility of Nelamangala – Tumkur section from Km. 29.5 to Km. 62.00 (32.5 Kms.) on (BOT) basis through Concessionaire and Six lane of Tumkur bypass from Km. 62.00 to Km. 75.00 (13 Kms.) on EPC through O&M Contractor of NH-4 (New NH-48) in the state of Karnataka 10/NHAI/RO-BNG/13020/Tender/2017 dated 11.09.2017 06/10/2017 11/09/2017 06/11/2017
Time 15:0Hrs
438 Independent Engineer services during Operation & Maintenance Period for Four-laning of Rohtak-Hisar section of NH 10 from km.87.000 to km.170.000 including connecting link from km.87.000 (NH 10) to Km. 348.000 (NH 71) to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase-III in the State of Haryana NHAI/RO/CHD/11011/PD-RTK/RTK-HTK-HSR/NH-10/IE/RFP/IE 08/09/2017 07/09/2017 10/09/2017
Time 15:0Hrs
439 Consultancy service for Authority’s Engineer for supervision of Construction of 2 lane with paved shoulder from km 168.00 to km 183.783 (Yesemyong to Unger) on Mokokchung to Tuli Section of NH-61 under EPC mode in the state of Nagaland (2nd Call) CE/NH/etender/2017-18/06/01 01/09/2017 04/09/2017 07/11/2017
Time 12:0Hrs
440 Consultancy Service for Authoritys Engineer for Supervision of Widening two lane to four Lane from Km 128.850 to Km 142.750 of NH63 on Ankola Gooty section passing through Hubballi city limits in the State of Karnataka. J no NH63KNT2016/17/838. 2275 01/09/2017 04/09/2017 23/10/2017
Time 15:0Hrs
441 CONSULTANCY SERVICES OF AUTHORITY ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION FROM (I) KM 89.600 TO KM 133-520 (HARPALPUR-SUGIRA SECTION) (II) KM 133-520 TO KM 158-040 (KULPAHAR-MAHOBA SECTION) OF NH-76 AND NH-86 (5-360 KM) TO TWO LANE WITH PAVED SHOULDER AND (III) CONSTRUCTION OF VIADUCT AND ITS APPROACHES TO ROB AT KM 426 OF NH-91 IN KANPUR CITY ON EPC MODE IN THE STATE OF UTTAR PRADESH 1354M/13M-NHCK/17 dt- 05-08-2017 19/09/2017 01/09/2017 13/10/2017
Time 17:0Hrs
442 Consultancy Services for Authority’s Engineer for construction of four-laning of Bhopal – Biaora section of NH-12 from Mubarakpur to Biaora from km 324.000 to km 423.400 (PKG-II) length 97.325 km on EPC Mode NHAI/HQ/MP/Tech/BPL-BIO/PKG-II/AE/2017 13/09/2017 31/08/2017 20/11/2017
Time 11:0Hrs
443 CONSULTANCY SERVICES FOR SUPERVISION OF SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE CONTRACT OF PORBANDAR – BHILADI – JETPUR SECTION FROM KM. 0.000 TO KM. 117.600 OF NH-8B (NEW -27) IN THE STATE OF GUJARAT PIURAJ/SC/POR-JET/2017 30/08/2017 29/08/2017 28/09/2017
Time 11:0Hrs
444 CONSULTANCY SERVICES FOR SUPERVISION OF SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE CONTRACT OF BAMANBORE – GARAMORE SECTION FROM KM. 182.600 TO KM. 254.600 OF NH-8A IN THE STATE OF GUJARAT PIURAJ/SC/BAM GAR/2017 30/08/2017 29/08/2017 28/09/2017
Time 11:0Hrs
445 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF NH-21A (NEW NH-105) 4-LANE PINJORE BYPASS STARTING FROM KM 54.533 OF NH-22 AND TERMINATING AT KM 3.800 OF NH-21A (BYPASS CHAINAGE FROM KM 0.000 TO KM 7.700 TOTAL LENGTH 7.700 KM) IN THE STATE OF HARYANA ON EPC MODE PWD/HR/PKL/AE/15 08/05/2017 19/08/2017 16/10/2017
Time 11:0Hrs
446 Independent Engineer Services during Operation Maintenance Period for 4-laned Nagpur – Kondhali (Km 9 200 to Km 50 000) Section of NH-53 (Old NH-6) in the State of Maharashtra on BOT basis - Consultancy Package No IE-O and M/NH-53/NAG-6. NHAI/RO-NAG/TENDERS/2017-18/04 17/08/2017 17/08/2017 19/09/2017
Time 12:0Hrs
447 Consultancy Service for Authoritys Engineer for Supervision of Construction of 4-lane ROB and its approaches in lieu of existing 56/T-C2 km.0.517 on NH-367 in the state of Karnataka on EPC Mode ( J no NH-367-KNT(5)- 16-17-006-SandR(B) .(2nd call) EE/NHD/HBL/NH-367/ROB Banapur /AE/NIT/2017-18/2083 Dt.14.08.2017 17/08/2017 17/08/2017 16/09/2017
Time 17:0Hrs
448 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING LC NO 138B AT KM 1.45 ON NH-21A (NEW NH-105) AT PINJORE IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/7 22/04/2017 14/08/2017 28/09/2017
Time 15:0Hrs
449 Consultancy services for Authority’s Engineer for Supervision for Balance work for Four Laning of Obedullaganj to Itarsi Section of NH-69 from km. 2.800 to km. 8.300 and from km. 20.700 to km. 63.000 (Design Length 46.3 km.), excluding km. 8.300 to 20.700 Wild Life Area, in the state of Madhya Pradesh (Package-I ) on EPC Mode. NHAI/MP/AE/11012/Obed-Itarsi/2017 12/08/2017 11/08/2017 11/09/2017
Time 11:30Hrs
450 Procurement of Consultancy services for short term improvement and routine maintenance of Bhubaneswar (km 435.498) –Ichhapuram (km 620.430) section of NH-16 and Chandikhole (Km.0.000) –Paradip (Km.77.000) section of NH-5A in the state of Odisha NHAI/11011/16/RO/OD/2017 14/08/2017 10/08/2017 18/09/2017
Time 11:0Hrs
451 Selection of IE for Gadoj (State Border) –Majri to Haryana/Rajasthan Border and Majri to Neemrana ( SH111 & SH 111A) Highway Project 3/2017-18 04/08/2017 08/08/2017 25/09/2017
Time 11:0Hrs
-
452 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi Asti Aallapalli Sironcha NH 353C Package I Sakoli to Bandra Border (Length - 55.8 km) & Section (ii) Duggipar Gondia Kohmara NH 753 Package II from km 28 to km 42.4 Goregaon to Gondia section (Length - 14.4 km) on EPC Mode. NH/MAH/PWD/Nagpur-18/AE/Pkg-29 2nd call 04/08/2017 31/07/2017 30/08/2017
Time 17:0Hrs
453 Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 34.00 to Km. 70.900 (Chittapur cross to Start of Yadgir Bypass) of NH-150 in the state of Karnataka on EPC Mode (Package -I). EE/NHD/KLB/NH-150/Job-828 & 817/AE/NIT/2017-18/550 28/07/2017 28/07/2017 04/09/2017
Time 16:0Hrs
454 Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 79.650 to Km. 118.470 (End of Yadgir Bypass to Andhra Border section) of NH-150 in the State of Karnataka on EPC Mode (Package-II). EE/NHD/KLB/NH-150/Job-817/AE/NIT/2017-18/550 28/07/2017 28/07/2017 04/09/2017
Time 16:0Hrs
455 Consultancy service for Authority’s Engineer for supervision of Strengthening and widening to two lane with paved shoulder of NH-61 from Km 40.00 to Km 72.40 under EPC mode in the state of Nagaland during 2016-17 (3rd Call) CE/NH/etender/2017-18/05/01 03/07/2017 28/07/2017 22/08/2017
Time 12:0Hrs
456 Construction of Rock Fall Area Bypass on Lengpui Airport Road on NH-44A Via Lengte Road during 2016-17 in the State of Mizoram. 3/RFP/CE-HW/2017-18/AE 03/08/2017 28/07/2017 10/09/2017
Time 17:0Hrs
457 Authority Engineer for Construction of 2-lane with paved shoulder of flexible pavement from Km 42.80 to Km 60.30 of NH-150 during 2016-17 in the State of Mizoram on EPC Mode under NH (O). 3(2)/RFP/CE-HW/2017-18/AE 11/08/2017 28/07/2017 10/09/2017
Time 17:0Hrs
458 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF 02 NOS. ROBS AND THEIR APPROACHES IN LIEU OF LC NO. 109A AT KM 64.130 ON NH-709A AND IN LIEU OF LC NO. 111C AT KM 300.5 ON NH 71 (NEW NH-352) AT JIND IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/6 22/04/2017 28/07/2017 11/09/2017
Time 15:0Hrs
459 Independent Engineer Services during Operation & Maintenance period for 6 laning of Panipat - Jalandhar section of NH-1 (New NH-44) from Km.96.000 to Km.387.100 (Length 291.100 Km including balance work of about 10 Kms) in the State of Haryana & Punjab on BOT (Toll) basis on DBFOT pattern under NHDP Phase-V NHAI/RO/CHD/11011/PD-AMB/NH-1/IE 06/09/2017 26/07/2017 19/09/2017
Time 15:0Hrs
-
460 Consultancy services for Authority Engineer for supervision for balance work for four lanning work for Lalghati (Bhopal) to Mubarakpur section of NH 12 from km 315.725 to 324.000(Pkg-I) in the state of MP on EPC mode NHAI/HQ/MP/Tech/BPL-BIO/PKG-I/AE/2017 30/07/2017 26/07/2017 28/08/2017
Time 11:30Hrs
461 Default AE Values Default AE Project 25/07/2017 25/07/2017 25/09/2017
Time 15:0Hrs
462 RAJKOT-GONDAL-JETPUR BOT PROJECT UNDER O/M PHASE PIURAJ/IE/RAJ-GON-JET/2017 04/08/2017 25/07/2017 23/08/2017
Time 11:0Hrs
463 Consultancy Services for Authority’s Engineer for Supervision of “Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A on EPC basis” (Retender) NHIDCL/Assam/Dolabari-Jamuguri/AE /2017/Retender 24/07/2017 24/07/2017 21/09/2017
Time 11:0Hrs
464 Consultancy Services for Authority Engineer for Construction of Two Lane ROB and its approaches in lieu of existing Level Crossing L.C. No. 39-B at Km. 158.525 on NH-74 including Railway Portion in the State of Uttarakhand on EPC Mode and Construction of 4-lane ROB and its approaches in lieu of existing level crossing no 43-B at Km. 2.400 on NH-121 in the State of Uttarakhand on EPC Mode. 2344/12M-NH/2017 dt 21.07.2017 22/07/2017 22/07/2017 16/09/2017
Time 17:0Hrs
465 Consultancy services of Authority’s Engineer for supervision of Widening the existing lane to 2 lane with paved shoulder from Km.239.900 to 294.300 km Nayagarh to Khurda excluding Khurda bypass of NH 57 on EPC mode in the state of Odisha 05 CE-NH-17-18 19/07/2017 19/07/2017 06/09/2017
Time 17:0Hrs
466 Independent Engineer services for Supervision of Six laning of Narasannapeta-Ranastalam section of NH-16 from design Km.580.671 to design Km.634.861 (Length=54.19 Km) in the State of Andhra Pradesh under NHDP phase-V on Hybrid Annuity Mode. NHAI/AP/IE/Nara-Rana/2016-17 25/07/2017 19/07/2017 12/09/2017
Time 11:0Hrs
-
467 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OFREHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION GUHAGHAR ROAD TO CHIPLUN SECTION OF NH-166E (LENGTH - 39.83 KM) DESIGN CHAINAGE 0/00 TO 26/230 & 40/00 TO 53/600IN THE STATE OF MAHARASHTRA UNDER EPC MODE. (2nd Call) NH/MAH/PWD/PUNE/KLOP-1/AE/PKG.1 13/07/2017 17/07/2017 02/08/2017
Time 17:0Hrs
468 Consultancy Services For Authority Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Jintur- Parbhani section of NH-752 I in the State of Maharashtra under EPC Mode. NH/MAH/MSRDC/Aurangabad-3/AE/Pkg-35 Second call 25/07/2017 14/07/2017 19/08/2017
Time 17:0Hrs
469 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Mehkar to Ajispur section of NH- 548 C from km 0.000 (Mehkar) to km 35.836 (Ajispur) (Length 35.836 km) in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Amravati/ AE/Pkg-41 Second Call 25/07/2017 14/07/2017 19/08/2017
Time 17:0Hrs
470 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “STRENGTHENING OF EXISTING TWO LANE PAVEMENT I/C PAVED SHOULDER ON NH NO. 39 FROM KM 212.325 TO KM 260.00” ON EPC IN THE STATE OF MANIPUR DURING 2016-17 UNDER NH(O). Under Job No. 39/MN/2016-17/19 ACE-I/NH/RFP-Authority Engineer/2017-18/136/ Pkg.01 09/08/2017 10/07/2017 19/08/2017
Time 14:0Hrs
471 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF STRENGTHENING OF EXISTING TWO LANE PAVEMENT I/C CONSTRUCTION OF PAVED SHOULDER FROM KM 260.000 TO KM 299.000 ON NH -39 (NEW NH-02), MAO-IMPHAL SECTION (SH - KM 260.000 TO KM 287.000 IN THE STATE OF MANIPUR ON EPC MODE DURING 2016-17 UNDER NH(O) Job No. 39/MN/2016-17/18 ACE-I/NH/RFP-Authority Engineer/2017-18/70/ Pkg.02 09/08/2017 10/07/2017 19/08/2017
Time 14:0Hrs
472 Strengthening of existing two lane pavement including construction of paved shoulders on NH-39 (New NH-02) Mao- Imphal Section (SH - Mao- Senapati from km 212.325 to km 260.00) on EPC mode (2nd Call). (Package-1) ACE-I/NH/RFP-Authority Engineer/2017-18/136/ Pkg.1 13/07/2017 10/07/2017 09/08/2017
Time 14:0Hrs
473 Strengthening of existing two lane pavement including construction of paved shoulders from km 260.000 to km 299.000 of NH-39 (New NH- 02) Mao-Imphal Section (SH- km. 260.000 to km. 287.000) in the state of Manipur on (EPC) mode (2nd Call) (Package-2) ACE-I/NH/RFP-Authority Engineer/2017-18/136/ Pkg.2 13/07/2017 10/07/2017 09/08/2017
Time 14:0Hrs
474 Consultancy services for Authority Engineer for supervision of construction of 4-laning from Itanagar to Banderdewa (package A from 29.500 km to 40.40km) in the state of Arunachal Pradesh on EPC mode. CEAP(HW)/WZ/W-24/IB/AE/17-18 10/07/2017 07/07/2017 09/10/2017
Time 15:1Hrs
475 Consultancy services for Authority’s Engineer for Supervision of Construction of Major Bridge over river Narmada near Garudeshwar at KM 469/00 to 470/00 of NH-56 on EPC mode in the State of Gujarat. 08of2017-18-02 06/07/2017 06/07/2017 24/07/2017
Time 18:0Hrs
476 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION MORSHICHANDURBAZARACHALPUR SECTION OF NH-353K IN THE STATE OF MAHARASHTRA FOR UPGRADATION TWO LANES WITH PAVED SHOULDER/FOUR LANE CONFIGURATION IN THE STATE OF MAHARASHTRA UNDER EPC MODE. EENH⁄AKL⁄RFP⁄AE⁄20 2 nd Call 13/07/2017 05/07/2017 18/07/2017
Time 17:0Hrs
477 Improvement of T Junction near DhaulaKuan Metro Station including widening of National Highway from DhaulaKuan up to end of Junction on NH-8 and improvement of T Junction near Defence area including widening of National Highway up to Defence area on NH-8 and R&R Hospital Link Underpass on EPC Mode in the State of Delhi NHAI/2017/DEL-GUR/DHAULA KUAN 31/07/2017 05/07/2017 17/08/2017
Time 11:0Hrs
478 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OFREHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION DAHEGAON - KUHI - UMRED SECTION OF NH-247 (LENGTH - 41.54 KM)IN THE STATE OF MAHARASHTRA UNDER EPC MODE CENH/D1/PROC/AE/2017-18/1417 11/07/2017 03/07/2017 18/07/2017
Time 17:0Hrs
479 2 LANE PAVED SHOULDER WADI ASOLA 353 I CENH/D1/PROC/AE/2017-18/1417/1 11/07/2017 03/07/2017 18/07/2017
Time 17:0Hrs
480 Consultancy Services For Authoritys Engineer For Supervision of Rehabilitation and Upgradation of Existing km 98750 Design Ch 121500 to Existing Km 83690 design Ch 136500 from Existing km 78050 Design Ch 142500 to Pimpalgaon Baswant existing km 59100 Design Ch 161281 to Two lane with paved shoulders strengthening of Existing km 83690 to Existing Km 78050 of section Pimpalgaon Vani Saputara Road NH953 in the state of Maharashtra Total Length 39421 Km CENH/D-1/PROC/AE/2017-18/1417/01 13/07/2017 03/07/2017 18/07/2017
Time 15:0Hrs
481 Consultancy service for Authoritys Engineer for supervision of Construction of New 2lane with Paved Shoulders Configuration of Capital Road (Bypass, Dimapur to Kohima, Length = 34.171 Kms) in the state of Nagaland through Engineering, Procurement & Construction (EPC) Basis during 2016-17. CE/RnB/ISC-BYPASS/21/AE/2017-18 03/07/2017 03/07/2017 14/08/2017
Time 17:0Hrs
482 Consultancy service for Authority’s Engineer for supervision of Construction of 2 lane with paved shoulder from km 168.00 to 183.783 (Yesemyong to Unger) on Mokokchung to Tuli Section of NH-61 under EPC mode in the state of Nagaland CE/NH/etender/2017-18/04/01 14/06/2017 30/06/2017 29/08/2017
Time 13:0Hrs
483 Authority’s Engineer for Supervision of Rehabilitation and Up-Gradation to 4-Laning Of Birmitrapur-Brahmani Bypass end Of Nh-23 (New NH No. 143) Km 211.200-Km 237.100 & from Km 0.000-Km 3.200 (Brahmani By-Pass) i.e. upto Km 240.100 on NH-23 Beside BNR Weigh Bridge, Package 1A and Four laning of NH-23(new NH No. 143) from km.240.250 i.e. Brahmani by-pass end beside BNR Weigh Bridge to km.287.200 i.e. Rajamunda Section in the State of Odisha under NHDP Phae IV. Package 1B. NHAI/NHDP-IV/OR/02/2010/AE/PK1/101745 30/06/2017 22/06/2017 08/08/2017
Time 11:0Hrs
484 Consultancy Services as Independent Engineer Services during Operation & Maintenance Period for 4-lane divided carriageway of Orai-Bhognipur Section (Km. 220.00 to Km. 255.00) on NH-25 and Bhognipur-Barah Section (Km. 421.20 to Km. 449.00) on NH-2 on BOT (Annuity) Basis in the State of Uttar Pradesh. (New Chainage Km. 1515.713 to Km. 1578.513 of NH-27) 01/NHAI/RO-LKO(East)/11012/NH-25/Tender/2017 23/06/2017 21/06/2017 11/07/2017
Time 17:0Hrs
485 Independent Engineer Services during Operation & Maintenance Period for 6 laning Project of Etawah (Km 323.475) to Chakeri (Km 483.687) Section of NH-2 (New NH-19) on DBFOT basis under NHDP Phase-V in the State of Uttar Pradesh. 02/NHAI/RO-LKO(East)/17017/NH-2/Tender/2017 23/06/2017 21/06/2017 11/07/2017
Time 17:0Hrs
486 Consultancy Services for Supervision of Short Term Improvement & Routine Maintenance of Chakeri (Kanpur) to Kokhraj (Allahabad) Section from Km 483.687 to Km 628.753 of NH-2 (Length 145.10 Km) in the state of Uttar Pradesh. 03/NHAI/RO-LKO(East)/18018/NH-2/Tender/2017 23/06/2017 21/06/2017 11/07/2017
Time 17:0Hrs
487 Consultancy Services for Authority Engineer for Supervision of Construction of 2- Lane ROB and its approaches in lies of existing level crossing (LC No. C-61) at Km 165/550 on NH-89 in the State of Rajasthan on Engineering, Procurement and Construction Mode NIT No 01 of 2017-18 SE NH Bikaner 18/06/2017 19/06/2017 03/08/2017
Time 11:0Hrs
488 Independent Engineer services for Operation & Maintenance Period of Six Lanning of NH-47 from km 102.035 to km 144.680 on Chengapalli to start of Coimbatore Bypass and Four laning from km 170.880 to km 183.010 from end of Coimbatore Bypass to TN/Kerala Border Section of NH-47 In the State of Tamil Nadu under NHDP Phase-II on DBFOT (Toll) Basis RO Chennai/IE/O&M/2017/Package-XVII 20/06/2017 15/06/2017 29/06/2017
Time 11:0Hrs
489 RFP for Consultancy services for 1 year for supervision of Restoration / Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 0.00 to Km 115.00 covering 115 Km length on NH-102A in the state of Manipur NHIDCL/AE/Manipur/UTT/NH-102A/2017 21/06/2017 15/06/2017 26/10/2017
Time 15:0Hrs
490 Consultancy services for Authoritys Engineer for supervision of the works Construction of ROB and its approaches in lieu of level crossing LC No. 23/SPL/Tat Km 52.712 of NH-35 in the State of West Bengal on EPC. JOB NO. NH-35/WB 6/15-16/005/SRB. 06/2017-18 of SE NHC-I (2ND CALL of RFP-27 of 2016-17) 14/06/2017 15/06/2017 05/07/2017
Time 17:0Hrs
491 Consultancy Services for Authority’s Engineer for Supervision of (i) Tura-Mankachar road (0/0 to 1/660km) (ii) Doimukh-Harmuti road from Harmuti Junction (0km) to Khula camp (14/370 km) and Doimukh (0km) to Bagh Tinali (3/10 km) (iii), (iv) and (v) Wokha-Merapani Road from Wokha 0km to 60/585 km NHIDCL/Assam/DONER/AE/2017 15/06/2017 15/06/2017 05/10/2017
Time 11:0Hrs
492 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation of NH-43 (old NH-78) from (Old Ch. 245.000 to 331.000 km, New Ch. 245.000 to 323.100 km) (MP border/ CG border to Surajpur section) to two lane with paved shoulders in the State of Chhattisgarh under Corridor Approach through EPC mode contract 05/CE/NH/TC/44-01/2017/212773 14/06/2017 14/06/2017 09/08/2017
Time 17:0Hrs
493 Consultancy Service for Authoritys Engineer for Supervision of Construction of 4-lane ROB and its approaches in lieu of existing 56/T-C2 km.0.517 on NH-367 in the state of Karnataka on EPC Mode ( J no NH-367-KNT(5)- 16-17-006-SandR(B) EE/NHD/HBL/NH-367/ROB Banapur /AE/NIT/2017-18/1153Dated 02.06.2017 13/06/2017 13/06/2017 24/07/2017
Time 17:0Hrs
494 Consultancy Services for Authoritys Engineer Services for Rehabilitation & Upgradation of Two laning of Maheshkhunt-Sasarsa-Purnea Section of NH 107 from km 0.000 to km. 90.000 in the State of Bihar on EPC Mode (Package-I). NHAI/BH/MSP-I/AE/2017/Proc. 21/06/2017 09/06/2017 17/08/2017
Time 11:0Hrs
495 Consultancy service for Authority’s Engineer for supervision of Strengthening and widening to two lane with paved shoulder of NH-61 from Km 40.00 to Km 72.40 under EPC mode in the state of Nagaland during 2016-17 (2nd call) CE/NH/etender/2017-18/22/01 07/06/2017 08/06/2017 29/06/2017
Time 12:0Hrs
496 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR (i) Construction of (i) 154m span Steen Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru on Jiribam- Barak road on NH-53 in State of Manipur. (Pkg-I) (ii) Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 3.00 to Km 220.00 (Length= 217 Km) of NH-53 (New NH-37) (Package-I) in the state of Manipur on Percentage Rate basis. (Pkg-II) (iii) R NHIDCL/2017/AE/Manipur/B-M Bridge 12/06/2017 08/06/2017 20/07/2017
Time 15:0Hrs
497 Consultancy Services for Selection of Authoritys Engineer for Supervision of Construction of ROBs at Bishnupur and Mejia and Major Bridge on River Shali in the district of Bankura in West Bengal 6/2017-18 of SE, N. H. Circle No. II-3rd Call 07/06/2017 07/06/2017 10/07/2017
Time 14:0Hrs
498 Improvements and Re- construction to Two lane with Paved Shoulders from km. 544.200 to 594.000 of NH 150Aof Hosamane to Pandavapura section in the state of Karnataka on EPC mode. EE/NHD/TMK/AE/EPC/150A/17-18/262 07/06/2017 07/06/2017 10/07/2017
Time 16:0Hrs
499 Consultancy Services for Authority’s Engineer Services for Rehabilitation & Upgradation of Two laning of Maheshkhunt – Saharsa - Purnea section of NH 107 from km. 90.000 to km. 177.960 in the State of Bihar on EPC Mode (Package-II) NHAI/BH/MSP-II/AE/2017/Proc 07/06/2017 06/06/2017 18/07/2017
Time 11:0Hrs
500 Independent Engineer services for Two laning of balance work and Operation & Maintenance of Trichy – Karaikudi including Trichy Bypass road section of NH-210 from (Km 10.000 to Km 94.000) and Bypass (Km 110.016 to Km 135.930) in the State of Tamil Nadu on DBFOT (Annuity) Basis under NHDP-Phase-III RO Chennai/IE/O&M/2017/Package-XV 06/06/2017 06/06/2017 08/06/2017
Time 17:0Hrs
501 Consultancy Services for Authority’s Engineer for Supervision of Construction of Service Road (Length-32.00 km) in the project of 6-lanning of Indore-Dewas Section of NH-3 from km 577.550 to km 610.199 and km 0.000 to km 12.600 (Approx. length 45.05 km) in the State of Madhya Pradesh under NHDP Phase-V to be executed on EPC mode NHAI/MP/AE/11012/Indore-Dewas/Service Road/2017 07/06/2017 05/06/2017 24/07/2017
Time 11:0Hrs
502 Consultancy services for Authority’s Engineer for supervision of the work Up-gradation of NH-31C with a minimum of 2-lane with Paved shoulder configuration starting from km 105.00 to km 145.632 (total length 40.632 km) in the district of Jalpaiguri, on EPC mode in the state of West Bengal under Annual Plan 2016-17. (Job No. 31C-WB-2016-17/417) e-RFP No 04 OF 2017-18 of Superintending Engineer/ National Highway Circle No III 30/05/2017 05/06/2017 15/06/2017
Time 17:0Hrs
503 Consultancy services for Authoritys engineer for Reconstruction with geometric improvement of single intermediate lane to 2 lane with paved shoulder configuration from existing km 92.880 to km 121.550 of NH-125 in the state of Uttarakhand on EPC Mode. 1749/12M-NH/2017 dt 02.06.2017 06/06/2017 05/06/2017 19/07/2017
Time 17:0Hrs
504 Consultancy services for Authoritys engineer for supervision of civil construction works Reconstruction with geometric improvement of existing Two lane intermediate lane to 2 lane with paved shoulders configuration from existing km. 126.730 to km 135.075 and existing Km 143.750 to Km 163.000 of NH-125 in the State of Uttarakhand 1749/12M-NH/2017 dt 02.06.2017 A 06/06/2017 05/06/2017 19/07/2017
Time 17:0Hrs
505 Consultancy Services for Authority Engineer for Construction of Two Lane ROB and its approaches in lieu of existing Level Crossing (L.C. No. 39-B) at Km. 158.525 on NH-74 including Railway Portion in the State of Uttarakhand on EPC Mode & Construction of 4-lane ROB and its approaches in lieu of existing level crossing no 43-B at Km. 2.400 on NH-121 in the State of Uttarakhand on EPC Mode 1180/12M-NH/2017 dt 11.04.2017 01/06/2017 01/06/2017 17/07/2017
Time 17:0Hrs
506 Consultancy services for AE for supervision of the works for Construction of twins 2 Lane ROB and its approaches in replacement of existing LC Gates on Kubai and Kadamdiha on NH60. 04/2017-18 of SE,NHC-I (2ND CALL) 31/05/2017 01/06/2017 22/06/2017
Time 17:0Hrs
507 Consultancy services for Authority Engineer for Supervision of Four lane Oddanchathram Bypass from km 23.230 to km 30.900 of NH-209 (Design chainage from km 23.100 to km 33.200)in the state of Tamil Nadu under NHDP-IV on EPC Mode NHAI/AE/Oddanchatram Bypass/NH-209/2017 07/06/2017 31/05/2017 10/07/2017
Time 11:0Hrs
508 Consultancy services for Authority Engineer for Supervision of Four lane Oddanchathram Bypass from km. 23.230 to km. 30.900 of NH-209 (New NH. No. 83), (Design chainage from km. 23.100 to km, 33.200)in the state of Tamil Nadu under NHDP-IV on EPC Mode NHAI/AE/Oddanchatram Bypass/NH209/2017 20/07/2017 31/05/2017 10/08/2017
Time 11:0Hrs
509 Consultancy services for Authority’s engineer for supervision of civil construction works reconstruction with geometric improvement of single / intermediate lane to 2 lane with paved shoulder configuration from existing km 163.000 to km 194.800 (Tanakpur – Pithoragarh Project Road ) of NH -125 in the State of NH-125 in the state of Uttarakhand on EPC mode under improvement of NH Connectivity to Chardham. 1635/12M-NH/2017 dt 24.05.2017 31/05/2017 30/05/2017 13/07/2017
Time 17:0Hrs
-
510 Consultancy service for Authority’s Engineer for supervision of Improvement of city portion of Dimapur City (km 106.90 to Km 124.20) and Kohima City (km 177.60 to km 187.60) on NH No. 39 in the state of Nagaland under EPC mode during 2016-2017 CE/NH/etender/2017-18/03 13/04/2017 30/05/2017 04/08/2017
Time 12:0Hrs
511 Supervision Consultancy Services for construction supervision of Balance work to four lanes of Gwalior - Jhansi Section of NH-75 in the State of UP & MP under N-S Corridor on EPC Mode (Item Rate Basis) (2nd call) NHAI/MP/G-J/EPC-Item Rate/SC/01/17 (2nd Call) 31/05/2017 29/05/2017 20/07/2017
Time 11:0Hrs
512 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF STRENGTHENING OF EXISTING TWO LANE PAVEMENT I/C CONSTRUCTION OF PAVED SHOULDER FROM KM 260/000 TO KM 299/000 ON NH -39 (NEW NH-02) MAO-IMPHAL SECTION (SH- KM 260/000 TO KM 287/000 IN THE STATE OF MANIPUR ON EPC MODE DURING 2016-17 ACE-I/NH/RFP-Authority Engineer/2017-18/70/Pkg-2 29/05/2017 29/05/2017 06/07/2017
Time 11:0Hrs
513 Rehabilitation and upgradation to 2 lane with paved shoulder configuration from existing km 122.00 (Dharasu Bend) to km. 147.230 (Silkyara Bend) (design chainege 0.00 to 24.30) of NH-94 1140/13yata-NH-10/2017 27/05/2017 27/05/2017 31/07/2017
Time 15:0Hrs
514 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “STRENGTHENING OF EXISTING TWO LANE PAVEMENT I/C PAVED SHOULDER ON NH NO. 39 FROM KM 212.325 TO KM 260.00” ON EPC IN THE STATE OF MANIPUR DURING 2016-17 ACE-I/NH/RFP-Authority Engineer/2017-18/70 26/05/2017 26/05/2017 06/07/2017
Time 11:0Hrs
515 Chief Engineer Project Shivalik 80260/Infracon/Consultancy/36TF/E8 25/05/2017 25/05/2017 22/06/2017
Time 17:0Hrs
516 Independent Engineer services for Four Laning of Solapur- Bijapur Section of NH-13 (NEW NH NO 52) (Four Lane) from km 0.000 to km 110.542 (Design Length 109.08 km) in the states of Maharashtra and Karnataka to be executed under BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) basis under NHDP Phase III NHAI/GM(T)/IE/Sol-Bij/Mah/2017 23/05/2017 23/05/2017 17/07/2017
Time 11:0Hrs
-
517 RFP for procurement Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section section (i)Indapur-Tala –Mandad –Agardanda section of NH-753F ( Length - 42.345 km) section (ii) Mangaon –Mhalsa- Dighi Port section of NH-753F (Length - 54.75 km) section (iii) Wakan Pali Khopoli section of NH-548A (Length - 40.51 km) On EPC Basis. NH/MAH/MSRDC/Konkan-1/AE/Pkg-30-2nd call 25/05/2017 22/05/2017 12/06/2017
Time 17:0Hrs
518 6-laning of Chandikhole-Jagatpur-Bhubaneswar section of NH-16 from Km. 413.000-418.000 and Km. 0.000 to Km. 62.000 as BOT (Toll) on DBFOT Pattern under NHDP-Phase-V in the State of Odisha 11011/8/RO-OD/2017/IE 27/05/2017 22/05/2017 27/06/2017
Time 11:0Hrs
519 Independent Engineer services during balance construction period and O&M period for Four laning of Gwalior-Shivpuri section of NH-3 from km 15.600 of NH-75 (End of Gwalior bypass) to km 236.00 of NH-3 in the state of Madhya Pradesh on BOT (Toll) on DBFOT Pattern under NHDP Phase 660 09/06/2017 17/05/2017 31/07/2017
Time 14:0Hrs
520 Consultancy Services for Authority Engineer for Supervision for balance work for 4-laning of Bhopal-Biaora section of NH-12 from Lalghati km 315-725 to Bhopal bypass junction km. 324-00 (PKG-I) and balance work for 4-lanning of Bhopal-Biaora section of NH-12 from km. 324-00 to km. 423-40 (PKG-II) in the State of Madhya Pradesh on EPC Mode NHAI/HQ/MP/Tech/BPL- BIO/ AE/2017 dated 15/05/2017 17/05/2017 16/05/2017 15/06/2017
Time 11:30Hrs
521 Independent Engineer Services during Operation & Maintenance Period of Four lane Chenani - Nashri section of NH-44 (Old NH-1A) from km. 89.00 to km. 130.00 including 9 km long tunnel (2 lane) with parallel escape tunnel in the state of Jammu & Kashmir (2nd Call) J&K/IE/O&M/03 15/05/2017 15/05/2017 13/06/2017
Time 11:0Hrs
522 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF ROB AND ITS APPROACHES PARALLEL TO EXISTING ROB AT KM 1.800 ON NH-65 (NEW NH-152) AT AMBALA IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/4 12/04/2017 15/05/2017 01/08/2017
Time 15:0Hrs
523 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR CONSTRUCTION OF ROB AND ITS APPROACHES IN LIEU OF LEVEL CROSSING NO. C-25 AT KM 132.850 ON NH-334B AT JHAJJAR IN THE STATE OF HARYANA ON EPC MODE. PWD/HR/PKL/AE/5 12/04/2017 15/05/2017 02/08/2017
Time 15:0Hrs
524 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR Widening to Two/Four Lane with Paved Shoulders from Km 182.120 to km 227.600 of NH-167 on Haggari-Jadcherla Road on EPC mode under NH(O) in the STATE OF Telangana SE(R&B)NH/HYD/8/2016-17, Dt. 03.05.2017(2nd Call). 11/05/2017 11/05/2017 29/05/2017
Time 15:0Hrs
525 Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Stretch from Rohat (on NH-62) – Ahore (on NH-325) Length 82 Km NIT No 20 of 2017-18 S.No.03 09/05/2017 09/05/2017 11/05/2017
Time 11:0Hrs
526 Consultancy Services for Authority’s Engineer for Supervision of “Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypass) of NH-36 & 39 in the state of Nagaland and Dimapur Bypass (Assam Portion) from existing Km 159.400 of NH-36 to existing Km 102.500 of NH-39 and upto end point of Assam portion [Design Km 118.050 to design Km 132.375] (length 14.325 Km) in the State of Assam under SARDP-NE on EPC NHIDCL/Nagaland & Assam/Dimapur Bypass /AE/2017 17/05/2017 09/05/2017 08/09/2017
Time 15:0Hrs
527 Consultancy service for Authority’s Engineer for supervision of “Widening to two lane with paved shoulders from Km 4.40 to 56.00 of NH-218 Bijapur-Hubli section in the state of Karnataka through EPC Mode. (Job No.NH-218-KNT-2016-17-836)”. EE/NHD/VJP/NH-218/Job-836/AE/NIT/2017-18/476 05/05/2017 06/05/2017 15/06/2017
Time 11:0Hrs
528 Independent Engineer IE for O and M of Four laned Dhule Pimpalgaon Km 265 Km 380 section of NH 3 New NH 60 in the State of Maharashtra NHAI RO MUM NSK DP NH 3 2017 18 02 11/05/2017 02/05/2017 12/06/2017
Time 11:59Hrs
529 Independent Engineer IE for O and M of Four laned Vadape Gonde Km 539.5 Km 440 section of NH 3 New NH 160 in the State of Maharashtra NHAI RO MUM NSK VG NH 3 2017 18 01 11/05/2017 02/05/2017 12/06/2017
Time 11:59Hrs
530 Consultancy services for Authoritys Engineer for supervision of the work of (A) Construction of twins 2-Lane ROB and its approaches in replacement of existing level crossing Gate No – KA-34 (Rly Km 160/25-160/25-160/27) between Midnapore & Bankura in Kubai at Km 154.617 of NH-60 in the State of West Bengal, (JOB NO-NH-60/WB/(5)/16-026-S&R(B) and (B) Construction of Twins 2-Lane ROB and its approaches in replacement of existing level crossing Gate No KA-38 (Rly Km 165/21-165/23) between Chandrako 03/2017-2018 of SE NHC-I 26/04/2017 28/04/2017 19/05/2017
Time 17:0Hrs
531 Consultancy Services of Authority Engineer for Widening to 2 lane with paved shoulder from km 0 to 40 of NH 2C Dehri Banjari AKbarpur Road & Construction of ROB and its approach in lieu of existing level crossing at Km 119 on N H 30 Under NHO Annual Plan 2016 17 in Bihar under EPC mode of procurement 02/NH-GAYA/2017-18 27/04/2017 28/04/2017 08/05/2017
Time 15:0Hrs
532 Independent Engineer services for Operation & Maintenance Period of Trichy Bypass to Tovarankurichi – Madurai Section of NH-45B from Km 0/000 to Km 124/840 on OMT Basis in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XII – 2nd Call 02/05/2017 28/04/2017 15/05/2017
Time 15:0Hrs
533 Independent Engineer services for Two lanes with/without paved shoulders of Tindivanam – Krishnagiri section of NH-66 from Km 37.600 to Km 219.782 (Design Chainage) – DBFOT (Annuity) basis – Under NHDP Phase-III - in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XIV 22/05/2017 28/04/2017 31/05/2017
Time 11:0Hrs
534 Independent Engineer services for Operation and Maintenance of four laned Jalan-dhar to Punjab/JK Border (km 4.230 to km 117.750/ 4.000 and km 4.000 to km 16.350) of NH-1A in the state of Punjab (OMT Pkg-21A) on OMT basis. NHAI/IE/OMT-21A/2017/CM-III 23/05/2017 27/04/2017 29/06/2017
Time 11:0Hrs
535 Independent Engineer services for Operation and Maintenance of four laned Jalan-dhar to Punjab/JK Border (km 4.230 to km 117.750/ 4.000 and km 4.000 to km 16.350) of NH-1A in the state of Punjab (OMT Pkg-21A) on OMT basis. NHAI/IE/OMT-21 A/2017/CM-III 03/07/2017 27/04/2017 24/07/2017
Time 11:0Hrs
536 Independent Engineer services for Operation and Maintenance of four laned Jalan-dhar to Punjab/JK Border (km 4.230 to km 117.750/ 4.000 and km 4.000 to km 16.350) of NH-1A in the state of Punjab (OMT Pkg-21A) on OMT basis. NHAI /IE/OMT-21 A/2017/CM-III 21/08/2017 27/04/2017 09/09/2017
Time 11:0Hrs
537 Independent Services for Operation and Maintenance for Lalitpur-Sagar-Lakhnadon on NH-26 in the State of Madhya Pradesh on OMT Basis (Package-OMT-14 (NS)) 2017 NHAI 341 1 16/05/2017 26/04/2017 17/05/2017
Time 11:30Hrs
538 Consultancy Services for supervision of (i) two laning with paved shoulder of NH-53 from Silchar to Badarpur (ii) Construction of Extra-dosed RCC bridge including via duct and approaches over river feni (iii) Improvement and strengthening of road section from chand khera to kurti bridge NHIDCL/Assam/NH 53/AE/Sil-Bad/2016 27/04/2017 26/04/2017 28/06/2017
Time 11:0Hrs
539 Independent Services for Operation and Maintenance for Lalitpur-Sagar-Lakhnadon on NH-26 in the State of Madhya Pradesh on OMT Basis (Package-OMT-14 (NS)) 2017 NHAI 341 03/06/2017 26/04/2017 08/06/2017
Time 11:30Hrs
540 Request for Proposal for Selection of Authority’s Engineer for supervision of the project “Rehabilitation and Up-gradation from (i) km 178.000 to 215.000 (Kabrai-Banda) (ii) km 285.000 to 326.000 (Kalupur-Lalata Road) (iii) km 326.000 to 379.555 (Mau-Jasra) of NH-76 to two lane with paved shoulder on EPC Mode in the state of Uttar Pradesh 470/13M-NHCK/17 30/04/2017 24/04/2017 01/06/2017
Time 17:0Hrs
-
541 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of NH-43 (old NH-78) from (Old Ch. 245.000 to 331.000 km, New Ch. 245.000 to 323.100 km) (MP border/ CG border to Surajpur section) to two lane with paved shoulders in the State of Chhattisgarh under Corridor Approach through EPC mode contract. 02/CE/NH/TC/44-01/2017 17/05/2017 24/04/2017 27/05/2017
Time 17:0Hrs
542 Consultancy Services for Authority’s Engineer for Supervision of balance work for four Laning of Obedullaganj to Itarsi from km. 2.8 to km. 8.3 and from km. 20.7 to km. 63.00, excluding km. 8.3 to 20.7 Wild Life Area (PKG-I) and balance work for four laning of Itarsi to Betul Section of NH-69 from km. 63.0 to km. 137.0 (PKG-II) in the State of MP on EPC Mode. NHAI/MP/AE/11012/Phase-III/obed-Betul/2017 13/05/2017 21/04/2017 22/05/2017
Time 11:30Hrs
543 Supervision Consultancy Services for construction supervision of Balance work to four lanes of Gwalior - Jhansi Section of NH-75 in the State of UP & MP under N-S Corridor on EPC Mode (Item Rate Basis). NHAI/MP/G-J/EPC-Item Rate/SC/01/17 12/05/2017 21/04/2017 22/05/2017
Time 11:30Hrs
544 CONSULTANCY SERVICES OF AUTHORITY ENGINEER FOR UPGRADATION TO 2 LANE WITH PAVED SHOULDER FOR SECTION FROM KM. 58.00 TO KM. 91.600 EXLUDING CHAINAGE (59.460 TO 62.900),(73.120 TO 75.920),(82.650 TO 85.300) BALOTRA TO SANDERAO VIA JALORE SECTION OF NH-325 IN THE STATE OF RAJASTHAN EPC MODE ( JOB NO. NH-325/RJ/2016-17/677) AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER FOR SECTION FROM KM. 118.900 TO KM. 156.955 EXLUDING CHAINAGE (151.100 TO 154.730 BALOTRA TO SANDERAO 02/2017-18 SE NH Jodhpur 26/05/2017 21/04/2017 14/06/2017
Time 11:0Hrs
-
545 Independent Engineer services for 6-laning of Handia to Varanasi section of NH-2 from km 713.146 to km 785.544 (Design Length-72.398 km) in the State of Uttar Pradesh under NHDP Phase-V on DBFOT Hybrid Annuity mode Handia-Varanasi/NH-2/Hybrid Annuity/UP(Tech-Div)/IE/2016/98564 21/04/2017 20/04/2017 30/05/2017
Time 11:0Hrs
546 Consultancy services for Authority Engineer for Supervision of Construction of Partially Access Controlled Four lane Elevated Highway between Samrala Chowk (Design Chainage km 0.000) to Ludhiana Municipal Limit (Design Chainage km 12.951) of NH-95 (Section Passing through Ludhiana City) in the State of Punjab on EPC Mode under NHDP Phase IV NHAI/13044/1/2017/PB 12/05/2017 19/04/2017 19/05/2017
Time 11:0Hrs
547 Independent Engineer Services for Rehabilitation and up-gradation of NH-66 (Erstwhile NH-17) from Km 406/030 to Km 450/170 [Kalmath to Zarap section] to four lane with paved shoulder in the state of Maharashtra under NHDP -IV on Hybrid Annuity Mode. [Job No. 17 -MAH-NHDPIV-2016-17-07] RO/MUM/IE/NHDP-07/2016-17 25/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
548 Independent Engineer Services for Rehabilitation and up-gradation of NH- 66 (Erstwhile NH-17) from Km 367.200 to Km 406.030 [Talgaon to Kalmath section] to four lane with paved shoulder in the state of Maharashtra under NHDP -IV on Hybrid Annuity Mode. [Job No. 17 -MAH-NHDPIV-2016-17-08] RO/MUM/IE/NHDP-08/ 2016-17 25/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
549 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of Section (i) Indapur to Wadpale section of NH-17 [New NH No. 66] from existing km 84.000 to km 110.750 and section (ii) Veer (Wadpale) to Bhogaon Khurd section of NH-17 [New NH No. 66] from existing km 110.75 to km 148.0 in the State of Maharashtra to four-lanes with paved shoulders under NHDP-IV [Job No. 17 (New NH No. 66)-MAHNHDPIV-2016-17-11 and 12 RO/MUM/AE/NHDP-11-12/ 2016-17 24/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
550 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of Watul to Talgaon section of NH-17 [New NH No. 66] from existing km 332.200 to km 367.200 [Design km 165.270 to km 198.528] in the State of Maharashtra to four-lanes with paved shoulders on EPC Mode under NHDP-IV [Job No. 17 (New NH No. 66)-MAH-NHDPIV-2016-17- 18] RO/MUM/AE/NHDP-18/ 2016-17 24/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
551 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of Nasratpur to Barasgaon section ofNH-222 [Design Ch. 66.700 to Ch. 92.565 and Design Ch. 92.565 to Ch. 96.750] in the State of Maharashtra to four-lanes with paved shoulders on EPC Mode under NHDP-IV [Job No. 222-MAH-NHDPIV-2016-17-17 RO/MUM/AE/NHDP-17/ 2016-17 24/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
552 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Upgradation of Mantha Taluk border-Waturphata-Ashti-Majalgaon-Dharur-Maij-Kalamb-Yermala-Kusalamb-Barshi- road section-III from Majalgaon (101.740) to Kaij (159.258) of NH-548C to two lane with paved shoulder in the State of Maharashtra. [Job No. NH-548C-MAH-2016-17-1140 RO/MUM/AE/NHO-1140/ 2016-17 24/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
553 Consultancy services for Authority’s Engineer for Supervision of Four-laning of section (i) from existing km 475.000 to 502.500 of NH-17 (Patradevi to Karaswada section) and section (ii) from existing km 502.500 to km 514.830 and km 517.880 to km 522.790 of NH-17 (Karaswada-Porvorim-Panaji-Bambolim section)) in the state of Goa on EPC Mode under NHDP-III (Job No. 17 (New NH No. 66)-GOA-NHDPIV-2016-17-19 and 20) RO/MUM/AE/NHDP-19-20/GOA/ 2016-17 19/04/2017 17/04/2017 01/06/2017
Time 17:0Hrs
554 IE service for Six laning of Kozhikode Bypass (Calicut Bypass) section of NH-17 in the State of Kerala on Hybrid Annuity Mode. NHAI/Tech/KL/Kozhikode Bypass/NH-17/IE/2017-18 13/04/2017 13/04/2017 26/12/2017
Time 11:0Hrs
555 Independent Engineer Services for Four laning of End of Pandoh bypass to Takoli Section of NH-21 on Hybrid Annuity Mode in the state of Himachal Pradesh NHAI/HEM/PB-TK/2017/IE/HP 18/04/2017 13/04/2017 25/07/2017
Time 11:0Hrs
556 Consultancy service for Authority’s Engineer for supervision of Strengthening and widening to two lane with paved shoulder of NH-61 from Km 40.00 to Km 72.40 under EPC mode in the state of Nagaland CE/NH/etender/2017-18/02 27/03/2017 13/04/2017 06/06/2017
Time 12:0Hrs
557 Independent Engineer services for Operation and Maintenance of Ayodhya-Gorakhpur Section Border stretch of NH-28 in the State Uttar Pradesh (OMT Pkg-11) on OMT basis. 2017-NHAI- 186-1 24/04/2017 13/04/2017 15/05/2017
Time 11:0Hrs
558 Independent Engineer services for Operation and Maintenance of Gorakhpur-Kasia-UP/Bihar border section of NH-228from km. 279.800 to km. 360.915 (new ch. Km. 285.002 to km. 366.117) (Total Length 81.115 km.) on OMT basis toll collection of Toll Plaza at km. 255.200 (new Ch km. 256.500) (for Toll collection of BOT Annuity reach from km. 251.700 to km. 279.800 (new Ch km. 252.860 to km. 285.215) of Gorakhpur Bypass of NH-28 in the state of Uttar Pradesh (OMT Pkg-27A) on OMT basis. 2017-NHAI- 192-1 24/04/2017 13/04/2017 24/08/2017
Time 11:0Hrs
559 Independent Engineer services for Operation & Maintenance of Allahabad Bypass (including Ganga Bridge Pkg ABP-1) from Km. 158.00 to Km. 242.708 section of NH-2 in the State of UP under OMT Pkg 32 2017-NHAI-198-1 24/04/2017 13/04/2017 24/08/2017
Time 11:0Hrs
560 Independent Engineer services for Independent Engineer services for Operation & Maintenance of Kanpur-Lucknow (Km. 11-005 to Km. 75-500) stretch of NH-25 and Lucknow Bypass (Km. 0-00 to 22-850) stretch of NH-56A and 56B and Lucknow-Ayodhya Section (Km. 8-00 to Km. 137-970) stretch of NH-28(Total Length Km. 217-315) in the State of UP under OMT Pkg 10 2017-NHAI-188-1 24/04/2017 13/04/2017 24/08/2017
Time 11:0Hrs
-
561 Independent Engineer services during balance construction period and O&M period for Four laning of Gwalior-Shivpuri section of NH-3 from km 15.600 of NH-75 (End of Gwalior bypass) to km 236.00 of NH-3 in the state of Madhya Pradesh on BOT (Toll) on DBFOT Pattern under NHDP Phase-IV. 2017NHAI2041 25/04/2017 13/04/2017 11/05/2017
Time 14:0Hrs
562 Authority’s Engineer for Supervision of Construction of Stand alone Ring Road / Bypass around Jammu City in the state of J&K (4 Lane, Length -58.2Km) on Engineering Procurement and Construction (EPC) Basis NHAI/12011/EPC/AE/2017 03/05/2017 13/04/2017 14/09/2017
Time 11:0Hrs
563 Independent Engineer services for Operation and Maintenance of Ayodhya Gorakhpur Section Border stretch of NH 28 in the State Uttar Pradesh (OMT Pkg 11) on OMT basis 2017 NHAI 186 1 Extended 18/05/2017 13/04/2017 24/08/2017
Time 11:0Hrs
564 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up gradation of Barhani Kataya Chowk Near Shohratgarh Section Km. 385 000 to Km. 420 000 of NH 730 to two lane with paved shoulder under EPC mode in the State of Uttar Pradesh 886 357YATA NHCIRCLE 17 DATED 10 04 2017 17/07/2017 13/04/2017 27/11/2017
Time 15:0Hrs
565 Kadsd rwerew rwetwe 10/04/2017 11/04/2017 12/04/2017
Time 15:0Hrs
-
566 Feasibility study/ Detailed Engineering report for construction of two lane with paved shoulder for in principle approved National Highway Pokharan-Sankda-Bhainsda-Fatehgarh Length 80 Km NIT No 20 of 2017-18 S.No.02 09/05/2017 10/04/2017 11/05/2017
Time 11:0Hrs
567 Consultancy Services for Independent Engineer services for Six Laning of Bangalore – Nidigatta Section, Km 18/000 to Km 74/200 of NH-275 in state of Karnataka to be executed on Hybrid Annuity Mode– NHAI/ KNT/ NH-275/Bng-Nid/ IE/2017 07 April 2017 11/04/2017 07/04/2017 18/07/2017
Time 11:0Hrs
568 Consultancy Services for Independent Engineer services for Six Laning of Nidagatta-Mysore Section, km 74/20 to km 135/304 of NH-275 in the State of Karnataka to be executed on Hybrid Annuity Mode NHAI/ KNT/ NH-275/NID-MSY/IE/2017 07 April 2017 11/04/2017 07/04/2017 18/07/2017
Time 11:0Hrs
569 Consultancy services for Authority’s Engineer for supervision of the works of 1) Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T at km 307.050 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(9)/15-16/013-S&R(B) 2) Construction of ROB and its approaches in lieu of Level Crossing No. 21/SPL/E at km 338.600 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(10)/15-16-020-S&R(B) Bid Package No. 1/2017-18 of SE, NHC - II,Dated - 05.04.2017 04/04/2017 07/04/2017 15/05/2017
Time 15:0Hrs
570 Consultancy Services for Authority Engineer for Supervision for balance work for 4-lanning of Bhopal-Biaora section of NH-12 from Lalghati km 315-725 to Bhopal bypass junction km 324-00 (PKG-I) and balance work for 4-lanning of Bhopal-Biaora section of NH-12 from km 324-00 to km 423-40 (PKG-II) in the State of Madhya Pradesh on EPC Mode NHAI/HQ/MP/Tech/BPL-BIO/ AE/2017 dated 07/04/2017 08/04/2017 07/04/2017 08/05/2017
Time 11:30Hrs
571 Construction of ROB including approaches in lieu of Railway Crossing No C57 at Km 76.340 on NH 754 at Jalalabad in the state of Punjab on EPC Mode 61 13/04/2017 31/03/2017 16/04/2017
Time 16:0Hrs
572 RFP for Consultancy services for Authority’s Engineer for supervision of Civil Construction work for Widening to 2-lane with paved shoulders including geometric improvement from km 318.00 to km 339.940 on Churaibari-Agartala Section of NH-44 in Tripura on EPC mode (Job No. 8(44)/TR/2016-17/06) Bid No. 20(1)/CE/PWD (NH)/2015/DNIT-34/2016-17 31/03/2017 31/03/2017 28/04/2017
Time 12:0Hrs
573 Authority Engineer for Supervision of Rehabilitation and Upgradation of NH-4 from Km 133.36 to Km 171.59 (Andhra Pradesh / Tamil Nadu Border to Nalagampalli village) and Nalagampalli (Existing Km 171.590/Design Km 172.00) to AP/Karnataka Border (Existing Km 216.912/ Design Km 219.687) to four lane with paved shoulders (Design Length = 47.687 Km) under NHDP-IV in the State of Andhra Pradesh on EPC Mode NHAI/Tech/AP/2016/NH-4/AE 31/03/2017 31/03/2017 02/05/2017
Time 11:0Hrs
574 Authority Engineer services for Capacity Augmentation of the existing 4 lane stretch from lchhapuram to Narasannapeta from Km 470.415 to Km 580.700 (Design Length=110.285 Km) of NH-16 (Old NH-5) in the State of Andhra Pradesh on EPC mode NHAI/AP/NH-16/AE Services/ lchhapuram- Narasannapeta / 2016-17 03/04/2017 31/03/2017 26/05/2017
Time 11:0Hrs
-
575 Independent Engineer services for Rehabilitation a¬¬nd Upgradation by 4-Laning of Singhara to Binjhabahal Section from km 311.000 to Km 414.000 (Design Chainage from Km 310.806 to Km 414.982) of NH-6 (New NH-49) in the State of Odisha under NHDP Phase-IV on Hybrid Annuity Mode NHAI/NHDP IV/OR/07/2016/AE/2016/90 26/04/2017 31/03/2017 02/05/2017
Time 11:0Hrs
576 Consultancy services for Authority’s Engineer for Supervision of construction of NH-24 4-lane bypass starting from km 479.500 of NH-24 and terminating at km 17.600 of MDR-77C (bypass chainage from km 64.900/64.380 to km 79.516/79.000 total length 14.618 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode NHAI/ NHDP-VII/Pkg-IIIB/NH-24 Bypass/EPC/AE RFP/2017 06/04/2017 30/03/2017 01/05/2017
Time 11:0Hrs
577 Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh. Package No. HP/Shimla/29Sml HP/Shimla/29Sml 06/04/2017 30/03/2017 21/04/2017
Time 15:0Hrs
578 Reconstruction with geometric improvement of existing single/intermediate lane to 2 lane with earthen shoulder configuration from existing Km 16.545 to Km 33.130 & Km 41.260 to Km 57.975(design chainage 18.700 to Km 35.130 & Km 47.700 to Km 63.700) excluding Khat village from Km 53.425 to 55.330(Design chainage 59.330 to Km 61.150) of NH-109 in the state of Uttarakhand / widening and strengthening from km 57.975 to km 68.600( Fata to Sitapur) on NH-109 RO/UK/NH-109-UR-2016-17-493/01 05/05/2017 28/03/2017 25/05/2017
Time 15:0Hrs
579 Consultancy services for Authority Engineer for supervision of the works Construction of Twins 2 Lane ROB and its approaches in replacement of existing level crossing Gate No KA 38 Rly Km 165 21 165 23 between Chandrakona Road and Garbeta Stations in Kadamdiha at Km 159 448 of NH 60 in the state of West Bengal JOB NO NH 60 W B 3 15 16 025 S R B 32/016-17 of SE, NHC-I 27/03/2017 27/03/2017 18/04/2017
Time 17:0Hrs
580 Independent Engineer services for Development and operation of Beawar-Gomti section of NH-8 from km. 58.245 to 177.050 in the State of Rajasthan on Design, Build, Finance, Operate & Transfer (DBFOT) basis RW/JAI/RJ/B-G/4-Lane/New IE/2016 26/03/2017 27/03/2017 11/05/2017
Time 16:0Hrs
581 Consultancy Services of Authority’s Engineer for supervision of Rehabilitation and Up-gradation of Allahabad-Mirzapur section (km 400.878 to 450.000) of NH 76 E to two lane with paved shoulder under EPC Mode in the State of Uttar Pradesh 543/107COMB-18/17 23/03/2017 24/03/2017 24/04/2017
Time 15:0Hrs
-
582 Independent Engineer Services during Operation & Maintenance stage for 4/6 laning of Beawer- Pali- Pindwara section of NH- 14 under BOT project in the State of Rajasthan NHAI/Tech/Raj/Misc/2017 /75 27/03/2017 24/03/2017 25/04/2017
Time 11:0Hrs
583 Independent Engineer services for Four laning of Tuljapur - Ausa (including Tuljapur Bypass) Section of NH-361 from km 0.000 to km 55.835 (Existing Chainage km 416.000 to km 470.000) under NHDP Phase-IV in the state of Maharashtra on Hybrid Annuity Mode NHAI/GM (T)/RON/IE/Tujapur-Ausa/Mah/2017 29/03/2017 24/03/2017 30/05/2017
Time 11:0Hrs
584 Consultancy services for Authority engineer for supervision of Construction of High Level Thapra Bridge on Chordi Choraha-Kuba-Ananduri Road (MDR-83) in Km. 22 of Banswara District in the state of Rajasthan Under ISC on EPC Mode NIT 13/2016-17 PWD Dn Garhi 23/03/2017 23/03/2017 24/04/2017
Time 11:0Hrs
585 Consultancy Services for Authority Engineer for Supervision of “ Construction of Two-Laning of Akajan – Likabali- Bame Road on EPC basis from existing Km 71.000 to 99.000 (design Km. 65.810 to Km. 91.928) in the state of Arunachal Pradesh under SARDP-NE on Engineering Procurement & Construction (EPC) Mode NHIDCL/Ar.Pr./Akajan–Likabali– Bame (71.0 to 99.0 /AE/2017 23/03/2017 23/03/2017 11/05/2017
Time 16:30Hrs
586 Independent Services for Operation and Maintenance for Lalitpur-Sagar-Lakhnadon on NH-26 in the State of Madhya Pradesh on OMT Basis (Package-OMT-14 (NS) NHAI RO Bhopal O and M IE 2017 dated 18.03.2017 20/03/2017 20/03/2017 20/04/2017
Time 11:0Hrs
587 Consultancy services for Authority’s Engineer for supervision of civil construction works reconstruction with geometric improvement of existing intermediate lane to 2 lane with paved shoulder configuration from km 28.600 to km 59.420 of NH-94 in the state of Uttarakhand on EPC mode. CB/CD/PIU/DDN/RFP-10 20/03/2017 17/03/2017 17/05/2017
Time 11:0Hrs
588 Consultancy Services for Independent Engineer services for SIX-LANING OF DAVANAGERE – HAVERI FROM KM 260/000 TO KM 338/923 OF NH-48 (OLD NH-4) IN THE STATE OF KARNATAKA TO BE EXECUTED AS HYBRID ANNUITY PROJECT ON DBOT ANNUITY UNDER NHDP PHASE – V NHAI/KNT/ DAV- Haveri /NHDP-V/IE/2017 16th March 2017 17/03/2017 16/03/2017 02/05/2017
Time 11:0Hrs
-
589 Consultancy Services for Authoritys Engineer for Supervision of Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE Phase A on EPC basis NHIDCL/Assam/Dolabari-Jamuguri/AE/2017 16/03/2017 15/03/2017 08/05/2017
Time 11:0Hrs
590 Independent Engineer Services for Four laning of Jhansi-Khajuraho section (pkg-II) of NH-75/76 from Design Chainage Km 76-300 (Existing Chainage 82-100) near village Chhatipahari to Design Chainage Km 161-700 (Existing Chainage Km 57-9) near Bamitha town in the state of UP & MP under NHDP Phase – IV on Hybrid Annuity mode NHAI/MP/Tech/Jha- Khuj/IE/pkg-II/2017 dated 15/3/2017 17/03/2017 15/03/2017 17/04/2017
Time 17:0Hrs
591 Independent Engineer Services for Four laning of Jhansi-Khajuraho section (pkg-I) from km 0-00 to km 76-300 (existing km 108-300 of NH-25 Kanpur-Jhansi Section to km 82-10) of NH-75/76 in the state of UP/MP under NHDP Phase-III on Hybrid Annuity mode NHAI/MP/Tech/Jha- Khuj/IE/pkg-I/2017 dated 15/3/2017 17/03/2017 15/03/2017 17/04/2017
Time 17:0Hrs
592 Consultancy Services for Independent Engineer services for Six-Laning of Chitradurga – Davanagere including Chitradurga bypass (km 189/000 to km 260/000) (Design Chainage Km 0/000 to Km 20/700 & Km 208/000 to Km 260/000) of NH-48 (Old NH-4) in the state of Karnataka to be executed as Hybrid Annuity Project on DBFOT Pattern under NHDP Phase – V NHAI/KNT/Chitra- DAV/NHDP-V/IE/2017 15th March 2017 17/03/2017 15/03/2017 28/04/2017
Time 11:0Hrs
593 Consultancy Services for Authoritys Engineer for i Rehabilitation and up-gradation of Beodnabad-Ferrargunj of NH-223 from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2 Lane with hard shoulder in the UT of A&N PkgI ii Rehabilitation and up-gradation of section from Km 242.0 to 298.0 of NH-223 to 2 Lane with hard shoulder in the UT of A&N PkgII iii Construction of Major Bridge over Humphrey Strait Creek between Km.129.420 to Km. 130.600 of NH-223 in UT of A&N Islands Pkg-III NHIDCL/AE/A&N/Humphrey/Pkg-I&II/2016-17 10/03/2017 10/03/2017 24/04/2017
Time 15:0Hrs
594 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UPGRADATION TO TWO LANE WITH PAVED SHOULDERS FROM KM 531/250 TO KM 597/946 (KUNKURI TO CG/JH BORDER SECTION) OF NH-78 IN THE STATE OF CHHATTISGARH UNDER NHDP–IV THROUGH ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) BASIS CONTRACT BASIS RO/CG/AE/NH78 09/03/2017 10/03/2017 17/04/2017
Time 17:0Hrs
595 Independent Engineer services for six laning of Ranastalam - Anandapuram section of NH-16 from Km 634.000 to Km 681.000 in the State of Andhra Pradesh under NHDP Phase V on Hybrid Annuity Mode NHAI/AP/NH-16/IE Services/Ranastalam-Anandpuram / 2016-17 10/03/2017 09/03/2017 20/04/2017
Time 17:0Hrs
-
596 Consultancy Services for 4 Nos ROB and one Road Project in Bihar AE01/NH purnia/2016-17 09/03/2017 09/03/2017 31/03/2017
Time 15:0Hrs
597 Authority’s Engineer for the Balance Work of Four-Laning of Dhalkola Bypass (Length 5.5 Km) Including ROB on NH-34 (On EPC Mode) in the State of West Bengal. NHAI/NH-34/Dkhl Bypass/2016/Bal. Work/63C 23/03/2017 09/03/2017 07/04/2017
Time 11:0Hrs
598 Authority Engineer for supervision of Widening of road to 2-lane with paved shoulder including construction of Bridges & Culverts in Km.182 to 266/6 (Design length 81.60 km) on NH-59A (Indore–Betul road) in the State of Madhya Pradesh on EPC mode. RO/BPL/NH(O)/2016-17/83/AE 07/04/2017 09/03/2017 31/05/2017
Time 11:30Hrs
599 Authority’s Engineer for the work of Development of four-lane Islampur Bypass of 10.31 km length from km.0.00 (ex.ch. 498.500) to km. 10.310 (ex.ch. 506.950) of NH-31 in the State of West Bengal under NHDP PHASE II on Engineering, Procurement and Construction (EPC) mode NHAI/11015/WB-7/8/2015/AE/105 (C) 23/03/2017 08/03/2017 06/04/2017
Time 11:0Hrs
600 Independent Engineer services for Operation & Maintenance Period of Trichy Bypass to Tovarankurichi – Madurai Section of NH-45B from Km 0/000 to Km 124/840 on OMT Basis in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XII 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
601 Independent Engineer services for Operation & Maintenance Period of 4 laning of Madurai – Tirunelveli – Panagudi – Kanniyakumari Section from Km 0/000 to Km 243/170 on OMT Basis & 4 Laning and Strengthening of Existing 2 Lanes of Tirunelveli – Tuticorin Road from Km 4/300 to Km 51/200 of NH-7A in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XIII 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
602 Independent Engineer services for Operation & Maintenance Period of 2/4 laning of Trichy to Karur Section of NH-67 from Km 135/800 to Km 218/028 Including Lalapet ROB 2.28 Km) under NHDP Phase-III on BOT (Toll) basis in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-XI 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
603 Independent Engineer services for Operation & Maintenance Period of 4 Lane divided carriageway facility of Salem –Kumarapalayam Section from Km 0/000 to Km 53/525 (TN-06) and Kumarapalayam-Chengapalli Section from Km.53/525 to Km 102/035 (TN-07) of NH-544 (Old NH-47) in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-X 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
604 Independent Engineer services for Operation & Maintenance Period of 4 Lane divided carriageway of Krishnagiri – Thopurghat - Thumbipadi Section of NH-44 (old NH-7) from Km 94/000 to Km 180/000 (TN-01) in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-IX 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
605 Independent Engineer services for Operation & Maintenance Period of 4 Lane Thumbipadi-Salem -Namakkal Section from Km 180/000 to Km 248/625 (TN-02) and 4-lane Namakkal-Karur Section from Km.248/625 to Km 292/600 (TN-03) of NH-7 in the State of Tamil Nadu RO Chennai/IE/O&M/2017/Package-VIII 21/03/2017 07/03/2017 12/04/2017
Time 11:0Hrs
606 Consultancy Services for Authoritys Engineer for Supervision of Civil Construction work for Construction of 4lane bypass to Vizianagaram town of NH 43 (New NH 26) from km 537/6 to 552/0 (Raipur to Visakhapatnam section) to 4lane on EPC mode in the state of Andhra Pradesh SE/R&B/NH VJA NIT No.25/SE/AEE2/EPC/2016-17, dt.27.02.2017 09/03/2017 06/03/2017 20/04/2017
Time 17:0Hrs
607 Consultancy Services for Independent Engineer services for Six Laning & Strengthening of Km 340/000 to Km 403/400 of Hubli – Haveri section of NH-48 (old NH-4) in the state of Karnataka under to be executed on Hybrid Annuity mode under NHDP Phase-V NHAI/KNT/Haveri-Hubli/NHDP-V/IE/2017 dated 3-3-2017 06/03/2017 03/03/2017 17/04/2017
Time 17:0Hrs
608 Independent Engineer services for Four / Six Laning of Bodhre (km 390.000) to Dhule (km 452.800) section of NH-211 (new NH No. 52) (Existing Length 62.800 km Design Length 67.231 km) in the state of Maharashtra under NHDP Phase IV on Hybrid Annuity Mode NHAI/ Tech /01/IE/Bod-Dhule /2017 30/03/2017 03/03/2017 30/05/2017
Time 11:0Hrs
609 Independent Engineer services for Four laning of Waranga to Mahagaon section of NH-361 from km 253.700 to km 320.580 (design length 66.880 km) under NHDP Phase-IV on Hybrid Annuity Mode NHAI/ Tech /01/IE/War - Maha /2017 30/03/2017 03/03/2017 30/05/2017
Time 11:0Hrs
610 Independent Engineer services for Four laning of Mahagaon to Yavatmal (Package–II) section of NH-361 from km 320.580 to km 400.575 (Design Length 80.195) in the State of Maharashtra Under NHDP Phase on Hybrid Annuity Mode NHAI/ Tech /01/IE/Maha - Yavat/2017 31/03/2017 03/03/2017 25/05/2017
Time 11:0Hrs
611 Independent Engineer services for Four laning of Yavatmal to Wardha (Package -III) section of NH-361 from km 400.575 to km 465.500 (design length 64.925 km) under NHDP Phase-IV on Hybrid Annuity Mode NHAI/ Tech /01/IE/Yavat- War/2017 31/03/2017 03/03/2017 25/05/2017
Time 11:0Hrs
612 Independent Engineer services for Four Laning of Wardha-Butibori Section of NH-361 from km 465.500 to km 524.690 (design length 59.190 km) under NH (O) in the State of Maharashtra on Hybrid Annuity Mode NHAI/ Tech /01/IE/War - Buti/2017 31/03/2017 03/03/2017 25/05/2017
Time 11:0Hrs
613 Consultancy Services for Authority’s Engineer for Supervision of 4-laning of Piska More – Palama section of NH-23 and 4-laning of Kutchery Chowk Ranchi - Bijupara section (Package-I) and 4-laning of Bijupara – Kuru section (Package-II) of NH-75 in the State of Jharkhand on EPC mode. NHAI/JH/AE/NH-23 and75/2017 20/03/2017 02/03/2017 13/04/2017
Time 11:0Hrs
614 Consultancy Services for Independent Engineer for Supervision of Four Laning of Sethiyahopu – Cholopuram from Km 65.960 to Km 116.440 section of NH-45C in the State of Tamilnadu under NHDP Phase-IV on Hybrid Annuity Mode basis NHAI/HAM/SC/IE/11012/05/2017 03/03/2017 02/03/2017 17/04/2017
Time 11:0Hrs
615 Consultancy services for Independent Engineer for Supervision of Four laning of Cholopuram – Thanjavur from km. 116.440 to 164.275 section of NH-45C in the state of Tamilnadu under NHDP-IV on Hybrid Annuity Mode NHAI/HAM/CT/IE/11012/06/2017 03/03/2017 02/03/2017 17/04/2017
Time 11:0Hrs
616 RFO document for Authority Engineer of ADB-EPC package no 4 20/2016-17 28/02/2017 01/03/2017 11/05/2017
Time 11:0Hrs
617 Consultancy Service for Authority’s Engineer for Supervision of Rehabilitation and Up-gradation to Two Lane with Paved Shoulders from Km. 0.000 to Km. 72.600 Nakrekal to Thanamcherla section of NH-365 in the State of Telangana under NHDP-IV through EPC. RW/HYD/NIT/003/2016-17 24/02/2017 24/02/2017 24/04/2017
Time 15:0Hrs
618 Consultancy Services for Authoritys Engineer for supervision of Rehabilitation and Upgradation to two lane with earthen shoulder of Nongstoin-Wahkhaji road section from km 0.00 to km 43.100 (design km 0.00 to km 43.060) (design length 43.06 km) in the state of Meghalaya under SARDP-NE NHIDCL/MEGHALAYA/N-W/AE/2017 24/02/2017 24/02/2017 06/12/2017
Time 17:0Hrs
619 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF UPGRADATION OF YAGYI – KALEWA SECTION MILEPOST 40/0 TO MILEPOST 115/5 IN MYANMAR TO TWO LANE WITH EARTHEN SHOULDER ON EPC NHAI/11013/International cooperation - Myanmar/AE/2017 20/03/2017 23/02/2017 09/08/2017
Time 11:30Hrs
620 Consultancy services for Authority’s Engineer for supervision of Reconstruction with geometric improvement of existing intermediate lane to 2 lane with paved shoulder configuration from Km 1.957 to Km 28.600 excluding Narendra Nagar bypass (km 13.800 to km 18.550) of NH-94 in the state of Uttarakhand on EPC mode. CB/CD/PIU/DDN/RFP-08-2nd call 02/03/2017 20/02/2017 17/04/2017
Time 11:0Hrs
621 Rehabilitation and up-gradation of NH-85 (old NH-49) from Km119/017 to Km 161/300 (design chainage Km 119/017 to Km 160/800) (Bodimettu to Munnar) to Two Lane with Paved Shoulders in the State of Kerala on EPC mode CENH/MVPA/EPC-AE/04/2016-17 05/03/2017 16/02/2017 20/03/2017
Time 14:30Hrs
622 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF 4-LANING OF RAI MALIKPUR (HARYANA/RAJASTHAN BORDER)-NARNAUL-MOHINDERGARH-CHARKHI DADRI-BHIWANI-KHARAK- CORRIDOR, SECTION FROM KM 94.600 TO 125.920 OF NH-148B IN THE STATE OF HARYANA (PACKAGE-IV) ON EPC MODE. PWD/CHD/NH-PKL/8120 16/02/2017 16/02/2017 03/04/2017
Time 15:0Hrs
623 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF 4-LANING OF RAI MALIKPUR (HARYANA/RAJASTHAN BORDER)-NARNAUL-MOHINDERGARH-CHARKHI DADRI-BHIWANI-KHARAK- CORRIDOR, SECTION FROM KM 99.00 TO 114.375 OF NH-709 (Extn) and BHIWANI BYPASS FROM KM 125.920 TO 135.141 OF NH-148B IN THE STATE OF HARYANA (PACKAGE-V) ON EPC MODE. PWD/CHD/NH-PKL/8121 16/02/2017 16/02/2017 03/04/2017
Time 15:0Hrs
624 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF WORK OF CONSTRUCTION OF NH-21A (NEW NH-105) 4-LANE PINJORE BYPASS STARTING FROM KM 54.533 OF NH-22 AND TERMINATING AT KM 3.800 OF NH-21A (BYPASS CHAINAGE FROM KM 0.000 TO KM 7.700 TOTAL LENGTH 7.700 KM) IN THE STATE OF HARYANA ON EPC MODE. PWD/CHD/NH-PKL/8122 16/02/2017 16/02/2017 03/04/2017
Time 15:0Hrs
625 Consultancy services for construction of 5 ROBs and their approaches in lieu of level crossings at i km 135 on NH 19 ii km 132 on NH 19 iii km 12 on NH-103 iv km 91 on NH 28B and v km 94 on NH-28B in the state of Bihar 92 15/02/2017 15/02/2017 17/03/2017
Time 15:0Hrs
626 Widening to Two Lane with Paved Shoulders from Km 87/000 to 133/720 (Nattukal to Thanau Jn. in Palakkad) of NH-966 (old NH-213) in the State of Kerala on EPC mode CENH/MLPM/EPC-AE/03/2016-17 05/03/2017 10/02/2017 20/03/2017
Time 14:30Hrs
627 Consultancy services for Authoritys Engineer for Supervision of construction of NH-28 4-lane bypass starting from km 17.600 of MDR-77C and terminating at km 15.650 of NH-28 (bypass chaiange from km 79.516/79.000 to km 94.457/93.473 total length 14.707 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Basis NHAI//NHDP-VII/Pkg.-IIIA/NH-28 Bypass/EPC/AE/ RFP/2017 28/02/2017 06/02/2017 15/03/2017
Time 11:0Hrs
628 Independent Engineer services for Rehabilitation a¬¬nd Upgradation by 4-Laning of Binjabahal to Telebani Section from Km 414.000 to Km 491.710 (Design Chainage from Km 414.982 to Km 493.300) of NH-6 (New NH-49/53) in the State of Odisha under NHDP Phase-IV on Hybrid Annuity Mode NHAI/NHDP IV/OR/06/2016/AE/2016/019 02/02/2017 31/01/2017 17/03/2017
Time 11:0Hrs
629 RFP document for Independent Engineer Hanumangarh-Abohar(SH-07A)(upto Punjab Border) Highway Project. 16/2016-17 30/01/2017 30/01/2017 15/03/2017
Time 11:0Hrs
630 Consultancy Services of Authoritys Engineer for supervision of Construction of High Level Bridge across River Sone at Chanchikala including its approaches on Kone Nakatwar Ranidih road in Sonebhadra District of Uttar Pradesh under LWE scheme on EPC Mode. 2907 12 NIVIDA SON CIRCLE1617 23/02/2017 29/01/2017 12/04/2017
Time 17:0Hrs
631 Independent Engineer Services for Development and Maintenance of- RSHIP Package-03 F7(11)/BOT/PPP/D-1472 17/01/2017 27/01/2017 23/03/2017
Time 11:0Hrs
632 Independent Engineer services for Package-I Four Laning of balance work and Operation and Maintenance of Tirupathi – Tiruthani –Chennai Section of NH-205 from Km.274.800 to Km.338.030 in the State of Andhra Pradesh and from Km 0.000 to Km 61.470 in the State of Tamil Nadu on Design, Build Finance, Operate and Transfer (DBFOT) Toll Basis AND Package-II For Chennai Bypass from Km 0.000 to Km 32.600 in the State of Tamil Nadu RO Chennai/IE/O&M/2016/Package-VI 21/02/2017 26/01/2017 28/03/2017
Time 11:0Hrs
633 Consultancy for AE for Supervision of “Construction of 2- Laning of (i) design Km.0(Khupa) to Km.17.[ExistingKm95.8 of(Khupa – Hayuliang Road) to Km8.97(Hayuliang – Hawai Road)] (ii) design Km. 17.000 (Khupa) to Km. 34.000 [Existing Km 16.950 to Km 34.310 (Hayuliang – Hawai Road)] (iii) Design Km. 34.000 to Km. 51.825 [Existing Km 26.625 to Km 45.050 (Hayuliang – Hawai Road)] (iv) design Km. 51.825 to Km. 63.131 [Existing Km 45.050 of Hayuliang – Hawai road in the state of Ar. Pr.Under SARDP-NE. NHIDCL/Ar. Pr./ Hayuliang – Hawai /AE/2017 03/02/2017 25/01/2017 23/03/2017
Time 17:0Hrs
634 Consultancy Services for Authority’s Engineer for Supervision of Construction of Two Laning of Joram – Koloriang Road NH-713 on EPC basis from i design Km 20 to Km 32.050 Existing Km 20 to Km 35.150 ii design Km. 32.050 to Km. 44.000 Existing Km 35.150 to Km 50.050 iii design Km 44.000 to Km 59.363 Existing Km 50.000 to Km 70.000 iv design Km 59.363 to Km 77.363 Existing Km 70.00 to Km 88.700 in the state of Arunachal Pradesh under SARDPNE On EPC Mode. NHIDCL/Ar.Pr./Joram-Koloriang/AE/2017/Pkg-I 03/02/2017 25/01/2017 23/03/2017
Time 16:30Hrs
635 Consultancy Services for Authority’s Engineer for Supervision of Construction of Two Laning of Joram – Koloriang Road NH-713 on EPC basis from i design Km 77.363 to Km 92.363 existing Km 88.700 to Km 104.850 ii design Km. 92.363 to Km. 107.363 existing Km 104.850 to Km 122.600 iii design Km. 107.363 to Km. 122.353 existing Km 122.600 to Km 138.000 iv design Km. 122.353 to Km. 138.389 Existing Km 138.00 to Km 158.00 in the state of Arunachal Pradesh under SARDPNE On EPC Mode. NHIDCL/Ar.Pr./Joram-Koloriang/AE/2017/Pkg-II 03/02/2017 25/01/2017 12/04/2017
Time 17:0Hrs
636 Consultancy Services for Authority Engineer for Supervision of “ Construction of 2 lane road with Paved Shoulders from Meka-Roing-Hunli from existing Km 16 of Roing Hunli section to Km 21.5 of Hunli-Anini Road (Greenfield alignment) (NH-313) (Total Length = 74.863 Km) in Arunachal Pradesh under Arunachal Pradesh package of SARDP-NE on Engineering Procurement and Construction (EPC) basis. NHIDCL/Ar. Pr./Roing-Hunli/AE/2017 16/02/2017 25/01/2017 23/03/2017
Time 16:30Hrs
637 Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Helwak to Karad (Km. 85.000 to Km. 133.417) (L - 48.417 Km) section of NH 166 E & Section (ii) Karad to Tasgaon section of NH-2 (Length - 58.83 km) of NH-266 on EPC Mode NH/MAH/PWD/Pune -2/AE/Pkg-2 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
638 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Nagaj Junction at NH 166 to Jath (32 Km). From km. 0/000 (at Nagaj) to Km 31/148 (at Jath) & Km 134/000 (at Jath) to Km 151/350 (at Muchandi) section of NH-166E (Length - 48.50 km) & Section (ii) Tasgaon to Shirdhon section of NH-266. (Length - 23 km) of NH-266 on EPC Mode. NH/MAH/PWD/Pune - 3/AE/Pkg-3 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
639 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Tembhurni Pandharpur section of from Ch. 00/000 to Ch. 36/190 (Length=36.190 km) and Section (ii) Tembhurni-Pandarpur section, Ch. 40/800 to Ch. 95/136 (Length-54.336Km) of NH-516A on EPC Mode. NH/MAH/PWD/Pune -5/AE/Pkg-5 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
640 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Bhokar to Sarsam Budruk Section (Length = 33.00 Km) of NH 161 A ( Starting from NH 548 C Aakot and terminate at Junction of 161 near Wazar Aurangabad) and Section (ii) Sarsam Budruk to Kothari section of NH-161A (Length 57 km) on EPC Mode. NH/MAH/PWD/ Aurangabad -1/AE/Pkg-6 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
641 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Aurangabad-Sillod section of NH 753-F Design Chainage Km 0.00 to 60.630 (L=60.630 Km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/ Aurangabad - 2/AE/Pkg-7 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
642 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) Sillod–Ajanta–Fardapur section of NH 753-F Design Chainage Km 60.630 to 99.660 (L=39.03 Km) and Section (ii) Fardapur - Jalgaon section of NH 753 F Design Chainage Km 99.66 to 147.38 (L=47.720 Km) on EPC Mode NH/MAH/PWD/ Aurangabad -3/AE/Pkg-8 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
643 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Section 0.000 from design chainage Km to 55.937 Km of NH-752E from Paithan to Shirur (Project length 55.937) and Section (ii) Section from design chainage km 55.937 Km to 114.486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms) on EPC Mode NH/MAH/PWD/ Aurangabad - 4/AE/Pkg-9 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
644 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Parli—Pimpladahiguda section of NH-548B from From Km. 0.000 to Km. 18.440 (L=18.440 Km) and Section (ii) Lokhandi Sawargaon -Renapur (Latur) (34.463 Km) and Ambajogai Bypass (3.815 Km) Section of NH548B - Length 38.278 km on EPC Mode NH/MAH/PWD/ Aurangabad -5/AE/Pkg-10 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
645 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja section of NH-753M from 0.000 (Kumbhari Fata) to km 63.900 (Deaulgaon Raja) and extension from 17.900E (Jawkheda Fata) to 20.730E (Talegaon Fata) Total 66.730 kms in the State of Maharashtra under EPC Mode NH/MAH/PWD/Aurangabad - 6/AE/Pkg-11 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
646 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Bhandara- Ghotitok section of NH-753 (Length - 37.47 km) and Section (ii) Amdi-Saoner section of NH-753 (Length 39.58 km) on EPC Mode NH/MAH/PWD/Nagpur - 1/AE/Pkg-12 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
647 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Nagpur-Katol-Warur Section of NH-353J (Length - 40.47 km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur - 3/AE/Pkg-14 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
648 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Digras-Darwha-Karanja section of NH-361C (Length - 74.35 km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur - 5/AE/Pkg-16 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
649 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Nandgaon – Morshi section of NH-753K (Length - 43 km) and Section (ii) Morshi to MH/MP State Border section of NH-353k (length – 52.39 km) on EPC Mode NH/MAH/PWD/Nagpur -7/AE/Pkg-18 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
650 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Ajanta - Buldhana section of NH-753E Length - 49.13 Km (Design Chainag kmKM 0.000 to km 49.130) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur -8/AE/Pkg-19 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
651 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Akola to Akot section of NH-161A from Design Ch. Km 0.000 (Below VUP of NH-6 bypass, Akola) to Ch Km 51.700 (Akot) (Length = 39.286 km) and Section (ii) Akot to Anjangaon section of NH-548 C (Length - 31.53 km) on EPC Mode NH/MAH/PWD/Nagpur-11/AE/Pkg-22 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
652 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Khamgaon - Shegaon section of NH-548 C (Length - 22.800 Km (Ch. 0.000 TO 22.800)) and Section (ii) Shegaon - Deori phata section (Length - 41.500 km Ch 0.000 TO 41.500) (NH-753E and NH 548C) on EPC Mode NH/MAH/PWD/Nagpur-12/AE/Pkg-23 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
653 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Chikhli - Khamgaon Section of NH – 548C (Length - 56.103 km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur-14/AE/Pkg-25 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
654 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway section (i) MH/CG State border Murumgaon Dhanora Gadchiroli Sawli Mul Chandrapur Road NH 930 Section Gadchiroli to Mul Km. 189.475 to 230.30 & km 233.10 to km 234.02 (Length - 41.62 km) and Section (ii) MH/CG State border Murumgaon Dhanora Gadchiroli Sawli Mul Chandrapur Road NH 930 Section Mul to Chandrapur Km. 234.02 to km 273.719 ( NH/MAH/PWD/Nagpur-16/AE/Pkg-27 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
655 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section KM 47.00 to 98.00 Section Chimur to Warora of Umred Bhisi Chimur Anandwan Warora Road NH353E (Length - 42.75 km) in the State of Maharashtra under EPC Mode NH/MAH/PWD/Nagpur-17/AE/Pkg-28 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
656 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder 4-lane standards of National Highway section (i) Sakoli Lakhandur Wadsa Armori Gadchiroli Chamorshi Asti Aallapalli Sironcha NH 353C Package I Sakoli to Bandra Border (Length - 55.8 km) and Section (ii) Duggipar Gondia Kohmara NH 753 Package II from km 28 to km 42.4 Goregaon to Gondia section (Length - 14.4 km) on EPC Mode NH/MAH/PWD/Nagpur-18/AE/Pkg-29 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
657 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder 4-lane standards of National Highway section (i) Pahur-Jamner-Bodhwad section (44.76 km) of NH-753L (Length - 44.76 km) and Section (ii) Bodhwad-Muktainagar-Barhanpur (Icchapur), section (33.385 km) of NH-753L (Length 33.385 km) on EPC Mode NH/MAH/MSRDC/Nashik-1/AE/Pkg-31 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
658 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section Kolde village to Khetia MP border section of NH 752G length 48.60 km Part of NH 6-Wisarwadi-Nandurbar- Prakasha- Shahada- Khetia (MP Border) NH 752-G in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Nashik-2/AE/Pkg-32 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
659 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section NH-65Jahirabad-Virur-(NH50)-Bhalki(NH52) Nilanga-Nitur-Latur section of NH-752K from km. 00.000 to Km. 64.936 (Design Chainage) (Length - 64.936 km) in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Aurangabad-4/AE/Pkg-36 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
660 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder 4-lane standards of National Highway section (i) Satara – Koregaon – Mhaswad section of NH-548C (Length - 85.686 km) and Section (ii) Mhaswad - Tembhurni section of NH-548 C (Length - 57.678 km) on EPC Mode NH/MAH/MSRDC/Pune-1/AE/Pkg-37 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
661 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section Ahmednagar- Vasundephata section of NH 160.(L93.800Km) in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Pune-2/AE/Pkg-38 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
662 Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder 4-lane standards of National Highway section (i) Kalamb – Ralegaon – Wadki section of NH-361B (Length - 50.275 km) and Section (ii) Ralegaon- Sirasgaon–Vadner section of NH-361B (Length - 27.199 km) on EPC Mode NH/MAH/MSRDC/Amravati/AE/Pkg-40 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
663 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section section (i)Indapur-Tala –Mandad –Agardanda section of NH-753F ( Length 42.345 km) section (ii) Mangaon –Mhalsa- Dighi Port section of NH-753F (Length - 54.75 km) section (iii) Wakan Pali Khopoli section of NH-548A (Length 40.51 km) On EPC Basis NH/MAH/MSRDC/Konkan-1/AE/Pkg-30 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
664 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section (i) Ahmedpur to Pimpla junction Section of Ahmedpur – Kopra – Kinagaon – Ambejogai – Kaij – Manjarsumbha – Patoda – Jamkhed Road (NH 548D ) (Length - 55.623 km) section (ii) Pimpla junction to Manjarsumbha section of NH-548 D (Length - 81.685 km) section (iii) Manjarsumbha to Chumbhali Phata section of NH-548 D (Length - 32. NH/MAH/MSRDC/Aurangabad-1/AE/Pkg-33 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
665 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section (i) Mantha Taluka border to Partur section of NH 548C Length 51.262 Km section (ii) Partur to Majalgaon section from Km 51.262 to Km 101.740. – NH 548C (Length - 50.478 km) section (iii) Kaij to Kusalamb section of NH 548C Length 60.728 km section (iv)Shirod Shahpur - Basmat section of NH 752-I (Length - 22.43 km) on EP NH/MAH/MSRDC/Aurangabad-2/AE/Pkg-34 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
666 Consultancy Services For Authoritys Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder 4 lane standards of National Highway section (i) Pandhrpur to Sangola section of NH-965C (Length 34.358 km) section (ii) Sangola to Kurudwadi section of NH-965C (Length 48.375 km) section (iii) Mhaswad - Pilov - Pandarpur section of NH-548E (Length - 53.08 km) On EPC Basis NH/MAH/MSRDC/Pune-3/AE/Pkg-39 16/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
667 Consultancy Services For Authoritys Engineer For Supervision of Rehabilitation and Upgradation of Existing km 98750 Design Ch 121500 to Existing Km 83690 design Ch 136500 from Existing km 78050 Design Ch 142500 to Pimpalgaon Baswant existing km 59100 Design Ch 161281 to Two lane with paved shoulders strengthening of Existing km 83690 to Existing Km 78050 of section Pimpalgaon Vani Saputara Road NH953 in the state of Maharashtra Total Length 39421 Km 11/2016-17 Package 4 07/02/2017 24/01/2017 01/05/2017
Time 17:0Hrs
668 Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Guhaghar Road to Chiplun section of NH-166E (Length - 39.83 km) Design Chain age 0/00 to 26/230 & 40/00 to 53/600in the State of Maharashtra under EPC Mode. CE/MUM/PUNE/KOP/2016-17/AE/Pack-1 03/02/2017 24/01/2017 08/05/2017
Time 17:0Hrs
669 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION MORSHI-CHANDURBAZARACHALPUR SECTION OF NH-353K IN THE STATE OF MAHARASHTRA FOR UPGRADATION TWO LANES WITH PAVED SHOULDER/FOUR LANE CONFIGURATION IN THE STATE OF MAHARASHTRA UNDER EPC MODE. EENH⁄AKL⁄RFP⁄AE⁄20 21/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
670 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION UPGRADATION OF ANJANGAON-MP BORDER SECTION OF NH-548C IN THE STATE OF MAHARASHTRA UNDER EPC MODE. EENH⁄AKL⁄RFP⁄AE⁄21 21/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
671 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION JINTUR – PARBHANI SECTION OF NH-752 I IN THE STATE OF MAHARASHTRA UNDER EPC MODE NH/MAH/MSRDC/Aurangabad-3/AE/Pkg--35 22/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
672 Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Mehkar to Ajispur section of NH548 C from km 0.000 (Mehkar) to km 35.836 (Ajispur) (Length 35.836 km) in the State of Maharashtra under EPC Mode NH/MAH/MSRDC/Amravati/ AE/Pkg-41 22/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
673 Consultancy Services For Authority’s Engineer For Supervision ofrehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway sectionDahegaon - Kuhi - Umred section of NH-247 (Length - 41.54 km)in the State of Maharashtra under EPC Mode. RO/MUM/2016-17/AE/Pack-13 17/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
674 Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway section Deori - Amgaon section of NH-543 (Length - 38.2 km) in the State of Maharashtra under EPC Mode RO/MUM/2016-17/AE/Pack-15 18/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
675 Consultancy Services For Authority’s Engineer For Supervision of rehabilitation and up-gradation to 2 lane with paved shoulder / 4 lane standards of National Highway sectionWadi Junction to Asola Junction section of new NH-353-I (Existing km. 9.200 (NH-53, Wadi Junction) to km 39.400 (NH-361, Asola Junction) [Design km.0.000 to km. 39.200] (Excluding overlapping length of 6.8 km from km 17.200 to km 24.000 of Nagpur Mumbai Expressway)Length = 32.40 Kmin the State of Maharashtra under EPC Mode RO/MUM/2016-17/AE/Pack-24 18/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
676 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF REHABILITATION AND UP-GRADATION TO 2 LANE WITH PAVED SHOULDER / 4 LANE STANDARDS OF NATIONAL HIGHWAY SECTION MEHKAR - CHIKHLI SECTION OF NATIONAL HIGHWAY - NH 548C (LENGTH - 39.7 KM) IN THE STATE OF MAHARASHTRA UNDER EPC MODE. EENH⁄AKL⁄RFP⁄AE⁄17 20/03/2017 24/01/2017 01/05/2017
Time 17:0Hrs
677 Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 0.00 to Km. 54.370 (Maharashtra Border to Bidar) section of NH-50 in the state of Karnataka on EPC Mode (Package -I) RW/BNG/Genl/Authority Engineer/Tender/150/2016 23/01/2017 23/01/2017 08/03/2017
Time 11:0Hrs
678 Consultancy Services for Authoritys Engineer for supervision of project of 4 laning of Thalassery Mahe Bypass section of NH 17 from km 170.600 (design chainage km 170.600) to km 188.000 (deisgn chainage km 189.200) in the State of Kerala under NHDP Phase III on EPC mode NHAI/Tech/KL/Thala-Mahe Bypass/NH-17/AE/2016-17/104 21/02/2017 18/01/2017 07/03/2017
Time 11:0Hrs
679 Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and upgradation of Angul-Sambalpur Section of NH 42 in the State of Odisha (km. 112.00 to km. 265.00) under NHDP IV on EPC mode NHAI/NHDP IV/OR/06/2016/AE/2016/001 09/01/2017 09/01/2017 28/02/2017
Time 11:30Hrs
-
680 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER for (i) Construction of 1000m length Viaduct at Rangpo between Km 51.1 0 to Km 53.90 on Sevoke - Gangtok Road NH-10 (Old NH- 31A) in the State of West Bengal/Sikkim. (ii) Construction of upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phase ‘Á’ in the State of Sikkim. (iii) Construction/upgradation of existing roa NHIDCL/AE/Sikkim works-1/2016-2017 03/01/2017 03/01/2017 15/02/2017
Time 15:0Hrs
681 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER OF FOLLOWING PROJECT ON EPC BASIS 1- Widening of existing single lane road to two lane with paved shoulders configuration from Km 235.000 to Km 268.00 of NH-58 including 560m Marine Drive viaduct portion near Byasi in the State of Uttarakhand on EPC Mode 2- Construction of 2-Lane road Tunnel near Dat ki Devi at km. 33/ km. 34 on NH-72A (New No. 307) in the State of Uttarakhand (on EPC mode) 4400/13yata-NH-10/2016 dated 17.12.2016 07/02/2017 03/01/2017 14/03/2017
Time 17:0Hrs
682 RFP for appointment of Authority Engineer for (i) Reconstruction with geometric improvement of existing 2 lane/ intermediate lane to 2lane with paved shoulder configuration from km. 268.00 to 300.00 of NH-58 in the State of Uttarakhand under EPC mode (ii) Reconstruction with geometric improvement of existing 2 lane/ intermediate lane to 2lane with paved shoulder configuration from km. 300 to 338 of NH-58 in the State of Uttarakhand under EPC 4400/13yata-NH-10/2016 dated 17.12.16 01/02/2017 03/01/2017 20/02/2017
Time 17:0Hrs
683 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WORKS FOR REPLACEMENT OF SUPER-STRUCTURE OF EXISTING 5.575 KM LONG 4 LANE MAHATMA GANDHI SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95 IN PATNA IN BIHAR ON EPC MODE RW-NH/34048/2/2016-S&R (B) 29/12/2016 29/12/2016 02/02/2017
Time 17:0Hrs
684 CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF WORKS FOR REPLACEMENT OF SUPER-STRUCTURE OF EXISTING 5.575 KM LONG 4 LANE MAHATMA GANDHI SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95 IN PATNA IN BIHAR ON EPC MODE RW/NH-34048/2//2016-S&R(B) 29/12/2016 29/12/2016 30/01/2017
Time 17:0Hrs
685 Consultancy service for Authority’s Engineer for supervision of Widening to Two/Four Lane with Paved Shoulders from Km. 34.00 to Km. 70.900 (Chittapur cross to Start of Yadgir Bypass) of NH-150 in the state of Karnataka on EPC Mode (Package -I) EE/NHD/KLB/NH-150/Job-828/AE/NIT/2016-17/1010 19/12/2016 19/12/2016 01/02/2017
Time 16:0Hrs
686 Consultancy Services of Authoritys Engineer for supervision of Construction of High Level Bridge across River Sone at Chanchikala including its approaches on Kone Nakatwar Ranidih road in Sonebhadra District of Uttar Pradesh under LWE scheme on EPC Mode. 2907 12 NIVIDA SON CIRCLE16 17 23/02/2017 16/12/2016 21/02/2017
Time 17:0Hrs
687 Consultancy services for Authority’s Engineer for supervision of the works of 1) Construction of ROB and its approaches in lieu of existing Level Crossing Gate No. SK-192/(E)SPL (Rly. Km- 46/0-1) in between Oodlabari - Damdim Stations in Oodlabari at Km. 615.500 of NH-31 in the State of West Bengal on EPC (Engineering Procurement and Construction) mode. Job No. NH-31/WB(19)/15-16-017-S&R(B). 2) Construction of twins 2-lane ROB and its Approaches in lieu of the existing level crossing at km 652. e-RFP No. 22 OF 2016-17 OF SUPERINTEDING ENGINEER, N.H. CIRCLE-III 02/11/2016 08/12/2016 19/12/2016
Time 17:0Hrs
688 Consultancy service for Authority’s Engineer for supervision of Improvements and Re- Construction to Two Lane with Paved Shoulders from Km. 243.200 to 290.200 of NH 234 Huliyar-sira section in the state of Karnataka on EPC mode EE/NHD/TMK/NH-234/Job-815/NIT16/2016-17 06/12/2016 06/12/2016 20/01/2017
Time 16:0Hrs
689 Consultancy service for Authority’s Engineer for supervision of widening to two lane with paved shoulders from km. 125.626 to 155.800 of NH-167 Hagari to Jadacherla section in the state of Karnataka on EPC mode. EE/NHD/CTA/NH-167/Job-814/NIT/2016-17/1060 01/12/2016 01/12/2016 05/01/2017
Time 16:0Hrs
690 check Check 09/11/2016 24/11/2016 23/11/2018
Time 15:0Hrs
-
691 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR PROJECT OF (i) 154 m span Steel Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru on Jiribam-Barak road on NH-53 in Manipur state. NHIDCL/2016 /AE/Manipur/ B-M Bridge 21/11/2016 21/11/2016 13/01/2017
Time 17:0Hrs
692 Consultancy services for Authority’s Engineer for supervision of Upgradation of NH-31C from chainage 182 km (Hasimara) to 228 km (Salsalabari) to 2-lane with paved shoulder configuration in the district of Alipurduar, West Bengal Under Engineering, Procurement & Construction(EPC) Mode (2nd Call). e-RFP No-21 of 2016-17 of SE/NHC-III 28/10/2016 14/11/2016 21/11/2016
Time 17:0Hrs
693 Consultancy services for Authority’s Engineer for supervision of Reconstruction with geometric improvement of existing intermediate lane to 2 lane with paved shoulder configuration from Km 1.957 to Km 28.600 excluding Narendra Nagar bypass (km 13.800 to km 18.550) of NH-94 in the state of Uttarakhand on EPC mode CB/CD/PIU/DDN/RFP-08 11/11/2016 13/11/2016 22/12/2016
Time 17:0Hrs
694 Consultancy services for Authority’s Engineer for supervision of the work Upgradation of NH-31 from chaiage 718.00Km (Birpara) to km 742.50 (Falakata) to 2-lane with paved shoulder configuration in the State of West Bengal under Corridor Approach under EPC mode. (Job-No-031-WB-2016-17/407) e-RFP No-20 of 2016-17 of SE/NHC-III 21/10/2016 09/11/2016 21/11/2016
Time 17:0Hrs
695 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CIVIL CONSTRUCTION WORKS FOR REPLACEMENT OF SUPERSTRUCTURE OF EXISTING 5.575 KM LONG 4 LANE MAHATMA GANDHI SETU OVER GANGA RIVER ON NH-19 FROM KM 212.72 TO KM 218.95 IN PATNA IN BIHAR STATE ON EPC MODE RW/NH-34048/2/2016-S&R(B) 07/11/2016 07/11/2016 25/11/2016
Time 17:0Hrs
696 Consultancy Services for Construction of ROB in lieu of Level crossing A/12/B/2 at Km. 112-113 of NH-15(New NH-54) at Amritsar along with High level Bridge over adjoining UBDC Canal in the state of Punjab 09 05/11/2016 05/11/2016 19/11/2016
Time 13:0Hrs
697 Consultancy Services for Authority’s Engineer for Supervision of “Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypass) of NH-36 & 39 under SARDP-NE in the state of Nagaland on Engineering Procurement and Construction basis. NHIDCL/Nagaland/DB/AE/2016 19/10/2016 19/10/2016 31/01/2017
Time 17:0Hrs
698 Independent Engineer (IE) Services during Operation & Maintenance Period of Four lane Chenani - Nashri section of NH-44 (Old NH-1A) from km. 89.00 to km. 130.00 including 9 km long tunnel (2 lane) with parallel escape tunnel in the state of Jammu & Kashmir J&K/IE/O&M/02 07/10/2016 07/10/2016 30/11/2016
Time 11:0Hrs
699 Consultancy services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-Lane bidirectional Zojila Tunnel with Parallel Escape (Egress) Tunnel excluding approaches on Srinagar-Leh Section connecting NH-1 at km 95.00 and at km 118.00 in the State of Jammu &Kashmir on EPC Basis. 2017/NHIDC/215274/1 03/07/2017 20/07/2016 02/11/2017
Time 15:0Hrs
700 0 0 01/12/2015 04/03/2016 04/03/2016
Time 15:0Hrs
-
©2014 | All right Reserved